Mast Electronic Documents


General Information
Mast utilizes Electronic Document Interchange (EDI) for the transmission and receiving of documents with the vendors. All Mast vendors will be working on 3 standard EDI messages using ANSI X.12 format, standard version 4010: o Purchase order (850) o Advanced ship notice (856) o Invoice (810)

Mast has developed an EDI application using the ecVisions front end and backend technologies. ecVision shall assist Mast vendors in the set up and configuration of their solution in order to exchange EDI documents properly. Questions regarding Mast EDI should be directed to Mast EDI Technical Support team. See Appendix H for contact points. Questions regarding ecVision solution purchase and maintenance plan should be directed to the sales department of ecVision. Questions regarding ecVision software support and training should be directed to the support team of ecVision at Tel: 2117 9251 or email to : Support@ecvision.com

850
Purchase Orders

856
Advanced Ship Notices

810
Invoices
(Note)

Note: please refer to section 1.9

Issued: April 2, 2007

Page 1 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide

1.2

Basic work flow Mast Internal flow


Mast receives CPO from customer and places them into Spirit. Mast merchandisers issue an MPO for the relevant CPO and style with order qty on specific color and sizes. Mast merchandisers will need to perform SKU mapping and transmits the EDI MPO to vendors through ecVision server.

Vendor Internal flow


Vendors receive EDI MPO from Mast through ecVision client download, they can convert the MPO into a packing list form and input carton line details according to actual shipment details. Vendors will print UCC labels for their carton boxes for the shipment subject to customer requirement. Vendors can save the packing list as draft before the day of shipment. The format and usage of packing lists is subject to each customers requirements, see Section 1.5. Vendors will confirm final packing details by updating the draft packing list. When goods are passed to consolidator and no more change is expected, vendors will save the packing list as final version (read-only) and vendors are supposed to send the finalized ASN from ecVision to Mast according to the following timeline: FOB Air 24 hours before goods delivered to forwarder (GAC) FOB Sea within 48 hours after Goods at consolidator (GAC) DDP no more than 72 hours before goods arrive at DC Above is subject to customers requirement. Vendors can logon to the web-based ecVision system and find the final packing list uploaded from their local client. Vendors will convert the final packing list into Vendor commercial invoice for payment processing or Mast commercial invoice if applicable. See Section 1.9.

1.3

Mast Purchase Orders (850)


Vendors will be able to download EDI POs for every 4 hours within a day. (see Appendix A for sample) Vendors can consult their merchandising counter parts at Mast for the latest revision and EDI transmission status of their concerned POs. Mast POs are queued for EDI transmission for every newly issued purchase order and for every new revision of purchase order from the Spirit system.

Issued: April 2, 2007

Page 2 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide On needed basis, Mast merchandisers can manually re-transmit an active purchase order for their vendors.

1.4

Mast Packing Lists


Vendors are required to submit their packing lists to Mast for every shipment. Different customers can have different packing list layouts. (See Appendix B for the A&F and VSS samples) Mast Packing List is available in the ecVision application, namely, the XpressChain software, which allows vendors to convert a Mast PO to a Mast Packing List input screen. There are two options for turning a Packing List from a Mast PO, namely Turn Packing List with Label and Turn Packing List without Label respectively. o Turn Packing List with Label option allows the printing of a packing list and carton labels Turn Packing List with Label option is only allowed if SKU mapping is done by MAST. The MPO indicates in the comments section "SKU CROSS REFERENCE INCOMPLETE" if there is no SKU mapping. o Turn Packing List without Label option should never be used if a customer requires the ASN and bar code label (e.g. ANF and Pac Sun) o Turn Packing List without Label option should only be used if Packing List can be prepared by the vendor via other system authorized by Mast Packing List and Carton Label are not required by using ecVision application There are 2 report options available in ecVision Packing List application, namely SSCC Report and SKU Mapping Report. SSCC Report (See Appendix C for sample) o This SSCC Report, Human-readable ASN, lists all cartons with the customers information, such as CPO#, long SKU, short SKU, color and size codes, and the SSCC #. o Vendors should check this report to ensure that all cartons have SSCC# generated and they are printed on the labels that are applied on the corresponding carton of the shipment.

