ESTIMACION AL DIA 04/09/2023 ACUMULADO A LA FECHA POR EJERCER

ITEMS UNIT MATERIAL COST LABOR COST EXPENSES TOTAL TOTAL


Q'TY
U/P AMOUNT U/P AMOUNT U/P AMOUNT U/P AMOUNT U/P AMOUNT

MUROS BAJOS FUERA DE NAVE

COLOCACION DE MURO DE TABLARROCA A


UNA CARA CON POSTES A CADA 41 CM,
COLOCACION DE PLÁSTICO PARA RECIBIR M2 236.27 - - 226.20 27.14 6,413.31 253.34 59,857.59 254.81 64,554.58 254.81 64,554.58 - 18.54 - 4,697.00
FIBRA, COLOCACION DE FIBRA Y REDIMIX
NIVEL 3 EN JUNTAS Y PIJAS

COLOCACION DE MURO DE TABLARROCA A


DOS CARAS CON POSTES A CADA 41 CM,
COLOCACION DE PLÁSTICO PARA RECIBIR M2 163.44 267.60 32.11 5,248.39 299.71 48,984.93 155.98 46,749.08 155.98 46,749.08 7.46 2,235.85
FIBRA, COLOCACION DE FIBRA Y REDIMIX
NIVEL 3 EN JUNTAS Y PIJAS

SUBTOTAL 108,842.52 SUBTOTAL 111,303.66 111,303.66 - 2,461.15

IVA 17,414.80 AMORTIZACION -

TOTAL 126,257.32 TOTAL 111,303.66

IVA 17,808.59

TOTAL 129,112.25

AMORTIZACION DE ANTICIPO
PORCENTAJE 0.00%
ANTICIPO -

SANLDO ANTERIOR -

ESTA ESTIMACION -

ACUMULADO AMORTIZADO -

POR AMORTIZAR -

1 / 19
GENERADOR ESTIMACIO

2 PROYECTO: COLOCACION DE MU
UBICACIÓN: JUAREZ, N
CONTRATISTA: OLGA ME
9/4/2023 SUPERVISOR: ING.

CONCEPTO LARGO ANCHO ALTO DIAM

COLOCACION DE MURO DE
TABLARROCA A DOS CARAS CON
POSTES A CADA 41 CM, COLOCACION DE
PLÁSTICO PARA RECIBIR FIBRA, 7.09 4.400
COLOCACION DE FIBRA Y REDIMIX
NIVEL 3 EN JUNTAS Y PIJAS

COLOCACION DE MURO DE
TABLARROCA A UNA CARA CON POSTES
A CADA 41 CM, COLOCACION DE
PLÁSTICO PARA RECIBIR FIBRA, 3.78 3.2
COLOCACION DE FIBRA Y REDIMIX
NIVEL 3 EN JUNTAS Y PIJAS

7.2 3.2
9.51 3.2
27.52 3.2
11.13 3.2
10.3 3.2
2.2
7.01
0.2
4.4
GENERADOR ESTIMACION DE OBRA

COLOCACION DE MUROS DE TABLARROCA ESTIMACION N°:


JUAREZ, NUEVO LON. NORMAL:
OLGA MEJIA PUENTE EXCEDENTE:
ING. JOSUE EXTEMPORANEO:

PIEZAS REFERENCIA DEDUCIBLE CANTIDAD U

LOCKERS,QUIMICOS,C
OMPRESORES,
BODEGA
5 MANTENIMIENTO Y 155.98 m2
OFICINA
MANTENIMIENTO

TOTAL MURO 2
155.98 CARAS

LOCKERS HOMBRES 12.10

LOCKERS MUJERES 23.04


COCINA 30.43
COMEDOR 88.06
OFIC MANTENIMIENTO 35.62
BAÑOS 32.96
2 ARRIBA DE MURO DE
BLOCK 30.84
2 AL COSTADO DE
MURO DE BLOCK 1.76
TOTAL M2 DE
254.81 MURO A 1 CARA
TOTAL ESTUCO 221.55 m2
1
0
0
0

OBSERVACIONES

FUERON 5 MUROS DIVISORIOS


FORMULARIO DE E

HOJAS: PROYECTO: COLOCAC


N° DE CONTRATO: 0 UBICACIÓN:
FECHA: 4-Sep-23 CONTRATISTA:
N.P.T. PERIODO: SUPERVISOR:
+410.45

Calle de servicio
2 9.5210

CROQUIS GENERAL DE
40.0690
4 2.4290

0.0760
0.5493
1.3294 2.5000 2.1706 1.3294 2.5000 2.1706 2.5000 2.9507 2.5000 0.8480 2.500

