2.-Producción - Jun22 - RDA Rev.0
2.-Producción - Jun22 - RDA Rev.0
7%
COMPARACIÓN PRODUCCIÓN VS COSTO PLANIFICADO COMPARACIÓN PRODUCCIÓN VS COSTO REA
79.38% 385,799,599 7.81% 37,956,983 7.22% 35,096,869 -1.13% -5,508,908 86.87% 422,181,670 13.13% 63,822,570 -0.26%
84.65% 151,508,569 8.35% 14,939,632 9.74% 17,436,518 -2.95% -5,284,473 97.19% 173,952,792 10.80% 19,331,898 -2.80%
76.63% 40,658,506 4.53% 2,403,666 13.75% 7,294,813 3.19% 1,693,252 86.45% 45,866,357 18.93% 10,044,250 3.93%
68.26% 35,033,509 10.75% 5,518,660 23.30% 11,956,116 1.49% 763,603 85.78% 44,027,382 31.37% 16,099,182 5.77%
34.49% 12,449,587 2.90% 1,046,804 58.22% 21,014,026 7.04% 2,542,865 90.40% 32,629,613 33.23% 11,993,370 2.31%
101.33% 91,419,034 7.74% 6,984,679 -37.94% -34,228,404 0.63% 570,712 68.45% 61,755,520 3.52% 3,175,440 -5.06%
0.24% 15,058 0.24% 15,058 0.03% 2,016 0.03% 2,016 64.78% 4,098,832 41.91% 2,651,854 -64.51%
78.18% 54,715,336 10.07% 7,048,484 16.61% 11,621,784 -8.28% -5,796,883 85.52% 59,851,174 0.75% 526,576 9.27%
51.31% 2,311,821,386 13.64% 614,604,607 -16.95% -763,677,576 -6.41% -288,823,017 25.01% 1,126,864,075 3.14% 141,541,155 9.35%
58.77% 70,035,112 9.57% 11,405,166 -29.91% -35,636,416 -1.91% -2,280,694 28.40% 33,846,075 3.30% 3,931,372 0.46%
40.86% 65,153,956 8.48% 13,521,212 -25.84% -41,212,321 -8.45% -13,480,405 37.10% 59,166,328 7.64% 12,179,567 -22.09%
68.53% 13,748,782 21.91% 4,395,038 -18.25% -3,661,335 -21.91% -4,395,038 44.25% 8,877,865 0.00% 0 6.03%
83.97% 357,930,353 14.73% 62,806,774 -55.34% -235,902,746 -11.62% -49,513,748 31.48% 134,167,679 10.33% 44,014,603 -2.85%
32.13% 41,954,192 9.27% 12,106,154 -29.32% -38,275,387 -9.27% -12,106,154 0.35% 457,455 0.20% 267,010 2.47%
84.26% 35,265,617 30.95% 12,955,102 -44.15% -18,478,742 -6.94% -2,902,950 22.49% 9,414,172 0.62% 260,908 17.62%
11.62% 856,604 5.17% 381,395 88.38% 6,517,491 -5.17% -381,395 73.43% 5,414,684 0.00% 0 26.57%
23.70% 3,637,818 6.69% 1,027,383 76.30% 11,710,834 -6.69% -1,027,383 78.81% 12,096,631 0.00% 0 21.19%
35.20% 21,086,281 30.34% 18,172,049 47.29% 28,328,067 -16.59% -9,937,842 24.89% 14,910,306 0.27% 164,000 57.60%
93.61% 62,977,593 11.64% 7,831,791 -2.78% -1,873,503 -5.52% -3,717,055 53.07% 35,704,592 10.72% 7,210,751 37.75%
50.27% 208,160,006 20.71% 85,760,852 19.55% 80,944,173 -15.13% -62,664,405 45.99% 190,407,962 5.14% 21,302,029 23.84%
83.21% 324,953,539 25.94% 101,288,338 2.31% 9,028,518 -1.57% -6,148,923 35.93% 140,317,396 1.97% 7,710,435 49.59%
10.30% 7,342,744 4.19% 2,985,258 0.93% 665,152 3.42% 2,436,854 5.37% 3,830,702 1.51% 1,073,998 5.86%
52.54% 80,246,527 24.96% 38,122,620 21.68% 33,117,349 -17.35% -26,494,952 59.49% 90,852,284 0.00% 0 14.74%
0.09% 22,336 0.09% 22,336 -0.09% -22,336 -0.09% -22,336 0.00% 0 0.00% 0 0.00%
0.12% 22,336 0.12% 22,336 -0.12% -22,336 -0.12% -22,336 0.00% 0 0.00% 0 0.00%
0.05% 11,225 0.05% 11,225 -0.05% -11,225 -0.05% -11,225 23.72% 5,855,113 0.00% 0 -23.72%
3.11% 1,001,981 3.11% 1,001,981 -3.11% -1,001,981 -3.11% -1,001,981 0.01% 2,153 0.00% 0 -0.01%
42.87% 90,625,202 9.09% 19,215,418 -40.17% -84,926,602 -7.04% -14,885,818 8.06% 17,041,497 1.28% 2,705,531 -5.37%
51.09% 71,587,108 16.60% 23,259,222 -28.03% -39,266,222 -16.58% -23,224,819 93.68% 131,254,555 11.56% 16,195,621 -70.61%
78.67% 19,802,047 13.13% 3,305,688 -78.67% -19,802,047 -13.13% -3,305,688 17.15% 4,316,577 0.17% 42,169 -17.15%
42.50% 116,986,442 13.50% 37,152,864 -39.71% -109,300,133 -11.14% -30,658,464 1.52% 4,173,494 0.84% 2,315,572 1.28%
45.02% 99,466,237 10.44% 23,072,911 -23.94% -52,898,448 3.68% 8,120,980 14.98% 33,103,452 0.19% 424,618 6.09%
28.17% 73,525,156 5.52% 14,403,318 -2.73% -7,113,776 0.28% 720,666 9.05% 23,608,740 1.45% 3,775,143 16.40%
24.81% 70,980,457 10.47% 29,948,401 9.98% 28,557,817 -8.07% -23,086,785 21.07% 60,268,382 2.88% 8,237,379 13.73%
25.21% 27,477,976 7.16% 7,802,704 -19.58% -21,338,820 -5.74% -6,257,623 7.05% 7,687,157 0.54% 587,530 -1.42%
31.92% 7,188,232 10.34% 2,328,627 -19.42% -4,373,183 0.56% 126,376 208.18% 46,875,689 1.35% 302,891 -195.68%
55.00% 17,616,584 9.96% 3,190,477 -52.76% -16,898,110 -9.96% -3,190,477 2.50% 802,011 2.43% 779,049 -0.26%
72.47% 169,690,452 14.41% 33,751,149 -41.30% -96,706,988 -6.21% -14,531,156 17.50% 40,984,597 0.90% 2,099,852 13.66%
31.42% 20,001,599 11.27% 7,173,524 39.38% 25,070,737 1.49% 946,448 6.75% 4,299,941 0.91% 577,595 64.04%
46.37% 90,704,007 11.65% 22,794,644 -30.71% -60,067,554 -1.87% -3,653,269 0.57% 1,105,167 0.43% 831,789 15.10%
32.67% 53,540,942 8.17% 13,388,650 -6.79% -11,127,014 10.82% 17,728,580 3.67% 6,021,417 2.78% 4,551,743 22.21%
67.71% 2,179,517,081 7.92% 255,078,489 -14.17% -455,982,460 9.45% 304,053,620 44.36% 1,427,714,828 6.72% 216,402,354 9.19%
24.05% 18,380,706 4.63% 3,535,530 0.14% 103,236 -3.69% -2,820,306 23.96% 18,313,019 7.82% 5,973,863 0.22%
57.10% 45,273,615 7.40% 5,863,371 33.20% 26,320,844 22.62% 17,935,826 70.80% 56,138,401 6.35% 5,034,600 19.49%
30.40% 23,585,636 12.82% 9,950,044 33.09% 25,675,419 -3.19% -2,474,395 24.62% 19,103,348 6.19% 4,805,654 38.87%
30.67% 5,886,509 7.35% 1,410,426 64.98% 12,471,277 10.70% 2,053,448 109.91% 21,094,028 26.24% 5,035,515 -14.26%
59.30% 288,334,755 6.48% 31,498,511 -6.46% -31,424,421 -2.02% -9,799,442 41.04% 199,530,743 16.78% 81,585,388 11.80%
55.35% 164,830,435 15.44% 45,989,071 -51.07% -152,083,653 -12.25% -36,476,980 0.99% 2,947,166 0.50% 1,489,494 3.29%
21.62% 40,249,907 4.37% 8,134,164 -19.52% -36,340,201 -3.97% -7,393,691 1.87% 3,485,064 0.31% 582,993 0.23%
100.00% 659,523,820 0.31% 2,065,983 -10.26% -67,698,198 51.73% 341,185,742 24.89% 164,134,635 0.29% 1,934,075 64.85%
37.53% 34,121,532 14.46% 13,149,398 -5.50% -5,003,730 7.70% 6,998,182 10.49% 9,536,537 0.95% 859,860 21.53%
70.85% 279,828,122 6.53% 25,800,935 -1.76% -6,932,874 5.81% 22,948,039 95.52% 377,240,495 17.61% 69,556,157 -26.42%
41.56% 50,378,787 10.62% 12,870,861 -21.40% -25,938,685 -2.49% -3,014,928 18.25% 22,116,777 10.63% 12,885,829 1.92%
79.99% 13,110,202 17.51% 2,869,326 -79.99% -13,110,202 -17.51% -2,869,326 25.12% 4,116,525 1.32% 216,534 -25.12%
58.08% 36,915,419 2.44% 1,549,598 -58.08% -36,915,419 -2.44% -1,549,598 0.33% 208,184 0.33% 208,184 -0.33%
74.30% 47,285,202 18.98% 12,076,890 -73.88% -47,015,167 -18.98% -12,076,890 1.07% 683,141 0.76% 481,915 -0.65%
47.97% 20,932,708 9.45% 4,125,180 -46.11% -20,122,603 -9.45% -4,125,180 1.01% 439,972 0.32% 138,917 0.85%
60.54% 23,080,266 12.90% 4,917,196 -32.37% -12,341,876 -10.39% -3,960,900 3.24% 1,236,581 0.91% 345,790 24.92%
94.01% 20,725,600 28.08% 6,190,391 -94.01% -20,725,600 -28.08% -6,190,391 2.06% 453,973 1.96% 431,692 -2.06%
84.47% 407,073,860 13.09% 63,081,614 -9.32% -44,900,607 1.18% 5,684,410 94.58% 455,798,555 5.15% 24,835,894 -19.43%
COMPARACIÓN PRODUCCIÓN VS COSTO REAL INFORMACIÓN CONTRATO
MONTO UF 508,941.27
521,454 0.00% 0
1,959,411 0.00% 0
3,252,021 0.00% 0
0 0.00% 0
0 0.00% 0
-5,855,113 0.00% 0
-2,153 0.00% 0
-11,342,897 0.77% 1,624,069
-98,933,669 -11.53% -16,161,218
C.15.1 C.15.1 PREPARACION DEL AREA DE TRABAJO 9,529,464 28.89% 2,753,182 12.34% 1,175,666 16.55% 1,577,516
C.15.2 C.15.2 MOVIMIENTO DE TIERRAS 4,887,480 100.00% 4,887,480 7.56% 369,547 92.44% 4,517,933
C.15.3 C.15.3 CAPAS GRANULARES 5,044,409 93.93% 4,738,213 62.03% 3,129,047 31.90% 1,609,166
C.15.4 C.15.4 REVESTIMIENTOS Y PAVIMENTOS 19,718,679 0.00% 0 0.00% 0 0.00% 0
C.15.5 C.15.5 DRENAJE Y PROTECCION DE LA PLATAFORMA 3,355,693 0.00% 0 0.00% 0 0.00% 0
C.15.6 C.15.6 ELEMENTOS DE CONTROL Y SEGURIDAD 60,518,502 19.03% 11,513,704 8.56% 5,181,673 10.46% 6,332,031
C.15.7 C.15.7 ILUMINACIÓN 18,165,975 3.01% 547,523 0.00% 0 3.01% 547,523
C.16 PARADERO DE BUSES Y BAHÍA DE ESTACIONAMIENTO
C.16 16,390,336 0.00% 0 0.00% 0 0.00% 0
PITRUFQUÉN, LADO ORIENTE
C.16.1 C.16.1 PREPARACION DEL AREA DE TRABAJO 732,653 0.00% 0 0.00% 0 0.00% 0
C.16.2 C.16.2 REVESTIMIENTOS Y PAVIMENTOS 1,116,586 0.00% 0 0.00% 0 0.00% 0
C.16.3 C.16.3 ELEMENTOS DE CONTROL Y SEGURIDAD 9,816,290 0.00% 0 0.00% 0 0.00% 0
C.16.4 C.16.4 ILUMINACIÓN 4,724,807 0.00% 0 0.00% 0 0.00% 0
INSTALACIÓN CRUCE SEMAFORIZADO Y VALLAS
C.17 C.17 PEATONALES EN INTERSECCION ENLACE LEÓN GALLO LADO 63,557,571 0.00% 0 0.00% 0 0.00% 0
ORIENTE
C.17.1 C.17.1 OBRAS DE MITIGACIÓN 63,557,571 0.00% 0 0.00% 0 0.00% 0
C.18 DISEÑO GEOMETRICO BAJO ESTRUCTURA PS LEÓN GALLO Y
C.18 63,638,609 0.42% 270,035 0.00% 0 0.42% 270,035
FACILIDADES PEATONALES KM 701,500
C.18.1 C.18.1 PREPARACION DEL AREA DE TRABAJO 2,859,416 9.44% 270,035 0.00% 0 9.44% 270,035
C.18.2 C.18.2 MOVIMIENTO DE TIERRAS 5,299,218 0.00% 0 0.00% 0 0.00% 0
C.18.3 C.18.3 CAPAS GRANULARES 2,808,747 0.00% 0 0.00% 0 0.00% 0
C.18.4 C.18.4 REVESTIMIENTOS Y PAVIMENTOS 21,548,966 0.00% 0 0.00% 0 0.00% 0
C.18.5 C.18.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 986,816 0.00% 0 0.00% 0 0.00% 0
C.18.6 C.18.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 10,079,505 0.00% 0 0.00% 0 0.00% 0
C.18.7 C.18.7 ELEMENTOS DE CONTROL Y SEGURIDAD 6,392,910 0.00% 0 0.00% 0 0.00% 0
C.18.8 C.18.8 ILUMINACIÓN 11,162,708 0.00% 0 0.00% 0 0.00% 0
C.18.9 C.18.9 OBRAS COMPLEMETARIAS 2,500,323 0.00% 0 0.00% 0 0.00% 0
C.19 DG INT. LADO PONIENTE CALLE LEÓN GALLO, ARTURO PRAT
C.19 43,637,286 1.86% 810,105 0.00% 0 1.86% 810,105
Y BLANCO ENCALADA DM. 701.500
C.19.1 C.19.1 PREPARACION DEL AREA DE TRABAJO 1,699,850 47.66% 810,105 0.00% 0 47.66% 810,105
C.19.2 C.19.2 MOVIMIENTO DE TIERRAS 4,941,474 0.00% 0 0.00% 0 0.00% 0
C.19.3 C.19.3 CAPAS GRANULARES 1,151,358 0.00% 0 0.00% 0 0.00% 0
C.19.4 C.19.4 REVESTIMIENTOS Y PAVIMENTOS 6,125,904 0.00% 0 0.00% 0 0.00% 0
C.19.5 C.19.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 831,249 0.00% 0 0.00% 0 0.00% 0
C.19.6 C.19.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 8,849,837 0.00% 0 0.00% 0 0.00% 0
C.19.7 C.19.7 ELEMENTOS DE CONTROL Y SEGURIDAD 11,171,038 0.00% 0 0.00% 0 0.00% 0
C.19.8 C.19.8 ILUMINACIÓN 8,866,578 0.00% 0 0.00% 0 0.00% 0
C.20 PARADERO DE TAXI Y SEGREGACIÓN PEATONAL SECTOR
C.20 38,125,594 28.17% 10,738,390 2.51% 956,296 25.66% 9,782,094
PITRUFQUÉN KM 701,500
C.20.1 C.20.1 PREPARACION DEL AREA DE TRABAJO 1,049,494 95.12% 998,273 90.83% 953,267 4.29% 45,006
C.20.2 C.20.2 MOVIMIENTO DE TIERRAS 5,658,024 100.00% 5,658,024 0.05% 3,029 99.95% 5,654,995
C.20.3 C.20.3 CAPAS GRANULARES 2,186,310 100.00% 2,186,310 0.00% 0 100.00% 2,186,310
C.20.4 C.20.4 REVESTIMIENTOS Y PAVIMENTOS 6,077,390 4.23% 257,055 0.00% 0 4.23% 257,055
C.20.5 C.20.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 32,877 0.00% 0 0.00% 0 0.00% 0
C.20.6 C.20.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 2,734,979 0.00% 0 0.00% 0 0.00% 0
C.20.7 C.20.7 ELEMENTOS DE CONTROL Y SEGURIDAD 8,055,202 0.00% 0 0.00% 0 0.00% 0
C.20.8 C.20.8 ILUMINACIÓN 12,331,319 13.29% 1,638,728 0.00% 0 13.29% 1,638,728
C.21 ATRAVIESO PEATONAL ESTACION PITRUFQUEN LADO
C.21 22,046,670 0.00% 0 0.00% 0 0.00% 0
ORIENTE KM 701,900
C.21.1 C.21.1 PREPARACION DEL AREA DE TRABAJO 780,468 0.00% 0 0.00% 0 0.00% 0
C.21.2 C.21.2 MOVIMIENTO DE TIERRAS 16,289 0.00% 0 0.00% 0 0.00% 0
C.21.3 C.21.3 CAPAS GRANULARES 180,240 0.00% 0 0.00% 0 0.00% 0
C.21.4 C.21.4 REVESTIMIENTOS Y PAVIMENTOS 1,045,969 0.00% 0 0.00% 0 0.00% 0
C.21.5 C.21.5 DRENAJE Y PROTECCION DE LA PLATAFORMA 2,112,019 0.00% 0 0.00% 0 0.00% 0
C.21.6.1 C.21.6.1 ELEMENTOS DE CONTROL Y SEGURIDAD 9,615,865 0.00% 0 0.00% 0 0.00% 0
C.21.7 C.21.7 PAISAJISMO 1,636,987 0.00% 0 0.00% 0 0.00% 0
C.21.8 C.21.8 ILUMINACIÓN 4,158,510 0.00% 0 0.00% 0 0.00% 0
C.21.9 C.21.9 OBRAS COMPLEMETARIAS 2,500,323 0.00% 0 0.00% 0 0.00% 0
C.22 C.22 RAMALES ATRAVIESO QUINTA FAJA, GORBEA KM 717,000 481,920,373 75.15% 362,173,253 14.27% 68,766,024 60.88% 293,407,229
C.22.1 C.22.1 PREPARACION DEL AREA DE TRABAJO 17,953,519 98.29% 17,646,218 0.00% 0 98.29% 17,646,218
C.22.2 C.22.2 MOVIMIENTO DE TIERRAS 62,918,134 100.00% 62,918,134 0.00% 0 100.00% 62,918,134
C.22.3 C.22.3 CAPAS GRANULARES 30,631,583 100.00% 30,631,583 0.00% 0 100.00% 30,631,583
C.22.4 C.22.4 REVESTIMIENTOS Y PAVIMENTOS 125,511,269 100.00% 125,511,269 0.00% 0 100.00% 125,511,269
C.22.5 C.22.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 15,142,488 100.00% 15,142,488 3.89% 589,226 96.11% 14,553,262
C.22.6 C.22.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 12,309,957 35.88% 4,416,678 9.19% 1,131,078 26.69% 3,285,600
C.22.7 C.22.7 ELEMENTOS DE CONTROL Y SEGURIDAD 81,261,613 40.59% 32,980,808 19.20% 15,601,578 21.39% 17,379,230
C.22.8 C.22.8 PAISAJISMO 1,636,987 80.00% 1,309,590 80.00% 1,309,590 0.00% 0
C.22.9 C.22.9 ILUMINACIÓN 131,554,436 54.44% 71,616,485 38.11% 50,134,552 16.33% 21,481,933
C.22.10 C.22.10 OBRAS COMPLEMETARIAS 3,000,387 0.00% 0 0.00% 0 0.00% 0
INFORMACIÓN CONTRATO
MONTO UF 998,803.97
INICIO 14 OCTUBRE 2020
-
OBRA: VAC INFRAESTRUCTURA / O-259 RUTA 5 COLLIPULLI - G
2 B.10 MEJORAMIENTO PANTALLAS ACÚSTICAS INSTITUTO CLARET 1.00 59,900,880 59,900,880 82.49% 49,414,348 13.75%
3 B.10.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,083,840 1,083,840 100.00% 1,083,840 0.00%
B.10.1.1 m Remoción de Barreras de Contención Laterales Metálicas 240.00 4,516 1,083,840 100.00% 1,083,840 0.00%
3 B.10.2 MOVIMIENTO DE TIERRAS 1.00 1,184,640 1,184,640 83.33% 987,161 0.00%
B.10.2.1 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 240.00 4,936 1,184,640 83.33% 987,161 0.00%
3 B.10.3 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 8,237,040 8,237,040 100.00% 8,237,040 0.00%
B.10.3.1 m Barreras Metálicas de Contención Laterales con recuperación, de Do 240.00 34,321 8,237,040 100.00% 8,237,040 0.00%
3 B.10.4 OBRAS PANTALLAS ACUSTICAS 1.00 49,395,360 49,395,360 79.17% 39,106,307 16.67%
B.10.4.1 m2 Peralte de Pantalla Acústica MMA (h=1 m) 240.00 205,814 49,395,360 79.17% 39,106,307 16.67%
B.11 MEJORAMIENTO PANTALLAS ACÚSTICAS ESCUELA
2 1.00 67,279,025 67,279,025 90.82% 61,104,090 6.12%
MANZANAR
3 B.11.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,241,900 1,241,900 100.00% 1,241,900 0.00%
B.11.1.1 m Remoción de Barreras de Contención Laterales Metálicas 275.00 4,516 1,241,900 100.00% 1,241,900 0.00%
3 B.11.2 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 9,438,275 9,438,275 100.00% 9,438,275 0.00%
B.11.2.1 m Barreras Metálicas de Contención Laterales con recuperación, de Do 275.00 34,321 9,438,275 100.00% 9,438,275 0.00%
3 B.11.3 OBRAS PANTALLAS ACUSTICAS 1.00 56,598,850 56,598,850 89.09% 50,423,915 7.27%
B.11.3.1 m2 Peralte de Pantalla Acústica MMA (h=1 m) 275.00 205,814 56,598,850 89.09% 50,423,915 7.27%
2 B.12 MEJORAMIENTO PANTALLAS ACÚSTICAS SR. JOSÉ CURRÍN 1.00 414,059,715 414,059,715 69.82% 289,104,179 5.58%
3 B.12.1 PREPARACION DEL AREA DE TRABAJO 1.00 4,054,708 4,054,708 100.00% 4,054,708 0.00%
B.12.1.1 m2 Remoción de pavimentos Asfáltico 124.20 1,740 216,108 100.00% 216,108 0.00%
B.12.1.2 m Remoción de Barreras de Contención Laterales Metálicas 850.00 4,516 3,838,600 100.00% 3,838,600 0.00%
3 B.12.2 MOVIMIENTO DE TIERRAS 1.00 1,390,024 1,390,024 100.00% 1,390,024 0.00%
B.12.2.1 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 259.00 4,936 1,278,424 100.00% 1,278,424 0.00%
B.12.2.2 m2 Preparación de la Subrasante 124.00 900 111,600 100.00% 111,600 0.00%
3 B.12.3 CAPAS GRANULARES 1.00 482,787 482,787 100.00% 482,787 0.00%
B.12.3.1 m3 Base Granular, CBR = 80% 27.00 17,881 482,787 100.00% 482,787 0.00%
3 B.12.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 1,030,703 1,030,703 100.00% 1,030,703 0.00%
B.12.4.1 m2 Imprimación 124.00 566 70,184 100.00% 70,184 0.00%
B.12.4.2 m3 Concreto Asfáltico de Rodadura 6.21 154,673 960,519 100.00% 960,519 0.00%
3 B.12.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 55,346,234 55,346,233 100.00% 55,346,234 0.00%
B.12.5.1 m3 Hormigón G20 240.27 195,522 46,978,071 100.00% 46,978,071 0.00%
B.12.5.2 Kg Acero para Armaduras A630-420H 6,694.53 1,250 8,368,163 100.00% 8,368,163 0.00%
3 B.12.6 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 32,331,931 32,331,931 97.55% 31,541,347 0.00%
B.12.6.1 m Barreras Metálicas de Contención Laterales, de Doble Onda 81.00 39,001 3,159,081 100.00% 3,159,081 0.00%
B.12.6.2 m Barreras Metálicas de Contención Laterales con recuperación, de Do 850.00 34,321 29,172,850 97.29% 28,382,266 0.00%
3 B.12.7 OBRAS PANTALLAS ACUSTICAS 1.00 319,423,328 319,423,328 61.13% 195,258,376 7.23%
B.12.7.1 m2 Pantalla Acústica MMA (h=4 m) 828.00 205,814 170,413,992 51.36% 87,524,626 0.00%
B.12.7.2 m2 Peralte de Pantalla Acústica MMA (h=1 m) 724.00 205,814 149,009,336 72.30% 107,733,750 15.50%
2 B.13 MEJORAMIENTO PANTALLAS ACÚSTICAS CASA MACHI 1.00 390,516,034 390,516,034 85.52% 333,982,057 24.36%
3 B.13.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,463,952 1,463,952 100.00% 1,463,952 0.00%
B.13.1.1 m2 Remoción de pavimentos Asfáltico 249.60 1,740 434,304 100.00% 434,304 0.00%
B.13.1.2 m Remoción de Barreras de Contención Laterales Metálicas 228.00 4,516 1,029,648 100.00% 1,029,648 0.00%
3 B.13.2 MOVIMIENTO DE TIERRAS 1.00 2,791,720 2,791,720 100.00% 2,791,720 0.00%
B.13.2.1 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 520.00 4,936 2,566,720 100.00% 2,566,720 0.00%
B.13.2.2 m2 Preparación de la Subrasante 250.00 900 225,000 100.00% 225,000 0.00%
3 B.13.3 CAPAS GRANULARES 1.00 983,455 983,455 100.00% 983,455 0.00%
B.13.3.1 m3 Base Granular, CBR = 80% 55.00 17,881 983,455 100.00% 983,455 0.00%
3 B.13.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 2,071,819 2,071,819 100.00% 2,071,819 0.00%
B.13.4.1 m2 Imprimación 250.00 566 141,500 100.00% 141,500 0.00%
B.13.4.2 m3 Concreto Asfáltico de Rodadura 12.48 154,673 1,930,319 100.00% 1,930,319 0.00%
3 B.13.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 111,152,839 111,152,839 100.00% 111,152,839 0.00%
B.13.5.1 m3 Hormigón G20 483.00 195,522 94,437,126 100.00% 94,437,126 0.00%
B.13.5.2 Kg Acero para Armaduras A630-420H 13,372.57 1,250 16,715,713 100.00% 16,715,713 0.00%
3 B.13.6 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 15,196,377 15,196,377 100.00% 15,196,377 0.00%
B.13.6.1 m Barreras Metálicas de Contención Laterales, de Doble Onda 189.00 39,001 7,371,189 100.00% 7,371,189 0.00%
B.13.6.2 m Barreras Metálicas de Contención Laterales con recuperación, de Do 228.00 34,321 7,825,188 100.00% 7,825,188 0.00%
3 B.13.7 OBRAS PANTALLAS ACUSTICAS 1.00 256,855,872 256,855,872 77.99% 200,321,895 37.04%
B.13.7.1 m2 Pantalla Acústica MMA (h=3 m) 1,248.00 205,814 256,855,872 77.99% 200,321,895 37.04%
B.14 PARADERO DE BUSES EN SECTORES DE RUTA 5 LA
2 1.00 71,307,156 71,307,155 11.23% 8,007,896 7.60%
CANTERA KM 681,360 LADO ORIENTE
3 B.14.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,369,481 1,369,481 80.05% 1,096,301 27.47%
B.14.1.1 m2 Remoción de pavimentos Asfáltico 191.22 1,740 332,723 100.00% 332,723 100.00%
B.14.1.2 m Remoción de Obras de Drenaje Superficial 13.00 3,345 43,485 100.00% 43,485 100.00%
B.14.1.3 nº Remoción de Señalización Vertical Lateral 4.00 17,074 68,296 0.00% 0 0.00%
B.14.1.4 Km Despeje y Limpieza de Faja 0.16 4,500,581 720,093 100.00% 720,093 0.00%
B.14.1.5 n° Reubicación de Señalización Vertical Lateral 4.00 51,221 204,884 0.00% 0 0.00%
3 B.14.2 MOVIMIENTO DE TIERRAS 1.00 2,468,424 2,468,424 56.79% 1,401,824 56.79%
B.14.2.1 m3 Excavación de Escarpe 87.00 4,936 429,432 100.00% 429,432 100.00%
B.14.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 197.00 4,936 972,392 100.00% 972,392 100.00%
B.14.2.3 m3 Excavación en TCN para Obras de Drenaje 2.00 7,766 15,532 0.00% 0 0.00%
B.14.2.4 m3 Formación y Compactación de Terraplenes 48.00 10,801 518,448 0.00% 0 0.00%
B.14.2.5 m2 Preparación de la Subrasante 591.80 900 532,620 0.00% 0 0.00%
3 B.14.3 CAPAS GRANULARES 1.00 1,582,469 1,582,469 0.00% 0 0.00%
B.14.3.1 m3 Base Granular, CBR = 80% 88.50 17,881 1,582,469 0.00% 0 0.00%
3 B.14.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 12,630,387 12,630,388 0.00% 0 0.00%
B.14.4.1 m2 Imprimación 443.84 566 251,213 0.00% 0 0.00%
B.14.4.2 m2 Riego de Liga 443.84 469 208,161 0.00% 0 0.00%
B.14.4.3 m3 Concreto Asfáltico de Rodadura 26.63 154,673 4,118,942 0.00% 0 0.00%
B.14.4.4 m3 Concreto Asfáltico Capa Intermedia 39.95 145,156 5,798,982 0.00% 0 0.00%
B.14.4.5 m2 Aceras de Hormigón 149.32 15,089 2,253,089 0.00% 0 0.00%
3 B.14.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 464,398 464,398 0.00% 0 0.00%
B.14.5.1 m3 Hormigón G05 0.27 75,880 20,488 0.00% 0 0.00%
B.14.5.2 m3 Hormigón G25 1.23 246,289 302,935 0.00% 0 0.00%
B.14.5.3 Kg Acero para Armaduras A630-420H 112.78 1,250 140,975 0.00% 0 0.00%
3 B.14.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 7,085,032 7,085,032 0.00% 0 0.00%
B.14.6.1 m Soleras Tipo "A" 93.00 14,709 1,367,937 0.00% 0 0.00%
B.14.6.2 m Soleras con Zarpa de Hormigón 13.00 29,804 387,452 0.00% 0 0.00%
B.14.6.3 Nº Rejillas para Sumideros Tipo 60-18-R 7.00 592,504 4,147,528 0.00% 0 0.00%
B.14.6.4 m Canaleta con rejilla, Tipo ACO DRAIN Monoblock 5.00 236,423 1,182,115 0.00% 0 0.00%
3 B.14.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 32,502,224 32,502,224 16.95% 5,509,771 11.21%
B.14.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00%
B.14.7.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 5.00 281,276 1,406,380 0.00% 0 0.00%
B.14.7.3 n° Baliza Luminosa 2.00 1,865,691 3,731,382 50.00% 1,865,691 0.00%
B.14.7.4 Km Demarcación, Línea Lateral Continua 0.10 1,200,155 120,016 0.00% 0 0.00%
B.14.7.5 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 276.00 11,001 3,036,276 0.00% 0 0.00%
B.14.7.6 n° Tachas Reflectantes 138.00 1,600 220,800 0.00% 0 0.00%
B.14.7.7 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
B.14.7.8 m Valla Peatonal 45.00 44,402 1,998,090 0.00% 0 0.00%
B.14.7.9 m Valla Segregatoria 250.00 72,160 18,040,000 20.20% 3,644,080 20.20%
B.14.7.10 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 8.90 33,298 296,352 0.00% 0 0.00%
3 B.14.8 ILUMINACIÓN 1.00 13,204,741 13,204,740 0.00% 0 0.00%
RA02-17-I201 c/u Empalme por Compañía + Medidor Trifásico 1.00 1,221,415 1,221,415 0.00% 0 0.00%
RA02-17-207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 805,275 805,275 0.00% 0 0.00%
RA02-17-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 126.41 12,597 1,592,387 0.00% 0 0.00%
RA02-17-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA02-17-210 m Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA02-17-I213 c/u Construcción Cámara BT (CBT-xxx) 3.00 126,117 378,351 0.00% 0 0.00%
RA02-17-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 8.00 14,619 116,952 0.00% 0 0.00%
RA02-17-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 2.00 238,377 476,754 0.00% 0 0.00%
RA02-17-I218 c/u Provisión y montaje Luminaria Vial 38 W, LED 6.00 141,294 847,764 0.00% 0 0.00%
RA02-17-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 55.00 3,679 202,345 0.00% 0 0.00%
RA02-17-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 381.81 4,232 1,615,820 0.00% 0 0.00%
RA02-17-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 166.41 6,007 999,625 0.00% 0 0.00%
RA02-17-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 6.00 129,331 775,986 0.00% 0 0.00%
RA02-17-I229A c/u Instalación y provisión Poste 11 m brazo simple iluminación Vial 2.00 273,789 547,578 0.00% 0 0.00%
RA02-17-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 1.94 183,540 356,068 0.00% 0 0.00%
RA02-17-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 0.00% 0 0.00%
RA02-17-I232 c/u Cámaras Registro Malla de Puesta Tierra 4.00 40,986 163,944 0.00% 0 0.00%
RA02-17-I233 c/u Tablero Control General iluminación 1.00 2,013,921 2,013,921 0.00% 0 0.00%
RA02-17-I235 c/u Retiro Luminaria y Poste Metálico. 1.00 41,144 41,144 0.00% 0 0.00%
RA02-17-I236 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 0.00% 0 0.00%
RA02-17-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 1.00 17,856 17,856 0.00% 0 0.00%
RA02-17-II301 m Provisión y Montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 9.00 24,070 216,630 0.00% 0 0.00%
B.15 VILLA QUEPE ENTRE KM 687,660 - KM 687,780 LADO
2 1.00 152,721,919 152,721,919 74.23% 113,363,876 7.61%
PONIENTE
3 B.15.1 PREPARACION DEL AREA DE TRABAJO 1.00 889,600 889,600 100.00% 889,600 0.00%
B.15.1.1 m2 Remoción de pavimentos Asfáltico 96.00 1,740 167,040 100.00% 167,040 0.00%
B.15.1.2 m Remoción de Barreras de Contención Laterales Metálicas 160.00 4,516 722,560 100.00% 722,560 0.00%
3 B.15.2 MOVIMIENTO DE TIERRAS 1.00 1,073,600 1,073,600 100.00% 1,073,600 0.00%
B.15.2.1 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 200.00 4,936 987,200 100.00% 987,200 0.00%
B.15.2.2 m2 Preparación de la Subrasante 96.00 900 86,400 100.00% 86,400 0.00%
3 B.15.3 CAPAS GRANULARES 1.00 377,647 377,647 100.00% 377,647 0.00%
B.15.3.1 m3 Base Granular, CBR = 80% 21.12 17,881 377,647 100.00% 377,647 0.00%
3 B.15.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 945,252 945,252 100.00% 945,252 0.00%
B.15.4.1 m2 Imprimación 96.00 566 54,336 100.00% 54,336 0.00%
B.15.4.2 m3 Concreto Asfáltico de Rodadura 5.76 154,673 890,916 100.00% 890,916 0.00%
3 B.15.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 42,743,426 42,743,426 100.00% 42,743,426 0.00%
B.15.5.1 m3 Hormigón G20 185.73 195,522 36,314,301 100.00% 36,314,301 0.00%
B.15.5.2 Kg Acero para Armaduras A630-420H 5,143.30 1,250 6,429,125 100.00% 6,429,125 0.00%
3 B.15.6 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 7,901,674 7,901,674 69.50% 5,491,360 0.00%
B.15.6.1 m Barreras Metálicas de Contención Laterales con recuperación, de Do 160.00 34,321 5,491,360 100.00% 5,491,360 0.00%
B.15.6.2 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 0.00% 0 0.00%
3 B.15.7 OBRAS PANTALLAS ACUSTICAS 1.00 98,790,720 98,790,720 62.60% 61,842,991 11.77%
B.15.7.1 m2 Pantalla Acústica MMA (h=3 m) 480.00 205,814 98,790,720 62.60% 61,842,991 11.77%
2 B.16 MEJORAMIENTO SEÑALIZACIÓN A VILCÚN 1.00 24,827,316 24,827,316 0.00% 0 0.00%
3 B.16.1 PREPARACION DEL AREA DE TRABAJO 1.00 2,855,292 2,855,292 0.00% 0 0.00%
B.16.1.1 nº Remoción de Señalización Vertical Lateral 2.00 17,074 34,148 0.00% 0 0.00%
B.16.1.2 m Remoción de Señalización Vertical sobre la calzada 4.00 705,286 2,821,144 0.00% 0 0.00%
3 B.16.2 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 21,972,024 21,972,024 0.00% 0 0.00%
B.16.2.1 n° Señales Verticales Laterales Tipo 8 ,14 m2 < Sp<= 20 m2 2.00 2,788,558 5,577,116 0.00% 0 0.00%
B.16.2.2 n° Señalización Vertical sobre la calzada 4.00 4,098,727 16,394,908 0.00% 0 0.00%
2 B.17 MEJORAMIENTO SEÑALIZACIÓN VICTORIA 1.00 19,049,666 19,049,666 0.00% 0 0.00%
3 B.17.1 PREPARACION DEL AREA DE TRABAJO 1.00 34,148 34,148 0.00% 0 0.00%
B.17.1.1 nº Remoción de Señalización Vertical Lateral 2.00 17,074 34,148 0.00% 0 0.00%
3 B.17.2 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 19,015,518 19,015,518 0.00% 0 0.00%
B.17.2.1 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00%
B.17.2.2 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 3.00 1,027,331 3,081,993 0.00% 0 0.00%
B.17.2.3 n° Señales Verticales Laterales Tipo 6 ,7 m2 < Sp<=12 m2 2.00 1,537,396 3,074,792 0.00% 0 0.00%
B.17.2.4 Nº Señal Especial 2.00 4,098,727 8,197,454 0.00% 0 0.00%
B.17.2.5 n° Señalización Vertical sobre la calzada 1.00 4,098,727 4,098,727 0.00% 0 0.00%
2 B.18 MEJORAMIENTO SEÑALIZACIÓN FREIRE PRITUFQUEN 1.00 24,686,234 24,686,234 0.00% 0 0.00%
3 B.18.1 PREPARACION DEL AREA DE TRABAJO 1.00 722,360 722,360 0.00% 0 0.00%
B.18.1.1 nº Remoción de Señalización Vertical Lateral 1.00 17,074 17,074 0.00% 0 0.00%
B.18.1.2 N° Remoción de Señalización Vertical sobre la calzada 1.00 705,286 705,286 0.00% 0 0.00%
3 B.18.2 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 23,963,874 23,963,874 0.00% 0 0.00%
B.18.2.1 n° Señales Verticales Laterales Tipo 6 ,7 m2 < Sp<=12 m2 3.00 1,537,396 4,612,188 0.00% 0 0.00%
B.18.2.2 n° Señales Verticales Laterales Tipo 8 ,14 m2 < Sp<= 20 m2 4.00 2,788,558 11,154,232 0.00% 0 0.00%
B.18.2.3 n° Señales Verticales Laterales Tipo 9, 25 m2 < Sp<= 30 m2 1.00 4,098,727 4,098,727 0.00% 0 0.00%
B.18.2.4 n° Señalización Vertical sobre la calzada 1.00 4,098,727 4,098,727 0.00% 0 0.00%
2 B.19 MEJORAMIENTO SEÑALIZACIÓN PADRE LAS CASAS 1.00 32,235,601 32,235,601 0.00% 0 0.00%
3 B.19.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,530,090 1,530,090 0.00% 0 0.00%
B.19.1.1 nº Remoción de Señalización Vertical Lateral 7.00 17,074 119,518 0.00% 0 0.00%
B.19.1.2 N° Remoción de Señalización Vertical sobre la calzada 2.00 705,286 1,410,572 0.00% 0 0.00%
3 B.19.2 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 30,705,511 30,705,511 0.00% 0 0.00%
B.19.2.1 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00%
B.19.2.2 n° Señales Laterales, Tipo 4, 2 = Sp = 3 m2 1.00 373,078 373,078 0.00% 0 0.00%
B.19.2.3 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 6.00 1,027,331 6,163,986 0.00% 0 0.00%
B.19.2.4 n° Señales Verticales Laterales Tipo 6 ,7 m2 < Sp<=12 m2 3.00 1,537,396 4,612,188 0.00% 0 0.00%
B.19.2.5 n° Señales Verticales Laterales Tipo 9 ,20 m2 < Sp<= 25 m2 2.00 3,348,763 6,697,526 0.00% 0 0.00%
B.19.2.6 n° Señales Verticales Laterales Tipo 9, 25 m2 < Sp<= 30 m2 1.00 4,098,727 4,098,727 0.00% 0 0.00%
B.19.2.7 n° Señalización Vertical sobre la calzada 2.00 4,098,727 8,197,454 0.00% 0 0.00%
2 B.20 PARADERO LADO ORIENTE KM 615.780 1.00 211,392,656 211,392,656 2.70% 5,698,600 2.05%
3 B.20.1 PREPARACION DEL AREA DE TRABAJO 1.00 6,737,848 6,737,849 0.00% 0 0.00%
B.20.1.1 m3 Remoción de Estructuras 1.90 43,508 82,665 0.00% 0 0.00%
B.20.1.2 m Remoción de ductos 5.00 22,693 113,465 0.00% 0 0.00%
B.20.1.3 m2 Remoción de pavimentos Asfáltico 1,320.06 1,740 2,296,904 0.00% 0 0.00%
B.20.1.4 m Remoción de Obras de Drenaje Superficial 14.00 3,345 46,830 0.00% 0 0.00%
B.20.1.5 m Remoción de Cercos 447.55 2,791 1,249,112 0.00% 0 0.00%
B.20.1.6 nº Remoción de casetas de Paraderos para la locomoción colectiva 1.00 608,570 608,570 0.00% 0 0.00%
B.20.1.7 Km Despeje y Limpieza de Faja 0.52 4,500,581 2,340,302 0.00% 0 0.00%
3 B.20.2 MOVIMIENTO DE TIERRAS 1.00 17,674,140 17,674,140 0.00% 0 0.00%
B.20.2.1 m3 Excavación de Escarpe 434.00 4,936 2,142,224 0.00% 0 0.00%
B.20.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 1,191.60 4,936 5,881,738 0.00% 0 0.00%
B.20.2.3 m3 Excavación en TCN para Obras de Drenaje 50.50 7,766 392,183 0.00% 0 0.00%
B.20.2.4 m3 Formación y Compactación de Terraplenes 552.40 10,801 5,966,472 0.00% 0 0.00%
B.20.2.5 m3 Relleno Estructural 36.09 23,376 843,640 0.00% 0 0.00%
B.20.2.6 m2 Preparación de la Subrasante 2,719.87 900 2,447,883 0.00% 0 0.00%
3 B.20.3 CAPAS GRANULARES 1.00 10,918,496 10,918,496 0.00% 0 0.00%
B.20.3.1 m3 Base Granular, CBR = 80% 610.62 17,881 10,918,496 0.00% 0 0.00%
3 B.20.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 55,705,030 55,705,031 0.00% 0 0.00%
B.20.4.1 m2 Imprimación 2,719.87 566 1,539,446 0.00% 0 0.00%
B.20.4.2 m2 Riego de Liga 1,979.31 469 928,296 0.00% 0 0.00%
B.20.4.3 m3 Concreto Asfáltico de Rodadura 163.19 154,673 25,241,087 0.00% 0 0.00%
B.20.4.4 m3 Concreto Asfáltico Capa Intermedia 178.14 145,156 25,858,090 0.00% 0 0.00%
B.20.4.5 m2 Aceras de Hormigón 141.70 15,089 2,138,111 0.00% 0 0.00%
3 B.20.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 3,055,690 3,055,690 0.00% 0 0.00%
B.20.5.1 m3 Hormigón G05 0.12 75,880 9,106 0.00% 0 0.00%
B.20.5.2 m3 Hormigón G17 15.53 193,885 3,011,034 0.00% 0 0.00%
B.20.5.3 Kg Acero para Armaduras A630-420H 28.44 1,250 35,550 0.00% 0 0.00%
3 B.20.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 39,681,011 39,681,011 0.00% 0 0.00%
B.20.6.1 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=1,0 14.00 88,800 1,243,200 0.00% 0 0.00%
B.20.6.2 m Drenes de Pavimento 500.00 41,505 20,752,500 0.00% 0 0.00%
B.20.6.3 m Soleras Tipo "A" 70.74 14,709 1,040,515 0.00% 0 0.00%
B.20.6.4 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 163.10 3,394 553,561 0.00% 0 0.00%
B.20.6.5 m3 Revestimiento de Fosos y Contrafosos 45.00 297,428 13,384,260 0.00% 0 0.00%
B.20.6.6 m Rehabilitación de Fosos, Contrafosos y Canales, No Resvestidos 227.00 11,925 2,706,975 0.00% 0 0.00%
3 B.20.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 40,382,082 40,382,082 10.72% 4,329,600 10.72%
B.20.7.1 m Cerco de Alambre de Púas 452.00 7,620 3,444,240 0.00% 0 0.00%
B.20.7.2 n° Portones de Dos Hojas 2.00 502,306 1,004,612 0.00% 0 0.00%
B.20.7.3 n° Señales Laterales, Tipo 2, Sp = 1 m2 2.00 146,476 292,952 0.00% 0 0.00%
B.20.7.4 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00%
B.20.7.5 n° Delineadores verticales 5.00 81,267 406,335 0.00% 0 0.00%
B.20.7.6 Km Demarcación, Línea Lateral Segmentada termoplástica 0.59 1,600,206 944,122 0.00% 0 0.00%
B.20.7.7 Km Demarcación, Línea Lateral Continua 0.50 1,200,155 600,078 0.00% 0 0.00%
B.20.7.8 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 47.40 11,001 521,447 0.00% 0 0.00%
B.20.7.9 n° Tachas Reflectantes 251.00 1,600 401,600 0.00% 0 0.00%
B.20.7.10 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
B.20.7.11 m Barreras Metálicas de Contención Laterales, de Doble Onda 73.00 39,001 2,847,073 0.00% 0 0.00%
B.20.7.12 m Valla Peatonal 88.20 44,402 3,916,256 0.00% 0 0.00%
B.20.7.13 m Valla Peatonal en Mediana 300.00 72,160 21,648,000 20.00% 4,329,600 20.00%
B.20.7.14 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 8.60 33,298 286,363 0.00% 0 0.00%
3 B.20.8 ILUMINACIÓN 1.00 37,238,359 37,238,358 3.68% 1,369,000 0.00%
RA02-24.1-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA02-24.1-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00%
RA02-24.1-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00%
RA02-24.1-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA02-24.1-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 452.08 12,597 5,694,852 0.00% 0 0.00%
RA02-24.1-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 61.43 28,707 1,763,471 0.00% 0 0.00%
RA02-24.1-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA02-24.1-I213 c/u Construcción Cámara BT (CBT-xxx) 3.00 126,117 378,351 0.00% 0 0.00%
RA02-24.1-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 23.00 14,619 336,237 0.00% 0 0.00%
RA02-24.1-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 23.00 238,377 5,482,671 0.00% 0 0.00%
RA02-24.1-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 287.50 3,679 1,057,713 0.00% 0 0.00%
RA02-24.1-I222 m Provisión y montaje Cable 4 x 1 x 8,36 mm2, XTU 640.79 4,770 3,056,568 0.00% 0 0.00%
RA02-24.1-I223 m Provisión y montaje Cable 4 x 1 x 13,3 mm2, XTU 769.99 5,654 4,353,523 0.00% 0 0.00%
RA02-24.1-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 547.51 6,007 3,288,893 0.00% 0 0.00%
RA02-24.1-I228A c/u Instalación y provisión Poste 11m brazo simple iluminación vial 23.00 273,789 6,297,147 21.74% 1,369,000 0.00%
RA02-24.1-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 5.59 183,540 1,025,989 0.00% 0 0.00%
RA02-24.1-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00%
RA02-24.1-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00%
RA02-24.1-I234 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00%
RA02-24.1-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80-1 con Zanja + Retape 6.00 24,070 144,420 0.00% 0 0.00%
2 B.21 PARADERO LADO ORIENTE QUILLEM KM 636,420 1.00 140,110,288 140,110,287 23.07% 32,320,886 0.02%
3 B.21.1 PREPARACION DEL AREA DE TRABAJO 1.00 4,887,504 4,887,504 100.00% 4,887,504 0.00%
B.21.1.1 m2 Remoción de pavimentos Asfáltico 1,437.00 1,740 2,500,380 100.00% 2,500,380 0.00%
B.21.1.2 m Remoción de Obras de Drenaje Superficial 310.00 3,345 1,036,950 100.00% 1,036,950 0.00%
B.21.1.3 Km Despeje y Limpieza de Faja 0.30 4,500,581 1,350,174 100.00% 1,350,174 0.00%
3 B.21.2 MOVIMIENTO DE TIERRAS 1.00 15,123,043 15,123,043 96.44% 14,583,956 0.23%
B.21.2.1 m3 Excavación de Escarpe 139.00 4,936 686,104 100.00% 686,104 0.00%
B.21.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 2,460.00 4,936 12,142,560 100.00% 12,142,560 0.00%
B.21.2.3 m3 Excavación en TCN para Obras de Drenaje 4.43 7,766 34,403 100.00% 34,403 100.00%
B.21.2.4 m3 Formación y Compactación de Terraplenes 76.00 10,801 820,876 100.00% 820,876 0.00%
B.21.2.5 m2 Preparación de la Subrasante 1,599.00 900 1,439,100 62.54% 900,013 0.00%
3 B.21.3 CAPAS GRANULARES 1.00 6,437,160 6,437,160 0.00% 0 0.00%
B.21.3.1 m3 Base Granular, CBR = 80% 360.00 17,881 6,437,160 0.00% 0 0.00%
3 B.21.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 36,719,050 36,719,050 0.00% 0 0.00%
B.21.4.1 m2 Imprimación 1,599.00 566 905,034 0.00% 0 0.00%
B.21.4.2 m2 Riego de Liga 1,146.50 469 537,709 0.00% 0 0.00%
B.21.4.3 m3 Concreto Asfáltico de Rodadura 95.91 154,673 14,834,687 0.00% 0 0.00%
B.21.4.4 m3 Concreto Asfáltico Capa Intermedia 103.19 145,156 14,978,648 0.00% 0 0.00%
B.21.4.5 m2 Aceras de Hormigón 362.05 15,089 5,462,972 0.00% 0 0.00%
3 B.21.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 1,760,282 1,760,282 0.00% 0 0.00%
B.21.5.1 m3 Hormigón G05 2.79 75,880 211,705 0.00% 0 0.00%
B.21.5.2 m3 Hormigón G17 7.42 193,885 1,438,627 0.00% 0 0.00%
B.21.5.3 Kg Acero para Armaduras A630-420H 87.96 1,250 109,950 0.00% 0 0.00%
3 B.21.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 30,532,911 30,532,911 40.78% 12,451,500 0.00%
B.21.6.1 m Drenes de Pavimento 300.00 41,505 12,451,500 100.00% 12,451,500 0.00%
B.21.6.2 n° Embudos para Descargas de Agua 20.00 293,760 5,875,200 0.00% 0 0.00%
B.21.6.3 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 1.00 116,607 116,607 0.00% 0 0.00%
B.21.6.4 m Soleras Tipo "A" 19.00 14,709 279,471 0.00% 0 0.00%
B.21.6.5 m Cunetas de Hormigón 179.00 25,910 4,637,890 0.00% 0 0.00%
B.21.6.6 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormi 144.40 3,394 490,094 0.00% 0 0.00%
B.21.6.7 m3 Revestimiento de Fosos y Contrafosos 18.00 297,428 5,353,704 0.00% 0 0.00%
B.21.6.8 m Rehabilitacion de Fosos, Contrafosos y Canales, Revestidos 111.40 11,925 1,328,445 0.00% 0 0.00%
3 B.21.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 17,758,481 17,758,481 0.00% 0 0.00%
B.21.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00%
B.21.7.2 Km Demarcación, Línea Lateral Segmentada termoplástica 0.39 1,600,206 624,080 0.00% 0 0.00%
B.21.7.3 Km Demarcación, Línea Lateral Continua 0.30 1,200,155 360,047 0.00% 0 0.00%
B.21.7.4 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 38.00 11,001 418,038 0.00% 0 0.00%
B.21.7.5 n° Tachas Reflectantes 167.00 1,600 267,200 0.00% 0 0.00%
B.21.7.6 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
B.21.7.7 m Valla Peatonal 120.00 44,402 5,328,240 0.00% 0 0.00%
B.21.7.8 m Barreras Laterales de Hormigón en Sitio Alta 120.00 57,568 6,908,160 0.00% 0 0.00%
B.21.7.9 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 6.00 33,298 199,788 0.00% 0 0.00%
3 B.21.8 ILUMINACIÓN 1.00 26,891,857 26,891,856 1.48% 397,926 0.00%
RA02-24.2-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA02-24.2-I205 c/u Transformador 5 kVA 2f, norma COMPAÑÍA 1.00 1,151,499 1,151,499 0.00% 0 0.00%
RA02-24.2-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00%
RA02-24.2-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA02-24.2-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 363.40 12,597 4,577,750 0.00% 0 0.00%
RA02-24.2-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA02-24.2-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA02-24.2-I213 c/u Construcción Cámara BT (CBT-xxx) 1.00 126,117 126,117 0.00% 0 0.00%
RA02-24.2-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 21.00 14,619 306,999 0.00% 0 0.00%
RA02-24.2-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 13.00 238,377 3,098,901 0.00% 0 0.00%
RA02-24.2-I218 c/u Provisión y montaje Luminaria Vial 38 W, LED 8.00 141,294 1,130,352 0.00% 0 0.00%
RA02-24.2-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 202.50 3,679 744,998 0.00% 0 0.00%
RA02-24.2-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 258.36 4,232 1,093,380 0.00% 0 0.00%
RA02-24.2-I222 m Provisión y montaje Cable 4 x 1 x 8,36 mm2, XTU 755.22 4,770 3,602,399 0.00% 0 0.00%
RA02-24.2-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 400.40 6,007 2,405,203 0.00% 0 0.00%
RA02-24.2-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 8.00 129,331 1,034,648 38.46% 397,926 0.00%
RA02-24.2-I228A c/u Instalación y provisión Poste 11m brazo simple iluminación vial 13.00 273,789 3,559,257 0.00% 0 0.00%
RA02-24.2-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 5.10 183,540 936,054 0.00% 0 0.00%
RA02-24.2-I231 c/u Soldadura Termofusión. 26.00 30,775 800,150 0.00% 0 0.00%
RA02-24.2-I232 c/u Cámaras Registro Malla de Puesta Tierra 4.00 40,986 163,944 0.00% 0 0.00%
RA02-24.2-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00%
RA02-24.2-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 6.00 24,070 144,420 0.00% 0 0.00%
B.22 PARADERO DE BUSES ACCESO A TRAIGUÉN EN ATRAVIESO
2 1.00 25,171,415 25,171,414 0.00% 0 0.00%
VICTORIA TRAIGUÉN PONIENTE KM 624,900
3 B.22.1 PREPARACION DEL AREA DE TRABAJO 1.00 647,716 647,716 0.00% 0 0.00%
B.22.1.1 m Remoción de Obras de Drenaje Superficial 86.00 3,345 287,670 0.00% 0 0.00%
B.22.1.2 Km Despeje y Limpieza de Faja 0.08 4,500,581 360,046 0.00% 0 0.00%
3 B.22.2 MOVIMIENTO DE TIERRAS 1.00 2,089,376 2,089,376 0.00% 0 0.00%
B.22.2.1 m3 Excavación de Escarpe 123.00 4,936 607,128 0.00% 0 0.00%
B.22.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 6.00 4,936 29,616 0.00% 0 0.00%
B.22.2.3 m3 Excavación en TCN para Obras de Drenaje 4.25 7,766 33,006 0.00% 0 0.00%
B.22.2.4 m3 Formación y Compactación de Terraplenes 110.00 10,801 1,188,110 0.00% 0 0.00%
B.22.2.5 m2 Preparación de la Subrasante 257.24 900 231,516 0.00% 0 0.00%
3 B.22.3 CAPAS GRANULARES 1.00 293,964 293,964 0.00% 0 0.00%
B.22.3.1 m3 Base Granular, CBR = 80% 16.44 17,881 293,964 0.00% 0 0.00%
3 B.22.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 4,562,667 4,562,667 0.00% 0 0.00%
B.22.4.1 m2 Imprimación 82.22 566 46,537 0.00% 0 0.00%
B.22.4.2 m2 Riego de Liga 82.22 469 38,561 0.00% 0 0.00%
B.22.4.3 m3 Concreto Asfáltico de Rodadura 4.93 154,673 762,538 0.00% 0 0.00%
B.22.4.4 m3 Concreto Asfáltico Capa Intermedia 7.40 145,156 1,074,154 0.00% 0 0.00%
B.22.4.5 m2 Aceras de Hormigón 175.02 15,089 2,640,877 0.00% 0 0.00%
3 B.22.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 7,330,495 7,330,494 0.00% 0 0.00%
B.22.5.1 m3 Hormigón G05 1.79 75,880 135,825 0.00% 0 0.00%
B.22.5.2 m3 Hormigón G17 1.80 193,885 348,993 0.00% 0 0.00%
B.22.5.3 m3 Hormigón G30 17.00 257,926 4,384,742 0.00% 0 0.00%
B.22.5.4 Kg Acero para Armaduras A630-420H 941.21 1,250 1,176,513 0.00% 0 0.00%
B.22.5.5 m2 Moldajes 40.60 31,636 1,284,422 0.00% 0 0.00%
3 B.22.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 1,699,777 1,699,777 0.00% 0 0.00%
B.22.6.1 m Soleras Tipo "A" 91.78 14,709 1,349,992 0.00% 0 0.00%
B.22.6.2 m Cunetas de Hormigón, Tipo Baden, Tipo 1 13.50 25,910 349,785 0.00% 0 0.00%
3 B.22.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 4,648,363 4,648,363 0.00% 0 0.00%
B.22.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00%
B.22.7.2 Km Demarcación, Línea Lateral Segmentada 0.03 1,600,206 48,006 0.00% 0 0.00%
B.22.7.3 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 50.50 11,001 555,551 0.00% 0 0.00%
B.22.7.4 n° Tachas Reflectantes 16.00 1,600 25,600 0.00% 0 0.00%
B.22.7.5 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
B.22.7.6 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 11.00 33,298 366,278 0.00% 0 0.00%
3 B.22.8 ILUMINACIÓN 1.00 3,899,057 3,899,058 0.00% 0 0.00%
RA02-24.3-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 33.58 12,597 423,007 0.00% 0 0.00%
RA02-24.3-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA02-24.3-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA02-24.3-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 3.00 14,619 43,857 0.00% 0 0.00%
RA02-24.3-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 2.00 238,377 476,754 0.00% 0 0.00%
RA02-24.3-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 25.00 3,679 91,975 0.00% 0 0.00%
RA02-24.3-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 182.47 4,232 772,213 0.00% 0 0.00%
RA02-24.3-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 67.58 6,007 405,953 0.00% 0 0.00%
RA02-24.3-I228A c/u Instalación y provisión Poste 11m brazo simple iluminación vial 2.00 273,789 547,578 0.00% 0 0.00%
RA02-24.3-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 0.73 183,540 133,984 0.00% 0 0.00%
RA02-24.3-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 0.00% 0 0.00%
RA02-24.3-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00%
RA02-24.3-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 3.00 24,070 72,210 0.00% 0 0.00%
2 B.23 PARADERO LADO ORIENTE PÚA 1.00 275,245,432 275,245,431 2.79% 7,686,309 2.36%
3 B.23.1 PREPARACION DEL AREA DE TRABAJO 1.00 14,836,279 14,836,280 0.00% 0 0.00%
B.23.1.1 m3 Remoción de Estructuras 2.92 43,508 127,043 0.00% 0 0.00%
B.23.1.2 m2 Remoción de pavimentos Asfáltico 1,409.67 1,740 2,452,826 0.00% 0 0.00%
B.23.1.3 m Remoción de Obras de Drenaje Superficial 181.45 3,345 606,950 0.00% 0 0.00%
B.23.1.4 m Remoción de Barreras de Contención Laterales Metálicas 152.00 4,516 686,432 0.00% 0 0.00%
B.23.1.5 N° Remoción de Señalización Vertical sobre la calzada 2.00 705,286 1,410,572 0.00% 0 0.00%
B.23.1.6 m2 Remoción de Aceras 252.98 4,286 1,084,272 0.00% 0 0.00%
B.23.1.7 m Remoción de Cercos 448.52 2,791 1,251,819 0.00% 0 0.00%
B.23.1.8 Km Despeje y Limpieza de Faja 0.48 4,500,581 2,160,279 0.00% 0 0.00%
B.23.1.9 nº Reubicación de Señalización Vertical sobre la Calzada 1.00 705,286 705,286 0.00% 0 0.00%
B.23.1.10 nº Remoción de Estructuras 1.00 4,350,800 4,350,800 0.00% 0 0.00%
3 B.23.2 MOVIMIENTO DE TIERRAS 1.00 35,083,298 35,083,298 0.00% 0 0.00%
B.23.2.1 m3 Excavación de Escarpe 576.08 4,936 2,843,531 0.00% 0 0.00%
B.23.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 1,945.30 4,936 9,602,001 0.00% 0 0.00%
B.23.2.3 m3 Excavación en TCN para Obras de Drenaje 40.30 7,766 312,970 0.00% 0 0.00%
B.23.2.4 m3 Formación y Compactación de Terraplenes 1,834.49 10,801 19,814,326 0.00% 0 0.00%
B.23.2.5 m3 Relleno Estructural 14.59 23,376 341,056 0.00% 0 0.00%
B.23.2.6 m2 Preparación de la Subrasante 2,410.46 900 2,169,414 0.00% 0 0.00%
3 B.23.3 CAPAS GRANULARES 1.00 9,105,542 9,105,542 0.00% 0 0.00%
B.23.3.1 m3 Base Granular, CBR = 80% 509.23 17,881 9,105,542 0.00% 0 0.00%
3 B.23.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 53,979,421 53,979,421 0.00% 0 0.00%
B.23.4.1 m2 Imprimación 2,410.46 566 1,364,320 0.00% 0 0.00%
B.23.4.2 m2 Riego de Liga 2,108.91 469 989,079 0.00% 0 0.00%
B.23.4.3 m3 Concreto Asfáltico de Rodadura 144.63 154,673 22,370,356 0.00% 0 0.00%
B.23.4.4 m3 Concreto Asfáltico Capa Intermedia 189.80 145,156 27,550,609 0.00% 0 0.00%
B.23.4.5 m2 Aceras de Hormigón 113.00 15,089 1,705,057 0.00% 0 0.00%
3 B.23.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 15,710,122 15,710,122 0.00% 0 0.00%
B.23.5.1 m3 Hormigón G05 2.89 75,880 219,293 0.00% 0 0.00%
B.23.5.2 m3 Hormigón G17 2.89 193,885 560,328 0.00% 0 0.00%
B.23.5.3 m3 Hormigón G25 38.09 246,289 9,381,148 0.00% 0 0.00%
B.23.5.4 Kg Acero para Armaduras A630-420H 2,952.49 1,250 3,690,612 0.00% 0 0.00%
B.23.5.5 m2 Revestimiento de Mampostería de Piedra 34.70 53,566 1,858,740 0.00% 0 0.00%
3 B.23.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 24,292,231 24,292,231 0.00% 0.00%
B.23.6.1 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 43.30 116,607 5,049,083 0.00% 0 0.00%
B.23.6.2 m Soleras Tipo "A" 29.89 14,709 439,652 0.00% 0 0.00%
B.23.6.3 m Soleras con Zarpa de Hormigón 160.40 29,804 4,780,562 0.00% 0 0.00%
B.23.6.4 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormi 235.00 3,394 797,590 0.00% 0 0.00%
B.23.6.5 m3 Revestimiento de Fosos y Contrafosos 41.00 297,428 12,194,548 0.00% 0 0.00%
B.23.6.6 m Limpieza de Alcantarilla y Sifones, de mas de 1 m de altura 38.10 27,055 1,030,796 0.00% 0 0.00%
3 B.23.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 88,773,143 88,773,143 7.32% 6,494,400 7.32%
B.23.7.1 m Cerco de Alambre de Púas 456.77 7,620 3,480,587 0.00% 0 0.00%
B.23.7.2 n° Portones de Dos Hojas 2.00 502,306 1,004,612 0.00% 0 0.00%
B.23.7.3 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00%
B.23.7.4 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00%
B.23.7.5 n° Señalización Vertical sobre la calzada 2.00 4,098,727 8,197,454 0.00% 0 0.00%
B.23.7.6 n° Delineadores verticales 5.00 81,267 406,335 0.00% 0 0.00%
B.23.7.7 n° Marco Portaseñal 1.00 20,713,231 20,713,231 0.00% 0 0.00%
B.23.7.8 Km Demarcación, Línea Lateral Segmentada termoplástica 0.55 1,600,206 880,113 0.00% 0 0.00%
B.23.7.9 Km Demarcación, Línea Lateral Continua 0.46 1,200,155 552,071 0.00% 0 0.00%
B.23.7.10 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 40.50 11,001 445,541 0.00% 0 0.00%
B.23.7.11 n° Tachas Reflectantes 236.00 1,600 377,600 0.00% 0 0.00%
B.23.7.12 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
B.23.7.13 m Barreras Metálicas de Contención Laterales, de Doble Onda 226.00 39,001 8,814,226 0.00% 0 0.00%
B.23.7.14 m Valla Peatonal 31.00 44,402 1,376,462 0.00% 0 0.00%
B.23.7.15 m Valla Peatonal en Mediana 300.00 72,160 21,648,000 30.00% 6,494,400 30.00%
B.23.7.16 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 0.00% 0 0.00%
B.23.7.17 m Barreras Laterales de Hormigón en Sitio Alta 242.00 57,568 13,931,456 0.00% 0 0.00%
B.23.7.18 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 9.60 33,298 319,661 0.00% 0 0.00%
3 B.23.8 ILUMINACIÓN 1.00 33,465,396 33,465,395 3.56% 1,191,909 0.00%
RA02-24.4-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA02-24.4-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00%
RA02-24.4-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00%
RA02-24.4-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA02-24.4-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 457.83 12,597 5,767,285 0.00% 0 0.00%
RA02-24.4-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA02-24.4-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA02-24.4-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 21.00 14,619 306,999 0.00% 0 0.00%
RA02-24.4-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 21.00 238,377 5,005,917 23.81% 1,191,909 0.00%
RA02-24.4-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 262.50 3,679 965,738 0.00% 0 0.00%
RA02-24.4-I223 m Provisión y montaje Cable 4 x 1 x 13,3 mm2, XTU 1,268.54 5,654 7,172,325 0.00% 0 0.00%
RA02-24.4-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 494.83 6,007 2,972,444 0.00% 0 0.00%
RA02-24.4-I228A c/u Instalación y provisión Poste 11m brazo simple iluminación vial 21.00 273,789 5,749,569 0.00% 0 0.00%
RA02-24.4-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 5.10 183,540 936,054 0.00% 0 0.00%
RA02-24.4-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00%
RA02-24.4-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00%
RA02-24.4-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00%
RA02-24.4-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 6.00 24,070 144,420 0.00% 0 0.00%
2 B.24 PARADERO LADO PONIENTE KM 593,580 1.00 220,938,506 220,938,504 21.08% 46,567,789 14.12%
3 B.24.1 PREPARACION DEL AREA DE TRABAJO 1.00 6,684,244 6,684,244 93.24% 6,232,625 58.23%
B.24.1.1 m3 Remoción de Estructuras 9.38 43,508 408,105 31.98% 130,512 31.98%
B.24.1.2 m2 Remoción de pavimentos Asfáltico 1,437.00 1,740 2,500,380 93.04% 2,326,354 93.04%
B.24.1.3 m Remoción de Obras de Drenaje Superficial 162.00 3,345 541,890 100.00% 541,890 100.00%
B.24.1.4 Km Despeje y Limpieza de Faja 0.52 4,500,581 2,340,302 100.00% 2,340,302 0.00%