Issued: April 2, 2007

Page 3 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide o Vendors should generate SSCC number in case any SSCC is found missing. SKU Mapping Report (See Appendix E for sample) o This report lists all the SKU information of the MPO. o Both Masts and customers color / size codes are listed together with the ordered and packed quantity for vendors reference. o Vendors should make use of this report to ensure all the SKU information is properly mapped. o In addition, vendors can make use of the report to check the packed quantities vs the order. o Vendors should contact Mast Merchandising in case they found any doubt with the SKU information. Vendors are subject to chargeback penalties if they did not comply with the Packing List requirements for Mast. This is also subject to each customers chargeback calculation and policy stated in the Vendor Logistics guideline.

Issued: April 2, 2007

Page 4 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide

1.5

Mast UCC Labels


The usage and format of UCC labels is subject to each customers requirements for shipments. (See section 1.6) Mast has utilized the UCC 128 barcode label for carton labeling. (See Appendix D for sample label) Vendors are required to print UCC label according to the EDI requirements of Mast customers. Vendors are subject to chargeback penalties if they failed to apply UCC labels on Mast cartons for customers with EDI requirements. The ecVision application has a built-in technology to print UCC 128 labels for each cartons specified on the Mast packing list record. The format of the Mast UCC label (SSCC#) :

(00) 0 1234567 123 1 99999 C


o (00) application code for UCC 128 labels, 00 means packing labels o 0 stands for carton packing o 1234567 is a 7-digit manufacturer ID assigned by Mast customer o 123 is a 3-digit EDI vendor ID assigned by MAST o 1 is a single-digit designated for a single workstation running EDI in the vendors site, ie. a vendor can set up 1 to 9 workstations. o 99999 is a 5-digit running sequence number assigned by the ecVision application for every carton generated from the packing list. o Note : Barcode # must not duplicate with other cartons nor with other packing lists. It is the factorys responsibility to make sure that the bar code labels are of the best quality possible when the freight leaves origin. Bar codes should print dark without blemishes. Labels should be applied evenly on cartons without creases. When in doubt, reprint and / or re-apply the label(s) accordingly.
Page 5 of 40

Issued: April 2, 2007

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide Regular printer maintenance to the manufacturers specifications is critical. Shipping cartons with un-scanable labels will result in a chargeback. It is the factories responsibility to make sure the bar code numbers printed and applied to cartons match up with the ASN by use of the human readable ASN report. (See Appendix C for sample). Vendors are subject to chargeback penalties if they did not comply with the carton label requirements for Mast. This is also subject to each customers chargeback calculation and policy stated in the Vendor Logistics guideline.

Issued: April 2, 2007

Page 6 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide

1.6

Mast EDI requirements


Content Label Requirement UCC Label SKU needed? Packing template? Lists ? OPTIONAL YES YES YES YES OPTIONAL YES Barcode Label Requirement YES OPTIONAL Mandatory starting from Spring 2008 * OPTIONAL Mandatory starting from August 2007* OPTIONAL OPTIONAL OPTIONAL OPTIONAL Avery Dennison TPM TPM ecVision OPTIONAL OPTIONAL Customer Mast EDI ASN EDI ASN Requirement Requirement YES YES YES NO

Division Group A&F

Victoria's OPTIONAL Secret Stores Victoria's OPTIONAL Secret Direct Limited Stores Express Lerner Lane Bryant Limited Too Torrid Chicos Pacsun Hudson Bay Diesel OPTIONAL OPTIONAL OPTIONAL OPTIONAL N/A N/A N/A N/A N/A N/A

YES

OPTIONAL

YES

YES

NO

YES YES N/A N/A YES YES YES YES N/A YES

OPTIONAL OPTIONAL OPTIONAL OPTIONAL OPTIONAL OPTIONAL OPTIONAL OPTIONAL OPTIONAL OPTIONAL

YES YES YES YES YES YES YES YES YES YES

YES YES YES YES YES YES YES YES YES YES

NO NO NO NO YES YES YES YES NO NO

Note : the usage and format of packing lists is subject to customers vendor logistics guideline. * Vendors will be informed by Mast for the coming new barcode label requirement.

