Countrywide Home Loans

Production Technologies

Test Plan Template For


Production Fix PCRs
and Enhancements

Project: Name of project

Version #: Revision #
Date: Last update date
Prepared By: Name of person who completed the
template
Table of Revisions
Revision Date Author Notes

9158240.doc 2 of 9 10/17/2008
Table of Contents
1.0Scope................................................................................................................4
2.0Schedule ..........................................................................................................4
3.0Test Types.........................................................................................................5
4.0Environment.....................................................................................................5
5.0Resources ........................................................................................................6
(delete un-needed names)....................................................................................6
6.0 Roles and Responsibilities............................................................................6
QA Analyst.......................................................................................................................................................6
7.0 Tracking and Reporting..................................................................................6
8.0 Group Coordination Plan...............................................................................7
Developers.......................................................................................................................................................7
9.0 Deliverables.....................................................................................................7
10.0 Acceptance & Pass/Fail Criteria..................................................................8
Severity Levels.............................................................................................................................................8
11.0 Security Controls..........................................................................................8
12.0 Status and Reporting....................................................................................9
13.0 Risks & Constraints......................................................................................9
14.0 Assumptions.................................................................................................9
15.0 Approval(s)....................................................................................................9

9158240.doc 3 of 9 10/17/2008
Test Plan Template
Test Plan Objectives

This document outlines the objectives and activities for the Countrywide Quality
Assurance (QA) Testing process. The purpose of this plan is to define the testing
activities required to plan, prepare, and conduct testing.

It is intended for use by the QA Team in understanding and carrying out test activities,
evaluating the quality of test activities, and managing these activities through
successful completion.

Testing will be conducted to verify the following Business Requirements have been
successfully coded and tested in the QA Environment:

PASTE CLUES REQUIREMENT HERE

1.0 Scope
ENTER YOUR TEST STRATEGY STATEMENT HERE
CHART TO ASSIST WITH SCOPING -
CMD CLD WLD FSL
UIS N/A Web CWBC N/A
Edge and
AdvantEdge -
(Streamlined
UR Only) N/A Edge Edge
AdvantEdge
AdvantEdge - - (Prelim
LFXML (Prelim Only) N/A Edge Only)

2.0Schedule
(The underlined should be updated with the Release info you are working on)
Testing for AI Release 05.05.07 is scheduled for QA Testing to begin on 6/10/2005 and to be
completed prior to the anticipated release to the Beta Environment on 7/1/2005:

9158240.doc 4 of 9 10/17/2008
3.0 Test Types
Functional Testing will be executed using AI Test Tool to verify input and output of a CLUES
submission.

Functional testing uncovers what works, how it works, and whether it conforms to the
Specification Document.
Within Functional Testing are the following test subsets executed when applicable:

• Reliability Testing: tests how well code handles failures, data integrity, safety, and
security.

• Scenario Testing: tests a group of data that may individually produce no defects but
collectively may produce a variety of issues.

• Specification-Based Testing: tests that the code adheres to the requirements outlined
in the Specification Document.

• Boundary Testing: tests the maximum and minimum values and any special
exceptions when applied to web site calculations.

• Regression Testing will be conducted on every build introduced into the QA


Environment to ensure existing functionality has not been damaged.
• For a detailed list of test scenarios, please see QII Test Scenarios

4.0 Environment
LIST QA SERVER BEING USED AND ANY ADDITIONAL ENVIRONMENTAL SETTINGS THAT
NEED TO OCCUR

Any Environment Changes Checklist:


Chang
Environment Description
e
Ini file changes:
Database object changes:
Store Procedure changes:
Requires a dedicated server (list the one you are requesting):
Requires a separate build:
Requires late-to-production schedule (give reason & date, & "off" setting or
procedure):
Requires an early Alpha (give reason and date):
BBE Script Update:
.xslt updates (XML Mapper):
Web Site updates:
Mailers (Melissa data):
Logging Server Updates:
Config Server Updates:
Clues Manager Server Updates:

9158240.doc 5 of 9 10/17/2008
5.0Resources
(delete un-needed names)
Brahatha Mohan
Andrew Kennedy
Aziz Jivani
Yen Wong

6.0 Roles and Responsibilities


QA Analyst
• Review Functional and Technical Requirements Documents.
• Schedule Walkthrough Meeting with the System Analyst and the Assigned Developer.
• Develop Test Plan and Test Scenarios.
• Set up QA environment.
• Migrate code to the QA environment.
• Perform Integration testing: execute test scripts.
• Document defects in Viper.
• Perform Retests test scenarios.
• Document test results.
• Confirm exit criteria have been met and provide QA signoff.
QA Manager
• Prepares status reports throughout the test cycle for the VP of QA.
• Reviews test documentation and plans.
• Ensures testing will be completed by the anticipated date and notifies the VP of QA of
any changes which may prevent successful completion of testing.
• Serves as back up for all testing efforts and assists the QA Analyst if needed.