B.24.1.5 m Remoción de Cercos 320.16 2,791 893,567 100.00% 893,567 100.00%
3 B.24.2 MOVIMIENTO DE TIERRAS 1.00 37,041,339 37,041,340 75.98% 28,142,164 44.48%
B.24.2.1 m3 Excavación de Escarpe 719.00 4,936 3,548,984 100.00% 3,548,984 0.00%
B.24.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 1,727.00 4,936 8,524,472 100.00% 8,524,472 68.15%
B.24.2.3 m3 Excavación en TCN para Obras de Drenaje 40.40 7,766 313,746 49.50% 155,304 49.50%
B.24.2.4 m3 Formación y Compactación de Terraplenes 1,966.98 10,801 21,245,351 66.43% 14,113,287 41.01%
B.24.2.5 m3 Relleno Estructural 44.99 23,376 1,051,686 0.00% 0 0.00%
B.24.2.6 m2 Preparación de la Subrasante 2,619.00 900 2,357,100 76.37% 1,800,117 76.37%
3 B.24.3 CAPAS GRANULARES 1.00 10,500,975 10,500,975 0.00% 0 0.00%
B.24.3.1 m3 Base Granular, CBR = 80% 587.27 17,881 10,500,975 0.00% 0 0.00%
3 B.24.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 44,410,160 44,410,160 0.00% 0 0.00%
B.24.4.1 m2 Imprimación 2,619.00 566 1,482,354 0.00% 0 0.00%
B.24.4.2 m2 Riego de Liga 1,912.18 469 896,812 0.00% 0 0.00%
B.24.4.3 m3 Concreto Asfáltico de Rodadura 131.00 154,673 20,262,163 0.00% 0 0.00%
B.24.4.4 m3 Concreto Asfáltico Capa Intermedia 133.85 145,156 19,429,131 0.00% 0 0.00%
B.24.4.5 m2 Aceras de Hormigón 155.06 15,089 2,339,700 0.00% 0 0.00%
3 B.24.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 15,213,410 15,213,409 0.00% 0 0.00%
B.24.5.1 m3 Hormigón G05 1.93 75,880 146,448 0.00% 0 0.00%
B.24.5.2 m3 Hormigón G17 1.76 193,885 341,238 0.00% 0 0.00%
B.24.5.3 m3 Hormigón G25 38.48 246,289 9,477,201 0.00% 0 0.00%
B.24.5.4 Kg Acero para Armaduras A630-420H 2,666.83 1,250 3,333,538 0.00% 0 0.00%
B.24.5.5 m2 Revestimiento de Mampostería de Piedra 35.75 53,566 1,914,985 0.00% 0 0.00%
3 B.24.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 19,745,608 19,745,608 0.00% 0 0.00%
B.24.6.1 n° Embudos para Descargas de Agua 2.00 293,760 587,520 0.00% 0 0.00%
B.24.6.2 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 16.00 116,607 1,865,712 0.00% 0 0.00%
B.24.6.3 m Soleras Tipo "A" 42.00 14,709 617,778 0.00% 0 0.00%
B.24.6.4 m Cunetas de Hormigón 368.00 25,910 9,534,880 0.00% 0 0.00%
B.24.6.6 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 131.00 3,394 444,614 0.00% 0 0.00%
B.24.6.7 m3 Revestimiento de Fosos y Contrafosos 22.51 297,428 6,695,104 0.00% 0 0.00%
3 B.24.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 41,364,617 41,364,617 26.17% 10,824,000 26.17%
B.24.7.1 m Cerco de Alambre de Púas 326.06 7,620 2,484,577 0.00% 0 0.00%
B.24.7.2 n° Portones de Dos Hojas 2.00 502,306 1,004,612 0.00% 0 0.00%
B.24.7.3 n° Señales Laterales, Tipo 2, Sp = 1 m2 2.00 146,476 292,952 0.00% 0 0.00%
B.24.7.4 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00%
B.24.7.5 n° Delineadores verticales 5.00 81,267 406,335 0.00% 0 0.00%
B.24.7.6 Km Demarcación, Línea Lateral Segmentada termoplástica 0.59 1,600,206 944,122 0.00% 0 0.00%
B.24.7.7 Km Demarcación, Línea Lateral Continua 0.45 1,200,155 540,070 0.00% 0 0.00%
B.24.7.8 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 56.40 11,001 620,456 0.00% 0 0.00%
B.24.7.9 n° Tachas Reflectantes 348.00 1,600 556,800 0.00% 0 0.00%
B.24.7.10 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
B.24.7.11 m Valla Peatonal 57.00 44,402 2,530,914 0.00% 0 0.00%
B.24.7.12 m Valla Segregatoria 300.00 72,160 21,648,000 50.00% 10,824,000 50.00%
B.24.7.13 m Barreras Laterales de Hormigón en Sitio Alta 104.00 57,568 5,987,072 0.00% 0 0.00%
B.24.7.14 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 8.40 33,298 279,703 0.00% 0 0.00%
3 B.24.8 ILUMINACIÓN 1.00 44,977,118 44,977,116 3.04% 1,369,000 0.00%
RA02-24.5-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA02-24.5-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00%
RA02-24.5-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00%
RA02-24.5-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA02-24.5-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 511.33 12,597 6,441,224 0.00% 0 0.00%
RA02-24.5-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 30.94 28,707 888,195 0.00% 0 0.00%
RA02-24.5-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA02-24.5-I212 m3 Fabricación dado Hormigón Armado H 30 0,3x0,3x1,0 canalizaciones 1.68 20,826 34,988 0.00% 0 0.00%
RA02-24.5-I213 c/u Construcción Cámara BT (CBT-xxx) 3.00 126,117 378,351 0.00% 0 0.00%
RA02-24.5-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 23.00 14,619 336,237 0.00% 0 0.00%
RA02-24.5-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 23.00 238,377 5,482,671 0.00% 0 0.00%
RA02-24.5-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 287.50 3,679 1,057,713 0.00% 0 0.00%
RA02-24.5-I226 m Provisión y montaje Cable 2 x 1 x 42,4 mm2, XTU 1,444.31 10,623 15,342,905 0.00% 0 0.00%
RA02-24.5-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 559.93 6,007 3,363,500 0.00% 0 0.00%
RA02-24.5-I228A c/u Instalación y provisión Poste 11m brazo simple iluminación vial 23.00 273,789 6,297,147 21.74% 1,369,000 0.00%
RA02-24.5-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 5.59 183,540 1,025,989 0.00% 0 0.00%
RA02-24.5-I231 c/u Soldadura Termofusión. 22.00 30,775 677,050 0.00% 0 0.00%
RA02-24.5-I232 c/u Cámaras Registro Malla de Puesta Tierra 2.00 40,986 81,972 0.00% 0 0.00%
RA02-24.5-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00%
RA02-24.5-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 3.00 24,070 72,210 0.00% 0 0.00%
3 B.24.9 OBRAS COMPLEMETARIAS 1.00 1,001,035 1,001,035 0.00% 0 0.00%
B.24.9.2 m Limpieza de Alcantarilla y Sifones, de mas de 1 m de altura 37.00 27,055 1,001,035 0.00% 0 0.00%
2 B.25 PARADERO LADO PONIENTE KM 634,820 1.00 261,014,118 261,014,117 25.44% 66,411,380 5.79%
3 B.25.1 PREPARACION DEL AREA DE TRABAJO 1.00 6,965,685 6,965,685 100.00% 6,965,685 0.00%
B.25.1.1 m3 Remoción de Estructuras 2.41 43,508 104,854 100.00% 104,854 0.00%
B.25.1.2 m2 Remoción de pavimentos Asfáltico 1,846.91 1,740 3,213,623 100.00% 3,213,623 0.00%
B.25.1.3 m Remoción de Obras de Drenaje Superficial 70.71 3,345 236,525 100.00% 236,525 0.00%
B.25.1.4 m Remoción de Cercos 77.13 2,791 215,270 100.00% 215,270 0.00%
B.25.1.5 Km Despeje y Limpieza de Faja 0.71 4,500,581 3,195,413 100.00% 3,195,413 0.00%
3 B.25.2 MOVIMIENTO DE TIERRAS 1.00 29,355,821 29,355,821 98.70% 28,973,312 0.93%
B.25.2.1 m3 Excavación de Escarpe 1,570.00 4,936 7,749,520 100.00% 7,749,520 0.00%
B.25.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 1,369.00 4,936 6,757,384 100.00% 6,757,384 0.00%
B.25.2.3 m3 Excavación en TCN para Obras de Drenaje 25.82 7,766 200,518 100.00% 200,518 100.00%
B.25.2.4 m3 Formación y Compactación de Terraplenes 1,025.00 10,801 11,071,025 100.00% 11,071,025 0.00%
B.25.2.5 m3 Relleno Estructural 12.02 23,376 280,980 0.00% 0 0.00%
B.25.2.6 m2 Preparación de la Subrasante 3,662.66 900 3,296,394 96.92% 3,194,865 2.18%
3 B.25.3 CAPAS GRANULARES 1.00 14,880,389 14,880,389 96.13% 14,304,518 6.01%
B.25.3.1 m3 Base Granular, CBR = 80% 832.19 17,881 14,880,389 96.13% 14,304,518 6.01%
3 B.25.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 79,426,540 79,426,541 1.43% 1,132,101 0.36%
B.25.4.1 m2 Imprimación 3,662.66 566 2,073,066 54.61% 1,132,101 13.66%
B.25.4.2 m2 Riego de Liga 2,694.63 469 1,263,781 0.00% 0 0.00%
B.25.4.3 m3 Concreto Asfáltico de Rodadura 219.76 154,673 33,990,938 0.00% 0 0.00%
B.25.4.4 m3 Concreto Asfáltico Capa Intermedia 242.52 145,156 35,203,233 0.00% 0 0.00%
B.25.4.5 m2 Aceras de Hormigón 456.99 15,089 6,895,522 0.00% 0 0.00%
3 B.25.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 4,953,191 4,953,190 0.00% 0 0.00%
B.25.5.1 m3 Hormigón G05 0.84 75,880 63,739 0.00% 0 0.00%
B.25.5.2 m3 Hormigón G17 10.08 193,885 1,954,361 0.00% 0 0.00%
B.25.5.3 m3 Hormigón G25 9.04 246,289 2,226,453 0.00% 0 0.00%
B.25.5.4 Kg Acero para Armaduras A630-420H 566.91 1,250 708,638 0.00% 0 0.00%
3 B.25.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 13,934,174 13,934,174 8.57% 1,194,383 7.35%
B.25.6.1 n° Embudos para Descargas de Agua 1.00 293,760 293,760 0.00% 0 0.00%
B.25.6.2 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 13.20 116,607 1,539,212 30.30% 466,381 30.30%
B.25.6.3 m Soleras Tipo "A" 88.50 14,709 1,301,747 0.00% 0 0.00%
B.25.6.4 m Soleras con Zarpa de Hormigón 62.20 29,804 1,853,809 0.00% 0 0.00%
B.25.6.5 m Cunetas de Hormigón, Tipo Baden 30.00 25,910 777,300 0.00% 0 0.00%
B.25.6.6 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormi 139.00 3,394 471,766 35.97% 169,694 0.00%
B.25.6.7 m3 Revestimiento de Fosos y Contrafosos 24.00 297,428 7,138,272 0.00% 0 0.00%
B.25.6.8 m Limpieza de Alcantarillas y Sifones, de hasta 1 m de altura 29.00 19,252 558,308 100.00% 558,308 100.00%
3 B.25.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 55,588,231 55,588,230 10.38% 5,772,800 10.38%
B.25.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 4.00 146,476 585,904 0.00% 0 0.00%
B.25.7.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00%
B.25.7.3 n° Delineadores verticales 5.00 81,267 406,335 0.00% 0 0.00%
B.25.7.4 Km Demarcación, Línea Lateral Segmentada termoplástica 0.83 1,600,206 1,328,171 0.00% 0 0.00%
B.25.7.5 Km Demarcación, Línea Lateral Continua 0.67 1,200,155 804,104 0.00% 0 0.00%
B.25.7.6 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 203.00 11,001 2,233,203 0.00% 0 0.00%
B.25.7.7 n° Tachas Reflectantes 506.00 1,600 809,600 0.00% 0 0.00%
B.25.7.8 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
B.25.7.9 m Barreras Metálicas de Contención Laterales, de Doble Onda 20.00 39,001 780,020 0.00% 0 0.00%
B.25.7.10 m Valla Peatonal 137.00 44,402 6,083,074 0.00% 0 0.00%
B.25.7.11 m Valla Peatonal en Mediana 400.00 72,160 28,864,000 20.00% 5,772,800 20.00%
B.25.7.12 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 0.00% 0 0.00%
B.25.7.13 m Barreras Laterales de Hormigón en Sitio Alta 120.00 57,568 6,908,160 0.00% 0 0.00%
B.25.7.14 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 9.20 33,298 306,342 0.00% 0 0.00%
3 B.25.8 ILUMINACIÓN 1.00 55,910,087 55,910,087 14.43% 8,068,581 12.30%
RA02-24.6-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA02-24.6-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00%
RA02-24.6-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00%
RA02-24.6-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA02-24.6-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 592.93 12,597 7,469,139 0.00% 0 0.00%
RA02-24.6-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 122.30 28,707 3,510,866 0.00% 0 0.00%
RA02-24.6-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA02-24.6-I213 c/u Construcción Cámara BT (CBT-xxx) 6.00 126,117 756,702 0.00% 0 0.00%
RA02-24.6-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 31.00 14,619 453,189 0.00% 0 0.00%
RA02-24.6-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 31.00 238,377 7,389,687 38.71% 2,860,548 22.58%
RA02-24.6-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 387.50 3,679 1,425,613 0.00% 0 0.00%
RA02-24.6-I223 m Provisión y montaje Cable 4 x 1 x 13,3 mm2, XTU 600.97 5,654 3,397,884 0.00% 0 0.00%
RA02-24.6-I225 m Provisión y montaje Cable 2 x 1 x 33,6 mm2, XTU 1,310.93 8,999 11,797,059 24.79% 2,924,491 24.79%
RA02-24.6-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 708.11 6,007 4,253,617 0.00% 0 0.00%
RA02-24.6-I228A c/u Instalación y provisión Poste 11m brazo simple iluminación vial 31.00 273,789 8,487,459 22.58% 1,916,468 22.58%
RA02-24.6-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 7.53 183,540 1,382,056 26.56% 367,074 26.56%
RA02-24.6-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00%
RA02-24.6-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00%
RA02-24.6-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00%
RA02-24.6-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 51.03 24,070 1,228,292 0.00% 0 0.00%
2 B.26 PARADERO LADO PONIENTE ACCESO QUILLEM KM 636,120 1.00 286,079,654 286,079,653 34.79% 99,538,274 2.40%
3 B.26.1 PREPARACION DEL AREA DE TRABAJO 1.00 11,020,081 11,020,080 97.17% 10,707,728 2.38%
B.26.1.1 m3 Remoción de Estructuras 7.24 43,508 314,998 100.00% 314,998 0.00%
B.26.1.2 m2 Remoción de pavimentos Asfáltico 2,207.00 1,740 3,840,180 93.20% 3,579,048 0.00%
B.26.1.3 m Remoción de Obras de Drenaje Superficial 786.00 3,345 2,629,170 100.00% 2,629,170 0.00%
B.26.1.4 m Remoción de Barreras de Contención Laterales Metálicas 108.00 4,516 487,728 100.00% 487,728 53.70%
B.26.1.5 nº Remoción de Señalización Vertical Lateral 1.00 17,074 17,074 100.00% 17,074 0.00%
B.26.1.6 m Remoción de Cercos 114.50 2,791 319,570 100.00% 319,570 0.00%
B.26.1.7 nº Remoción de casetas de Paraderos para la locomoción colectiva 1.00 608,570 608,570 100.00% 608,570 0.00%
B.26.1.8 Km Despeje y Limpieza de Faja 0.60 4,500,581 2,700,349 100.00% 2,700,349 0.00%
B.26.1.9 nº Reubicación de Señalización Vertical Lateral 2.00 51,221 102,442 50.00% 51,221 0.00%
3 B.26.2 MOVIMIENTO DE TIERRAS 1.00 50,941,158 50,941,157 95.29% 48,542,533 4.20%
B.26.2.1 m3 Excavación de Escarpe 1,077.00 4,936 5,316,072 100.00% 5,316,072 0.00%
B.26.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 2,497.00 4,936 12,325,192 100.00% 12,325,192 0.00%
B.26.2.3 m3 Excavación en TCN para Obras de Drenaje 263.76 7,766 2,048,360 100.00% 2,048,360 100.00%
B.26.2.4 m3 Formación y Compactación de Terraplenes 2,438.00 10,801 26,332,838 100.00% 26,332,838 0.00%
B.26.2.5 m3 Relleno Estructural 32.60 23,376 762,058 0.00% 0 0.00%
B.26.2.6 m3 Relleno Estructurante 64.43 23,376 1,506,116 0.00% 0 0.00%
B.26.2.7 m2 Obras de Encauzamiento Menores 79.00 3,418 270,022 100.00% 270,022 0.00%
B.26.2.8 m2 Preparación de la Subrasante 2,645.00 900 2,380,500 94.52% 2,250,049 3.78%
3 B.26.3 CAPAS GRANULARES 1.00 10,528,869 10,528,869 90.86% 9,566,531 2.55%
B.26.3.1 m3 Base Granular, CBR = 80% 588.83 17,881 10,528,869 90.86% 9,566,531 2.55%
3 B.26.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 55,859,895 55,859,896 43.90% 24,519,767 0.00%
B.26.4.1 m2 Imprimación 2,645.00 566 1,497,070 75.61% 1,131,935 0.00%
B.26.4.2 m2 Riego de Liga 1,980.21 469 928,718 63.12% 586,207 0.00%
B.26.4.3 m3 Concreto Asfáltico de Rodadura 158.70 154,673 24,546,605 43.01% 10,557,495 0.00%
B.26.4.4 m3 Concreto Asfáltico Capa Intermedia 178.22 145,156 25,869,702 47.33% 12,244,130 0.00%
B.26.4.5 m2 Aceras de Hormigón 200.00 15,089 3,017,800 0.00% 0 0.00%
3 B.26.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 22,836,529 22,836,528 0.00% 0 0.00%
B.26.5.1 m3 Hormigón G05 2.92 75,880 221,570 0.00% 0 0.00%
B.26.5.2 m3 Hormigón G17 10.23 193,885 1,983,444 0.00% 0 0.00%
B.26.5.3 m3 Hormigón G25 63.83 246,289 15,720,627 0.00% 0 0.00%
B.26.5.4 Kg Acero para Armaduras A630-420H 3,928.71 1,250 4,910,888 0.00% 0 0.00%
3 B.26.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 43,949,890 43,949,890 0.00% 0 0.00%
B.26.6.1 m Drenes de Pavimento 400.00 41,505 16,602,000 0.00% 0 0.00%
B.26.6.2 n° Embudos para Descargas de Agua 3.00 293,760 881,280 0.00% 0 0.00%
B.26.6.3 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 23.00 116,607 2,681,961 0.00% 0 0.00%
B.26.6.4 m Soleras Tipo "A" 71.00 14,709 1,044,339 0.00% 0 0.00%
B.26.6.5 m Cunetas de Hormigón Triangulares 107.50 25,910 2,785,325 0.00% 0 0.00%
B.26.6.6 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormi 225.00 3,394 763,650 0.00% 0 0.00%
B.26.6.7 m3 Revestimiento de Fosos y Contrafosos 39.00 297,428 11,599,692 0.00% 0 0.00%
B.26.6.8 m Tubos Polietileno de Alta Densidad estructurados D=1,00 m 37.00 165,984 6,141,408 0.00% 0 0.00%
B.26.6.9 n° Suministro y Colocación de Escalines 10.00 7,043 70,430 0.00% 0 0.00%
B.26.6.10 m Limpieza de Alcantarilla y Sifones, de mas de 1 m de altura 51.00 27,055 1,379,805 0.00% 0 0.00%
3 B.26.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 41,310,461 41,310,461 11.70% 4,832,989 10.15%
B.26.7.1 m Cerco de Alambre de Púas 119.46 7,620 910,285 100.00% 910,285 29.68%
B.26.7.2 n° Señales Laterales, Tipo 2, Sp = 1 m2 5.00 146,476 732,380 0.00% 0 0.00%
B.26.7.3 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 4.00 281,276 1,125,104 0.00% 0 0.00%
B.26.7.4 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 1.00 1,027,331 1,027,331 0.00% 0 0.00%
B.26.7.5 n° Delineadores verticales 5.00 81,267 406,335 0.00% 0 0.00%
B.26.7.6 n° Hito de Vértice 1.00 51,545 51,545 0.00% 0 0.00%
B.26.7.7 Km Demarcación, Línea de Eje Continua Doble 0.03 1,600,206 48,006 0.00% 0 0.00%
B.26.7.8 Km Demarcación, Línea Lateral Segmentada termoplástica 0.60 1,600,206 960,124 0.00% 0 0.00%
B.26.7.9 Km Demarcación, Línea Lateral Continua 0.58 1,200,155 696,090 0.00% 0 0.00%
B.26.7.10 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 93.00 11,001 1,023,093 0.00% 0 0.00%
B.26.7.11 n° Tachas Reflectantes 259.00 1,600 414,400 0.00% 0 0.00%
B.26.7.12 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
B.26.7.13 m Valla Peatonal 59.00 44,402 2,619,718 0.00% 0 0.00%
B.26.7.14 m Valla Peatonal Desincentivadora 267.00 72,160 19,266,720 20.36% 3,922,704 20.36%
B.26.7.15 m Barreras Laterales de Hormigón en Sitio Alta 144.00 57,568 8,289,792 0.00% 0 0.00%
B.26.7.16 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 7.00 33,298 233,086 0.00% 0 0.00%
3 B.26.8 ILUMINACIÓN 1.00 49,632,771 49,632,772 2.76% 1,368,726 0.00%
RA02-24.7-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA02-24.7-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00%
RA02-24.7-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00%
RA02-24.7-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA02-24.7-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 428.51 12,597 5,397,940 0.00% 0 0.00%
RA02-24.7-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA02-24.7-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 94.81 35,649 3,379,882 0.00% 0 0.00%
RA02-24.7-I212 m3 Fabricación dado Hormigón Armado H 30 0,3x0,3x1,0 canalizaciones 4.23 20,826 88,094 0.00% 0 0.00%
RA02-24.7-I213 c/u Construcción Cámara BT (CBT-xxx) 2.00 126,117 252,234 0.00% 0 0.00%
RA02-24.7-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 21.00 14,619 306,999 0.00% 0 0.00%
RA02-24.7-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 24.00 238,377 5,721,048 0.00% 0 0.00%
RA02-24.7-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 300.00 3,679 1,103,700 0.00% 0 0.00%
RA02-24.7-I222 m Provisión y montaje Cable 4 x 1 x 8,36 mm2, XTU 543.29 4,770 2,591,493 0.00% 0 0.00%
RA02-24.7-I224 m Provisión y montaje Cable 4 x 1 x 21,2 mm2, XTU 1,274.29 6,942 8,846,121 0.00% 0 0.00%
RA02-24.7-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 673.18 6,007 4,043,792 0.00% 0 0.00%
RA02-24.7-I228A c/u Instalación y provisión Poste 11m brazo simple iluminación vial 24.00 273,789 6,570,936 20.83% 1,368,726 0.00%
RA02-24.7-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 5.10 183,540 936,054 0.00% 0 0.00%
RA02-24.7-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00%
RA02-24.7-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00%
RA02-24.7-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00%
RA02-24.7-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 243.72 24,070 5,866,340 0.00% 0 0.00%
RA02-24.7-II303 un Mensula para Postes 4.5 mt 3.00 63,480 190,440 0.00% 0 0.00%
2 B.27 PARADERO PICHIQUEPE C.S. PONIENTE KM 686,200 1.00 108,990,215 108,990,214 5.63% 6,139,156 1.42%
3 B.27.1 PREPARACION DEL AREA DE TRABAJO 1.00 2,218,205 2,218,205 40.58% 900,071 20.29%
B.27.1.1 m3 Remoción de Estructuras 0.85 43,508 36,982 0.00% 0 0.00%
B.27.1.2 m2 Remoción de pavimentos Asfáltico 55.37 1,740 96,344 0.00% 0 0.00%
B.27.1.3 m Remoción de Obras de Drenaje Superficial 11.17 3,345 37,364 0.00% 0 0.00%
B.27.1.4 m Remoción de Barreras de Contención Laterales Metálicas 53.00 4,516 239,348 0.00% 0 0.00%
B.27.1.5 nº Remoción de Señalización Vertical Lateral 1.00 17,074 17,074 0.00% 0 0.00%
B.27.1.6 m Remoción de Cercos 59.00 2,791 164,669 0.00% 0 0.00%
B.27.1.7 Km Despeje y Limpieza de Faja 0.35 4,500,581 1,575,203 57.14% 900,071 28.57%
B.27.1.8 N° Reubicación de Señalización Vertical Lateral 1.00 51,221 51,221 0.00% 0 0.00%
3 B.27.2 MOVIMIENTO DE TIERRAS 1.00 9,299,142 9,299,141 0.00% 0 0.00%
B.27.2.1 m3 Excavación de Escarpe 272.00 4,936 1,342,592 0.00% 0 0.00%
B.27.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 634.10 4,936 3,129,918 0.00% 0 0.00%
B.27.2.3 m3 Excavación en TCN para Obras de Drenaje 66.69 7,766 517,915 0.00% 0 0.00%
B.27.2.4 m3 Formación y Compactación de Terraplenes 372.86 10,801 4,027,261 0.00% 0 0.00%
B.27.2.5 m3 Relleno Estructural 6.79 23,376 158,723 0.00% 0 0.00%
B.27.2.6 m2 Preparación de la Subrasante 136.37 900 122,733 0.00% 0 0.00%
3 B.27.3 CAPAS GRANULARES 1.00 487,615 487,615 0.00% 0 0.00%
B.27.3.1 m3 Base Granular, CBR = 80% 27.27 17,881 487,615 0.00% 0 0.00%
3 B.27.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 11,888,997 11,888,997 0.00% 0 0.00%
B.27.4.1 m2 Imprimación 136.37 566 77,185 0.00% 0 0.00%
B.27.4.2 m2 Riego de Liga 136.37 469 63,958 0.00% 0 0.00%
B.27.4.3 m3 Concreto Asfáltico de Rodadura 6.82 154,673 1,054,870 0.00% 0 0.00%
B.27.4.4 m3 Concreto Asfáltico Capa Intermedia 9.55 145,156 1,386,240 0.00% 0 0.00%
B.27.4.5 m2 Aceras de Hormigón 616.79 15,089 9,306,744 0.00% 0 0.00%
3 B.27.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 27,345,030 27,345,031 15.15% 4,144,039 0.00%
B.27.5.1 m3 Hormigón G05 6.08 75,880 461,350 0.00% 0 0.00%
B.27.5.2 m3 Hormigón G17 3.84 193,885 744,518 0.00% 0 0.00%
B.27.5.3 m3 Hormigón G25 14.14 246,289 3,482,526 0.00% 0 0.00%
B.27.5.4 m3 Hormigón G30 60.00 257,926 15,475,560 16.67% 2,579,776 0.00%
B.27.5.5 Kg Acero para Armaduras A630-420H 3,125.40 1,250 3,906,750 40.04% 1,564,263 0.00%
B.27.5.6 m2 Moldajes 103.50 31,636 3,274,326 0.00% 0 0.00%
3 B.27.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 12,146,016 12,146,016 0.00% 0 0.00%
B.27.6.1 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=0,6 5.50 41,600 228,800 0.00% 0 0.00%
B.27.6.2 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 23.00 116,607 2,681,961 0.00% 0 0.00%
B.27.6.3 m Soleras Tipo "A" 61.49 14,709 904,456 0.00% 0 0.00%
B.27.6.4 m Cunetas de Hormigón 114.00 25,910 2,953,740 0.00% 0 0.00%
B.27.6.5 Nº Rejillas para Sumideros Tipo 60-18-R 1.00 592,504 592,504 0.00% 0 0.00%
B.27.6.6 m3 Construcción de Fosos y Contrafosos con Cotas de Fondo Preestable 79.32 11,925 945,891 0.00% 0 0.00%
B.27.6.7 m3 Revestimiento de Fosos y Contrafosos 12.00 297,428 3,569,136 0.00% 0 0.00%
B.27.6.8 m Limpieza de Alcantarillas y Sifones, de hasta 1 m de altura 14.00 19,252 269,528 0.00% 0 0.00%
3 B.27.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 9,525,947 9,525,947 0.00% 0 0.00%
B.27.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00%
B.27.7.2 Km Demarcación, Línea Lateral Segmentada 0.03 1,600,206 48,006 0.00% 0 0.00%
B.27.7.3 Km Demarcación, Línea Lateral Continua 0.02 1,200,155 24,003 0.00% 0 0.00%
B.27.7.4 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 18.00 11,001 198,018 0.00% 0 0.00%
B.27.7.5 n° Tachas Reflectantes 22.00 1,600 35,200 0.00% 0 0.00%
B.27.7.6 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
B.27.7.7 m Valla Peatonal 82.00 44,402 3,640,964 0.00% 0 0.00%
B.27.7.8 m Barreras Laterales de Hormigón en Sitio Alta 30.00 57,568 1,727,040 0.00% 0 0.00%
B.27.7.9 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 6.00 33,298 199,788 0.00% 0 0.00%
3 B.27.8 ILUMINACIÓN 1.00 36,079,263 36,079,262 3.04% 1,095,046 3.04%
RA02-24.8-I201 un Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA02-24.8-I205 c/u Transformador 5 kVA 2f, norma COMPAÑÍA 1.00 1,151,499 1,151,499 0.00% 0 0.00%
RA02-24.8-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifásico 1.00 636,606 636,606 0.00% 0 0.00%
RA02-24.8-I207 un Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA02-24.8-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 269.02 12,597 3,388,845 0.00% 0 0.00%
RA02-24.8-I209 m Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 187.92 28,707 5,394,619 0.00% 0 0.00%
RA02-24.8-I210 m Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 83.50 35,649 2,976,692 0.00% 0 0.00%
RA02-24.8-I213 c/u Construcción Cámara BT (CBT-xxx) 4.00 126,117 504,468 0.00% 0 0.00%
RA02-24.8-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 18.00 14,619 263,142 0.00% 0 0.00%
RA02-24.8-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 18.00 238,377 4,290,786 0.00% 0 0.00%
RA02-24.8-I219 c/u Provisión y montaje Luminaria Vial 41,2 W, LED (ANTIVANDÁLICA) 6.00 35,873 215,238 0.00% 0 0.00%
RA02-24.8-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 225.00 3,679 827,775 0.00% 0 0.00%
RA02-24.8-I222 m Provisión y montaje Cable 4 x 1 x 8,36 mm2, XTU 1,194.75 4,770 5,698,958 0.00% 0 0.00%
RA02-24.8-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 467.50 6,007 2,808,273 0.00% 0 0.00%
RA02-24.8-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 18.00 273,789 4,928,202 22.22% 1,095,046 22.22%
RA02-24.8-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 4.37 183,540 802,070 0.00% 0 0.00%
RA02-24.8-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00%
RA02-24.8-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00%
RA02-24.8-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00%
RA02-24.8-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 6.00 24,070 144,420 0.00% 0 0.00%
2 B.28 PARADERO LADO PONIENTE ENLACE QUEPE 1.00 22,516,680 22,516,680 12.50% 2,815,049 10.90%
3 B.28.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,093,047 1,093,047 95.31% 1,041,826 62.37%
B.28.1.1 m Remoción de Obras de Drenaje Superficial 45.77 3,345 153,101 100.00% 153,101 100.00%
B.28.1.2 nº Remoción de Señalización Vertical Lateral 2.00 17,074 34,148 100.00% 34,148 100.00%
B.28.1.3 m2 Remoción de Construciones 6.94 71,258 494,531 100.00% 494,531 100.00%
B.28.1.4 Km Despeje y Limpieza de Faja 0.08 4,500,581 360,046 100.00% 360,046 0.00%
B.28.1.5 n° Reubicación de Señalización Vertical Lateral 1.00 51,221 51,221 0.00% 0 0.00%
3 B.28.2 MOVIMIENTO DE TIERRAS 1.00 1,773,223 1,773,224 100.00% 1,773,223 100.00%
B.28.2.1 m3 Excavación de Escarpe 78.76 4,936 388,759 100.00% 388,759 100.00%
B.28.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 121.18 4,936 598,144 100.00% 598,144 100.00%
B.28.2.3 m3 Formación y Compactación de Terraplenes 61.76 10,801 667,070 100.00% 667,070 100.00%
B.28.2.4 m2 Preparación de la Subrasante 132.50 900 119,250 100.00% 119,250 100.00%
3 B.28.3 CAPAS GRANULARES 1.00 473,847 473,847 0.00% 0 0.00%
B.28.3.1 m3 Base Granular, CBR = 80% 26.50 17,881 473,847 0.00% 0 0.00%
3 B.28.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 3,904,948 3,904,947 0.00% 0 0.00%
B.28.4.1 m2 Imprimación 132.50 566 74,995 0.00% 0 0.00%
B.28.4.2 m2 Riego de Liga 132.50 469 62,143 0.00% 0 0.00%
B.28.4.3 m3 Concreto Asfáltico de Rodadura 6.63 154,673 1,025,482 0.00% 0 0.00%
B.28.4.4 m3 Concreto Asfáltico Capa Intermedia 9.28 145,156 1,347,048 0.00% 0 0.00%
B.28.4.5 m2 Aceras de Hormigón 92.47 15,089 1,395,280 0.00% 0 0.00%
3 B.28.5 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 966,381 966,381 0.00% 0 0.00%
B.28.5.1 m Soleras Tipo "A" 65.70 14,709 966,381 0.00% 0 0.00%
3 B.28.6 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 5,844,679 5,844,679 0.00% 0 0.00%
B.28.6.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00%
B.28.6.2 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 1.00 1,027,331 1,027,331 0.00% 0 0.00%
B.28.6.3 Km Demarcación, Línea Lateral Segmentada 0.05 1,600,206 80,010 0.00% 0 0.00%
B.28.6.4 Km Demarcación, Línea Lateral Continua 0.04 1,200,155 48,006 0.00% 0 0.00%
B.28.6.5 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 5.00 11,001 55,005 0.00% 0 0.00%
B.28.6.6 n° Tachas Reflectantes 32.00 1,600 51,200 0.00% 0 0.00%
B.28.6.7 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
B.28.6.8 m Valla Peatonal 16.00 44,402 710,432 0.00% 0 0.00%
B.28.6.9 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 6.60 33,298 219,767 0.00% 0 0.00%
3 B.28.7 ILUMINACIÓN 1.00 8,460,555 8,460,556 0.00% 0 0.00%
RA02-24.9-I200 un Empalme por Compañía + Medidor Trifásico 1.00 1,221,415 1,221,415 0.00% 0 0.00%
RA02-24.9-I207 c/u Ferretería instalación + desconectadores fusibles Trifásicos 1.00 805,275 805,275 0.00% 0 0.00%
RA02-24.9-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 45.63 12,597 574,801 0.00% 0 0.00%
RA02-24.9-I209 m Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA02-24.9-I210 m Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA02-24.9-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 3.00 14,619 43,857 0.00% 0 0.00%
RA02-24.9-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 3.00 238,377 715,131 0.00% 0 0.00%
RA02-24.9-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 25.00 3,679 91,975 0.00% 0 0.00%
RA02-24.9-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 123.20 4,232 521,382 0.00% 0 0.00%
RA02-24.9-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 70.63 6,007 424,274 0.00% 0 0.00%
RA02-24.9-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 2.00 273,789 547,578 0.00% 0 0.00%
RA02-24.9-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 0.73 183,540 133,984 0.00% 0 0.00%
RA02-24.9-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 0.00% 0 0.00%
RA02-24.9-I232 c/u Cámaras Registro Malla de Puesta Tierra 4.00 40,986 163,944 0.00% 0 0.00%
RA02-24.9-I233 c/u Tablero Control General iluminación Trifásico 1.00 2,013,921 2,013,921 0.00% 0 0.00%
RA02-24.9-I234 c/u Retiro y reemplazo de luminaria existente poste galvanizado 1.00 304,384 304,384 0.00% 0 0.00%
RA02-24.9-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 1.00 17,856 17,856 0.00% 0 0.00%
RA02-24.9-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 3.00 24,070 72,210 0.00% 0 0.00%
B.29 PARADERO PONIENTE (REEMPLAZADO CALLE SERVICIO YPF
2 1.00 32,028,631 32,028,630 2.24% 718,474 0.00%
- VENTURELLI ) KM 710,020
3 B.29.1 PREPARACION DEL AREA DE TRABAJO 1.00 663,633 663,633 71.07% 471,676 0.00%
B.29.1.1 m2 Remoción de pavimentos Asfáltico 5.60 1,740 9,744 0.00% 0 0.00%
B.29.1.2 m Remoción de Cercos 86.93 2,791 242,622 46.01% 111,630 0.00%
B.29.1.3 Km Despeje y Limpieza de Faja 0.08 4,500,581 360,046 100.00% 360,046 0.00%
B.29.1.4 n° Reubicación de Señalización Vertical Lateral 1.00 51,221 51,221 0.00% 0 0.00%
3 B.29.2 MOVIMIENTO DE TIERRAS 1.00 4,302,027 4,302,027 5.74% 246,798 0.00%
B.29.2.1 m3 Excavación de Escarpe 123.00 4,936 607,128 40.65% 246,798 0.00%
B.29.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 9.00 4,936 44,424 0.00% 0 0.00%
B.29.2.3 m3 Excavación en TCN para Obras de Drenaje 2.65 7,766 20,580 0.00% 0 0.00%
B.29.2.4 m3 Formación y Compactación de Terraplenes 329.94 10,801 3,563,682 0.00% 0 0.00%
B.29.2.5 m2 Preparación de la Subrasante 73.57 900 66,213 0.00% 0 0.00%
3 B.29.3 CAPAS GRANULARES 1.00 268,215 268,215 0.00% 0 0.00%
B.29.3.1 m3 Base Granular, CBR = 80% 15.00 17,881 268,215 0.00% 0 0.00%
3 B.29.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 4,006,913 4,006,913 0.00% 0 0.00%
B.29.4.1 m2 Imprimación 73.57 566 41,641 0.00% 0 0.00%
B.29.4.2 m2 Riego de Liga 73.57 469 34,504 0.00% 0 0.00%
B.29.4.3 m3 Concreto Asfáltico de Rodadura 3.68 154,673 569,197 0.00% 0 0.00%
B.29.4.4 m3 Concreto Asfáltico Capa Intermedia 5.15 145,156 747,553 0.00% 0 0.00%
B.29.4.5 m2 Aceras de Hormigón 173.24 15,089 2,614,018 0.00% 0 0.00%
3 B.29.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 594,545 594,544 0.00% 0 0.00%
B.29.5.1 m3 Hormigón G05 0.82 75,880 62,222 0.00% 0 0.00%
B.29.5.2 m3 Hormigón G17 2.02 193,885 391,648 0.00% 0 0.00%
B.29.5.3 Kg Acero para Armaduras A630-420H 112.54 1,250 140,675 0.00% 0 0.00%
3 B.29.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 1,132,593 1,132,593 0.00% 0 0.00%
B.29.6.1 m Soleras Tipo "A" 77.00 14,709 1,132,593 0.00% 0 0.00%
3 B.29.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 9,079,256 9,079,256 0.00% 0 0.00%
B.29.7.1 m Cerco de Alambre de Púas 87.60 7,620 667,512 0.00% 0 0.00%
B.29.7.2 n° Señales Laterales, Tipo 2, Sp = 1 m2 3.00 146,476 439,428 0.00% 0 0.00%
B.29.7.3 Km Demarcación, Línea Lateral Segmentada 0.03 1,600,206 48,006 0.00% 0 0.00%
B.29.7.4 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 5.00 11,001 55,005 0.00% 0 0.00%
B.29.7.5 n° Tachas Reflectantes 18.00 1,600 28,800 0.00% 0 0.00%
B.29.7.6 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
B.29.7.7 m Valla Peatonal 92.00 44,402 4,084,984 0.00% 0 0.00%
B.29.7.8 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 7.48 33,298 249,069 0.00% 0 0.00%
3 B.29.8 ILUMINACIÓN 1.00 11,981,449 11,981,448 0.00% 0 0.00%
RA02-24.10-I201 un Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA02-24.10-I205 un Transformador 5 kVA 2f, norma COMPAÑÍA 1.00 1,151,499 1,151,499 0.00% 0 0.00%
RA02-24.10-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifásico 1.00 636,606 636,606 0.00% 0 0.00%
RA02-24.10-I207 un Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA02-24.10-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 93.41 12,597 1,176,686 0.00% 0 0.00%
RA02-24.10-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA02-24.10-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA02-24.10-I212 m3 Fabricación dado Hormigón Armado H 30 0,3x0,3x1,0 canalizaciones 2.88 20,826 59,979 0.00% 0 0.00%
RA02-24.10-I213 c/u Construcción Cámara BT (CBT-xxx) 1.00 126,117 126,117 0.00% 0 0.00%
RA02-24.10-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 5.00 14,619 73,095 0.00% 0 0.00%
RA02-24.10-I218 c/u Provisión y montaje Luminaria Vial 38 W, LED 5.00 141,294 706,470 0.00% 0 0.00%
RA02-24.10-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 87.50 3,679 321,913 0.00% 0 0.00%
RA02-24.10-I222 m Provisión y montaje Cable 4 x 1 x 8,36 mm2, XTU 350.33 4,770 1,671,074 0.00% 0 0.00%
RA02-24.10-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 154.75 6,007 929,583 0.00% 0 0.00%
RA02-24.10-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 5.00 129,331 646,655 0.00% 0 0.00%
RA02-24.10-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 5.00 273,789 1,368,945 0.00% 0 0.00%
RA02-24.10-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 1.22 183,540 223,919 0.00% 0 0.00%
RA02-24.10-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 0.00% 0 0.00%
RA02-24.10-I232 c/u Cámaras Registro Malla de Puesta Tierra 4.00 40,986 163,944 0.00% 0 0.00%
RA02-24.10-I233 un Tablero Control General iluminación monofásico 1.00 476,354 476,354 0.00% 0 0.00%
RA02-24.10-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 30.34 24,070 730,284 0.00% 0 0.00%
2 B.30 PARADERO LADO ORIENTE CHADA KM 707,850 1.00 234,167,600 234,167,598 31.17% 72,983,464 8.21%
3 B.30.1 PREPARACION DEL AREA DE TRABAJO 1.00 16,651,189 16,651,189 98.03% 16,323,770 1.36%
B.30.1.1 m3 Remoción de Estructuras 2.15 43,508 93,542 100.00% 93,542 0.00%
B.30.1.2 m Remoción de ductos 23.30 22,693 528,747 42.92% 226,938 42.92%
B.30.1.3 m2 Remoción de pavimentos Asfáltico 1,655.70 1,740 2,880,918 100.00% 2,880,918 0.00%
B.30.1.4 nº Remoción de Señalización Vertical Lateral 1.00 17,074 17,074 100.00% 17,074 0.00%
B.30.1.5 Km Despeje y Limpieza de Faja 0.59 4,500,581 2,655,343 100.00% 2,655,343 0.00%
B.30.1.6 n° Tala y Remocion de arboles 7.00 1,489,192 10,424,344 100.00% 10,424,344 0.00%
B.30.1.7 nº Reubicación de Señalización Vertical Lateral 1.00 51,221 51,221 50.00% 25,611 0.00%
3 B.30.2 MOVIMIENTO DE TIERRAS 1.00 24,794,940 24,794,940 98.41% 24,400,821 0.00%
B.30.2.1 m3 Excavación de Escarpe 1,294.61 4,936 6,390,195 100.00% 6,390,195 0.00%
B.30.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 864.00 4,936 4,264,704 100.00% 4,264,704 0.00%
B.30.2.3 m3 Excavación en TCN para Obras de Drenaje 29.45 7,766 228,709 100.00% 228,709 0.00%
B.30.2.4 m3 Formación y Compactación de Terraplenes 1,004.00 10,801 10,844,204 100.00% 10,844,204 0.00%
B.30.2.5 m3 Relleno Estructural 16.86 23,376 394,119 0.00% 0 0.00%
B.30.2.6 m2 Preparación de la Subrasante 2,970.01 900 2,673,009 100.00% 2,673,009 0.00%
3 B.30.3 CAPAS GRANULARES 1.00 12,007,092 12,007,092 98.59% 11,837,792 1.79%
B.30.3.1 m3 Base Granular, CBR = 80% 671.50 17,881 12,007,092 98.59% 11,837,792 1.79%
3 B.30.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 61,862,146 61,862,145 0.00% 0 0.00%
B.30.4.1 m2 Imprimación 2,970.01 566 1,681,026 0.00% 0 0.00%
B.30.4.2 m2 Riego de Liga 2,108.90 469 989,074 0.00% 0 0.00%
B.30.4.3 m3 Concreto Asfáltico de Rodadura 178.20 154,673 27,562,729 0.00% 0 0.00%
B.30.4.4 m3 Concreto Asfáltico Capa Intermedia 189.80 145,156 27,550,609 0.00% 0 0.00%
B.30.4.5 m2 Aceras de Hormigón 270.31 15,089 4,078,708 0.00% 0 0.00%
3 B.30.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 872,785 872,785 0.00% 0 0.00%
B.30.5.1 m3 Hormigón G05 0.55 75,880 41,734 0.00% 0 0.00%
B.30.5.2 m3 Hormigón G17 3.99 193,885 773,601 0.00% 0 0.00%
B.30.5.3 Kg Acero para Armaduras A630-420H 45.96 1,250 57,450 0.00% 0 0.00%
3 B.30.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 32,012,919 32,012,919 41.75% 13,366,128 41.75%
B.30.6.1 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=0,8 12.00 69,341 832,092 83.33% 693,382 83.33%
B.30.6.2 n° Embudos para Descargas de Agua 1.00 293,760 293,760 0.00% 0 0.00%
B.30.6.3 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 2.00 116,607 233,214 0.00% 0 0.00%
B.30.6.4 m Soleras Tipo "A" 38.00 14,709 558,942 0.00% 0 0.00%
B.30.6.5 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormi 529.83 3,394 1,798,243 44.93% 807,951 44.93%
B.30.6.6 m3 Revestimiento de Fosos y Contrafosos 91.77 297,428 27,294,968 41.73% 11,390,190 41.73%
B.30.6.7 m Rehabilitacion de Fosos, Contrafosos y Canales, Revestidos 84.00 11,925 1,001,700 47.38% 474,605 47.38%
3 B.30.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 43,063,191 43,063,191 12.57% 5,412,000 12.57%
B.30.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 2.00 146,476 292,952 0.00% 0 0.00%
B.30.7.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00%
B.30.7.3 n° Delineadores verticales 5.00 81,267 406,335 0.00% 0 0.00%
B.30.7.4 Km Demarcación, Línea Lateral Segmentada 0.66 1,600,206 1,056,136 0.00% 0 0.00%
B.30.7.5 Km Demarcación, Línea Lateral Continua 0.92 1,200,155 1,104,143 0.00% 0 0.00%
B.30.7.6 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 37.00 11,001 407,037 0.00% 0 0.00%
B.30.7.7 n° Tachas Reflectantes 286.00 1,600 457,600 0.00% 0 0.00%
B.30.7.8 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
B.30.7.9 m Barreras Metálicas de Contención Laterales, de Doble Onda 20.00 39,001 780,020 0.00% 0 0.00%
B.30.7.10 m Valla Peatonal en Mediana 300.00 72,160 21,648,000 25.00% 5,412,000 25.00%
B.30.7.11 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 0.00% 0 0.00%
B.30.7.12 m Barreras Laterales de Hormigón en Sitio Alta 176.00 57,568 10,131,968 0.00% 0 0.00%
B.30.7.13 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 9.00 33,298 299,682 0.00% 0 0.00%
3 B.30.8 ILUMINACIÓN 1.00 42,903,338 42,903,338 3.83% 1,642,953 0.00%
RA02-24.11-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA02-24.11-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00%
RA02-24.11-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00%
RA02-24.11-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA02-24.11-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 537.45 12,597 6,770,258 0.00% 0 0.00%
RA02-24.11-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA02-24.11-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA02-24.11-I213 c/u Construcción Cámara BT (CBT-xxx) 4.00 126,117 504,468 0.00% 0 0.00%
RA02-24.11-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 26.00 14,619 380,094 0.00% 0 0.00%
RA02-24.11-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 26.00 238,377 6,197,802 0.00% 0 0.00%
RA02-24.11-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 325.00 3,679 1,195,675 0.00% 0 0.00%
RA02-24.11-I223 m Provisión y montaje Cable 4 x 1 x 13,3 mm2, XTU 670.06 5,654 3,788,519 0.00% 0 0.00%
RA02-24.11-I224 m Provisión y montaje Cable 4 x 1 x 21,2 mm2, XTU 1,020.65 6,942 7,085,352 0.00% 0 0.00%
RA02-24.11-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 596.49 6,007 3,583,115 0.00% 0 0.00%
RA02-24.11-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 26.00 273,789 7,118,514 23.08% 1,642,953 0.00%
RA02-24.11-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 6.32 183,540 1,159,973 0.00% 0 0.00%
RA02-24.11-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00%
RA02-24.11-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00%
RA02-24.11-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00%
RA02-24.11-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 28.04 24,070 674,923 0.00% 0 0.00%
2 B.31 PARADERO RAMAL S-0 QUINTA FAJA ORIENTE KM 706,440 1.00 63,663,170 63,663,170 70.80% 45,072,336 12.75%
3 B.31.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,352,513 1,352,513 100.00% 1,352,513 0.00%
B.31.1.1 m3 Remoción de Estructuras 7.86 43,508 341,973 100.00% 341,973 0.00%
B.31.1.2 m Remoción de Obras de Drenaje Superficial 121.62 3,345 406,819 100.00% 406,819 0.00%
B.31.1.3 m2 Despeje y Limpieza de Faja 0.10 4,500,581 450,058 100.00% 450,058 0.00%
B.31.1.4 nº Reubicación de Señalización Vertical Lateral 3.00 51,221 153,663 100.00% 153,663 0.00%
3 B.31.2 MOVIMIENTO DE TIERRAS 1.00 5,953,750 5,953,750 99.74% 5,938,543 0.00%
B.31.2.1 m3 Excavación de Escarpe 255.00 4,936 1,258,680 100.00% 1,258,680 0.00%
B.31.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 5.00 4,936 24,680 100.00% 24,680 0.00%
B.31.2.3 m3 Excavación en TCN para Obras de Drenaje 26.05 7,766 202,304 100.00% 202,304 0.00%
B.31.2.4 m3 Formación y Compactación de Terraplenes 395.60 10,801 4,272,876 100.00% 4,272,876 0.00%
B.31.2.5 m2 Preparación de la Subrasante 216.90 900 195,210 92.21% 180,003 0.00%
3 B.31.3 CAPAS GRANULARES 1.00 775,678 775,678 89.90% 697,334 0.00%
B.31.3.1 m3 Base Granular, CBR = 80% 43.38 17,881 775,678 89.90% 697,334 0.00%
3 B.31.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 6,068,065 6,068,065 82.34% 4,996,743 12.43%
B.31.4.1 m2 Imprimación 216.90 566 122,765 100.00% 122,765 0.00%
B.31.4.2 m2 Riego de Liga 216.90 469 101,726 100.00% 101,726 0.00%
B.31.4.3 m3 Concreto Asfáltico de Rodadura 10.84 154,673 1,676,655 100.00% 1,676,655 0.00%
B.31.4.4 m3 Concreto Asfáltico Capa Intermedia 13.01 145,156 1,888,480 100.00% 1,888,480 0.00%
B.31.4.5 m2 Aceras de Hormigón 151.00 15,089 2,278,439 52.98% 1,207,117 33.11%
3 B.31.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 11,408,320 11,408,320 100.00% 11,408,320 25.59%
B.31.5.1 m3 Hormigón G05 1.85 75,880 140,378 100.00% 140,378 0.00%
B.31.5.2 m3 Hormigón G17 2.57 193,885 498,284 100.00% 498,284 100.00%
B.31.5.3 m3 Hormigón G20 9.36 195,522 1,830,086 100.00% 1,830,086 100.00%
B.31.5.4 Kg Hormigón G25 0.80 246,289 197,031 100.00% 197,031 0.00%
B.31.5.5 m3 Hormigón G30 22.56 257,926 5,818,811 100.00% 5,818,811 0.00%
B.31.5.6 Kg Acero para Armaduras A630-420H 1,163.39 1,250 1,454,238 100.00% 1,454,238 40.62%
B.31.5.7 m2 Moldajes 46.45 31,636 1,469,492 100.00% 1,469,492 0.00%
3 B.31.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 16,667,911 16,667,911 87.34% 14,558,025 0.00%
B.31.6.2 n° Embudos para Descargas de Agua 1.00 293,760 293,760 0.00% 0 0.00%
B.31.6.3 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 4.00 116,607 466,428 0.00% 0 0.00%
B.31.6.4 m Soleras Tipo "A" 91.76 14,709 1,349,698 0.00% 0 0.00%
B.31.6.7 m Tubos Polietileno de Alta Densidad estructurados D=1,00 m 75.00 165,984 12,448,800 100.00% 12,448,800 0.00%
B.31.6.8 n° Construcción de Cámara de Inspección Tipo B 3.00 477,062 1,431,186 100.00% 1,431,186 0.00%
B.31.6.9 n° Tapas de Cámaras 3.00 190,798 572,394 100.00% 572,394 0.00%
B.31.6.10 m Suministro y Colocación de Escalines 15.00 7,043 105,645 100.00% 105,645 0.00%
3 B.31.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 7,704,398 7,704,399 45.51% 3,506,452 45.51%
B.31.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00%
B.31.7.2 Km Demarcación, Línea Lateral Segmentada 0.05 1,600,206 80,010 0.00% 0 0.00%
B.31.7.3 Km Demarcación, Línea Lateral Continua 0.06 1,200,155 72,009 0.00% 0 0.00%
B.31.7.4 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 5.00 11,001 55,005 0.00% 0 0.00%
B.31.7.5 n° Tachas Reflectantes 37.00 1,600 59,200 0.00% 0 0.00%
B.31.7.6 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 100.00% 3,506,452 100.00%
B.31.7.7 m Valla Peatonal 80.00 44,402 3,552,160 0.00% 0 0.00%
B.31.7.8 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 7.00 33,298 233,086 0.00% 0 0.00%
3 B.31.8 ILUMINACIÓN 1.00 13,732,535 13,732,535 19.04% 2,614,406 6.85%
RA02-24.12-I200 un Empalme por Compañía + Medidor Trifasico 1.00 1,221,415 1,221,415 0.00% 0 0.00%
RA02-24.12-I207 c/u Ferretería instalación + desconectadores fusibles Trifásicos 1.00 805,275 805,275 0.00% 0 0.00%
RA02-24.12-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 103.00 12,597 1,297,491 100.00% 1,297,491 12.62%
RA02-24.12-I209 m Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA02-24.12-I210 m Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA02-24.12-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 9.00 14,619 131,571 0.00% 0 0.00%
RA02-24.12-I218 c/u Provisión y montaje Luminaria Vial 38 W, LED 8.00 141,294 1,130,352 0.00% 0 0.00%
RA02-24.12-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 140.00 3,679 515,060 0.00% 0 0.00%
RA02-24.12-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 278.10 4,232 1,176,919 25.17% 296,231 25.17%
RA02-24.12-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 128.00 6,007 768,896 80.47% 618,731 10.16%
RA02-24.12-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 8.00 273,789 2,190,312 0.00% 0 0.00%
RA02-24.12-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 8.00 129,331 1,034,648 0.00% 0 0.00%
RA02-24.12-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 2.19 183,540 401,953 100.00% 401,953 100.00%
RA02-24.12-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 0.00% 0 0.00%
RA02-24.12-I232 c/u Cámaras Registro Malla de Puesta Tierra 4.00 40,986 163,944 0.00% 0 0.00%
RA02-24.12-I233 c/u Tablero Control General iluminación Trifásico 1.00 2,013,921 2,013,921 0.00% 0 0.00%
RA02-24.12-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 3.00 24,070 72,210 0.00% 0 0.00%
2 B.32 PARADERO LADO ORIENTE PUENTE TOLTÉN KM 700,400 1.00 195,598,131 195,598,129 15.66% 30,636,453 9.79%
3 B.32.1 PREPARACION DEL AREA DE TRABAJO 1.00 6,691,183 6,691,182 95.86% 6,414,225 45.12%
B.32.1.1 m3 Remoción de Estructuras 10.16 43,508 442,041 100.00% 442,041 100.00%
B.32.1.2 m2 Remoción de pavimentos Asfáltico 1,170.32 1,740 2,036,357 91.43% 1,861,841 91.43%
B.32.1.3 m Remoción de Obras de Drenaje Superficial 54.42 3,345 182,035 100.00% 182,035 100.00%
B.32.1.4 m Remoción de Barreras de Contención Laterales Metálicas 118.00 4,516 532,888 100.00% 532,888 100.00%
B.32.1.5 m Remoción de Cercos 7.16 2,791 19,984 100.00% 19,984 0.00%
B.32.1.6 Km Despeje y Limpieza de Faja 0.75 4,500,581 3,375,436 100.00% 3,375,436 0.00%
B.32.1.7 n° Reubicación de Señalización Vertical Lateral 2.00 51,221 102,442 0.00% 0 0.00%
3 B.32.2 MOVIMIENTO DE TIERRAS 1.00 22,715,741 22,715,741 80.61% 18,310,664 47.36%
B.32.2.1 m3 Excavación de Escarpe 1,107.00 4,936 5,464,152 100.00% 5,464,152 0.00%
B.32.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 423.00 4,936 2,087,928 100.00% 2,087,928 0.00%
B.32.2.3 m3 Excavación en TCN para Obras de Drenaje 104.32 7,766 810,149 100.00% 810,149 100.00%
B.32.2.4 m3 Formación y Compactación de Terraplenes 1,089.72 10,801 11,770,066 70.76% 8,328,499 70.76%
B.32.2.5 m3 Relleno Estructural 14.80 23,376 345,965 0.00% 0 0.00%
B.32.2.6 m2 Preparación de la Subrasante 2,486.09 900 2,237,481 72.40% 1,619,936 72.40%
3 B.32.3 CAPAS GRANULARES 1.00 9,382,518 9,382,518 57.17% 5,363,986 57.17%
B.32.3.1 m3 Base Granular, CBR = 80% 524.72 17,881 9,382,518 57.17% 5,363,986 57.17%
3 B.32.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 43,736,221 43,736,221 0.00% 0 0.00%
B.32.4.1 m2 Imprimación 2,486.09 566 1,407,127 0.00% 0 0.00%
B.32.4.2 m2 Riego de Liga 2,027.76 469 951,019 0.00% 0 0.00%
B.32.4.3 m3 Concreto Asfáltico de Rodadura 124.30 154,673 19,225,854 0.00% 0 0.00%
B.32.4.4 m3 Concreto Asfáltico Capa Intermedia 121.67 145,156 17,661,131 0.00% 0 0.00%
B.32.4.5 m2 Aceras de Hormigón 297.64 15,089 4,491,090 0.00% 0 0.00%
3 B.32.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 12,971,556 12,971,555 0.00% 0 0.00%
B.32.5.1 m3 Hormigón G05 2.62 75,880 198,806 0.00% 0 0.00%
B.32.5.2 m3 Hormigón G17 33.61 193,885 6,516,475 0.00% 0 0.00%
B.32.5.3 m3 Hormigón G25 20.51 246,289 5,051,387 0.00% 0 0.00%
B.32.5.4 Kg Acero para Armaduras A630-420H 963.91 1,250 1,204,888 0.00% 0 0.00%
3 B.32.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 27,555,581 27,555,581 0.00% 0 0.00%
B.32.6.1 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=0,8 10.00 69,341 693,410 0.00% 0 0.00%
B.32.6.2 n° Embudos para Descargas de Agua 1.00 293,760 293,760 0.00% 0 0.00%
B.32.6.3 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 11.60 116,607 1,352,641 0.00% 0 0.00%
B.32.6.4 m Soleras Tipo "A" 169.00 14,709 2,485,821 0.00% 0 0.00%
B.32.6.5 m Cunetas de Hormigón Triangulares 70.00 25,910 1,813,700 0.00% 0 0.00%
B.32.6.6 Nº Rejillas para Sumideros Tipo 60-18-R 1.00 592,504 592,504 0.00% 0 0.00%
B.32.6.7 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 326.90 3,394 1,109,499 0.00% 0 0.00%
B.32.6.8 m3 Revestimiento de Fosos y Contrafosos 56.00 297,428 16,655,968 0.00% 0 0.00%
B.32.6.9 m Tubos Polietileno de Alta Densidad estructurados D=1,00 m 8.00 165,984 1,327,872 0.00% 0 0.00%
B.32.6.10 m Limpieza de Alcantarillas y Sifones, de hasta 1 m de altura 54.00 19,252 1,039,608 0.00% 0 0.00%
B.32.6.11 n° Tapas de Cámaras 1.00 190,798 190,798 0.00% 0 0.00%
3 B.32.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 46,464,429 46,464,429 0.00% 0 0.00%
B.32.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 5.00 146,476 732,380 0.00% 0 0.00%
B.32.7.2 n° Baliza Luminosa 2.00 1,865,691 3,731,382 0.00% 0 0.00%
B.32.7.3 Km Demarcación, Línea Lateral Segmentada 0.60 1,600,206 960,124 0.00% 0 0.00%
B.32.7.4 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 62.50 11,001 687,563 0.00% 0 0.00%
B.32.7.5 n° Tachas Reflectantes 248.00 1,600 396,800 0.00% 0 0.00%
B.32.7.6 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
B.32.7.7 m Valla Peatonal 116.70 44,402 5,181,713 0.00% 0 0.00%
B.32.7.10 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 0.00% 0 0.00%
B.32.7.8 m Barreras Laterales de Hormigón en Sitio Alta 497.00 57,568 28,611,296 0.00% 0 0.00%
B.32.7.9 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 7.40 33,298 246,405 0.00% 0 0.00%
3 B.32.8 ILUMINACIÓN 1.00 26,080,902 26,080,902 2.10% 547,578 0.00%
RA02-24.13-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA02-24.13-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00%
RA02-24.13-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00%
RA02-24.13-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA02-24.13-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 436.57 12,597 5,499,472 0.00% 0 0.00%
RA02-24.13-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA02-24.13-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA02-24.13-I213 c/u Construcción Cámara BT (CBT-xxx) 1.00 126,117 126,117 0.00% 0 0.00%
RA02-24.13-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 10.00 14,619 146,190 0.00% 0 0.00%