Issued: April 2, 2007

Page 7 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide

1.7

Mast Advanced Ship Notices (856)


ASNs contains the packing list details and the UCC label information (see Appendix C for a sample of human-readable ASN) Each ASN refers to a single shipment of each MPO. Vendors should send EDI ASN to Mast. Vendors will be requested to send the ASN to customer DC by other means, eg emails, according to Mast customers requirements. The ASN should be shown under Sent folder after send. Vendors should check if any outstanding sent ASN pending in outbox without moving to the sent folder. For any outstanding ASN pending in outbox for more than 2 hours after send, vendors should contact Ecvision support for technical assistant. The vendor ASN will be posted to ecVisions online web-based system. Vendors are subject to chargeback penalties if they did not comply with the EDI requirements for Mast. This is also subject to each customers chargeback calculation and policy stated in the Vendor Logistics guideline.

1.8

Packing List Revision

When a vendor needs to revise a Packing List, followings are the various conditions for reference: Packing List has been saved as Final and ASN has not yet been sent o o o o o o Copy the Packing List for amend Revise the Packing List accordingly Re-generate and re-print label(s) whenever is necessary Re-print reports for checking Re-print Packing List Send ASN and continue with the other procedures

ASN has been sent and Invoice has not been generated o o o o o o o o o Logon to ecVision web Search for the submitted Packing List and delete it Inform Mast on the Packing List / ASN for deletion Copy the Packing List for amend Revise the Packing List accordingly Re-generate and re-print label(s) whenever is necessary Re-print reports for checking Re-print Packing List Send ASN and continue with the other procedures
Page 8 of 40

Issued: April 2, 2007

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide

ASN has been sent and Invoice has been generated but not yet sent o o o o o o o o o o Logon to ecVision web Search for the Invoice and delete it Search for the submitted Packing List and delete it Inform Mast on the Packing List / ASN for deletion Copy the Packing List for amend Revise the Packing List accordingly Re-generate and re-print label(s) whenever is necessary Re-print reports for checking Re-print Packing List Send ASN and continue with the other procedures

ASN has been sent and Invoice has been generated and sent o o o o o o o o o o o o Inform Mast on the Packing List / ASN for deletion Inform Mast Finance on the Vendor Commercial Invoice for deletion Copy the Packing List for amend Revise the Packing List accordingly Re-generate and re-print label(s) whenever is necessary Re-print reports for checking Re-print Packing List Send ASN Logon to ecVision web Search for the submitted Invoice and reset it as draft Revise the Invoice and generate the printout Submit to Mast Finance in accordance with section 2.7

Issued: April 2, 2007

Page 9 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide

1.9

Vendor Commercial Invoices (VCI) and Mast Commercial Invoices (MCI)


Vendors should send EDI Vendor Commercial Invoices and Mast commercial invoices (if applicable) to Mast through ecVision platform. (See Appendix F & G for samples) Vendors can log onto the ecVision website to find their uploaded packing lists. Vendors can turn their packing lists into vendor commercial invoices. Vendors can consolidate several packing list into a vendor commercial invoice for a shipment group subject to LLSs MPO consolidation guideline. Vendors who handle commission / export handling costs will need to fill in the cost breakdown items in the invoice detail portion. Vendors are expected to use the Vendor Commercial Invoice / Factory Invoice (if applicable) /Mast Commercial Invoice (if applicable) to clear customs. Factory Invoice is used only if vendors have commission arrangements. Mast Commercial Invoice will be used only for Mast FOB customers. All vendors (both LC and open account payment term) will need to submit the merchandized invoices to Mast through ecVision online system.

Issued: April 2, 2007

Page 10 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide

2.0 Payment process


2.1 Mast will process payment provided that the vendor commercial invoice (VCI) is generated via ecVision platform. 2.2 Open Account Payment Term (wiring) 2.2.1 Open account vendor should submit the following documents to Mast for wiring payment request:a) EDI VCI; and b) Hard copy VCI; and c) Invoice Listing Report (Appendix K) printed from ecVision sorted by Ship Date Range; and d) Other documents (as per Appendix L: VCI Supplementary Guide point 4) Vendors should send EDI VCI to Mast via ecVision platform. For other hard copy document distribution to Mast, please refer to Appendix H for details. 2.2.2 Payment of merchandized order (MPO) for all regions is supported by Mast Finance Account Payable Team in HK (Mast Finance AP). Please refer to Appendix H for contact list. 2.2.3 Any delay of EDI invoice or hard copy document submission and any error will affect the payment process. 2.3 Letter of Credit Payment Term (LC) LC vendor should submit EDI VCI to Mast via ecVision platform. In addition, vendor has to submit the hard copy documents (e.g. hard copy VCI) to advising bank according to the LC clauses for payment purpose. 2.4 VCI Layout The VCI layout is pre-set in ecVision system. In general, each invoice must contain: MPO number Complete commercial invoice description (CID) from purchase order Quantity Unit cost Total line cost Country of origin Gross weight Net weight Net Net weight Mast style number
Issued: April 2, 2007 Page 11 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide CPO number Carton count

