Está en la página 1de 1

93

CP_INT- 3000 HDPE

N-3000
HDPE D4.658 m
L=14 m/km
BP-93 S=0.92

T-92
CP_IN
DPE
3000 H

00
DN-30
HDPE143.361 m
L= m/km
S=1.26
BP-92
1
T-9 27
_IN
km

20
2

CP H
m/ 1 m 00

DP
3

E
PE
2
1. .5 30

HD
S= L=54 DN-
PC-3D

BP-91
DESVIO A LA DERECHA

2720
HDP
E

T-90
CP_IN
PC-9

000
PELIGRO OBRAS

DN-3 m
PC-3C

HDPE121.499 m
DE

PC-2B
FIN

L= 5 m/k
FIN DE DESVIO

S=1.5
PELIGRO OBRAS

DESVIO A LA IZQUIERDA

BP-90
PC-12
DISMINUIR VELOCIDAD
DISMINUIR
VELOCIDAD

T-89
CP_IN
HDPE
2720

00
DN-30
HDPE145.796 m
L= m/km
S=1.55
A

BP-89
100 mts
DESVÍO

PC-2 DESVIO A 100 mts

T-88
CP_IN
2720
H
DESVÍO

200 mts

DPE
00
PC-2 DESVIO A 200 mts

DN-30
HDPE157.374 m
L= 5 m/km
S=1.5

A
300 mts
BP-88 DESVÍO

PC-2 DESVIO A 300 mts


T-87
CP_IN
DPE
2720 H

00
DN-30

A
HDPE 24.700 m
L=1 5 m/km

DESVÍO

400 mts
S=1.5

PC-2 DESVIO A 400 mts


BP-87

A
500 mts
DESVÍO

PC-2 DESVIO A 500 mts


PLANO:
PROYECTO:
PROYECTISTA:

BP-111
CP_INT-110
-109A 0 3000 HDPE
CP_INTDN-300
3 m BP-110 HDPE DN-3000 CP_INT-111
3000 HDPE
HDPE L=122.445 m
L=18.988 m/km
S=0.94 S=0.923 m/km HDPE DN-3000
BP-109A L=146.167
S=0.917 m
m/km
m
9 300
m/km 0

E INT-

BP-109
.886

HDP CP_
S=0L=12.41DN- 109

3000 HDPE
m
m/km
DN-3000

CP_INT-108
L=107.161
HDPE
S=0.924

BP-105

CP_INT-105
3000 HDPE
HDPE DN-3000
L=157.973 BP-106
m
m

S=0.925 m/km
INT-
m/km 0

04 CP_INT-106 BP-108
.908.908 300 A

HDPCP_

INT-1 000
3000 3000
HDPE 3000
S=0 L=9 E DN- 107

CP_ HDPE HDPE


DN-3000 HDPE
DN-3 m m L=81.473
E .557m/k S=0.921 m BP-107A
HDPL=97916 m/km
NOMENCLATURA

-107 0
S=0. BP-107 CP_INT
DN-300
3m
HDPE
L=10.06
4 m/km
S=0.89

BP-104
T-103
CP_IN 000
3000
DN-3 m
HDPE 486
HDPEL=54.18 m/km
S=0.9
BP-103

T-102
CP_IN 3000000
HDPE DN-3 m
.241
HDPE
L=14618 m/km
S=0.9

02
BP-1

01
INT-1
CP_ 3000
3000
m
DN-
HDPE m
E .594m/k
HDPL=75917
S=0.

01
BP-1
EN LA PROVINCIA DE LIMA Y EL CALLAO”

100
INT- 3000
MORALES DUAREZ, EN LOS DISTRITOS DEL

3000
CP_ m
HDPEDN- 4 m
E 5.55 m/k
HDPL=14 917
S=0.
NORTE, COSTANERO, LA MARINA, ARGENTINA Y
DE CONDUCCION DE AGUAS RESIDUALES EN EL

00
BP-1
DESVIO Y SEÑALIZACION
LA LEGUA, MIRAFLORES, SURQUILLO, SAN ISIDRO,
LINCE, JESÚS MARÍA, PUEBLO LIBRE, SAN MIGUEL,
MAGDALENA DEL MAR, SANTA ANITA Y EL CALLAO
AMBITO DEL AREA DE DRENAJE DEL INTERCEPTOR
”MEJORAMIENTO DE LOS COLECTORES PRIMARIOS

AGUSTINO, CERCADO DE LIMA, BREÑA, CARMEN DE

99
INT- 3000
CP_
HDPE 3000m
DN- 8 m
E 3.59 m/k
HDPL=14 917
S=0.

9
BP-9

98
3000
INT-
HDPE 3000m
CP_ DN- 3 m
E 4.99m/k
HDPL=14917
S=0.