RA02-24.13-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 10.00 238,377 2,383,770 0.00% 0 0.00%
RA02-24.13-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 125.00 3,679 459,875 0.00% 0 0.00%
RA02-24.13-I223 m Provisión y montaje Cable 4 x 1 x 13,3 mm2, XTU 1,211.14 5,654 6,847,786 0.00% 0 0.00%
RA02-24.13-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 473.57 6,007 2,844,735 0.00% 0 0.00%
RA02-24.13-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 10.00 273,789 2,737,890 20.00% 547,578 0.00%
RA02-24.13-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 2.43 183,540 446,002 0.00% 0 0.00%
RA02-24.13-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00%
RA02-24.13-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00%
RA02-24.13-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00%
RA02-24.13-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 6.00 24,070 144,420 0.00% 0 0.00%
2 B.33 PARADERO PICHIQUEPE C.S. ORIENTE KM 686,200 1.00 163,861,110 163,861,107 25.88% 42,413,928 18.99%
3 B.33.1 PREPARACION DEL AREA DE TRABAJO 1.00 3,217,086 3,217,086 79.04% 2,542,944 65.06%
B.33.1.1 m2 Remoción de pavimentos Asfáltico 479.50 1,740 834,330 41.71% 347,999 41.71%
B.33.1.2 m Remoción de Obras de Drenaje Superficial 188.52 3,345 630,599 100.00% 630,599 100.00%
B.33.1.3 nº Remoción de Señalización Vertical Lateral 4.00 17,074 68,296 50.00% 34,148 50.00%
B.33.1.4 Km Despeje y Limpieza de Faja 0.34 4,500,581 1,530,198 100.00% 1,530,198 70.59%
B.33.1.5 n° Reubicación de Señalización Vertical Lateral 3.00 51,221 153,663 0.00% 0 0.00%
3 B.33.2 MOVIMIENTO DE TIERRAS 1.00 31,876,030 31,876,029 64.89% 20,683,098 64.89%
B.33.2.1 m3 Excavación de Escarpe 581.00 4,936 2,867,816 100.00% 2,867,816 100.00%
B.33.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 498.00 4,936 2,458,128 80.32% 1,974,368 80.32%
B.33.2.3 m3 Excavación en TCN para Obras de Drenaje 623.12 7,766 4,839,150 0.00% 0 0.00%
B.33.2.4 m3 Formación y Compactación de Terraplenes 1,479.87 10,801 15,984,076 94.60% 15,120,936 94.60%
B.33.2.5 m3 Relleno Estructural 210.10 23,376 4,911,298 0.00% 0 0.00%
B.33.2.6 m2 Preparación de la Subrasante 906.18 900 815,562 88.28% 719,978 88.28%
3 B.33.3 CAPAS GRANULARES 1.00 3,240,752 3,240,752 0.00% 0 0.00%
B.33.3.1 m3 Base Granular, CBR = 80% 181.24 17,881 3,240,752 0.00% 0 0.00%
3 B.33.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 24,396,095 24,396,095 0.00% 0 0.00%
B.33.4.1 m2 Imprimación 906.18 566 512,898 0.00% 0 0.00%
B.33.4.2 m2 Riego de Liga 906.18 469 424,998 0.00% 0 0.00%
B.33.4.3 m3 Concreto Asfáltico de Rodadura 45.31 154,673 7,008,234 0.00% 0 0.00%
B.33.4.4 m3 Concreto Asfáltico Capa Intermedia 63.43 145,156 9,207,245 0.00% 0 0.00%
B.33.4.5 m2 Aceras de Hormigón 480.00 15,089 7,242,720 0.00% 0 0.00%
3 B.33.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 1,023,518 1,023,517 0.00% 0 0.00%
B.33.5.1 m3 Hormigón G05 0.27 75,880 20,488 0.00% 0 0.00%
B.33.5.2 m3 Hormigón G25 2.68 246,289 660,055 0.00% 0 0.00%
B.33.5.3 m3 Acero para Armaduras A630-420H 274.38 1,250 342,975 0.00% 0 0.00%
3 B.33.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 17,191,058 17,191,058 0.00% 0 0.00%
B.33.6.1 m Soleras Tipo "A" 145.80 14,709 2,144,572 0.00% 0 0.00%
B.33.6.2 Nº Rejillas para Sumideros Tipo 60-18-R 5.00 592,504 2,962,520 0.00% 0 0.00%
B.33.6.3 m Tubo de HDPE Sanitario D:400mm 311.56 24,477 7,626,054 0.00% 0 0.00%
B.33.6.4 n° Construcción de Cámara de Inspección Tipo B 6.00 477,062 2,862,372 0.00% 0 0.00%
B.33.6.5 n° Tapas de Cámaras 6.00 190,798 1,144,788 0.00% 0 0.00%
B.33.6.6 n° Suministro y Colocación de Escalines 64.00 7,043 450,752 0.00% 0 0.00%
3 B.33.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 62,717,885 62,717,884 29.28% 18,366,601 11.99%
B.33.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 2.00 146,476 292,952 0.00% 0 0.00%
B.33.7.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00%
B.33.7.3 n° Baliza Luminosa 2.00 1,865,691 3,731,382 50.00% 1,865,691 0.00%
B.33.7.4 Km Demarcación, Línea Lateral Segmentada 0.42 1,600,206 672,087 0.00% 0 0.00%
B.33.7.5 Km Demarcación, Línea Lateral Continua 0.36 1,200,155 432,056 0.00% 0 0.00%
B.33.7.6 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 92.00 11,001 1,012,092 0.00% 0 0.00%
B.33.7.7 n° Tachas Reflectantes 198.00 1,600 316,800 0.00% 0 0.00%
B.33.7.8 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
B.33.7.9 m Barreras Metálicas de Contención Laterales, de Doble Onda 20.00 39,001 780,020 100.00% 780,020 100.00%
B.33.7.10 m Valla Peatonal 250.00 44,402 11,100,500 0.00% 0 0.00%
B.33.7.11 m Valla Peatonal en Mediana 300.00 72,160 21,648,000 20.00% 4,329,600 20.00%
B.33.7.12 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 100.00% 2,410,314 100.00%
B.33.7.13 m Barreras Laterales de Hormigón en Sitio Alta 277.00 57,568 15,946,336 56.32% 8,980,976 0.00%
B.33.7.14 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 9.20 33,298 306,342 0.00% 0 0.00%
3 B.33.8 ILUMINACIÓN 1.00 20,198,686 20,198,685 4.07% 821,285 4.07%
RA02-24.14-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA02-24.14-I205 c/u Transformador 5 kVA 2f, norma COMPAÑÍA 1.00 1,151,499 1,151,499 0.00% 0 0.00%
RA02-24.14-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00%
RA02-24.14-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA02-24.14-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 223.80 12,597 2,819,209 0.00% 0 0.00%
RA02-24.14-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 26.92 28,707 772,792 0.00% 0 0.00%
RA02-24.14-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA02-24.14-I213 c/u Construcción Cámara BT (CBT-xxx) 4.00 126,117 504,468 0.00% 0 0.00%
RA02-24.14-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 9.00 14,619 131,571 0.00% 0 0.00%
RA02-24.14-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 9.00 238,377 2,145,393 0.00% 0 0.00%
RA02-24.14-I218 c/u Provisión y montaje Luminaria Vial 38 W, LED 3.00 141,294 423,882 0.00% 0 0.00%
RA02-24.14-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 127.50 3,679 469,073 0.00% 0 0.00%
RA02-24.14-I223 m Provisión y montaje Cable 4 x 1 x 13,3 mm2, XTU 665.01 5,654 3,759,967 0.00% 0 0.00%
RA02-24.14-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 268.26 6,007 1,611,438 0.00% 0 0.00%
RA02-24.14-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 9.00 273,789 2,464,101 33.33% 821,285 33.33%
RA02-24.14-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 3.00 129,331 387,993 0.00% 0 0.00%
RA02-24.14-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 2.19 183,540 401,953 0.00% 0 0.00%
RA02-24.14-I231 c/u Soldadura Termofusión. 22.00 30,775 677,050 0.00% 0 0.00%
RA02-24.14-I232 c/u Cámaras Registro Malla de Puesta Tierra 2.00 40,986 81,972 0.00% 0 0.00%
RA02-24.14-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00%
RA02-24.14-I234 c/u Retiro y reemplazo de luminaria existente poste galvanizado 1.00 304,384 304,384 0.00% 0 0.00%
RA02-24.14-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 1.00 17,856 17,856 0.00% 0 0.00%
RA02-24.14-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 6.00 24,070 144,420 0.00% 0 0.00%
C OBRAS DE SERVICIALIDAD 3,218,662,548 53.55% 1,723,534,621 17.37%
C.2 DISEÑO GEOMETRICO ACCESO A CALLE DE SERVICIO
2 1.00 76,417,523 76,417,522 24.19% 18,483,942 0.94%
SECTOR TURBINA KM 607,960 ORIENTE
3 C.2.1 PREPARACION DEL AREA DE TRABAJO 1.00 7,404,569 7,404,569 99.31% 7,353,348 0.00%
C.2.1.1 m2 Remoción de pavimentos Asfáltico 292.01 1,740 508,097 100.00% 508,097 0.00%
C.2.1.2 m Remoción de Obras de Drenaje Superficial 168.13 3,345 562,395 100.00% 562,395 0.00%
C.2.1.3 m2 Remoción de Aceras 16.03 4,286 68,705 100.00% 68,705 0.00%
C.2.1.4 nº Remoción de casetas de Paraderos para la locomoción colectiva 1.00 608,570 608,570 100.00% 608,570 0.00%
C.2.1.5 Km Despeje y Limpieza de Faja 1.20 4,500,581 5,400,697 100.00% 5,400,697 0.00%
C.2.1.6 n° Reubicación de Señalización Vertical Lateral 5.00 51,221 256,105 80.00% 204,884 0.00%
3 C.2.2 MOVIMIENTO DE TIERRAS 1.00 4,004,905 4,004,905 92.96% 3,722,834 0.00%
C.2.2.1 m3 Excavación de Escarpe 33.00 4,936 162,888 100.00% 162,888 0.00%
C.2.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 515.00 4,936 2,542,040 100.00% 2,542,040 0.00%
C.2.2.3 m3 Excavación en TCN para Obras de Drenaje 0.91 7,766 7,067 0.00% 0 0.00%
C.2.2.4 m3 Formación y Compactación de Terraplenes 15.00 10,801 162,015 100.00% 162,015 0.00%
C.2.2.5 m3 Relleno Estructurante 9.00 23,376 210,384 0.00% 0 0.00%
C.2.2.6 m2 Preparación de la Subrasante 1,022.79 900 920,511 92.98% 855,891 0.00%
3 C.2.3 CAPAS GRANULARES 1.00 2,524,618 2,524,618 82.87% 2,092,151 28.33%
C.2.3.1 m3 Base Granular, CBR = 80% 141.19 17,881 2,524,618 82.87% 2,092,151 28.33%
3 C.2.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 21,286,618 21,286,618 0.00% 0 0.00%
C.2.4.1 m2 Imprimación 705.95 566 399,568 0.00% 0 0.00%
C.2.4.2 m2 Riego de Liga 705.95 469 331,091 0.00% 0 0.00%
C.2.4.3 m3 Concreto Asfáltico de Rodadura 42.36 154,673 6,551,948 0.00% 0 0.00%
C.2.4.4 m3 Concreto Asfáltico Capa Intermedia 63.54 145,156 9,223,212 0.00% 0 0.00%
C.2.4.5 m2 Aceras de Hormigón 316.84 15,089 4,780,799 0.00% 0 0.00%
3 C.2.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 2,448,212 2,448,212 0.00% 0 0.00%
C.2.5.1 m3 Hormigón G05 0.58 75,880 44,010 0.00% 0 0.00%
C.2.5.2 m3 Hormigón G17 2.30 193,885 445,935 0.00% 0 0.00%
C.2.5.3 m3 Hormigón G30 4.00 257,926 1,031,704 0.00% 0 0.00%
C.2.5.4 Kg Acero para Armaduras A630-420H 311.00 1,250 388,750 0.00% 0 0.00%
C.2.5.5 m2 Moldajes 17.00 31,636 537,812 0.00% 0 0.00%
3 C.2.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 10,992,931 10,992,931 0.00% 0 0.00%
C.2.6.1 m Soleras Tipo "A" 79.20 14,709 1,164,953 0.00% 0 0.00%
C.2.6.2 m Soleras con Zarpa de Hormigón 108.00 29,804 3,218,832 0.00% 0 0.00%
C.2.6.3 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 107.00 3,394 363,158 0.00% 0 0.00%
C.2.6.4 m3 Revestimiento de Fosos y Contrafosos 21.00 297,428 6,245,988 0.00% 0 0.00%
3 C.2.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 15,591,231 15,591,231 7.48% 1,165,860 0.00%
C.2.7.10 m Cerco de Alambre de Púas 153.00 7,620 1,165,860 100.00% 1,165,860 0.00%
C.2.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00%
C.2.7.2 Km Demarcación, Línea de Eje Continua Doble 0.04 1,600,206 64,008 0.00% 0 0.00%
C.2.7.3 Km Demarcación, Línea Lateral Segmentada 0.17 1,600,206 272,035 0.00% 0 0.00%
C.2.7.4 Km Demarcación, Línea Lateral Continua 0.25 1,200,155 300,039 0.00% 0 0.00%
C.2.7.5 n° Tachas Reflectantes 166.00 1,600 265,600 0.00% 0 0.00%
C.2.7.6 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
C.2.7.7 m Valla Peatonal 144.00 44,402 6,393,888 0.00% 0 0.00%
C.2.7.8 m Barreras Laterales de Hormigón en Sitio Alta 56.00 57,568 3,223,808 0.00% 0 0.00%
C.2.7.9 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 7.60 33,298 253,065 0.00% 0 0.00%
3 C.2.8 ILUMINACIÓN 1.00 12,164,439 12,164,438 34.11% 4,149,749 0.00%
RA-03-2-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA-03-2-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA-03-2-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 135.73 12,597 1,709,791 84.73% 1,448,706 0.00%
RA-03-2-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA-03-2-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA-03-2-I213 c/u Construcción Cámara BT (CBT-xxx) 1.00 126,117 126,117 0.00% 0 0.00%
RA-03-2-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 7.00 14,619 102,333 0.00% 0 0.00%
RA-03-2-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 7.00 238,377 1,668,639 0.00% 0 0.00%
RA-03-2-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 87.50 3,679 321,913 0.00% 0 0.00%
RA-03-2-I222 m Provisión y montaje Cable 4 x 1 x 8,36 mm2, XTU 390.77 4,770 1,863,973 58.86% 1,097,134 0.00%
RA-03-2-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 169.73 6,007 1,019,568 67.75% 690,757 0.00%
RA-03-2-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 7.00 273,789 1,916,523 0.00% 0 0.00%
RA-03-2-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 1.70 183,540 312,018 0.00% 0 0.00%
RA-03-2-I231 c/u Soldadura Termofusión. 22.00 30,775 677,050 0.00% 0 0.00%
RA-03-2-I232 c/u Cámaras Registro Malla de Puesta Tierra 2.00 40,986 81,972 0.00% 0 0.00%
RA-03-2-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00%
RA-03-2-I234 c/u Retiro y reemplazo de luminaria existente poste galvanizado/hormigó 3.00 304,384 913,152 100.00% 913,152 0.00%
RA-03-2-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 3.00 24,070 72,210 0.00% 0 0.00%
C.3 DISEÑO GEOMETRICO ACCESO A CALLE DE SERVICIO
2 1.00 79,288,308 79,288,308 90.30% 71,594,459 30.02%
SECTOR TURBINA KM 607,960 PONIENTE
3 C.3.1 PREPARACION DEL AREA DE TRABAJO 1.00 3,436,904 3,436,904 100.00% 3,436,904 2.98%
C.3.1.1 m2 Remoción de pavimentos Asfáltico 1,036.77 1,740 1,803,980 100.00% 1,803,980 0.00%
C.3.1.2 m Remoción de Obras de Drenaje Superficial 245.94 3,345 822,669 100.00% 822,669 0.00%
C.3.1.3 m Remoción de Cercos 74.00 2,791 206,534 100.00% 206,534 0.00%
C.3.1.4 Km Despeje y Limpieza de Faja 0.10 4,500,581 450,058 100.00% 450,058 0.00%
C.3.1.5 n° Reubicación de Señalización Vertical Lateral 3.00 51,221 153,663 100.00% 153,663 66.67%
3 C.3.2 MOVIMIENTO DE TIERRAS 1.00 5,244,941 5,244,941 100.00% 5,244,941 0.05%
C.3.2.1 m3 Excavación de Escarpe 187.12 4,936 923,624 100.00% 923,624 0.00%
C.3.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 459.34 4,936 2,267,302 100.00% 2,267,302 0.00%
C.3.2.3 m3 Excavación en TCN para Obras de Drenaje 12.35 7,766 95,910 100.00% 95,910 2.83%
C.3.2.4 m3 Formación y Compactación de Terraplenes 54.50 10,801 588,655 100.00% 588,655 0.00%
C.3.2.5 m3 Relleno Estructural 2.59 23,376 60,544 100.00% 60,544 0.00%
C.3.2.6 m2 Preparación de la Subrasante 1,454.34 900 1,308,906 100.00% 1,308,906 0.00%
3 C.3.3 CAPAS GRANULARES 1.00 5,201,046 5,201,046 100.00% 5,201,046 0.00%
C.3.3.1 m3 Base Granular, CBR = 80% 290.87 17,881 5,201,046 100.00% 5,201,046 0.00%
3 C.3.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 28,343,698 28,343,698 100.00% 28,343,698 18.32%
C.3.4.1 m2 Imprimación 1,212.38 566 686,207 100.00% 686,207 0.00%
C.3.4.2 m2 Riego de Liga 1,212.38 469 568,606 100.00% 568,606 0.00%
C.3.4.3 m3 Concreto Asfáltico de Rodadura 72.74 154,673 11,250,914 100.00% 11,250,914 20.99%
C.3.4.4 m3 Concreto Asfáltico Capa Intermedia 109.11 145,156 15,837,971 100.00% 15,837,971 17.87%
3 C.3.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 914,132 914,132 100.00% 914,132 6.08%
C.3.5.1 m3 Hormigón G05 0.05 75,880 3,794 100.00% 3,794 40.00%
C.3.5.2 m3 Hormigón G25 3.21 246,289 790,588 100.00% 790,588 6.54%
C.3.5.3 Kg Acero para Armaduras A630-420H 95.80 1,250 119,750 100.00% 119,750 1.93%
3 C.3.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 11,820,811 11,820,811 100.00% 11,820,811 63.28%
C.3.6.1 n° Embudos para Descargas de Agua 1.00 293,760 293,760 100.00% 293,760 100.00%
C.3.6.2 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 3.00 116,607 349,821 100.00% 349,821 100.00%
C.3.6.3 m Soleras Tipo "A" 318.00 14,709 4,677,462 100.00% 4,677,462 68.55%
C.3.6.4 Nº Rejillas para Sumideros Tipo 60-18-R 1.00 592,504 592,504 100.00% 592,504 100.00%
C.3.6.5 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormi 101.77 3,394 345,407 100.00% 345,407 50.38%
C.3.6.6 m3 Revestimiento de Fosos y Contrafosos 17.63 297,428 5,243,656 100.00% 5,243,656 54.62%
C.3.6.7 m Tubo de PVC Sanitario D: 315mm 13.00 24,477 318,201 100.00% 318,201 0.00%
3 C.3.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 13,842,047 13,842,046 73.61% 10,188,809 48.98%
C.3.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 5.00 146,476 732,380 100.00% 732,380 80.00%
C.3.7.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 100.00% 562,552 50.00%
C.3.7.3 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 4.00 1,027,331 4,109,324 100.00% 4,109,324 100.00%
C.3.7.4 n° Señales Verticales Laterales Tipo 6 ,7 m2 < Sp<=12 m2 1.00 1,537,396 1,537,396 100.00% 1,537,396 0.00%
C.3.7.5 Km Demarcación, Línea de Eje Continua Doble 0.13 1,600,206 208,027 0.00% 0 0.00%
C.3.7.6 Km Demarcación, Línea Lateral Continua 0.32 1,200,155 384,050 0.00% 0 0.00%
C.3.7.7 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 78.00 11,001 858,078 0.00% 0 0.00%
C.3.7.8 n° Tachas Reflectantes 69.00 1,600 110,400 0.00% 0 0.00%
C.3.7.9 m Valla Segregatorias con recuperación de vallas 74.00 72,160 5,339,840 60.81% 3,247,157 33.78%
3 C.3.8 ILUMINACIÓN 1.00 10,474,325 10,474,325 61.42% 6,433,714 39.86%
RA-03-3-I201 c/u Empalme por Compañía + Medidor Trifásico 1.00 1,221,415 1,221,415 0.00% 0 0.00%
RA-03-3-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 805,275 805,275 0.00% 0 0.00%
RA-03-3-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 118.40 12,597 1,491,485 100.00% 1,491,485 7.09%
RA-03-3-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 100.00% 86,121 100.00%
RA-03-3-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 100.00% 106,947 100.00%
RA-03-3-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 368.28 4,232 1,558,561 100.00% 1,558,561 100.00%
RA-03-3-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 161.40 6,007 969,530 100.00% 969,530 10.00%
RA-03-3-I231 c/u Soldadura Termofusión. 22.00 30,775 677,050 100.00% 677,050 100.00%
RA-03-3-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 100.00% 122,958 100.00%
RA-03-3-I233 c/u Tablero Control General iluminación Trifásico 1.00 2,013,921 2,013,921 0.00% 0 0.00%
RA-03-3-I234 c/u Retiro y reemplazo de luminaria existente poste galvanizado/hormigó 3.00 304,384 913,152 100.00% 913,152 100.00%
RA-03-3-I235 c/u Retiro Luminaria y Poste Metálico. 3.00 41,144 123,432 100.00% 123,432 100.00%
RA-03-3-I236 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 100.00% 6,358 100.00%
RA-03-3-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 5.00 17,856 89,280 100.00% 89,280 100.00%
RA-03-3-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 12.00 24,070 288,840 100.00% 288,840 100.00%
3 C.3.9 OBRAS COMPLEMETARIAS 1.00 10,404 10,404 100.00% 10,404 100.00%
C.3.9.2 Gl ESCALINES 2.00 5,202 10,404 100.00% 10,404 100.00%
MODIFICACIÓN DISEÑO GEOMETRICO RAMAL NOR-PONIENTE
2 C.4 DE ACCESO A TRAIGUÉN EN ATRAVIESO VICTORIA - 1.00 77,583,696 77,583,697 63.49% 49,261,055 9.64%
TRAIGUÉN
3 C.4.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,120,149 1,120,148 100.00% 1,120,149 0.00%
C.4.1.1 m2 Remoción de pavimentos Asfáltico 7.46 1,740 12,980 100.00% 12,980 0.00%
C.4.1.2 m Remoción de Obras de Drenaje Superficial 117.70 3,345 393,707 100.00% 393,707 0.00%
C.4.1.3 m Remoción de Cercos 46.00 2,791 128,386 100.00% 128,386 0.00%
C.4.1.4 Km Despeje y Limpieza de Faja 0.13 4,500,581 585,076 100.00% 585,076 0.00%
3 C.4.2 MOVIMIENTO DE TIERRAS 1.00 5,345,959 5,345,960 100.00% 5,345,959 0.00%
C.4.2.1 m3 Excavación de Escarpe 253.00 4,936 1,248,808 100.00% 1,248,808 0.00%
C.4.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 9.00 4,936 44,424 100.00% 44,424 0.00%
C.4.2.3 m3 Excavación en TCN para Obras de Drenaje 30.73 7,766 238,649 100.00% 238,649 0.00%
C.4.2.4 m3 Formación y Compactación de Terraplenes 245.35 10,801 2,650,025 100.00% 2,650,025 0.00%
C.4.2.5 m3 Relleno Estructural 20.15 23,376 471,026 100.00% 471,026 0.00%
C.4.2.6 m2 Preparación de la Subrasante 770.03 900 693,027 100.00% 693,027 0.00%
3 C.4.3 CAPAS GRANULARES 1.00 3,058,724 3,058,724 100.00% 3,058,724 0.00%
C.4.3.1 m3 Base Granular, CBR = 80% 171.06 17,881 3,058,724 100.00% 3,058,724 0.00%
3 C.4.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 8,557,005 8,557,006 100.00% 8,557,005 0.00%
C.4.4.1 m2 Imprimación 558.48 566 316,100 100.00% 316,100 0.00%
C.4.4.2 m2 Riego de Liga 368.99 469 173,056 100.00% 173,056 0.00%
C.4.4.3 m3 Concreto Asfáltico de Rodadura 27.92 154,673 4,318,470 100.00% 4,318,470 0.00%
C.4.4.4 m3 Concreto Asfáltico Capa Intermedia 25.83 145,156 3,749,379 100.00% 3,749,379 0.00%
3 C.4.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 1,769,540 1,769,539 100.00% 1,769,540 0.00%
C.4.5.1 m3 Hormigón G05 0.16 75,880 12,141 100.00% 12,141 0.00%
C.4.5.2 m3 Hormigón G10 0.85 78,882 67,050 100.00% 67,050 0.00%
C.4.5.3 m3 Hormigón G30 5.22 257,926 1,346,374 100.00% 1,346,374 0.00%
C.4.5.4 Kg Acero para Armaduras A630-420H 275.18 1,250 343,975 100.00% 343,975 0.00%
3 C.4.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 6,091,471 6,091,471 100.00% 6,091,471 12.48%
C.4.6.1 n° Embudos para Descargas de Agua 1.00 293,760 293,760 100.00% 293,760 100.00%
C.4.6.2 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 4.00 116,607 466,428 100.00% 466,428 100.00%
C.4.6.3 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 83.60 3,394 283,738 100.00% 283,738 0.00%
C.4.6.4 m3 Revestimiento de Fosos y Contrafosos 15.00 297,428 4,461,420 100.00% 4,461,420 0.00%
C.4.6.5 m Tubo de HDPE Sanitario D:400mm 15.00 24,477 367,155 100.00% 367,155 0.00%
C.4.6.6 n° Tapas de Cámaras 1.00 190,798 190,798 100.00% 190,798 0.00%
C.4.6.7 n° Suministro y Colocación de Escalines 4.00 7,043 28,172 100.00% 28,172 0.00%
3 C.4.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 39,248,696 39,248,696 27.88% 10,943,911 17.11%
C.4.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 11.00 146,476 1,611,236 100.00% 1,611,236 0.00%
C.4.7.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 100.00% 562,552 0.00%
C.4.7.3 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 2.00 1,027,331 2,054,662 100.00% 2,054,662 0.00%
C.4.7.4 n° Señales Verticales Laterales Tipo 7 ,12 m2 < Sp<= 14 m2 15.00 2,238,487 33,577,305 20.00% 6,715,461 20.00%
C.4.7.5 Km Demarcación, Línea de Eje Continua Doble 0.10 1,600,206 160,021 0.00% 0 0.00%
C.4.7.6 Km Demarcación, Línea Lateral Segmentada 0.04 1,600,206 64,008 0.00% 0 0.00%
C.4.7.7 Km Demarcación, Línea Lateral Continua 0.17 1,200,155 204,026 0.00% 0 0.00%
C.4.7.8 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 86.00 11,001 946,086 0.00% 0 0.00%
C.4.7.9 n° Tachas Reflectantes 43.00 1,600 68,800 0.00% 0 0.00%
3 C.4.8 ILUMINACIÓN 1.00 12,392,152 12,392,152 99.86% 12,374,296 0.00%
RA-03-4-I201 c/u Empalme por Compañía + Medidor Trifásico 1.00 1,221,415 1,221,415 100.00% 1,221,415 0.00%
RA-03-4-I207 c/u Ferretería instalación + desconectadores fusibles Trifásicos 1.00 805,275 805,275 100.00% 805,275 0.00%
RA-03-4-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 68.57 12,597 863,776 100.00% 863,776 0.00%
RA-03-4-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 49.91 28,707 1,432,766 100.00% 1,432,766 0.00%
RA-03-4-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 5.00 14,619 73,095 100.00% 73,095 0.00%
RA-03-4-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 5.00 238,377 1,191,885 100.00% 1,191,885 0.00%
RA-03-4-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 62.50 3,679 229,938 100.00% 229,938 0.00%
RA-03-4-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 311.80 4,232 1,319,538 100.00% 1,319,538 0.00%
RA-03-4-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 140.48 6,007 843,863 100.00% 843,863 0.00%
RA-03-4-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 5.00 273,789 1,368,945 100.00% 1,368,945 0.00%
RA-03-4-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 1.22 183,540 223,919 100.00% 223,919 0.00%
RA-03-4-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 100.00% 615,500 0.00%
RA-03-4-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 100.00% 122,958 0.00%
RA-03-4-I233 c/u Tablero Control General iluminación Trifásico 1.00 2,013,921 2,013,921 100.00% 2,013,921 0.00%
RA-03-4-I235 c/u Retiro Luminaria y Poste Metálico. 1.00 41,144 41,144 100.00% 41,144 0.00%
RA-03-4-I236 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 100.00% 6,358 0.00%
RA-03-4-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 1.00 17,856 17,856 0.00% 0 0.00%
C.5 HABILITACIÓN ÁREA DE ESTACIONAMIENTO RAMAL NOR-
2 1.00 19,191,475 19,191,475 95.66% 18,357,786 18.05%
ORIENTE ATRAVIESO VICTORIA - TRAIGUÉN
3 C.5.1 PREPARACION DEL AREA DE TRABAJO 1.00 195,227 195,227 100.00% 195,227 0.00%
C.5.1.1 m Remoción de Obras de Drenaje Superficial 18.00 3,345 60,210 100.00% 60,210 0.00%
C.5.1.2 Km Despeje y Limpieza de Faja 0.03 4,500,581 135,017 100.00% 135,017 0.00%
3 C.5.2 MOVIMIENTO DE TIERRAS 1.00 2,314,567 2,314,567 100.00% 2,314,567 0.00%
C.5.2.1 m3 Excavación de Escarpe 183.00 4,936 903,288 100.00% 903,288 0.00%
C.5.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 2.00 4,936 9,872 100.00% 9,872 0.00%
C.5.2.3 m3 Formación y Compactación de Terraplenes 107.00 10,801 1,155,707 100.00% 1,155,707 0.00%
C.5.2.4 m2 Preparación de la Subrasante 273.00 900 245,700 100.00% 245,700 0.00%
3 C.5.3 CAPAS GRANULARES 1.00 1,318,009 1,318,009 100.00% 1,318,009 0.00%
C.5.3.1 m3 Sub Base Granular, CBR = 50% 32.76 17,881 585,782 100.00% 585,782 0.00%
C.5.3.2 m3 Base Granular, CBR = 80% 40.95 17,881 732,227 100.00% 732,227 0.00%
3 C.5.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 3,799,450 3,799,450 100.00% 3,799,450 0.00%
C.5.4.1 m2 Imprimación 273.00 566 154,518 100.00% 154,518 0.00%
C.5.4.2 m3 Concreto Asfáltico de Rodadura 13.65 154,673 2,111,286 100.00% 2,111,286 0.00%
C.5.4.3 m2 Aceras de Hormigón 101.64 15,089 1,533,646 100.00% 1,533,646 0.00%
3 C.5.5 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 1,294,392 1,294,392 100.00% 1,294,392 0.00%
C.5.5.1 n° Soleras Tipo "A" 88.00 14,709 1,294,392 100.00% 1,294,392 0.00%
3 C.5.6 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 4,618,425 4,618,425 81.95% 3,784,736 35.22%
C.5.6.1 n° Señales Laterales, Tipo 1, Sp = 0.5 m2 3.00 98,470 295,410 100.00% 295,410 33.33%
C.5.6.2 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 33.00 11,001 363,033 0.00% 0 0.00%
C.5.6.3 n° Modificacion lateral caseta existente 2.00 1,528,226 3,056,452 100.00% 3,056,452 50.00%
C.5.6.4 n° Topes de Goma 16.00 29,416 470,656 0.00% 0 0.00%
C.5.6.5 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 13.00 33,298 432,874 100.00% 432,874 0.00%
3 C.5.7 ILUMINACIÓN 1.00 5,651,405 5,651,405 100.00% 5,651,405 32.51%
RA-03-5-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 64.12 12,597 807,720 100.00% 807,720 0.00%
RA-03-5-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 100.00% 86,121 100.00%
RA-03-5-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 100.00% 106,947 100.00%
RA-03-5-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 4.00 14,619 58,476 100.00% 58,476 0.00%
RA-03-5-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 4.00 238,377 953,508 100.00% 953,508 50.00%
RA-03-5-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 50.00 3,679 183,950 100.00% 183,950 0.00%
RA-03-5-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 197.42 4,232 835,481 100.00% 835,481 0.00%
RA-03-5-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 89.12 6,007 535,344 100.00% 535,344 0.00%
RA-03-5-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 4.00 273,789 1,095,156 100.00% 1,095,156 100.00%
RA-03-5-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 0.97 183,540 178,034 100.00% 178,034 0.00%
RA-03-5-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 100.00% 615,500 0.00%
RA-03-5-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 100.00% 122,958 0.00%
RA-03-5-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 3.00 24,070 72,210 100.00% 72,210 100.00%
2 C.8 PROLONGACIÓN CALLE DE SERVICIO YPF LADO ORIENTE 1.00 486,242,142 486,242,145 52.84% 256,910,334 4.46%
3 C.8.1 PREPARACION DEL AREA DE TRABAJO 1.00 7,606,409 7,606,409 97.21% 7,394,140 2.98%
C.8.1.1 m3 Remoción de Estructuras 4.55 43,508 197,961 100.00% 197,961 0.00%
C.8.1.2 m Remoción de ductos 10.00 22,693 226,930 100.00% 226,930 100.00%
C.8.1.3 m2 Remoción de pavimentos Asfáltico 1,072.00 1,740 1,865,280 88.62% 1,653,011 0.00%
C.8.1.4 m Remoción de Cercos 518.00 2,791 1,445,738 100.00% 1,445,738 0.00%
C.8.1.5 Km Despeje y Limpieza de Faja 0.86 4,500,581 3,870,500 100.00% 3,870,500 0.00%
3 C.8.2 MOVIMIENTO DE TIERRAS 1.00 129,441,907 129,441,907 98.40% 127,364,906 0.79%
C.8.2.1 m3 Excavación de Escarpe 3,234.90 4,936 15,967,466 100.00% 15,967,466 0.00%
C.8.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 436.00 4,936 2,152,096 100.00% 2,152,096 0.00%
C.8.2.3 m3 Excavación en TCN para Obras de Drenaje 195.69 7,766 1,519,729 45.99% 698,923 45.99%
C.8.2.4 m3 Formación y Compactación de Terraplenes 9,444.19 10,801 102,006,696 100.00% 102,006,696 0.00%
C.8.2.5 m3 Relleno Estructural 94.37 23,376 2,205,993 50.86% 1,121,968 10.59%
C.8.2.6 m2 Preparación de la Subrasante 6,211.03 900 5,589,927 96.92% 5,417,757 1.61%
3 C.8.3 CAPAS GRANULARES 1.00 22,211,957 22,211,957 95.39% 21,187,986 3.22%
C.8.3.1 m3 Base Granular, CBR = 80% 1,242.21 17,881 22,211,957 95.39% 21,187,986 3.22%
3 C.8.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 136,414,722 136,414,721 16.48% 22,482,890 2.11%
C.8.4.1 m2 Imprimación 5,263.62 566 2,979,209 64.59% 1,924,271 18.99%
C.8.4.2 m2 Riego de Liga 5,262.62 469 2,468,169 47.50% 1,172,380 32.30%
C.8.4.3 m3 Concreto Asfáltico de Rodadura 315.82 154,673 48,848,827 15.20% 7,425,022 0.00%
C.8.4.4 m3 Concreto Asfáltico Capa Intermedia 473.73 145,156 68,764,752 15.20% 10,452,242 0.00%
C.8.4.5 m2 Aceras de Hormigón 885.00 15,089 13,353,765 11.30% 1,508,975 11.30%
3 C.8.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 4,327,583 4,327,583 19.68% 851,493 19.68%
C.8.5.1 m3 Hormigón G05 7.24 75,880 549,371 13.81% 75,868 13.81%
C.8.5.2 m3 Hormigón G17 10.60 193,885 2,055,181 37.74% 775,625 37.74%
C.8.5.3 m3 Hormigón G25 4.32 246,289 1,063,968 0.00% 0 0.00%
C.8.5.4 Kg Acero para Armaduras A630-420H 527.25 1,250 659,063 0.00% 0 0.00%
3 C.8.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 65,156,347 65,156,348 31.24% 20,353,499 24.57%
C.8.6.1 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=0,8 36.00 69,341 2,496,276 47.22% 1,178,742 47.22%
C.8.6.2 n° Embudos para Descargas de Agua 1.00 293,760 293,760 0.00% 0 0.00%
C.8.6.3 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 17.40 116,607 2,028,962 24.71% 501,356 24.71%
C.8.6.4 m Soleras Tipo "A" 908.00 14,709 13,355,772 0.00% 0 0.00%
C.8.6.5 Nº Rejillas para Sumideros Tipo 60-18-R 6.00 592,504 3,555,024 50.00% 1,777,512 0.00%
C.8.6.6 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 759.42 3,394 2,577,471 60.44% 1,557,824 20.94%
C.8.6.7 m3 Revestimiento de Fosos y Contrafosos 132.14 297,428 39,302,136 35.09% 13,791,119 35.09%
C.8.6.8 m Tubo de PVC Sanitario D: 315mm 48.20 24,477 1,179,791 100.00% 1,179,791 0.00%
C.8.6.9 m Tubo de PVC Sanitario D: 400mm 15.00 24,477 367,155 100.00% 367,155 0.00%
3 C.8.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 48,474,845 48,474,845 51.27% 24,851,503 0.00%
C.8.7.1 m Cerco de Alambre de Púas 519.00 7,620 3,954,780 100.00% 3,954,780 0.00%
C.8.7.2 n° Portones de Dos Hojas 8.00 502,306 4,018,448 0.00% 0 0.00%
C.8.7.3 n° Señales Laterales, Tipo 2, Sp = 1 m2 10.00 146,476 1,464,760 0.00% 0 0.00%
C.8.7.4 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00%
C.8.7.5 n° Señales Verticales Laterales Tipo 8 ,14 m2 < Sp<= 20 m2 1.00 2,788,558 2,788,558 0.00% 0 0.00%
C.8.7.6 n° Delineadores verticales 5.00 81,267 406,335 0.00% 0 0.00%
C.8.7.7 Km Demarcación, Línea de Eje Continua Doble 0.05 1,600,206 80,010 0.00% 0 0.00%
C.8.7.8 Km Demarcación, Línea de Eje segmentada 0.42 550,071 231,030 0.00% 0 0.00%
C.8.7.9 Km Demarcación, Línea Lateral Segmentada 0.31 1,600,206 496,064 0.00% 0 0.00%
C.8.7.10 Km Demarcación, Línea Lateral Continua 0.39 1,200,155 468,060 0.00% 0 0.00%
C.8.7.11 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 330.00 11,001 3,630,330 0.00% 0 0.00%
C.8.7.12 n° Tachas Reflectantes 331.00 1,600 529,600 0.00% 0 0.00%
C.8.7.13 m Barreras Metálicas de Contención Laterales, de Doble Onda 20.00 39,001 780,020 0.00% 0 0.00%
C.8.7.14 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 0.00% 0 0.00%
C.8.7.15 m Barreras Laterales de Hormigón en Sitio Alta 463.00 57,568 26,653,984 78.40% 20,896,723 0.00%
3 C.8.8 ILUMINACIÓN 1.00 71,932,820 71,932,822 45.08% 32,423,917 0.00%
RA-03-8-I201 un Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA-03-8-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00%
RA-03-8-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00%
RA-03-8-I207 un Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA-03-8-I208 m Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 777.90 12,597 9,799,206 96.93% 9,498,371 0.00%
RA-03-8-I209 m Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 159.02 28,707 4,564,987 41.50% 1,894,470 0.00%
RA-03-8-I210 m Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA-03-8-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 38.00 14,619 555,522 0.00% 0 0.00%
RA-03-8-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 38.00 238,377 9,058,326 0.00% 0 0.00%
RA-03-8-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 475.00 3,679 1,747,525 0.00% 0 0.00%
RA-03-8-I224 m Provisión y montaje Cable 4 x 1 x 21,2 mm2, XTU 961.79 6,942 6,676,746 51.99% 3,471,240 0.00%
RA-03-8-I226 m Provisión y montaje Cable 2 x 1 x 42,4 mm2, XTU 1,592.19 10,623 16,913,834 62.81% 10,623,579 0.00%
RA-03-8-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 970.92 6,007 5,832,316 79.72% 4,649,523 0.00%
RA-03-8-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 38.00 273,789 10,403,982 13.16% 1,369,164 0.00%
RA-03-8-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 9.23 183,540 1,694,074 43.34% 734,212 0.00%
RA-03-8-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00%
RA-03-8-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00%
RA-03-8-I233 un Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00%
RA-03-8-I235 c/u Retiro Luminaria y Poste Metálico. 3.00 41,144 123,432 100.00% 123,432 0.00%
RA-03-8-I236 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 100.00% 6,358 0.00%
RA-03-8-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 3.00 17,856 53,568 100.00% 53,568 0.00%
RA-03-8-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 6.00 24,070 144,420 0.00% 0 0.00%
3 C.8.9 OBRAS COMPLEMETARIAS 1.00 675,552 675,552 0.00% 0 0.00%
C.8.9.2 m Limpieza de Alcantarillas y Sifones, de hasta 1 m de altura 30.70 19,252 591,036 0.00% 0 0.00%
C.8.9.3 [n°] Suministro y Colocación de Escalines 12.00 7,043 84,516 0.00% 0 0.00%
C.10 FACILIDADES PEATONALES SECTOR TRONCAL ALTO
2 1.00 297,787,985 297,787,985 4.28% 12,746,782 3.19%
METRENCO KM 682,720 LADO PONIENTE
3 C.10.1 PREPARACION DEL AREA DE TRABAJO 1.00 8,097,006 8,097,006 61.07% 4,944,473 61.07%
C.10.1.1 m2 Remoción de pavimentos Asfáltico 1,143.17 1,740 1,989,116 65.61% 1,305,059 65.61%
C.10.1.2 m Remoción de Obras de Drenaje Superficial 500.90 3,345 1,675,511 39.93% 669,031 39.93%
C.10.1.3 m Remoción de Barreras de Contención Laterales Metálicas 233.00 4,516 1,052,228 0.00% 0 0.00%
C.10.1.4 Km Despeje y Limpieza de Faja 0.66 4,500,581 2,970,383 100.00% 2,970,383 100.00%
C.10.1.5 nº Reubicación de Señalización Vertical Lateral 8.00 51,221 409,768 0.00% 0 0.00%
3 C.10.2 MOVIMIENTO DE TIERRAS 1.00 25,309,041 25,309,041 18.05% 4,567,618 18.05%
C.10.2.1 m3 Excavación de Escarpe 303.00 4,936 1,495,608 67.00% 1,002,057 67.00%
C.10.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 2,788.00 4,936 13,761,568 17.93% 2,467,449 17.93%
C.10.2.3 m3 Excavación en TCN para Obras de Drenaje 56.65 7,766 439,944 0.00% 0 0.00%
C.10.2.4 m3 Formación y Compactación de Terraplenes 408.18 10,801 4,408,752 14.70% 648,087 14.70%
C.10.2.5 m3 Relleno Estructural 41.65 23,376 973,610 0.00% 0 0.00%
C.10.2.6 m2 Preparación de la Subrasante 4,699.51 900 4,229,559 10.64% 450,025 10.64%
3 C.10.3 CAPAS GRANULARES 1.00 18,045,505 18,045,505 0.00% 0 0.00%
C.10.3.1 m3 Base Granular, CBR = 80% 1,009.20 17,881 18,045,505 0.00% 0 0.00%
3 C.10.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 84,996,876 84,996,876 0.00% 0 0.00%
C.10.4.1 m2 Imprimación 4,057.39 566 2,296,483 0.00% 0 0.00%
C.10.4.2 m2 Riego de Liga 3,287.44 469 1,541,809 0.00% 0 0.00%
C.10.4.3 m3 Concreto Asfáltico de Rodadura 230.47 154,673 35,647,486 0.00% 0 0.00%
C.10.4.4 m3 Concreto Asfáltico Capa Intermedia 269.92 145,156 39,180,508 0.00% 0 0.00%
C.10.4.5 m2 Aceras de Hormigón 419.55 15,089 6,330,590 0.00% 0 0.00%
3 C.10.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 50,109,204 50,109,204 0.00% 0 0.00%
C.10.5.1 m3 Hormigón G05 9.10 75,880 690,508 0.00% 0 0.00%
C.10.5.2 m3 Hormigón G17 5.77 193,885 1,118,716 0.00% 0 0.00%
C.10.5.3 m3 Hormigón G25 0.51 246,289 125,607 0.00% 0 0.00%
C.10.5.4 m3 Hormigón G30 114.08 257,926 29,424,198 0.00% 0 0.00%
C.10.5.5 Kg Acero para Armaduras A630-420H 5,873.35 1,250 7,341,688 0.00% 0 0.00%
C.10.5.6 m2 Revestimiento de Mampostería de Piedra 212.98 53,566 11,408,487 0.00% 0 0.00%
3 C.10.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 13,222,855 13,222,855 0.00% 0 0.00%
C.10.6.1 m Soleras Tipo "A" 222.00 14,709 3,265,398 0.00% 0 0.00%
C.10.6.2 m Soleras con Zarpa de Hormigón (Solera con Zarpa Tipo 1) 180.00 29,804 5,364,720 0.00% 0 0.00%
C.10.6.3 m Cunetas de Hormigón, Tipo Baden, Tipo 1 78.73 25,910 2,039,894 0.00% 0 0.00%
C.10.6.4 Nº Rejillas para Sumideros Tipo 60-18-R 1.00 592,504 592,504 0.00% 0 0.00%
C.10.6.5 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 34.00 3,394 115,396 0.00% 0 0.00%
C.10.6.6 m3 Revestimiento de Fosos y Contrafosos 5.92 297,428 1,760,774 0.00% 0 0.00%
C.10.6.7 m Tubo de HDPE D:315 mm 2.00 24,477 48,954 0.00% 0 0.00%
C.10.6.8 n° Suministro y Colocación de Escalines 5.00 7,043 35,215 0.00% 0 0.00%
3 C.10.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 56,031,715 56,031,716 3.33% 1,865,691 0.00%
C.10.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 33.00 146,476 4,833,708 0.00% 0 0.00%
C.10.7.2 n° Baliza Luminosa 4.00 1,865,691 7,462,764 25.00% 1,865,691 0.00%
C.10.7.3 Km Demarcación, Línea de Eje Continua Simple 0.33 1,200,155 396,051 0.00% 0 0.00%
C.10.7.4 Km Demarcación, Línea de Eje Mixta 0.02 1,100,142 22,003 0.00% 0 0.00%
C.10.7.5 Km Demarcación, Línea Lateral Segmentada termoplástica 0.67 1,600,206 1,072,138 0.00% 0 0.00%
C.10.7.6 Km Demarcación, Línea Lateral Continua 0.79 1,200,155 948,122 0.00% 0 0.00%
C.10.7.7 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 260.00 11,001 2,860,260 0.00% 0 0.00%
C.10.7.8 n° Tachas Reflectantes 271.00 1,600 433,600 0.00% 0 0.00%
C.10.7.9 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
C.10.7.10 m Barreras Metálicas de Contención Laterales, de Doble Onda 209.00 39,001 8,151,209 0.00% 0 0.00%
C.10.7.11 m Valla Peatonal 97.00 44,402 4,306,994 0.00% 0 0.00%
C.10.7.12 m Barreras Laterales de Hormigón en Sitio Alta 369.00 57,568 21,242,592 0.00% 0 0.00%
C.10.7.13 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 23.90 33,298 795,822 0.00% 0 0.00%
3 C.10.8 ILUMINACIÓN 1.00 41,975,783 41,975,782 3.26% 1,369,000 0.00%
RA03-11-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA03-11-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00%
RA03-11-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00%
RA03-11-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA03-11-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 540.30 12,597 6,806,159 0.00% 0 0.00%
RA03-11-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA03-11-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA03-11-I211 m. Provisión y montaje c.a.g. 6" ANSI C80-1 con Zanja + retape (Tuneler 12.90 305,053 3,935,184 0.00% 0 0.00%
RA03-11-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 23.00 14,619 336,237 0.00% 0 0.00%
RA03-11-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 23.00 238,377 5,482,671 0.00% 0 0.00%
RA03-11-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 287.50 3,679 1,057,713 0.00% 0 0.00%
RA03-11-I223 m Provisión y montaje Cable 4 x 1 x 13,3 mm2, XTU 1,542.24 5,654 8,719,825 0.00% 0 0.00%
RA03-11-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 596.20 6,007 3,581,373 0.00% 0 0.00%
RA03-11-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 23.00 273,789 6,297,147 21.74% 1,369,000 0.00%
RA03-11-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 5.59 183,540 1,025,989 0.00% 0 0.00%
RA03-11-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00%
RA03-11-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00%
RA03-11-I233 c/u Tablero Control General iluminación Monofásica 1.00 476,354 476,354 0.00% 0 0.00%
RA03-11-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 12.00 24,070 288,840 0.00% 0 0.00%
C.11 ACERA PEATONAL CALLE DE SERVICIO PONIENTE SECTOR
2 1.00 186,211,529 186,211,528 2.10% 3,909,706 0.40%
METRENCO ENTRE KM 682,600 - KM 683,500
3 C.11.1 PREPARACION DEL AREA DE TRABAJO 1.00 4,472,520 4,472,520 40.25% 1,800,178 0.00%
C.11.1.1 m3 Remoción de Estructuras 12.17 43,508 529,492 0.00% 0 0.00%
C.11.1.2 m Remoción de ductos 14.00 22,693 317,702 0.00% 0 0.00%
C.11.1.3 nº Remoción e instalación de Señalización Vertical Lateral 4.00 51,221 204,884 0.00% 0 0.00%
C.11.1.4 Km Despeje y Limpieza de Faja 0.76 4,500,581 3,420,442 52.63% 1,800,178 0.00%
3 C.11.2 MOVIMIENTO DE TIERRAS 1.00 19,453,321 19,453,321 3.81% 740,473 3.81%
C.11.2.1 m3 Excavación de Escarpe 442.00 4,936 2,181,712 33.94% 740,473 33.94%
C.11.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 1,555.00 4,936 7,675,480 0.00% 0 0.00%
C.11.2.3 m3 Excavación en TCN para Obras de Drenaje 45.91 7,766 356,537 0.00% 0 0.00%
C.11.2.4 m3 Formación y Compactación de Terraplenes 795.71 10,801 8,594,464 0.00% 0 0.00%
C.11.2.5 m3 Relleno Estructural 23.67 23,376 553,310 0.00% 0 0.00%
C.11.2.6 m2 Preparación de la Subrasante 102.02 900 91,818 0.00% 0 0.00%
3 C.11.3 CAPAS GRANULARES 1.00 364,772 364,772 0.00% 0 0.00%
C.11.3.2 m3 Base Granular, CBR = 80% 20.40 17,881 364,772 0.00% 0 0.00%
3 C.11.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 20,757,805 20,757,805 0.00% 0 0.00%
C.11.4.1 m2 Imprimación 102.02 566 57,743 0.00% 0 0.00%
C.11.4.2 m3 Concreto Asfáltico de Rodadura 6.12 154,673 946,599 0.00% 0 0.00%
C.11.4.3 m2 Aceras de Hormigón 1,309.13 15,089 19,753,463 0.00% 0 0.00%
3 C.11.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 6,437,981 6,437,981 0.00% 0 0.00%
C.11.5.1 m3 Hormigón G05 1.18 75,880 89,538 0.00% 0 0.00%
C.11.5.2 m3 Hormigón G17 18.35 193,885 3,557,790 0.00% 0 0.00%
C.11.5.3 m3 Hormigón G25 3.90 246,289 960,527 0.00% 0 0.00%
C.11.5.4 Kg Acero para Armaduras A630-420H 457.06 1,250 571,325 0.00% 0 0.00%
C.11.5.5 m2 Revestimiento de Mampostería de Piedra 23.50 53,566 1,258,801 0.00% 0 0.00%
3 C.11.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 57,773,778 57,773,778 0.00% 0 0.00%
C.11.6.1 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=0,6 6.20 41,600 257,920 0.00% 0 0.00%
C.11.6.2 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=0,8 7.00 69,341 485,387 0.00% 0 0.00%
C.11.6.3 m Soleras Tipo "A" 63.00 14,709 926,667 0.00% 0 0.00%
C.11.6.4 m Soleras con Zarpa de Hormigón (Solera con Zarpa Tipo 1) 269.00 29,804 8,017,276 0.00% 0 0.00%
C.11.6.5 m Soleras con Zarpa de Hormigón (Solera con Zarpa Tipo 3) 241.00 29,804 7,182,764 0.00% 0 0.00%
C.11.6.6 m Cunetas de Hormigón, Tipo Baden, Tipo 1 96.00 25,910 2,487,360 0.00% 0 0.00%
C.11.6.7 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 360.00 3,394 1,221,840 0.00% 0 0.00%
C.11.6.8 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 180.00 3,394 610,920 0.00% 0 0.00%
C.11.6.9 m3 Revestimiento de Fosos y Contrafosos 123.00 297,428 36,583,644 0.00% 0 0.00%
3 C.11.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 4,434,984 4,434,984 0.00% 0 0.00%
C.11.7.1 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 52.00 11,001 572,052 0.00% 0 0.00%
C.11.7.2 m Valla Peatonal 78.00 44,402 3,463,356 0.00% 0 0.00%
C.11.7.3 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 12.00 33,298 399,576 0.00% 0 0.00%
3 C.11.8 ILUMINACIÓN 1.00 71,386,705 71,386,704 1.92% 1,369,055 0.00%
RA03-12-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA03-12-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA03-12-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 628.73 12,597 7,920,112 0.00% 0 0.00%
RA03-12-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 325.66 28,707 9,348,722 0.00% 0 0.00%
RA03-12-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 37.00 14,619 540,903 0.00% 0 0.00%
RA03-12-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 36.00 238,377 8,581,572 0.00% 0 0.00%
RA03-12-I218 c/u Provisión y montaje Luminaria Vial 38 W, LED 1.00 141,294 141,294 0.00% 0 0.00%
RA03-12-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 455.00 3,679 1,673,945 0.00% 0 0.00%
RA03-12-I225 m Provisión y montaje Cable 2 x 1 x 33,6 mm2, XTU 2,576.85 8,999 23,189,073 0.00% 0 0.00%
RA03-12-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 979.39 6,007 5,883,196 0.00% 0 0.00%
RA03-12-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 36.00 273,789 9,856,404 13.89% 1,369,055 0.00%
RA03-12-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 1.00 129,331 129,331 0.00% 0 0.00%
RA03-12-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 8.99 183,540 1,650,025 0.00% 0 0.00%
RA03-12-I231 c/u Soldadura Termofusión. 28.00 30,775 861,700 0.00% 0 0.00%
RA03-12-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00%
RA03-12-I233 c/u Tablero Control General iluminación 1.00 476,354 476,354 0.00% 0 0.00%
RA03-12-I235 c/u Retiro Luminaria y Poste Metálico. 5.00 41,144 205,720 0.00% 0 0.00%
RA03-12-I236 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 0.00% 0 0.00%
RA03-12-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 5.00 17,856 89,280 0.00% 0 0.00%
3 C.11.9 OBRAS COMPLEMETARIAS 1.00 1,129,663 1,129,663 0.00% 0 0.00%
C.11.9.2 n° Tapas de Cámaras 1.00 190,798 190,798 0.00% 0 0.00%
C.11.9.3 n° Suministro y Colocación de Escalines 6.00 7,043 42,258 0.00% 0 0.00%
C.11.9.4 n° Empalme Sumidero a Colector o Cámara de Inspección 1.00 550,071 550,071 0.00% 0 0.00%
C.11.9.5 m Limpieza de Alcantarillas y Sifones, de hasta 1 m de altura 18.00 19,252 346,536 0.00% 0 0.00%
C.12 PANTALLAS ACUSTICAS SECTOR METRENCO ENTRE KM
2 1.00 659,522,951 659,522,951 89.74% 591,825,622 52.05%
683,400 - KM 684,300 LADO PONIENTE
3 C.12.1 PREPARACION DEL AREA DE TRABAJO 1.00 7,175,622 7,175,622 100.00% 7,175,622 0.00%
C.12.1.1 m2 Remoción de pavimentos Asfáltico 241.00 1,740 419,340 100.00% 419,340 0.00%
C.12.1.2 m Remoción de Barreras de Contención Laterales Metálicas 313.00 4,516 1,413,508 100.00% 1,413,508 0.00%
C.12.1.3 nº Remoción de Señalización Vertical Lateral 1.00 17,074 17,074 100.00% 17,074 0.00%
C.12.1.4 m Remoción de elementos mamposteria 50.00 106,514 5,325,700 100.00% 5,325,700 0.00%
3 C.12.2 MOVIMIENTO DE TIERRAS 1.00 2,697,240 2,697,240 100.00% 2,697,240 0.00%
C.12.2.1 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 502.50 4,936 2,480,340 100.00% 2,480,340 0.00%
C.12.2.2 m2 Preparación de la Subrasante 241.00 900 216,900 100.00% 216,900 0.00%
3 C.12.3 CAPAS GRANULARES 1.00 947,693 947,693 100.00% 947,693 0.00%
C.12.3.1 m3 Base Granular, CBR = 80% 53.00 17,881 947,693 100.00% 947,693 0.00%
3 C.12.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 2,001,875 2,001,876 100.00% 2,001,875 0.00%
C.12.4.1 m2 Imprimación 241.20 566 136,519 100.00% 136,519 0.00%
C.12.4.2 m3 Concreto Asfáltico de Rodadura 12.06 154,673 1,865,356 100.00% 1,865,356 0.00%
3 C.12.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 107,391,549 107,391,549 100.00% 107,391,549 37.70%
C.12.5.1 m3 Hormigón G20 466.64 195,522 91,238,386 100.00% 91,238,386 37.70%
C.12.5.2 Kg Acero para Armaduras A630-420H 12,922.53 1,250 16,153,163 100.00% 16,153,163 37.70%
3 C.12.6 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 16,953,040 16,953,040 100.00% 16,953,040 22.85%
C.12.6.1 m Barreras Metálicas de Contención Laterales, de Doble Onda 130.00 39,001 5,070,130 100.00% 5,070,130 28.85%
C.12.6.2 m Barreras Metálicas de Contención Laterales con recuperación, de Do 276.00 34,321 9,472,596 100.00% 9,472,596 0.00%
C.12.6.3 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 100.00% 2,410,314 100.00%
3 C.12.7 OBRAS PANTALLAS ACUSTICAS 1.00 522,355,932 522,355,932 87.04% 454,658,603 57.22%
C.12.7.1 m2 Pantalla Acústica MMA (h=3 m) 2,538.00 205,814 522,355,932 87.04% 454,658,603 57.22%
C.13 HABILITACIÓN ÁREA DE ESTACIONAMIENTO ENLACE QUEPE
2 1.00 90,928,945 90,928,944 32.02% 29,117,802 22.16%
LADO PONIENTE
3 C.13.1 PREPARACION DEL AREA DE TRABAJO 1.00 898,672 898,672 100.00% 898,672 23.86%
C.13.1.1 m2 Remoción de pavimentos Asfáltico 22.00 1,740 38,280 100.00% 38,280 100.00%
C.13.1.2 m Remoción de Obras de Drenaje Superficial 27.00 3,345 90,315 100.00% 90,315 100.00%
C.13.1.3 m Remoción de Barreras de Contención Laterales Metálicas 31.00 4,516 139,996 100.00% 139,996 61.29%
C.13.1.4 Km Despeje y Limpieza de Faja 0.14 4,500,581 630,081 100.00% 630,081 0.00%
3 C.13.2 MOVIMIENTO DE TIERRAS 1.00 9,725,573 9,725,573 100.00% 9,725,573 15.10%
C.13.2.1 m3 Excavación de Escarpe 88.00 4,936 434,368 100.00% 434,368 0.00%
C.13.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 733.00 4,936 3,618,088 100.00% 3,618,088 0.00%
C.13.2.3 m3 Excavación en TCN para Obras de Drenaje 61.63 7,766 478,619 100.00% 478,619 0.00%
C.13.2.4 m3 Formación y Compactación de Terraplenes 337.28 10,801 3,642,961 100.00% 3,642,961 12.54%
C.13.2.5 m3 Relleno Estructurante 11.24 23,376 262,746 100.00% 262,746 100.00%
C.13.2.6 m2 Preparación de la Subrasante 1,431.99 900 1,288,791 100.00% 1,288,791 58.10%
3 C.13.3 CAPAS GRANULARES 1.00 6,913,510 6,913,510 98.76% 6,827,859 98.76%
C.13.3.1 m3 Sub Base Granular, CBR = 50% 171.84 17,881 3,072,671 100.00% 3,072,671 100.00%
C.13.3.2 m3 Base Granular, CBR = 80% 214.80 17,881 3,840,839 97.77% 3,755,188 97.77%
3 C.13.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 14,831,029 14,831,029 0.00% 0 0.00%
C.13.4.1 m2 Imprimación 1,109.45 566 627,949 0.00% 0 0.00%
C.13.4.2 m3 Concreto Asfáltico de Rodadura 55.47 154,673 8,579,711 0.00% 0 0.00%
C.13.4.3 m2 Aceras de Hormigón 372.68 15,089 5,623,369 0.00% 0 0.00%
3 C.13.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 14,455,934 14,455,934 56.54% 8,174,061 56.54%
C.13.5.1 m3 Hormigón G05 1.85 75,880 140,378 100.00% 140,378 100.00%
C.13.5.2 m3 Hormigón G17 25.09 193,885 4,864,575 100.00% 4,864,575 100.00%
C.13.5.3 m3 Hormigón G25 27.01 246,289 6,652,266 37.02% 2,462,669 37.02%
C.13.5.4 Kg Acero para Armaduras A630-420H 1,060.52 1,250 1,325,650 53.29% 706,439 53.29%
C.13.5.5 m2 Revestimiento de Mampostería de Piedra 27.50 53,566 1,473,065 0.00% 0 0.00%
3 C.13.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 19,122,745 19,122,745 0.87% 165,984 0.87%
C.13.6.1 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 10.00 116,607 1,166,070 0.00% 0 0.00%
C.13.6.2 m Soleras Tipo "A" 327.00 14,709 4,809,843 0.00% 0 0.00%
C.13.6.3 Nº Rejillas para Sumideros Tipo 60-18-R 1.00 592,504 592,504 0.00% 0 0.00%
C.13.6.4 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormi 320.00 3,394 1,086,080 0.00% 0 0.00%
C.13.6.5 m3 Revestimiento de Fosos y Contrafosos 38.00 297,428 11,302,264 0.00% 0 0.00%
C.13.6.6 m Tubos Polietileno de Alta Densidad estructurados D=1,00 m 1.00 165,984 165,984 100.00% 165,984 100.00%
3 C.13.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 8,764,142 8,764,142 0.00% 0 0.00%
C.13.7.1 n° Señales Laterales, Tipo 1, Sp = 0.5 m2 4.00 98,470 393,880 0.00% 0 0.00%
C.13.7.2 Km Demarcación, Línea de Eje Continua Doble 0.11 1,600,206 176,023 0.00% 0 0.00%
C.13.7.3 Km Demarcación, Línea Lateral Continua 0.20 1,200,155 240,031 0.00% 0 0.00%
