Está en la página 1de 1
EXPEDIENTE TECNICO DEL PROYECTO DE INSTALACION DEL SERVICIO DE AGUA PARA RIEGO 000283 08S EN LAS COMUNIDADES DE ‘AYUMAQUI, SIJAHUI Y YADQUIRE DEL DISTRITO DE COYLLURQUI, PROVINCIA DE COTABAMBAS, APURIMAC RELACION DE INSUMOS EXPEDIENTE TECNICO INICIAL Paria —] Presupuestado moa [aaa as aoe [Topograto nh (893.7033) 23.00] 20,555.18] 20,555.19] jOperario’ ii 7,640.2885| 17.58] 28,836.27, 28,808 68} [Operario. nn 13,997 .6478| 17.58} 246,078.64 245,927.72) Oficial i 963.6310] 14.26] 73.744.24] 73,748.02] Oficial ian L737 oveal 14.26 107,407.45) 107.549. 16) reco nh 11,364,576 12.85] 146,034.82] 146,011.42] Peon nh '90,364.7320] 72.85] 1.161,186.64) 4,161,149.92| /Alambra Nagra Resociao #16 ig aoe.2605| 00) 9279.27 5.200.06| [Alambre Negro Recocido #8 hg [- 204 oas5| 4.06] 5,158.74 214281] ISLAVOS PARA MADERA CISD fig} 3a a670] 4.08] 1407.20 7.29739 [Giavos para Madera cio | ros area] aa] 5.005097 Sa78T1 [PERNOS HEXAGONALES DEES 1 pea 145.0000] 0.50 22.50 22.50 [PERNOS HEXAGONALES DE 3/4" 372" pea 3.0000 00 450) 4.50 [SLAVOS PARA CALAMINA is 7z.0000| 65 77.00 3170 emo TRE and} 128.0000) 213 zr Fra FIERRO CORR. 3 ACE AREGUPA GED ig 135.2000] 3.80] 50.72 350.72 [Acero Cornugado Fy=4700 Kglen’-Grado 60 fe} sata aol a al Sis aol S579 farena Fina ims 30.3663] —To2.00| 6,156.40 6.14831 Piedra Chancada de 7" as aos 3682] — 0775] 2o,e00-74] 20.851 49 PIEDRA CHANCADA DES" img Z0ss2| 977 700.70 700.68 PIEDRA GRANDE De © im ose40] 42.5 25.25 7525 PIEDRA GRANDE DE im ‘e580! 4250 72:7 77 farena Gruesa ima Te sooit —To2.0of 10321 7503-22 Arona Gruesa ima-[—are.s70o] 102.00] 48.487 83] 48,467.80 Piedra Mediana fna-[209.640] — 42.50] 6.909.853] 3.900-63] PIEDRA GRANDE ims 734-4500] 42.50] 3,580.14 3580.15] PIEDRA CRANCADADE SE" ma} es siz] e775] 25.995 85] —75.568.77 [SRAVA 34 172 PULGADA im 30280] 8775 705.60 735 00 JUNTA WATER STOP 6 PUIG, tira ooool — 14.03 —te.6r9 aot 15 520-02 [Gomonto Porland Tipo 142 SK) BOL 7 as2.s404] 20.40] 150 763.83] 159,795.65 MECHAO GUA fp | 1.934.4026] 0.45 3851 32850 (CORDON DETONANTE in| saba705| ——ow7] aren T7az80 FFULMINANTE fd [-—sase.c0e7]| oat 1,660.63 7565.2] DINAMITA 5% OTEXT ROW fg | sa0.soaa] 77.88] ——To.350-00) —To.s6844 GANASTILLA DES und Fo A] 25.00 45.80 [Ganasilla de PVC Oa ung 7.0000] 10.20 70.20 70:20 EANASTILLA DE 10" und 7.0000] 13300 738.00 733.00 [SANASTILLA DE 10"A™ and 2.0000] 135.0 256.00 768.00 SAASTILLA DEP a6" ane 2.0000] 11270 226.40 225.40 SANASTILLA DE a6 and 0000) —112 70 55350 $6359 EANASTILLA DE T0"A and 3000| a7 195 111585 Tite as] Ginta Tels ne] 1756, 0000] — 1.26] 156208 758206] CORDEL im 343.4758] 007 74.05 2.0] ALVULADE AIRE 1 [DE DOBLE CAWARA) frd_[_ 15.000] Tes 50] 7852.50 Zaz50 RYACVOLA FLOTADORA DE 7 and “0000 27300 32209 323.00 RVALVULA FLOTADORA DE 3 [naa non] a0 aa] 0 oo Zc al WALVULA FLOTADORA DE 3° und Zo0c0] 7,030.30 206060 2060-69 HALVULA FLOTADORA DE Tana 20060] —1.107.7o[ 2,205 40 2:203.40 ACVOLA FLOTADORA DE # and 30000] —1.10%-7a| 305.10 3:305.10 HALVULA FLOTADORA DE 6° and #.0900| 2.635 00] 2,635.00 2.835.00 Fresco 25g Bot} ——tro.coed| 18.00) 1980.17 7980.17 Fves0 Go 25K jor | —sa6.ea2if 18 00) 6,053.15 3.063-16 PEGAMENTO PARA PYG ign [152 sexe] 20-75] 10,708.49] ——To.78234 [eiNta TEFLON ind 20000] 1.02 2.04] 24 fWiNCHA und 4.6552] 70.00 5.87 5.87 FINCH und ‘Dsvis| — 70.00 ait oar ARANDETA DAO X00 TF und 2,0000] 127-50 755.00 7550 A RICLETE S16" 3,250 hg, TUERCAY HURSHUA find | 36,0000! — 9-10 509,60 50580 BONTORA DE DILATACION DE ACERO T™ fand-|_—— 2.0000] 16-75 33.50 sa MONE DE RGERO TIPO BOA 6X 19 DE ALMA DE FIBRA DES im 74.1300[ 7.09 EEE sae

También podría gustarte