3 0.45
VC-01(0.25 X 0.40) VC-01(0.25 X 0.40)
0.45 3 MURO DE 0.25m. MURO DE 0.15m.
SOBRECIMIENTO
e=0.50m. Ø5/8" @0.20
AMBOS SENTIDOS
NFZ=-1.80m.
NPT +0.15 0.20 0.20 NPT +0.15 CONCRETO
F'c=175Kg/cm2
0.45
1,20 1,20 NPT +0.00 0.15 0.15 NPT +0.00 2,10
SOBRECIMIENTO
1,50 CONCRETO
F'c=175Kg/cm2
4 Ø 5/8"+
VC-01(0.25 X 0.40)
VC-01(0.25 X 0.40)
VC-01(0.25 X 0.40)
2 Ø 1/2"
0.60 0.60
CIMIENTO CORRIDO
VIGA DE
VIGA DE CONEXIÓN
CONEXIÓN 0.40 0.40
1,50
8.00
SOLADO DE Cº POBRE
F'c=100Kg/cm2 e=0.10m.
SOLADO DE Cº POBRE
F'c=100Kg/cm2 e=0.10m.
VIGA 0,40
e=0.50m. Ø5/8" @0.20
AMBOS SENTIDOS
NFZ=-1.80m.
1,50 NFZ=-1.80m.
SOBRECIMIENTO SOBRECIMIENTO
VC-01(0.25 X 0.40)
VC-01(0.25 X 0.40)
CONCRETO CONCRETO
3.75 0.45
0.25 F'c=175Kg/cm2 F'c=175Kg/cm2
0.5 0.5
2.30 4 Ø 5/8"+
1,20 1,20 2.60 0.10
0.05
0.10
0.05 2 Ø 1/2"
2,32
CIMIENTO SOBRECIMIENTO
CONCRETO CONCRETO
e=0.50m. Ø5/8" @0.20 e=0.50m. Ø5/8" @0.20
AMBOS SENTIDOS AMBOS SENTIDOS F'c=175Kg/cm2 F'c=175Kg/cm2
NFZ=-1.80m. NFZ=-1.80m.
+ 40% P.G. + 40% P.G.
1,20 1,20 0.60 0.60
PLANO DE ZAPATAS
A B ESCALA 1: 50
C
14 Ø3/8" @0.10
0,90
NPT -0.90
VIGA DE
CONEXIÓN 0,40 NPT -1.30
4 Ø3/8" @0.10
A B C ZAPATA 01
Ø5/8" @0.20
AMBOS SENTIDOS
0,50
NPT -1.80
4.00 3.75 0,05
SOLADO DE Cº POBRE
F'c=100Kg/cm2 e=0.05m.
CiCONOBRA
CORTE A-A 1,20 CONSTRUCTORES S.A.C.
CONSULTORA, INMOBILIARIA, CONSTRUCCIONES Y OBRAS S.A.C.
S . TIMOTEO SAYRITUPA NU E
UBICACIÓN:
0.45
SECTOR HUARAN S/N
ZAPATA 01 SOLADO DE Cº
F'c=70Kg/cm2, e=0.05m.
SOLADO DE Cº
F'c=70Kg/cm2, e=0.05m.
ZAPATA 02 DISTRITO:
PROVINCIA:
CALCA
CALCA
Ø5/8" @0.20 Ø5/8" @0.20 Ø5/8" @0.20
DEPARTAMENTO: CUSCO
AMBOS SENTIDOS
A AMBOS SENTIDOS
A
AMBOS SENTIDOS
PLANO:
ESTRUCTURAS
2 Ø 5/8"
HEHC
DETALLE ARMADO TIPICO VIGA DE CONEXIÓN VC-01(0.25 x 0.40m.) ESCALA: LAMINA:
INDICADAS
ESCALA: 1/25
FECHA:
CALCA JUNIO DEL 2023
E-01