8
BP-9

97
3000
HDPE
INT-
CP_ 3000m
DN- 5 m
E 0.49m/k
HDPL=14917
S=0.

CP_INT-96
3000 HDPE
BP-96
HDPE DN-3000 BP-97
L=57.021 m
S=0.917 m/km
T-95
3000
HDPE
CP_IN 00
DN-30 m
69
HDPEL=73.2 m/km
17
S=0.9

CP_INT-94
3000 HDPE BP-95
FECHA:

BP-94 HDPE DN-3000


L=145.662 m
S=0.917 m/km

CP_INT-93
3000 HDPE

HDPE DN-3000m
ESCALA:

L=144.658
m/km
BP-93 S=0.92

CP_INT-92
3000 HDPE

DN-3000
m
HDPE
L=143.361
m/km
S=1.26
BP-92
1

REVISADO:
REVISADO:
INT-9 2720

CP_
m/kmm

E
HDPE
23 .521 000

HDP
S=1.L=54 DN-3
PC-3D

BP-91
DESVIO A LA DERECHA

2720
HDPE

0
CP_INT-9
PC-9

DN-3000
PELIGRO OBRAS

HDPE 9m
PC-3C
DE

L=121.49
PC-2B
FIN

m/km
FIN DE DESVIO

S=1.55
PELIGRO OBRAS

DESVIO A LA IZQUIERDA

BP-90
PC-12

TOPOGRAFIA:
DISMINUIR VELOCIDAD
DIS M INU IR
V E L O CI DA D

2720
CP_INT-89
HDPE

DN-3000
m
HDPE
L=145.796
m/km
S=1.55
A

BP-89
100 mts
DESVÍO

PC-2 DESVIO A 100 mts

CP_INT-88
HDPE
2720
200 mts
DESVÍO

PC-2 DESVIO A 200 mts

DN-3000
m
HDPE
L=157.374
m/km
S=1.55
A
300 mts
DESVÍO

BP-88
PC-2 DESVIO A 300 mts

CP_INT-87
2720 HDPE

DN-3000
m
HDPE
A

L=124.700
m/km
400 mts
DESVÍO

S=1.55
1/10001/1000
PC-2 DESVIO A 400 mts

BP-87

2720
HDPE
CP_INT-86
A
500 mts
DESVÍO

DN-3000
m
PC-2 DESVIO A 500 mts

HDPE
L=136.414
m/km
S=1.55
BP-86

CP_INT-85
2720 HDPE

HDPE DN-3000m
L=142.941
CP_INT-84
2720 HDPE S=1.55m/km

HDPE DN-3000 BP-85


BP-84 L=144.763 m
CP_INT-83
2720 HDPE
S=1.55 m/km
HDPE DN-3000
L=147.456 m
CP_INT-82
2720 HDPE S=1.55 m/km
BP-82 BP-83
HDPE DN-3000
L=136.199 m
S=1.56 m/km
81
INT-
m

CP_
m/k1 m 0
.542.34 300

HDP
S=1L=6 E DN-

BP-81
2720
HDPE

ÁREA DE TRABAJO.
78
INT-
m
-300
m

CP_
m/k34 0
47.4
.50

HDP
S=3L=1 E DN

2720
HDPE

8
BP-7

76
2720 0
INT-
HDPE 300m
CP_ DN- 18 m
E
46.7 m/k
HDPL=1 .50
S=3
6
BP-7

74

ABERTURA PARA DESVIO


INT-
2720
m

DN-

CP_
m/k m

HDPE
50 6 3000

HDP
L=14E
S=3. 6.68

MAYO 2023
4
BP-7

2720 -72
m/kmm

CP_INT
HDPE
L=147.DN-30
HDPE
S=3.50 123 00

DESCRIPCION
2
BP-7

CONSORCIO SAN MIGUEL


CONSORCIO SAN MIGUEL
CONSORCIO SAN MIGUEL
CONSORCIO SAN MIGUEL
CONSORCIO SAN MIGUEL
2720 0
m/km
DN-3000
HDPE
CP_INT-7
L=144.13
HDPE
S=3.50 1 m

DESVIOS SENTIDO NORTE A SUR


DESVIOS SENTIDO SUR A NORTE
MALLA DE SEGURIDAD DE OBRA.
BP-70

2720
m/km
DN-3000

CP_INT-68
HDPE
L=145.074
S=3.49
HDPE

CONSORCIO SAN MIGUEL


BP-68

EQUIPO DE ESTUDIOS PELIMINARES


2720 HDPE
L=135.034 m
S=3.50 m/km
HDPE DN-3000

PUNTOS DE CONTROL DE BANDERILLERO.

GERENCIA DE PROYECTOS Y OBRAS

CONTRATO:

SEDAPAL

PLANO 1 DE 3
PDS-01
BARRERA TIPO TAMBOR CON DISPOSITIVO LUMINOSO.

SERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE LIMA