C.13.7.4 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 160.00 11,001 1,760,160 0.00% 0 0.00%
C.13.7.5 m Valla Peatonal 121.00 44,402 5,372,642 0.00% 0 0.00%
C.13.7.6 n° Topes de Goma 20.00 29,416 588,320 0.00% 0 0.00%
C.13.7.7 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 7.00 33,298 233,086 0.00% 0 0.00%
3 C.13.8 ILUMINACIÓN 1.00 16,217,340 16,217,340 20.51% 3,325,653 20.33%
RA-03-15-201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA-03-15-205 c/u Transformador 5 kVA 2f, norma COMPAÑÍA 1.00 1,151,499 1,151,499 0.00% 0 0.00%
RA-03-15-206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00%
RA-03-15-207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA-03-15-208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 151.24 12,597 1,905,170 92.57% 1,763,616 92.57%
RA-03-15-209 m Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 28.23 28,707 810,399 0.00% 0 0.00%
RA-03-15-213 c/u Construcción Cámara BT (CBT-xxx) 3.00 126,117 378,351 0.00% 0 0.00%
RA-03-15-214 c/u Provisión y montaje Cámara Paso (CP-xxx) 10.00 14,619 146,190 0.00% 0 0.00%
RA-03-15-216 c/u Provisión y montaje Luminaria Vial 196 W, LED 9.00 238,377 2,145,393 0.00% 0 0.00%
RA-03-15-218 c/u Provisión y montaje Luminaria Vial 38 W, LED 1.00 141,294 141,294 0.00% 0 0.00%
RA-03-15-220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 117.50 3,679 432,283 0.00% 0 0.00%
RA-03-15-222 m Provisión y montaje Cable 4 x 1 x 8,36 mm2, XTU 484.57 4,770 2,311,399 0.00% 0 0.00%
RA-03-15-227 m Provisión y montaje Cable Cu desnudo 16 mm2. 195.47 6,007 1,174,188 92.60% 1,087,298 92.60%
RA-03-15-229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 1.00 129,331 129,331 22.22% 28,737 0.00%
RA-03-15-228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 9.00 273,789 2,464,101 0.00% 0 0.00%
RA-03-15-230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 2.43 183,540 446,002 100.00% 446,002 100.00%
RA-03-15-231 c/u Soldadura Termofusión. 22.00 30,775 677,050 0.00% 0 0.00%
RA-03-15-232 c/u Cámaras Registro Malla de Puesta Tierra 2.00 40,986 81,972 0.00% 0 0.00%
RA-03-15-233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00%
2 C.14 CONEXIÓN RUTA S-199 FREIRE - VILLARICA CON RUTA 5 1.00 394,951,349 394,951,351 69.10% 272,895,248 12.34%
3 C.14.1 PREPARACION DEL AREA DE TRABAJO 1.00 11,455,727 11,455,728 97.76% 11,199,622 6.60%
C.14.1.1 m2 Remoción de pavimentos Asfáltico 1,336.17 1,740 2,324,936 100.00% 2,324,936 5.40%
C.14.1.2 m Remoción de Obras de Drenaje Superficial 210.58 3,345 704,390 100.00% 704,390 38.27%
C.14.1.3 m Remoción de Barreras de Contención Laterales Metálicas 197.00 4,516 889,652 100.00% 889,652 0.00%
C.14.1.4 nº Remoción de Señalización Vertical Lateral 13.00 17,074 221,962 100.00% 221,962 0.00%
C.14.1.5 m2 Remoción de Aceras 84.21 4,286 360,924 100.00% 360,924 100.00%
C.14.1.6 m Remoción de Cercos 464.73 2,791 1,297,061 100.00% 1,297,061 0.00%
C.14.1.7 Km Despeje y Limpieza de Faja 1.20 4,500,581 5,400,697 100.00% 5,400,697 0.00%
C.14.1.8 n° Reubicación de Señalización Vertical Lateral 5.00 51,221 256,105 0.00% 0 0.00%
3 C.14.2 MOVIMIENTO DE TIERRAS 1.00 69,696,002 69,696,002 100.00% 69,696,002 3.31%
C.14.2.1 m3 Excavación de Escarpe 1,499.09 4,936 7,399,508 100.00% 7,399,508 0.00%
C.14.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 2,105.16 4,936 10,391,070 100.00% 10,391,070 2.62%
C.14.2.3 m3 Excavación en TCN para Obras de Drenaje 17.49 7,766 135,827 100.00% 135,827 0.00%
C.14.2.4 m3 Formación y Compactación de Terraplenes 4,137.77 10,801 44,692,054 100.00% 44,692,054 3.02%
C.14.2.5 m3 Relleno Estructural 10.62 23,376 248,253 100.00% 248,253 0.00%
C.14.2.6 m2 Preparación de la Subrasante 7,588.10 900 6,829,290 100.00% 6,829,290 10.00%
3 C.14.3 CAPAS GRANULARES 1.00 27,136,563 27,136,563 95.21% 25,836,722 1.97%
C.14.3.1 m3 Base Granular, CBR = 80% 1,517.62 17,881 27,136,563 95.21% 25,836,722 1.97%
3 C.14.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 128,730,334 128,730,335 81.94% 105,483,145 23.31%
C.14.4.1 m2 Imprimación 5,816.40 566 3,292,082 94.22% 3,101,800 0.00%
C.14.4.2 m2 Riego de Liga 4,901.63 469 2,298,864 87.32% 2,007,368 0.00%
C.14.4.3 m3 Concreto Asfáltico de Rodadura 348.98 154,673 53,977,784 84.25% 45,476,283 20.00%
C.14.4.4 m3 Concreto Asfáltico Capa Intermedia 441.15 145,156 64,035,569 85.73% 54,897,694 30.00%
C.14.4.5 m2 Aceras de Hormigón 339.72 15,089 5,126,035 0.00% 0 0.00%
3 C.14.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 2,183,994 2,183,993 90.43% 1,974,978 0.90%
C.14.5.1 m3 Hormigón G05 0.26 75,880 19,729 100.00% 19,729 100.00%
C.14.5.2 m3 Hormigón G20 10.66 195,522 2,084,265 93.81% 1,955,249 0.00%
C.14.5.3 Kg Acero para Armaduras A630-420H 64.00 1,250 80,000 0.00% 0 0.00%
3 C.14.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 35,836,299 35,836,299 21.90% 7,846,773 4.58%
C.14.6.1 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=0,8 8.00 69,341 554,728 100.00% 554,728 0.00%
C.14.6.2 n° Embudos para Descargas de Agua 12.00 293,760 3,525,120 0.00% 0 0.00%
C.14.6.3 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 56.00 116,607 6,529,992 0.00% 0 0.00%
C.14.6.4 m Soleras Tipo "A" 864.50 14,709 12,715,931 11.57% 1,471,233 11.57%
C.14.6.5 m Construcción de Canales, Fosos y Contrafosos sin Revestir, Trapecial 140.00 3,394 475,160 35.71% 169,680 35.71%
C.14.6.6 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 216.00 3,394 733,104 0.00% 0 0.00%
C.14.6.7 m3 Revestimiento de Fosos y Contrafosos 38.00 297,428 11,302,264 50.00% 5,651,132 0.00%
3 C.14.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 43,407,968 43,407,968 37.30% 16,190,489 31.07%
C.14.7.21 m Cerco de Alambre de Púas 110.00 7,620 838,200 100.00% 838,200 0.00%
C.14.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 17.00 146,476 2,490,092 0.00% 0 0.00%
C.14.7.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 4.00 281,276 1,125,104 0.00% 0 0.00%
C.14.7.3 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 1.00 1,027,331 1,027,331 0.00% 0 0.00%
C.14.7.4 n° Delineadores verticales 2.00 81,267 162,534 0.00% 0 0.00%
C.14.7.5 n° Delineador Direccional Simple 4.00 82,644 330,576 0.00% 0 0.00%
C.14.7.6 n° Hitos Tubulares 3.00 36,062 108,186 0.00% 0 0.00%
C.14.7.7 n° Baliza Luminosa 2.00 1,865,691 3,731,382 50.00% 1,865,691 0.00%
C.14.7.8 Km Demarcación, Línea de Eje Continua Doble 0.16 1,600,206 256,033 0.00% 0 0.00%
C.14.7.9 Km Demarcación, Línea Lateral Segmentada 0.22 1,600,206 352,045 0.00% 0 0.00%
C.14.7.10 Km Demarcación, Línea Lateral Continua 1.35 1,200,155 1,620,209 0.00% 0 0.00%
C.14.7.11 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 302.00 11,001 3,322,302 0.00% 0 0.00%
C.14.7.12 n° Tachas Reflectantes 658.00 1,600 1,052,800 0.00% 0 0.00%
C.14.7.13 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
C.14.7.14 m Barreras Metálicas de Contención Laterales, de Doble Onda 284.00 39,001 11,076,284 100.00% 11,076,284 100.00%
C.14.7.15 m Valla Peatonal 97.00 44,402 4,306,994 0.00% 0 0.00%
C.14.7.17 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 100.00% 2,410,314 100.00%
C.14.7.18 m Barreras Laterales de Hormigón en Sitio Alta 84.00 57,568 4,835,712 0.00% 0 0.00%
C.14.7.19 m Barreras Laterales de Hormigón en Sitio Baja 9.00 52,129 469,161 0.00% 0 0.00%
C.14.7.20 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 11.60 33,298 386,257 0.00% 0 0.00%
3 C.14.8 ILUMINACIÓN 1.00 76,504,462 76,504,463 45.31% 34,667,517 0.00%
RA-03-16-I201 un Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA-03-16-I204 c/u Transformador 15 kVA 2f, norma COMPAÑÍA 1.00 1,639,312 1,639,312 0.00% 0 0.00%
RA-03-16-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00%
RA-03-16-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA-03-16-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 910.36 12,597 11,467,805 90.29% 10,354,281 0.00%
RA-03-16-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA-03-16-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA-03-16-I213 c/u Construcción Cámara BT (CBT-xxx) 2.00 126,117 252,234 0.00% 0 0.00%
RA-03-16-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 42.00 14,619 613,998 0.00% 0 0.00%
RA-03-16-I215 c/u Provisión y montaje Luminaria Vial 213 W, LED 21.00 214,952 4,513,992 0.00% 0 0.00%
RA-03-16-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 27.00 238,377 6,436,179 0.00% 0 0.00%
RA-03-16-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 525.00 3,679 1,931,475 0.00% 0 0.00%
RA-03-16-I225 m Provisión y montaje Cable 2 x 1 x 33,6 mm2, XTU 1,137.62 8,999 10,237,442 90.63% 9,278,194 0.00%
RA-03-16-I226 m Provisión y montaje Cable 2 x 1 x 42,4 mm2, XTU 1,385.32 10,623 14,716,254 57.75% 8,498,637 0.00%
RA-03-16-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 959.42 6,007 5,763,236 89.95% 5,184,031 0.00%
RA-03-16-I228 c/u Instalación y provisión Poste 12m brazo simple iluminación vial 42.00 273,789 11,499,138 0.00% 0 0.00%
RA-03-16-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 10.21 183,540 1,873,943 48.97% 917,670 0.00%
RA-03-16-I231 c/u Soldadura Termofusión. 30.00 30,775 923,250 0.00% 0 0.00%
RA-03-16-I232 c/u Cámaras Registro Malla de Puesta Tierra 6.00 40,986 245,916 0.00% 0 0.00%
RA-03-16-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00%
RA-03-16-I234 c/u Retiro y reemplazo de luminaria existente poste galvanizado 6.00 304,384 1,826,304 0.00% 0 0.00%
RA-03-16-I237 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 0.00% 0 0.00%
RA-03-16-I238 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 6.00 17,856 107,136 0.00% 0 0.00%
RA-03-16-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 18.06 24,070 434,704 100.00% 434,704 0.00%
3 C.15.1 PREPARACION DEL AREA DE TRABAJO 1.00 9,529,464 9,529,464 28.89% 2,753,182 12.34%
C.15.1.1 m2 Remoción de pavimentos Asfáltico 675.67 1,740 1,175,666 100.00% 1,175,666 100.00%
C.15.1.2 m Remoción de Barreras de Contención Laterales Metálicas 211.00 4,516 952,876 71.09% 677,400 0.00%
C.15.1.3 nº Remoción de Señalización Vertical Lateral 2.00 17,074 34,148 0.00% 0 0.00%
C.15.1.4 N° Remoción de Señalización Vertical sobre la calzada 3.00 705,286 2,115,858 0.00% 0 0.00%
C.15.1.5 Km Despeje y Limpieza de Faja 0.20 4,500,581 900,116 100.00% 900,116 0.00%
C.15.1.6 nº Remoción de Estructuras 1.00 4,350,800 4,350,800 0.00% 0 0.00%
3 C.15.2 MOVIMIENTO DE TIERRAS 1.00 4,887,480 4,887,480 100.00% 4,887,480 7.56%
C.15.2.1 m3 Excavación de Escarpe 42.60 4,936 210,274 100.00% 210,274 0.00%
C.15.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 508.30 4,936 2,508,969 100.00% 2,508,969 0.00%
C.15.2.3 m3 Formación y Compactación de Terraplenes 83.21 10,801 898,751 100.00% 898,751 0.00%
C.15.2.4 m2 Preparación de la Subrasante 1,410.54 900 1,269,486 100.00% 1,269,486 29.11%
3 C.15.3 CAPAS GRANULARES 1.00 5,044,409 5,044,409 93.93% 4,738,213 62.03%
C.15.3.1 m3 Base Granular, CBR = 80% 282.11 17,881 5,044,409 93.93% 4,738,213 62.03%
3 C.15.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 19,718,679 19,718,679 0.00% 0 0.00%
C.15.4.1 m2 Imprimación 1,123.71 566 636,020 0.00% 0 0.00%
C.15.4.2 m2 Riego de Liga 868.08 469 407,130 0.00% 0 0.00%
C.15.4.3 m3 Concreto Asfáltico de Rodadura 56.14 154,673 8,683,342 0.00% 0 0.00%
C.15.4.4 m3 Concreto Asfáltico Capa Intermedia 60.77 145,156 8,821,130 0.00% 0 0.00%
C.15.4.5 m2 Aceras de Hormigón 77.61 15,089 1,171,057 0.00% 0 0.00%
3 C.15.5 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 3,355,693 3,355,693 0.00% 0 0.00%
C.15.5.1 m Soleras Tipo "A" 39.00 14,709 573,651 0.00% 0 0.00%
C.15.5.2 n° Modificacion de Altura, Camara de Inspección 2.00 1,200,223 2,400,446 0.00% 0 0.00%
C.15.5.3 n° Tapas de Cámaras 2.00 190,798 381,596 0.00% 0 0.00%
3 C.15.6 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 60,518,503 60,518,502 19.03% 11,513,704 8.56%
C.15.6.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00%
C.15.6.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 1.00 281,276 281,276 0.00% 0 0.00%
C.15.6.3 n° Señalización Vertical sobre la calzada 3.00 4,098,727 12,296,181 0.00% 0 0.00%
C.15.6.4 n° Marco Portaseñal 1.00 20,713,231 20,713,231 0.00% 0 0.00%
C.15.6.5 Km Demarcación, Línea Lateral Segmentada 0.29 1,600,206 464,060 0.00% 0 0.00%
C.15.6.6 Km Demarcación, Línea Lateral Continua 0.20 1,200,155 240,031 0.00% 0 0.00%
C.15.6.7 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 13.60 11,001 149,614 0.00% 0 0.00%
C.15.6.8 n° Tachas Reflectantes 131.00 1,600 209,600 0.00% 0 0.00%
C.15.6.9 m Barreras Metálicas de Contención Laterales, de Doble Onda 80.00 39,001 3,120,080 0.00% 0 0.00%
C.15.6.10 m Valla Peatonal 16.00 44,402 710,432 0.00% 0 0.00%
C.15.6.11 n° Terminales Atenuadores Certificados 2.00 2,410,314 4,820,628 0.00% 0 0.00%
C.15.6.12 m Barreras Laterales de Hormigón en Sitio Alta 293.00 57,568 16,867,424 68.26% 11,513,704 30.72%
C.15.6.13 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 15.00 33,298 499,470 0.00% 0 0.00%
3 C.15.7 ILUMINACIÓN 1.00 18,165,976 18,165,975 3.01% 547,523 0.00%
RA03-17-I201 c/u Empalme por Compañía + Medidor Trifásico 1.00 1,221,415 1,221,415 0.00% 0 0.00%
RA03-17-I207 c/u Ferretería instalación + desconectadores fusibles Trifasico 1.00 805,275 805,275 0.00% 0 0.00%
RA03-17-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 204.69 12,597 2,578,480 0.00% 0 0.00%
RA03-17-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA03-17-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA03-17-I213 c/u Construcción Cámara BT (CBT-xxx) 1.00 126,117 126,117 0.00% 0 0.00%
RA03-17-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 9.00 14,619 131,571 0.00% 0 0.00%
RA03-17-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 9.00 238,377 2,145,393 0.00% 0 0.00%
RA03-17-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 112.50 3,679 413,888 0.00% 0 0.00%
RA03-17-I222 m Provisión y montaje Cable 4 x 1 x 8,36 mm2, XTU 601.26 4,770 2,868,010 0.00% 0 0.00%
RA03-17-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 247.69 6,007 1,487,874 0.00% 0 0.00%
RA03-17-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 9.00 273,789 2,464,101 22.22% 547,523 0.00%
RA03-17-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 2.19 183,540 401,953 0.00% 0 0.00%
RA03-17-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 0.00% 0 0.00%
RA03-17-I232 c/u Cámaras Registro Malla de Puesta Tierra 2.00 40,986 81,972 0.00% 0 0.00%
RA03-17-I233 c/u Tablero Control General iluminación Trifásico 1.00 2,013,921 2,013,921 0.00% 0 0.00%
RA03-17-I234 c/u Retiro y reemplazo de luminaria existente poste galvanizado/hormigó 1.00 304,384 304,384 0.00% 0 0.00%
RA03-17-I236 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 0.00% 0 0.00%
RA03-17-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 1.00 17,856 17,856 0.00% 0 0.00%
RA03-17-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 12.00 24,070 288,840 0.00% 0 0.00%
C.16 PARADERO DE BUSES Y BAHÍA DE ESTACIONAMIENTO
2 1.00 16,390,336 16,390,336 0.00% 0 0.00%
PITRUFQUÉN, LADO ORIENTE
3 C.16.1 PREPARACION DEL AREA DE TRABAJO 1.00 732,653 732,653 0.00% 0 0.00%
C.16.1.1 m2 Remoción de Aceras 17.00 4,286 72,862 0.00% 0 0.00%
C.16.1.2 nº Remoción de casetas de Paraderos para la locomoción colectiva 1.00 608,570 608,570 0.00% 0 0.00%
C.16.1.3 n° Reubicación de Señalización Vertical Lateral 1.00 51,221 51,221 0.00% 0 0.00%
3 C.16.2 REVESTIMIENTOS Y PAVIMENTOS 1.00 1,116,586 1,116,586 0.00% 0 0.00%
C.16.2.1 m2 Aceras de Hormigón 74.00 15,089 1,116,586 0.00% 0 0.00%
3 C.16.3 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 9,816,290 9,816,290 0.00% 0 0.00%
C.16.3.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 4.00 146,476 585,904 0.00% 0 0.00%
C.16.3.2 n° Baliza Luminosa 2.00 1,865,691 3,731,382 0.00% 0 0.00%
C.16.3.3 Km Demarcación, Líneas Segmenta de Separación de Pistas 0.10 550,071 55,007 0.00% 0 0.00%
C.16.3.4 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 41.00 11,001 451,041 0.00% 0 0.00%
C.16.3.5 n° Tachas Reflectantes 23.00 1,600 36,800 0.00% 0 0.00%
C.16.3.6 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
C.16.3.7 m Valla Peatonal 28.00 44,402 1,243,256 0.00% 0 0.00%
C.16.3.8 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 6.20 33,298 206,448 0.00% 0 0.00%
3 C.16.4 ILUMINACIÓN 1.00 4,724,807 4,724,807 0.00% 0 0.00%
RA03-18-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 38.98 12,597 491,031 0.00% 0 0.00%
RA03-18-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA03-18-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA03-18-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 3.00 14,619 43,857 0.00% 0 0.00%
RA03-18-I215 c/u Provisión y montaje Luminaria Vial 213 W, LED 1.00 214,952 214,952 0.00% 0 0.00%
RA03-18-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 2.00 238,377 476,754 0.00% 0 0.00%
RA03-18-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 37.50 3,679 137,963 0.00% 0 0.00%
RA03-18-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 153.85 4,232 651,093 0.00% 0 0.00%
RA03-18-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 81.98 6,007 492,454 0.00% 0 0.00%
RA03-18-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 3.00 273,789 821,367 0.00% 0 0.00%
RA03-18-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 0.73 183,540 133,984 0.00% 0 0.00%
RA03-18-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 0.00% 0 0.00%
RA03-18-I232 c/u Cámaras Registro Malla de Puesta Tierra 4.00 40,986 163,944 0.00% 0 0.00%
RA03-18-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 12.00 24,070 288,840 0.00% 0 0.00%
INSTALACIÓN CRUCE SEMAFORIZADO Y VALLAS
2 C.17 PEATONALES EN INTERSECCION ENLACE LEÓN GALLO LADO 1.00 63,557,571 63,557,571 0.00% 0 0.00%
ORIENTE
3 C.17.1 OBRAS DE MITIGACIÓN 1.00 63,557,571 63,557,571 0.00% 0 0.00%
SEM-1.1 Un Configuración Controlador Norma UOCT 2.00 5,677,681 11,355,362 0.00% 0 0.00%
SEM-1.1.1 Un Diseño proyecto comunicación de la red wan para el sistema ITS de Pi 1.00 5,000,000 5,000,000 0.00% 0 0.00%
SEM-1.1.2 Un Dispositivo en el controlador de semáforo de comunicación con el sist 1.00 10,037,124 10,037,124 0.00% 0 0.00%
SEM-1.1.3 Un Integración de unidad de comunicación al sistema de control 1.00 620,828 620,828 0.00% 0 0.00%
SEM-1.1.4 Un Reconfiguración de unidad de comunicación 1.00 541,235 541,235 0.00% 0 0.00%
SEM-2.9 m Provisión de cable NYSA 16 mm2 10.00 4,312 43,120 0.00% 0 0.00%
SEM-2.10 m Provisión de cable NYSA 4 mm2 para tierra 300.00 739 221,700 0.00% 0 0.00%
SEM-2.13 m Provisión de cable TM 3 x 16 AWG 185.00 1,740 321,900 0.00% 0 0.00%
SEM-2.17 m Provisión de cable TM 7 x 16 AWG 45.00 3,735 168,075 0.00% 0 0.00%
SEM-2.18 m Provisión de cable TM 8 x 16 AWG 350.00 4,321 1,512,350 0.00% 0 0.00%
SEM-2.20 m Provisión de cable TM 10 x 16 AWG 40.00 6,254 250,160 0.00% 0 0.00%
SEM-2.21 m Provisión de cable TM 12 x 16 AWG 220.00 6,299 1,385,780 0.00% 0 0.00%
SEM-2.26 Un Provisión de controlador norma UOCT 20 etapas, con gabinete 1.00 5,003,013 5,003,013 0.00% 0 0.00%
SEM-2.32 Un Provisión de gabinete remoto para terminación de cables de semáfor 1.00 372,952 372,952 0.00% 0 0.00%
SEM-2.34 Un Provisión de lámpara 3x200 mm de aluminio, módulos leds 8.00 366,130 2,929,040 0.00% 0 0.00%
SEM-2.38 Un Provisión de lámpara 3x200 mm + 1x300 mm de aluminio, módulos le 2.00 611,732 1,223,464 0.00% 0 0.00%
SEM-2.41 Un Provisión de lámpara peatonal 2x300 mm de aluminio, módulos leds 8.00 295,633 2,365,064 0.00% 0 0.00%
SEM-2.51 Un Provisión de poste con brazo 1.00 531,002 531,002 0.00% 0 0.00%
SEM-2.52 Un Provisión de poste simple peatonal 3.00 94,375 283,125 0.00% 0 0.00%
SEM-2.53 Un Provisión de poste simple vehicular 6.00 129,624 777,744 0.00% 0 0.00%
SEM-2.58 Un Provisión de soporte adosado para lámpara de semáforo 6.00 21,945 131,670 0.00% 0 0.00%
SEM-2.59 Un Provisión de soporte colgado para lámpara de semáforo 2.00 50,030 100,060 0.00% 0 0.00%
SEM-2.75 m Suministro de Tag 2" 52.00 11,825 614,900 0.00% 0 0.00%
SEM-2.76 m Suministro de Tag 2,5" 125.00 17,738 2,217,250 0.00% 0 0.00%
SEM-2.77 m Suministro de Tag 3" 3.00 19,330 57,990 0.00% 0 0.00%
SEM-2.94 Un Provisión de placa de respaldo 3 cuerpos en acero 8.00 83,005 664,040 0.00% 0 0.00%
SEM-2.95 Un Provisión de placa de respaldo 4 cuerpos en acero 2.00 90,964 181,928 0.00% 0 0.00%
SEM-2.97 Un Suministro e instalación de GPS en controlador norma UOCT 1.00 339,636 339,636 0.00% 0 0.00%
SEM-3.2 Un Conexión de cables de comunicación en controlador 1.00 61,401 61,401 0.00% 0 0.00%
SEM-3.3 Un Conexión lámparas 18.00 13,076 235,368 0.00% 0 0.00%
SEM-3.12 Un Construcción y montaje basamento para gabinete de controlador 1.00 329,744 329,744 0.00% 0 0.00%
SEM-3.15 cont Identificación y rotulación de cables de controlador 1.00 188,750 188,750 0.00% 0 0.00%
SEM-3.16 Un Instalación eléctrica controlador norma UOCT 1.00 153,502 153,502 0.00% 0 0.00%
SEM-3.21 m Instalación de cables NYSA 4 mm2 para tierra 300.00 898 269,400 0.00% 0 0.00%
SEM-3.22 m Instalación de cables NYSA 16 mm2 10.00 1,114 11,140 0.00% 0 0.00%
SEM-3.24 m Instalación de cable tipo TM 840.00 1,842 1,547,280 0.00% 0 0.00%
SEM-3.26 Un Instalación de lámparas poste simple o adosado 16.00 14,782 236,512 0.00% 0 0.00%
SEM-3.27 Un Instalación de lámparas poste con brazo 2.00 28,426 56,852 0.00% 0 0.00%
SEM-3.30 Un Instalación placa de respaldo 3 cuerpos 8.00 12,735 101,880 0.00% 0 0.00%
SEM-3.31 Un Instalación placa de respaldo 4 cuerpos 2.00 15,055 30,110 0.00% 0 0.00%
SEM-3.34 Un Instalación soporte adosado para lámpara de semáforo 5.00 5,685 28,425 0.00% 0 0.00%
SEM-3.35 Un Instalación soporte colgado para lámpara de semáforo 2.00 10,802 21,604 0.00% 0 0.00%
SEM-3.37 Un Instalación unidad de comunicación independiente en controlador 1.00 68,223 68,223 0.00% 0 0.00%
SEM-3.44 Un Montaje de poste con brazo 1.00 185,339 185,339 0.00% 0 0.00%
SEM-3.45 Un Montaje de poste vehicular o peatonal 9.00 63,675 573,075 0.00% 0 0.00%
SEM-4.9 Un Instalación de interruptor automático de 10A 1.00 6,822 6,822 0.00% 0 0.00%
SEM-4.11 Un Suministro de interruptor automático de 10A 1.00 10,233 10,233 0.00% 0 0.00%
SEM-4.23 Un Construcción de cámara de acera 0,6 x 0,7 m 1.00 341,114 341,114 0.00% 0 0.00%
SEM-4.24 Un Construcción de cámara de acera 0,6 x 1,1 m 7.00 363,855 2,546,985 0.00% 0 0.00%
SEM-4.28 m Construcción e instalación de canalización bajo acera 135.00 24,788 3,346,380 0.00% 0 0.00%
SEM-4.30 m Construcción e instalación de canalización bajo calzada 44.00 52,304 2,301,376 0.00% 0 0.00%
SEM-5.7 int/ Mediciones periódicas de flujo peatonal 8.00 206,943 1,655,544 0.00% 0 0.00%
C.18 DISEÑO GEOMETRICO BAJO ESTRUCTURA PS LEÓN GALLO Y
2 1.00 63,638,609 63,638,609 0.42% 270,035 0.00%
FACILIDADES PEATONALES KM 701,500
3 C.18.1 PREPARACION DEL AREA DE TRABAJO 1.00 2,859,416 2,859,416 9.44% 270,035 0.00%
C.18.1.1 m3 Remoción de Estructuras 3.66 43,508 159,239 0.00% 0 0.00%
C.18.1.2 m2 Remoción de pavimentos Asfáltico 472.47 1,740 822,098 0.00% 0 0.00%
C.18.1.3 m Remoción de Obras de Drenaje Superficial 167.25 3,345 559,451 0.00% 0 0.00%
C.18.1.4 nº Reubicación de Señalización Vertical Lateral 5.00 51,221 256,105 0.00% 0 0.00%
C.18.1.5 m2 Remoción de Aceras 161.00 4,286 690,046 0.00% 0 0.00%
C.18.1.6 Km Despeje y Limpieza de Faja 0.06 4,500,581 270,035 100.00% 270,035 0.00%
C.18.1.7 Nº Reubicación de Señalización Vertical Lateral 2.00 51,221 102,442 0.00% 0 0.00%
3 C.18.2 MOVIMIENTO DE TIERRAS 1.00 5,299,217 5,299,218 0.00% 0 0.00%
C.18.2.1 m3 Excavación de Escarpe 1.00 4,936 4,936 0.00% 0 0.00%
C.18.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 374.00 4,936 1,846,064 0.00% 0 0.00%
C.18.2.3 m3 Excavación en TCN para Obras de Drenaje 100.70 7,766 782,036 0.00% 0 0.00%
C.18.2.4 m3 Formación y Compactación de Terraplenes 48.30 10,801 521,688 0.00% 0 0.00%
C.18.2.5 m3 Relleno Estructural 61.50 23,376 1,437,624 0.00% 0 0.00%
C.18.2.6 m2 Preparación de la Subrasante 785.41 900 706,869 0.00% 0 0.00%
3 C.18.3 CAPAS GRANULARES 1.00 2,808,747 2,808,747 0.00% 0 0.00%
C.18.3.1 m3 Base Granular, CBR = 80% 157.08 17,881 2,808,747 0.00% 0 0.00%
3 C.18.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 21,548,966 21,548,966 0.00% 0 0.00%
C.18.4.1 m2 Imprimación 785.41 566 444,542 0.00% 0 0.00%
C.18.4.2 m2 Riego de Liga 785.41 469 368,357 0.00% 0 0.00%
C.18.4.3 m3 Concreto Asfáltico de Rodadura 47.12 154,673 7,288,192 0.00% 0 0.00%
C.18.4.4 m3 Concreto Asfáltico Capa Intermedia 70.69 145,156 10,261,078 0.00% 0 0.00%
C.18.4.5 m2 Aceras de Hormigón 211.20 15,089 3,186,797 0.00% 0 0.00%
3 C.18.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 986,816 986,816 0.00% 0 0.00%
C.18.5.1 m3 Hormigón G05 0.27 75,880 20,488 0.00% 0 0.00%
C.18.5.2 m3 Hormigón G25 2.97 246,289 731,478 0.00% 0 0.00%
C.18.5.3 Kg Acero para Armaduras A630-420H 187.88 1,250 234,850 0.00% 0 0.00%
3 C.18.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 10,079,505 10,079,505 0.00% 0 0.00%
C.18.6.1 m Soleras con Zarpa de Hormigón 39.00 29,804 1,162,356 0.00% 0 0.00%
C.18.6.2 Nº Rejillas para Sumideros Tipo 60-18-R 5.00 592,504 2,962,520 0.00% 0 0.00%
C.18.6.3 m Tubo de PVC Sanitario D: 315mm 20.00 24,477 489,540 0.00% 0 0.00%
C.18.6.4 m Tubo de PVC Sanitario D: 400mm 68.00 24,477 1,664,436 0.00% 0 0.00%
C.18.6.5 N° Construcción de Cámara de Inspección Tipo B 1.00 477,062 477,062 0.00% 0 0.00%
C.18.6.6 N° Modificacion de Altura, Camara de Inspección 1.00 1,200,223 1,200,223 0.00% 0 0.00%
C.18.6.7 N° Tapas de Cámaras 2.00 190,798 381,596 0.00% 0 0.00%
C.18.6.8 N° Suministro y Colocación de Escalines 13.00 7,043 91,559 0.00% 0 0.00%
C.18.6.9 N° Empalme Sumidero a Colector o Cámara de Inspección 3.00 550,071 1,650,213 0.00% 0 0.00%
3 C.18.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 6,392,910 6,392,910 0.00% 0 0.00%
C.18.7.1 n° Señales Laterales, Tipo 1, Sp = 0.5 m2 2.00 98,470 196,940 0.00% 0 0.00%
C.18.7.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 1.00 281,276 281,276 0.00% 0 0.00%
C.18.7.3 n° Señales Laterales, Tipo 4, 2 = Sp = 3 m2 1.00 373,078 373,078 0.00% 0 0.00%
C.18.7.4 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 1.00 1,027,331 1,027,331 0.00% 0 0.00%
C.18.7.5 Km Demarcación, Línea de Eje Continua Doble 0.08 1,600,206 128,016 0.00% 0 0.00%
C.18.7.6 Km Demarcación, Línea de Eje segmentada 0.02 550,071 11,001 0.00% 0 0.00%
C.18.7.7 Km Demarcación, Línea Lateral Continua 0.30 1,200,155 360,047 0.00% 0 0.00%
C.18.7.8 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 81.00 11,001 891,081 0.00% 0 0.00%
C.18.7.9 n° Tachas Reflectantes 10.00 1,600 16,000 0.00% 0 0.00%
C.18.7.10 m Valla Peatonal 70.00 44,402 3,108,140 0.00% 0 0.00%
3 C.18.8 ILUMINACIÓN 1.00 11,162,709 11,162,708 0.00% 0 0.00%
RA03-20-I208 m Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 34.79 12,597 438,250 0.00% 0 0.00%
RA03-20-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA03-20-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 60.86 35,649 2,169,598 0.00% 0 0.00%
RA03-20-I212 m3 Fabricación dado Hormigón Armado H 30 0,3x0,3x1,0 canalizaciones 1.04 20,826 21,659 0.00% 0 0.00%
RA03-20-I213 c/u Construcción Cámara BT (CBT-xxx) 2.00 126,117 252,234 0.00% 0 0.00%
RA03-20-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 2.00 14,619 29,238 0.00% 0 0.00%
RA03-20-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 2.00 238,377 476,754 0.00% 0 0.00%
RA03-20-I219 c/u Provisión y montaje Luminaria Vial 38 W, LED 8.00 141,294 1,130,352 0.00% 0 0.00%
RA03-20-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 65.00 3,679 239,135 0.00% 0 0.00%
RA03-20-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 258.26 4,232 1,092,956 0.00% 0 0.00%
RA03-20-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 120.65 6,007 724,745 0.00% 0 0.00%
RA03-20-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 8.00 129,331 1,034,648 0.00% 0 0.00%
RA03-20-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 2.00 273,789 547,578 0.00% 0 0.00%
RA03-20-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 0.49 183,540 89,935 0.00% 0 0.00%
RA03-20-I231 c/u Soldadura Termofusión. 26.00 30,775 800,150 0.00% 0 0.00%
RA03-20-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00%
RA03-20-I234 c/u Retiro y reemplazo de luminaria existente poste galvanizado/hormigó 5.00 304,384 1,521,920 0.00% 0 0.00%
RA03-20-I236 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 0.00% 0 0.00%
RA03-20-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 5.00 17,856 89,280 0.00% 0 0.00%
RA03-20-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 12.00 24,070 288,840 0.00% 0 0.00%
3 C.18.9 OBRAS COMPLEMETARIAS 1.00 2,500,323 2,500,323 0.00% 0 0.00%
C.18.9.2 Gl Reubicación Poste Metálico Existente con cámara seguridad y normaliza 1.00 2,500,323 2,500,323 0.00% 0 0.00%
C.19 DG INT. LADO PONIENTE CALLE LEÓN GALLO, ARTURO PRAT
2 1.00 43,637,288 43,637,286 1.86% 810,105 0.00%
Y BLANCO ENCALADA DM. 701.500
3 C.19.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,699,851 1,699,850 47.66% 810,105 0.00%
C.19.1.1 m2 Remoción de pavimentos Asfáltico 153.57 1,740 267,212 0.00% 0 0.00%
C.19.1.2 m Remoción de Obras de Drenaje Superficial 175.90 3,345 588,386 0.00% 0 0.00%
C.19.1.3 nº Remoción de Señalización Vertical Lateral 2.00 17,074 34,148 0.00% 0 0.00%
C.19.1.4 Km Despeje y Limpieza de Faja 0.18 4,500,581 810,105 100.00% 810,105 0.00%
3 C.19.2 MOVIMIENTO DE TIERRAS 1.00 4,941,474 4,941,474 0.00% 0 0.00%
C.19.2.1 m3 Excavación de Escarpe 33.00 4,936 162,888 0.00% 0 0.00%
C.19.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 255.00 4,936 1,258,680 0.00% 0 0.00%
C.19.2.3 m3 Excavación en TCN para Obras de Drenaje 140.06 7,766 1,087,706 0.00% 0 0.00%
C.19.2.4 m3 Formación y Compactación de Terraplenes 3.57 10,801 38,560 0.00% 0 0.00%
C.19.2.5 m3 Relleno Estructural 90.00 23,376 2,103,840 0.00% 0 0.00%
C.19.2.6 m2 Preparación de la Subrasante 322.00 900 289,800 0.00% 0 0.00%
3 C.19.3 CAPAS GRANULARES 1.00 1,151,358 1,151,358 0.00% 0 0.00%
C.19.3.1 m3 Base Granular, CBR = 80% 64.39 17,881 1,151,358 0.00% 0 0.00%
3 C.19.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 6,125,904 6,125,904 0.00% 0 0.00%
C.19.4.1 m2 Imprimación 321.94 566 182,218 0.00% 0 0.00%
C.19.4.2 m2 Riego de Liga 321.94 469 150,990 0.00% 0 0.00%
C.19.4.3 m3 Concreto Asfáltico de Rodadura 19.32 154,673 2,988,282 0.00% 0 0.00%
C.19.4.4 m3 Concreto Asfáltico Capa Intermedia 19.32 145,156 2,804,414 0.00% 0 0.00%
3 C.19.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 831,250 831,249 0.00% 0 0.00%
C.19.5.1 m3 Hormigón G05 0.14 75,880 10,623 0.00% 0 0.00%
C.19.5.2 m3 Hormigón G25 2.59 246,289 637,889 0.00% 0 0.00%
C.19.5.3 Kg Acero para Armaduras A630-420H 146.19 1,250 182,738 0.00% 0 0.00%
3 C.19.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 8,849,836 8,849,837 0.00% 0 0.00%
C.19.6.1 m Soleras Tipo "A" 185.70 14,709 2,731,461 0.00% 0 0.00%
C.19.6.2 Nº Rejillas para Sumideros Tipo 60-18-R 3.00 592,504 1,777,512 0.00% 0 0.00%
C.19.6.3 m Tubos Polietileno de Alta Densidad estructurados D=0,30 m 4.50 91,286 410,787 0.00% 0 0.00%
C.19.6.4 m Tubo de HDPE Sanitario D:400mm 106.20 24,477 2,599,457 0.00% 0 0.00%
C.19.6.5 N° Construcción de Cámara de Inspección Tipo B 1.00 477,062 477,062 0.00% 0 0.00%
C.19.6.6 N° Tapas de Cámaras 1.00 190,798 190,798 0.00% 0 0.00%
C.19.6.7 N° Suministro y Colocación de Escalines 16.00 7,043 112,688 0.00% 0 0.00%
C.19.6.8 N° Empalme Sumidero a Colector o Cámara de Inspección 1.00 550,071 550,071 0.00% 0 0.00%
3 C.19.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 11,171,037 11,171,038 0.00% 0 0.00%
C.19.7.1 n° Señales Laterales, Tipo 1, Sp = 0.5 m2 6.00 98,470 590,820 0.00% 0 0.00%
C.19.7.2 n° Baliza Luminosa 2.00 1,865,691 3,731,382 0.00% 0 0.00%
C.19.7.3 Km Demarcación, Línea de Eje Continua Simple 0.01 1,200,155 12,002 0.00% 0 0.00%
C.19.7.4 Km Demarcación, Línea de Eje segmentada 0.09 550,071 49,506 0.00% 0 0.00%
C.19.7.5 Km Demarcación, Línea Lateral Segmentada 0.03 1,600,206 48,006 0.00% 0 0.00%
C.19.7.6 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 492.00 11,001 5,412,492 0.00% 0 0.00%
C.19.7.7 n° Tachas Reflectantes 268.00 1,600 428,800 0.00% 0 0.00%
C.19.7.8 m Valla Peatonal 20.00 44,402 888,040 0.00% 0 0.00%
C.19.7.9 m Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 0.30 33,298 9,989 0.00% 0 0.00%
3 C.19.8 ILUMINACIÓN 1.00 8,866,578 8,866,578 0.00% 0 0.00%
RA03-21-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00%
RA03-21-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00%
RA03-21-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 97.65 12,597 1,230,097 0.00% 0 0.00%
RA03-21-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 44.62 28,707 1,280,906 0.00% 0 0.00%
RA03-21-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA03-21-I212 m3 Fabricación dado Hormigón Armado H 30 0,3x0,3x1,0 canalizaciones 2.37 20,826 49,358 0.00% 0 0.00%
RA03-21-I213 c/u Construcción Cámara BT (CBT-xxx) 1.00 126,117 126,117 0.00% 0 0.00%
RA03-21-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 5.00 14,619 73,095 0.00% 0 0.00%
RA03-21-I215 c/u Provisión y montaje Luminaria Vial 213 W, LED 5.00 214,952 1,074,760 0.00% 0 0.00%
RA03-21-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 400.33 4,232 1,694,197 0.00% 0 0.00%
RA03-21-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 145.46 6,007 873,778 0.00% 0 0.00%
RA03-21-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 1.22 183,540 223,919 0.00% 0 0.00%
RA03-21-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 0.00% 0 0.00%
RA03-21-I232 c/u Cámaras Registro Malla de Puesta Tierra 4.00 40,986 163,944 0.00% 0 0.00%
RA03-21-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00%
RA03-21-I236 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 0.00% 0 0.00%
RA03-21-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 5.00 17,856 89,280 0.00% 0 0.00%
RA03-21-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 3.00 24,070 72,210 0.00% 0 0.00%
C.20 PARADERO DE TAXI Y SEGREGACIÓN PEATONAL SECTOR
2 1.00 38,125,597 38,125,594 28.17% 10,738,390 2.51%
PITRUFQUÉN KM 701,500
3 C.20.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,049,494 1,049,494 95.12% 998,273 90.83%
C.20.1.1 m2 Remoción de pavimentos Asfáltico 85.16 1,740 148,178 100.00% 148,178 100.00%
C.20.1.2 m Remoción de Obras de Drenaje Superficial 58.75 3,345 196,519 100.00% 196,519 100.00%
C.20.1.3 nº Remoción de casetas de Paraderos para la locomoción colectiva 1.00 608,570 608,570 100.00% 608,570 100.00%
C.20.1.4 Km Despeje y Limpieza de Faja 0.01 4,500,581 45,006 100.00% 45,006 0.00%
C.20.1.5 nº Reubicación de Señalización Vertical Lateral 1.00 51,221 51,221 0.00% 0 0.00%
3 C.20.2 MOVIMIENTO DE TIERRAS 1.00 5,658,024 5,658,024 100.00% 5,658,024 0.05%
C.20.2.1 m3 Excavación de Escarpe 169.00 4,936 834,184 100.00% 834,184 0.00%
C.20.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 68.90 4,936 340,090 100.00% 340,090 0.00%
C.20.2.3 m3 Excavación en TCN para Obras de Drenaje 0.39 7,766 3,029 100.00% 3,029 100.00%
C.20.2.4 m3 Formación y Compactación de Terraplenes 377.00 10,801 4,071,977 100.00% 4,071,977 0.00%
C.20.2.5 m2 Preparación de la Subrasante 454.16 900 408,744 100.00% 408,744 0.00%
3 C.20.3 CAPAS GRANULARES 1.00 2,186,310 2,186,310 100.00% 2,186,310 0.00%
C.20.3.1 m3 Sub Base Granular, CBR = 50% 54.34 17,881 971,654 100.00% 971,654 0.00%
C.20.3.2 m3 Base Granular, CBR = 80% 67.93 17,881 1,214,656 100.00% 1,214,656 0.00%
3 C.20.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 6,077,391 6,077,390 4.23% 257,055 0.00%
C.20.4.1 m2 Imprimación 454.16 566 257,055 100.00% 257,055 0.00%
C.20.4.2 m3 Concreto Asfáltico de Rodadura 22.71 154,673 3,512,624 0.00% 0 0.00%
C.20.4.3 m2 Aceras de Hormigón 152.94 15,089 2,307,712 0.00% 0 0.00%
3 C.20.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 32,877 32,877 0.00% 0 0.00%
C.20.5.1 m3 Hormigón G05 0.05 75,880 3,794 0.00% 0 0.00%
C.20.5.2 m3 Hormigón G17 0.15 193,885 29,083 0.00% 0 0.00%
3 C.20.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 2,734,979 2,734,979 0.00% 0 0.00%
C.20.6.1 m Soleras Tipo "A" 143.00 14,709 2,103,387 0.00% 0 0.00%
C.20.6.2 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormi 11.70 3,394 39,710 0.00% 0 0.00%
C.20.6.3 m3 Revestimiento de Fosos y Contrafosos 1.99 297,428 591,882 0.00% 0 0.00%
3 C.20.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 8,055,202 8,055,202 0.00% 0 0.00%
C.20.7.1 n° Señales Laterales, Tipo 1, Sp = 0.5 m2 4.00 98,470 393,880 0.00% 0 0.00%
C.20.7.2 n° Señales Laterales, Tipo 2, Sp = 1 m2 2.00 146,476 292,952 0.00% 0 0.00%
C.20.7.3 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00%
C.20.7.4 Km Demarcación, Líneas Segmenta de Separación de Pistas 0.03 550,071 16,502 0.00% 0 0.00%
C.20.7.5 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 51.50 11,001 566,552 0.00% 0 0.00%
C.20.7.6 n° Tachas Reflectantes 25.00 1,600 40,000 0.00% 0 0.00%
C.20.7.7 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00%
C.20.7.8 m Valla Peatonal 48.00 44,402 2,131,296 0.00% 0 0.00%
C.20.7.9 n° Topes de Goma 14.00 29,416 411,824 0.00% 0 0.00%
C.20.7.10 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 4.00 33,298 133,192 0.00% 0 0.00%
3 C.20.8 ILUMINACIÓN 1.00 12,331,320 12,331,319 13.29% 1,638,728 0.00%
RA03-22-I200 un Empalme por Compañía + Medidor Trifasico 1.00 1,221,415 1,221,415 0.00% 0 0.00%
RA03-22-I207 c/u Ferretería instalación + desconectadores fusibles Trifásicos 1.00 805,275 805,275 0.00% 0 0.00%
RA03-22-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 77.73 12,597 979,165 90.06% 881,836 0.00%
RA03-22-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 22.07 28,707 633,563 0.00% 0 0.00%
RA03-22-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA03-22-I212 m3 Fabricación dado Hormigón Armado H 30 0,3x0,3x1,0 canalizaciones 2.28 20,826 47,483 0.00% 0 0.00%
RA03-22-I213 c/u Construcción Cámara BT (CBT-xxx) 1.00 126,117 126,117 0.00% 0 0.00%
RA03-22-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 7.00 14,619 102,333 0.00% 0 0.00%
RA03-22-I215 c/u Provisión y montaje Luminaria Vial 279 W, LED 2.00 214,952 429,904 0.00% 0 0.00%
RA03-22-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 1.00 238,377 238,377 0.00% 0 0.00%
RA03-22-I218 c/u Provisión y montaje Luminaria Vial 38 W, LED 4.00 141,294 565,176 0.00% 0 0.00%
RA03-22-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 57.50 3,679 211,543 0.00% 0 0.00%
RA03-22-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 309.96 4,232 1,311,751 0.00% 0 0.00%
RA03-22-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 139.80 6,007 839,779 90.13% 756,892 0.00%
RA03-22-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 4.00 129,331 517,324 0.00% 0 0.00%
RA03-22-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 3.00 273,789 821,367 0.00% 0 0.00%
RA03-22-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 1.70 183,540 312,018 0.00% 0 0.00%
RA03-22-I231 c/u Soldadura Termofusión. 22.00 30,775 677,050 0.00% 0 0.00%
RA03-22-I232 c/u Cámaras Registro Malla de Puesta Tierra 2.00 40,986 81,972 0.00% 0 0.00%
RA03-22-I233 c/u Tablero Control General iluminación Trifásica 1.00 2,013,921 2,013,921 0.00% 0 0.00%
RA03-22-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 12.00 24,070 288,840 0.00% 0 0.00%
C.21 ATRAVIESO PEATONAL ESTACION PITRUFQUEN LADO
2 1.00 22,046,670 22,046,670 0.00% 0 0.00%
ORIENTE KM 701,900
3 C.21.1 PREPARACION DEL AREA DE TRABAJO 1.00 780,468 780,468 0.00% 0 0.00%
C.21.1.1 m Remoción de Obras de Drenaje Superficial 15.50 3,345 51,848 0.00% 0 0.00%
C.21.1.2 m2 Remoción de Aceras 170.00 4,286 728,620 0.00% 0 0.00%
3 C.21.2 MOVIMIENTO DE TIERRAS 1.00 16,289 16,289 0.00% 0 0.00%
C.21.2.1 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 3.30 4,936 16,289 0.00% 0 0.00%
3 C.21.3 CAPAS GRANULARES 1.00 180,240 180,240 0.00% 0 0.00%
C.21.3.1 m3 Base Granular, CBR = 80% 10.08 17,881 180,240 0.00% 0 0.00%
3 C.21.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 1,045,969 1,045,969 0.00% 0 0.00%
C.21.4.1 m2 Aceras de Hormigón 69.32 15,089 1,045,969 0.00% 0 0.00%
3 C.21.5 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 2,112,019 2,112,019 0.00% 0 0.00%
C.21.5.1 m Soleras Tipo "A" 15.00 14,709 220,635 0.00% 0 0.00%
C.21.5.2 m Canaleta con Rejilla de Acero Inoxidable 8.00 236,423 1,891,384 0.00% 0 0.00%
3 C.21.6.1 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 9,615,865 9,615,865 0.00% 0 0.00%
C.21.6.1.1 n° Señales Laterales, Tipo 1, Sp = 0.5 m2 6.00 98,470 590,820 0.00% 0 0.00%
C.21.6.1.2 n° Baliza Luminosa 2.00 1,865,691 3,731,382 0.00% 0 0.00%
C.21.6.1.3 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas Termoplastic 180.00 11,001 1,980,180 0.00% 0 0.00%
C.21.6.1.4 m Valla Peatonal 46.00 44,402 2,042,492 0.00% 0 0.00%
C.21.6.1.5 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 30.00 33,298 998,940 0.00% 0 0.00%
C.21.6.1.6 gl Resalto plano 1.00 272,051 272,051 0.00% 0 0.00%
3 C.21.7 PAISAJISMO 1.00 1,636,987 1,636,987 0.00% 0 0.00%
C.21.7.1 Gl Obras de reposición de áreas verde 1.00 1,636,987 1,636,987 0.00% 0 0.00%
3 C.21.8 ILUMINACIÓN 1.00 4,158,510 4,158,510 0.00% 0 0.00%
RA03-23-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 38.05 12,597 479,316 0.00% 0 0.00%
RA03-23-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00%
RA03-23-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00%
RA03-23-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 2.00 14,619 29,238 0.00% 0 0.00%
RA03-23-I218 c/u Provisión y montaje Luminaria Vial 38 W, LED 2.00 141,294 282,588 0.00% 0 0.00%
RA03-23-I219 c/u Provisión y montaje Luminaria Vial 41,2 W, LED, ANTIVANDALICA 6.00 35,873 215,238 0.00% 0 0.00%
RA03-23-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 10.00 3,679 36,790 0.00% 0 0.00%
RA03-23-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 246.37 4,232 1,042,638 0.00% 0 0.00%
RA03-23-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 81.05 6,007 486,867 0.00% 0 0.00%
RA03-23-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 2.00 129,331 258,662 0.00% 0 0.00%
RA03-23-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 0.45 183,540 82,593 0.00% 0 0.00%
RA03-23-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 0.00% 0 0.00%
RA03-23-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00%
RA03-23-I237. Gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 0.00% 0 0.00%
RA03-23-I238 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 1.00 17,856 17,856 0.00% 0 0.00%
RA03-23-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 12.00 24,070 288,840 0.00% 0 0.00%
3 C.21.9 OBRAS COMPLEMETARIAS 1.00 2,500,323 2,500,323 0.00% 0 0.00%
C.21.9.2 GL Reubicación Poste Metálico Existente con cámara seguridad y normaliza 1.00 2,500,323 2,500,323 0.00% 0 0.00%
2 C.22 RAMALES ATRAVIESO QUINTA FAJA, GORBEA KM 717,000 1.00 481,920,373 481,920,373 75.15% 362,173,253 14.27%
3 C.22.1 PREPARACION DEL AREA DE TRABAJO 1.00 17,953,518 17,953,519 98.29% 17,646,218 0.00%
C.22.1.1 m3 Remoción de Estructuras 11.06 43,508 481,198 100.00% 481,198 0.00%
C.22.1.2 m2 Remoción de pavimentos Asfáltico 2,711.00 1,740 4,717,140 100.00% 4,717,140 0.00%
C.22.1.3 m Remoción de Obras de Drenaje Superficial 163.00 3,345 545,235 100.00% 545,235 0.00%
C.22.1.4 m Remoción de Barreras de Contención Laterales Metálicas 608.00 4,516 2,745,728 100.00% 2,745,728 0.00%
C.22.1.5 nº Remoción de Señalización Vertical Lateral 5.00 17,074 85,370 100.00% 85,370 0.00%
C.22.1.6 m Remoción de Cercos 187.00 2,791 521,917 100.00% 521,917 0.00%
C.22.1.7 Km Despeje y Limpieza de Faja 1.82 4,500,581 8,191,057 100.00% 8,191,057 0.00%
C.22.1.8 n° Reubicación de Señalización Vertical Lateral 13.00 51,221 665,873 53.85% 358,573 0.00%
3 C.22.2 MOVIMIENTO DE TIERRAS 1.00 62,918,134 62,918,134 100.00% 62,918,134 0.00%
C.22.2.1 m3 Excavación de Escarpe 2,695.00 4,936 13,302,520 100.00% 13,302,520 0.00%
C.22.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 728.50 4,936 3,595,876 100.00% 3,595,876 0.00%
C.22.2.3 m3 Excavación en TCN para Obras de Drenaje 40.63 7,766 315,533 100.00% 315,533 0.00%
C.22.2.4 m3 Formación y Compactación de Terraplenes 3,420.37 10,801 36,943,416 100.00% 36,943,416 0.00%
C.22.2.5 m3 Relleno Estructural 45.00 23,376 1,051,920 100.00% 1,051,920 0.00%
C.22.2.6 m2 Preparación de la Subrasante 8,565.41 900 7,708,869 100.00% 7,708,869 0.00%
3 C.22.3 CAPAS GRANULARES 1.00 30,631,583 30,631,583 100.00% 30,631,583 0.00%
C.22.3.1 m3 Base Granular, CBR = 80% 1,713.08 17,881 30,631,583 100.00% 30,631,583 0.00%
3 C.22.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 125,511,269 125,511,269 100.00% 125,511,269 0.00%
C.22.4.1 m2 Imprimación 6,263.62 566 3,545,209 100.00% 3,545,209 0.00%
C.22.4.2 m2 Riego de Liga 4,717.11 469 2,212,325 100.00% 2,212,325 0.00%
C.22.4.3 m3 Concreto Asfáltico de Rodadura 375.82 154,673 58,129,207 100.00% 58,129,207 0.00%
C.22.4.4 m3 Concreto Asfáltico Capa Intermedia 424.54 145,156 61,624,528 100.00% 61,624,528 0.00%
3 C.22.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 15,142,488 15,142,488 100.00% 15,142,488 3.89%
C.22.5.1 m3 Hormigón G05 1.00 75,880 75,880 100.00% 75,880 0.00%
C.22.5.2 m3 Hormigón G17 73.20 193,885 14,192,382 100.00% 14,192,382 0.00%
C.22.5.3 Kg Acero para Armaduras A630-420H 228.00 1,250 285,000 100.00% 285,000 0.00%
C.22.5.4 m2 Revestimiento de Mampostería de Piedra 11.00 53,566 589,226 100.00% 589,226 100.00%
3 C.22.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 12,309,957 12,309,957 35.88% 4,416,678 9.19%
C.22.6.1 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=1,0 37.00 88,800 3,285,600 100.00% 3,285,600 0.00%
C.22.6.2 n° Embudos para Descargas de Agua 3.00 293,760 881,280 33.33% 293,731 33.33%
C.22.6.3 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 12.00 116,607 1,399,284 0.00% 0 0.00%
C.22.6.4 m Soleras Tipo "A" 149.00 14,709 2,191,641 33.56% 735,515 33.56%
C.22.6.5 m Construcción de Canales, Fosos y Contrafosos sin Revestir 132.00 3,394 448,008 22.73% 101,832 22.73%
C.22.6.6 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 64.00 3,394 217,216 0.00% 0 0.00%
C.22.6.7 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 6.00 3,394 20,364 0.00% 0 0.00%
C.22.6.8 m3 Revestimiento de Fosos y Contrafosos 13.00 297,428 3,866,564 0.00% 0 0.00%
3 C.22.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 81,261,614 81,261,613 40.59% 32,980,808 19.20%
C.22.7.1 m Cerco de Alambre de Púas 80.00 7,620 609,600 100.00% 609,600 0.00%
C.22.7.2 n° Señales Laterales, Tipo 2, Sp = 1 m2 17.00 146,476 2,490,092 0.00% 0 0.00%
C.22.7.3 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 9.00 281,276 2,531,484 0.00% 0 0.00%
C.22.7.4 n° Señales Laterales, Tipo 4, 2 = Sp = 3 m2 1.00 373,078 373,078 0.00% 0 0.00%
C.22.7.5 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 6.00 1,027,331 6,163,986 0.00% 0 0.00%
C.22.7.6 n° Señales Verticales Laterales Tipo 7 ,12 m2 < Sp<= 14 m2 2.00 2,238,487 4,476,974 0.00% 0 0.00%
C.22.7.7 n° Señales Verticales Laterales Tipo 8 ,14 m2 < Sp<= 20 m2 1.00 2,788,558 2,788,558 0.00% 0 0.00%
C.22.7.8 n° Señales Verticales Laterales Tipo 9, 25 m2 < Sp<= 30 m2 1.00 4,098,727 4,098,727 0.00% 0 0.00%
C.22.7.9 n° Delineadores verticales 14.00 81,267 1,137,738 0.00% 0 0.00%
C.22.7.10 n° Delineador Direccional Simple 7.00 82,644 578,508 0.00% 0 0.00%
C.22.7.11 n° Hito de Vértice 1.00 51,545 51,545 0.00% 0 0.00%
C.22.7.12 Km Demarcación, Línea Lateral Segmentada 0.94 1,600,206 1,504,194 0.00% 0 0.00%
C.22.7.13 Km Demarcación, Línea Lateral Continua 1.76 1,200,155 2,112,273 0.00% 0 0.00%
C.22.7.14 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 318.00 11,001 3,498,318 0.00% 0 0.00%
C.22.7.15 n° Tachas Reflectantes 507.00 1,600 811,200 0.00% 0 0.00%
C.22.7.16 m Barreras Metálicas de Contención Laterales, de Doble Onda 963.00 39,001 37,557,963 86.19% 32,371,208 41.54%
C.22.7.18 m Barreras Laterales de Hormigón en Sitio Alta 182.00 57,568 10,477,376 0.00% 0 0.00%
3 C.22.8 PAISAJISMO 1.00 1,636,987 1,636,987 80.00% 1,309,590 80.00%
C.22.8.1 Gl Obras de reposición de áreas verde 1.00 1,636,987 1,636,987 80.00% 1,309,590 80.00%
3 C.22.9 ILUMINACIÓN 1.00 131,554,436 131,554,436 54.44% 71,616,485 38.11%
RA03-24-I201 c/u Empalme por Compañía + Medidor Monofásico 2.00 428,041 856,082 0.00% 0 0.00%
RA03-24-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00%
RA03-24-I205 c/u Transformador 5 kVA 2f, norma COMPAÑÍA 1.00 1,151,499 1,151,499 0.00% 0 0.00%
RA03-24-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 3.00 636,606 1,909,818 0.00% 0 0.00%
RA03-24-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 2.00 281,717 563,434 0.00% 0 0.00%
RA03-24-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 1,471.36 12,597 18,534,722 99.16% 18,379,030 30.58%
RA03-24-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 307.70 28,707 8,833,144 82.55% 7,291,760 65.00%
RA03-24-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 66.67% 71,302 66.67%
RA03-24-I213 c/u Construcción Cámara BT (CBT-xxx) 12.00 126,117 1,513,404 0.00% 0 0.00%
RA03-24-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 62.00 238,377 14,779,374 83.87% 12,395,461 83.87%
RA03-24-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 775.00 3,679 2,851,225 60.26% 1,718,148 60.26%
RA03-24-I223 m Provisión y montaje Cable 4 x 1 x 13,3 mm2, XTU 878.81 5,654 4,968,792 45.52% 2,261,794 45.52%
RA03-24-I224 m Provisión y montaje Cable 4 x 1 x 21,2 mm2, XTU 2,155.96 6,942 14,966,674 13.91% 2,081,864 13.91%
RA03-24-I226 m Provisión y montaje Cable 2 x 1 x 42,4 mm2, XTU 1,801.09 10,623 19,132,979 13.88% 2,655,657 13.88%
RA03-24-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 1,662.21 6,007 9,984,895 93.79% 9,364,833 33.09%
RA03-24-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 62.00 273,789 16,974,918 83.87% 14,236,864 83.87%
RA03-24-I231 c/u Soldadura Termofusión. 44.00 30,775 1,354,100 0.00% 0 0.00%
RA03-24-I232 c/u Cámaras Registro Malla de Puesta Tierra 13.00 40,986 532,818 0.00% 0 0.00%
RA03-24-I233 c/u Tablero Control General iluminación monofásico 2.00 476,354 952,708 0.00% 0 0.00%
RA03-24-I234 c/u Retiro y reemplazo de luminaria existente poste galvanizado/hormigó 23.00 304,384 7,000,832 13.04% 912,908 0.00%
RA03-24-I235 c/u Retiro Luminaria y Poste Metálico. 8.00 41,144 329,152 75.00% 246,864 0.00%
RA03-24-I236 c/u Reubicación Poste Metálico existente con Luminaria 1.00 2,965 2,965 0.00% 0 0.00%
RA03-24-I237 gl Retiro y normalización circuito alimentador postes Iluminación existen 3.00 6,358 19,074 0.00% 0 0.00%
RA03-24-I238 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 27.00 17,856 482,112 0.00% 0 0.00%
RA03-24-I240 km CONTRUCCIÓN NUEVA LÍNEA MT + CABLES MT +ELEM ELÉCTRI 0.28 7,031,559 1,968,837 0.00% 0 0.00%
RA03-24-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 9.00 24,070 216,630 0.00% 0 0.00%
3 C.22.10 OBRAS COMPLEMETARIAS 1.00 3,000,387 3,000,387 0.00% 0 0.00%
C.22.10.2 n° Postes SOS 1.00 3,000,387 3,000,387 0.00% 0 0.00%
RUTA 5 COLLIPULLI - GORBEA INFORMACIÓN CONTRATO
MONTO UF 508,941.27
0 0.00% 0 - 0.0%
UF = 29,942.78
ESTADOS DE PAGO
UF CLP
Nº Total Facturado Diferencial Importe
Fecha Valor Importe Neto EP Retenciones
Mensual UF Reajuste
1 04-11-2021 30,427.33 4,578.53 457.85 4,120.68 484.55 1,996,673
2 01-12-2021 30,762.80 6,965.14 696.51 6,268.63 820.02 5,140,399
3 31-12-2021 30,991.74 14,110.73 1,411.07 12,699.66 1,048.96 13,321,432
4 31-01-2022 31,212.65 12,198.70 1,219.87 10,978.83 1,269.87 13,941,689
5
6
7
8
9
10
11
12
13
14
15
16
17
TOTALES 37,853.10 3,785.31 34,067.79 -------- 34,400,193
#REF!