2.5 Split shipment For split shipment case, if the invoice represents total shipment of one mpo, please split the quantity for each shipment, i.e. per individual packing list. Separate VCI has to be prepared in according to the actual shipped information per individual packing list. 2.6 VCI supplementary guide please refer to Appendix L 2.7 Exception and Error Handling 2.7.1 Once you have successfully sent out the EDI VCI via ecVision platform, i.e. Status = Sent and EDI VCI is saved in Sentbox, vendor can amend the VCI if require. However, vendor cannot re-submit the revised EDI VCI via ecVision again once the VCI was sent. Instead, vendor have to submit the revised VCI by Open Account System - Electronic Invoice (Appendix M). Please add a remark note to highlight this particular VCI in the Invoice Listing Report for Mast Finance APs reference. If the hard copy VCI has already been sent to Mast Finance AP office before amendment, please inform Mast Finance AP (Appendix H) by email immediately. Please remark the email subject as CANX_EDI_NAME OF VENDOR_VENDOR INV. REF. For example: CANX EDI VendorA INV#1234567 Under the following exceptional situations, vendor can submit VCI via Open Account system Electronic invoice (Appendix M) rather than ecVision platform:a) Amendment to VCI after VCI successfully sent out to Mast (per 2.7.1); or b) For urgent shipment of new vendor who has not yet completed the ecVision system set up or installation. Any discrepancy or error on the documentation or non-compliance will cause delay in payment.

2.7.2 2.7.3

2.7.4

2.7.5

Issued: April 2, 2007

Page 12 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide Appendix A Purchase Order

Issued: April 2, 2007

Page 13 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix B Vendor EDI Processing Guide A&F Packing List Header Page

Issued: April 2, 2007

Page 14 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix B Vendor EDI Processing Guide A&F Packing List Detail contd

Issued: April 2, 2007

Page 15 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix B Vendor EDI Processing Guide A&F Packing List Summary Page

Issued: April 2, 2007

Page 16 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix B Vendor EDI Processing Guide VSS Packing List Header

Issued: April 2, 2007

Page 17 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix B Vendor EDI Processing Guide VSS Packing List Summary Page

Issued: April 2, 2007

Page 18 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix C Vendor EDI Processing Guide Human-readable ASN (SSCC Report)

Issued: April 2, 2007

Page 19 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix D-1 Vendor EDI Processing Guide UCC Label for VSS

Issued: April 2, 2007

Page 20 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix D-2 Vendor EDI Processing Guide UCC Label for A & F

Issued: April 2, 2007

Page 21 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix D-3 Vendor EDI Processing Guide UCC Label for VSD

Issued: April 2, 2007

Page 22 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix E Vendor EDI Processing Guide SKU Mapping Report

Issued: April 2, 2007

Page 23 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide
Appendix F Vendor Commercial Invoice

Issued: April 2, 2007

Page 24 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide Appendix F Vendor Commercial Invoice, contd

Issued: April 2, 2007

Page 25 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide Appendix G-1 Mast Commercial Invoice

Issued: April 2, 2007

Page 26 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide Appendix G-2 Factory Invoice

Issued: April 2, 2007

Page 27 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide Appendix H 1) EDI Technical Support contact: Distribution and Contact List

1st Tier
ecVision Hotline Support (refer to Appendix N) Support@ecvision.com Hotline: 852-2784-6562

