Está en la página 1de 1

TRAYECTORIA TRAYECTORIA TRAYECTORIA TRAYECTORIA

T6 T4 T5 T6
2

VER TABLA DE B
5 CONDUIT
5

1 3 4
1

RESERVA
2

N.S.D.+1.85
N.S.D.+1.85

90

90

90

90
240

240
N.P.T.+2.55
A

150

150
N.REV N.REV

A
DADO DE

700
CONCRETO ARMADO

VER NOTA 10

900

900
N.REV.+2.40

N.P.T.+2.55

200
N.P.T.+2.70
N.REV.+2.65
N.S.D.+1.85
DADO DE
CORTE B CONCRETO ARMADO 100 120 120 100 100 B A A
N.P.T.+2.70
VER NOTA 10
540
VISTA FRONTAL T4

53
DETALLE 103
SIN ESC. AC0T.mm
NOMENCLATURA

DISTANCIA ENTRE EL CENTRO DEL N.P.T. NIVEL DE PISO TERMINADO

E-1002
MENORES ADYACENTES EN HILERAS O COLUMNAS
(CENTRO A CENTRO EN mm)
BANCO DE DUCTOS N.REV. NIVEL DE REVESTIMIENTO
CONDUIT
(DIAM.) 27 (1) 35 (1-1/4) 41 (1-1/2) 53 (2) 63 (2-1/2) 78 (3) 103 (4) 155 (6) mm
mm N.S.D. NIVEL SUPERIOR DE DUCTO

27 (1) 100 100 100 100 120 120 120 160 100
DETALLE 103
D-BATSANT-L-103
35 (1-1/4) 100 100 100 100 120 120 150 160 100

N.P.T.+2.75
41 (1-1/2) 100 100 100 100 120 120 150 160 100 NOTAS
53 (2) 100 100 100 120 120 120 150 160 100

63 (2-1/2) 100 120 120 120 120 150 150 200 120 GARANTIZANDO LA IMPERMEABILIDAD POR MEDIO DE ADITIVOS INTEGRALES DE CONCRETO, Y COLARSE

78 (3) 120 120 120 120 150 150 160 200 120

103 (4) 120 150 150 150 150 160 180 220 150
N.P.T.+2.70

DE 70 CM.

155 (6) 160 160 160 160 200 200 220 270 150
E-1003

10.- PARA DETALLES DE ARMADO DE BANCO DE DUCTOS VER PLANO D-BATSANT-F-052.


EN BANCO DE DUCTOS
EMERGENCIA Y/O PROCESO EN CASETA DE OPERADORES VER PLANO D-BATSANT-L-104 "ARREGLO DE EQUIPOS
N.P.T.+2.75

PAROS DE EMERGENCIA EN CASETA DE OPERADORES".


N.P.T.
VIALIDAD
ENERFLEX - PETROFAC CONTRATO : SAN - 2015 - 6700000566.

TABLA DE CONDUITS

700
No DE No DE CONDUCTORES TIPO DE
No DE CIRCUITO
540 TRAYECTORIA SERVICIO
I-PIT-102-C , I-TIT-101-C , I-PIT-100-C , I-TIT-100-C 4-PR- 2 X 18 AWG (1032A)
100 120 120 100 100
FUTURO

T4 53 mm ( 2 PULGADAS) P-FQIT-101-C , P-UIT-103-C , P-FQIT-100 , P-UIT-102-C 4-PR- 2 X 18 AWG (9409)


PROCESO
C-TTD-E1002-C , C-FQIT-101-C , C-TTD-E1003-C , FQIT-100-C 4-PR- 2 X 22 AWG (3105A)
N.A.T.+2.40
N.A.T.+2.45

I-SDY-205-C , I-ZSC-205-C , I-ZSO-205-C , I-ZS-205-C


I-SDY-215-C , I-ZSC-215-C , I-ZSO-215-C , I-ZS-215-C 20-C-14 AWG ROJO( 361933)
T5 53 mm ( 2 PULGADAS) I-SDY-200-C , I-ZSC-200-C , I-ZSO-200-C , I-ZS-200-C 20-C-14 AWG NEGRO( 361931) PAROS DE
I-SDY-210-C , I-ZSC-210-C , I-ZSO-210-C , I-ZS-210-C EMERGENCIA

100
I-ES-01-C , I-ES-02-C , I-EY-1002-C , I-EY-1003-C
I-DGC-01-C , I-DGC-02-C , I-DGC-03-C , I-DGC-04-C , I-DF-01-C
I-DF-02-C , I-DF-03-C ,I-DF-04-C 8-TR- 3 X 18 AWG (1036A)
T4 T5 T6 R T6 53 mm ( 2 PULGADAS) GAS Y

200
I-AVV-01-C , I-AVA-01-C , I-AVR-01-C , I-AA-01-C , P-AA-01-C 8-C-14AWG ROJO( 361933) FUEGO
53 53 53 41 I-EMA-01-C , I-EMR-01-C , I-EMP-01-C 8-C-14AWG NEGRO( 361931)

100
LISTA DE MATERIALES
PART UNID MARCA CANT
PLANTA 1 m CROUSE HINDS 6

ESC: 1:100 ACOT: m CORTE A-A 2 PZA --- 78


SIN ESC. ACOT.mm 3 PZA CROUSE HINDS 2
4 m --- 26
5 PZA CROUSE HINDS 3

C.P. FECHA R E V I S I O N E S N U M. DIBUJOS DE REFERENCIA ELABORADO POR:


MCA FECHA POR Vo.Bo. D-BATSANT-L-100 ING.LEOPOLDO MARTINEZ SALAS.
ING. GILBERTO J. MATHEUS P.
As AS-BUILT JUNIO 2018 NUVOIL PETROFAC D-BATSANT-L-104 ARREGLO DE EQUIPOS CASETA DE OPERADORES
D-BATSANT-L-200 ING.JAVIER JIMENEZ RODRIGUEZ.
D-BATSANT-L-201
D-BATSANT-L-202
PARO DE EMERGENCIA Y/O PROCESO
D-BATSANT-P-052 DETALLES DE ARMADO DE BANCO DE DUCTOS

D-BATSANT-L-300 ING. ARMANDO ZAPATA SIERRA. ING. FRANCISCO JAVIER ANDRADE


D-BATSANT-L-301
D-BATSANT-L-302 IND IND DIBUJO ELABORADO EN VILLAHERMOSA, TAB. As

También podría gustarte