Previsión Estado de Pago presentado Enero 2021
OBRA: VAC INFRAESTRUCTURA / O-259 RUTA 5 COLLIPULLI - GORBEA
C.3 C.3 DISEÑO GEOMETRICO ACCESO A CALLE DE SERVICIO SECTOR TURBINA KM 607,960 PONIENTE 79,288,308 57.10% 45,273,615 7.40% 5,863,371
C.11 ACERA PEATONAL CALLE DE SERVICIO PONIENTE SECTOR METRENCO ENTRE KM 682,600 - KM
C.11 186,211,528 21.62% 40,249,907 4.37% 8,134,164
683,500
C.12 C.12 PANTALLAS ACUSTICAS SECTOR METRENCO ENTRE KM 683,400 - KM 684,300 LADO PONIENTE 659,522,951 100.00% 659,523,820 0.31% 2,065,983
C.13 C.13 HABILITACIÓN ÁREA DE ESTACIONAMIENTO ENLACE QUEPE LADO PONIENTE 90,928,944 37.53% 34,121,532 14.46% 13,149,398
C.14 C.14 CONEXIÓN RUTA S-199 FREIRE - VILLARICA CON RUTA 5 394,951,351 70.85% 279,828,122 6.53% 25,800,935
C.15 CONSTRUCCIÓN BAHIA DE ESTACIONAMIENTO PARADERO DE BUSES PASARELA PITRUFQUEN
C.15 121,220,202 41.56% 50,378,787 10.62% 12,870,861
NORTE LADO PONIENTE
C.16 C.16 PARADERO DE BUSES Y BAHÍA DE ESTACIONAMIENTO PITRUFQUÉN, LADO ORIENTE 16,390,336 79.99% 13,110,202 17.51% 2,869,326
C.17 INSTALACIÓN CRUCE SEMAFORIZADO Y VALLAS PEATONALES EN INTERSECCION ENLACE
C.17 63,557,571 58.08% 36,915,419 2.44% 1,549,598
LEÓN GALLO LADO ORIENTE
C.18 DISEÑO GEOMETRICO BAJO ESTRUCTURA PS LEÓN GALLO Y FACILIDADES PEATONALES KM
C.18 63,638,609 74.30% 47,285,202 18.98% 12,076,890
701,500
C.19 C.19 DG INT. LADO PONIENTE CALLE LEÓN GALLO, ARTURO PRAT Y BLANCO ENCALADA DM. 701.500 43,637,286 47.97% 20,932,708 9.45% 4,125,180
C.20 C.20 PARADERO DE TAXI Y SEGREGACIÓN PEATONAL SECTOR PITRUFQUÉN KM 701,500 38,125,594 60.54% 23,080,266 12.90% 4,917,196
C.21 C.21 ATRAVIESO PEATONAL ESTACION PITRUFQUEN LADO ORIENTE KM 701,900 22,046,670 94.01% 20,725,600 28.08% 6,190,391
C.22 C.22 RAMALES ATRAVIESO QUINTA FAJA, GORBEA KM 717,000 481,920,373 84.47% 407,073,860 13.09% 63,081,614
C.D. POR DISTRIBUIR
RUTA 5 COLLIPULLI - GORBEA
C.15.1 C.15.1 PREPARACION DEL AREA DE TRABAJO 9,529,464 100.00% 9,529,811 0.00% 0 100.00%
C.15.2 C.15.2 MOVIMIENTO DE TIERRAS 4,887,480 100.00% 4,887,480 0.00% 0 100.00%
C.15.3 C.15.3 CAPAS GRANULARES 5,044,409 99.21% 5,004,381 0.00% 0 99.21%
C.15.4 C.15.4 REVESTIMIENTOS Y PAVIMENTOS 19,718,679 79.03% 15,584,190 34.43% 6,788,490 44.61%
C.15.5 C.15.5 DRENAJE Y PROTECCION DE LA PLATAFORMA 3,355,693 82.91% 2,782,216 0.00% 0 82.91%
C.15.6 C.15.6 ELEMENTOS DE CONTROL Y SEGURIDAD 60,518,502 0.00% 0 0.00% 0 0.00%
C.15.7 C.15.7 ILUMINACIÓN 18,165,975 69.31% 12,590,709 33.48% 6,082,371 35.83%
C.16 PARADERO DE BUSES Y BAHÍA DE ESTACIONAMIENTO
C.16 16,390,336 79.99% 13,110,202 17.51% 2,869,326 62.48%
PITRUFQUÉN, LADO ORIENTE
C.16.1 C.16.1 PREPARACION DEL AREA DE TRABAJO 732,653 100.02% 732,827 0.00% 0 100.02%
C.16.2 C.16.2 REVESTIMIENTOS Y PAVIMENTOS 1,116,586 100.02% 1,116,760 0.00% 0 100.02%
C.16.3 C.16.3 ELEMENTOS DE CONTROL Y SEGURIDAD 9,816,290 74.43% 7,306,748 18.55% 1,820,713 55.89%
C.16.4 C.16.4 ILUMINACIÓN 4,724,807 83.68% 3,953,867 22.19% 1,048,613 61.49%
INSTALACIÓN CRUCE SEMAFORIZADO Y VALLAS
C.17 C.17 PEATONALES EN INTERSECCION ENLACE LEÓN GALLO LADO 63,557,571 58.08% 36,915,419 2.44% 1,549,598 55.64%
ORIENTE
C.17.1 C.17.1 OBRAS DE MITIGACIÓN 63,557,571 58.08% 36,915,419 2.44% 1,549,598 55.64%
C.18 DISEÑO GEOMETRICO BAJO ESTRUCTURA PS LEÓN GALLO Y
C.18 63,638,609 74.30% 47,285,202 18.98% 12,076,890 55.33%
FACILIDADES PEATONALES KM 701,500
C.18.1 C.18.1 PREPARACION DEL AREA DE TRABAJO 2,859,416 99.99% 2,859,242 0.00% 0 99.99%
C.18.2 C.18.2 MOVIMIENTO DE TIERRAS 5,299,218 100.00% 5,299,391 0.00% 0 100.00%
C.18.3 C.18.3 CAPAS GRANULARES 2,808,747 100.01% 2,808,921 0.00% 0 100.01%
C.18.4 C.18.4 REVESTIMIENTOS Y PAVIMENTOS 21,548,966 98.59% 21,245,485 27.07% 5,833,369 71.52%
C.18.5 C.18.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 986,816 100.02% 986,990 0.00% 0 100.02%
C.18.6 C.18.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 10,079,505 78.54% 7,916,354 32.13% 3,238,694 46.41%
C.18.7 C.18.7 ELEMENTOS DE CONTROL Y SEGURIDAD 6,392,910 23.62% 1,509,961 23.62% 1,509,961 0.00%
C.18.8 C.18.8 ILUMINACIÓN 11,162,708 41.74% 4,658,858 13.39% 1,494,866 28.34%
C.18.9 C.18.9 OBRAS COMPLEMETARIAS 2,500,323 0.00% 0 0.00% 0 0.00%
C.19 DG INT. LADO PONIENTE CALLE LEÓN GALLO, ARTURO PRAT
C.19 43,637,286 47.97% 20,932,708 9.45% 4,125,180 38.52%
Y BLANCO ENCALADA DM. 701.500
C.19.1 C.19.1 PREPARACION DEL AREA DE TRABAJO 1,699,850 100.03% 1,700,371 0.00% 0 100.03%
C.19.2 C.19.2 MOVIMIENTO DE TIERRAS 4,941,474 100.02% 4,942,342 0.00% 0 100.02%
C.19.3 C.19.3 CAPAS GRANULARES 1,151,358 100.00% 1,151,358 0.00% 0 100.00%
C.19.4 C.19.4 REVESTIMIENTOS Y PAVIMENTOS 6,125,904 58.96% 3,611,958 33.82% 2,072,045 25.14%
C.19.5 C.19.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 831,249 100.02% 831,424 0.00% 0 100.02%
C.19.6 C.19.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 8,849,837 69.14% 6,118,549 19.26% 1,704,658 49.88%
C.19.7 C.19.7 ELEMENTOS DE CONTROL Y SEGURIDAD 11,171,038 0.00% 0 0.00% 0 0.00%
C.19.8 C.19.8 ILUMINACIÓN 8,866,578 29.06% 2,576,706 3.93% 348,477 25.13%
C.20 PARADERO DE TAXI Y SEGREGACIÓN PEATONAL SECTOR
C.20 38,125,594 60.54% 23,080,266 12.90% 4,917,196 47.64%
PITRUFQUÉN KM 701,500
C.20.1 C.20.1 PREPARACION DEL AREA DE TRABAJO 1,049,494 100.00% 1,049,494 0.00% 0 100.00%
C.20.2 C.20.2 MOVIMIENTO DE TIERRAS 5,658,024 100.01% 5,658,723 0.00% 0 100.01%
C.20.3 C.20.3 CAPAS GRANULARES 2,186,310 100.01% 2,186,483 0.00% 0 100.01%
C.20.4 C.20.4 REVESTIMIENTOS Y PAVIMENTOS 6,077,390 76.04% 4,621,524 14.01% 851,672 62.03%
C.20.5 C.20.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 32,877 100.00% 32,877 0.00% 0 100.00%
C.20.6 C.20.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 2,734,979 93.94% 2,569,277 82.34% 2,252,097 11.60%
C.20.7 C.20.7 ELEMENTOS DE CONTROL Y SEGURIDAD 8,055,202 5.71% 460,017 5.71% 460,017 0.00%
C.20.8 C.20.8 ILUMINACIÓN 12,331,319 52.73% 6,501,871 10.98% 1,353,410 41.75%
C.21 ATRAVIESO PEATONAL ESTACION PITRUFQUEN LADO
C.21 22,046,670 94.01% 20,725,600 28.08% 6,190,391 65.93%
ORIENTE KM 701,900
C.21.1 C.21.1 PREPARACION DEL AREA DE TRABAJO 780,468 100.00% 780,468 0.00% 0 100.00%
C.21.2 C.21.2 MOVIMIENTO DE TIERRAS 16,289 100.00% 16,289 0.00% 0 100.00%
C.21.3 C.21.3 CAPAS GRANULARES 180,240 100.00% 180,240 0.00% 0 100.00%
C.21.4 C.21.4 REVESTIMIENTOS Y PAVIMENTOS 1,045,969 100.00% 1,045,969 0.00% 0 100.00%
C.21.5 C.21.5 DRENAJE Y PROTECCION DE LA PLATAFORMA 2,112,019 100.01% 2,112,193 0.00% 0 100.01%
C.21.6.1 C.21.6.1 ELEMENTOS DE CONTROL Y SEGURIDAD 9,615,865 98.61% 9,482,453 41.71% 4,010,875 56.90%
C.21.7 C.21.7 PAISAJISMO 1,636,987 100.00% 1,636,987 0.00% 0 100.00%
C.21.8 C.21.8 ILUMINACIÓN 4,158,510 93.11% 3,871,933 17.84% 742,056 75.26%
C.21.9 C.21.9 OBRAS COMPLEMETARIAS 2,500,323 63.95% 1,599,068 57.49% 1,437,460 6.46%
C.22 C.22 RAMALES ATRAVIESO QUINTA FAJA, GORBEA KM 717,000 481,920,373 84.47% 407,073,860 13.09% 63,081,614 71.38%
C.22.1 C.22.1 PREPARACION DEL AREA DE TRABAJO 17,953,519 100.00% 17,953,016 0.44% 79,229 99.56%
C.22.2 C.22.2 MOVIMIENTO DE TIERRAS 62,918,134 99.76% 62,768,350 1.43% 901,646 98.33%
C.22.3 C.22.3 CAPAS GRANULARES 30,631,583 100.00% 30,631,236 0.00% 0 100.00%
C.22.4 C.22.4 REVESTIMIENTOS Y PAVIMENTOS 125,511,269 100.00% 125,510,749 0.00% 0 100.00%
C.22.5 C.22.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 15,142,488 100.00% 15,143,184 32.01% 4,847,314 67.99%
C.22.6 C.22.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 12,309,957 63.59% 7,827,425 33.39% 4,110,890 30.19%
C.22.7 C.22.7 ELEMENTOS DE CONTROL Y SEGURIDAD 81,261,613 62.49% 50,783,827 49.29% 40,052,533 13.21%
C.22.8 C.22.8 PAISAJISMO 1,636,987 36.19% 592,461 36.19% 592,461 0.00%
C.22.9 C.22.9 ILUMINACIÓN 131,554,436 72.87% 95,863,612 9.50% 12,497,541 63.37%
C.22.10 C.22.10 OBRAS COMPLEMETARIAS 3,000,387 0.00% 0 0.00% 0 0.00%
RUTA 5 COLLIPULLI - GORBEA
Jun-22
Producción Anterior
Importe
3,984,144,005
359,676,633
136,568,937
136,568,937
38,254,840
38,254,840
29,514,849
29,514,849 -
11,402,783
11,402,783
73,247,133
80,465,124
17,479,421
12,486,726
1,640,348
0
7,217,991
0
0
47,666,852
3,174,653
32,909,776
0
1,545,287
85,509
9,951,627
1,697,216,779
58,629,946
2,605,597
16,301,108
13,559,200
3,380,909
9,708,138
4,762
13,070,232
51,632,744
11,356,709
22,955,986
943,580
52,643
751,552
682,348
3,337,386
11,552,540
0
9,353,744
9,353,744
295,123,579
21,535,984
28,166,387
24,442,785
131,830,374
4,894,608
32,111,140
30,884,289
21,258,012
29,848,038
3,632,518
10,533,699
0
0
0
0
15,681,821
0
22,310,515
1,948,082
2,052,258
5,654,059
2,609,332
0
10,046,784
88,221,943
299,694
87,922,249
475,209
475,209
2,610,435
2,610,435
2,914,232
1,084,187
1,124,417
0
705,628
55,145,802
1,242,074
192,628
53,711,100
122,399,154
4,055,055
1,389,850
482,787
71,510
12,122,877
0
104,277,075
223,665,201
1,464,126
2,791,720
983,281
289,111
22,029,842
0
196,107,121
4,357,486
1,185,673
1,605,500
0
0
0
0
0
1,566,313
42,123,907
889,600
1,073,600
18,008
0
8,623,914
0
31,518,785
0
0
0
0
0
0
0
0
0
0
0
0
71,409,784
6,738,196
16,830,327
10,918,496
751,481
69,934
20,752,500
4,448,852
10,899,998
48,327,886
4,888,026
15,122,697
6,437,160
676,052
538,878
12,847,047
0
7,818,026
16,496,359
647,890
2,090,070
294,137
2,440,446
7,330,843
0
18,841
3,674,132
79,833,578
12,921,932
51,652,732
8,454,985
357,363
456,926
0
4,485,373
9,940,270
76,393,326
6,684,592
35,989,999
9,429,135
0
3,528,734
0
3,489,537
17,271,329
0
59,121,838
6,965,859
29,075,187
7,735,441
0
61,797
0
0
15,283,554
41,032,056
7,307,529
26,249,800
0
0
0
0
910,285
6,564,442
19,675,272
2,168,585
9,140,593
34,817
0
164,892
0
0
8,166,385
4,859,605
1,093,393
1,773,571
445,753
8,928
0
0
1,537,960
14,426,107
663,633
4,302,027
268,389
1,257,893
594,545
0
673,806
6,665,814
135,939,303
16,635,934
24,795,113
12,007,265
29,435,903
872,959
2,833,279
21,647,826
27,711,024
12,828,075
1,352,860
5,953,750
729,548
14,636
1,440,124
0
0
3,337,157
67,909,363
6,691,182
22,369,949
9,382,345
13,707,017
5,903,280
693,584
0
9,162,006
40,152,292
3,217,607
26,010,102
3,240,752
1,901,347
0
0
0
5,782,484
1,924,438,592
14,845,176
7,358,836
3,415,024
0
0
0
0
1,166,034
2,905,282
39,410,244
3,437,252
5,245,115
5,201,220
16,588,698
913,958
2,249,711
0
5,772,804
1,486
13,635,592
1,120,669
4,874,760
3,058,897
583,913
1,288,692
0
0
2,708,661
4,476,083
195,227
2,314,914
533,616
0
0
0
1,432,326
256,836,244
7,606,580
127,236,299
22,211,610
73,283,123
808,202
2,812,956
7,973,228
14,904,246
0
118,841,364
8,096,831
24,335,257
18,046,200
45,055,626
921,646
0
0
22,385,804
32,115,743
4,436,455
14,973,396
0
0
0
0
0
12,705,892
0
657,457,837
7,175,796
2,697,760
947,867
2,002,223
107,391,202
14,887,057
522,355,932
20,972,134
899,020
9,463,175
1,828,971
0
1,368,590
0
0
7,412,378
254,027,187
11,456,596
69,696,869
27,136,910
116,811,134
2,183,820
10,576,309
838,200
15,327,349
37,507,926
9,529,811
4,887,480
5,004,381
8,795,700
2,782,216
0
6,508,338
10,240,876
732,827
1,116,760
5,486,035
2,905,254
35,365,821
35,365,821
35,208,312
2,859,242
5,299,391
2,808,921
15,412,116
986,990
4,677,660
0
3,163,992
0
16,807,528
1,700,371
4,942,342
1,151,358
1,539,913
831,424
4,413,891
0
2,228,229
18,163,070
1,049,494
5,658,723
2,186,483
3,769,852
32,877
317,180
0
5,148,461
14,535,209
780,468
16,289
180,240
1,045,969
2,112,193
5,471,578
1,636,987
3,129,877
161,608
343,992,246
17,873,787
61,866,704
30,631,236
125,510,749
10,295,870
3,716,535
10,731,294
0
83,366,071
0
OBRA: VAC INFRAESTRUCTURA / O-259 RUTA 5 COLLIPULLI - GORBEA
2 B.10 MEJORAMIENTO PANTALLAS ACÚSTICAS INSTITUTO CLARET 1.00 59,900,880 59,900,880 35.20% 21,086,281 30.34% 18,172,049
3 B.10.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,083,840 1,083,840 100.03% 1,084,187 0.00% 0
B.10.1.1 m Remoción de Barreras de Contención Laterales Metálicas 240.00 4,516 1,083,840 100.03% 1,084,187 0.00% 0.0
3 B.10.2 MOVIMIENTO DE TIERRAS 1.00 1,184,640 1,184,640 100.01% 1,184,814 5.10% 60,397
B.10.2.1 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 240.00 4,936 1,184,640 100.01% 1,184,814 5.10% 60,397.0
3 B.10.3 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 8,237,040 8,237,040 0.00% 0 0.00% 0
B.10.3.1 m Barreras Metálicas de Contención Laterales con recuperación, de Do 240.00 34,321 8,237,040 0.00% 0 0.00% 0.0
3 B.10.4 OBRAS PANTALLAS ACUSTICAS 1.00 49,395,360 49,395,360 38.10% 18,817,280 36.67% 18,111,652
B.10.4.1 m2 Peralte de Pantalla Acústica MMA (h=1 m) 240.00 205,814 49,395,360 38.10% 18,817,280 36.67% 18,111,652.0
B.11 MEJORAMIENTO PANTALLAS ACÚSTICAS ESCUELA
2 1.00 67,279,025 67,279,025 93.61% 62,977,593 11.64% 7,831,791
MANZANAR
3 B.11.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,241,900 1,241,900 100.01% 1,242,074 0.00% 0
B.11.1.1 m Remoción de Barreras de Contención Laterales Metálicas 275.00 4,516 1,241,900 100.01% 1,242,074 0.00% 0.0
3 B.11.2 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 9,438,275 9,438,275 54.42% 5,136,669 52.38% 4,944,041
B.11.2.1 m Barreras Metálicas de Contención Laterales con recuperación, de Do 275.00 34,321 9,438,275 54.42% 5,136,669 52.38% 4,944,041.0
3 B.11.3 OBRAS PANTALLAS ACUSTICAS 1.00 56,598,850 56,598,850 100.00% 56,598,850 5.10% 2,887,750
B.11.3.1 m2 Peralte de Pantalla Acústica MMA (h=1 m) 275.00 205,814 56,598,850 100.00% 56,598,850 5.10% 2,887,750.0
2 B.12 MEJORAMIENTO PANTALLAS ACÚSTICAS SR. JOSÉ CURRÍN 1.00 414,059,715 414,059,715 50.27% 208,160,006 20.71% 85,760,852
3 B.12.1 PREPARACION DEL AREA DE TRABAJO 1.00 4,054,708 4,054,708 100.01% 4,055,055 0.00% 0
B.12.1.1 m2 Remoción de pavimentos Asfáltico 124.20 1,740 216,108 100.00% 216,108 0.00% 0.0
B.12.1.2 m Remoción de Barreras de Contención Laterales Metálicas 850.00 4,516 3,838,600 100.01% 3,838,947 0.00% 0.0
3 B.12.2 MOVIMIENTO DE TIERRAS 1.00 1,390,024 1,390,024 99.99% 1,389,850 0.00% 0
B.12.2.1 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 259.00 4,936 1,278,424 99.99% 1,278,250 0.00% 0.0
B.12.2.2 m2 Preparación de la Subrasante 124.00 900 111,600 100.00% 111,600 0.00% 0.0
3 B.12.3 CAPAS GRANULARES 1.00 482,787 482,787 100.00% 482,787 0.00% 0
B.12.3.1 m3 Base Granular, CBR = 80% 27.00 17,881 482,787 100.00% 482,787 0.00% 0.0
3 B.12.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 1,030,703 1,030,703 100.00% 1,030,703 93.06% 959,193
B.12.4.1 m2 Imprimación 124.00 566 70,184 100.00% 70,184 19.80% 13,898.0
B.12.4.2 m3 Concreto Asfáltico de Rodadura 6.21 154,673 960,519 100.00% 960,519 98.41% 945,295.0
3 B.12.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 55,346,234 55,346,233 46.30% 25,625,181 24.40% 13,502,304
B.12.5.1 m3 Hormigón G20 240.27 195,522 46,978,071 36.73% 17,257,367 28.74% 13,502,304.0
B.12.5.2 Kg Acero para Armaduras A630-420H 6,694.53 1,250 8,368,163 100.00% 8,367,814 0.00% 0.0
3 B.12.6 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 32,331,931 32,331,931 1.55% 501,414 1.55% 501,414
B.12.6.1 m Barreras Metálicas de Contención Laterales, de Doble Onda 81.00 39,001 3,159,081 15.87% 501,414 15.87% 501,414.0
B.12.6.2 m Barreras Metálicas de Contención Laterales con recuperación, de Do 850.00 34,321 29,172,850 0.00% 0 0.00% 0.0
3 B.12.7 OBRAS PANTALLAS ACUSTICAS 1.00 319,423,328 319,423,328 54.81% 175,075,016 22.16% 70,797,941
B.12.7.1 m2 Pantalla Acústica MMA (h=4 m) 828.00 205,814 170,413,992 98.57% 167,979,358 37.38% 63,702,283.0
B.12.7.2 m2 Peralte de Pantalla Acústica MMA (h=1 m) 724.00 205,814 149,009,336 4.76% 7,095,658 4.76% 7,095,658.0
2 B.13 MEJORAMIENTO PANTALLAS ACÚSTICAS CASA MACHI 1.00 390,516,034 390,516,034 83.21% 324,953,539 25.94% 101,288,338
3 B.13.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,463,952 1,463,952 100.01% 1,464,126 0.00% 0
B.13.1.1 m2 Remoción de pavimentos Asfáltico 249.60 1,740 434,304 100.04% 434,478 0.00% 0.0
B.13.1.2 m Remoción de Barreras de Contención Laterales Metálicas 228.00 4,516 1,029,648 100.00% 1,029,648 0.00% 0.0
3 B.13.2 MOVIMIENTO DE TIERRAS 1.00 2,791,720 2,791,720 100.00% 2,791,720 0.00% 0
B.13.2.1 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 520.00 4,936 2,566,720 100.00% 2,566,720 0.00% 0.0
B.13.2.2 m2 Preparación de la Subrasante 250.00 900 225,000 100.00% 225,000 0.00% 0.0
3 B.13.3 CAPAS GRANULARES 1.00 983,455 983,455 99.98% 983,281 0.00% 0
B.13.3.1 m3 Base Granular, CBR = 80% 55.00 17,881 983,455 99.98% 983,281 0.00% 0.0
3 B.13.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 2,071,819 2,071,819 100.00% 2,071,819 86.05% 1,782,708
B.13.4.1 m2 Imprimación 250.00 566 141,500 100.00% 141,500 3.94% 5,581.0
B.13.4.2 m3 Concreto Asfáltico de Rodadura 12.48 154,673 1,930,319 100.00% 1,930,319 92.06% 1,777,127.0
3 B.13.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 111,152,839 111,152,839 50.90% 56,574,935 31.08% 34,545,093
B.13.5.1 m3 Hormigón G20 483.00 195,522 94,437,126 42.21% 39,859,745 36.58% 34,545,093.0
B.13.5.2 Kg Acero para Armaduras A630-420H 13,372.57 1,250 16,715,713 100.00% 16,715,190 0.00% 0.0
3 B.13.6 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 15,196,377 15,196,377 27.72% 4,212,133 27.72% 4,212,133
B.13.6.1 m Barreras Metálicas de Contención Laterales, de Doble Onda 189.00 39,001 7,371,189 57.14% 4,212,133 57.14% 4,212,133.0
B.13.6.2 m Barreras Metálicas de Contención Laterales con recuperación, de Do 228.00 34,321 7,825,188 0.00% 0 0.00% 0.0
3 B.13.7 OBRAS PANTALLAS ACUSTICAS 1.00 256,855,872 256,855,872 100.00% 256,855,525 23.65% 60,748,404
B.13.7.1 m2 Pantalla Acústica MMA (h=3 m) 1,248.00 205,814 256,855,872 100.00% 256,855,525 23.65% 60,748,404.0
B.14 PARADERO DE BUSES EN SECTORES DE RUTA 5 LA
2 1.00 71,307,156 71,307,155 10.30% 7,342,744 4.19% 2,985,258
CANTERA KM 681,360 LADO ORIENTE
3 B.14.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,369,481 1,369,481 100.00% 1,369,481 13.42% 183,808
B.14.1.1 m2 Remoción de pavimentos Asfáltico 191.22 1,740 332,723 100.00% 332,723 0.00% 0.0
B.14.1.2 m Remoción de Obras de Drenaje Superficial 13.00 3,345 43,485 100.00% 43,485 0.00% 0.0
B.14.1.3 nº Remoción de Señalización Vertical Lateral 4.00 17,074 68,296 100.00% 68,296 12.00% 8,193.0
B.14.1.4 Km Despeje y Limpieza de Faja 0.16 4,500,581 720,093 100.00% 720,093 0.00% 0.0
B.14.1.5 n° Reubicación de Señalización Vertical Lateral 4.00 51,221 204,884 100.00% 204,884 85.71% 175,615.0
3 B.14.2 MOVIMIENTO DE TIERRAS 1.00 2,468,424 2,468,424 99.63% 2,459,373 34.59% 853,873
B.14.2.1 m3 Excavación de Escarpe 87.00 4,936 429,432 100.00% 429,432 0.00% 0.0
B.14.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 197.00 4,936 972,392 100.00% 972,392 0.00% 0.0
B.14.2.3 m3 Excavación en TCN para Obras de Drenaje 2.00 7,766 15,532 40.61% 6,308 40.61% 6,308.0
B.14.2.4 m3 Formación y Compactación de Terraplenes 48.00 10,801 518,448 100.00% 518,448 60.71% 314,772.0
B.14.2.5 m2 Preparación de la Subrasante 591.80 900 532,620 100.03% 532,793 100.03% 532,793.0
3 B.14.3 CAPAS GRANULARES 1.00 1,582,469 1,582,469 0.00% 0 0.00% 0
B.14.3.1 m3 Base Granular, CBR = 80% 88.50 17,881 1,582,469 0.00% 0 0.00% 0.0
3 B.14.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 12,630,387 12,630,388 0.00% 0 0.00% 0
B.14.4.1 m2 Imprimación 443.84 566 251,213 0.00% 0 0.00% 0.0
B.14.4.2 m2 Riego de Liga 443.84 469 208,161 0.00% 0 0.00% 0.0
B.14.4.3 m3 Concreto Asfáltico de Rodadura 26.63 154,673 4,118,942 0.00% 0 0.00% 0.0
B.14.4.4 m3 Concreto Asfáltico Capa Intermedia 39.95 145,156 5,798,982 0.00% 0 0.00% 0.0
B.14.4.5 m2 Aceras de Hormigón 149.32 15,089 2,253,089 0.00% 0 0.00% 0.0
3 B.14.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 464,398 464,398 0.00% 0 0.00% 0
B.14.5.1 m3 Hormigón G05 0.27 75,880 20,488 0.00% 0 0.00% 0.0
B.14.5.2 m3 Hormigón G25 1.23 246,289 302,935 0.00% 0 0.00% 0.0
B.14.5.3 Kg Acero para Armaduras A630-420H 112.78 1,250 140,975 0.00% 0 0.00% 0.0
3 B.14.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 7,085,032 7,085,032 0.00% 0 0.00% 0
B.14.6.1 m Soleras Tipo "A" 93.00 14,709 1,367,937 0.00% 0 0.00% 0.0
B.14.6.2 m Soleras con Zarpa de Hormigón 13.00 29,804 387,452 0.00% 0 0.00% 0.0
B.14.6.3 Nº Rejillas para Sumideros Tipo 60-18-R 7.00 592,504 4,147,528 0.00% 0 0.00% 0.0
B.14.6.4 m Canaleta con rejilla, Tipo ACO DRAIN Monoblock 5.00 236,423 1,182,115 0.00% 0 0.00% 0.0
3 B.14.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 32,502,224 32,502,224 0.00% 0 0.00% 0
B.14.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00% 0.0
B.14.7.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 5.00 281,276 1,406,380 0.00% 0 0.00% 0.0
B.14.7.3 n° Baliza Luminosa 2.00 1,865,691 3,731,382 0.00% 0 0.00% 0.0
B.14.7.4 Km Demarcación, Línea Lateral Continua 0.10 1,200,155 120,016 0.00% 0 0.00% 0.0
B.14.7.5 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 276.00 11,001 3,036,276 0.00% 0 0.00% 0.0
B.14.7.6 n° Tachas Reflectantes 138.00 1,600 220,800 0.00% 0 0.00% 0.0
B.14.7.7 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
B.14.7.8 m Valla Peatonal 45.00 44,402 1,998,090 0.00% 0 0.00% 0.0
B.14.7.9 m Valla Segregatoria 250.00 72,160 18,040,000 0.00% 0 0.00% 0.0
B.14.7.10 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 8.90 33,298 296,352 0.00% 0 0.00% 0.0
3 B.14.8 ILUMINACIÓN 1.00 13,204,741 13,204,740 26.61% 3,513,890 14.75% 1,947,577
RA02-17-I201 c/u Empalme por Compañía + Medidor Trifásico 1.00 1,221,415 1,221,415 0.00% 0 0.00% 0.0
RA02-17-207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 805,275 805,275 0.00% 0 0.00% 0.0
RA02-17-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 126.41 12,597 1,592,387 100.01% 1,592,560 17.86% 284,416.0
RA02-17-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA02-17-210 m Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA02-17-I213 c/u Construcción Cámara BT (CBT-xxx) 3.00 126,117 378,351 57.15% 216,225 57.15% 216,225.0
RA02-17-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 8.00 14,619 116,952 57.21% 66,904 57.21% 66,904.0
RA02-17-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 2.00 238,377 476,754 0.00% 0 0.00% 0.0
RA02-17-I218 c/u Provisión y montaje Luminaria Vial 38 W, LED 6.00 141,294 847,764 0.00% 0 0.00% 0.0
RA02-17-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 55.00 3,679 202,345 0.00% 0 0.00% 0.0
RA02-17-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 381.81 4,232 1,615,820 0.00% 0 0.00% 0.0
RA02-17-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 166.41 6,007 999,625 100.02% 999,798 92.87% 928,371.0
RA02-17-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 6.00 129,331 775,986 0.00% 0 0.00% 0.0
RA02-17-I229A c/u Instalación y provisión Poste 11 m brazo simple iluminación Vial 2.00 273,789 547,578 0.00% 0 0.00% 0.0
RA02-17-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 1.94 183,540 356,068 100.05% 356,241 100.05% 356,241.0
RA02-17-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 0.00% 0 0.00% 0.0
RA02-17-I232 c/u Cámaras Registro Malla de Puesta Tierra 4.00 40,986 163,944 0.00% 0 0.00% 0.0
RA02-17-I233 c/u Tablero Control General iluminación 1.00 2,013,921 2,013,921 0.00% 0 0.00% 0.0
RA02-17-I235 c/u Retiro Luminaria y Poste Metálico. 1.00 41,144 41,144 100.42% 41,318 0.00% 0.0
RA02-17-I236 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 100.00% 6,358 0.00% 0.0
RA02-17-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 1.00 17,856 17,856 100.00% 17,856 0.00% 0.0
RA02-17-II301 m Provisión y Montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 9.00 24,070 216,630 100.00% 216,630 44.05% 95,420.0
B.15 VILLA QUEPE ENTRE KM 687,660 - KM 687,780 LADO
2 1.00 152,721,919 152,721,919 52.54% 80,246,527 24.96% 38,122,620
PONIENTE
3 B.15.1 PREPARACION DEL AREA DE TRABAJO 1.00 889,600 889,600 100.00% 889,600 0.00% 0
B.15.1.1 m2 Remoción de pavimentos Asfáltico 96.00 1,740 167,040 100.10% 167,214 0.00% 0.0
B.15.1.2 m Remoción de Barreras de Contención Laterales Metálicas 160.00 4,516 722,560 99.98% 722,386 0.00% 0.0
3 B.15.2 MOVIMIENTO DE TIERRAS 1.00 1,073,600 1,073,600 100.00% 1,073,600 0.00% 0
B.15.2.1 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 200.00 4,936 987,200 100.00% 987,200 0.00% 0.0
B.15.2.2 m2 Preparación de la Subrasante 96.00 900 86,400 100.00% 86,400 0.00% 0.0
3 B.15.3 CAPAS GRANULARES 1.00 377,647 377,647 100.05% 377,820 95.28% 359,812
B.15.3.1 m3 Base Granular, CBR = 80% 21.12 17,881 377,647 100.05% 377,820 95.28% 359,812.0
3 B.15.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 945,252 945,252 2.32% 21,923 2.32% 21,923
B.15.4.1 m2 Imprimación 96.00 566 54,336 40.35% 21,923 40.35% 21,923.0
B.15.4.2 m3 Concreto Asfáltico de Rodadura 5.76 154,673 890,916 0.00% 0 0.00% 0.0
3 B.15.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 42,743,426 42,743,426 46.47% 19,863,894 26.30% 11,239,980
B.15.5.1 m3 Hormigón G20 185.73 195,522 36,314,301 37.00% 13,434,769 30.95% 11,239,980.0
B.15.5.2 Kg Acero para Armaduras A630-420H 5,143.30 1,250 6,429,125 100.00% 6,429,125 0.00% 0.0
3 B.15.6 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 7,901,674 7,901,674 0.00% 0 0.00% 0
B.15.6.1 m Barreras Metálicas de Contención Laterales con recuperación, de Do 160.00 34,321 5,491,360 0.00% 0 0.00% 0.0
B.15.6.2 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 0.00% 0 0.00% 0.0
3 B.15.7 OBRAS PANTALLAS ACUSTICAS 1.00 98,790,720 98,790,720 58.73% 58,019,690 26.83% 26,500,905
B.15.7.1 m2 Pantalla Acústica MMA (h=3 m) 480.00 205,814 98,790,720 58.73% 58,019,690 26.83% 26,500,905.0
2 B.16 MEJORAMIENTO SEÑALIZACIÓN A VILCÚN 1.00 24,827,316 24,827,316 0.09% 22,336 0.09% 22,336
3 B.16.1 PREPARACION DEL AREA DE TRABAJO 1.00 2,855,292 2,855,292 0.78% 22,336 0.78% 22,336
B.16.1.1 nº Remoción de Señalización Vertical Lateral 2.00 17,074 34,148 65.41% 22,336 65.41% 22,336.0
B.16.1.2 m Remoción de Señalización Vertical sobre la calzada 4.00 705,286 2,821,144 0.00% 0 0.00% 0.0
3 B.16.2 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 21,972,024 21,972,024 0.00% 0 0.00% 0
B.16.2.1 n° Señales Verticales Laterales Tipo 8 ,14 m2 < Sp<= 20 m2 2.00 2,788,558 5,577,116 0.00% 0 0.00% 0.0
B.16.2.2 n° Señalización Vertical sobre la calzada 4.00 4,098,727 16,394,908 0.00% 0 0.00% 0.0
2 B.17 MEJORAMIENTO SEÑALIZACIÓN VICTORIA 1.00 19,049,666 19,049,666 0.12% 22,336 0.12% 22,336
3 B.17.1 PREPARACION DEL AREA DE TRABAJO 1.00 34,148 34,148 65.41% 22,336 65.41% 22,336
B.17.1.1 nº Remoción de Señalización Vertical Lateral 2.00 17,074 34,148 65.41% 22,336 65.41% 22,336.0
3 B.17.2 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 19,015,518 19,015,518 0.00% 0 0.00% 0
B.17.2.1 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00% 0.0
B.17.2.2 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 3.00 1,027,331 3,081,993 0.00% 0 0.00% 0.0
B.17.2.3 n° Señales Verticales Laterales Tipo 6 ,7 m2 < Sp<=12 m2 2.00 1,537,396 3,074,792 0.00% 0 0.00% 0.0
B.17.2.4 Nº Señal Especial 2.00 4,098,727 8,197,454 0.00% 0 0.00% 0.0
B.17.2.5 n° Señalización Vertical sobre la calzada 1.00 4,098,727 4,098,727 0.00% 0 0.00% 0.0
2 B.18 MEJORAMIENTO SEÑALIZACIÓN FREIRE PRITUFQUEN 1.00 24,686,234 24,686,234 0.05% 11,225 0.05% 11,225
3 B.18.1 PREPARACION DEL AREA DE TRABAJO 1.00 722,360 722,360 1.55% 11,225 1.55% 11,225
B.18.1.1 nº Remoción de Señalización Vertical Lateral 1.00 17,074 17,074 65.74% 11,225 65.74% 11,225.0
B.18.1.2 N° Remoción de Señalización Vertical sobre la calzada 1.00 705,286 705,286 0.00% 0 0.00% 0.0
3 B.18.2 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 23,963,874 23,963,874 0.00% 0 0.00% 0
B.18.2.1 n° Señales Verticales Laterales Tipo 6 ,7 m2 < Sp<=12 m2 3.00 1,537,396 4,612,188 0.00% 0 0.00% 0.0
B.18.2.2 n° Señales Verticales Laterales Tipo 8 ,14 m2 < Sp<= 20 m2 4.00 2,788,558 11,154,232 0.00% 0 0.00% 0.0
B.18.2.3 n° Señales Verticales Laterales Tipo 9, 25 m2 < Sp<= 30 m2 1.00 4,098,727 4,098,727 0.00% 0 0.00% 0.0
B.18.2.4 n° Señalización Vertical sobre la calzada 1.00 4,098,727 4,098,727 0.00% 0 0.00% 0.0
2 B.19 MEJORAMIENTO SEÑALIZACIÓN PADRE LAS CASAS 1.00 32,235,601 32,235,601 3.11% 1,001,981 3.11% 1,001,981
3 B.19.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,530,090 1,530,090 65.49% 1,001,981 65.49% 1,001,981
B.19.1.1 nº Remoción de Señalización Vertical Lateral 7.00 17,074 119,518 65.55% 78,347 65.55% 78,347.0
B.19.1.2 N° Remoción de Señalización Vertical sobre la calzada 2.00 705,286 1,410,572 65.48% 923,634 65.48% 923,634.0
3 B.19.2 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 30,705,511 30,705,511 0.00% 0 0.00% 0
B.19.2.1 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00% 0.0
B.19.2.2 n° Señales Laterales, Tipo 4, 2 = Sp = 3 m2 1.00 373,078 373,078 0.00% 0 0.00% 0.0
B.19.2.3 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 6.00 1,027,331 6,163,986 0.00% 0 0.00% 0.0
B.19.2.4 n° Señales Verticales Laterales Tipo 6 ,7 m2 < Sp<=12 m2 3.00 1,537,396 4,612,188 0.00% 0 0.00% 0.0
B.19.2.5 n° Señales Verticales Laterales Tipo 9 ,20 m2 < Sp<= 25 m2 2.00 3,348,763 6,697,526 0.00% 0 0.00% 0.0
B.19.2.6 n° Señales Verticales Laterales Tipo 9, 25 m2 < Sp<= 30 m2 1.00 4,098,727 4,098,727 0.00% 0 0.00% 0.0
B.19.2.7 n° Señalización Vertical sobre la calzada 2.00 4,098,727 8,197,454 0.00% 0 0.00% 0.0
2 B.20 PARADERO LADO ORIENTE KM 615.780 1.00 211,392,656 211,392,656 42.87% 90,625,202 9.09% 19,215,418
3 B.20.1 PREPARACION DEL AREA DE TRABAJO 1.00 6,737,848 6,737,849 100.01% 6,738,196 0.00% 0
B.20.1.1 m3 Remoción de Estructuras 1.90 43,508 82,665 100.00% 82,665 0.00% 0.0
B.20.1.2 m Remoción de ductos 5.00 22,693 113,465 100.00% 113,465 0.00% 0.0
B.20.1.3 m2 Remoción de pavimentos Asfáltico 1,320.06 1,740 2,296,904 100.01% 2,297,078 0.00% 0.0
B.20.1.4 m Remoción de Obras de Drenaje Superficial 14.00 3,345 46,830 100.37% 47,004 0.00% 0.0
B.20.1.5 m Remoción de Cercos 447.55 2,791 1,249,112 100.00% 1,249,112 0.00% 0.0
B.20.1.6 nº Remoción de casetas de Paraderos para la locomoción colectiva 1.00 608,570 608,570 100.00% 608,570 0.00% 0.0
B.20.1.7 Km Despeje y Limpieza de Faja 0.52 4,500,581 2,340,302 100.00% 2,340,302 0.00% 0.0
3 B.20.2 MOVIMIENTO DE TIERRAS 1.00 17,674,140 17,674,140 95.23% 16,830,327 0.00% 0
B.20.2.1 m3 Excavación de Escarpe 434.00 4,936 2,142,224 100.00% 2,142,224 0.00% 0.0
B.20.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 1,191.60 4,936 5,881,738 100.00% 5,881,564 0.00% 0.0
B.20.2.3 m3 Excavación en TCN para Obras de Drenaje 50.50 7,766 392,183 100.00% 392,183 0.00% 0.0
B.20.2.4 m3 Formación y Compactación de Terraplenes 552.40 10,801 5,966,472 100.00% 5,966,646 0.00% 0.0
B.20.2.5 m3 Relleno Estructural 36.09 23,376 843,640 0.00% 0 0.00% 0.0
B.20.2.6 m2 Preparación de la Subrasante 2,719.87 900 2,447,883 99.99% 2,447,710 0.00% 0.0
3 B.20.3 CAPAS GRANULARES 1.00 10,918,496 10,918,496 100.00% 10,918,496 0.00% 0
B.20.3.1 m3 Base Granular, CBR = 80% 610.62 17,881 10,918,496 100.00% 10,918,496 0.00% 0.0
3 B.20.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 55,705,030 55,705,031 25.70% 14,314,919 24.35% 13,563,438
B.20.4.1 m2 Imprimación 2,719.87 566 1,539,446 100.01% 1,539,620 51.20% 788,139.0
B.20.4.2 m2 Riego de Liga 1,979.31 469 928,296 0.00% 0 0.00% 0.0
B.20.4.3 m3 Concreto Asfáltico de Rodadura 163.19 154,673 25,241,087 0.00% 0 0.00% 0.0
B.20.4.4 m3 Concreto Asfáltico Capa Intermedia 178.14 145,156 25,858,090 49.41% 12,775,299 49.41% 12,775,299.0
B.20.4.5 m2 Aceras de Hormigón 141.70 15,089 2,138,111 0.00% 0 0.00% 0.0
3 B.20.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 3,055,690 3,055,690 87.11% 2,661,673 84.82% 2,591,739
B.20.5.1 m3 Hormigón G05 0.12 75,880 9,106 100.00% 9,106 0.00% 0.0
B.20.5.2 m3 Hormigón G17 15.53 193,885 3,011,034 86.91% 2,617,017 85.72% 2,581,159.0
B.20.5.3 Kg Acero para Armaduras A630-420H 28.44 1,250 35,550 100.00% 35,550 29.76% 10,580.0
3 B.20.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 39,681,011 39,681,011 52.30% 20,752,500 0.00% 0
B.20.6.1 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=1,0 14.00 88,800 1,243,200 0.00% 0 0.00% 0.0
B.20.6.2 m Drenes de Pavimento 500.00 41,505 20,752,500 100.00% 20,752,500 0.00% 0.0
B.20.6.3 m Soleras Tipo "A" 70.74 14,709 1,040,515 0.00% 0 0.00% 0.0
B.20.6.4 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 163.10 3,394 553,561 0.00% 0 0.00% 0.0
B.20.6.5 m3 Revestimiento de Fosos y Contrafosos 45.00 297,428 13,384,260 0.00% 0 0.00% 0.0
B.20.6.6 m Rehabilitación de Fosos, Contrafosos y Canales, No Resvestidos 227.00 11,925 2,706,975 0.00% 0 0.00% 0.0
3 B.20.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 40,382,082 40,382,082 11.02% 4,448,852 0.00% 0
B.20.7.1 m Cerco de Alambre de Púas 452.00 7,620 3,444,240 100.00% 3,444,240 0.00% 0.0
B.20.7.2 n° Portones de Dos Hojas 2.00 502,306 1,004,612 100.00% 1,004,612 0.00% 0.0
B.20.7.3 n° Señales Laterales, Tipo 2, Sp = 1 m2 2.00 146,476 292,952 0.00% 0 0.00% 0.0
B.20.7.4 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00% 0.0
B.20.7.5 n° Delineadores verticales 5.00 81,267 406,335 0.00% 0 0.00% 0.0
B.20.7.6 Km Demarcación, Línea Lateral Segmentada termoplástica 0.59 1,600,206 944,122 0.00% 0 0.00% 0.0
B.20.7.7 Km Demarcación, Línea Lateral Continua 0.50 1,200,155 600,078 0.00% 0 0.00% 0.0
B.20.7.8 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 47.40 11,001 521,447 0.00% 0 0.00% 0.0
B.20.7.9 n° Tachas Reflectantes 251.00 1,600 401,600 0.00% 0 0.00% 0.0
B.20.7.10 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
B.20.7.11 m Barreras Metálicas de Contención Laterales, de Doble Onda 73.00 39,001 2,847,073 0.00% 0 0.00% 0.0
B.20.7.12 m Valla Peatonal 88.20 44,402 3,916,256 0.00% 0 0.00% 0.0
B.20.7.13 m Valla Peatonal en Mediana 300.00 72,160 21,648,000 0.00% 0 0.00% 0.0
B.20.7.14 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 8.60 33,298 286,363 0.00% 0 0.00% 0.0
3 B.20.8 ILUMINACIÓN 1.00 37,238,359 37,238,358 37.49% 13,960,239 8.22% 3,060,241
RA02-24.1-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA02-24.1-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00% 0.0
RA02-24.1-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00% 0.0
RA02-24.1-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA02-24.1-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 452.08 12,597 5,694,852 100.00% 5,695,025 0.00% 0.0
RA02-24.1-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 61.43 28,707 1,763,471 0.00% 0 0.00% 0.0
RA02-24.1-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA02-24.1-I213 c/u Construcción Cámara BT (CBT-xxx) 3.00 126,117 378,351 100.00% 378,351 11.89% 45,000.0
RA02-24.1-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 23.00 14,619 336,237 100.05% 336,411 0.00% 0.0
RA02-24.1-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 23.00 238,377 5,482,671 0.00% 0 0.00% 0.0
RA02-24.1-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 287.50 3,679 1,057,713 100.02% 1,057,886 92.87% 982,323.0
RA02-24.1-I222 m Provisión y montaje Cable 4 x 1 x 8,36 mm2, XTU 640.79 4,770 3,056,568 60.31% 1,843,567 60.31% 1,843,567.0
RA02-24.1-I223 m Provisión y montaje Cable 4 x 1 x 13,3 mm2, XTU 769.99 5,654 4,353,523 2.38% 103,659 2.38% 103,659.0
RA02-24.1-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 547.51 6,007 3,288,893 100.01% 3,289,066 0.00% 0.0
RA02-24.1-I228A c/u Instalación y provisión Poste 11m brazo simple iluminación vial 23.00 273,789 6,297,147 1.36% 85,692 1.36% 85,692.0
RA02-24.1-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 5.59 183,540 1,025,989 100.02% 1,026,162 0.00% 0.0
RA02-24.1-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00% 0.0
RA02-24.1-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00% 0.0
RA02-24.1-I234 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA02-24.1-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80-1 con Zanja + Retape 6.00 24,070 144,420 100.00% 144,420 0.00% 0.0
2 B.21 PARADERO LADO ORIENTE QUILLEM KM 636,420 1.00 140,110,288 140,110,287 51.09% 71,587,108 16.60% 23,259,222
3 B.21.1 PREPARACION DEL AREA DE TRABAJO 1.00 4,887,504 4,887,504 100.01% 4,888,026 0.00% 0
B.21.1.1 m2 Remoción de pavimentos Asfáltico 1,437.00 1,740 2,500,380 100.01% 2,500,554 0.00% 0.0
B.21.1.2 m Remoción de Obras de Drenaje Superficial 310.00 3,345 1,036,950 100.03% 1,037,298 0.00% 0.0
B.21.1.3 Km Despeje y Limpieza de Faja 0.30 4,500,581 1,350,174 100.00% 1,350,174 0.00% 0.0
3 B.21.2 MOVIMIENTO DE TIERRAS 1.00 15,123,043 15,123,043 100.00% 15,122,697 0.00% 0
B.21.2.1 m3 Excavación de Escarpe 139.00 4,936 686,104 100.00% 686,104 0.00% 0.0
B.21.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 2,460.00 4,936 12,142,560 100.00% 12,142,213 0.00% 0.0
B.21.2.3 m3 Excavación en TCN para Obras de Drenaje 4.43 7,766 34,403 100.00% 34,403 0.00% 0.0
B.21.2.4 m3 Formación y Compactación de Terraplenes 76.00 10,801 820,876 100.02% 821,050 0.00% 0.0
B.21.2.5 m2 Preparación de la Subrasante 1,599.00 900 1,439,100 99.99% 1,438,927 0.00% 0.0
3 B.21.3 CAPAS GRANULARES 1.00 6,437,160 6,437,160 100.00% 6,437,160 0.00% 0
B.21.3.1 m3 Base Granular, CBR = 80% 360.00 17,881 6,437,160 100.00% 6,437,160 0.00% 0.0
3 B.21.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 36,719,050 36,719,050 43.98% 16,148,668 42.14% 15,472,616
B.21.4.1 m2 Imprimación 1,599.00 566 905,034 100.02% 905,208 51.59% 466,915.0
B.21.4.2 m2 Riego de Liga 1,146.50 469 537,709 49.22% 264,639 49.22% 264,639.0
B.21.4.3 m3 Concreto Asfáltico de Rodadura 95.91 154,673 14,834,687 0.00% 0 0.00% 0.0
B.21.4.4 m3 Concreto Asfáltico Capa Intermedia 103.19 145,156 14,978,648 100.00% 14,978,821 98.41% 14,741,062.0
B.21.4.5 m2 Aceras de Hormigón 362.05 15,089 5,462,972 0.00% 0 0.00% 0.0
3 B.21.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 1,760,282 1,760,282 100.02% 1,760,630 69.41% 1,221,752
B.21.5.1 m3 Hormigón G05 2.79 75,880 211,705 100.08% 211,879 0.00% 0.0
B.21.5.2 m3 Hormigón G17 7.42 193,885 1,438,627 100.00% 1,438,627 84.92% 1,221,752.0
B.21.5.3 Kg Acero para Armaduras A630-420H 87.96 1,250 109,950 100.16% 110,124 0.00% 0.0
3 B.21.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 30,532,911 30,532,911 54.58% 16,664,040 12.50% 3,816,993
B.21.6.1 m Drenes de Pavimento 300.00 41,505 12,451,500 100.00% 12,451,847 0.00% 0.0
B.21.6.2 n° Embudos para Descargas de Agua 20.00 293,760 5,875,200 0.00% 0 0.00% 0.0
B.21.6.3 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 1.00 116,607 116,607 0.00% 0 0.00% 0.0
B.21.6.4 m Soleras Tipo "A" 19.00 14,709 279,471 0.00% 0 0.00% 0.0
B.21.6.5 m Cunetas de Hormigón 179.00 25,910 4,637,890 0.00% 0 0.00% 0.0
B.21.6.6 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormi 144.40 3,394 490,094 100.00% 490,094 29.77% 145,882.0
B.21.6.7 m3 Revestimiento de Fosos y Contrafosos 18.00 297,428 5,353,704 69.52% 3,722,099 68.57% 3,671,111.0
B.21.6.8 m Rehabilitacion de Fosos, Contrafosos y Canales, Revestidos 111.40 11,925 1,328,445 0.00% 0 0.00% 0.0
3 B.21.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 17,758,481 17,758,481 0.00% 0 0.00% 0
B.21.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00% 0.0
B.21.7.2 Km Demarcación, Línea Lateral Segmentada termoplástica 0.39 1,600,206 624,080 0.00% 0 0.00% 0.0
B.21.7.3 Km Demarcación, Línea Lateral Continua 0.30 1,200,155 360,047 0.00% 0 0.00% 0.0
B.21.7.4 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 38.00 11,001 418,038 0.00% 0 0.00% 0.0
B.21.7.5 n° Tachas Reflectantes 167.00 1,600 267,200 0.00% 0 0.00% 0.0
B.21.7.6 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
B.21.7.7 m Valla Peatonal 120.00 44,402 5,328,240 0.00% 0 0.00% 0.0
B.21.7.8 m Barreras Laterales de Hormigón en Sitio Alta 120.00 57,568 6,908,160 0.00% 0 0.00% 0.0
B.21.7.9 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 6.00 33,298 199,788 0.00% 0 0.00% 0.0
3 B.21.8 ILUMINACIÓN 1.00 26,891,857 26,891,856 39.29% 10,565,887 10.22% 2,747,861
RA02-24.2-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA02-24.2-I205 c/u Transformador 5 kVA 2f, norma COMPAÑÍA 1.00 1,151,499 1,151,499 0.00% 0 0.00% 0.0
RA02-24.2-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00% 0.0
RA02-24.2-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA02-24.2-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 363.40 12,597 4,577,750 99.99% 4,577,403 0.00% 0.0
RA02-24.2-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA02-24.2-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA02-24.2-I213 c/u Construcción Cámara BT (CBT-xxx) 1.00 126,117 126,117 100.00% 126,117 100.00% 126,117.0
RA02-24.2-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 21.00 14,619 306,999 100.06% 307,173 100.06% 307,173.0
RA02-24.2-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 13.00 238,377 3,098,901 0.00% 0 0.00% 0.0
RA02-24.2-I218 c/u Provisión y montaje Luminaria Vial 38 W, LED 8.00 141,294 1,130,352 0.00% 0 0.00% 0.0
RA02-24.2-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 202.50 3,679 744,998 48.81% 363,611 48.81% 363,611.0
RA02-24.2-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 258.36 4,232 1,093,380 48.81% 533,640 48.81% 533,640.0
RA02-24.2-I222 m Provisión y montaje Cable 4 x 1 x 8,36 mm2, XTU 755.22 4,770 3,602,399 32.54% 1,172,266 32.54% 1,172,266.0
RA02-24.2-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 400.40 6,007 2,405,203 100.00% 2,405,203 0.00% 0.0
RA02-24.2-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 8.00 129,331 1,034,648 0.00% 0 0.00% 0.0
RA02-24.2-I228A c/u Instalación y provisión Poste 11m brazo simple iluminación vial 13.00 273,789 3,559,257 0.00% 0 0.00% 0.0
RA02-24.2-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 5.10 183,540 936,054 100.00% 936,054 26.18% 245,054.0
RA02-24.2-I231 c/u Soldadura Termofusión. 26.00 30,775 800,150 0.00% 0 0.00% 0.0
RA02-24.2-I232 c/u Cámaras Registro Malla de Puesta Tierra 4.00 40,986 163,944 0.00% 0 0.00% 0.0
RA02-24.2-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA02-24.2-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 6.00 24,070 144,420 100.00% 144,420 0.00% 0.0
B.22 PARADERO DE BUSES ACCESO A TRAIGUÉN EN ATRAVIESO
2 1.00 25,171,415 25,171,414 78.67% 19,802,047 13.13% 3,305,688
VICTORIA TRAIGUÉN PONIENTE KM 624,900
3 B.22.1 PREPARACION DEL AREA DE TRABAJO 1.00 647,716 647,716 100.03% 647,890 0.00% 0
B.22.1.1 m Remoción de Obras de Drenaje Superficial 86.00 3,345 287,670 100.06% 287,844 0.00% 0.0
B.22.1.2 Km Despeje y Limpieza de Faja 0.08 4,500,581 360,046 100.00% 360,046 0.00% 0.0
3 B.22.2 MOVIMIENTO DE TIERRAS 1.00 2,089,376 2,089,376 100.03% 2,090,070 0.00% 0
B.22.2.1 m3 Excavación de Escarpe 123.00 4,936 607,128 100.03% 607,302 0.00% 0.0
B.22.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 6.00 4,936 29,616 100.58% 29,789 0.00% 0.0
B.22.2.3 m3 Excavación en TCN para Obras de Drenaje 4.25 7,766 33,006 100.00% 33,006 0.00% 0.0
B.22.2.4 m3 Formación y Compactación de Terraplenes 110.00 10,801 1,188,110 100.01% 1,188,284 0.00% 0.0
B.22.2.5 m2 Preparación de la Subrasante 257.24 900 231,516 100.07% 231,689 0.00% 0.0
3 B.22.3 CAPAS GRANULARES 1.00 293,964 293,964 100.06% 294,137 0.00% 0
B.22.3.1 m3 Base Granular, CBR = 80% 16.44 17,881 293,964 100.06% 294,137 0.00% 0.0
3 B.22.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 4,562,667 4,562,667 53.49% 2,440,446 0.00% 0
B.22.4.1 m2 Imprimación 82.22 566 46,537 100.00% 46,537 0.00% 0.0
B.22.4.2 m2 Riego de Liga 82.22 469 38,561 100.00% 38,561 0.00% 0.0
B.22.4.3 m3 Concreto Asfáltico de Rodadura 4.93 154,673 762,538 99.98% 762,364 0.00% 0.0
B.22.4.4 m3 Concreto Asfáltico Capa Intermedia 7.40 145,156 1,074,154 100.00% 1,074,154 0.00% 0.0
B.22.4.5 m2 Aceras de Hormigón 175.02 15,089 2,640,877 19.65% 518,830 0.00% 0.0
3 B.22.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 7,330,495 7,330,494 100.00% 7,330,843 0.00% 0
B.22.5.1 m3 Hormigón G05 1.79 75,880 135,825 100.13% 135,999 0.00% 0.0
B.22.5.2 m3 Hormigón G17 1.80 193,885 348,993 100.00% 348,993 0.00% 0.0
B.22.5.3 m3 Hormigón G30 17.00 257,926 4,384,742 100.00% 4,384,916 0.00% 0.0
B.22.5.4 Kg Acero para Armaduras A630-420H 941.21 1,250 1,176,513 100.00% 1,176,513 0.00% 0.0
B.22.5.5 m2 Moldajes 40.60 31,636 1,284,422 100.00% 1,284,422 0.00% 0.0
3 B.22.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 1,699,777 1,699,777 87.77% 1,491,816 87.77% 1,491,816
B.22.6.1 m Soleras Tipo "A" 91.78 14,709 1,349,992 100.01% 1,350,166 100.01% 1,350,166.0
B.22.6.2 m Cunetas de Hormigón, Tipo Baden, Tipo 1 13.50 25,910 349,785 40.50% 141,650 40.50% 141,650.0
3 B.22.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 4,648,363 4,648,363 34.58% 1,607,614 34.18% 1,588,773
B.22.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 40.54% 59,379 40.54% 59,379.0
B.22.7.2 Km Demarcación, Línea Lateral Segmentada 0.03 1,600,206 48,006 100.00% 48,006 60.75% 29,165.0
B.22.7.3 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 50.50 11,001 555,551 100.00% 555,551 100.00% 555,551.0
B.22.7.4 n° Tachas Reflectantes 16.00 1,600 25,600 40.72% 10,424 40.72% 10,424.0
B.22.7.5 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 16.19% 567,802 16.19% 567,802.0
B.22.7.6 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 11.00 33,298 366,278 100.05% 366,452 100.05% 366,452.0
3 B.22.8 ILUMINACIÓN 1.00 3,899,057 3,899,058 100.00% 3,899,231 5.77% 225,099
RA02-24.3-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 33.58 12,597 423,007 100.00% 423,007 0.00% 0.0
RA02-24.3-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 100.00% 86,121 97.64% 84,087.0
RA02-24.3-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 100.00% 106,947 97.63% 104,417.0
RA02-24.3-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 3.00 14,619 43,857 100.00% 43,857 0.00% 0.0
RA02-24.3-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 2.00 238,377 476,754 100.04% 476,928 0.00% 0.0
RA02-24.3-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 25.00 3,679 91,975 100.00% 91,975 0.00% 0.0
RA02-24.3-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 182.47 4,232 772,213 99.98% 772,039 0.00% 0.0
RA02-24.3-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 67.58 6,007 405,953 100.00% 405,953 0.00% 0.0
RA02-24.3-I228A c/u Instalación y provisión Poste 11m brazo simple iluminación vial 2.00 273,789 547,578 100.03% 547,752 0.00% 0.0
RA02-24.3-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 0.73 183,540 133,984 100.00% 133,984 0.00% 0.0
RA02-24.3-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 100.00% 615,500 0.00% 0.0
RA02-24.3-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 100.00% 122,958 29.76% 36,595.0
RA02-24.3-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 3.00 24,070 72,210 100.00% 72,210 0.00% 0.0
2 B.23 PARADERO LADO ORIENTE PÚA 1.00 275,245,432 275,245,431 42.50% 116,986,442 13.50% 37,152,864
3 B.23.1 PREPARACION DEL AREA DE TRABAJO 1.00 14,836,279 14,836,280 99.83% 14,811,234 12.73% 1,889,302
B.23.1.1 m3 Remoción de Estructuras 2.92 43,508 127,043 100.00% 127,043 0.00% 0.0
B.23.1.2 m2 Remoción de pavimentos Asfáltico 1,409.67 1,740 2,452,826 100.00% 2,452,826 0.00% 0.0
B.23.1.3 m Remoción de Obras de Drenaje Superficial 181.45 3,345 606,950 99.97% 606,776 0.00% 0.0
B.23.1.4 m Remoción de Barreras de Contención Laterales Metálicas 152.00 4,516 686,432 100.00% 686,432 0.00% 0.0
B.23.1.5 N° Remoción de Señalización Vertical sobre la calzada 2.00 705,286 1,410,572 100.00% 1,410,572 85.71% 1,209,062.0
B.23.1.6 m2 Remoción de Aceras 252.98 4,286 1,084,272 99.98% 1,084,099 0.00% 0.0
B.23.1.7 m Remoción de Cercos 448.52 2,791 1,251,819 100.00% 1,251,819 0.00% 0.0
B.23.1.8 Km Despeje y Limpieza de Faja 0.48 4,500,581 2,160,279 100.01% 2,160,453 0.00% 0.0
B.23.1.9 nº Reubicación de Señalización Vertical sobre la Calzada 1.00 705,286 705,286 96.45% 680,240 96.45% 680,240.0
B.23.1.10 nº Remoción de Estructuras 1.00 4,350,800 4,350,800 100.00% 4,350,974 0.00% 0.0
3 B.23.2 MOVIMIENTO DE TIERRAS 1.00 35,083,298 35,083,298 150.94% 52,953,498 3.71% 1,300,766
B.23.2.1 m3 Excavación de Escarpe 576.08 4,936 2,843,531 100.01% 2,843,704 0.00% 0.0
B.23.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 1,945.30 4,936 9,602,001 100.00% 9,602,174 0.00% 0.0
B.23.2.3 m3 Excavación en TCN para Obras de Drenaje 40.30 7,766 312,970 100.00% 312,970 0.00% 0.0
B.23.2.4 m3 Formación y Compactación de Terraplenes 1,834.49 10,801 19,814,326 100.00% 19,814,500 0.00% 0.0
B.23.2.5 m3 Relleno Estructural 14.59 23,376 341,056 0.00% 0 0.00% 0.0
B.23.2.6 m2 Preparación de la Subrasante 2,410.46 900 2,169,414 100.00% 2,169,414 0.00% 0.0
3 B.23.3 CAPAS GRANULARES 1.00 9,105,542 9,105,542 100.00% 9,105,368 7.14% 650,383
B.23.3.1 m3 Base Granular, CBR = 80% 509.23 17,881 9,105,542 100.00% 9,105,368 7.14% 650,383.0
3 B.23.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 53,979,421 53,979,421 49.20% 26,558,022 48.54% 26,200,659
B.23.4.1 m2 Imprimación 2,410.46 566 1,364,320 100.00% 1,364,320 73.81% 1,006,957.0
B.23.4.2 m2 Riego de Liga 2,108.91 469 989,079 26.99% 266,944 26.99% 266,944.0
B.23.4.3 m3 Concreto Asfáltico de Rodadura 144.63 154,673 22,370,356 0.00% 0 0.00% 0.0
B.23.4.4 m3 Concreto Asfáltico Capa Intermedia 189.80 145,156 27,550,609 90.48% 24,926,758 90.48% 24,926,758.0
B.23.4.5 m2 Aceras de Hormigón 113.00 15,089 1,705,057 0.00% 0 0.00% 0.0
3 B.23.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 15,710,122 15,710,122 27.04% 4,248,320 24.13% 3,791,394
B.23.5.1 m3 Hormigón G05 2.89 75,880 219,293 100.08% 219,467 11.93% 26,169.0
B.23.5.2 m3 Hormigón G17 2.89 193,885 560,328 60.33% 338,066 60.33% 338,066.0
B.23.5.3 m3 Hormigón G25 38.09 246,289 9,381,148 0.00% 0 0.00% 0.0
B.23.5.4 Kg Acero para Armaduras A630-420H 2,952.49 1,250 3,690,612 100.00% 3,690,787 92.86% 3,427,159.0
B.23.5.5 m2 Revestimiento de Mampostería de Piedra 34.70 53,566 1,858,740 0.00% 0 0.00% 0.0
3 B.23.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 24,292,231 24,292,231 0.00% 0.00% 0
B.23.6.1 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 43.30 116,607 5,049,083 0.00% 0 0.00% 0.0
B.23.6.2 m Soleras Tipo "A" 29.89 14,709 439,652 0.00% 0 0.00% 0.0
B.23.6.3 m Soleras con Zarpa de Hormigón 160.40 29,804 4,780,562 0.00% 0 0.00% 0.0
