MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE PROTECCION FRENTE A INUNDACIONES EN LA LOCALIDAD DE TARANCATO DEL DISTRITO DE
PROYECTO
PICHARI - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO
UBICACIÓN TARANCATO - PICHARI - LA CONVENCION - CUSCO
EXCAVACION
PROG. AREA (m2) VOLUMEN (m3)
0+040.00 38.51
0+060.00 39.68 781.87
0+080.00 69.78 1,094.65
0+100.00 51.78 1,215.61
0+120.00 67.25 1,190.28
TOTAL 4,282.41
RELLENO
PROG. AREA (m2) VOLUMEN (m3)
0+040.00 2.17
0+060.00 49.81 519.80
0+080.00 58.44 1,082.49
0+100.00 1.62 600.66
0+120.00 - 16.24
TOTAL 2,219.19
ENROCADO
PROG. AREA (m2) VOLUMEN (m3)
0+040.00 32.76
0+060.00 30.65 634.06
0+080.00 28.82 594.70
0+100.00 29.66 584.76
0+120.00 27.19 568.44
TOTAL 2,381.96
EXCAVACION
PROG. AREA (m2) VOLUMEN (m3) as01 as02 astotal L V
0+120.00 67.25
0+130.00 9.39 383.20
0+140.00 39.80 245.96 16.03 14.76 30.79 10.00 307.9
0+160.00 40.80 806.08 13.87 18.58 32.45 20.00 632.4
0+180.00 41.80 826.08 17.9 23.9 41.8 20.00 742.5
0+200.00 29.55 713.57 17.3 12.26 29.56 20.00 713.6
0+220.00 42.17 717.23 27.5 14.68 42.18 20.00 717.4
0+240.00 54.48 966.50 29.85 24.63 54.48 20.00 966.6
0+260.00 38.72 931.98 17.26 21.45 38.71 20.00 931.9
0+280.00 59.66 983.73 17.29 42.36 59.65 20.00 983.6
0+300.00 32.81 924.63 20.66 12.15 32.81 20.00 924.6
0+320.00 35.97 687.80 16.11 19.86 35.97 20.00 687.8
0+340.00 40.26 762.32 21.02 19.24 40.26 20.00 762.3
0+360.00 26.85 671.12 16.43 10.43 26.86 20.00 671.2
0+380.00 35.77 626.22
0+400.00 40.81 765.76
0+420.00 38.34 791.47
0+440.00 20.22 585.61
0+460.00 17.97 381.90
0+480.00 22.48 404.45
0+500.00 13.88 363.58
0+520.00 18.12 320.02
0+530.00 16.18 219.50
TOTAL 14,078.72
TRAMO II : DETALLE DE METRADOS
RELLENO
AREA AREA DE
AREA DE RELLENO AREA VOLUMEN
PROG. CIMENTACION RELLENO
(m2) EXCAVACION (m2) (m3)
C°A° (m2) TOTAL
0+120.00 - 67.25 - 67.25
0+130.00 3.86 9.39 7.07 6.18 367.14
0+140.00 40.19 39.80 7.33 72.66 394.20
0+160.00 27.67 40.80 7.39 61.09 1,337.49
0+180.00 15.70 41.80 8.10 49.41 1,104.92
0+200.00 30.26 29.55 7.02 52.79 1,021.92
0+220.00 15.18 42.17 8.11 49.24 1,020.27
0+240.00 3.42 54.48 9.27 48.64 978.78
0+260.00 18.84 38.72 7.93 49.63 982.65
0+280.00 8.69 59.66 9.09 59.26 1,088.84
0+300.00 19.63 32.81 7.34 45.09 1,043.47
0+320.00 12.53 35.97 7.59 40.91 859.96
0+340.00 18.71 40.26 7.47 51.50 924.08
0+360.00 24.07 26.85 6.42 44.50 960.05
0+380.00 6.56 35.77 7.67 34.67 791.67
0+400.00 10.57 40.81 8.17 43.21 778.71
0+420.00 32.87 38.34 8.14 63.07 1,062.80
0+440.00 9.16 20.22 4.12 25.25 883.28
0+460.00 17.24 17.97 3.81 31.40 566.52
0+480.00 3.99 22.48 4.19 22.28 536.78
0+500.00 6.81 13.88 3.46 17.23 395.14
0+520.00 3.27 18.12 3.90 17.49 347.21
0+530.00 9.18 16.18 3.79 21.57 249.99
TOTAL 17,695.87
TRAMO II : DETALLE DE METRADOS
CONCRETO
PROG. AREA (m2) VOLUMEN (m3) OBS
0+120.00 10.54
0+130.00 8.91 97.24 MURO INCLINADO