2nd Tier
Mast Far East Sam Chui Terence Ching Eric Ho Iris Siu Mast US Joseph Bozzi Cynthia Baking Mast Korea Fred Jung Mast Taiwan Amanda Chang Mast Vietnam Vincent Nguyen Mast Shanghai Norman Yu Mast Sri Lanka Chinthaka Perera Mast India Radhakrishna Sridhar Jbozzi@limitedbrands.com CBaking@limitedbrands.com FJung@limitedbrands.com AChang@limitedbrands.com VNguyen@limitedbrands.com NYu@limitedbrands.com CPerera@limitedbrands.com RadhakrishnaS@limitedbrands.com Schui@limitedbrands.com tching@mast.com eho@mast.com Isiu@limitedbrands.com

Issued: April 2, 2007

Page 28 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide Appendix H 2) Mast Finance Contract: Mast Hong Kong Finance Office a) Open Account (MFE/MNV) Supervisor Associate Distribution and Contact List

Samuel Wong Jenny Ma Koko Chow Ellen Leung

swong@mast.com jema@mast.com kchow@mast.com eleung@mast.com

Manager LC Team Supervisor Associate

Cherry Tse Carmen Wong KoKo Chow Joan Lee

ctse@mast.com ckwong@mast.com kchow@mast.com jlee@mast.com

Manager

b)

Open Account (MII) Supervisor Associate

Rita Szeto Pauline So Pinky Chan Carol Chan Katherine Yeung Emily Yeung Cyrus Chan Iris Cheung

rszeto@mast.com paso@mast.com pchan@mast.com cachan@mast.com kyeung@mast.com eyeung@mast.com cychan@mast.com icheung@mast.com

Manager

Financial Controller

Wenda Leung

weleung@mast.com

Issued: April 2, 2007

Page 29 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix H Mast Regional Office Mast Shanghai Yu Norman Maggie Shen Angel Liu Yvonne Liu Sambhasivan Mahesh Atukorala Shamini Wu Surawati Sung Susana Noh Ellen Kim Kay Atukorala Shamini Ariyaratne Sidath Le Lily Sharon Weizman Maurizio Fausti Silvia Da Pozzo ayu@mast.com mshen@mast.com anliu@mast.com yliu@mast.com msambhasivan@mast.com satukorala@mast.com suwu@mast.com susung@mast.com enoh@mast.com kaykim@mast.com satukorala@mast.com sariyaratne@mast.com lle@mast.com Sweizman@mast.com MFausti@mast.com SDaPozzo@mast.com Vendor EDI Processing Guide Distribution and Contact List

Mast Taiwan

Mast India

Mast Jakarta

Mast Korea

Mast Sri Lanka

Mast Vietnam Mast Israel Mast Italy

Issued: April 2, 2007

Page 30 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix H Vendor EDI Processing Guide Distribution and Contact List

3) For vendor who has open account payment term with Mast, for payment purpose, vendor has to send the Invoice Listing Report, hard copy VCI and other documents (please refer to Appendix L) to Mast as described below: a) Invoice Listing Report (Appendix K) sorted by Ship Date Range can be printed out from ecVision application. b) All the above said documents to be sent to the following email address with email subject as NAME OF VENDOR_EDI_SHIP DATE RANGE. For example: VendorA_EDI_14Mar07-20Mar07 i) Invoices bill to Mast Industries (Far East) Limited (MFE) or Mast Industries N.V. (MNV) for MPO issued by MFE or MNV Mast MFE AP Global email: Mast_Invoice_MFE@mast.com ii) Invoices bill to Mast Industries Inc. (MII) for MPO issued by MII Mast MII AP Global email: Mast_Invoice_MII@mast.com c) For the invoices issue to MFE or MNV, you can send the full set hard copy documents to the following address i) Hong Kong 8/F., Trade Square, 681 Cheung Sha Wan, Kowloon, Hong Kong Attn: MFE Finance AP

ii) Non-Hong Kong Regional office d) The full set hard copy documents should be sent to Mast on a timely basis per below: FOB and FCA terms Within 3 days on / after shipment date; DDP terms Within 3 days on / after goods receive by DC

Payment will be processed on weekly basis and pay in accordance to the payment term.

