Está en la página 1de 12

PARCIAL 1

Problema 1

Ÿ Datos:

Ancho tributario: BT ≔ 20 ft

Dimensiones de las vigas: BV ≔ 16 in HV ≔ 24 in

Cargas:

Ÿ Combinaciones de carga:

Columna CD

Ÿ Predimensionamiento:

Inicialmente asumiremos una resistencia del concreto de 4000 psi

ϕPu ≔ 134.4 kip f'c ≔ 4000 psi


ϕPu
BCD ≔ ‾‾‾
2
Ag ≔ ――― = 67.2 in Ag = 8.2 in
0.5 ⋅ f'c

Inicialmente la columna sera de 8.5 in x 8.5 in

BCD ≔ 8.5 in LCD ≔ 8.5 in HCD ≔ 24 ft

Ÿ Analisis de esbeltez
Ÿ Analisis de esbeltez
3
B V ⋅ HV 4
IGviga ≔ ――― = 18432 in
12
4
IViga ≔ 0.35 ⋅ IGviga = 6451.2 in
3
BCD ⋅ LCD 4
IGcolumna ≔ ―――― = 435.01 in
12

4
IColumna ≔ 0.7 ⋅ IGcolumna = 304.5 in

ΨA ≔ 1 Columna empotrada
IColumna
―――
20 ft
ΨB ≔ ――――――――= 0.06
IViga IColumna IColumna
――+ ――― + ―――
30 ft 20 ft 24 ft

KCD ≔ 0.7 + 0.05 ⋅ ⎛⎝ΨA + ΨB⎞⎠ = 0.75

KCD ≔ 0.85 + 0.05 ⋅ ⎛⎝ΨB⎞⎠ = 0.85

KCD ≔ 0.75 El menor de ambos valores

rCD ≔ 0.3 ⋅ BCD = 2.55 in Radio de giro (El codigo ACI 318 En la seccion
10.10.1.2 permite usar el valor aproximado de
0.3 veces la dimension de la columna)

KCD ⋅ HCD
―――= 84.71 84.71 > 40 Columna esbelta: Se deben tomar en
rCD consideracion los efectos de esbeltez

M1CD ≔ 38 kip ⋅ ft

M2CD ≔ 94.4 kip ⋅ ft

M2min ≔ 134.4 kip ⋅ (0.6 in + 0.03 ⋅ 8.5 in) = 9.58 kip ⋅ ft Ecuacion: 10-17 (ACI-318)
-M1CD
Cm ≔ 0.6 + 0.4 ⋅ ――― = 0.44
M2CD

1.2 ⋅ 80 kip
βdns ≔ ―――― = 0.71
134.3 kip

EC ≔ 57000 ⋅ ‾‾‾‾
4000 psi = 3605 ksi
0.4 ⋅ EC ⋅ IGcolumna 2
EI ≔ ――――― = 2540.26 kip ⋅ ft Ecuacion: 10-15 (ACI-318)
1 + βdns
2
π ⋅ EI
PC ≔ ―――― 2
= 77.38 kip
⎛⎝KCD ⋅ HCD⎞⎠
0.4 ⋅ EC ⋅ IGcolumna 2
EI ≔ ――――― = 2540.26 kip ⋅ ft
1 + βdns
2
π ⋅ EI
PC ≔ ―――― 2
= 77.38 kip
⎛⎝KCD ⋅ HCD⎞⎠

La Pu que es de 134.4 kip es mayor que la Pc de Euler, por lo que es


necesario cambiar las dimensionesiones de la columna ya que esta es
demaciado esbelta.

Se usara una columna con un ancho igual a la viga de 16 in en ambas


direcciones
BCD ≔ 16 in LCD ≔ 16 in HCD ≔ 24 ft
3
BCD ⋅ LCD 4
IGcolumna ≔ ―――― = 5461.33 in
12
4
IColumna ≔ 0.7 ⋅ IGcolumna = 3822.93 in

ΨA ≔ 1 Columna empotrada
IColumna
―――
20 ft
ΨB ≔ ――――――――= 0.34
IViga IColumna IColumna
――+ ――― + ―――
30 ft 20 ft 24 ft

KCD ≔ 0.7 + 0.05 ⋅ ⎛⎝ΨA + ΨB⎞⎠ = 0.77

KCD ≔ 0.85 + 0.05 ⋅ ⎛⎝ΨB⎞⎠ = 0.87

KCD ≔ 0.77 El menor de ambos valores

rCD ≔ 0.3 ⋅ BCD = 4.8 in


KCD ⋅ HCD
―――= 46.2 46 > 40 Columna esbelta: Se deben tomar en
rCD consideracion los efectos de esbeltes
1.2 ⋅ 80 kip
βdns ≔ ―――― = 0.71
134.3 kip

EC ≔ 57000 ⋅ ‾‾‾‾
4000 psi = 3605 ksi

0.4 ⋅ EC ⋅ IGcolumna 2
EI ≔ ――――― = 31892.1 kip ⋅ ft
1 + βdns
2
π ⋅ EI
PC ≔ ―――― 2
= 921.68 kip
⎛⎝KCD ⋅ HCD⎞⎠