0+130.00 11.81 MURO VERTICAL
0+140.00 10.70 112.55
0+160.00 10.70 214.00
0+180.00 10.70 214.00
0+200.00 10.70 214.00
0+220.00 10.70 214.00
0+240.00 10.70 214.00
0+260.00 10.70 214.00
0+280.00 10.70 214.00
0+300.00 10.70 214.00
0+320.00 10.70 214.00
0+340.00 10.70 214.00
0+360.00 10.70 214.00
0+380.00 10.70 214.00
0+400.00 10.70 214.00
0+420.00 10.70 214.00
0+430.00 11.05 108.74 MURO VERTICAL
0+430.00 9.60 MURO INCLINADO
0+440.00 10.41 100.03
0+460.00 5.35 157.59
0+480.00 5.35 107.00
0+500.00 5.35 107.00
0+520.00 5.35 107.00
0+530.00 5.35 68.48
TOTAL 3,961.63 1,782,731.25
EXCAVACION
PROG. AREA (m2) VOLUMEN (m3)
0+440.00 35.59
0+460.00 34.27 698.54
0+480.00 12.50 467.70
0+500.00 33.00 455.03
0+520.00 7.97 409.66
0+540.00 11.29 192.55
0+560.00 4.48 157.71
0+580.00 21.53 260.08
0+600.00 12.75 342.74
0+620.00 20.40 331.49
0+640.00 41.14 615.43
0+660.00 18.45 595.89
0+680.00 22.46 409.04
0+700.00 19.68 421.39
0+720.00 15.16 348.42
0+740.00 6.81 219.69
0+760.00 3.75 105.57
0+780.00 9.36 131.09
0+800.00 8.74 181.02
0+820.00 6.41 151.51
0+840.00 3.50 99.05
0+860.00 3.81 73.06
0+880.00 9.54 133.47
TOTAL 6,800.13
RELLENO
PROG. AREA (m2) VOLUMEN (m3)
0+440.00 0.74
0+460.00 - 7.44
0+480.00 1.52 15.16
0+500.00 0.72 22.32
0+520.00 6.79 75.10
0+540.00 1.51 83.05
0+560.00 2.38 38.93
0+580.00 0.08 24.61
0+600.00 1.73 18.04
0+620.00 - 17.25
0+640.00 0.08 0.83
TRAMO III : DETALLE DE METRADOS
0+660.00 1.38 14.59
0+680.00 0.44 18.17
0+700.00 0.32 7.62
0+720.00 0.23 5.50
0+740.00 3.96 41.87
0+760.00 2.75 67.11
0+780.00 0.45 32.00
0+800.00 0.78 12.24
0+820.00 0.39 11.69
0+840.00 8.19 85.78
0+860.00 14.75 229.32
0+880.00 5.73 204.74
TOTAL 1,033.36
ENROCADO
PROG. AREA (m2) VOLUMEN (m3)
0+440.00 13.04
0+460.00 13.05 260.95
0+480.00 12.30 253.50
0+500.00 12.36 246.52
0+520.00 12.90 252.53
0+540.00 12.89 257.91
0+560.00 12.12 250.11
0+580.00 12.50 246.21
0+600.00 12.27 247.73
0+620.00 12.68 249.50
0+640.00 13.20 258.77
0+660.00 12.23 254.24
0+680.00 13.06 252.91
0+700.00 12.08 251.45
0+720.00 11.98 240.62
0+740.00 12.44 244.24
0+760.00 11.93 243.69
0+780.00 12.40 243.23
0+800.00 12.96 253.56
0+820.00 12.55 255.12
0+840.00 12.16 247.14
0+860.00 13.17 253.30
0+880.00 14.41 275.77
TOTAL 5,539.00
TRAMO III : DETALLE DE METRADOS
ELIMINACION DE MATERIAL EXCEDENTE
RELLENO TRAMO III 1,033.36
RELLENO FALTANTE TRAMO II 3617.1546
ELIMINACION DE MATERIAL EXCEDENTE 2,149.62
TRAMO IV : DETALLE DE METRADOS
DESCOLMATACION
PROG. AREA (m2) VOLUMEN (m3)
0+880.00 7.63
0+900.00 31.49 391.14
0+920.00 23.89 553.82
0+940.00 6.80 306.95
0+960.00 27.88 346.81
0+980.00 10.48 383.62
1+000.00 2.69 131.70
1+020.00 - 26.87
1+040.00 - -
1+060.00 16.22 162.19
1+080.00 15.09 313.11
1+100.00 13.12 282.16
1+120.00 23.05 361.75
1+140.00 4.89 279.44
1+160.00 - 48.93
1+180.00 13.73 137.28
1+200.00 2.66 163.89
1+220.00 1.49 41.47
1+240.00 5.35 68.37
1+260.00 7.08 124.29