Issued: April 2, 2007

Page 31 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix I Vendor EDI Processing Guide Inspection Report Sample

Issued: April 2, 2007

Page 32 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix J Vendor EDI Processing Guide Certificate of Compliance Sample

Issued: April 2, 2007

Page 33 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide Appendix K Invoice Listing Report Sample

Issued: April 2, 2007

Page 34 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix L Vendor EDI Processing Guide VCI Supplementary Guide

EDI PO, ASN & Invoicing Preparation and submission of Vendor Commercial Invoice (VCI) for Payment Process 1. Preparation of EDI VCI: A. XpressChain Currently, the packing list and ASN are prepared in XpressChain of ecVision. The XpressChain is an offline system. There is no synchronization between XpressChain and the Invoice module. Vendor has to press Receive to download before preparation of both packing list and ASN. Vendor has to press Send to upload of packing list to Invoice Module before VCI preparation. B. Invoice Module After VCI has been turned from Packing List uploaded from XpressChain, vendor has to review the invoice information which includes unit price, quantities and other invoice descriptions. If there is any discrepancy in the unit price (i.e. unit price per VCI does not matched with unit cost per MPO), a static message of The unit price in invoice detail is different from latest MPO(s) will be shown in header of respective VCI. Vendor has to contact Mast Sourcing Team to follow up immediately. Before pressing the button SEND, the draft VCI will be saved in Inbox with status Draft or Finalized. Watermark of DRAFT will be removed and Invoice Date will be printed after pressing of SEND button in the Invoice folder. Status of EDI VCI after pressing SEND button in the Invoice Module:o Press Send button to send invoice to ecVision server. EDI VCI will stay in ecVision server before submission to Mast. The invoice status is RTS and is stored in folder Outbox. o After submission to Mast, the invoice status is changed to Sent and saved in folder Sentbox. o If the invoice unit price does not match to latest MPO, the invoice will be rejected. The invoice status is Rejected and is saved in Rejectedbox. Vendor can re-send the invoice after revision.

Issued: April 2, 2007

Page 35 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix L C. Vendor EDI Processing Guide VCI Supplementary Guide

D.

If there is any discrepancy in unit price, While it is kept in Outbox with status of RTS, vendor can amend the VCI by pressing EDIT and re-send again. While it is kept in Sentbox with status of Sent, vendor can amend the VCI by pressing EDIT, but re-submit to Mast HK Finance by Open Account System - Electronic Invoicing program (please refer to Appendix M). While it is kept in Rejectedbox with status of rejected, vendor can amend the VCI by pressing EDIT and re-send again. Mast will only accept VCI submitted from ecVision server for ONE time.

2. Special notes in VCI preparation: A. The VCI invoice number (e.g. 0000123F06) in header folder is automatically generated from ecVision system. Vendor has to input Vendors own invoice reference to the field Vendor Invoice Reference. For inquiry, please quote both the VCI invoice number and vendors own invoice number per Vendor Invoice Reference. NetNet weight, Net Weight and Gross Weight are carried forward from Packing List by MPO and are not editable. Manufacturer name and address fields is editable. Cost breakdown field will be applicable for vendor has buying commission and middleman charge arrangement. Information to be inputted in text field Remark in the Header folder, which include: Bank information such as name of bank, address, account number, LC details Shipping marks Name of exporter provide name of responsible employee of the exporter Information to be inputted in text field Breakdown Summary in Detail folder, i.e. by style number, which include: Visa description The maximum number of characters inputted in the field Visa No. is 20. For visa number more than 20 characters, please type the details in the text field If there are multiple country of origins for the same MPO, such as pant with belt, please mark the detailed country of origins separately in the text field Term of Sales please revise the term of sales carried forward from MPO to include name of Port. For example, revise FOB to FOB Hong Kong and so on.

B. C. D. E.

F.

G.

Issued: April 2, 2007

Page 36 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix L Vendor EDI Processing Guide VCI Supplementary Guide

3. MPOs consolidation please follow the SOP and guideline of MPOs consolidation issued by LLS separately. 4. Other documents required for Payment A. Orders issued by Mast Industries Inc. Division PAC Others B. Orders issued by Mast Industries (Far East) Ltd. Division Compliance certificate (Appendix J) n/a Inspection report (Appendix I) n/a 1 set 1 set Inspection report (Appendix I) 1 set n/a

Mast Limited Brands EXP/LTD/HBL/VCS/VCL/VSS/ PNK/PKS/PKD ANF/HOL/ACS/AFK n/a Other Mast Independent Clients n/a Groups orders C.