-M1CD
Cm ≔ 0.6 + 0.4 ⋅ ――― = 0.44
M2CD
-M1CD
Cm ≔ 0.6 + 0.4 ⋅ ――― = 0.44
M2CD

1
δS ≔ ――――― = 1.24
134.4 kip
1 - ――――
0.75 ⋅ PC
Cm
δNS ≔ ――――― = 0.54 δNS ≔ 1
134.4 kip
1 - ――――
0.75 ⋅ PC

Debido a que no se tiene momento debido a cargas laterales el


momento ultimo sera:

MuB ≔ δS ⋅ 38 kip ⋅ ft = 47.17 kip ⋅ ft

MuT ≔ δS ⋅ 94.4 kip ⋅ ft = 117.18 kip ⋅ ft

ϕMu ≔ MuT = 117.18 kip ⋅ ft

Ÿ Diseño del acero de refuerzo


Ÿ Diseño del acero de refuerzo

se usara un recubrimiento de 4 cm
BCD - 8 cm
γ ≔ ―――― = 0.8
BCD
2 ϕPu
ϕPu ≔ 134.4 kip Ag ≔ BCD ⋅ LCD = 256 in Kn ≔ ――― = 0.13
f'c ⋅ Ag
ϕMu ϕPu ⋅ e
e ≔ ―― = 10.46 in Rn ≔ ―――― = 0.09
ϕPu f'c ⋅ Ag ⋅ BCD

2 2
ρ ≔ 0.01 As ≔ ρ ⋅ Ag = 2.56 in As = 16.52 cm

Se usaran barras # 6
As
Cant ≔ ―――― 2
= 5.8 Se usaran 8 barras # 6
2.85 cm
S ≔ 16 in = 40.64 cm
⎛3 ⎞
S ≔ 48 ⋅ ⎜―in⎟ = 45.72 cm
⎝8 ⎠
⎛6 ⎞
S ≔ 16 ⋅ ⎜―in⎟ = 30.48 cm
⎝8 ⎠
S ≔ 30 cm

Estribos # 3 @ 30 cm

Columna DE
Columna DE

Ÿ Predimensionamiento:

Debido a la experiencia del diseño de la columna anterior se usara


directamente las mismas dimensiones, con lo que cambiara
solamente el refuerzo. En el caso del concreto se mantendra de 4000
para hacer valida la asumcion realizada al calcular el factor k, de que
todo estaba hecho del mismo material.
BDE ≔ 16 in LDE ≔ 16 in HDE ≔ 24 ft
3
BDE ⋅ LDE 4
IGcolumna ≔ ―――― = 5461.33 in
12
4
IColumna ≔ 0.7 ⋅ IGcolumna = 3822.93 in

IColumna
―――
24 ft
ΨA ≔ ――――――――= 0.28
IViga IColumna IColumna
――+ ――― + ―――
30 ft 24 ft 20 ft

IColumna
―――
24 ft
ΨB ≔ ―――――= 0.38
IViga IColumna
――+ ―――
25 ft 24 ft

KDE ≔ 0.7 + 0.05 ⋅ ⎛⎝ΨA + ΨB⎞⎠ = 0.73

KDE ≔ 0.85 + 0.05 ⋅ ⎛⎝ΨB⎞⎠ = 0.87

KDE ≔ 0.73 El menor de ambos valores

rDE ≔ 0.3 ⋅ BDE = 4.8 in

KDE ⋅ HDE
―――= 43.8 43.8 > 40 Columna esbelta: Se deben tomar en
rDE consideracion los efectos de esbeltes
1.2 ⋅ 50 kip
βdns ≔ ―――― = 0.73
82.4 kip

EC ≔ 57000 ⋅ ‾‾‾‾
4000 psi = 3605 ksi

0.4 ⋅ EC ⋅ IGcolumna 2
EI ≔ ――――― = 31645.96 kip ⋅ ft
1 + βdns

2
π ⋅ EI
PC ≔ ―――― 2
= 1017.54 kip
⎛⎝KDE ⋅ HDE⎞⎠
2
π ⋅ EI
PC ≔ ―――― 2
= 1017.54 kip
⎛⎝KDE ⋅ HDE⎞⎠

51.2 kip ⋅ ft
Cm ≔ 0.6 + 0.4 ⋅ ――――= 0.9
68.48 kip ⋅ ft

1
δS ≔ ―――― = 1.12
82.4 kip
1 - ―――
0.75 ⋅ PC
Cm
δNS ≔ ―――― = 1.01
82.4 kip
1 - ―――
0.75 ⋅ PC

Debido a que no se tiene momento debido a cargas laterales el


momento ultimo sera:

