Está en la página 1de 1

1 2 3 4 5 6 7 8

MONTANTE - 07
Llega Baja Tub. Des. Ø4"
Vent. Ø2"
C

Sube Tub. Vent. Ø4"

C
Llega Vent. Aux. Vent. Aux. Vent. Aux. Vent. Aux. Vent. Aux. Vent. Aux. Vent. Aux.
Vent. Ø2" % 2" M - 1M - 1 M-2 M-2 M - 3M - 3 M-4 M-4 M-5 M-5 M-6 M-6 M-7 M-7
0.5
S= =
0.5 S Llega Tub. Aux.
% 2" R-2" Vent. Ø3" 2" 2" 2" 2" 2"
S-2" TECHO NPT + 24.96
Llega
Vent. Ø2"
S= 2"
0.5%
2" 2" 2"
0 .5% 2" 3" 3" 4" 3" 4"
3"
S= Llega
3" 4" 2" 3" 3" 2" 2" 3" 2" 2" 3" 3" 2" 3" 4" 2"
Vent. Ø2"
AZOTEA
4" 4" 2" 2" 4" 4" 2"
B

NPT + 22.46

B
(2° NIVEL DUPLEX) R-4" R-3"

Llega VACIO
Vent. Ø2"
2" 2" 3" 3" 2" 2" 2" 2" 2" 2" 2"
4" 2"
3" 3" 3" 3" 4" 3" 3" 4" 3" 4" 2" 2"
MONTANTE - 06 3"
3"
3" 3" 3" 3"
Baja Tub. Des. Ø4" 3" 3" 3" 3" 3"
8º PISO

S=
Sube Tub. Vent. Ø4"

%
(1º NIVEL DUPLEX) 4" 4" 2" 2" 2" 4" 2" NPT + 19.96
MONTANTE - 05

0.5
0.5% Baja Tub. Des. Ø4"

S=
Llega Tub. Aux. Sube Tub. Vent. Ø4" Llega Tub. Aux.
Vent. Ø3" Vent. Ø3"
Falsa 2" 2" 2" 2" 2" 2" 2" 2"
Columna 4" 2"

A6
Llega
A5

S-2" 3" 3" 3" 3" 3" 3" 4" 3" 3" 4" 3" 4" 2" 2"
Llega Tub. Aux. Vent. Ø2" 3" 4"
Vent. Ø3" 2"
S
=
5%

0. R-2"
7º PISO 4" 2" 2" 2" 2" 4" 4" 4" NPT + 17.46
5%
0.

2" Llega 2"


=

Vent. Ø2"
S

S
=0 .5%
S=0
R-2" 2" 2" .5%
3"
VACIO
2" MONTANTE - 04 S-2"
2" 2" 2" 2" 2" 2" 2" 2"
A4

2" Baja Tub. Des. Ø3" 3" 3" 3" 3" 3" 3"
Sube Tub. Vent. Ø3" 4" 2"
3" 4" 3" 4" 4" 2" 2"

5%
3"

S
TECHO

0.
S

0.
=0 4"

=
Llega 2" 5%

5%
0. NTT + 24.96

S
Vent. Ø2" .5% Llega
A2

A3
%
S Vent. Ø2" 0.5

S
S-2" = 6° PISO 4" 2" 2" 2" 2" 4" 4" 4" NPT + 14.86

=
S-2" TECHO S

0.
Baja y Llega Tub. TECHO DE

5%
Des.Ø2" de Agua ASCENSOR NTT + 24.96
Pluvial de techo del Llega
S

Vent. Ø2" % 2" 2" 2" 2" 2" 2" 2" 2"
5%

ascensor 0.5 S= 3"


=

NTT + 26.66 0.5%


S=
0.
0.

(Ver Detalle) 4" 2"


5%
=

2" 3" 3" 4" 3" 4" 4" 2" 2"


A1

3" 4"
% 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3" 3"
0.5
Llega Tub. Vent. Ø3" Llega S = 0.5% S= 2"
R-2" Llega 4" 2" 4" 4" 4"
Falsa 5° PISO 2" 2" 2" NPT + 12.26
de Camara de Bombeo Columna Vent. Ø3" S-2" Vent. Ø2"
Desagüe-2 2"
2"
Llega Tub. Aux. 2" 2" 2" 2" 2" 2" 2" 2"
Vent. Ø3" 3"
Llega Tub. Aux. 4" 2"
5% Vent. Ø3" 3" 3" 4" 3" 4" 4" 2" 2"
0.
S=0

Llega 3" 3" 3" 3" 3"


= 3" 4"
Vent. Ø2" S
Falsa VACIO
.5%

Columna
4" 2" 2" 4" 4" 4"
MONTANTE - 01 4° PISO 2" 2" NPT + 9.66
Baja Tub. Des. Ø4"
Sube Tub. Vent. Ø4"
2" 3" 2" 2" 2" 2" 2" 2" 2"
4" 2"
3" 3" 3" 3" 3" 4" 3" 3" 4" 3" 4" 2" 2"
Llega 3" 4"
Vent. Ø2"

3° PISO 4" 2" 2" 2" 2" 4" 4" 4" NPT + 7.06

A
A

3" 3" 3" 3" 3"


2" 2" 2" 2" 2" 2" 2" 2"
4" 2"
3" 3" 4" 3" 4" 4" 2" 2"
1 2 3 4 5 6 7 7A 8 4"
3" 3" 3" 3" 3" 3" 3"