1+280.00 4.97 120.43
1+300.00 4.67 96.32
1+320.00 4.18 88.49
1+340.00 8.53 127.09
1+360.00 4.00 125.24
TOTAL 4,681.36
UÑA DE CIMENTACION Acero longitudinal 1/2" 1.00 5.00 1.00 5.00 - - 5.00 - - -
UÑA DE CIMENTACION Acero transversal 1/2" 1.00 5.00 2.63 13.15 - - 13.15 - - -
BASE - ZAPATA Acero longitudinal 5/8" 1.00 24.00 1.00 24.00 - - - 24.00 - -
BASE - ZAPATA Acero transversal 5/8" 1.00 3.33 7.95 26.50 - - - 26.50 - -
MURO PANTALLA Acero transversal 3/4" 1.00 5.00 11.68 58.41 - - - - 58.41 -
MURO PANTALLA Acero transversal 5/8" 1.00 4.00 8.00 32.00 - - - 32.00 - -
MURO PANTALLA Acero longitudinal 3/8" 1.00 25.00 1.00 25.00 - 25.00 - - - -
MURO PANTALLA Acero longitudinal 1/2" 1.00 25.00 1.00 25.00 - - 25.00 - - -
TRASLAPE Acero transversal 5/8" 1.00 2.67 0.60 1.60 - - - 1.60 - -
TRASLAPE Acero transversal 1/2" 1.00 3.33 0.50 1.67 - - 1.67 - - -
TRASLAPE Acero transversal 3/8" 1.00 2.78 0.40 1.11 - 1.11 - - - -
Peso en kilogramos por metro lineal 0.25 0.58 1.02 1.60 2.26 0.02
Longitud total por diámetro en ml. - 26.11 44.82 84.10 58.41 - Total en Kg.
Total en kilogramos por diámetro - 15.14 45.71 134.56 132.01 - 327.42
UÑA DE CIMENTACION Acero longitudinal 1/2" 1.00 5.00 1.00 5.00 - - 5.00 - - -
UÑA DE CIMENTACION Acero transversal 1/2" 1.00 5.00 2.63 13.15 - - 13.15 - - -
BASE - ZAPATA Acero longitudinal 5/8" 1.00 24.00 1.00 24.00 - - - 24.00 - -
BASE - ZAPATA Acero transversal 5/8" 1.00 3.33 7.95 26.50 - - - 26.50 - -
MURO PANTALLA Acero transversal 3/4" 1.00 5.00 11.68 58.41 - - - - 58.41 -
MURO PANTALLA Acero transversal 5/8" 1.00 4.00 8.00 32.00 - - - 32.00 - -
MURO PANTALLA Acero longitudinal 3/8" 1.00 25.00 1.00 25.00 - 25.00 - - - -
MURO PANTALLA Acero longitudinal 1/2" 1.00 25.00 1.00 25.00 - - 25.00 - - -
TRASLAPE Acero transversal 5/8" 1.00 2.67 0.60 1.60 - - - 1.60 - -
TRASLAPE Acero transversal 1/2" 1.00 3.33 0.50 1.67 - - 1.67 - - -
TRASLAPE Acero transversal 3/8" 1.00 2.78 0.40 1.11 - 1.11 - - - -
Peso en kilogramos por metro lineal 0.25 0.58 1.02 1.60 2.26 0.02
Longitud total por diámetro en ml. - 26.11 44.82 84.10 58.41 - Total en Kg.
Total en kilogramos por diámetro - 15.14 45.71 134.56 132.01 - 327.42
VERTEDERO DE DEMASÍAS
Longitudinal Acero longitudinal 1/2" 6.67 5.00 1.00 33.35 - - 33.35 - - -
Transversal Acero transversal 1/2" 6.67 5.00 1.00 33.35 - - 33.35 - - -
Peso en kilogramos por metro lineal 0.25 0.58 1.02 1.60 2.26 0.02
Longitud total por diámetro en ml. - - 66.70 - - - Total en Kg.
Total en kilogramos por diámetro - - 68.03 - - - 68.03
VERTEDERO DE DEMASÍAS
Longitudinal Acero Vertical 1/2" 2.00 5.00 1.00 10.00 - - 10.00 - - -
Transversal Acero Horizontal 1/2" 2.00 4.00 1.00 8.00 - - 8.00 - - -
Peso en kilogramos por metro lineal 0.25 0.58 1.02 1.60 2.26 0.02
Longitud total por diámetro en ml. - - 18.00 - - - Total en Kg.
Total en kilogramos por diámetro - - 18.36 - - - 18.36