Orders of Mast Industries N.V. countersigned invoice and Division Compliance certificate (Appendix J) n/a Inspection report (Appendix I) n/a 1 set 1 set

Mast Limited Brands EXP/LTD/HBL/VCS/VCL/VSS/ PNK/PKS/PKD ANF/HOL/ACS/AFK n/a Other Mast Independent Clients n/a Groups orders

For the process of countersign invoice as required by special regional offices of Mast, please contact respective regional office (Appendix H).

Issued: April 2, 2007

Page 37 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide Appendix M Open Account System - Electronic Invoice Supplementary Guide 1. Preparation of electronic invoice text file A) For installation of Open Account System for the preparation of Electronic Invoice Text File, please contact Mast Finance AP associates (Appendix H) for the Installation Guide and User Guide document for installation and reference. B) Vendors can prepare the electronic invoice text file according to the User Guide C) If vendors have several vendor names record with Mast, please ensure each vendor name is correctly selected before input. D) Check correctness of batch total shown in the input screen against the total amount of invoices submission E) For easy identification, please save the electronic invoice text file with your company name and date as the filename. For example, VendorA_13Mar07.txt F) Electronic invoice text file should be sent to Mast via email with the documentation stated per below section 2. a) Invoice to MFE or MNV (for MPO issued by MFE or MNV) o Mast MFE AP Global emails account: Mast_Invoice_MFE@mast.com b) Invoice to MII (for MPO issued by MII) o Mast MII AP Global emails account: Mast_Invoice_MII@mast.com G) Please indicate the invoice batch dollar total in your email H) There is no limit in number of invoice/mpo in the electronic invoice input tool. 2. Hard copy of revised VCI or VCI, other documents (please refer to Appendix L: VCI Supplementary Guide point 4) and the electronic invoice text file (per above section 1 F) should be sent to Mast Finance AP. Please refer to Appendix H for the details of distribution list. 3. Error handling A) If any error is found in the invoice / other documents, regional office / Mast Finance AP will inform vendor for the error. Vendor should remove the rejected invoice item and re-submit the electronic text file by excluding the rejected item. Otherwise, it may cause delay in payment process of the whole batch invoice. B) Vendor has to follow up the rejected item and re-submit the correct hard copy and electronic text file in the next batch for payment processing.

Issued: April 2, 2007

Page 38 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Vendor EDI Processing Guide Appendix N ecVision Customer Services Support Hours

ecVision HK Support Mon to Fri 9am to 6pm; Sat 9am to 1pm HK time Email : support@ecvision.com Phone : +852-2784-6562 ecVision US Support Mon to Fri 9am to 5pm EST Email : ussupport@ecvision.com Phone : +1-732-582-3909 Italy Reseller - Aton Spa Mon to Fri 9am to 6pm Italy time Email : helpdesk@aton.it Phone : +39-0422618576 Turkey Reseller Sertas Mon to Fri 9am to 6pm Turkey time Email : yalcin@sertas.com.tr Phone : +90-232-4625020 Srilanka Reseller Abas Mon to Fri 9am to 5pm; Sat 9am to 1pm LK time Email : abas@sltnet.lk Phone : +94-11-2591898 Korea reseller EI System Mon to Fri 9am to 6pm Seoul time Email : hjkang@eimail.co.kr Phone : +82-2-557-1357 Taiwan reseller Tranz Mon to Fri 9am to 5pm Taipei time Email : support@tranztex.com Phone : +886-2-3322-3470

Issued: April 2, 2007

Page 39 of 40

Mast Industries Inc./ Mast Industries (Far East) Ltd./Mast Industries N.V.
Appendix N Vendor EDI Processing Guide ecVision Customer Services Support Hours

Indonesia reseller DKP Mon to Fri 9am to 5pm; Sat 9am to 1pm Indonesia time Email : sindhu.kalana@sgp-dkp.com Phone : +62-216410730 India reseller - Indus Infoways Mon to Sat 9am to 6:30pm India time Email : blrecvsupport@indusinfoways.com Phone : +91-80-41369785 Singapore reseller Sato Mon to Fri 9am to 4:45pm Singapore time Email: technical@satoasiapacific.com Phone : +65-6273-6455