2° PISO 4" 2" 2" 2" 2" 4" 4" 4" NPT + 4.46

INST. SANITARIAS (Red de Desagüe) 2" 2" 2" 2" 2"

PLANTA : TECHO NPT. +24.96 4" 2"


4" 3" 3" 4" 4"
3"
4" 2" 2"

ESC : 1/50
1° PISO 4" 4" 2" 2" NPT. + 1.50
3" 3"
4" 4" 4" 4" 4" 4" 4" 4" 4" R - 4"

Sube Tub. Vent. Ø 3" de


Techo Ascensor Camara de Bombeo
4" 3"
Niv.+ 22.66 de Desagüe-1
4"
3" 3" 3" 3"
CAJA N° 1
2"Ø .60 x .60
NCT. ± 0.00 SEMI SOTANO 3" NPT. - 1.25
Tuberia de PVC Ø2" Y Ø3" Tuberia de PVC Ø4" .20 NCF. - 0.80
de Ventilación (Montantes) 3"
VA AL COLECTOR CAMARA DE
PUBLICO Ø 6" CUARTO DE BOMBEO
.12 CODO 45° BOMBEO Sube Tub. Vent. Ø3" de 3" 3" DESAGÜE -1
.15 LOSA Camara de Bombeo
2"Ø CISTERNA - 1 CISTERNA - 2
Reserva Consumo 3" 3" de Desagüe - 2
Reserva A.C.I.
Domestico Vol. = 28.90 m3.
Varillas de Refuerzo
.40 .25 .40 FC de 1/4" cada
3 Hiladas .40 .25 .40
Varillas de Refuerzo
FC de 1/4" cada
LEYENDA DESAGUE Vol. = 14.75 m3.

PLANTA 3 Hiladas 2"Ø 1° SOTANO CTO. BOMBAS NPT. - 4.53


PLANTA SIMBOLOGIA DESCRIPCION MATERIAL
Tuberia de PVC Ø2" Y Ø3" 3"
TUBERIA DE DESAGUE PVC 1.50 3"
de Ventilación
Tuberia de PVC Ø4"
(Montantes) II
TUBERIA DE VENTILACION

CODO DE 45° II PLACA


ESQUEMA DE MONTANTES 3" 3"
CAMARA DE
BOMBEO
DESAGÜE -2

"YEE" SIMPLE II
ASCENSOR
Techo
( Red de Desague) Sombrero de
Ventilacion
NTT.+ 24.96 PVC 2"
LOSA
"YEE" DOBLE II

TRAMPA "P" II
2"Ø .20
ESPECIFICACIONES TECNICAS - DESAGÜE .40
"TEE" SUBE II
- LAS TUBERÍAS PARA DESAGÜE Y VENTILACION SERAN DE PVC NTP 399.003 Nivel de Techo
CODO 45° Va Tub. Des.Ø 2"
"TEE" BAJA II 2"Ø CLASE PESADA CON UNIONES SIMPLE PRESION.
de Agua Pluvial
del techo ascensor a - LOS EMPALMES SE HARAN A PRESIÓN USANDO UN PEGAMENTO ESPECIAL PARA
CODO DE 90° SUBE Montante - 05 PVC DE RECONOCIDA CALIDAD.
Varillas de Refuerzo II
(Ver planta techo) - TAPONEAR PROVISIONALMENTE LAS SALIDAS DE DESAGÜE HASTA COLOCAR LOS
FC de 1/4" cada
Varillas de Refuerzo APARATOS SANITARIOS.
3 Hiladas (Tipica) CODO DE 90° BAJA II
.40 .25 .40 FC de 1/4" cada - LOS REGISTROS SERAN DE BRONCE CROMADO CON TAPA ROSCADA HERMETICA.
.40 .25 .40 3 Hiladas (Tipica) - LOS SUMIDEROS SERAN DE BRONCE CROMADO CON REJILLA REMOVIBLE. LA DET. SOMBRERO VENT. T. E.
ELEVACION REGISTRO ROSCADO BRONCE DETALLE DE TUB. DESAGUE Ø2" PENDIENTE DE LOS PISOS Y TECHOS DEBERA ESTAR DIRIGIDA HACIA EL ESC. 1/10
ELEVACION SUMIDERO.
SUMIDERO II
CON MONTANTE DE DESGUE Ø3" DE - LA PENDIENTE EN TUBERIAS DE DESAGUE SERA MINIMO DE I% EN TUBERIAS DE
DETALLE: REFUERZO PARA TUBERIA DETALLE: REFUERZO PARA TUBERIA AGUA PLUVIAL DEL TECHO ASCENSOR
Ø4" Y 1.5% EN TUBERIAS DE Ø3" Y Ø2".
- TODA VENTILACION TERMINARA EN SOMBRERETE A 0.40m SOBRE EL NIVEL DEL
DE Ø2"/Ø3" DE VENTILACION DE Ø4" DE MONTANTES CAJA DE REGISTRO C°S°N°
(MONTANTE -05)
TECHO TERMINAD.
- LAS TUBERIAS DE DESAGUE Y VENTILACION SERAN INSTALADAS ANTES DE
ESC : 1/25 ESC : 1/25 VACIAR EL PISO o LEVANTAR EL MURO.
S/E
PRUEBAS HIDRAULICAS:
- DESPUÉS DE TAPONEAR LAS SALIDAS DE DESAGÜE, SE PROCEDERÁ A LLENAR
DE AGUA LAS TUBERÍAS. ESTAS DEBEN QUEDAR LLENAS SIN QUE EXISTAN FUGAS
DURANTE 24 HORAS.