B.23.6.4 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormi 235.00 3,394 797,590 100.00% 797,590 95.24% 759,626.0
B.23.6.5 m3 Revestimiento de Fosos y Contrafosos 41.00 297,428 12,194,548 16.19% 1,974,377 16.19% 1,974,377.0
B.23.6.6 m Limpieza de Alcantarilla y Sifones, de mas de 1 m de altura 38.10 27,055 1,030,796 0.00% 0 0.00% 0.0
3 B.23.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 88,773,143 88,773,143 5.05% 4,485,373 0.00% 0
B.23.7.1 m Cerco de Alambre de Púas 456.77 7,620 3,480,587 100.00% 3,480,587 0.00% 0.0
B.23.7.2 n° Portones de Dos Hojas 2.00 502,306 1,004,612 100.02% 1,004,786 0.00% 0.0
B.23.7.3 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00% 0.0
B.23.7.4 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00% 0.0
B.23.7.5 n° Señalización Vertical sobre la calzada 2.00 4,098,727 8,197,454 0.00% 0 0.00% 0.0
B.23.7.6 n° Delineadores verticales 5.00 81,267 406,335 0.00% 0 0.00% 0.0
B.23.7.7 n° Marco Portaseñal 1.00 20,713,231 20,713,231 0.00% 0 0.00% 0.0
B.23.7.8 Km Demarcación, Línea Lateral Segmentada termoplástica 0.55 1,600,206 880,113 0.00% 0 0.00% 0.0
B.23.7.9 Km Demarcación, Línea Lateral Continua 0.46 1,200,155 552,071 0.00% 0 0.00% 0.0
B.23.7.10 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 40.50 11,001 445,541 0.00% 0 0.00% 0.0
B.23.7.11 n° Tachas Reflectantes 236.00 1,600 377,600 0.00% 0 0.00% 0.0
B.23.7.12 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
B.23.7.13 m Barreras Metálicas de Contención Laterales, de Doble Onda 226.00 39,001 8,814,226 0.00% 0 0.00% 0.0
B.23.7.14 m Valla Peatonal 31.00 44,402 1,376,462 0.00% 0 0.00% 0.0
B.23.7.15 m Valla Peatonal en Mediana 300.00 72,160 21,648,000 0.00% 0 0.00% 0.0
B.23.7.16 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 0.00% 0 0.00% 0.0
B.23.7.17 m Barreras Laterales de Hormigón en Sitio Alta 242.00 57,568 13,931,456 0.00% 0 0.00% 0.0
B.23.7.18 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 9.60 33,298 319,661 0.00% 0 0.00% 0.0
3 B.23.8 ILUMINACIÓN 1.00 33,465,396 33,465,395 37.48% 12,544,011 7.78% 2,603,741
RA02-24.4-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA02-24.4-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00% 0.0
RA02-24.4-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00% 0.0
RA02-24.4-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA02-24.4-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 457.83 12,597 5,767,285 99.99% 5,766,764 0.00% 0.0
RA02-24.4-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA02-24.4-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA02-24.4-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 21.00 14,619 306,999 100.00% 306,999 60.72% 186,411.0
RA02-24.4-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 21.00 238,377 5,005,917 0.00% 0 0.00% 0.0
RA02-24.4-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 262.50 3,679 965,738 100.00% 965,737 100.00% 965,737.0
RA02-24.4-I223 m Provisión y montaje Cable 4 x 1 x 13,3 mm2, XTU 1,268.54 5,654 7,172,325 20.24% 1,451,592 20.24% 1,451,592.0
RA02-24.4-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 494.83 6,007 2,972,444 100.00% 2,972,444 0.00% 0.0
RA02-24.4-I228A c/u Instalación y provisión Poste 11m brazo simple iluminación vial 21.00 273,789 5,749,569 0.00% 0 0.00% 0.0
RA02-24.4-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 5.10 183,540 936,054 100.00% 936,054 0.00% 0.0
RA02-24.4-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00% 0.0
RA02-24.4-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00% 0.0
RA02-24.4-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA02-24.4-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 6.00 24,070 144,420 100.00% 144,420 0.00% 0.0
2 B.24 PARADERO LADO PONIENTE KM 593,580 1.00 220,938,506 220,938,504 45.02% 99,466,237 10.44% 23,072,911
3 B.24.1 PREPARACION DEL AREA DE TRABAJO 1.00 6,684,244 6,684,244 100.01% 6,684,592 0.00% 0
B.24.1.1 m3 Remoción de Estructuras 9.38 43,508 408,105 100.00% 408,105 0.00% 0.0
B.24.1.2 m2 Remoción de pavimentos Asfáltico 1,437.00 1,740 2,500,380 100.01% 2,500,554 0.00% 0.0
B.24.1.3 m Remoción de Obras de Drenaje Superficial 162.00 3,345 541,890 100.00% 541,890 0.00% 0.0
B.24.1.4 Km Despeje y Limpieza de Faja 0.52 4,500,581 2,340,302 100.01% 2,340,476 0.00% 0.0
B.24.1.5 m Remoción de Cercos 320.16 2,791 893,567 100.00% 893,567 0.00% 0.0
3 B.24.2 MOVIMIENTO DE TIERRAS 1.00 37,041,339 37,041,340 97.16% 35,989,999 0.00% 0
B.24.2.1 m3 Excavación de Escarpe 719.00 4,936 3,548,984 100.00% 3,548,810 0.00% 0.0
B.24.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 1,727.00 4,936 8,524,472 100.00% 8,524,298 0.00% 0.0
B.24.2.3 m3 Excavación en TCN para Obras de Drenaje 40.40 7,766 313,746 100.00% 313,746 0.00% 0.0
B.24.2.4 m3 Formación y Compactación de Terraplenes 1,966.98 10,801 21,245,351 100.00% 21,245,872 0.00% 0.0
B.24.2.5 m3 Relleno Estructural 44.99 23,376 1,051,686 0.00% 0 0.00% 0.0
B.24.2.6 m2 Preparación de la Subrasante 2,619.00 900 2,357,100 100.01% 2,357,273 0.00% 0.0
3 B.24.3 CAPAS GRANULARES 1.00 10,500,975 10,500,975 100.00% 10,500,628 10.20% 1,071,493
B.24.3.1 m3 Base Granular, CBR = 80% 587.27 17,881 10,500,975 100.00% 10,500,628 10.20% 1,071,493.0
3 B.24.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 44,410,160 44,410,160 6.93% 3,077,123 6.93% 3,077,123
B.24.4.1 m2 Imprimación 2,619.00 566 1,482,354 82.75% 1,226,713 82.75% 1,226,713.0
B.24.4.2 m2 Riego de Liga 1,912.18 469 896,812 0.00% 0 0.00% 0.0
B.24.4.3 m3 Concreto Asfáltico de Rodadura 131.00 154,673 20,262,163 0.00% 0 0.00% 0.0
B.24.4.4 m3 Concreto Asfáltico Capa Intermedia 133.85 145,156 19,429,131 9.52% 1,850,410 9.52% 1,850,410.0
B.24.4.5 m2 Aceras de Hormigón 155.06 15,089 2,339,700 0.00% 0 0.00% 0.0
3 B.24.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 15,213,410 15,213,409 61.08% 9,293,033 37.89% 5,764,299
B.24.5.1 m3 Hormigón G05 1.93 75,880 146,448 100.00% 146,448 0.00% 0.0
B.24.5.2 m3 Hormigón G17 1.76 193,885 341,238 100.00% 341,238 85.71% 292,490.0
B.24.5.3 m3 Hormigón G25 38.48 246,289 9,477,201 57.74% 5,471,809 57.74% 5,471,809.0
B.24.5.4 Kg Acero para Armaduras A630-420H 2,666.83 1,250 3,333,538 100.00% 3,333,538 0.00% 0.0
B.24.5.5 m2 Revestimiento de Mampostería de Piedra 35.75 53,566 1,914,985 0.00% 0 0.00% 0.0
3 B.24.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 19,745,608 19,745,608 0.00% 0 0.00% 0
B.24.6.1 n° Embudos para Descargas de Agua 2.00 293,760 587,520 0.00% 0 0.00% 0.0
B.24.6.2 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 16.00 116,607 1,865,712 0.00% 0 0.00% 0.0
B.24.6.3 m Soleras Tipo "A" 42.00 14,709 617,778 0.00% 0 0.00% 0.0
B.24.6.4 m Cunetas de Hormigón 368.00 25,910 9,534,880 0.00% 0 0.00% 0.0
B.24.6.6 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 131.00 3,394 444,614 0.00% 0 0.00% 0.0
B.24.6.7 m3 Revestimiento de Fosos y Contrafosos 22.51 297,428 6,695,104 0.00% 0 0.00% 0.0
3 B.24.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 41,364,617 41,364,617 8.44% 3,489,537 0.00% 0
B.24.7.1 m Cerco de Alambre de Púas 326.06 7,620 2,484,577 100.01% 2,484,751 0.00% 0.0
B.24.7.2 n° Portones de Dos Hojas 2.00 502,306 1,004,612 100.02% 1,004,786 0.00% 0.0
B.24.7.3 n° Señales Laterales, Tipo 2, Sp = 1 m2 2.00 146,476 292,952 0.00% 0 0.00% 0.0
B.24.7.4 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00% 0.0
B.24.7.5 n° Delineadores verticales 5.00 81,267 406,335 0.00% 0 0.00% 0.0
B.24.7.6 Km Demarcación, Línea Lateral Segmentada termoplástica 0.59 1,600,206 944,122 0.00% 0 0.00% 0.0
B.24.7.7 Km Demarcación, Línea Lateral Continua 0.45 1,200,155 540,070 0.00% 0 0.00% 0.0
B.24.7.8 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 56.40 11,001 620,456 0.00% 0 0.00% 0.0
B.24.7.9 n° Tachas Reflectantes 348.00 1,600 556,800 0.00% 0 0.00% 0.0
B.24.7.10 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
B.24.7.11 m Valla Peatonal 57.00 44,402 2,530,914 0.00% 0 0.00% 0.0
B.24.7.12 m Valla Segregatoria 300.00 72,160 21,648,000 0.00% 0 0.00% 0.0
B.24.7.13 m Barreras Laterales de Hormigón en Sitio Alta 104.00 57,568 5,987,072 0.00% 0 0.00% 0.0
B.24.7.14 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 8.40 33,298 279,703 0.00% 0 0.00% 0.0
3 B.24.8 ILUMINACIÓN 1.00 44,977,118 44,977,116 67.66% 30,431,325 29.26% 13,159,996
RA02-24.5-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA02-24.5-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00% 0.0
RA02-24.5-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00% 0.0
RA02-24.5-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA02-24.5-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 511.33 12,597 6,441,224 100.00% 6,441,398 0.00% 0.0
RA02-24.5-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 30.94 28,707 888,195 0.00% 0 0.00% 0.0
RA02-24.5-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA02-24.5-I212 m3 Fabricación dado Hormigón Armado H 30 0,3x0,3x1,0 canalizaciones 1.68 20,826 34,988 0.00% 0 0.00% 0.0
RA02-24.5-I213 c/u Construcción Cámara BT (CBT-xxx) 3.00 126,117 378,351 100.05% 378,525 0.00% 0.0
RA02-24.5-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 23.00 14,619 336,237 0.00% 0 0.00% 0.0
RA02-24.5-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 23.00 238,377 5,482,671 0.00% 0 0.00% 0.0
RA02-24.5-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 287.50 3,679 1,057,713 100.00% 1,057,713 0.00% 0.0
RA02-24.5-I226 m Provisión y montaje Cable 2 x 1 x 42,4 mm2, XTU 1,444.31 10,623 15,342,905 100.00% 15,342,905 67.86% 10,411,257.0
RA02-24.5-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 559.93 6,007 3,363,500 100.01% 3,363,673 0.00% 0.0
RA02-24.5-I228A c/u Instalación y provisión Poste 11m brazo simple iluminación vial 23.00 273,789 6,297,147 43.65% 2,748,739 43.65% 2,748,739.0
RA02-24.5-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 5.59 183,540 1,025,989 100.02% 1,026,162 0.00% 0.0
RA02-24.5-I231 c/u Soldadura Termofusión. 22.00 30,775 677,050 0.00% 0 0.00% 0.0
RA02-24.5-I232 c/u Cámaras Registro Malla de Puesta Tierra 2.00 40,986 81,972 0.00% 0 0.00% 0.0
RA02-24.5-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA02-24.5-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 3.00 24,070 72,210 100.00% 72,210 0.00% 0.0
3 B.24.9 OBRAS COMPLEMETARIAS 1.00 1,001,035 1,001,035 0.00% 0 0.00% 0
B.24.9.2 m Limpieza de Alcantarilla y Sifones, de mas de 1 m de altura 37.00 27,055 1,001,035 0.00% 0 0.00% 0.0
2 B.25 PARADERO LADO PONIENTE KM 634,820 1.00 261,014,118 261,014,117 28.17% 73,525,156 5.52% 14,403,318
3 B.25.1 PREPARACION DEL AREA DE TRABAJO 1.00 6,965,685 6,965,685 100.00% 6,965,859 0.00% 0
B.25.1.1 m3 Remoción de Estructuras 2.41 43,508 104,854 100.00% 104,854 0.00% 0.0
B.25.1.2 m2 Remoción de pavimentos Asfáltico 1,846.91 1,740 3,213,623 100.00% 3,213,623 0.00% 0.0
B.25.1.3 m Remoción de Obras de Drenaje Superficial 70.71 3,345 236,525 100.07% 236,699 0.00% 0.0
B.25.1.4 m Remoción de Cercos 77.13 2,791 215,270 100.00% 215,270 0.00% 0.0
B.25.1.5 Km Despeje y Limpieza de Faja 0.71 4,500,581 3,195,413 100.00% 3,195,413 0.00% 0.0
3 B.25.2 MOVIMIENTO DE TIERRAS 1.00 29,355,821 29,355,821 99.04% 29,075,187 0.00% 0
B.25.2.1 m3 Excavación de Escarpe 1,570.00 4,936 7,749,520 100.00% 7,749,520 0.00% 0.0
B.25.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 1,369.00 4,936 6,757,384 100.00% 6,757,210 0.00% 0.0
B.25.2.3 m3 Excavación en TCN para Obras de Drenaje 25.82 7,766 200,518 100.00% 200,518 0.00% 0.0
B.25.2.4 m3 Formación y Compactación de Terraplenes 1,025.00 10,801 11,071,025 100.00% 11,071,372 0.00% 0.0
B.25.2.5 m3 Relleno Estructural 12.02 23,376 280,980 0.00% 0 0.00% 0.0
B.25.2.6 m2 Preparación de la Subrasante 3,662.66 900 3,296,394 100.01% 3,296,567 0.00% 0.0
3 B.25.3 CAPAS GRANULARES 1.00 14,880,389 14,880,389 100.00% 14,880,389 48.02% 7,144,948
B.25.3.1 m3 Base Granular, CBR = 80% 832.19 17,881 14,880,389 100.00% 14,880,389 48.02% 7,144,948.0
3 B.25.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 79,426,540 79,426,541 4.16% 3,304,193 4.16% 3,304,193
B.25.4.1 m2 Imprimación 3,662.66 566 2,073,066 38.09% 789,714 38.09% 789,714.0
B.25.4.2 m2 Riego de Liga 2,694.63 469 1,263,781 0.00% 0 0.00% 0.0
B.25.4.3 m3 Concreto Asfáltico de Rodadura 219.76 154,673 33,990,938 0.00% 0 0.00% 0.0
B.25.4.4 m3 Concreto Asfáltico Capa Intermedia 242.52 145,156 35,203,233 7.14% 2,514,479 7.14% 2,514,479.0
B.25.4.5 m2 Aceras de Hormigón 456.99 15,089 6,895,522 0.00% 0 0.00% 0.0
3 B.25.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 4,953,191 4,953,190 35.02% 1,734,444 33.77% 1,672,647
B.25.5.1 m3 Hormigón G05 0.84 75,880 63,739 100.27% 63,913 29.78% 18,980.0
B.25.5.2 m3 Hormigón G17 10.08 193,885 1,954,361 49.22% 961,893 49.22% 961,893.0
B.25.5.3 m3 Hormigón G25 9.04 246,289 2,226,453 0.00% 0 0.00% 0.0
B.25.5.4 Kg Acero para Armaduras A630-420H 566.91 1,250 708,638 100.00% 708,638 97.62% 691,774.0
3 B.25.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 13,934,174 13,934,174 0.00% 0 0.00% 0
B.25.6.1 n° Embudos para Descargas de Agua 1.00 293,760 293,760 0.00% 0 0.00% 0.0
B.25.6.2 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 13.20 116,607 1,539,212 0.00% 0 0.00% 0.0
B.25.6.3 m Soleras Tipo "A" 88.50 14,709 1,301,747 0.00% 0 0.00% 0.0
B.25.6.4 m Soleras con Zarpa de Hormigón 62.20 29,804 1,853,809 0.00% 0 0.00% 0.0
B.25.6.5 m Cunetas de Hormigón, Tipo Baden 30.00 25,910 777,300 0.00% 0 0.00% 0.0
B.25.6.6 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormi 139.00 3,394 471,766 0.00% 0 0.00% 0.0
B.25.6.7 m3 Revestimiento de Fosos y Contrafosos 24.00 297,428 7,138,272 0.00% 0 0.00% 0.0
B.25.6.8 m Limpieza de Alcantarillas y Sifones, de hasta 1 m de altura 29.00 19,252 558,308 0.00% 0 0.00% 0.0
3 B.25.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 55,588,231 55,588,230 0.00% 0 0.00% 0
B.25.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 4.00 146,476 585,904 0.00% 0 0.00% 0.0
B.25.7.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00% 0.0
B.25.7.3 n° Delineadores verticales 5.00 81,267 406,335 0.00% 0 0.00% 0.0
B.25.7.4 Km Demarcación, Línea Lateral Segmentada termoplástica 0.83 1,600,206 1,328,171 0.00% 0 0.00% 0.0
B.25.7.5 Km Demarcación, Línea Lateral Continua 0.67 1,200,155 804,104 0.00% 0 0.00% 0.0
B.25.7.6 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 203.00 11,001 2,233,203 0.00% 0 0.00% 0.0
B.25.7.7 n° Tachas Reflectantes 506.00 1,600 809,600 0.00% 0 0.00% 0.0
B.25.7.8 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
B.25.7.9 m Barreras Metálicas de Contención Laterales, de Doble Onda 20.00 39,001 780,020 0.00% 0 0.00% 0.0
B.25.7.10 m Valla Peatonal 137.00 44,402 6,083,074 0.00% 0 0.00% 0.0
B.25.7.11 m Valla Peatonal en Mediana 400.00 72,160 28,864,000 0.00% 0 0.00% 0.0
B.25.7.12 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 0.00% 0 0.00% 0.0
B.25.7.13 m Barreras Laterales de Hormigón en Sitio Alta 120.00 57,568 6,908,160 0.00% 0 0.00% 0.0
B.25.7.14 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 9.20 33,298 306,342 0.00% 0 0.00% 0.0
3 B.25.8 ILUMINACIÓN 1.00 55,910,087 55,910,087 31.42% 17,565,084 4.08% 2,281,530
RA02-24.6-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA02-24.6-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00% 0.0
RA02-24.6-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00% 0.0
RA02-24.6-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA02-24.6-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 592.93 12,597 7,469,139 100.00% 7,469,313 0.00% 0.0
RA02-24.6-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 122.30 28,707 3,510,866 0.00% 0 0.00% 0.0
RA02-24.6-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA02-24.6-I213 c/u Construcción Cámara BT (CBT-xxx) 6.00 126,117 756,702 100.00% 756,702 34.29% 259,441.0
RA02-24.6-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 31.00 14,619 453,189 99.96% 453,015 0.00% 0.0
RA02-24.6-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 31.00 238,377 7,389,687 0.00% 0 0.00% 0.0
RA02-24.6-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 387.50 3,679 1,425,613 96.44% 1,374,840 96.44% 1,374,840.0
RA02-24.6-I223 m Provisión y montaje Cable 4 x 1 x 13,3 mm2, XTU 600.97 5,654 3,397,884 19.05% 647,249 19.05% 647,249.0
RA02-24.6-I225 m Provisión y montaje Cable 2 x 1 x 33,6 mm2, XTU 1,310.93 8,999 11,797,059 0.00% 0 0.00% 0.0
RA02-24.6-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 708.11 6,007 4,253,617 100.00% 4,253,617 0.00% 0.0
RA02-24.6-I228A c/u Instalación y provisión Poste 11m brazo simple iluminación vial 31.00 273,789 8,487,459 0.00% 0 0.00% 0.0
RA02-24.6-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 7.53 183,540 1,382,056 100.00% 1,382,056 0.00% 0.0
RA02-24.6-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00% 0.0
RA02-24.6-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00% 0.0
RA02-24.6-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA02-24.6-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 51.03 24,070 1,228,292 100.00% 1,228,292 0.00% 0.0
2 B.26 PARADERO LADO PONIENTE ACCESO QUILLEM KM 636,120 1.00 286,079,654 286,079,653 24.81% 70,980,457 10.47% 29,948,401
3 B.26.1 PREPARACION DEL AREA DE TRABAJO 1.00 11,020,081 11,020,080 78.04% 8,599,571 11.72% 1,292,042
B.26.1.1 m3 Remoción de Estructuras 7.24 43,508 314,998 0.00% 0 0.00% 0.0
B.26.1.2 m2 Remoción de pavimentos Asfáltico 2,207.00 1,740 3,840,180 100.00% 3,840,006 0.00% 0.0
B.26.1.3 m Remoción de Obras de Drenaje Superficial 786.00 3,345 2,629,170 47.62% 1,251,919 45.83% 1,204,979.0
B.26.1.4 m Remoción de Barreras de Contención Laterales Metálicas 108.00 4,516 487,728 100.00% 487,728 17.85% 87,063.0
B.26.1.5 nº Remoción de Señalización Vertical Lateral 1.00 17,074 17,074 0.00% 0 0.00% 0.0
B.26.1.6 m Remoción de Cercos 114.50 2,791 319,570 100.05% 319,743 0.00% 0.0
B.26.1.7 nº Remoción de casetas de Paraderos para la locomoción colectiva 1.00 608,570 608,570 0.00% 0 0.00% 0.0
B.26.1.8 Km Despeje y Limpieza de Faja 0.60 4,500,581 2,700,349 99.99% 2,700,175 0.00% 0.0
B.26.1.9 nº Reubicación de Señalización Vertical Lateral 2.00 51,221 102,442 0.00% 0 0.00% 0.0
3 B.26.2 MOVIMIENTO DE TIERRAS 1.00 50,941,158 50,941,157 86.50% 44,062,837 34.97% 17,813,037
B.26.2.1 m3 Excavación de Escarpe 1,077.00 4,936 5,316,072 99.99% 5,315,725 0.00% 0.0
B.26.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 2,497.00 4,936 12,325,192 100.00% 12,325,539 15.18% 1,870,841.0
B.26.2.3 m3 Excavación en TCN para Obras de Drenaje 263.76 7,766 2,048,360 2.38% 48,758 2.38% 48,758.0
B.26.2.4 m3 Formación y Compactación de Terraplenes 2,438.00 10,801 26,332,838 95.92% 25,258,046 56.12% 14,778,669.0
B.26.2.5 m3 Relleno Estructural 32.60 23,376 762,058 0.00% 0 0.00% 0.0
B.26.2.6 m3 Relleno Estructurante 64.43 23,376 1,506,116 0.00% 0 0.00% 0.0
B.26.2.7 m2 Obras de Encauzamiento Menores 79.00 3,418 270,022 0.00% 0 0.00% 0.0
B.26.2.8 m2 Preparación de la Subrasante 2,645.00 900 2,380,500 46.83% 1,114,769 46.83% 1,114,769.0
3 B.26.3 CAPAS GRANULARES 1.00 10,528,869 10,528,869 13.49% 1,420,447 13.49% 1,420,447
B.26.3.1 m3 Base Granular, CBR = 80% 588.83 17,881 10,528,869 13.49% 1,420,447 13.49% 1,420,447.0
3 B.26.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 55,859,895 55,859,896 0.00% 0 0.00% 0
B.26.4.1 m2 Imprimación 2,645.00 566 1,497,070 0.00% 0 0.00% 0.0
B.26.4.2 m2 Riego de Liga 1,980.21 469 928,718 0.00% 0 0.00% 0.0
B.26.4.3 m3 Concreto Asfáltico de Rodadura 158.70 154,673 24,546,605 0.00% 0 0.00% 0.0
B.26.4.4 m3 Concreto Asfáltico Capa Intermedia 178.22 145,156 25,869,702 0.00% 0 0.00% 0.0
B.26.4.5 m2 Aceras de Hormigón 200.00 15,089 3,017,800 0.00% 0 0.00% 0.0
3 B.26.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 22,836,529 22,836,528 0.00% 0 0.00% 0
B.26.5.1 m3 Hormigón G05 2.92 75,880 221,570 0.00% 0 0.00% 0.0
B.26.5.2 m3 Hormigón G17 10.23 193,885 1,983,444 0.00% 0 0.00% 0.0
B.26.5.3 m3 Hormigón G25 63.83 246,289 15,720,627 0.00% 0 0.00% 0.0
B.26.5.4 Kg Acero para Armaduras A630-420H 3,928.71 1,250 4,910,888 0.00% 0 0.00% 0.0
3 B.26.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 43,949,890 43,949,890 0.00% 0 0.00% 0
B.26.6.1 m Drenes de Pavimento 400.00 41,505 16,602,000 0.00% 0 0.00% 0.0
B.26.6.2 n° Embudos para Descargas de Agua 3.00 293,760 881,280 0.00% 0 0.00% 0.0
B.26.6.3 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 23.00 116,607 2,681,961 0.00% 0 0.00% 0.0
B.26.6.4 m Soleras Tipo "A" 71.00 14,709 1,044,339 0.00% 0 0.00% 0.0
B.26.6.5 m Cunetas de Hormigón Triangulares 107.50 25,910 2,785,325 0.00% 0 0.00% 0.0
B.26.6.6 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormi 225.00 3,394 763,650 0.00% 0 0.00% 0.0
B.26.6.7 m3 Revestimiento de Fosos y Contrafosos 39.00 297,428 11,599,692 0.00% 0 0.00% 0.0
B.26.6.8 m Tubos Polietileno de Alta Densidad estructurados D=1,00 m 37.00 165,984 6,141,408 0.00% 0 0.00% 0.0
B.26.6.9 n° Suministro y Colocación de Escalines 10.00 7,043 70,430 0.00% 0 0.00% 0.0
B.26.6.10 m Limpieza de Alcantarilla y Sifones, de mas de 1 m de altura 51.00 27,055 1,379,805 0.00% 0 0.00% 0.0
3 B.26.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 41,310,461 41,310,461 2.20% 910,285 0.00% 0
B.26.7.1 m Cerco de Alambre de Púas 119.46 7,620 910,285 100.00% 910,285 0.00% 0.0
B.26.7.2 n° Señales Laterales, Tipo 2, Sp = 1 m2 5.00 146,476 732,380 0.00% 0 0.00% 0.0
B.26.7.3 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 4.00 281,276 1,125,104 0.00% 0 0.00% 0.0
B.26.7.4 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 1.00 1,027,331 1,027,331 0.00% 0 0.00% 0.0
B.26.7.5 n° Delineadores verticales 5.00 81,267 406,335 0.00% 0 0.00% 0.0
B.26.7.6 n° Hito de Vértice 1.00 51,545 51,545 0.00% 0 0.00% 0.0
B.26.7.7 Km Demarcación, Línea de Eje Continua Doble 0.03 1,600,206 48,006 0.00% 0 0.00% 0.0
B.26.7.8 Km Demarcación, Línea Lateral Segmentada termoplástica 0.60 1,600,206 960,124 0.00% 0 0.00% 0.0
B.26.7.9 Km Demarcación, Línea Lateral Continua 0.58 1,200,155 696,090 0.00% 0 0.00% 0.0
B.26.7.10 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 93.00 11,001 1,023,093 0.00% 0 0.00% 0.0
B.26.7.11 n° Tachas Reflectantes 259.00 1,600 414,400 0.00% 0 0.00% 0.0
B.26.7.12 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
B.26.7.13 m Valla Peatonal 59.00 44,402 2,619,718 0.00% 0 0.00% 0.0
B.26.7.14 m Valla Peatonal Desincentivadora 267.00 72,160 19,266,720 0.00% 0 0.00% 0.0
B.26.7.15 m Barreras Laterales de Hormigón en Sitio Alta 144.00 57,568 8,289,792 0.00% 0 0.00% 0.0
B.26.7.16 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 7.00 33,298 233,086 0.00% 0 0.00% 0.0
3 B.26.8 ILUMINACIÓN 1.00 49,632,771 49,632,772 32.21% 15,987,317 18.99% 9,422,875
RA02-24.7-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA02-24.7-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00% 0.0
RA02-24.7-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00% 0.0
RA02-24.7-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA02-24.7-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 428.51 12,597 5,397,940 100.00% 5,397,767 44.28% 2,390,450.0
RA02-24.7-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA02-24.7-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 94.81 35,649 3,379,882 0.00% 0 0.00% 0.0
RA02-24.7-I212 m3 Fabricación dado Hormigón Armado H 30 0,3x0,3x1,0 canalizaciones 4.23 20,826 88,094 0.00% 0 0.00% 0.0
RA02-24.7-I213 c/u Construcción Cámara BT (CBT-xxx) 2.00 126,117 252,234 0.00% 0 0.00% 0.0
RA02-24.7-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 21.00 14,619 306,999 0.00% 0 0.00% 0.0
RA02-24.7-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 24.00 238,377 5,721,048 0.00% 0 0.00% 0.0
RA02-24.7-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 300.00 3,679 1,103,700 0.00% 0 0.00% 0.0
RA02-24.7-I222 m Provisión y montaje Cable 4 x 1 x 8,36 mm2, XTU 543.29 4,770 2,591,493 0.00% 0 0.00% 0.0
RA02-24.7-I224 m Provisión y montaje Cable 4 x 1 x 21,2 mm2, XTU 1,274.29 6,942 8,846,121 0.00% 0 0.00% 0.0
RA02-24.7-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 673.18 6,007 4,043,792 100.00% 4,043,792 92.86% 3,754,950.0
RA02-24.7-I228A c/u Instalación y provisión Poste 11m brazo simple iluminación vial 24.00 273,789 6,570,936 0.00% 0 0.00% 0.0
RA02-24.7-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 5.10 183,540 936,054 60.32% 564,618 60.32% 564,618.0
RA02-24.7-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00% 0.0
RA02-24.7-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00% 0.0
RA02-24.7-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA02-24.7-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 243.72 24,070 5,866,340 100.00% 5,866,167 44.28% 2,597,884.0
RA02-24.7-II303 un Mensula para Postes 4.5 mt 3.00 63,480 190,440 60.37% 114,973 60.37% 114,973.0
2 B.27 PARADERO PICHIQUEPE C.S. PONIENTE KM 686,200 1.00 108,990,215 108,990,214 25.21% 27,477,976 7.16% 7,802,704
3 B.27.1 PREPARACION DEL AREA DE TRABAJO 1.00 2,218,205 2,218,205 100.05% 2,219,420 2.29% 50,835
B.27.1.1 m3 Remoción de Estructuras 0.85 43,508 36,982 100.47% 37,155 0.00% 0.0
B.27.1.2 m2 Remoción de pavimentos Asfáltico 55.37 1,740 96,344 100.18% 96,517 0.00% 0.0
B.27.1.3 m Remoción de Obras de Drenaje Superficial 11.17 3,345 37,364 100.47% 37,537 0.00% 0.0
B.27.1.4 m Remoción de Barreras de Contención Laterales Metálicas 53.00 4,516 239,348 100.07% 239,522 0.00% 0.0
B.27.1.5 nº Remoción de Señalización Vertical Lateral 1.00 17,074 17,074 101.02% 17,248 18.22% 3,111.0
B.27.1.6 m Remoción de Cercos 59.00 2,791 164,669 100.11% 164,843 0.00% 0.0
B.27.1.7 Km Despeje y Limpieza de Faja 0.35 4,500,581 1,575,203 100.00% 1,575,203 0.00% 0.0
B.27.1.8 N° Reubicación de Señalización Vertical Lateral 1.00 51,221 51,221 100.34% 51,395 93.17% 47,724.0
3 B.27.2 MOVIMIENTO DE TIERRAS 1.00 9,299,142 9,299,141 98.30% 9,140,593 0.00% 0
B.27.2.1 m3 Excavación de Escarpe 272.00 4,936 1,342,592 100.01% 1,342,766 0.00% 0.0
B.27.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 634.10 4,936 3,129,918 100.00% 3,129,918 0.00% 0.0
B.27.2.3 m3 Excavación en TCN para Obras de Drenaje 66.69 7,766 517,915 100.00% 517,915 0.00% 0.0
B.27.2.4 m3 Formación y Compactación de Terraplenes 372.86 10,801 4,027,261 100.00% 4,027,261 0.00% 0.0
B.27.2.5 m3 Relleno Estructural 6.79 23,376 158,723 0.00% 0 0.00% 0.0
B.27.2.6 m2 Preparación de la Subrasante 136.37 900 122,733 100.00% 122,733 0.00% 0.0
3 B.27.3 CAPAS GRANULARES 1.00 487,615 487,615 100.00% 487,615 92.86% 452,798
B.27.3.1 m3 Base Granular, CBR = 80% 27.27 17,881 487,615 100.00% 487,615 92.86% 452,798.0
3 B.27.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 11,888,997 11,888,997 2.78% 330,056 2.78% 330,056
B.27.4.1 m2 Imprimación 136.37 566 77,185 85.52% 66,010 85.52% 66,010.0
B.27.4.2 m2 Riego de Liga 136.37 469 63,958 0.00% 0 0.00% 0.0
B.27.4.3 m3 Concreto Asfáltico de Rodadura 6.82 154,673 1,054,870 0.00% 0 0.00% 0.0
B.27.4.4 m3 Concreto Asfáltico Capa Intermedia 9.55 145,156 1,386,240 19.05% 264,046 19.05% 264,046.0
B.27.4.5 m2 Aceras de Hormigón 616.79 15,089 9,306,744 0.00% 0 0.00% 0.0
3 B.27.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 27,345,030 27,345,031 5.54% 1,515,809 4.94% 1,350,917
B.27.5.1 m3 Hormigón G05 6.08 75,880 461,350 100.08% 461,698 64.33% 296,806.0
B.27.5.2 m3 Hormigón G17 3.84 193,885 744,518 0.00% 0 0.00% 0.0
B.27.5.3 m3 Hormigón G25 14.14 246,289 3,482,526 0.00% 0 0.00% 0.0
B.27.5.4 m3 Hormigón G30 60.00 257,926 15,475,560 0.00% 0 0.00% 0.0
B.27.5.5 Kg Acero para Armaduras A630-420H 3,125.40 1,250 3,906,750 26.98% 1,054,111 26.98% 1,054,111.0
B.27.5.6 m2 Moldajes 103.50 31,636 3,274,326 0.00% 0 0.00% 0.0
3 B.27.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 12,146,016 12,146,016 0.76% 92,651 0.76% 92,651
B.27.6.1 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=0,6 5.50 41,600 228,800 40.49% 92,651 40.49% 92,651.0
B.27.6.2 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 23.00 116,607 2,681,961 0.00% 0 0.00% 0.0
B.27.6.3 m Soleras Tipo "A" 61.49 14,709 904,456 0.00% 0 0.00% 0.0
B.27.6.4 m Cunetas de Hormigón 114.00 25,910 2,953,740 0.00% 0 0.00% 0.0
B.27.6.5 Nº Rejillas para Sumideros Tipo 60-18-R 1.00 592,504 592,504 0.00% 0 0.00% 0.0
B.27.6.6 m3 Construcción de Fosos y Contrafosos con Cotas de Fondo Preestable 79.32 11,925 945,891 0.00% 0 0.00% 0.0
B.27.6.7 m3 Revestimiento de Fosos y Contrafosos 12.00 297,428 3,569,136 0.00% 0 0.00% 0.0
B.27.6.8 m Limpieza de Alcantarillas y Sifones, de hasta 1 m de altura 14.00 19,252 269,528 0.00% 0 0.00% 0.0
3 B.27.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 9,525,947 9,525,947 0.00% 0 0.00% 0
B.27.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00% 0.0
B.27.7.2 Km Demarcación, Línea Lateral Segmentada 0.03 1,600,206 48,006 0.00% 0 0.00% 0.0
B.27.7.3 Km Demarcación, Línea Lateral Continua 0.02 1,200,155 24,003 0.00% 0 0.00% 0.0
B.27.7.4 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 18.00 11,001 198,018 0.00% 0 0.00% 0.0
B.27.7.5 n° Tachas Reflectantes 22.00 1,600 35,200 0.00% 0 0.00% 0.0
B.27.7.6 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
B.27.7.7 m Valla Peatonal 82.00 44,402 3,640,964 0.00% 0 0.00% 0.0
B.27.7.8 m Barreras Laterales de Hormigón en Sitio Alta 30.00 57,568 1,727,040 0.00% 0 0.00% 0.0
B.27.7.9 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 6.00 33,298 199,788 0.00% 0 0.00% 0.0
3 B.27.8 ILUMINACIÓN 1.00 36,079,263 36,079,262 37.95% 13,691,832 15.31% 5,525,447
RA02-24.8-I201 un Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA02-24.8-I205 c/u Transformador 5 kVA 2f, norma COMPAÑÍA 1.00 1,151,499 1,151,499 0.00% 0 0.00% 0.0
RA02-24.8-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifásico 1.00 636,606 636,606 0.00% 0 0.00% 0.0
RA02-24.8-I207 un Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA02-24.8-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 269.02 12,597 3,388,845 100.01% 3,389,019 0.00% 0.0
RA02-24.8-I209 m Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 187.92 28,707 5,394,619 0.00% 0 0.00% 0.0
RA02-24.8-I210 m Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 83.50 35,649 2,976,692 0.00% 0 0.00% 0.0
RA02-24.8-I213 c/u Construcción Cámara BT (CBT-xxx) 4.00 126,117 504,468 100.00% 504,468 0.00% 0.0
RA02-24.8-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 18.00 14,619 263,142 100.00% 263,142 0.00% 0.0
RA02-24.8-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 18.00 238,377 4,290,786 0.00% 0 0.00% 0.0
RA02-24.8-I219 c/u Provisión y montaje Luminaria Vial 41,2 W, LED (ANTIVANDÁLICA) 6.00 35,873 215,238 0.00% 0 0.00% 0.0
RA02-24.8-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 225.00 3,679 827,775 100.02% 827,949 77.39% 640,627.0
RA02-24.8-I222 m Provisión y montaje Cable 4 x 1 x 8,36 mm2, XTU 1,194.75 4,770 5,698,958 86.90% 4,952,665 85.71% 4,884,820.0
RA02-24.8-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 467.50 6,007 2,808,273 100.00% 2,808,273 0.00% 0.0
RA02-24.8-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 18.00 273,789 4,928,202 0.00% 0 0.00% 0.0
RA02-24.8-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 4.37 183,540 802,070 99.98% 801,896 0.00% 0.0
RA02-24.8-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00% 0.0
RA02-24.8-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00% 0.0
RA02-24.8-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA02-24.8-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 6.00 24,070 144,420 100.00% 144,420 0.00% 0.0
2 B.28 PARADERO LADO PONIENTE ENLACE QUEPE 1.00 22,516,680 22,516,680 31.92% 7,188,232 10.34% 2,328,627
3 B.28.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,093,047 1,093,047 100.03% 1,093,393 0.00% 0
B.28.1.1 m Remoción de Obras de Drenaje Superficial 45.77 3,345 153,101 100.00% 153,101 0.00% 0.0
B.28.1.2 nº Remoción de Señalización Vertical Lateral 2.00 17,074 34,148 100.51% 34,321 0.00% 0.0
B.28.1.3 m2 Remoción de Construciones 6.94 71,258 494,531 100.04% 494,704 0.00% 0.0
B.28.1.4 Km Despeje y Limpieza de Faja 0.08 4,500,581 360,046 100.00% 360,046 0.00% 0.0
B.28.1.5 n° Reubicación de Señalización Vertical Lateral 1.00 51,221 51,221 100.00% 51,221 0.00% 0.0
3 B.28.2 MOVIMIENTO DE TIERRAS 1.00 1,773,223 1,773,224 100.02% 1,773,571 0.00% 0
B.28.2.1 m3 Excavación de Escarpe 78.76 4,936 388,759 100.04% 388,933 0.00% 0.0
B.28.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 121.18 4,936 598,144 100.03% 598,318 0.00% 0.0
B.28.2.3 m3 Formación y Compactación de Terraplenes 61.76 10,801 667,070 100.00% 667,070 0.00% 0.0
B.28.2.4 m2 Preparación de la Subrasante 132.50 900 119,250 100.00% 119,250 0.00% 0.0
3 B.28.3 CAPAS GRANULARES 1.00 473,847 473,847 100.04% 474,020 5.97% 28,267
B.28.3.1 m3 Base Granular, CBR = 80% 26.50 17,881 473,847 100.04% 474,020 5.97% 28,267.0
3 B.28.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 3,904,948 3,904,947 34.86% 1,361,285 34.63% 1,352,357
B.28.4.1 m2 Imprimación 132.50 566 74,995 100.00% 74,995 88.10% 66,067.0
B.28.4.2 m2 Riego de Liga 132.50 469 62,143 57.30% 35,609 57.30% 35,609.0
B.28.4.3 m3 Concreto Asfáltico de Rodadura 6.63 154,673 1,025,482 0.00% 0 0.00% 0.0
B.28.4.4 m3 Concreto Asfáltico Capa Intermedia 9.28 145,156 1,347,048 92.85% 1,250,681 92.85% 1,250,681.0
B.28.4.5 m2 Aceras de Hormigón 92.47 15,089 1,395,280 0.00% 0 0.00% 0.0
3 B.28.5 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 966,381 966,381 0.00% 0 0.00% 0
B.28.5.1 m Soleras Tipo "A" 65.70 14,709 966,381 0.00% 0 0.00% 0.0
3 B.28.6 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 5,844,679 5,844,679 0.00% 0 0.00% 0
B.28.6.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00% 0.0
B.28.6.2 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 1.00 1,027,331 1,027,331 0.00% 0 0.00% 0.0
B.28.6.3 Km Demarcación, Línea Lateral Segmentada 0.05 1,600,206 80,010 0.00% 0 0.00% 0.0
B.28.6.4 Km Demarcación, Línea Lateral Continua 0.04 1,200,155 48,006 0.00% 0 0.00% 0.0
B.28.6.5 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 5.00 11,001 55,005 0.00% 0 0.00% 0.0
B.28.6.6 n° Tachas Reflectantes 32.00 1,600 51,200 0.00% 0 0.00% 0.0
B.28.6.7 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
B.28.6.8 m Valla Peatonal 16.00 44,402 710,432 0.00% 0 0.00% 0.0
B.28.6.9 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 6.60 33,298 219,767 0.00% 0 0.00% 0.0
3 B.28.7 ILUMINACIÓN 1.00 8,460,555 8,460,556 29.38% 2,485,963 11.20% 948,003
RA02-24.9-I200 un Empalme por Compañía + Medidor Trifásico 1.00 1,221,415 1,221,415 0.00% 0 0.00% 0.0
RA02-24.9-I207 c/u Ferretería instalación + desconectadores fusibles Trifásicos 1.00 805,275 805,275 0.00% 0 0.00% 0.0
RA02-24.9-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 45.63 12,597 574,801 100.03% 574,975 0.00% 0.0
RA02-24.9-I209 m Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA02-24.9-I210 m Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA02-24.9-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 3.00 14,619 43,857 100.00% 43,857 77.36% 33,927.0
RA02-24.9-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 3.00 238,377 715,131 23.81% 170,302 23.81% 170,302.0
RA02-24.9-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 25.00 3,679 91,975 100.00% 91,975 100.00% 91,975.0
RA02-24.9-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 123.20 4,232 521,382 100.00% 521,382 100.00% 521,382.0
RA02-24.9-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 70.63 6,007 424,274 100.00% 424,274 0.00% 0.0
RA02-24.9-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 2.00 273,789 547,578 23.82% 130,417 23.82% 130,417.0
RA02-24.9-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 0.73 183,540 133,984 100.13% 134,158 0.00% 0.0
RA02-24.9-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 0.00% 0 0.00% 0.0
RA02-24.9-I232 c/u Cámaras Registro Malla de Puesta Tierra 4.00 40,986 163,944 0.00% 0 0.00% 0.0
RA02-24.9-I233 c/u Tablero Control General iluminación Trifásico 1.00 2,013,921 2,013,921 0.00% 0 0.00% 0.0
RA02-24.9-I234 c/u Retiro y reemplazo de luminaria existente poste galvanizado 1.00 304,384 304,384 100.00% 304,384 0.00% 0.0
RA02-24.9-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 1.00 17,856 17,856 100.97% 18,029 0.00% 0.0
RA02-24.9-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 3.00 24,070 72,210 100.00% 72,210 0.00% 0.0
B.29 PARADERO PONIENTE (REEMPLAZADO CALLE SERVICIO YPF
2 1.00 32,028,631 32,028,630 55.00% 17,616,584 9.96% 3,190,477
- VENTURELLI ) KM 710,020
3 B.29.1 PREPARACION DEL AREA DE TRABAJO 1.00 663,633 663,633 100.00% 663,633 0.00% 0
B.29.1.1 m2 Remoción de pavimentos Asfáltico 5.60 1,740 9,744 100.00% 9,744 0.00% 0.0
B.29.1.2 m Remoción de Cercos 86.93 2,791 242,622 100.00% 242,622 0.00% 0.0
B.29.1.3 Km Despeje y Limpieza de Faja 0.08 4,500,581 360,046 100.00% 360,046 0.00% 0.0
B.29.1.4 n° Reubicación de Señalización Vertical Lateral 1.00 51,221 51,221 100.00% 51,221 0.00% 0.0
3 B.29.2 MOVIMIENTO DE TIERRAS 1.00 4,302,027 4,302,027 100.00% 4,302,027 0.00% 0
B.29.2.1 m3 Excavación de Escarpe 123.00 4,936 607,128 100.03% 607,302 0.00% 0.0
B.29.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 9.00 4,936 44,424 100.00% 44,424 0.00% 0.0
B.29.2.3 m3 Excavación en TCN para Obras de Drenaje 2.65 7,766 20,580 100.00% 20,580 0.00% 0.0
B.29.2.4 m3 Formación y Compactación de Terraplenes 329.94 10,801 3,563,682 100.00% 3,563,508 0.00% 0.0
B.29.2.5 m2 Preparación de la Subrasante 73.57 900 66,213 100.00% 66,213 0.00% 0.0
3 B.29.3 CAPAS GRANULARES 1.00 268,215 268,215 100.06% 268,389 0.00% 0
B.29.3.1 m3 Base Granular, CBR = 80% 15.00 17,881 268,215 100.06% 268,389 0.00% 0.0
3 B.29.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 4,006,913 4,006,913 37.88% 1,517,852 6.49% 259,959
B.29.4.1 m2 Imprimación 73.57 566 41,641 100.00% 41,641 0.00% 0.0
B.29.4.2 m2 Riego de Liga 73.57 469 34,504 100.50% 34,678 0.00% 0.0
B.29.4.3 m3 Concreto Asfáltico de Rodadura 3.68 154,673 569,197 100.03% 569,370 23.81% 135,523.0
B.29.4.4 m3 Concreto Asfáltico Capa Intermedia 5.15 145,156 747,553 100.02% 747,727 0.00% 0.0
B.29.4.5 m2 Aceras de Hormigón 173.24 15,089 2,614,018 4.76% 124,436 4.76% 124,436.0
3 B.29.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 594,545 594,544 100.00% 594,545 0.00% 0
B.29.5.1 m3 Hormigón G05 0.82 75,880 62,222 100.00% 62,222 0.00% 0.0
B.29.5.2 m3 Hormigón G17 2.02 193,885 391,648 100.00% 391,648 0.00% 0.0
B.29.5.3 Kg Acero para Armaduras A630-420H 112.54 1,250 140,675 100.00% 140,675 0.00% 0.0
3 B.29.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 1,132,593 1,132,593 89.30% 1,011,380 89.30% 1,011,380
B.29.6.1 m Soleras Tipo "A" 77.00 14,709 1,132,593 89.30% 1,011,380 89.30% 1,011,380.0
3 B.29.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 9,079,256 9,079,256 8.81% 799,497 1.38% 125,691
B.29.7.1 m Cerco de Alambre de Púas 87.60 7,620 667,512 100.00% 667,512 0.00% 0.0
B.29.7.2 n° Señales Laterales, Tipo 2, Sp = 1 m2 3.00 146,476 439,428 0.00% 0 0.00% 0.0
B.29.7.3 Km Demarcación, Línea Lateral Segmentada 0.03 1,600,206 48,006 100.00% 48,006 95.26% 45,728.0
B.29.7.4 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 5.00 11,001 55,005 100.32% 55,179 95.54% 52,551.0
B.29.7.5 n° Tachas Reflectantes 18.00 1,600 28,800 100.00% 28,800 95.18% 27,412.0
B.29.7.6 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
B.29.7.7 m Valla Peatonal 92.00 44,402 4,084,984 0.00% 0 0.00% 0.0
B.29.7.8 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 7.48 33,298 249,069 0.00% 0 0.00% 0.0
3 B.29.8 ILUMINACIÓN 1.00 11,981,449 11,981,448 70.60% 8,459,261 14.97% 1,793,447
RA02-24.10-I201 un Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA02-24.10-I205 un Transformador 5 kVA 2f, norma COMPAÑÍA 1.00 1,151,499 1,151,499 0.00% 0 0.00% 0.0
RA02-24.10-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifásico 1.00 636,606 636,606 0.00% 0 0.00% 0.0
RA02-24.10-I207 un Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA02-24.10-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 93.41 12,597 1,176,686 100.01% 1,176,859 0.00% 0.0
RA02-24.10-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA02-24.10-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA02-24.10-I212 m3 Fabricación dado Hormigón Armado H 30 0,3x0,3x1,0 canalizaciones 2.88 20,826 59,979 0.00% 0 0.00% 0.0
RA02-24.10-I213 c/u Construcción Cámara BT (CBT-xxx) 1.00 126,117 126,117 100.00% 126,117 0.00% 0.0
RA02-24.10-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 5.00 14,619 73,095 100.00% 73,095 0.00% 0.0
RA02-24.10-I218 c/u Provisión y montaje Luminaria Vial 38 W, LED 5.00 141,294 706,470 100.00% 706,470 100.00% 706,470.0
RA02-24.10-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 87.50 3,679 321,913 100.00% 321,912 0.00% -1.0
RA02-24.10-I222 m Provisión y montaje Cable 4 x 1 x 8,36 mm2, XTU 350.33 4,770 1,671,074 100.01% 1,671,248 0.00% 0.0
RA02-24.10-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 154.75 6,007 929,583 100.00% 929,583 0.00% 0.0
RA02-24.10-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 5.00 129,331 646,655 100.00% 646,655 0.00% 0.0
RA02-24.10-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 5.00 273,789 1,368,945 100.03% 1,369,312 44.06% 603,171.0
RA02-24.10-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 1.22 183,540 223,919 100.00% 223,919 0.00% 0.0
RA02-24.10-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 78.60% 483,806 78.60% 483,806.0
RA02-24.10-I232 c/u Cámaras Registro Malla de Puesta Tierra 4.00 40,986 163,944 0.00% 0 0.00% 0.0
RA02-24.10-I233 un Tablero Control General iluminación monofásico 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA02-24.10-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 30.34 24,070 730,284 100.00% 730,284 0.00% 0.0
2 B.30 PARADERO LADO ORIENTE CHADA KM 707,850 1.00 234,167,600 234,167,598 72.47% 169,690,452 14.41% 33,751,149
3 B.30.1 PREPARACION DEL AREA DE TRABAJO 1.00 16,651,189 16,651,189 100.00% 16,651,189 0.09% 15,255
B.30.1.1 m3 Remoción de Estructuras 2.15 43,508 93,542 100.19% 93,716 0.00% 0.0
B.30.1.2 m Remoción de ductos 23.30 22,693 528,747 99.97% 528,573 0.00% 0.0
B.30.1.3 m2 Remoción de pavimentos Asfáltico 1,655.70 1,740 2,880,918 100.00% 2,880,918 0.00% 0.0
B.30.1.4 nº Remoción de Señalización Vertical Lateral 1.00 17,074 17,074 100.00% 17,074 0.00% 0.0
B.30.1.5 Km Despeje y Limpieza de Faja 0.59 4,500,581 2,655,343 100.00% 2,655,343 0.00% 0.0
B.30.1.6 n° Tala y Remocion de arboles 7.00 1,489,192 10,424,344 100.00% 10,424,170 0.00% 0.0
B.30.1.7 nº Reubicación de Señalización Vertical Lateral 1.00 51,221 51,221 100.34% 51,395 29.78% 15,255.0
3 B.30.2 MOVIMIENTO DE TIERRAS 1.00 24,794,940 24,794,940 100.00% 24,795,113 0.00% 0
B.30.2.1 m3 Excavación de Escarpe 1,294.61 4,936 6,390,195 100.00% 6,390,195 0.00% 0.0
B.30.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 864.00 4,936 4,264,704 100.00% 4,264,704 0.00% 0.0
B.30.2.3 m3 Excavación en TCN para Obras de Drenaje 29.45 7,766 228,709 100.00% 228,709 0.00% 0.0
B.30.2.4 m3 Formación y Compactación de Terraplenes 1,004.00 10,801 10,844,204 100.00% 10,844,204 0.00% 0.0
B.30.2.5 m3 Relleno Estructural 16.86 23,376 394,119 100.00% 394,119 0.00% 0.0
B.30.2.6 m2 Preparación de la Subrasante 2,970.01 900 2,673,009 100.01% 2,673,182 0.00% 0.0
3 B.30.3 CAPAS GRANULARES 1.00 12,007,092 12,007,092 100.00% 12,007,265 0.00% 0
B.30.3.1 m3 Base Granular, CBR = 80% 671.50 17,881 12,007,092 100.00% 12,007,265 0.00% 0.0
3 B.30.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 61,862,146 61,862,145 67.15% 41,541,205 19.57% 12,105,302
B.30.4.1 m2 Imprimación 2,970.01 566 1,681,026 100.00% 1,681,026 0.00% 0.0
B.30.4.2 m2 Riego de Liga 2,108.90 469 989,074 100.00% 989,074 79.37% 784,979.0
B.30.4.3 m3 Concreto Asfáltico de Rodadura 178.20 154,673 27,562,729 41.07% 11,320,323 41.07% 11,320,323.0
B.30.4.4 m3 Concreto Asfáltico Capa Intermedia 189.80 145,156 27,550,609 100.00% 27,550,782 0.00% 0.0
B.30.4.5 m2 Aceras de Hormigón 270.31 15,089 4,078,708 0.00% 0 0.00% 0.0
3 B.30.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 872,785 872,785 100.02% 872,959 0.00% 0
B.30.5.1 m3 Hormigón G05 0.55 75,880 41,734 100.00% 41,734 0.00% 0.0
B.30.5.2 m3 Hormigón G17 3.99 193,885 773,601 100.00% 773,601 0.00% 0.0
B.30.5.3 Kg Acero para Armaduras A630-420H 45.96 1,250 57,450 100.30% 57,624 0.00% 0.0
3 B.30.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 32,012,919 32,012,919 47.04% 15,059,572 38.19% 12,226,293
B.30.6.1 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=0,8 12.00 69,341 832,092 100.02% 832,266 0.00% 0.0
B.30.6.2 n° Embudos para Descargas de Agua 1.00 293,760 293,760 0.00% 0 0.00% 0.0
B.30.6.3 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 2.00 116,607 233,214 0.00% 0 0.00% 0.0
B.30.6.4 m Soleras Tipo "A" 38.00 14,709 558,942 0.00% 0 0.00% 0.0
B.30.6.5 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormi 529.83 3,394 1,798,243 100.01% 1,798,417 6.80% 122,330.0
B.30.6.6 m3 Revestimiento de Fosos y Contrafosos 91.77 297,428 27,294,968 45.54% 12,428,889 44.35% 12,103,963.0
B.30.6.7 m Rehabilitacion de Fosos, Contrafosos y Canales, Revestidos 84.00 11,925 1,001,700 0.00% 0 0.00% 0.0
3 B.30.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 43,063,191 43,063,191 50.27% 21,647,826 0.00% 0
B.30.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 2.00 146,476 292,952 0.00% 0 0.00% 0.0
B.30.7.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00% 0.0
B.30.7.3 n° Delineadores verticales 5.00 81,267 406,335 0.00% 0 0.00% 0.0
B.30.7.4 Km Demarcación, Línea Lateral Segmentada 0.66 1,600,206 1,056,136 0.00% 0 0.00% 0.0
B.30.7.5 Km Demarcación, Línea Lateral Continua 0.92 1,200,155 1,104,143 0.00% 0 0.00% 0.0
B.30.7.6 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 37.00 11,001 407,037 0.00% 0 0.00% 0.0
B.30.7.7 n° Tachas Reflectantes 286.00 1,600 457,600 0.00% 0 0.00% 0.0
B.30.7.8 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
B.30.7.9 m Barreras Metálicas de Contención Laterales, de Doble Onda 20.00 39,001 780,020 0.00% 0 0.00% 0.0
B.30.7.10 m Valla Peatonal en Mediana 300.00 72,160 21,648,000 100.00% 21,647,826 0.00% 0.0
B.30.7.11 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 0.00% 0 0.00% 0.0
B.30.7.12 m Barreras Laterales de Hormigón en Sitio Alta 176.00 57,568 10,131,968 0.00% 0 0.00% 0.0
B.30.7.13 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 9.00 33,298 299,682 0.00% 0 0.00% 0.0
3 B.30.8 ILUMINACIÓN 1.00 42,903,338 42,903,338 86.51% 37,115,323 21.92% 9,404,299
RA02-24.11-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA02-24.11-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00% 0.0
RA02-24.11-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00% 0.0
RA02-24.11-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA02-24.11-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 537.45 12,597 6,770,258 100.00% 6,770,258 0.00% 0.0
RA02-24.11-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA02-24.11-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA02-24.11-I213 c/u Construcción Cámara BT (CBT-xxx) 4.00 126,117 504,468 100.03% 504,642 0.00% 0.0
RA02-24.11-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 26.00 14,619 380,094 100.00% 380,094 0.00% 0.0
RA02-24.11-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 26.00 238,377 6,197,802 86.90% 5,386,018 85.71% 5,312,228.0
RA02-24.11-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 325.00 3,679 1,195,675 100.00% 1,195,675 0.00% 0.0
RA02-24.11-I223 m Provisión y montaje Cable 4 x 1 x 13,3 mm2, XTU 670.06 5,654 3,788,519 100.00% 3,788,693 0.00% 0.0
RA02-24.11-I224 m Provisión y montaje Cable 4 x 1 x 21,2 mm2, XTU 1,020.65 6,942 7,085,352 100.00% 7,085,526 0.00% 0.0
RA02-24.11-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 596.49 6,007 3,583,115 100.00% 3,583,115 0.00% 0.0
RA02-24.11-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 26.00 273,789 7,118,514 92.52% 6,586,059 57.48% 4,092,071.0
RA02-24.11-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 6.32 183,540 1,159,973 100.03% 1,160,320 0.00% 0.0
RA02-24.11-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00% 0.0
RA02-24.11-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00% 0.0
RA02-24.11-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA02-24.11-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 28.04 24,070 674,923 100.00% 674,923 0.00% 0.0
2 B.31 PARADERO RAMAL S-0 QUINTA FAJA ORIENTE KM 706,440 1.00 63,663,170 63,663,170 31.42% 20,001,599 11.27% 7,173,524
3 B.31.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,352,513 1,352,513 100.03% 1,352,860 0.00% 0
B.31.1.1 m3 Remoción de Estructuras 7.86 43,508 341,973 100.05% 342,146 0.00% 0.0
B.31.1.2 m Remoción de Obras de Drenaje Superficial 121.62 3,345 406,819 100.00% 406,819 0.00% 0.0
B.31.1.3 m2 Despeje y Limpieza de Faja 0.10 4,500,581 450,058 100.00% 450,058 0.00% 0.0
B.31.1.4 nº Reubicación de Señalización Vertical Lateral 3.00 51,221 153,663 100.11% 153,837 0.00% 0.0
3 B.31.2 MOVIMIENTO DE TIERRAS 1.00 5,953,750 5,953,750 100.00% 5,953,750 0.00% 0
B.31.2.1 m3 Excavación de Escarpe 255.00 4,936 1,258,680 100.00% 1,258,680 0.00% 0.0
B.31.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 5.00 4,936 24,680 100.00% 24,680 0.00% 0.0
B.31.2.3 m3 Excavación en TCN para Obras de Drenaje 26.05 7,766 202,304 100.00% 202,304 0.00% 0.0
B.31.2.4 m3 Formación y Compactación de Terraplenes 395.60 10,801 4,272,876 100.00% 4,272,876 0.00% 0.0
B.31.2.5 m2 Preparación de la Subrasante 216.90 900 195,210 100.00% 195,210 0.00% 0.0
3 B.31.3 CAPAS GRANULARES 1.00 775,678 775,678 100.00% 775,678 5.95% 46,130
B.31.3.1 m3 Base Granular, CBR = 80% 43.38 17,881 775,678 100.00% 775,678 5.95% 46,130.0
3 B.31.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 6,068,065 6,068,065 31.16% 1,891,072 30.92% 1,876,436
B.31.4.1 m2 Imprimación 216.90 566 122,765 100.14% 122,939 88.22% 108,303.0