7.0 Tracking and Reporting

 Tracking:
Defect and time tracking will be reported in Viper on the QA Work Order.

 Reporting
Progress and statuses of test activities are reported to the Managers throughout the
critical stages of testing.

9158240.doc 6 of 9 10/17/2008
8.0 Group Coordination Plan
Developers
The Developers are responsible for correcting defects and researching problems that
arise during test sessions. The Developers correct any defects and unit test coding
changes.

Systems Analyst
The Systems Analyst is responsible for providing a PCR Walkthrough answering all
questions regarding the business requirements and will notify QA of any changes to the
Functional or Technical Specification prior to or during the test cycle. The SA will provide
continuing support throughout the test cycle until completion.

9.0 Deliverables
 QII Test Plan
 Test Case Input Files
 Test Case Output Results

9158240.doc 7 of 9 10/17/2008
10.0 Acceptance & Pass/Fail Criteria
Acceptance
The following criteria must be met prior to moving the code to the Beta and
Production Environments:
• All scripts have been executed to completion.
• Analysis of test results indicates that the system meets the requirements set forth in
the Functional Design Document.
• There are no open showstopper defects.
• The Managers have reviewed all outstanding defect reports and agree that none are
serious enough to delay the delivery of software to the client.
Pass/Fail Criteria
A defect is identified by the inability to meet the specifications defined by the
requirements, documented in the approved Product Specification Document. The QA
Analyst records the defects in the Defect Tracking Tool. The Software Development
Team is responsible for analyzing and correcting the defect. Each defect is assigned
a priority that is used by the Development Team to determine the repair order of the
open defects.

Severity Levels
The established severity levels for this project for defect reporting are as
follows:

Showstopper
Testing cannot continue and the execution of the current test cannot proceed
unless this incident is corrected. No effective workaround exists, and if not
corrected the incident would have a significant impact to the testing schedule.
Code will not be moved into Production when a Showstopper cannot be
downgraded to a High Level Defect.

High
Incidents that do not prevent the current test from continuing, but must be
resolved. The current code can be implemented with a work around in place.
Code may be moved into Production with a fix delivered in a future release.

Medium
These incidents identify changes that would provide a benefit, but due to risk
or time constraints, must be made at a later date.

Low
Incidents that do not have any negative impact on the goals of testing or on
production.

11.0 Security Controls


Standard PT security controls will be put in place to ensure the borrower name and SSN has
been changed to test data.

9158240.doc 8 of 9 10/17/2008
12.0 Status and Reporting

QA Analyst
Notify the QA Manager when their test planning is complete.
Notifies the QA Manager if their the test schedule is at risk.
Provides status of testing to the QA Manager or VP of QA at any given time during
the test cycle.
 Notifies the QA manager when completing a work order.
QA Manager
 Notifies the VP of QA when test plans have been reviewed.
 Sends weekly statuses of all QA work orders for a specific Release.

13.0 Risks & Constraints


Risk
Due to the short test cycles allowed during a specific release, any code not delivered and Unit
tested on the anticipated QA start date is at risk of not being fully tested.

Constraints
In the event code is delivered late, the analyst will review the changes being made and identify
the risk of delivering the code with only high level testing. They will notify the QA Manager and the
VP of QA of this risk. If proceeding high level testing will occur and the Analyst will identify any
scenarios that were not tested due to the time constraint.

14.0 Assumptions
It is assumed that any reader of this document will be familiar with standard PT SDLC practices
and the use and management of Viper.

15.0 Approval(s)
15.1 Business Solution Owner & System Owner Acceptance and Sign-Off
Concurrence by both the Business Solution Owner and System Owner that the Test Plan
is accurate.
Business Solution Owner System Owner
Name: Name:

Signature: Signature:

Date: Date: