Está en la página 1de 1

TUB e Prog.

TUBe Prog. 1
D
D
. PVC 1+79

. PVC +62
··· PLANO EN PLANTA ···

2+300

Ø 4" 6 a 3+

Ø 4" 4 a 1+7
2+3

2+
ESC. 1 : 1000

28
C.P.

20

L=18 590

L=25 96
0
2+
34
0

83.7

8.30
2+
26
0

0 m.
2+200
C.2+

2+240

m.
2+
2+220
PAS NG: 30 m
2+400

2+380

18
V36

LO

0
. 0

ARE
2+

2+1
42

LA
0

1+7
60

2+140

C.V.

1+

20
Nº9

C.P.
1C
74

+7.0V

1+680
2+ 1

1+660
0
2+080
2+100

0
20

.
C.P.
1+

1+
76

1+620
0

40

1+60
1+
78
0
2+06

0
0

1+
PAS NG: 25 m

58
1+

LO

0
PAS NG: 20 m
80

AR
0

LO
ELA

ARE
1+
82

Nº8
2+040 60

LA
0
1+5

Nº7
1+

1+
84
N

5
0

40
2 HID
P. 29
2+020 1+
SIMBOLOGIA

1+
86

.70m
RAN ca
0

52
0
Tubería existente D=6" TUBERÍA EXISTENTE

TES

2 HID
P. 35

TUBe Prog. 0
1+ Quebradas
88

RAN0mca

D
0 0
50

. PVC + 3 0
2+000

.3
1+

TES
Red de RIEGO TUB. PVC CL-6. Ø4" L=772.95 m.

Ø 4" 0 a 1+
1+ De 0+000 a 0+772.95
90
0
0

L=13 624
1+98 Curvas de Nivel 80
1+4

90.2
Hidrantes

1+
HIDRANTE

92
1+9

0 m.
0
1+

60
Parcelas 46

1+940
10 0

Bloques de Riego
ELEV = 2531.208

Puntos de estación 40
1+4

Cauda
BM-1
Cauda

-
PROGR

L= 14.6

l = 1.28
29 2% Desarenador o Sedimentador DES.
l = 0.7

.29
m PERFIL LONGITUDINAL Cámara de Filtros C.F.

l/s
2 l/s

-0.71%
L=45.02 m
RED CHALLA N°2 Cámara de Llaves C.LL.

ESCALA VERTICAL 1:200 Cámara de Distribución


-29 2.74

C.D.
L=
.95 m
1

ESCALA HORIZONTAL 1:1000


%

Cámara Purga de Lodos C.P.

Cámara Ventosa C.V.

PROGRESIVA = 2+157.62
ELEV = 2519.065
PROGRESIVA = 2+040.56
-56. 5 m

ELEV = 2516.668
53%
2.9
L=2

2.54% -5.47
L=32.44 m L=25 %

PROGRESIVA = 1+935.40
.99 m
8%
9.3 48 m

ELEV = 2512.847
-2.33% 9 .
L=62.74 m L=2
0.79%
L=29.15 m
%
45
12. .42 m
4 2
L=

PROGRESIVA = 1+818.48
0.59%
L=39.88 m
-29 8.08
L=

ELEV = 2506.877
.41 m
1

%
.70 m
%

17 6.23
-2.99% 1
L=20.61 L=
m
%
94 m
12. .23
26
L=
0.57%
L=13.97 m

D=4" L=25m Prog. 1+760


D=4" L=25m Prog. 1+735
INICIO PASARELA Nº8
L=4

D=4" L=20m Prog. 1+655

D=4" L=20m Prog. 1+675


-50 00 m

FIN PASARELA Nº8


INICIO PASARELA Nº7
.17%
4.

FIN PASARELA Nº7

m
L= 4.98%
.63
64
3
0.53%
L=15.52 m
26 %
m
L= 0.75
.59

-32 3.19
3

L=
3
.61 m
%

4.41%
-9 L=21.20 m
L=1 .29%
1.00
m

PROGRESIVA

COTA TERRENO

COTA RASANTE

ALTURA DE
CORTE
GEOMETRIA TUBERÍA PVC D=4" De Prog. 0+300 a 1+624 TUBERÍA PVC D=4" De Prog. 1+624 a 1+796 TUBERÍA PVC D=4" De Prog. 1+796 a 3+590
DEL TRAMO L=21.09m
L=9.91m L=14.83m L=16.07m L=14.32m L=17.82m L=11.42m L=19.34m L=12.98m L=13.44m L=9.48m L=11.60m L=18.26m L=12.58m L=12.30m L=13.45m L=41.99m L=6.90mL=9.46m L=17.64m L=91.93m L=13.44m L=25.64m L=12.32m L=9.36m L=15.31m L=19.34m L=21.10m L=10.22m L=15.93m L=15.59m L=21.28m L=17.74m L=19.55m L=15.67m L=18.54m L=9.61m L=11.68m L=7.65m L=15.73m L=17.87m L=10.92m L=13.83mL=8.17m

P R O Y E C T O :CONST. SISTEMA DE RIEGO TECNIFICADO CHALLA CHICO (TOTORA) Departamento: Cochabamba Fecha :
G.A.D. DE COCHABAMBA
Consultora & Constructora
S.D. DE CUENCAS CHULKUNI S.R.L.
Provincia: José Carrasco Cochabamba
12/
PLANO: PLANTA Y PERFIL RED CHALLA N°2 Municipio: Totora
Diciembre 2020
32

También podría gustarte