B.31.4.2 m2 Riego de Liga 216.90 469 101,726 14.29% 14,532 14.29% 14,532.0
B.31.4.3 m3 Concreto Asfáltico de Rodadura 10.84 154,673 1,676,655 0.00% 0 0.00% 0.0
B.31.4.4 m3 Concreto Asfáltico Capa Intermedia 13.01 145,156 1,888,480 92.86% 1,753,601 92.86% 1,753,601.0
B.31.4.5 m2 Aceras de Hormigón 151.00 15,089 2,278,439 0.00% 0 0.00% 0.0
3 B.31.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 11,408,320 11,408,320 31.37% 3,578,894 18.75% 2,138,770
B.31.5.1 m3 Hormigón G05 1.85 75,880 140,378 100.12% 140,552 0.00% 0.0
B.31.5.2 m3 Hormigón G17 2.57 193,885 498,284 85.74% 427,250 85.74% 427,250.0
B.31.5.3 m3 Hormigón G20 9.36 195,522 1,830,086 4.76% 87,188 4.76% 87,188.0
B.31.5.4 Kg Hormigón G25 0.80 246,289 197,031 0.00% 0 0.00% 0.0
B.31.5.5 m3 Hormigón G30 22.56 257,926 5,818,811 0.00% 0 0.00% 0.0
B.31.5.6 Kg Acero para Armaduras A630-420H 1,163.39 1,250 1,454,238 100.00% 1,454,238 17.86% 259,655.0
B.31.5.7 m2 Moldajes 46.45 31,636 1,469,492 100.01% 1,469,666 92.87% 1,364,677.0
3 B.31.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 16,667,911 16,667,911 0.00% 0 0.00% 0
B.31.6.2 n° Embudos para Descargas de Agua 1.00 293,760 293,760 0.00% 0 0.00% 0.0
B.31.6.3 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 4.00 116,607 466,428 0.00% 0 0.00% 0.0
B.31.6.4 m Soleras Tipo "A" 91.76 14,709 1,349,698 0.00% 0 0.00% 0.0
B.31.6.7 m Tubos Polietileno de Alta Densidad estructurados D=1,00 m 75.00 165,984 12,448,800 0.00% 0 0.00% 0.0
B.31.6.8 n° Construcción de Cámara de Inspección Tipo B 3.00 477,062 1,431,186 0.00% 0 0.00% 0.0
B.31.6.9 n° Tapas de Cámaras 3.00 190,798 572,394 0.00% 0 0.00% 0.0
B.31.6.10 m Suministro y Colocación de Escalines 15.00 7,043 105,645 0.00% 0 0.00% 0.0
3 B.31.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 7,704,398 7,704,399 0.00% 0 0.00% 0
B.31.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00% 0.0
B.31.7.2 Km Demarcación, Línea Lateral Segmentada 0.05 1,600,206 80,010 0.00% 0 0.00% 0.0
B.31.7.3 Km Demarcación, Línea Lateral Continua 0.06 1,200,155 72,009 0.00% 0 0.00% 0.0
B.31.7.4 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 5.00 11,001 55,005 0.00% 0 0.00% 0.0
B.31.7.5 n° Tachas Reflectantes 37.00 1,600 59,200 0.00% 0 0.00% 0.0
B.31.7.6 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
B.31.7.7 m Valla Peatonal 80.00 44,402 3,552,160 0.00% 0 0.00% 0.0
B.31.7.8 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 7.00 33,298 233,086 0.00% 0 0.00% 0.0
3 B.31.8 ILUMINACIÓN 1.00 13,732,535 13,732,535 46.96% 6,449,345 22.66% 3,112,188
RA02-24.12-I200 un Empalme por Compañía + Medidor Trifasico 1.00 1,221,415 1,221,415 0.00% 0 0.00% 0.0
RA02-24.12-I207 c/u Ferretería instalación + desconectadores fusibles Trifásicos 1.00 805,275 805,275 0.00% 0 0.00% 0.0
RA02-24.12-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 103.00 12,597 1,297,491 100.01% 1,297,665 0.00% 0.0
RA02-24.12-I209 m Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA02-24.12-I210 m Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA02-24.12-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 9.00 14,619 131,571 100.13% 131,745 0.00% 0.0
RA02-24.12-I218 c/u Provisión y montaje Luminaria Vial 38 W, LED 8.00 141,294 1,130,352 4.76% 53,859 4.76% 53,859.0
RA02-24.12-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 140.00 3,679 515,060 100.00% 515,060 60.71% 312,715.0
RA02-24.12-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 278.10 4,232 1,176,919 100.00% 1,176,919 60.72% 714,576.0
RA02-24.12-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 128.00 6,007 768,896 100.00% 768,896 0.00% 0.0
RA02-24.12-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 8.00 273,789 2,190,312 90.48% 1,981,744 90.48% 1,981,744.0
RA02-24.12-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 8.00 129,331 1,034,648 4.76% 49,294 4.76% 49,294.0
RA02-24.12-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 2.19 183,540 401,953 100.00% 401,953 0.00% 0.0
RA02-24.12-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 0.00% 0 0.00% 0.0
RA02-24.12-I232 c/u Cámaras Registro Malla de Puesta Tierra 4.00 40,986 163,944 0.00% 0 0.00% 0.0
RA02-24.12-I233 c/u Tablero Control General iluminación Trifásico 1.00 2,013,921 2,013,921 0.00% 0 0.00% 0.0
RA02-24.12-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 3.00 24,070 72,210 100.00% 72,210 0.00% 0.0
2 B.32 PARADERO LADO ORIENTE PUENTE TOLTÉN KM 700,400 1.00 195,598,131 195,598,129 46.37% 90,704,007 11.65% 22,794,644
3 B.32.1 PREPARACION DEL AREA DE TRABAJO 1.00 6,691,183 6,691,182 100.00% 6,691,182 0.00% 0
B.32.1.1 m3 Remoción de Estructuras 10.16 43,508 442,041 100.00% 442,041 0.00% 0.0
B.32.1.2 m2 Remoción de pavimentos Asfáltico 1,170.32 1,740 2,036,357 100.01% 2,036,530 0.00% 0.0
B.32.1.3 m Remoción de Obras de Drenaje Superficial 54.42 3,345 182,035 100.00% 182,035 0.00% 0.0
B.32.1.4 m Remoción de Barreras de Contención Laterales Metálicas 118.00 4,516 532,888 100.00% 532,888 0.00% 0.0
B.32.1.5 m Remoción de Cercos 7.16 2,791 19,984 100.00% 19,984 0.00% 0.0
B.32.1.6 Km Despeje y Limpieza de Faja 0.75 4,500,581 3,375,436 99.99% 3,375,262 0.00% 0.0
B.32.1.7 n° Reubicación de Señalización Vertical Lateral 2.00 51,221 102,442 100.00% 102,442 0.00% 0.0
3 B.32.2 MOVIMIENTO DE TIERRAS 1.00 22,715,741 22,715,741 98.48% 22,369,949 0.00% 0
B.32.2.1 m3 Excavación de Escarpe 1,107.00 4,936 5,464,152 99.99% 5,463,805 0.00% 0.0
B.32.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 423.00 4,936 2,087,928 100.00% 2,087,928 0.00% 0.0
B.32.2.3 m3 Excavación en TCN para Obras de Drenaje 104.32 7,766 810,149 100.00% 810,149 0.00% 0.0
B.32.2.4 m3 Formación y Compactación de Terraplenes 1,089.72 10,801 11,770,066 100.00% 11,770,413 0.00% 0.0
B.32.2.5 m3 Relleno Estructural 14.80 23,376 345,965 0.00% 0 0.00% 0.0
B.32.2.6 m2 Preparación de la Subrasante 2,486.09 900 2,237,481 100.01% 2,237,654 0.00% 0.0
3 B.32.3 CAPAS GRANULARES 1.00 9,382,518 9,382,518 100.00% 9,382,345 0.00% 0
B.32.3.1 m3 Base Granular, CBR = 80% 524.72 17,881 9,382,518 100.00% 9,382,345 0.00% 0.0
3 B.32.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 43,736,221 43,736,221 54.46% 23,819,833 23.12% 10,112,816
B.32.4.1 m2 Imprimación 2,486.09 566 1,407,127 100.01% 1,407,301 0.00% 0.0
B.32.4.2 m2 Riego de Liga 2,027.76 469 951,019 90.48% 860,454 90.48% 860,454.0
B.32.4.3 m3 Concreto Asfáltico de Rodadura 124.30 154,673 19,225,854 20.24% 3,890,947 20.24% 3,890,947.0
B.32.4.4 m3 Concreto Asfáltico Capa Intermedia 121.67 145,156 17,661,131 100.00% 17,661,131 30.36% 5,361,415.0
B.32.4.5 m2 Aceras de Hormigón 297.64 15,089 4,491,090 0.00% 0 0.00% 0.0
3 B.32.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 12,971,556 12,971,555 85.17% 11,047,615 39.66% 5,144,335
B.32.5.1 m3 Hormigón G05 2.62 75,880 198,806 99.91% 198,632 0.00% 0.0
B.32.5.2 m3 Hormigón G17 33.61 193,885 6,516,475 100.00% 6,516,648 30.95% 2,017,062.0
B.32.5.3 m3 Hormigón G25 20.51 246,289 5,051,387 61.91% 3,127,273 61.91% 3,127,273.0
B.32.5.4 Kg Acero para Armaduras A630-420H 963.91 1,250 1,204,888 100.01% 1,205,062 0.00% 0.0
3 B.32.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 27,555,581 27,555,581 2.52% 693,584 0.00% 0
B.32.6.1 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=0,8 10.00 69,341 693,410 100.03% 693,584 0.00% 0.0
B.32.6.2 n° Embudos para Descargas de Agua 1.00 293,760 293,760 0.00% 0 0.00% 0.0
B.32.6.3 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 11.60 116,607 1,352,641 0.00% 0 0.00% 0.0
B.32.6.4 m Soleras Tipo "A" 169.00 14,709 2,485,821 0.00% 0 0.00% 0.0
B.32.6.5 m Cunetas de Hormigón Triangulares 70.00 25,910 1,813,700 0.00% 0 0.00% 0.0
B.32.6.6 Nº Rejillas para Sumideros Tipo 60-18-R 1.00 592,504 592,504 0.00% 0 0.00% 0.0
B.32.6.7 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 326.90 3,394 1,109,499 0.00% 0 0.00% 0.0
B.32.6.8 m3 Revestimiento de Fosos y Contrafosos 56.00 297,428 16,655,968 0.00% 0 0.00% 0.0
B.32.6.9 m Tubos Polietileno de Alta Densidad estructurados D=1,00 m 8.00 165,984 1,327,872 0.00% 0 0.00% 0.0
B.32.6.10 m Limpieza de Alcantarillas y Sifones, de hasta 1 m de altura 54.00 19,252 1,039,608 0.00% 0 0.00% 0.0
B.32.6.11 n° Tapas de Cámaras 1.00 190,798 190,798 0.00% 0 0.00% 0.0
3 B.32.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 46,464,429 46,464,429 0.00% 0 0.00% 0
B.32.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 5.00 146,476 732,380 0.00% 0 0.00% 0.0
B.32.7.2 n° Baliza Luminosa 2.00 1,865,691 3,731,382 0.00% 0 0.00% 0.0
B.32.7.3 Km Demarcación, Línea Lateral Segmentada 0.60 1,600,206 960,124 0.00% 0 0.00% 0.0
B.32.7.4 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 62.50 11,001 687,563 0.00% 0 0.00% 0.0
B.32.7.5 n° Tachas Reflectantes 248.00 1,600 396,800 0.00% 0 0.00% 0.0
B.32.7.6 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
B.32.7.7 m Valla Peatonal 116.70 44,402 5,181,713 0.00% 0 0.00% 0.0
B.32.7.10 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 0.00% 0 0.00% 0.0
B.32.7.8 m Barreras Laterales de Hormigón en Sitio Alta 497.00 57,568 28,611,296 0.00% 0 0.00% 0.0
B.32.7.9 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 7.40 33,298 246,405 0.00% 0 0.00% 0.0
3 B.32.8 ILUMINACIÓN 1.00 26,080,902 26,080,902 64.03% 16,699,499 28.90% 7,537,493
RA02-24.13-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA02-24.13-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00% 0.0
RA02-24.13-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00% 0.0
RA02-24.13-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA02-24.13-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 436.57 12,597 5,499,472 100.00% 5,499,472 0.00% 0.0
RA02-24.13-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA02-24.13-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA02-24.13-I213 c/u Construcción Cámara BT (CBT-xxx) 1.00 126,117 126,117 100.14% 126,290 35.76% 45,103.0
RA02-24.13-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 10.00 14,619 146,190 100.00% 146,190 0.00% 0.0
RA02-24.13-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 10.00 238,377 2,383,770 0.00% 0 0.00% 0.0
RA02-24.13-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 125.00 3,679 459,875 100.00% 459,875 100.00% 459,875.0
RA02-24.13-I223 m Provisión y montaje Cable 4 x 1 x 13,3 mm2, XTU 1,211.14 5,654 6,847,786 97.62% 6,684,879 97.62% 6,684,879.0
RA02-24.13-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 473.57 6,007 2,844,735 100.00% 2,844,735 0.00% 0.0
RA02-24.13-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 10.00 273,789 2,737,890 12.70% 347,636 12.70% 347,636.0
RA02-24.13-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 2.43 183,540 446,002 100.00% 446,002 0.00% 0.0
RA02-24.13-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00% 0.0
RA02-24.13-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00% 0.0
RA02-24.13-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA02-24.13-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 6.00 24,070 144,420 100.00% 144,420 0.00% 0.0
3 B.32.9 OBRAS COMPLEMETARIAS 1.00 0 #DIV/0! 0 #DIV/0! 0
B.32.9.1 GL Desvíos de transito 0 0.00% 0 0.00% 0.0
2 B.33 PARADERO PICHIQUEPE C.S. ORIENTE KM 686,200 1.00 163,861,110 163,861,107 32.67% 53,540,942 8.17% 13,388,650
3 B.33.1 PREPARACION DEL AREA DE TRABAJO 1.00 3,217,086 3,217,086 100.02% 3,217,607 0.00% 0
B.33.1.1 m2 Remoción de pavimentos Asfáltico 479.50 1,740 834,330 100.02% 834,504 0.00% 0.0
B.33.1.2 m Remoción de Obras de Drenaje Superficial 188.52 3,345 630,599 100.03% 630,773 0.00% 0.0
B.33.1.3 nº Remoción de Señalización Vertical Lateral 4.00 17,074 68,296 100.00% 68,296 0.00% 0.0
B.33.1.4 Km Despeje y Limpieza de Faja 0.34 4,500,581 1,530,198 100.01% 1,530,371 0.00% 0.0
B.33.1.5 n° Reubicación de Señalización Vertical Lateral 3.00 51,221 153,663 100.00% 153,663 0.00% 0.0
3 B.33.2 MOVIMIENTO DE TIERRAS 1.00 31,876,030 31,876,029 84.59% 26,964,730 2.99% 954,628
B.33.2.1 m3 Excavación de Escarpe 581.00 4,936 2,867,816 100.01% 2,868,163 0.00% 0.0
B.33.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 498.00 4,936 2,458,128 100.00% 2,458,128 0.00% 0.0
B.33.2.3 m3 Excavación en TCN para Obras de Drenaje 623.12 7,766 4,839,150 100.00% 4,838,976 19.73% 954,628.0
B.33.2.4 m3 Formación y Compactación de Terraplenes 1,479.87 10,801 15,984,076 100.00% 15,983,728 0.00% 0.0
B.33.2.5 m3 Relleno Estructural 210.10 23,376 4,911,298 0.00% 0 0.00% 0.0
B.33.2.6 m2 Preparación de la Subrasante 906.18 900 815,562 100.02% 815,735 0.00% 0.0
3 B.33.3 CAPAS GRANULARES 1.00 3,240,752 3,240,752 100.00% 3,240,752 0.00% 0
B.33.3.1 m3 Base Granular, CBR = 80% 181.24 17,881 3,240,752 100.00% 3,240,752 0.00% 0.0
3 B.33.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 24,396,095 24,396,095 41.13% 10,033,973 33.34% 8,132,626
B.33.4.1 m2 Imprimación 906.18 566 512,898 100.00% 512,898 0.00% 0.0
B.33.4.2 m2 Riego de Liga 906.18 469 424,998 73.80% 313,656 73.80% 313,656.0
B.33.4.3 m3 Concreto Asfáltico de Rodadura 45.31 154,673 7,008,234 0.00% 0 0.00% 0.0
B.33.4.4 m3 Concreto Asfáltico Capa Intermedia 63.43 145,156 9,207,245 100.00% 9,207,419 84.92% 7,818,970.0
B.33.4.5 m2 Aceras de Hormigón 480.00 15,089 7,242,720 0.00% 0 0.00% 0.0
3 B.33.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 1,023,518 1,023,517 12.77% 130,718 12.77% 130,718
B.33.5.1 m3 Hormigón G05 0.27 75,880 20,488 100.00% 20,488 100.00% 20,488.0
B.33.5.2 m3 Hormigón G25 2.68 246,289 660,055 0.00% 0 0.00% 0.0
B.33.5.3 m3 Acero para Armaduras A630-420H 274.38 1,250 342,975 32.14% 110,230 32.14% 110,230.0
3 B.33.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 17,191,058 17,191,058 0.00% 0 0.00% 0
B.33.6.1 m Soleras Tipo "A" 145.80 14,709 2,144,572 0.00% 0 0.00% 0.0
B.33.6.2 Nº Rejillas para Sumideros Tipo 60-18-R 5.00 592,504 2,962,520 0.00% 0 0.00% 0.0
B.33.6.3 m Tubo de HDPE Sanitario D:400mm 311.56 24,477 7,626,054 0.00% 0 0.00% 0.0
B.33.6.4 n° Construcción de Cámara de Inspección Tipo B 6.00 477,062 2,862,372 0.00% 0 0.00% 0.0
B.33.6.5 n° Tapas de Cámaras 6.00 190,798 1,144,788 0.00% 0 0.00% 0.0
B.33.6.6 n° Suministro y Colocación de Escalines 64.00 7,043 450,752 0.00% 0 0.00% 0.0
3 B.33.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 62,717,885 62,717,884 0.00% 0 0.00% 0
B.33.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 2.00 146,476 292,952 0.00% 0 0.00% 0.0
B.33.7.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00% 0.0
B.33.7.3 n° Baliza Luminosa 2.00 1,865,691 3,731,382 0.00% 0 0.00% 0.0
B.33.7.4 Km Demarcación, Línea Lateral Segmentada 0.42 1,600,206 672,087 0.00% 0 0.00% 0.0
B.33.7.5 Km Demarcación, Línea Lateral Continua 0.36 1,200,155 432,056 0.00% 0 0.00% 0.0
B.33.7.6 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 92.00 11,001 1,012,092 0.00% 0 0.00% 0.0
B.33.7.7 n° Tachas Reflectantes 198.00 1,600 316,800 0.00% 0 0.00% 0.0
B.33.7.8 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
B.33.7.9 m Barreras Metálicas de Contención Laterales, de Doble Onda 20.00 39,001 780,020 0.00% 0 0.00% 0.0
B.33.7.10 m Valla Peatonal 250.00 44,402 11,100,500 0.00% 0 0.00% 0.0
B.33.7.11 m Valla Peatonal en Mediana 300.00 72,160 21,648,000 0.00% 0 0.00% 0.0
B.33.7.12 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 0.00% 0 0.00% 0.0
B.33.7.13 m Barreras Laterales de Hormigón en Sitio Alta 277.00 57,568 15,946,336 0.00% 0 0.00% 0.0
B.33.7.14 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 9.20 33,298 306,342 0.00% 0 0.00% 0.0
3 B.33.8 ILUMINACIÓN 1.00 20,198,686 20,198,685 49.28% 9,953,162 20.65% 4,170,678
RA02-24.14-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA02-24.14-I205 c/u Transformador 5 kVA 2f, norma COMPAÑÍA 1.00 1,151,499 1,151,499 0.00% 0 0.00% 0.0
RA02-24.14-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00% 0.0
RA02-24.14-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA02-24.14-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 223.80 12,597 2,819,209 100.01% 2,819,382 0.00% 0.0
RA02-24.14-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 26.92 28,707 772,792 0.00% 0 0.00% 0.0
RA02-24.14-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA02-24.14-I213 c/u Construcción Cámara BT (CBT-xxx) 4.00 126,117 504,468 100.00% 504,468 30.36% 153,161.0
RA02-24.14-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 9.00 14,619 131,571 100.00% 131,571 0.00% 0.0
RA02-24.14-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 9.00 238,377 2,145,393 3.18% 68,135 3.18% 68,135.0
RA02-24.14-I218 c/u Provisión y montaje Luminaria Vial 38 W, LED 3.00 141,294 423,882 0.00% 0 0.00% 0.0
RA02-24.14-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 127.50 3,679 469,073 100.04% 469,246 100.04% 469,246.0
RA02-24.14-I223 m Provisión y montaje Cable 4 x 1 x 13,3 mm2, XTU 665.01 5,654 3,759,967 90.48% 3,401,883 90.48% 3,401,883.0
RA02-24.14-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 268.26 6,007 1,611,438 100.00% 1,611,438 0.00% 0.0
RA02-24.14-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 9.00 273,789 2,464,101 3.18% 78,253 3.18% 78,253.0
RA02-24.14-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 3.00 129,331 387,993 0.00% 0 0.00% 0.0
RA02-24.14-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 2.19 183,540 401,953 100.00% 401,953 0.00% 0.0
RA02-24.14-I231 c/u Soldadura Termofusión. 22.00 30,775 677,050 0.00% 0 0.00% 0.0
RA02-24.14-I232 c/u Cámaras Registro Malla de Puesta Tierra 2.00 40,986 81,972 0.00% 0 0.00% 0.0
RA02-24.14-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA02-24.14-I234 c/u Retiro y reemplazo de luminaria existente poste galvanizado 1.00 304,384 304,384 100.00% 304,384 0.00% 0.0
RA02-24.14-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 1.00 17,856 17,856 100.97% 18,029 0.00% 0.0
RA02-24.14-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 6.00 24,070 144,420 100.00% 144,420 0.00% 0.0
1 C OBRAS DE SERVICIALIDAD 3,218,662,548 2,179,517,081 255,078,489
C.2 DISEÑO GEOMETRICO ACCESO A CALLE DE SERVICIO
2 1.00 76,417,523 76,417,522 24.05% 18,380,706 4.63% 3,535,530
SECTOR TURBINA KM 607,960 ORIENTE
3 C.2.1 PREPARACION DEL AREA DE TRABAJO 1.00 7,404,569 7,404,569 100.00% 7,404,569 0.62% 45,733
C.2.1.1 m2 Remoción de pavimentos Asfáltico 292.01 1,740 508,097 100.00% 508,097 0.00% 0.0
C.2.1.2 m Remoción de Obras de Drenaje Superficial 168.13 3,345 562,395 100.00% 562,395 0.00% 0.0
C.2.1.3 m2 Remoción de Aceras 16.03 4,286 68,705 100.00% 68,705 0.00% 0.0
C.2.1.4 nº Remoción de casetas de Paraderos para la locomoción colectiva 1.00 608,570 608,570 100.00% 608,570 0.00% 0.0
C.2.1.5 Km Despeje y Limpieza de Faja 1.20 4,500,581 5,400,697 100.00% 5,400,697 0.00% 0.0
C.2.1.6 n° Reubicación de Señalización Vertical Lateral 5.00 51,221 256,105 100.00% 256,105 17.86% 45,733.0
3 C.2.2 MOVIMIENTO DE TIERRAS 1.00 4,004,905 4,004,905 94.75% 3,794,695 9.48% 379,671
C.2.2.1 m3 Excavación de Escarpe 33.00 4,936 162,888 100.00% 162,888 0.00% 0.0
C.2.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 515.00 4,936 2,542,040 100.00% 2,542,040 0.00% 0.0
C.2.2.3 m3 Excavación en TCN para Obras de Drenaje 0.91 7,766 7,067 100.00% 7,067 100.00% 7,067.0
C.2.2.4 m3 Formación y Compactación de Terraplenes 15.00 10,801 162,015 100.11% 162,189 0.00% 0.0
C.2.2.5 m3 Relleno Estructurante 9.00 23,376 210,384 0.00% 0 0.00% 0.0
C.2.2.6 m2 Preparación de la Subrasante 1,022.79 900 920,511 100.00% 920,511 40.48% 372,604.0
3 C.2.3 CAPAS GRANULARES 1.00 2,524,618 2,524,618 90.48% 2,284,336 90.48% 2,284,336
C.2.3.1 m3 Base Granular, CBR = 80% 141.19 17,881 2,524,618 90.48% 2,284,336 90.48% 2,284,336.0
3 C.2.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 21,286,618 21,286,618 1.88% 400,329 1.88% 400,329
C.2.4.1 m2 Imprimación 705.95 566 399,568 45.23% 180,720 45.23% 180,720.0
C.2.4.2 m2 Riego de Liga 705.95 469 331,091 0.00% 0 0.00% 0.0
C.2.4.3 m3 Concreto Asfáltico de Rodadura 42.36 154,673 6,551,948 0.00% 0 0.00% 0.0
C.2.4.4 m3 Concreto Asfáltico Capa Intermedia 63.54 145,156 9,223,212 2.38% 219,609 2.38% 219,609.0
C.2.4.5 m2 Aceras de Hormigón 316.84 15,089 4,780,799 0.00% 0 0.00% 0.0
3 C.2.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 2,448,212 2,448,212 0.73% 17,772 0.73% 17,772
C.2.5.1 m3 Hormigón G05 0.58 75,880 44,010 40.38% 17,772 40.38% 17,772.0
C.2.5.2 m3 Hormigón G17 2.30 193,885 445,935 0.00% 0 0.00% 0.0
C.2.5.3 m3 Hormigón G30 4.00 257,926 1,031,704 0.00% 0 0.00% 0.0
C.2.5.4 Kg Acero para Armaduras A630-420H 311.00 1,250 388,750 0.00% 0 0.00% 0.0
C.2.5.5 m2 Moldajes 17.00 31,636 537,812 0.00% 0 0.00% 0.0
3 C.2.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 10,992,931 10,992,931 0.00% 0 0.00% 0
C.2.6.1 m Soleras Tipo "A" 79.20 14,709 1,164,953 0.00% 0 0.00% 0.0
C.2.6.2 m Soleras con Zarpa de Hormigón 108.00 29,804 3,218,832 0.00% 0 0.00% 0.0
C.2.6.3 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 107.00 3,394 363,158 0.00% 0 0.00% 0.0
C.2.6.4 m3 Revestimiento de Fosos y Contrafosos 21.00 297,428 6,245,988 0.00% 0 0.00% 0.0
3 C.2.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 15,591,231 15,591,231 7.48% 1,166,034 0.00% 0
C.2.7.10 m Cerco de Alambre de Púas 153.00 7,620 1,165,860 100.01% 1,166,034 0.00% 0.0
C.2.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00% 0.0
C.2.7.2 Km Demarcación, Línea de Eje Continua Doble 0.04 1,600,206 64,008 0.00% 0 0.00% 0.0
C.2.7.3 Km Demarcación, Línea Lateral Segmentada 0.17 1,600,206 272,035 0.00% 0 0.00% 0.0
C.2.7.4 Km Demarcación, Línea Lateral Continua 0.25 1,200,155 300,039 0.00% 0 0.00% 0.0
C.2.7.5 n° Tachas Reflectantes 166.00 1,600 265,600 0.00% 0 0.00% 0.0
C.2.7.6 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
C.2.7.7 m Valla Peatonal 144.00 44,402 6,393,888 0.00% 0 0.00% 0.0
C.2.7.8 m Barreras Laterales de Hormigón en Sitio Alta 56.00 57,568 3,223,808 0.00% 0 0.00% 0.0
C.2.7.9 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 7.60 33,298 253,065 0.00% 0 0.00% 0.0
3 C.2.8 ILUMINACIÓN 1.00 12,164,439 12,164,438 27.23% 3,312,971 3.35% 407,689
RA-03-2-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA-03-2-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA-03-2-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 135.73 12,597 1,709,791 100.00% 1,709,791 0.00% 0.0
RA-03-2-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 100.00% 86,121 17.86% 15,379.0
RA-03-2-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA-03-2-I213 c/u Construcción Cámara BT (CBT-xxx) 1.00 126,117 126,117 14.31% 18,041 14.31% 18,041.0
RA-03-2-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 7.00 14,619 102,333 92.88% 95,048 92.88% 95,048.0
RA-03-2-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 7.00 238,377 1,668,639 0.00% 0 0.00% 0.0
RA-03-2-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 87.50 3,679 321,913 0.00% 0 0.00% 0.0
RA-03-2-I222 m Provisión y montaje Cable 4 x 1 x 8,36 mm2, XTU 390.77 4,770 1,863,973 0.00% 0 0.00% 0.0
RA-03-2-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 169.73 6,007 1,019,568 100.02% 1,019,742 0.00% 0.0
RA-03-2-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 7.00 273,789 1,916,523 0.00% 0 0.00% 0.0
RA-03-2-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 1.70 183,540 312,018 100.00% 312,018 88.10% 274,881.0
RA-03-2-I231 c/u Soldadura Termofusión. 22.00 30,775 677,050 0.00% 0 0.00% 0.0
RA-03-2-I232 c/u Cámaras Registro Malla de Puesta Tierra 2.00 40,986 81,972 0.00% 0 0.00% 0.0
RA-03-2-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA-03-2-I234 c/u Retiro y reemplazo de luminaria existente poste galvanizado/hormigó 3.00 304,384 913,152 0.00% 0 0.00% 0.0
RA-03-2-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 3.00 24,070 72,210 100.00% 72,210 6.01% 4,340.0
C.3 DISEÑO GEOMETRICO ACCESO A CALLE DE SERVICIO
2 1.00 79,288,308 79,288,308 57.10% 45,273,615 7.40% 5,863,371
SECTOR TURBINA KM 607,960 PONIENTE
3 C.3.1 PREPARACION DEL AREA DE TRABAJO 1.00 3,436,904 3,436,904 100.01% 3,437,252 0.00% 0
C.3.1.1 m2 Remoción de pavimentos Asfáltico 1,036.77 1,740 1,803,980 100.00% 1,803,980 0.00% 0.0
C.3.1.2 m Remoción de Obras de Drenaje Superficial 245.94 3,345 822,669 100.02% 822,843 0.00% 0.0
C.3.1.3 m Remoción de Cercos 74.00 2,791 206,534 100.00% 206,534 0.00% 0.0
C.3.1.4 Km Despeje y Limpieza de Faja 0.10 4,500,581 450,058 100.00% 450,058 0.00% 0.0
C.3.1.5 n° Reubicación de Señalización Vertical Lateral 3.00 51,221 153,663 100.11% 153,837 0.00% 0.0
3 C.3.2 MOVIMIENTO DE TIERRAS 1.00 5,244,941 5,244,941 100.00% 5,245,115 0.00% 0
C.3.2.1 m3 Excavación de Escarpe 187.12 4,936 923,624 100.00% 923,624 0.00% 0.0
C.3.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 459.34 4,936 2,267,302 100.01% 2,267,476 0.00% 0.0
C.3.2.3 m3 Excavación en TCN para Obras de Drenaje 12.35 7,766 95,910 100.00% 95,910 0.00% 0.0
C.3.2.4 m3 Formación y Compactación de Terraplenes 54.50 10,801 588,655 100.00% 588,655 0.00% 0.0
C.3.2.5 m3 Relleno Estructural 2.59 23,376 60,544 100.00% 60,544 0.00% 0.0
C.3.2.6 m2 Preparación de la Subrasante 1,454.34 900 1,308,906 100.00% 1,308,906 0.00% 0.0
3 C.3.3 CAPAS GRANULARES 1.00 5,201,046 5,201,046 100.00% 5,201,220 0.00% 0
C.3.3.1 m3 Base Granular, CBR = 80% 290.87 17,881 5,201,046 100.00% 5,201,220 0.00% 0.0
3 C.3.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 28,343,698 28,343,698 65.03% 18,432,665 6.51% 1,843,967
C.3.4.1 m2 Imprimación 1,212.38 566 686,207 100.03% 686,381 0.00% 0.0
C.3.4.2 m2 Riego de Liga 1,212.38 469 568,606 100.06% 568,952 88.74% 504,606.0
C.3.4.3 m3 Concreto Asfáltico de Rodadura 72.74 154,673 11,250,914 11.90% 1,339,361 11.90% 1,339,361.0
C.3.4.4 m3 Concreto Asfáltico Capa Intermedia 109.11 145,156 15,837,971 100.00% 15,837,971 0.00% 0.0
3 C.3.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 914,132 914,132 99.98% 913,958 0.00% 0
C.3.5.1 m3 Hormigón G05 0.05 75,880 3,794 100.00% 3,794 0.00% 0.0
C.3.5.2 m3 Hormigón G25 3.21 246,289 790,588 100.00% 790,588 0.00% 0.0
C.3.5.3 Kg Acero para Armaduras A630-420H 95.80 1,250 119,750 99.85% 119,576 0.00% 0.0
3 C.3.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 11,820,811 11,820,811 49.27% 5,824,558 30.24% 3,574,847
C.3.6.1 n° Embudos para Descargas de Agua 1.00 293,760 293,760 0.00% 0 0.00% 0.0
C.3.6.2 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 3.00 116,607 349,821 0.00% 0 0.00% 0.0
C.3.6.3 m Soleras Tipo "A" 318.00 14,709 4,677,462 0.00% 0 0.00% 0.0
C.3.6.4 Nº Rejillas para Sumideros Tipo 60-18-R 1.00 592,504 592,504 0.00% 0 0.00% 0.0
C.3.6.5 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormi 101.77 3,394 345,407 100.05% 345,581 0.00% 0.0
C.3.6.6 m3 Revestimiento de Fosos y Contrafosos 17.63 297,428 5,243,656 100.01% 5,244,003 63.69% 3,339,873.0
C.3.6.7 m Tubo de PVC Sanitario D: 315mm 13.00 24,477 318,201 73.84% 234,974 73.84% 234,974.0
3 C.3.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 13,842,047 13,842,046 0.00% 0 0.00% 0
C.3.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 5.00 146,476 732,380 0.00% 0 0.00% 0.0
C.3.7.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00% 0.0
C.3.7.3 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 4.00 1,027,331 4,109,324 0.00% 0 0.00% 0.0
C.3.7.4 n° Señales Verticales Laterales Tipo 6 ,7 m2 < Sp<=12 m2 1.00 1,537,396 1,537,396 0.00% 0 0.00% 0.0
C.3.7.5 Km Demarcación, Línea de Eje Continua Doble 0.13 1,600,206 208,027 0.00% 0 0.00% 0.0
C.3.7.6 Km Demarcación, Línea Lateral Continua 0.32 1,200,155 384,050 0.00% 0 0.00% 0.0
C.3.7.7 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 78.00 11,001 858,078 0.00% 0 0.00% 0.0
C.3.7.8 n° Tachas Reflectantes 69.00 1,600 110,400 0.00% 0 0.00% 0.0
C.3.7.9 m Valla Segregatorias con recuperación de vallas 74.00 72,160 5,339,840 0.00% 0 0.00% 0.0
3 C.3.8 ILUMINACIÓN 1.00 10,474,325 10,474,325 59.27% 6,208,443 4.16% 435,639
RA-03-3-I201 c/u Empalme por Compañía + Medidor Trifásico 1.00 1,221,415 1,221,415 0.00% 0 0.00% 0.0
RA-03-3-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 805,275 805,275 0.00% 0 0.00% 0.0
RA-03-3-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 118.40 12,597 1,491,485 100.00% 1,491,485 0.00% 0.0
RA-03-3-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA-03-3-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA-03-3-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 368.28 4,232 1,558,561 100.00% 1,558,561 0.00% 0.0
RA-03-3-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 161.40 6,007 969,530 100.00% 969,530 0.00% 0.0
RA-03-3-I231 c/u Soldadura Termofusión. 22.00 30,775 677,050 99.97% 676,876 50.94% 344,884.0
RA-03-3-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 73.81% 90,755 73.81% 90,755.0
RA-03-3-I233 c/u Tablero Control General iluminación Trifásico 1.00 2,013,921 2,013,921 0.00% 0 0.00% 0.0
RA-03-3-I234 c/u Retiro y reemplazo de luminaria existente poste galvanizado/hormigó 3.00 304,384 913,152 100.02% 913,326 0.00% 0.0
RA-03-3-I235 c/u Retiro Luminaria y Poste Metálico. 3.00 41,144 123,432 100.00% 123,432 0.00% 0.0
RA-03-3-I236 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 100.00% 6,358 0.00% 0.0
RA-03-3-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 5.00 17,856 89,280 100.00% 89,280 0.00% 0.0
RA-03-3-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 12.00 24,070 288,840 100.00% 288,840 0.00% 0.0
3 C.3.9 OBRAS COMPLEMETARIAS 1.00 10,404 10,404 100.00% 10,404 85.72% 8,918
C.3.9.2 Gl ESCALINES 2.00 5,202 10,404 100.00% 10,404 85.71% 8,918.0
MODIFICACIÓN DISEÑO GEOMETRICO RAMAL NOR-PONIENTE
2 C.4 DE ACCESO A TRAIGUÉN EN ATRAVIESO VICTORIA - 1.00 77,583,696 77,583,697 30.40% 23,585,636 12.82% 9,950,044
TRAIGUÉN
3 C.4.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,120,149 1,120,148 100.05% 1,120,669 0.00% 0
C.4.1.1 m2 Remoción de pavimentos Asfáltico 7.46 1,740 12,980 101.33% 13,153 0.00% 0.0
C.4.1.2 m Remoción de Obras de Drenaje Superficial 117.70 3,345 393,707 100.04% 393,881 0.00% 0.0
C.4.1.3 m Remoción de Cercos 46.00 2,791 128,386 100.00% 128,386 0.00% 0.0
C.4.1.4 Km Despeje y Limpieza de Faja 0.13 4,500,581 585,076 100.03% 585,249 0.00% 0.0
3 C.4.2 MOVIMIENTO DE TIERRAS 1.00 5,345,959 5,345,960 100.00% 5,345,786 8.81% 471,026
C.4.2.1 m3 Excavación de Escarpe 253.00 4,936 1,248,808 100.00% 1,248,808 0.00% 0.0
C.4.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 9.00 4,936 44,424 100.00% 44,424 0.00% 0.0
C.4.2.3 m3 Excavación en TCN para Obras de Drenaje 30.73 7,766 238,649 100.00% 238,649 0.00% 0.0
C.4.2.4 m3 Formación y Compactación de Terraplenes 245.35 10,801 2,650,025 99.99% 2,649,852 0.00% 0.0
C.4.2.5 m3 Relleno Estructural 20.15 23,376 471,026 100.00% 471,026 100.00% 471,026.0
C.4.2.6 m2 Preparación de la Subrasante 770.03 900 693,027 100.00% 693,027 0.00% 0.0
3 C.4.3 CAPAS GRANULARES 1.00 3,058,724 3,058,724 100.01% 3,058,897 0.00% 0
C.4.3.1 m3 Base Granular, CBR = 80% 171.06 17,881 3,058,724 100.01% 3,058,897 0.00% 0.0
3 C.4.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 8,557,005 8,557,006 47.61% 4,074,127 40.79% 3,490,214
C.4.4.1 m2 Imprimación 558.48 566 316,100 100.00% 316,100 0.00% 0.0
C.4.4.2 m2 Riego de Liga 368.99 469 173,056 43.69% 75,601 43.69% 75,601.0
C.4.4.3 m3 Concreto Asfáltico de Rodadura 27.92 154,673 4,318,470 0.00% 0 0.00% 0.0
C.4.4.4 m3 Concreto Asfáltico Capa Intermedia 25.83 145,156 3,749,379 98.21% 3,682,426 91.07% 3,414,613.0
3 C.4.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 1,769,540 1,769,539 100.00% 1,769,540 27.17% 480,848
C.4.5.1 m3 Hormigón G05 0.16 75,880 12,141 100.00% 12,141 0.00% 0.0
C.4.5.2 m3 Hormigón G10 0.85 78,882 67,050 100.00% 67,050 0.00% 0.0
C.4.5.3 m3 Hormigón G30 5.22 257,926 1,346,374 100.00% 1,346,374 35.71% 480,848.0
C.4.5.4 Kg Acero para Armaduras A630-420H 275.18 1,250 343,975 100.00% 343,975 0.00% 0.0
3 C.4.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 6,091,471 6,091,471 31.79% 1,936,619 31.79% 1,936,619
C.4.6.1 n° Embudos para Descargas de Agua 1.00 293,760 293,760 65.48% 192,343 65.48% 192,343.0
C.4.6.2 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 4.00 116,607 466,428 0.00% 0 0.00% 0.0
C.4.6.3 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 83.60 3,394 283,738 100.00% 283,738 100.00% 283,738.0
C.4.6.4 m3 Revestimiento de Fosos y Contrafosos 15.00 297,428 4,461,420 32.74% 1,460,538 32.74% 1,460,538.0
C.4.6.5 m Tubo de HDPE Sanitario D:400mm 15.00 24,477 367,155 0.00% 0 0.00% 0.0
C.4.6.6 n° Tapas de Cámaras 1.00 190,798 190,798 0.00% 0 0.00% 0.0
C.4.6.7 n° Suministro y Colocación de Escalines 4.00 7,043 28,172 0.00% 0 0.00% 0.0
3 C.4.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 39,248,696 39,248,696 0.00% 0 0.00% 0
C.4.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 11.00 146,476 1,611,236 0.00% 0 0.00% 0.0
C.4.7.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00% 0.0
C.4.7.3 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 2.00 1,027,331 2,054,662 0.00% 0 0.00% 0.0
C.4.7.4 n° Señales Verticales Laterales Tipo 7 ,12 m2 < Sp<= 14 m2 15.00 2,238,487 33,577,305 0.00% 0 0.00% 0.0
C.4.7.5 Km Demarcación, Línea de Eje Continua Doble 0.10 1,600,206 160,021 0.00% 0 0.00% 0.0
C.4.7.6 Km Demarcación, Línea Lateral Segmentada 0.04 1,600,206 64,008 0.00% 0 0.00% 0.0
C.4.7.7 Km Demarcación, Línea Lateral Continua 0.17 1,200,155 204,026 0.00% 0 0.00% 0.0
C.4.7.8 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 86.00 11,001 946,086 0.00% 0 0.00% 0.0
C.4.7.9 n° Tachas Reflectantes 43.00 1,600 68,800 0.00% 0 0.00% 0.0
3 C.4.8 ILUMINACIÓN 1.00 12,392,152 12,392,152 50.68% 6,279,998 28.82% 3,571,337
RA-03-4-I201 c/u Empalme por Compañía + Medidor Trifásico 1.00 1,221,415 1,221,415 0.00% 0 0.00% 0.0
RA-03-4-I207 c/u Ferretería instalación + desconectadores fusibles Trifásicos 1.00 805,275 805,275 0.00% 0 0.00% 0.0
RA-03-4-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 68.57 12,597 863,776 100.00% 863,776 0.00% 0.0
RA-03-4-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 49.91 28,707 1,432,766 0.00% 0 0.00% 0.0
RA-03-4-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 5.00 14,619 73,095 99.76% 72,921 0.00% 0.0
RA-03-4-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 5.00 238,377 1,191,885 100.01% 1,192,059 100.01% 1,192,059.0
RA-03-4-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 62.50 3,679 229,938 100.00% 229,938 0.00% 0.0
RA-03-4-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 311.80 4,232 1,319,538 100.01% 1,319,711 69.05% 911,171.0
RA-03-4-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 140.48 6,007 843,863 100.00% 843,863 0.00% 0.0
RA-03-4-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 5.00 273,789 1,368,945 100.01% 1,369,119 100.01% 1,369,119.0
RA-03-4-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 1.22 183,540 223,919 100.08% 224,092 0.00% 0.0
RA-03-4-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 16.08% 98,988 16.08% 98,988.0
RA-03-4-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00% 0.0
RA-03-4-I233 c/u Tablero Control General iluminación Trifásico 1.00 2,013,921 2,013,921 0.00% 0 0.00% 0.0
RA-03-4-I235 c/u Retiro Luminaria y Poste Metálico. 1.00 41,144 41,144 100.00% 41,144 0.00% 0.0
RA-03-4-I236 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 100.00% 6,358 0.00% 0.0
RA-03-4-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 1.00 17,856 17,856 100.97% 18,029 0.00% 0.0
C.5 HABILITACIÓN ÁREA DE ESTACIONAMIENTO RAMAL NOR-
2 1.00 19,191,475 19,191,475 30.67% 5,886,509 7.35% 1,410,426
ORIENTE ATRAVIESO VICTORIA - TRAIGUÉN
3 C.5.1 PREPARACION DEL AREA DE TRABAJO 1.00 195,227 195,227 100.00% 195,227 0.00% 0
C.5.1.1 m Remoción de Obras de Drenaje Superficial 18.00 3,345 60,210 100.00% 60,210 0.00% 0.0
C.5.1.2 Km Despeje y Limpieza de Faja 0.03 4,500,581 135,017 100.00% 135,017 0.00% 0.0
3 C.5.2 MOVIMIENTO DE TIERRAS 1.00 2,314,567 2,314,567 100.01% 2,314,914 0.00% 0
C.5.2.1 m3 Excavación de Escarpe 183.00 4,936 903,288 100.02% 903,462 0.00% 0.0
C.5.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 2.00 4,936 9,872 101.75% 10,045 0.00% 0.0
C.5.2.3 m3 Formación y Compactación de Terraplenes 107.00 10,801 1,155,707 100.00% 1,155,707 0.00% 0.0
C.5.2.4 m2 Preparación de la Subrasante 273.00 900 245,700 100.00% 245,700 0.00% 0.0
3 C.5.3 CAPAS GRANULARES 1.00 1,318,009 1,318,009 100.03% 1,318,356 59.54% 784,740
C.5.3.1 m3 Sub Base Granular, CBR = 50% 32.76 17,881 585,782 100.03% 585,955 17.87% 104,666.0
C.5.3.2 m3 Base Granular, CBR = 80% 40.95 17,881 732,227 100.02% 732,401 92.88% 680,074.0
3 C.5.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 3,799,450 3,799,450 10.11% 383,941 10.11% 383,941
C.5.4.1 m2 Imprimación 273.00 566 154,518 85.81% 132,593 85.81% 132,593.0
C.5.4.2 m3 Concreto Asfáltico de Rodadura 13.65 154,673 2,111,286 11.90% 251,348 11.90% 251,348.0
C.5.4.3 m2 Aceras de Hormigón 101.64 15,089 1,533,646 0.00% 0 0.00% 0.0
3 C.5.5 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 1,294,392 1,294,392 0.00% 0 0.00% 0
C.5.5.1 n° Soleras Tipo "A" 88.00 14,709 1,294,392 0.00% 0 0.00% 0.0
3 C.5.6 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 4,618,425 4,618,425 0.00% 0 0.00% 0
C.5.6.1 n° Señales Laterales, Tipo 1, Sp = 0.5 m2 3.00 98,470 295,410 0.00% 0 0.00% 0.0
C.5.6.2 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 33.00 11,001 363,033 0.00% 0 0.00% 0.0
C.5.6.3 n° Modificacion lateral caseta existente 2.00 1,528,226 3,056,452 0.00% 0 0.00% 0.0
C.5.6.4 n° Topes de Goma 16.00 29,416 470,656 0.00% 0 0.00% 0.0
C.5.6.5 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 13.00 33,298 432,874 0.00% 0 0.00% 0.0
3 C.5.7 ILUMINACIÓN 1.00 5,651,405 5,651,405 29.62% 1,674,071 4.28% 241,745
RA-03-5-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 64.12 12,597 807,720 100.02% 807,893 0.00% 0.0
RA-03-5-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA-03-5-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA-03-5-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 4.00 14,619 58,476 92.58% 54,138 92.58% 54,138.0
RA-03-5-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 4.00 238,377 953,508 0.00% 0 0.00% 0.0
RA-03-5-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 50.00 3,679 183,950 14.29% 26,279 14.29% 26,279.0
RA-03-5-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 197.42 4,232 835,481 0.00% 0 0.00% 0.0
RA-03-5-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 89.12 6,007 535,344 100.00% 535,344 0.00% 0.0
RA-03-5-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 4.00 273,789 1,095,156 0.00% 0 0.00% 0.0
RA-03-5-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 0.97 183,540 178,034 100.10% 178,207 88.18% 156,988.0
RA-03-5-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 0.00% 0 0.00% 0.0
RA-03-5-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00% 0.0
RA-03-5-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 3.00 24,070 72,210 100.00% 72,210 6.01% 4,340.0
2 C.8 PROLONGACIÓN CALLE DE SERVICIO YPF LADO ORIENTE 1.00 486,242,142 486,242,145 59.30% 288,334,755 6.48% 31,498,511
3 C.8.1 PREPARACION DEL AREA DE TRABAJO 1.00 7,606,409 7,606,409 100.00% 7,606,580 0.00% 0
C.8.1.1 m3 Remoción de Estructuras 4.55 43,508 197,961 100.00% 197,961 0.00% 0.0
C.8.1.2 m Remoción de ductos 10.00 22,693 226,930 100.08% 227,104 0.00% 0.0
C.8.1.3 m2 Remoción de pavimentos Asfáltico 1,072.00 1,740 1,865,280 100.00% 1,865,295 0.00% 0.0
C.8.1.4 m Remoción de Cercos 518.00 2,791 1,445,738 100.00% 1,445,738 0.00% 0.0
C.8.1.5 Km Despeje y Limpieza de Faja 0.86 4,500,581 3,870,500 100.00% 3,870,482 0.00% 0.0
3 C.8.2 MOVIMIENTO DE TIERRAS 1.00 129,441,907 129,441,907 98.30% 127,236,299 0.00% 0
C.8.2.1 m3 Excavación de Escarpe 3,234.90 4,936 15,967,466 100.00% 15,967,326 0.00% 0.0
C.8.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 436.00 4,936 2,152,096 100.00% 2,152,096 0.00% 0.0
C.8.2.3 m3 Excavación en TCN para Obras de Drenaje 195.69 7,766 1,519,729 100.00% 1,519,729 0.00% 0.0
C.8.2.4 m3 Formación y Compactación de Terraplenes 9,444.19 10,801 102,006,696 100.00% 102,007,019 0.00% 0.0
C.8.2.5 m3 Relleno Estructural 94.37 23,376 2,205,993 0.00% 0 0.00% 0.0
C.8.2.6 m2 Preparación de la Subrasante 6,211.03 900 5,589,927 100.00% 5,590,129 0.00% 0.0
3 C.8.3 CAPAS GRANULARES 1.00 22,211,957 22,211,957 100.00% 22,211,610 0.00% 0
C.8.3.1 m3 Base Granular, CBR = 80% 1,242.21 17,881 22,211,957 100.00% 22,211,610 0.00% 0.0
3 C.8.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 136,414,722 136,414,721 71.33% 97,306,740 17.61% 24,023,617
C.8.4.1 m2 Imprimación 5,263.62 566 2,979,209 100.01% 2,979,383 0.00% 0.0
C.8.4.2 m2 Riego de Liga 5,262.62 469 2,468,169 99.99% 2,467,823 37.61% 928,314.0
C.8.4.3 m3 Concreto Asfáltico de Rodadura 315.82 154,673 48,848,827 47.28% 23,095,303 47.28% 23,095,303.0
C.8.4.4 m3 Concreto Asfáltico Capa Intermedia 473.73 145,156 68,764,752 100.00% 68,764,231 0.00% 0.0
C.8.4.5 m2 Aceras de Hormigón 885.00 15,089 13,353,765 0.00% 0 0.00% 0.0
3 C.8.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 4,327,583 4,327,583 85.37% 3,694,556 66.70% 2,886,354
C.8.5.1 m3 Hormigón G05 7.24 75,880 549,371 99.97% 549,198 0.00% 0.0
C.8.5.2 m3 Hormigón G17 10.60 193,885 2,055,181 100.01% 2,055,355 100.01% 2,055,355.0
C.8.5.3 m3 Hormigón G25 4.32 246,289 1,063,968 40.49% 430,766 40.49% 430,766.0
C.8.5.4 Kg Acero para Armaduras A630-420H 527.25 1,250 659,063 100.03% 659,237 60.73% 400,233.0
3 C.8.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 65,156,347 65,156,348 7.40% 4,819,171 3.08% 2,006,215
C.8.6.1 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=0,8 36.00 69,341 2,496,276 100.01% 2,496,623 80.37% 2,006,215.0
C.8.6.2 n° Embudos para Descargas de Agua 1.00 293,760 293,760 100.00% 293,760 0.00% 0.0
C.8.6.3 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 17.40 116,607 2,028,962 99.99% 2,028,788 0.00% 0.0
C.8.6.4 m Soleras Tipo "A" 908.00 14,709 13,355,772 0.00% 0 0.00% 0.0
C.8.6.5 Nº Rejillas para Sumideros Tipo 60-18-R 6.00 592,504 3,555,024 0.00% 0 0.00% 0.0
C.8.6.6 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 759.42 3,394 2,577,471 0.00% 0 0.00% 0.0
C.8.6.7 m3 Revestimiento de Fosos y Contrafosos 132.14 297,428 39,302,136 0.00% 0 0.00% 0.0
C.8.6.8 m Tubo de PVC Sanitario D: 315mm 48.20 24,477 1,179,791 0.00% 0 0.00% 0.0
C.8.6.9 m Tubo de PVC Sanitario D: 400mm 15.00 24,477 367,155 0.00% 0 0.00% 0.0
3 C.8.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 48,474,845 48,474,845 16.45% 7,973,228 0.00% 0
C.8.7.1 m Cerco de Alambre de Púas 519.00 7,620 3,954,780 100.00% 3,954,780 0.00% 0.0
C.8.7.2 n° Portones de Dos Hojas 8.00 502,306 4,018,448 100.00% 4,018,448 0.00% 0.0
C.8.7.3 n° Señales Laterales, Tipo 2, Sp = 1 m2 10.00 146,476 1,464,760 0.00% 0 0.00% 0.0
C.8.7.4 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00% 0.0
C.8.7.5 n° Señales Verticales Laterales Tipo 8 ,14 m2 < Sp<= 20 m2 1.00 2,788,558 2,788,558 0.00% 0 0.00% 0.0
C.8.7.6 n° Delineadores verticales 5.00 81,267 406,335 0.00% 0 0.00% 0.0
C.8.7.7 Km Demarcación, Línea de Eje Continua Doble 0.05 1,600,206 80,010 0.00% 0 0.00% 0.0
C.8.7.8 Km Demarcación, Línea de Eje segmentada 0.42 550,071 231,030 0.00% 0 0.00% 0.0
C.8.7.9 Km Demarcación, Línea Lateral Segmentada 0.31 1,600,206 496,064 0.00% 0 0.00% 0.0
C.8.7.10 Km Demarcación, Línea Lateral Continua 0.39 1,200,155 468,060 0.00% 0 0.00% 0.0
C.8.7.11 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 330.00 11,001 3,630,330 0.00% 0 0.00% 0.0
C.8.7.12 n° Tachas Reflectantes 331.00 1,600 529,600 0.00% 0 0.00% 0.0
C.8.7.13 m Barreras Metálicas de Contención Laterales, de Doble Onda 20.00 39,001 780,020 0.00% 0 0.00% 0.0
C.8.7.14 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 0.00% 0 0.00% 0.0
C.8.7.15 m Barreras Laterales de Hormigón en Sitio Alta 463.00 57,568 26,653,984 0.00% 0 0.00% 0.0
3 C.8.8 ILUMINACIÓN 1.00 71,932,820 71,932,822 24.31% 17,486,571 3.59% 2,582,325
RA-03-8-I201 un Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA-03-8-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00% 0.0
RA-03-8-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00% 0.0
RA-03-8-I207 un Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA-03-8-I208 m Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 777.90 12,597 9,799,206 100.00% 9,799,380 5.95% 583,245.0
RA-03-8-I209 m Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 159.02 28,707 4,564,987 0.00% 0 0.00% 0.0
RA-03-8-I210 m Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA-03-8-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 38.00 14,619 555,522 0.00% 0 0.00% 0.0
RA-03-8-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 38.00 238,377 9,058,326 0.00% 0 0.00% 0.0
RA-03-8-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 475.00 3,679 1,747,525 0.00% 0 0.00% 0.0
RA-03-8-I224 m Provisión y montaje Cable 4 x 1 x 21,2 mm2, XTU 961.79 6,942 6,676,746 0.00% 0 0.00% 0.0
RA-03-8-I226 m Provisión y montaje Cable 2 x 1 x 42,4 mm2, XTU 1,592.19 10,623 16,913,834 0.00% 0 0.00% 0.0
RA-03-8-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 970.92 6,007 5,832,316 100.00% 5,832,316 15.87% 925,723.0
RA-03-8-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 38.00 273,789 10,403,982 0.00% 0 0.00% 0.0
RA-03-8-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 9.23 183,540 1,694,074 90.12% 1,526,750 57.48% 973,696.0
RA-03-8-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00% 0.0
RA-03-8-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00% 0.0
RA-03-8-I233 un Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA-03-8-I235 c/u Retiro Luminaria y Poste Metálico. 3.00 41,144 123,432 100.14% 123,606 0.00% 0.0
RA-03-8-I236 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 100.00% 6,358 0.00% 0.0
RA-03-8-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 3.00 17,856 53,568 100.32% 53,741 0.00% 0.0
RA-03-8-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 6.00 24,070 144,420 100.00% 144,420 69.01% 99,661.0
3 C.8.9 OBRAS COMPLEMETARIAS 1.00 675,552 675,552 0.00% 0 0.00% 0
C.8.9.2 m Limpieza de Alcantarillas y Sifones, de hasta 1 m de altura 30.70 19,252 591,036 0.00% 0 0.00% 0.0
C.8.9.3 [n°] Suministro y Colocación de Escalines 12.00 7,043 84,516 0.00% 0 0.00% 0.0
C.10 FACILIDADES PEATONALES SECTOR TRONCAL ALTO
2 1.00 297,787,985 297,787,985 55.35% 164,830,435 15.44% 45,989,071
METRENCO KM 682,720 LADO PONIENTE
3 C.10.1 PREPARACION DEL AREA DE TRABAJO 1.00 8,097,006 8,097,006 100.00% 8,096,831 0.00% 0
C.10.1.1 m2 Remoción de pavimentos Asfáltico 1,143.17 1,740 1,989,116 100.00% 1,989,116 0.00% 0.0
C.10.1.2 m Remoción de Obras de Drenaje Superficial 500.90 3,345 1,675,511 99.98% 1,675,162 0.00% 0.0
C.10.1.3 m Remoción de Barreras de Contención Laterales Metálicas 233.00 4,516 1,052,228 100.00% 1,052,228 0.00% 0.0
C.10.1.4 Km Despeje y Limpieza de Faja 0.66 4,500,581 2,970,383 100.00% 2,970,383 0.00% 0.0
C.10.1.5 nº Reubicación de Señalización Vertical Lateral 8.00 51,221 409,768 100.04% 409,942 0.00% 0.0
3 C.10.2 MOVIMIENTO DE TIERRAS 1.00 25,309,041 25,309,041 96.15% 24,335,257 0.00% 0
C.10.2.1 m3 Excavación de Escarpe 303.00 4,936 1,495,608 100.00% 1,495,608 0.00% 0.0
C.10.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 2,788.00 4,936 13,761,568 100.00% 13,761,221 0.00% 0.0
C.10.2.3 m3 Excavación en TCN para Obras de Drenaje 56.65 7,766 439,944 100.00% 439,944 0.00% 0.0
C.10.2.4 m3 Formación y Compactación de Terraplenes 408.18 10,801 4,408,752 100.00% 4,408,752 0.00% 0.0
C.10.2.5 m3 Relleno Estructural 41.65 23,376 973,610 0.00% 0 0.00% 0.0
C.10.2.6 m2 Preparación de la Subrasante 4,699.51 900 4,229,559 100.00% 4,229,732 0.00% 0.0
3 C.10.3 CAPAS GRANULARES 1.00 18,045,505 18,045,505 100.00% 18,046,200 0.00% 0
C.10.3.1 m3 Base Granular, CBR = 80% 1,009.20 17,881 18,045,505 100.00% 18,046,200 0.00% 0.0
3 C.10.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 84,996,876 84,996,876 86.76% 73,743,502 33.75% 28,687,876
C.10.4.1 m2 Imprimación 4,057.39 566 2,296,483 100.00% 2,296,483 0.00% 0.0
C.10.4.2 m2 Riego de Liga 3,287.44 469 1,541,809 99.99% 1,541,636 0.00% 0.0
C.10.4.3 m3 Concreto Asfáltico de Rodadura 230.47 154,673 35,647,486 86.19% 30,724,875 80.48% 28,687,876.0
C.10.4.4 m3 Concreto Asfáltico Capa Intermedia 269.92 145,156 39,180,508 100.00% 39,180,508 0.00% 0.0
C.10.4.5 m2 Aceras de Hormigón 419.55 15,089 6,330,590 0.00% 0 0.00% 0.0
3 C.10.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 50,109,204 50,109,204 15.09% 7,561,016 13.25% 6,639,370
C.10.5.1 m3 Hormigón G05 9.10 75,880 690,508 99.97% 690,334 4.47% 30,872.0
C.10.5.2 m3 Hormigón G17 5.77 193,885 1,118,716 4.76% 53,264 4.76% 53,264.0
C.10.5.3 m3 Hormigón G25 0.51 246,289 125,607 0.00% 0 0.00% 0.0
C.10.5.4 m3 Hormigón G30 114.08 257,926 29,424,198 0.00% 0 0.00% 0.0
C.10.5.5 Kg Acero para Armaduras A630-420H 5,873.35 1,250 7,341,688 92.86% 6,817,418 89.29% 6,555,234.0
C.10.5.6 m2 Revestimiento de Mampostería de Piedra 212.98 53,566 11,408,487 0.00% 0 0.00% 0.0
3 C.10.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 13,222,855 13,222,855 8.08% 1,068,950 8.08% 1,068,950
C.10.6.1 m Soleras Tipo "A" 222.00 14,709 3,265,398 32.74% 1,068,950 32.74% 1,068,950.0
C.10.6.2 m Soleras con Zarpa de Hormigón (Solera con Zarpa Tipo 1) 180.00 29,804 5,364,720 0.00% 0 0.00% 0.0
C.10.6.3 m Cunetas de Hormigón, Tipo Baden, Tipo 1 78.73 25,910 2,039,894 0.00% 0 0.00% 0.0
C.10.6.4 Nº Rejillas para Sumideros Tipo 60-18-R 1.00 592,504 592,504 0.00% 0 0.00% 0.0
C.10.6.5 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 34.00 3,394 115,396 0.00% 0 0.00% 0.0
C.10.6.6 m3 Revestimiento de Fosos y Contrafosos 5.92 297,428 1,760,774 0.00% 0 0.00% 0.0
C.10.6.7 m Tubo de HDPE D:315 mm 2.00 24,477 48,954 0.00% 0 0.00% 0.0
C.10.6.8 n° Suministro y Colocación de Escalines 5.00 7,043 35,215 0.00% 0 0.00% 0.0
3 C.10.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 56,031,715 56,031,716 0.00% 0 0.00% 0
C.10.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 33.00 146,476 4,833,708 0.00% 0 0.00% 0.0