MuB ≔ δS ⋅ 51.2 kip ⋅ ft = 57.4 kip ⋅ ft

MuT ≔ δS ⋅ 68.48 kip ⋅ ft = 76.77 kip ⋅ ft

ϕMu ≔ MuT = 76.77 kip ⋅ ft

Ÿ Diseño del acero de refuerzo


Ÿ Diseño del acero de refuerzo

se usara un recubrimiento de 4 cm
BDE - 8 cm
γ ≔ ―――― = 0.8
BDE
2 ϕPu
ϕPu ≔ 82.4 kip Ag ≔ BCD ⋅ LCD = 256 in Kn ≔ ――― = 0.08
f'c ⋅ Ag
ϕMu ϕPu ⋅ e
e ≔ ―― = 11.18 in Rn ≔ ―――― = 0.06
ϕPu f'c ⋅ Ag ⋅ BDE

2 2
ρ ≔ 0.01 As ≔ ρ ⋅ Ag = 2.56 in As = 16.52 cm

Se usaran barras # 6
As
Cant ≔ ―――― 2
= 5.8 Se usaran 8 barras # 6
2.85 cm
S ≔ 16 in = 40.64 cm
⎛3 ⎞
S ≔ 48 ⋅ ⎜―in⎟ = 45.72 cm
⎝8 ⎠
⎛6 ⎞
S ≔ 16 ⋅ ⎜―in⎟ = 30.48 cm
⎝8 ⎠
S ≔ 30 cm

Estribos # 3 @ 30 cm

Problema 2
Problema 2

Ÿ Datos:

Ancho tributario: BT ≔ 15 ft

Dimensiones de las vigas: BV ≔ 12 in HV ≔ 18 in

Cargas:

Ÿ Combinaciones de carga:

Ÿ Predimensionamiento:

Inicialmente asumiremos una resistencia del concreto de 4000 psi

ϕPu ≔ 680 kip f'c ≔ 4000 psi


ϕPu
BCD ≔ ‾‾‾
2
Ag ≔ ――― = 340 in Ag = 18.44 in
0.5 ⋅ f'c

Inicialmente la columna sera de 20 in x 20 in

B ≔ 20 in L ≔ 20 in H ≔ 18 ft

Ÿ Analisis de esbeltez
Ÿ Analisis de esbeltez
3
B V ⋅ HV 4
IGviga ≔ ――― = 5832 in
12
4
IViga ≔ 0.35 ⋅ IGviga = 2041.2 in
3
B⋅L 4
IGcolumna ≔ ――= 13333.33 in
12

4
IColumna ≔ 0.7 ⋅ IGcolumna = 9333.33 in

IColumna
―――
18 ft
ΨA ≔ ―――――――――― = 0.32
IViga IViga IColumna IColumna
――+ ――+ ――― + ―――
15 ft 15 ft 18 ft 11.5 ft
IColumna
―――
18 ft
ΨB ≔ ―――――――――― = 0.32
IViga IViga IColumna IColumna
――+ ――+ ――― + ―――
15 ft 15 ft 18 ft 11.5 ft

KCD ≔ 0.7 + 0.05 ⋅ ⎛⎝ΨA + ΨB⎞⎠ = 0.73

KCD ≔ 0.85 + 0.05 ⋅ ⎛⎝ΨB⎞⎠ = 0.87

KCD ≔ 0.73 El menor de ambos valores

rCD ≔ 0.3 ⋅ B = 6 in Radio de giro (El codigo ACI 318 En la seccion


10.10.1.2 permite usar el valor aproximado de
0.3 veces la dimension de la columna)

KCD ⋅ HCD
―――= 35.04 35.04 < 40 No es necesario considerar los efectos de
rCD esbeltez en las columnas.

ϕMu ≔ 248 kip ⋅ ft

Ÿ Diseño del acero de refuerzo


Ÿ Diseño del acero de refuerzo

se usara un recubrimiento de 4 cm
B - 8 cm
γ ≔ ―――= 0.84
B
2 ϕPu
ϕPu = 680 kip Ag ≔ B ⋅ L = 400 in Kn ≔ ――― = 0.43
f'c ⋅ Ag
ϕMu ϕPu ⋅ e
e ≔ ―― = 4.38 in Rn ≔ ―――― = 0.1
ϕPu f'c ⋅ Ag ⋅ BCD

ρ ≔ 0.01
ρ ≔ 0.01
2 2
ρ ≔ 0.01 As ≔ ρ ⋅ Ag = 4 in As = 25.81 cm

Se usaran barras # 7
As
Cant ≔ ―――― 2
= 6.65 Se usaran 8 barras # 7
3.88 cm
Para espaciado de barras mayores a
15 cm el codigo ACI pide que las
barras sean amarradas con ganchos.

S ≔ 20 in = 50.8 cm
⎛3 ⎞
S ≔ 48 ⋅ ⎜―in⎟ = 45.72 cm
⎝8 ⎠
⎛7 ⎞
S ≔ 16 ⋅ ⎜―in⎟ = 35.56 cm
⎝8 ⎠
S ≔ 30 cm

Estribos # 3 @ 30 cm

También podría gustarte