0.8017
0.0000 6.9000 2.7697 6.0000
3.0507 3.0507
8.0000

8.4585
50HP
X-FO RMER
1.9000

15HP
MDB-1
1000kVA PFC
7.9750
Cuarto de Químicos y
Cuarto Eléctrico

D R YER
1.2500

20HP
6.8110
10.6487 6.2763 Pegamento
Cuarto de Compresor

D R YER
Wall Open W
FUTURE Shutter door
AIR T /K
20HP 7 00 X 1800

2.9933
0.1500

N.P.T= 410.85
3
0.5500 4.0000
73
1.1227 2.83 0.90 0.47 0.1000 0.89 0.4
1.80 0.2500 2.00 0.4836 2.20 0.7565 1.70 2.00 2.30 0.30 2.99 2.71
0.5000
0.2356
4.0800 7.7000 1.8000
1.7000 2.0000 1.5000 1.0098 1.5000 2.2500 1.7500 2.5000 1.7500 1.7500 2.5000
. Wall Open W2.0 x H2.2 DOOR(H-02) Wall Open
0.6476

0.6476

4.4983 7.7000 0.4836

W1.0 x H0.45 Ø6" for Air Pipe


2.2799 for Cable tray
0.7799
2.3000
#3 2.2500
H=FL+3.3
0.9513

H=FL+3.1 9.4820
1.2500
6.7021
Lockers Mujeres

6.0000
Catering
2.4649

W1.6 x H2.2 door(H-05)


1.0017 1.0170
#7
3.3559

N.P.T= 410.95
Lockers Hombres

1.0000

Cocina

1.50
6.7984
6.8110

9.5823
1.0000
4.7891

4.1812
3.3051

0.8031

Vending

3.38
2.5459
1.8153

Muro de tablaroca
h=2.20 m 3.2799 5.1021

0.0000 0.0000

4.20 1.10 0.70 2.10 1.80 2.10

W1.1 x H2.2 door(H-07)


#16
FORMULARIO DE ESTIMACION CROQUIS

COLOCACION DE MUROS DE TABLARROCA ESTIMACION N°:


JUAREZ, NUEVO LON. NORMAL:
OLGA MEJIA PUENTE EXCEDENTE:
ING. JOSUE EXTEMPORANEO:

CROQUIS GENERAL DE UBICACIÓN


Pendiente 0.9%
40.0690
4 2.4290

0.0760 0.0760 0.0000

07 2.5000 0.8480 2.5000 2.8456 2.5000 0.6544 2.8500 3.1500 2.8436 2.5000 0.6564

6.0000

8.0000

9.4580

7.5000

3.3305

Cisternas y bombas
7.9750 7.7000
Cuarto de Químicos y Bodega de Office of
Pegamento Mantenimiento Production
Wall Open W3.0 x H3.5
Shutter door (H-10)

3.3300
9.6330
2.9933
2.9000 1.7790 1.3210

0.5446
2.30 0.30 2.99 2.71 3.10 2.00 0.90 2.90 1.78 1.32 0.9697
2.5000 1.7500 1.7500 2.5000 1.7500 1.7500 2.5000 1.7500 1.7500 2.5000 1.7500 2.5000 2.5000 1.0000 2.5000 2.5000 1.0000
Wall Open
Ø6" for Air Pipe
H=FL+3.3 5.8716

Micro Wave(12ea) 4.4197

.2 door(H-05) CAFETERIA
WC Hombres

WC Mujeres
(240 personas)
4.5948

4.5948

4.5948

4.5948

27.5183
Catering Table

7.0110
6.8103

6.8105
2.6447 2.6447
0.9917

0.9907

1.7766 3.2269
2.2161

Sink
2.0232

0.6096
5.0893
1.1016
1.0000

0.9144
1.9446 2.0000 1.1447
1.8750

3.2269

0.22 2.00 3.78 0.97


0.30 1.80 3.90 2.65 1.77 1.58
1.80 2.10

W1.1 x H2.2 door(H-07) #17


1
0
0
0

0.9697
5000 2.5000 1.0000

5.8716
WC Mujeres
4.5948

4.5948

7.0110
6.8105

2.6447
0.9907

3.2269
Sink

0.6096
1.1016
1.0000

0.9144

2.0000 1.1447

3.2269

2.00 3.78 0.97

H-07) #17
ESTIMACIO

HOJAS: PROYECTO: COLOCA


N° DE CONTRATO: UBICACIÓN:
FECHA: 4-Sep-23 CONTRATISTA:
PERIODO: SUPERVISOR:

MEMORÍA FOTO
ESTIMACION FOTOGRAFICO

COLOCACION DE MUROS DE TABLARROCA ESTIMACION N°:


JUAREZ, NUEVO LON. NORMAL:
OLGA MEJIA PUENTE EXCEDENTE:
ING. JOSUE EXTEMPORANEO:

MEMORÍA FOTOGRAFICA