C.10.7.2 n° Baliza Luminosa 4.00 1,865,691 7,462,764 0.00% 0 0.00% 0.0
C.10.7.3 Km Demarcación, Línea de Eje Continua Simple 0.33 1,200,155 396,051 0.00% 0 0.00% 0.0
C.10.7.4 Km Demarcación, Línea de Eje Mixta 0.02 1,100,142 22,003 0.00% 0 0.00% 0.0
C.10.7.5 Km Demarcación, Línea Lateral Segmentada termoplástica 0.67 1,600,206 1,072,138 0.00% 0 0.00% 0.0
C.10.7.6 Km Demarcación, Línea Lateral Continua 0.79 1,200,155 948,122 0.00% 0 0.00% 0.0
C.10.7.7 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 260.00 11,001 2,860,260 0.00% 0 0.00% 0.0
C.10.7.8 n° Tachas Reflectantes 271.00 1,600 433,600 0.00% 0 0.00% 0.0
C.10.7.9 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
C.10.7.10 m Barreras Metálicas de Contención Laterales, de Doble Onda 209.00 39,001 8,151,209 0.00% 0 0.00% 0.0
C.10.7.11 m Valla Peatonal 97.00 44,402 4,306,994 0.00% 0 0.00% 0.0
C.10.7.12 m Barreras Laterales de Hormigón en Sitio Alta 369.00 57,568 21,242,592 0.00% 0 0.00% 0.0
C.10.7.13 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 23.90 33,298 795,822 0.00% 0 0.00% 0.0
3 C.10.8 ILUMINACIÓN 1.00 41,975,783 41,975,782 76.18% 31,978,679 22.85% 9,592,875
RA03-11-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA03-11-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00% 0.0
RA03-11-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00% 0.0
RA03-11-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA03-11-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 540.30 12,597 6,806,159 99.99% 6,805,812 0.00% 0.0
RA03-11-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA03-11-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA03-11-I211 m. Provisión y montaje c.a.g. 6" ANSI C80-1 con Zanja + retape (Tuneler 12.90 305,053 3,935,184 0.00% 0 0.00% 0.0
RA03-11-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 23.00 14,619 336,237 100.05% 336,411 0.00% 0.0
RA03-11-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 23.00 238,377 5,482,671 82.54% 4,525,219 82.54% 4,525,219.0
RA03-11-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 287.50 3,679 1,057,713 100.02% 1,057,886 0.00% 0.0
RA03-11-I223 m Provisión y montaje Cable 4 x 1 x 13,3 mm2, XTU 1,542.24 5,654 8,719,825 100.00% 8,719,825 0.00% 0.0
RA03-11-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 596.20 6,007 3,581,373 100.00% 3,581,200 0.00% 0.0
RA03-11-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 23.00 273,789 6,297,147 89.52% 5,637,324 80.48% 5,067,656.0
RA03-11-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 5.59 183,540 1,025,989 100.02% 1,026,162 0.00% 0.0
RA03-11-I231 c/u Soldadura Termofusión. 24.00 30,775 738,600 0.00% 0 0.00% 0.0
RA03-11-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00% 0.0
RA03-11-I233 c/u Tablero Control General iluminación Monofásica 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA03-11-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 12.00 24,070 288,840 100.00% 288,840 0.00% 0.0
C.11 ACERA PEATONAL CALLE DE SERVICIO PONIENTE SECTOR
2 1.00 186,211,529 186,211,528 21.62% 40,249,907 4.37% 8,134,164
METRENCO ENTRE KM 682,600 - KM 683,500
3 C.11.1 PREPARACION DEL AREA DE TRABAJO 1.00 4,472,520 4,472,520 100.01% 4,473,041 0.82% 36,586
C.11.1.1 m3 Remoción de Estructuras 12.17 43,508 529,492 100.03% 529,666 0.00% 0.0
C.11.1.2 m Remoción de ductos 14.00 22,693 317,702 100.11% 318,049 0.00% 0.0
C.11.1.3 nº Remoción e instalación de Señalización Vertical Lateral 4.00 51,221 204,884 100.00% 204,884 17.86% 36,586.0
C.11.1.4 Km Despeje y Limpieza de Faja 0.76 4,500,581 3,420,442 100.00% 3,420,442 0.00% 0.0
3 C.11.2 MOVIMIENTO DE TIERRAS 1.00 19,453,321 19,453,321 97.16% 18,900,532 20.19% 3,927,136
C.11.2.1 m3 Excavación de Escarpe 442.00 4,936 2,181,712 100.01% 2,181,886 0.00% 0.0
C.11.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 1,555.00 4,936 7,675,480 100.00% 7,675,654 0.00% 0.0
C.11.2.3 m3 Excavación en TCN para Obras de Drenaje 45.91 7,766 356,537 100.00% 356,537 100.00% 356,537.0
C.11.2.4 m3 Formación y Compactación de Terraplenes 795.71 10,801 8,594,464 100.00% 8,594,637 40.48% 3,478,781.0
C.11.2.5 m3 Relleno Estructural 23.67 23,376 553,310 0.00% 0 0.00% 0.0
C.11.2.6 m2 Preparación de la Subrasante 102.02 900 91,818 100.00% 91,818 100.00% 91,818.0
3 C.11.3 CAPAS GRANULARES 1.00 364,772 364,772 40.46% 147,576 40.46% 147,576
C.11.3.2 m3 Base Granular, CBR = 80% 20.40 17,881 364,772 40.46% 147,576 40.46% 147,576.0
3 C.11.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 20,757,805 20,757,805 0.00% 0 0.00% 0
C.11.4.1 m2 Imprimación 102.02 566 57,743 0.00% 0 0.00% 0.0
C.11.4.2 m3 Concreto Asfáltico de Rodadura 6.12 154,673 946,599 0.00% 0 0.00% 0.0
C.11.4.3 m2 Aceras de Hormigón 1,309.13 15,089 19,753,463 0.00% 0 0.00% 0.0
3 C.11.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 6,437,981 6,437,981 0.56% 36,242 0.56% 36,242
C.11.5.1 m3 Hormigón G05 1.18 75,880 89,538 40.48% 36,242 40.48% 36,242.0
C.11.5.2 m3 Hormigón G17 18.35 193,885 3,557,790 0.00% 0 0.00% 0.0
C.11.5.3 m3 Hormigón G25 3.90 246,289 960,527 0.00% 0 0.00% 0.0
C.11.5.4 Kg Acero para Armaduras A630-420H 457.06 1,250 571,325 0.00% 0 0.00% 0.0
C.11.5.5 m2 Revestimiento de Mampostería de Piedra 23.50 53,566 1,258,801 0.00% 0 0.00% 0.0
3 C.11.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 57,773,778 57,773,778 0.00% 0 0.00% 0
C.11.6.1 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=0,6 6.20 41,600 257,920 0.00% 0 0.00% 0.0
C.11.6.2 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=0,8 7.00 69,341 485,387 0.00% 0 0.00% 0.0
C.11.6.3 m Soleras Tipo "A" 63.00 14,709 926,667 0.00% 0 0.00% 0.0
C.11.6.4 m Soleras con Zarpa de Hormigón (Solera con Zarpa Tipo 1) 269.00 29,804 8,017,276 0.00% 0 0.00% 0.0
C.11.6.5 m Soleras con Zarpa de Hormigón (Solera con Zarpa Tipo 3) 241.00 29,804 7,182,764 0.00% 0 0.00% 0.0
C.11.6.6 m Cunetas de Hormigón, Tipo Baden, Tipo 1 96.00 25,910 2,487,360 0.00% 0 0.00% 0.0
C.11.6.7 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 360.00 3,394 1,221,840 0.00% 0 0.00% 0.0
C.11.6.8 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 180.00 3,394 610,920 0.00% 0 0.00% 0.0
C.11.6.9 m3 Revestimiento de Fosos y Contrafosos 123.00 297,428 36,583,644 0.00% 0 0.00% 0.0
3 C.11.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 4,434,984 4,434,984 0.00% 0 0.00% 0
C.11.7.1 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 52.00 11,001 572,052 0.00% 0 0.00% 0.0
C.11.7.2 m Valla Peatonal 78.00 44,402 3,463,356 0.00% 0 0.00% 0.0
C.11.7.3 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 12.00 33,298 399,576 0.00% 0 0.00% 0.0
3 C.11.8 ILUMINACIÓN 1.00 71,386,705 71,386,704 23.38% 16,692,516 5.58% 3,986,624
RA03-12-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA03-12-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA03-12-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 628.73 12,597 7,920,112 100.00% 7,919,938 0.00% 0.0
RA03-12-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 325.66 28,707 9,348,722 0.00% 0 0.00% 0.0
RA03-12-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 37.00 14,619 540,903 90.50% 489,537 90.50% 489,537.0
RA03-12-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 36.00 238,377 8,581,572 0.00% 0 0.00% 0.0
RA03-12-I218 c/u Provisión y montaje Luminaria Vial 38 W, LED 1.00 141,294 141,294 0.00% 0 0.00% 0.0
RA03-12-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 455.00 3,679 1,673,945 4.76% 79,728 4.76% 79,728.0
RA03-12-I225 m Provisión y montaje Cable 2 x 1 x 33,6 mm2, XTU 2,576.85 8,999 23,189,073 1.59% 368,042 1.59% 368,042.0
RA03-12-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 979.39 6,007 5,883,196 100.00% 5,883,369 40.48% 2,381,363.0
RA03-12-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 36.00 273,789 9,856,404 0.00% 0 0.00% 0.0
RA03-12-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 1.00 129,331 129,331 0.00% 0 0.00% 0.0
RA03-12-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 8.99 183,540 1,650,025 100.01% 1,650,198 40.48% 667,954.0
RA03-12-I231 c/u Soldadura Termofusión. 28.00 30,775 861,700 0.00% 0 0.00% 0.0
RA03-12-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00% 0.0
RA03-12-I233 c/u Tablero Control General iluminación 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA03-12-I235 c/u Retiro Luminaria y Poste Metálico. 5.00 41,144 205,720 100.00% 205,720 0.00% 0.0
RA03-12-I236 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 102.70% 6,530 0.00% 0.0
RA03-12-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 5.00 17,856 89,280 100.19% 89,454 0.00% 0.0
3 C.11.9 OBRAS COMPLEMETARIAS 1.00 1,129,663 1,129,663 0.00% 0 0.00% 0
C.11.9.2 n° Tapas de Cámaras 1.00 190,798 190,798 0.00% 0 0.00% 0.0
C.11.9.3 n° Suministro y Colocación de Escalines 6.00 7,043 42,258 0.00% 0 0.00% 0.0
C.11.9.4 n° Empalme Sumidero a Colector o Cámara de Inspección 1.00 550,071 550,071 0.00% 0 0.00% 0.0
C.11.9.5 m Limpieza de Alcantarillas y Sifones, de hasta 1 m de altura 18.00 19,252 346,536 0.00% 0 0.00% 0.0
C.12 PANTALLAS ACUSTICAS SECTOR METRENCO ENTRE KM
2 1.00 659,522,951 659,522,951 100.00% 659,523,820 0.31% 2,065,983
683,400 - KM 684,300 LADO PONIENTE
3 C.12.1 PREPARACION DEL AREA DE TRABAJO 1.00 7,175,622 7,175,622 100.00% 7,175,796 0.00% 0
C.12.1.1 m2 Remoción de pavimentos Asfáltico 241.00 1,740 419,340 100.04% 419,514 0.00% 0.0
C.12.1.2 m Remoción de Barreras de Contención Laterales Metálicas 313.00 4,516 1,413,508 99.99% 1,413,334 0.00% 0.0
C.12.1.3 nº Remoción de Señalización Vertical Lateral 1.00 17,074 17,074 101.02% 17,248 0.00% 0.0
C.12.1.4 m Remoción de elementos mamposteria 50.00 106,514 5,325,700 100.00% 5,325,700 0.00% 0.0
3 C.12.2 MOVIMIENTO DE TIERRAS 1.00 2,697,240 2,697,240 100.02% 2,697,760 0.00% 0
C.12.2.1 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 502.50 4,936 2,480,340 100.01% 2,480,687 0.00% 0.0
C.12.2.2 m2 Preparación de la Subrasante 241.00 900 216,900 100.08% 217,073 0.00% 0.0
3 C.12.3 CAPAS GRANULARES 1.00 947,693 947,693 100.02% 947,867 0.00% 0
C.12.3.1 m3 Base Granular, CBR = 80% 53.00 17,881 947,693 100.02% 947,867 0.00% 0.0
3 C.12.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 2,001,875 2,001,876 100.02% 2,002,223 0.00% 0
C.12.4.1 m2 Imprimación 241.20 566 136,519 100.13% 136,693 0.00% 0.0
C.12.4.2 m3 Concreto Asfáltico de Rodadura 12.06 154,673 1,865,356 100.01% 1,865,530 0.00% 0.0
3 C.12.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 107,391,549 107,391,549 100.00% 107,391,202 0.00% 0
C.12.5.1 m3 Hormigón G20 466.64 195,522 91,238,386 100.00% 91,238,039 0.00% 0.0
C.12.5.2 Kg Acero para Armaduras A630-420H 12,922.53 1,250 16,153,163 100.00% 16,153,163 0.00% 0.0
3 C.12.6 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 16,953,040 16,953,040 100.00% 16,953,040 12.19% 2,065,983
C.12.6.1 m Barreras Metálicas de Contención Laterales, de Doble Onda 130.00 39,001 5,070,130 100.00% 5,070,130 0.00% 0.0
C.12.6.2 m Barreras Metálicas de Contención Laterales con recuperación, de Do 276.00 34,321 9,472,596 100.00% 9,472,596 0.00% 0.0
C.12.6.3 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 100.00% 2,410,314 85.71% 2,065,983.0
3 C.12.7 OBRAS PANTALLAS ACUSTICAS 1.00 522,355,932 522,355,932 100.00% 522,355,932 0.00% 0
C.12.7.1 m2 Pantalla Acústica MMA (h=3 m) 2,538.00 205,814 522,355,932 100.00% 522,355,932 0.00% 0.0
C.13 HABILITACIÓN ÁREA DE ESTACIONAMIENTO ENLACE QUEPE
2 1.00 90,928,945 90,928,944 37.53% 34,121,532 14.46% 13,149,398
LADO PONIENTE
3 C.13.1 PREPARACION DEL AREA DE TRABAJO 1.00 898,672 898,672 100.04% 899,020 0.00% 0
C.13.1.1 m2 Remoción de pavimentos Asfáltico 22.00 1,740 38,280 100.00% 38,280 0.00% 0.0
C.13.1.2 m Remoción de Obras de Drenaje Superficial 27.00 3,345 90,315 100.19% 90,489 0.00% 0.0
C.13.1.3 m Remoción de Barreras de Contención Laterales Metálicas 31.00 4,516 139,996 100.00% 139,996 0.00% 0.0
C.13.1.4 Km Despeje y Limpieza de Faja 0.14 4,500,581 630,081 100.03% 630,255 0.00% 0.0
3 C.13.2 MOVIMIENTO DE TIERRAS 1.00 9,725,573 9,725,573 97.30% 9,463,175 0.00% 0
C.13.2.1 m3 Excavación de Escarpe 88.00 4,936 434,368 100.00% 434,368 0.00% 0.0
C.13.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 733.00 4,936 3,618,088 100.00% 3,618,262 0.00% 0.0
C.13.2.3 m3 Excavación en TCN para Obras de Drenaje 61.63 7,766 478,619 100.00% 478,619 0.00% 0.0
C.13.2.4 m3 Formación y Compactación de Terraplenes 337.28 10,801 3,642,961 100.00% 3,643,135 0.00% 0.0
C.13.2.5 m3 Relleno Estructurante 11.24 23,376 262,746 0.00% 0 0.00% 0.0
C.13.2.6 m2 Preparación de la Subrasante 1,431.99 900 1,288,791 100.00% 1,288,791 0.00% 0.0
3 C.13.3 CAPAS GRANULARES 1.00 6,913,510 6,913,510 94.71% 6,547,749 68.25% 4,718,778
C.13.3.1 m3 Sub Base Granular, CBR = 50% 171.84 17,881 3,072,671 100.00% 3,072,671 40.48% 1,243,700.0
C.13.3.2 m3 Base Granular, CBR = 80% 214.80 17,881 3,840,839 90.48% 3,475,078 90.48% 3,475,078.0
3 C.13.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 14,831,029 14,831,029 0.20% 29,861 0.20% 29,861
C.13.4.1 m2 Imprimación 1,109.45 566 627,949 4.76% 29,861 4.76% 29,861.0
C.13.4.2 m3 Concreto Asfáltico de Rodadura 55.47 154,673 8,579,711 0.00% 0 0.00% 0.0
C.13.4.3 m2 Aceras de Hormigón 372.68 15,089 5,623,369 0.00% 0 0.00% 0.0
3 C.13.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 14,455,934 14,455,934 35.78% 5,172,810 26.32% 3,804,220
C.13.5.1 m3 Hormigón G05 1.85 75,880 140,378 100.12% 140,552 0.00% 0.0
C.13.5.2 m3 Hormigón G17 25.09 193,885 4,864,575 76.19% 3,706,434 73.34% 3,567,466.0
C.13.5.3 m3 Hormigón G25 27.01 246,289 6,652,266 0.00% 0 0.00% 0.0
C.13.5.4 Kg Acero para Armaduras A630-420H 1,060.52 1,250 1,325,650 100.01% 1,325,824 17.86% 236,754.0
C.13.5.5 m2 Revestimiento de Mampostería de Piedra 27.50 53,566 1,473,065 0.00% 0 0.00% 0.0
3 C.13.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 19,122,745 19,122,745 0.00% 0 0.00% 0
C.13.6.1 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 10.00 116,607 1,166,070 0.00% 0 0.00% 0.0
C.13.6.2 m Soleras Tipo "A" 327.00 14,709 4,809,843 0.00% 0 0.00% 0.0
C.13.6.3 Nº Rejillas para Sumideros Tipo 60-18-R 1.00 592,504 592,504 0.00% 0 0.00% 0.0
C.13.6.4 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormi 320.00 3,394 1,086,080 0.00% 0 0.00% 0.0
C.13.6.5 m3 Revestimiento de Fosos y Contrafosos 38.00 297,428 11,302,264 0.00% 0 0.00% 0.0
C.13.6.6 m Tubos Polietileno de Alta Densidad estructurados D=1,00 m 1.00 165,984 165,984 0.00% 0 0.00% 0.0
3 C.13.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 8,764,142 8,764,142 0.00% 0 0.00% 0
C.13.7.1 n° Señales Laterales, Tipo 1, Sp = 0.5 m2 4.00 98,470 393,880 0.00% 0 0.00% 0.0
C.13.7.2 Km Demarcación, Línea de Eje Continua Doble 0.11 1,600,206 176,023 0.00% 0 0.00% 0.0
C.13.7.3 Km Demarcación, Línea Lateral Continua 0.20 1,200,155 240,031 0.00% 0 0.00% 0.0
C.13.7.4 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 160.00 11,001 1,760,160 0.00% 0 0.00% 0.0
C.13.7.5 m Valla Peatonal 121.00 44,402 5,372,642 0.00% 0 0.00% 0.0
C.13.7.6 n° Topes de Goma 20.00 29,416 588,320 0.00% 0 0.00% 0.0
C.13.7.7 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 7.00 33,298 233,086 0.00% 0 0.00% 0.0
3 C.13.8 ILUMINACIÓN 1.00 16,217,340 16,217,340 74.05% 12,008,917 28.34% 4,596,539
RA-03-15-201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA-03-15-205 c/u Transformador 5 kVA 2f, norma COMPAÑÍA 1.00 1,151,499 1,151,499 0.00% 0 0.00% 0.0
RA-03-15-206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00% 0.0
RA-03-15-207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA-03-15-208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 151.24 12,597 1,905,170 100.00% 1,905,170 0.00% 0.0
RA-03-15-209 m Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 28.23 28,707 810,399 0.00% 0 0.00% 0.0
RA-03-15-213 c/u Construcción Cámara BT (CBT-xxx) 3.00 126,117 378,351 100.00% 378,351 0.00% 0.0
RA-03-15-214 c/u Provisión y montaje Cámara Paso (CP-xxx) 10.00 14,619 146,190 100.12% 146,364 0.00% 0.0
RA-03-15-216 c/u Provisión y montaje Luminaria Vial 196 W, LED 9.00 238,377 2,145,393 100.00% 2,145,393 100.00% 2,145,393.0
RA-03-15-218 c/u Provisión y montaje Luminaria Vial 38 W, LED 1.00 141,294 141,294 100.00% 141,294 77.36% 109,306.0
RA-03-15-220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 117.50 3,679 432,283 100.00% 432,283 0.00% 0.0
RA-03-15-222 m Provisión y montaje Cable 4 x 1 x 8,36 mm2, XTU 484.57 4,770 2,311,399 99.99% 2,311,225 0.00% 0.0
RA-03-15-227 m Provisión y montaje Cable Cu desnudo 16 mm2. 195.47 6,007 1,174,188 100.00% 1,174,188 0.00% 0.0
RA-03-15-229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 1.00 129,331 129,331 100.00% 129,331 77.38% 100,077.0
RA-03-15-228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 9.00 273,789 2,464,101 100.00% 2,464,101 77.37% 1,906,548.0
RA-03-15-230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 2.43 183,540 446,002 100.00% 446,002 0.00% 0.0
RA-03-15-231 c/u Soldadura Termofusión. 22.00 30,775 677,050 49.51% 335,215 49.51% 335,215.0
RA-03-15-232 c/u Cámaras Registro Malla de Puesta Tierra 2.00 40,986 81,972 0.00% 0 0.00% 0.0
RA-03-15-233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00% 0.0
2 C.14 CONEXIÓN RUTA S-199 FREIRE - VILLARICA CON RUTA 5 1.00 394,951,349 394,951,351 70.85% 279,828,122 6.53% 25,800,935
3 C.14.1 PREPARACION DEL AREA DE TRABAJO 1.00 11,455,727 11,455,728 100.01% 11,456,596 0.00% 0
C.14.1.1 m2 Remoción de pavimentos Asfáltico 1,336.17 1,740 2,324,936 100.00% 2,324,936 0.00% 0.0
C.14.1.2 m Remoción de Obras de Drenaje Superficial 210.58 3,345 704,390 100.00% 704,390 0.00% 0.0
C.14.1.3 m Remoción de Barreras de Contención Laterales Metálicas 197.00 4,516 889,652 100.00% 889,652 0.00% 0.0
C.14.1.4 nº Remoción de Señalización Vertical Lateral 13.00 17,074 221,962 100.23% 222,483 0.00% 0.0
C.14.1.5 m2 Remoción de Aceras 84.21 4,286 360,924 100.05% 361,098 0.00% 0.0
C.14.1.6 m Remoción de Cercos 464.73 2,791 1,297,061 100.01% 1,297,235 0.00% 0.0
C.14.1.7 Km Despeje y Limpieza de Faja 1.20 4,500,581 5,400,697 100.00% 5,400,697 0.00% 0.0
C.14.1.8 n° Reubicación de Señalización Vertical Lateral 5.00 51,221 256,105 100.00% 256,105 0.00% 0.0
3 C.14.2 MOVIMIENTO DE TIERRAS 1.00 69,696,002 69,696,002 100.00% 69,696,869 0.00% 0
C.14.2.1 m3 Excavación de Escarpe 1,499.09 4,936 7,399,508 100.00% 7,399,579 0.00% 0.0
C.14.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 2,105.16 4,936 10,391,070 100.00% 10,391,140 0.00% 0.0
C.14.2.3 m3 Excavación en TCN para Obras de Drenaje 17.49 7,766 135,827 100.00% 135,827 0.00% 0.0
C.14.2.4 m3 Formación y Compactación de Terraplenes 4,137.77 10,801 44,692,054 100.00% 44,692,376 0.00% 0.0
C.14.2.5 m3 Relleno Estructural 10.62 23,376 248,253 100.00% 248,253 0.00% 0.0
C.14.2.6 m2 Preparación de la Subrasante 7,588.10 900 6,829,290 100.01% 6,829,694 0.00% 0.0
3 C.14.3 CAPAS GRANULARES 1.00 27,136,563 27,136,563 100.00% 27,136,910 0.00% 0
C.14.3.1 m3 Base Granular, CBR = 80% 1,517.62 17,881 27,136,563 100.00% 27,136,910 0.00% 0.0
3 C.14.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 128,730,334 128,730,335 96.02% 123,604,300 5.28% 6,793,166
C.14.4.1 m2 Imprimación 5,816.40 566 3,292,082 99.99% 3,291,909 0.00% 0.0
C.14.4.2 m2 Riego de Liga 4,901.63 469 2,298,864 100.01% 2,299,038 0.00% 0.0
C.14.4.3 m3 Concreto Asfáltico de Rodadura 348.98 154,673 53,977,784 100.00% 53,978,131 12.59% 6,793,166.0
C.14.4.4 m3 Concreto Asfáltico Capa Intermedia 441.15 145,156 64,035,569 100.00% 64,035,222 0.00% 0.0
C.14.4.5 m2 Aceras de Hormigón 339.72 15,089 5,126,035 0.00% 0 0.00% 0.0
3 C.14.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 2,183,994 2,183,993 99.99% 2,183,820 0.00% 0
C.14.5.1 m3 Hormigón G05 0.26 75,880 19,729 100.00% 19,729 0.00% 0.0
C.14.5.2 m3 Hormigón G20 10.66 195,522 2,084,265 99.99% 2,084,091 0.00% 0.0
C.14.5.3 Kg Acero para Armaduras A630-420H 64.00 1,250 80,000 100.00% 80,000 0.00% 0.0
3 C.14.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 35,836,299 35,836,299 52.39% 18,774,711 22.88% 8,198,402
C.14.6.1 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=0,8 8.00 69,341 554,728 100.00% 554,728 0.00% 0.0
C.14.6.2 n° Embudos para Descargas de Agua 12.00 293,760 3,525,120 0.00% 0 0.00% 0.0
C.14.6.3 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 56.00 116,607 6,529,992 0.00% 0 0.00% 0.0
C.14.6.4 m Soleras Tipo "A" 864.50 14,709 12,715,931 44.90% 5,709,108 44.90% 5,709,108.0
C.14.6.5 m Construcción de Canales, Fosos y Contrafosos sin Revestir, Trapecial 140.00 3,394 475,160 100.00% 475,160 0.00% 0.0
C.14.6.6 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 216.00 3,394 733,104 100.00% 733,104 0.00% 0.0
C.14.6.7 m3 Revestimiento de Fosos y Contrafosos 38.00 297,428 11,302,264 100.00% 11,302,611 22.02% 2,489,294.0
3 C.14.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 43,407,968 43,407,968 13.69% 5,941,905 11.76% 5,103,705
C.14.7.21 m Cerco de Alambre de Púas 110.00 7,620 838,200 100.00% 838,200 0.00% 0.0
C.14.7.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 17.00 146,476 2,490,092 0.00% 0 0.00% 0.0
C.14.7.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 4.00 281,276 1,125,104 0.00% 0 0.00% 0.0
C.14.7.3 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 1.00 1,027,331 1,027,331 0.00% 0 0.00% 0.0
C.14.7.4 n° Delineadores verticales 2.00 81,267 162,534 0.00% 0 0.00% 0.0
C.14.7.5 n° Delineador Direccional Simple 4.00 82,644 330,576 0.00% 0 0.00% 0.0
C.14.7.6 n° Hitos Tubulares 3.00 36,062 108,186 0.00% 0 0.00% 0.0
C.14.7.7 n° Baliza Luminosa 2.00 1,865,691 3,731,382 0.00% 0 0.00% 0.0
C.14.7.8 Km Demarcación, Línea de Eje Continua Doble 0.16 1,600,206 256,033 0.00% 0 0.00% 0.0
C.14.7.9 Km Demarcación, Línea Lateral Segmentada 0.22 1,600,206 352,045 0.00% 0 0.00% 0.0
C.14.7.10 Km Demarcación, Línea Lateral Continua 1.35 1,200,155 1,620,209 0.00% 0 0.00% 0.0
C.14.7.11 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 302.00 11,001 3,322,302 0.00% 0 0.00% 0.0
C.14.7.12 n° Tachas Reflectantes 658.00 1,600 1,052,800 0.00% 0 0.00% 0.0
C.14.7.13 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
C.14.7.14 m Barreras Metálicas de Contención Laterales, de Doble Onda 284.00 39,001 11,076,284 0.00% 0 0.00% 0.0
C.14.7.15 m Valla Peatonal 97.00 44,402 4,306,994 0.00% 0 0.00% 0.0
C.14.7.17 n° Terminales Atenuadores Certificados 1.00 2,410,314 2,410,314 0.00% 0 0.00% 0.0
C.14.7.18 m Barreras Laterales de Hormigón en Sitio Alta 84.00 57,568 4,835,712 100.00% 4,835,712 100.00% 4,835,712.0
C.14.7.19 m Barreras Laterales de Hormigón en Sitio Baja 9.00 52,129 469,161 57.12% 267,993 57.12% 267,993.0
C.14.7.20 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 11.60 33,298 386,257 0.00% 0 0.00% 0.0
3 C.14.8 ILUMINACIÓN 1.00 76,504,462 76,504,463 27.49% 21,033,011 7.46% 5,705,662
RA-03-16-I201 un Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA-03-16-I204 c/u Transformador 15 kVA 2f, norma COMPAÑÍA 1.00 1,639,312 1,639,312 0.00% 0 0.00% 0.0
RA-03-16-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 1.00 636,606 636,606 0.00% 0 0.00% 0.0
RA-03-16-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA-03-16-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 910.36 12,597 11,467,805 100.00% 11,467,631 0.00% 0.0
RA-03-16-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA-03-16-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA-03-16-I213 c/u Construcción Cámara BT (CBT-xxx) 2.00 126,117 252,234 0.00% 0 0.00% 0.0
RA-03-16-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 42.00 14,619 613,998 0.00% 0 0.00% 0.0
RA-03-16-I215 c/u Provisión y montaje Luminaria Vial 213 W, LED 21.00 214,952 4,513,992 0.00% 0 0.00% 0.0
RA-03-16-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 27.00 238,377 6,436,179 0.00% 0 0.00% 0.0
RA-03-16-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 525.00 3,679 1,931,475 0.00% 0 0.00% 0.0
RA-03-16-I225 m Provisión y montaje Cable 2 x 1 x 33,6 mm2, XTU 1,137.62 8,999 10,237,442 0.00% 0 0.00% 0.0
RA-03-16-I226 m Provisión y montaje Cable 2 x 1 x 42,4 mm2, XTU 1,385.32 10,623 14,716,254 0.00% 0 0.00% 0.0
RA-03-16-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 959.42 6,007 5,763,236 100.00% 5,763,236 73.81% 4,253,776.0
RA-03-16-I228 c/u Instalación y provisión Poste 12m brazo simple iluminación vial 42.00 273,789 11,499,138 0.00% 0 0.00% 0.0
RA-03-16-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 10.21 183,540 1,873,943 76.19% 1,427,816 73.34% 1,374,260.0
RA-03-16-I231 c/u Soldadura Termofusión. 30.00 30,775 923,250 0.00% 0 0.00% 0.0
RA-03-16-I232 c/u Cámaras Registro Malla de Puesta Tierra 6.00 40,986 245,916 0.00% 0 0.00% 0.0
RA-03-16-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA-03-16-I234 c/u Retiro y reemplazo de luminaria existente poste galvanizado 6.00 304,384 1,826,304 100.00% 1,826,304 0.00% 0.0
RA-03-16-I237 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 100.00% 6,358 0.00% 0.0
RA-03-16-I238 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 6.00 17,856 107,136 99.84% 106,962 0.00% 0.0
RA-03-16-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 18.06 24,070 434,704 100.00% 434,704 17.86% 77,626.0
3 C.15.1 PREPARACION DEL AREA DE TRABAJO 1.00 9,529,464 9,529,464 100.00% 9,529,811 0.00% 0
C.15.1.1 m2 Remoción de pavimentos Asfáltico 675.67 1,740 1,175,666 100.00% 1,175,666 0.00% 0.0
C.15.1.2 m Remoción de Barreras de Contención Laterales Metálicas 211.00 4,516 952,876 100.00% 952,876 0.00% 0.0
C.15.1.3 nº Remoción de Señalización Vertical Lateral 2.00 17,074 34,148 100.51% 34,321 0.00% 0.0
C.15.1.4 N° Remoción de Señalización Vertical sobre la calzada 3.00 705,286 2,115,858 100.00% 2,115,858 0.00% 0.0
C.15.1.5 Km Despeje y Limpieza de Faja 0.20 4,500,581 900,116 100.00% 900,116 0.00% 0.0
C.15.1.6 nº Remoción de Estructuras 1.00 4,350,800 4,350,800 100.00% 4,350,974 0.00% 0.0
3 C.15.2 MOVIMIENTO DE TIERRAS 1.00 4,887,480 4,887,480 100.00% 4,887,480 0.00% 0
C.15.2.1 m3 Excavación de Escarpe 42.60 4,936 210,274 100.08% 210,447 0.00% 0.0
C.15.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 508.30 4,936 2,508,969 100.00% 2,508,969 0.00% 0.0
C.15.2.3 m3 Formación y Compactación de Terraplenes 83.21 10,801 898,751 100.00% 898,751 0.00% 0.0
C.15.2.4 m2 Preparación de la Subrasante 1,410.54 900 1,269,486 99.99% 1,269,313 0.00% 0.0
3 C.15.3 CAPAS GRANULARES 1.00 5,044,409 5,044,409 99.21% 5,004,381 0.00% 0
C.15.3.1 m3 Base Granular, CBR = 80% 282.11 17,881 5,044,409 99.21% 5,004,381 0.00% 0.0
3 C.15.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 19,718,679 19,718,679 79.03% 15,584,190 34.43% 6,788,490
C.15.4.1 m2 Imprimación 1,123.71 566 636,020 100.00% 636,020 0.00% 0.0
C.15.4.2 m2 Riego de Liga 868.08 469 407,130 100.00% 407,130 90.48% 368,372.0
C.15.4.3 m3 Concreto Asfáltico de Rodadura 56.14 154,673 8,683,342 65.87% 5,720,083 65.87% 5,720,083.0
C.15.4.4 m3 Concreto Asfáltico Capa Intermedia 60.77 145,156 8,821,130 100.00% 8,820,957 7.94% 700,035.0
C.15.4.5 m2 Aceras de Hormigón 77.61 15,089 1,171,057 0.00% 0 0.00% 0.0
3 C.15.5 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 3,355,693 3,355,693 82.91% 2,782,216 0.00% 0
C.15.5.1 m Soleras Tipo "A" 39.00 14,709 573,651 0.00% 0 0.00% 0.0
C.15.5.2 n° Modificacion de Altura, Camara de Inspección 2.00 1,200,223 2,400,446 100.01% 2,400,620 0.00% 0.0
C.15.5.3 n° Tapas de Cámaras 2.00 190,798 381,596 100.00% 381,596 0.00% 0.0
3 C.15.6 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 60,518,503 60,518,502 0.00% 0 0.00% 0
C.15.6.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 1.00 146,476 146,476 0.00% 0 0.00% 0.0
C.15.6.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 1.00 281,276 281,276 0.00% 0 0.00% 0.0
C.15.6.3 n° Señalización Vertical sobre la calzada 3.00 4,098,727 12,296,181 0.00% 0 0.00% 0.0
C.15.6.4 n° Marco Portaseñal 1.00 20,713,231 20,713,231 0.00% 0 0.00% 0.0
C.15.6.5 Km Demarcación, Línea Lateral Segmentada 0.29 1,600,206 464,060 0.00% 0 0.00% 0.0
C.15.6.6 Km Demarcación, Línea Lateral Continua 0.20 1,200,155 240,031 0.00% 0 0.00% 0.0
C.15.6.7 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 13.60 11,001 149,614 0.00% 0 0.00% 0.0
C.15.6.8 n° Tachas Reflectantes 131.00 1,600 209,600 0.00% 0 0.00% 0.0
C.15.6.9 m Barreras Metálicas de Contención Laterales, de Doble Onda 80.00 39,001 3,120,080 0.00% 0 0.00% 0.0
C.15.6.10 m Valla Peatonal 16.00 44,402 710,432 0.00% 0 0.00% 0.0
C.15.6.11 n° Terminales Atenuadores Certificados 2.00 2,410,314 4,820,628 0.00% 0 0.00% 0.0
C.15.6.12 m Barreras Laterales de Hormigón en Sitio Alta 293.00 57,568 16,867,424 0.00% 0 0.00% 0.0
C.15.6.13 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 15.00 33,298 499,470 0.00% 0 0.00% 0.0
3 C.15.7 ILUMINACIÓN 1.00 18,165,976 18,165,975 69.31% 12,590,709 33.48% 6,082,371
RA03-17-I201 c/u Empalme por Compañía + Medidor Trifásico 1.00 1,221,415 1,221,415 0.00% 0 0.00% 0.0
RA03-17-I207 c/u Ferretería instalación + desconectadores fusibles Trifasico 1.00 805,275 805,275 0.00% 0 0.00% 0.0
RA03-17-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 204.69 12,597 2,578,480 99.99% 2,578,306 0.00% 0.0
RA03-17-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA03-17-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA03-17-I213 c/u Construcción Cámara BT (CBT-xxx) 1.00 126,117 126,117 100.00% 126,117 0.00% 0.0
RA03-17-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 9.00 14,619 131,571 100.00% 131,571 0.00% 0.0
RA03-17-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 9.00 238,377 2,145,393 85.71% 1,838,760 85.71% 1,838,760.0
RA03-17-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 112.50 3,679 413,888 100.00% 413,888 0.00% 0.0
RA03-17-I222 m Provisión y montaje Cable 4 x 1 x 8,36 mm2, XTU 601.26 4,770 2,868,010 100.01% 2,868,184 73.81% 2,116,993.0
RA03-17-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 247.69 6,007 1,487,874 100.00% 1,487,874 0.00% 0.0
RA03-17-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 9.00 273,789 2,464,101 85.71% 2,111,938 85.71% 2,111,938.0
RA03-17-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 2.19 183,540 401,953 100.00% 401,953 0.00% 0.0
RA03-17-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 2.38% 14,680 2.38% 14,680.0
RA03-17-I232 c/u Cámaras Registro Malla de Puesta Tierra 2.00 40,986 81,972 0.00% 0 0.00% 0.0
RA03-17-I233 c/u Tablero Control General iluminación Trifásico 1.00 2,013,921 2,013,921 0.00% 0 0.00% 0.0
RA03-17-I234 c/u Retiro y reemplazo de luminaria existente poste galvanizado/hormigó 1.00 304,384 304,384 100.00% 304,384 0.00% 0.0
RA03-17-I236 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 100.00% 6,358 0.00% 0.0
RA03-17-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 1.00 17,856 17,856 100.00% 17,856 0.00% 0.0
RA03-17-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 12.00 24,070 288,840 100.00% 288,840 0.00% 0.0
C.16 PARADERO DE BUSES Y BAHÍA DE ESTACIONAMIENTO
2 1.00 16,390,336 16,390,336 79.99% 13,110,202 17.51% 2,869,326
PITRUFQUÉN, LADO ORIENTE
3 C.16.1 PREPARACION DEL AREA DE TRABAJO 1.00 732,653 732,653 100.02% 732,827 0.00% 0
C.16.1.1 m2 Remoción de Aceras 17.00 4,286 72,862 100.00% 72,862 0.00% 0.0
C.16.1.2 nº Remoción de casetas de Paraderos para la locomoción colectiva 1.00 608,570 608,570 100.00% 608,570 0.00% 0.0
C.16.1.3 n° Reubicación de Señalización Vertical Lateral 1.00 51,221 51,221 100.34% 51,395 0.00% 0.0
3 C.16.2 REVESTIMIENTOS Y PAVIMENTOS 1.00 1,116,586 1,116,586 100.02% 1,116,760 0.00% 0
C.16.2.1 m2 Aceras de Hormigón 74.00 15,089 1,116,586 100.02% 1,116,760 0.00% 0.0
3 C.16.3 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 9,816,290 9,816,290 74.43% 7,306,748 18.55% 1,820,713
C.16.3.1 n° Señales Laterales, Tipo 2, Sp = 1 m2 4.00 146,476 585,904 100.03% 586,078 100.03% 586,078.0
C.16.3.2 n° Baliza Luminosa 2.00 1,865,691 3,731,382 32.74% 1,221,492 32.74% 1,221,492.0
C.16.3.3 Km Demarcación, Líneas Segmenta de Separación de Pistas 0.10 550,071 55,007 100.00% 55,007 0.00% 0.0
C.16.3.4 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 41.00 11,001 451,041 100.04% 451,215 0.00% 0.0
C.16.3.5 n° Tachas Reflectantes 23.00 1,600 36,800 100.00% 36,800 35.71% 13,143.0
C.16.3.6 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 100.00% 3,506,452 0.00% 0.0
C.16.3.7 m Valla Peatonal 28.00 44,402 1,243,256 100.00% 1,243,256 0.00% 0.0
C.16.3.8 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 6.20 33,298 206,448 100.00% 206,448 0.00% 0.0
3 C.16.4 ILUMINACIÓN 1.00 4,724,807 4,724,807 83.68% 3,953,867 22.19% 1,048,613
RA03-18-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 38.98 12,597 491,031 100.00% 491,031 0.00% 0.0
RA03-18-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA03-18-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA03-18-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 3.00 14,619 43,857 99.60% 43,684 0.00% 0.0
RA03-18-I215 c/u Provisión y montaje Luminaria Vial 213 W, LED 1.00 214,952 214,952 100.00% 214,952 35.71% 76,769.0
RA03-18-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 2.00 238,377 476,754 100.04% 476,928 100.04% 476,928.0
RA03-18-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 37.50 3,679 137,963 100.00% 137,963 0.00% 0.0
RA03-18-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 153.85 4,232 651,093 100.00% 651,093 0.00% 0.0
RA03-18-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 81.98 6,007 492,454 100.00% 492,454 0.00% 0.0
RA03-18-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 3.00 273,789 821,367 100.00% 821,367 35.71% 293,345.0
RA03-18-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 0.73 183,540 133,984 100.00% 133,984 0.00% 0.0
RA03-18-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 32.75% 201,571 32.75% 201,571.0
RA03-18-I232 c/u Cámaras Registro Malla de Puesta Tierra 4.00 40,986 163,944 0.00% 0 0.00% 0.0
RA03-18-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 12.00 24,070 288,840 100.00% 288,840 0.00% 0.0
INSTALACIÓN CRUCE SEMAFORIZADO Y VALLAS
2 C.17 PEATONALES EN INTERSECCION ENLACE LEÓN GALLO LADO 1.00 63,557,571 63,557,571 58.08% 36,915,419 2.44% 1,549,598
ORIENTE
3 C.17.1 OBRAS DE MITIGACIÓN 1.00 63,557,571 63,557,571 58.08% 36,915,419 2.44% 1,549,598
SEM-1.1 Un Configuración Controlador Norma UOCT 2.00 5,677,681 11,355,362 0.00% 0 0.00% 0.0
SEM-1.1.1 Un Diseño proyecto comunicación de la red wan para el sistema ITS de Pi 1.00 5,000,000 5,000,000 100.00% 5,000,000 0.00% 0.0
SEM-1.1.2 Un Dispositivo en el controlador de semáforo de comunicación con el sist 1.00 10,037,124 10,037,124 0.00% 0 0.00% 0.0
SEM-1.1.3 Un Integración de unidad de comunicación al sistema de control 1.00 620,828 620,828 0.00% 0 0.00% 0.0
SEM-1.1.4 Un Reconfiguración de unidad de comunicación 1.00 541,235 541,235 0.00% 0 0.00% 0.0
SEM-2.9 m Provisión de cable NYSA 16 mm2 10.00 4,312 43,120 100.00% 43,120 0.00% 0.0
SEM-2.10 m Provisión de cable NYSA 4 mm2 para tierra 300.00 739 221,700 100.00% 221,700 0.00% 0.0
SEM-2.13 m Provisión de cable TM 3 x 16 AWG 185.00 1,740 321,900 100.00% 321,900 0.00% 0.0
SEM-2.17 m Provisión de cable TM 7 x 16 AWG 45.00 3,735 168,075 100.00% 168,075 0.00% 0.0
SEM-2.18 m Provisión de cable TM 8 x 16 AWG 350.00 4,321 1,512,350 100.00% 1,512,350 0.00% 0.0
SEM-2.20 m Provisión de cable TM 10 x 16 AWG 40.00 6,254 250,160 100.00% 250,160 0.00% 0.0
SEM-2.21 m Provisión de cable TM 12 x 16 AWG 220.00 6,299 1,385,780 100.00% 1,385,780 0.00% 0.0
SEM-2.26 Un Provisión de controlador norma UOCT 20 etapas, con gabinete 1.00 5,003,013 5,003,013 100.00% 5,003,013 0.00% 0.0
SEM-2.32 Un Provisión de gabinete remoto para terminación de cables de semáfor 1.00 372,952 372,952 100.00% 372,952 0.00% 0.0
SEM-2.34 Un Provisión de lámpara 3x200 mm de aluminio, módulos leds 8.00 366,130 2,929,040 100.00% 2,929,040 0.00% 0.0
SEM-2.38 Un Provisión de lámpara 3x200 mm + 1x300 mm de aluminio, módulos le 2.00 611,732 1,223,464 100.00% 1,223,464 0.00% 0.0
SEM-2.41 Un Provisión de lámpara peatonal 2x300 mm de aluminio, módulos leds 8.00 295,633 2,365,064 100.00% 2,365,064 0.00% 0.0
SEM-2.51 Un Provisión de poste con brazo 1.00 531,002 531,002 100.00% 531,002 0.00% 0.0
SEM-2.52 Un Provisión de poste simple peatonal 3.00 94,375 283,125 100.00% 283,125 0.00% 0.0
SEM-2.53 Un Provisión de poste simple vehicular 6.00 129,624 777,744 100.00% 777,744 0.00% 0.0
SEM-2.58 Un Provisión de soporte adosado para lámpara de semáforo 6.00 21,945 131,670 100.00% 131,670 0.00% 0.0
SEM-2.59 Un Provisión de soporte colgado para lámpara de semáforo 2.00 50,030 100,060 100.00% 100,060 0.00% 0.0
SEM-2.75 m Suministro de Tag 2" 52.00 11,825 614,900 100.00% 614,900 0.00% 0.0
SEM-2.76 m Suministro de Tag 2,5" 125.00 17,738 2,217,250 100.00% 2,217,250 0.00% 0.0
SEM-2.77 m Suministro de Tag 3" 3.00 19,330 57,990 100.00% 57,990 0.00% 0.0
SEM-2.94 Un Provisión de placa de respaldo 3 cuerpos en acero 8.00 83,005 664,040 100.00% 664,040 0.00% 0.0
SEM-2.95 Un Provisión de placa de respaldo 4 cuerpos en acero 2.00 90,964 181,928 100.00% 181,928 0.00% 0.0
SEM-2.97 Un Suministro e instalación de GPS en controlador norma UOCT 1.00 339,636 339,636 100.00% 339,636 0.00% 0.0
SEM-3.2 Un Conexión de cables de comunicación en controlador 1.00 61,401 61,401 100.00% 61,401 0.00% 0.0
SEM-3.3 Un Conexión lámparas 18.00 13,076 235,368 100.00% 235,368 0.00% 0.0
SEM-3.12 Un Construcción y montaje basamento para gabinete de controlador 1.00 329,744 329,744 16.22% 53,478 16.22% 53,478.0
SEM-3.15 cont Identificación y rotulación de cables de controlador 1.00 188,750 188,750 100.00% 188,750 0.00% 0.0
SEM-3.16 Un Instalación eléctrica controlador norma UOCT 1.00 153,502 153,502 100.00% 153,502 0.00% 0.0
SEM-3.21 m Instalación de cables NYSA 4 mm2 para tierra 300.00 898 269,400 96.41% 259,741 49.09% 132,248.0
SEM-3.22 m Instalación de cables NYSA 16 mm2 10.00 1,114 11,140 4.46% 497 4.46% 497.0
SEM-3.24 m Instalación de cable tipo TM 840.00 1,842 1,547,280 0.00% 0 0.00% 0.0
SEM-3.26 Un Instalación de lámparas poste simple o adosado 16.00 14,782 236,512 100.00% 236,512 0.00% 0.0
SEM-3.27 Un Instalación de lámparas poste con brazo 2.00 28,426 56,852 100.00% 56,852 60.71% 34,517.0
SEM-3.30 Un Instalación placa de respaldo 3 cuerpos 8.00 12,735 101,880 2.34% 2,380 2.34% 2,380.0
SEM-3.31 Un Instalación placa de respaldo 4 cuerpos 2.00 15,055 30,110 0.00% 0 0.00% 0.0
SEM-3.34 Un Instalación soporte adosado para lámpara de semáforo 5.00 5,685 28,425 90.59% 25,751 90.59% 25,751.0
SEM-3.35 Un Instalación soporte colgado para lámpara de semáforo 2.00 10,802 21,604 4.61% 996 4.61% 996.0
SEM-3.37 Un Instalación unidad de comunicación independiente en controlador 1.00 68,223 68,223 100.25% 68,397 0.00% 0.0
SEM-3.44 Un Montaje de poste con brazo 1.00 185,339 185,339 100.00% 185,339 100.00% 185,339.0
SEM-3.45 Un Montaje de poste vehicular o peatonal 9.00 63,675 573,075 26.98% 154,637 26.98% 154,637.0
SEM-4.9 Un Instalación de interruptor automático de 10A 1.00 6,822 6,822 0.00% 0 0.00% 0.0
SEM-4.11 Un Suministro de interruptor automático de 10A 1.00 10,233 10,233 0.00% 0 0.00% 0.0
SEM-4.23 Un Construcción de cámara de acera 0,6 x 0,7 m 1.00 341,114 341,114 100.00% 341,114 100.00% 341,114.0
SEM-4.24 Un Construcción de cámara de acera 0,6 x 1,1 m 7.00 363,855 2,546,985 100.01% 2,547,159 24.29% 618,641.0
SEM-4.28 m Construcción e instalación de canalización bajo acera 135.00 24,788 3,346,380 99.99% 3,346,206 0.00% 0.0
SEM-4.30 m Construcción e instalación de canalización bajo calzada 44.00 52,304 2,301,376 100.00% 2,301,376 0.00% 0.0
SEM-5.7 int/ Mediciones periódicas de flujo peatonal 8.00 206,943 1,655,544 0.00% 0 0.00% 0.0
C.18 DISEÑO GEOMETRICO BAJO ESTRUCTURA PS LEÓN GALLO Y
2 1.00 63,638,609 63,638,609 74.30% 47,285,202 18.98% 12,076,890
FACILIDADES PEATONALES KM 701,500
3 C.18.1 PREPARACION DEL AREA DE TRABAJO 1.00 2,859,416 2,859,416 99.99% 2,859,242 0.00% 0
C.18.1.1 m3 Remoción de Estructuras 3.66 43,508 159,239 100.00% 159,239 0.00% 0.0
C.18.1.2 m2 Remoción de pavimentos Asfáltico 472.47 1,740 822,098 100.00% 822,098 0.00% 0.0
C.18.1.3 m Remoción de Obras de Drenaje Superficial 167.25 3,345 559,451 100.00% 559,451 0.00% 0.0
C.18.1.4 nº Reubicación de Señalización Vertical Lateral 5.00 51,221 256,105 100.00% 256,105 0.00% 0.0
C.18.1.5 m2 Remoción de Aceras 161.00 4,286 690,046 99.97% 689,872 0.00% 0.0
C.18.1.6 Km Despeje y Limpieza de Faja 0.06 4,500,581 270,035 100.00% 270,035 0.00% 0.0
C.18.1.7 Nº Reubicación de Señalización Vertical Lateral 2.00 51,221 102,442 100.00% 102,442 0.00% 0.0
3 C.18.2 MOVIMIENTO DE TIERRAS 1.00 5,299,217 5,299,218 100.00% 5,299,391 0.00% 0
C.18.2.1 m3 Excavación de Escarpe 1.00 4,936 4,936 100.00% 4,936 0.00% 0.0
C.18.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 374.00 4,936 1,846,064 100.00% 1,846,064 0.00% 0.0
C.18.2.3 m3 Excavación en TCN para Obras de Drenaje 100.70 7,766 782,036 100.00% 782,036 0.00% 0.0
C.18.2.4 m3 Formación y Compactación de Terraplenes 48.30 10,801 521,688 100.03% 521,862 0.00% 0.0
C.18.2.5 m3 Relleno Estructural 61.50 23,376 1,437,624 100.00% 1,437,624 0.00% 0.0
C.18.2.6 m2 Preparación de la Subrasante 785.41 900 706,869 100.00% 706,869 0.00% 0.0
3 C.18.3 CAPAS GRANULARES 1.00 2,808,747 2,808,747 100.01% 2,808,921 0.00% 0
C.18.3.1 m3 Base Granular, CBR = 80% 157.08 17,881 2,808,747 100.01% 2,808,921 0.00% 0.0
3 C.18.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 21,548,966 21,548,966 98.59% 21,245,485 27.07% 5,833,369
C.18.4.1 m2 Imprimación 785.41 566 444,542 100.00% 444,542 0.00% 0.0
C.18.4.2 m2 Riego de Liga 785.41 469 368,357 100.00% 368,357 0.00% 0.0
C.18.4.3 m3 Concreto Asfáltico de Rodadura 47.12 154,673 7,288,192 100.00% 7,288,365 40.48% 2,950,052.0
C.18.4.4 m3 Concreto Asfáltico Capa Intermedia 70.69 145,156 10,261,078 100.00% 10,260,904 0.00% 0.0
C.18.4.5 m2 Aceras de Hormigón 211.20 15,089 3,186,797 90.48% 2,883,317 90.48% 2,883,317.0
3 C.18.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 986,816 986,816 100.02% 986,990 0.00% 0
C.18.5.1 m3 Hormigón G05 0.27 75,880 20,488 100.00% 20,488 0.00% 0.0
C.18.5.2 m3 Hormigón G25 2.97 246,289 731,478 100.00% 731,478 0.00% 0.0
C.18.5.3 Kg Acero para Armaduras A630-420H 187.88 1,250 234,850 100.07% 235,024 0.00% 0.0
3 C.18.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 10,079,505 10,079,505 78.54% 7,916,354 32.13% 3,238,694
C.18.6.1 m Soleras con Zarpa de Hormigón 39.00 29,804 1,162,356 100.00% 1,162,356 100.00% 1,162,356.0
C.18.6.2 Nº Rejillas para Sumideros Tipo 60-18-R 5.00 592,504 2,962,520 26.98% 799,369 26.98% 799,369.0
C.18.6.3 m Tubo de PVC Sanitario D: 315mm 20.00 24,477 489,540 100.00% 489,540 0.00% 0.0
C.18.6.4 m Tubo de PVC Sanitario D: 400mm 68.00 24,477 1,664,436 100.00% 1,664,436 0.00% 0.0
C.18.6.5 N° Construcción de Cámara de Inspección Tipo B 1.00 477,062 477,062 100.00% 477,062 0.00% 0.0
C.18.6.6 N° Modificacion de Altura, Camara de Inspección 1.00 1,200,223 1,200,223 100.00% 1,200,223 0.00% 0.0
C.18.6.7 N° Tapas de Cámaras 2.00 190,798 381,596 100.00% 381,596 0.00% 0.0
C.18.6.8 N° Suministro y Colocación de Escalines 13.00 7,043 91,559 100.00% 91,559 0.00% 0.0
C.18.6.9 N° Empalme Sumidero a Colector o Cámara de Inspección 3.00 550,071 1,650,213 100.00% 1,650,213 77.38% 1,276,969.0
3 C.18.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 6,392,910 6,392,910 23.62% 1,509,961 23.62% 1,509,961
C.18.7.1 n° Señales Laterales, Tipo 1, Sp = 0.5 m2 2.00 98,470 196,940 4.78% 9,419 4.78% 9,419.0
C.18.7.2 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 1.00 281,276 281,276 4.76% 13,394 4.76% 13,394.0
C.18.7.3 n° Señales Laterales, Tipo 4, 2 = Sp = 3 m2 1.00 373,078 373,078 4.76% 17,757 4.76% 17,757.0
C.18.7.4 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 1.00 1,027,331 1,027,331 4.76% 48,904 4.76% 48,904.0
C.18.7.5 Km Demarcación, Línea de Eje Continua Doble 0.08 1,600,206 128,016 100.14% 128,190 100.14% 128,190.0
C.18.7.6 Km Demarcación, Línea de Eje segmentada 0.02 550,071 11,001 101.59% 11,176 101.59% 11,176.0
C.18.7.7 Km Demarcación, Línea Lateral Continua 0.30 1,200,155 360,047 100.05% 360,220 100.05% 360,220.0
C.18.7.8 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 81.00 11,001 891,081 90.48% 806,208 90.48% 806,208.0
C.18.7.9 n° Tachas Reflectantes 10.00 1,600 16,000 100.00% 16,000 100.00% 16,000.0
C.18.7.10 m Valla Peatonal 70.00 44,402 3,108,140 3.18% 98,693 3.18% 98,693.0
3 C.18.8 ILUMINACIÓN 1.00 11,162,709 11,162,708 41.74% 4,658,858 13.39% 1,494,866
RA03-20-I208 m Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 34.79 12,597 438,250 100.04% 438,423 0.00% 0.0
RA03-20-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA03-20-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 60.86 35,649 2,169,598 0.00% 0 0.00% 0.0
RA03-20-I212 m3 Fabricación dado Hormigón Armado H 30 0,3x0,3x1,0 canalizaciones 1.04 20,826 21,659 0.00% 0 0.00% 0.0
RA03-20-I213 c/u Construcción Cámara BT (CBT-xxx) 2.00 126,117 252,234 100.00% 252,234 92.86% 234,230.0
RA03-20-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 2.00 14,619 29,238 100.00% 29,238 92.86% 27,150.0
RA03-20-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 2.00 238,377 476,754 0.00% 0 0.00% 0.0
RA03-20-I219 c/u Provisión y montaje Luminaria Vial 38 W, LED 8.00 141,294 1,130,352 0.00% 0 0.00% 0.0
RA03-20-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 65.00 3,679 239,135 85.72% 204,998 85.72% 204,998.0
RA03-20-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 258.26 4,232 1,092,956 85.73% 936,993 85.73% 936,993.0
RA03-20-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 120.65 6,007 724,745 100.00% 724,745 0.00% 0.0
RA03-20-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 8.00 129,331 1,034,648 4.76% 49,285 4.76% 49,285.0
RA03-20-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 2.00 273,789 547,578 4.76% 26,088 4.76% 26,088.0
RA03-20-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 0.49 183,540 89,935 100.19% 90,108 17.93% 16,122.0
RA03-20-I231 c/u Soldadura Termofusión. 26.00 30,775 800,150 0.00% 0 0.00% 0.0
RA03-20-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 0.00% 0 0.00% 0.0
RA03-20-I234 c/u Retiro y reemplazo de luminaria existente poste galvanizado/hormigó 5.00 304,384 1,521,920 100.01% 1,522,094 0.00% 0.0
RA03-20-I236 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 100.00% 6,358 0.00% 0.0
RA03-20-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 5.00 17,856 89,280 100.19% 89,454 0.00% 0.0
RA03-20-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 12.00 24,070 288,840 100.00% 288,840 0.00% 0.0
3 C.18.9 OBRAS COMPLEMETARIAS 1.00 2,500,323 2,500,323 0.00% 0 0.00% 0
C.18.9.2 Gl Reubicación Poste Metálico Existente con cámara seguridad y normaliza 1.00 2,500,323 2,500,323 0.00% 0 0.00% 0.0
C.19 DG INT. LADO PONIENTE CALLE LEÓN GALLO, ARTURO PRAT
2 1.00 43,637,288 43,637,286 47.97% 20,932,708 9.45% 4,125,180
Y BLANCO ENCALADA DM. 701.500
3 C.19.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,699,851 1,699,850 100.03% 1,700,371 0.00% 0
C.19.1.1 m2 Remoción de pavimentos Asfáltico 153.57 1,740 267,212 100.06% 267,385 0.00% 0.0
C.19.1.2 m Remoción de Obras de Drenaje Superficial 175.90 3,345 588,386 100.03% 588,560 0.00% 0.0
C.19.1.3 nº Remoción de Señalización Vertical Lateral 2.00 17,074 34,148 100.00% 34,148 0.00% 0.0
C.19.1.4 Km Despeje y Limpieza de Faja 0.18 4,500,581 810,105 100.02% 810,278 0.00% 0.0
3 C.19.2 MOVIMIENTO DE TIERRAS 1.00 4,941,474 4,941,474 100.02% 4,942,342 0.00% 0
C.19.2.1 m3 Excavación de Escarpe 33.00 4,936 162,888 100.11% 163,062 0.00% 0.0
C.19.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 255.00 4,936 1,258,680 100.01% 1,258,854 0.00% 0.0
C.19.2.3 m3 Excavación en TCN para Obras de Drenaje 140.06 7,766 1,087,706 100.02% 1,087,880 0.00% 0.0
C.19.2.4 m3 Formación y Compactación de Terraplenes 3.57 10,801 38,560 100.45% 38,733 0.00% 0.0
C.19.2.5 m3 Relleno Estructural 90.00 23,376 2,103,840 100.00% 2,103,840 0.00% 0.0
C.19.2.6 m2 Preparación de la Subrasante 322.00 900 289,800 100.06% 289,973 0.00% 0.0
3 C.19.3 CAPAS GRANULARES 1.00 1,151,358 1,151,358 100.00% 1,151,358 0.00% 0
C.19.3.1 m3 Base Granular, CBR = 80% 64.39 17,881 1,151,358 100.00% 1,151,358 0.00% 0.0
3 C.19.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 6,125,904 6,125,904 58.96% 3,611,958 33.82% 2,072,045
C.19.4.1 m2 Imprimación 321.94 566 182,218 100.00% 182,218 0.00% 0.0
C.19.4.2 m2 Riego de Liga 321.94 469 150,990 100.00% 150,990 100.00% 150,990.0
C.19.4.3 m3 Concreto Asfáltico de Rodadura 19.32 154,673 2,988,282 15.87% 474,336 15.87% 474,336.0
C.19.4.4 m3 Concreto Asfáltico Capa Intermedia 19.32 145,156 2,804,414 100.00% 2,804,414 51.59% 1,446,719.0
3 C.19.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 831,250 831,249 100.02% 831,424 0.00% 0
C.19.5.1 m3 Hormigón G05 0.14 75,880 10,623 100.00% 10,623 0.00% 0.0
C.19.5.2 m3 Hormigón G25 2.59 246,289 637,889 100.00% 637,889 0.00% 0.0
C.19.5.3 Kg Acero para Armaduras A630-420H 146.19 1,250 182,738 100.10% 182,912 0.00% 0.0
3 C.19.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 8,849,836 8,849,837 69.14% 6,118,549 19.26% 1,704,658
C.19.6.1 m Soleras Tipo "A" 185.70 14,709 2,731,461 0.00% 0 0.00% 0.0
C.19.6.2 Nº Rejillas para Sumideros Tipo 60-18-R 3.00 592,504 1,777,512 99.99% 1,777,338 90.47% 1,608,068.0
C.19.6.3 m Tubos Polietileno de Alta Densidad estructurados D=0,30 m 4.50 91,286 410,787 100.04% 410,961 0.00% 0.0
C.19.6.4 m Tubo de HDPE Sanitario D:400mm 106.20 24,477 2,599,457 100.00% 2,599,457 0.00% 0.0
C.19.6.5 N° Construcción de Cámara de Inspección Tipo B 1.00 477,062 477,062 100.00% 477,062 0.00% 0.0
C.19.6.6 N° Tapas de Cámaras 1.00 190,798 190,798 100.09% 190,972 0.00% 0.0
C.19.6.7 N° Suministro y Colocación de Escalines 16.00 7,043 112,688 100.00% 112,688 85.71% 96,590.0
C.19.6.8 N° Empalme Sumidero a Colector o Cámara de Inspección 1.00 550,071 550,071 100.00% 550,071 0.00% 0.0
3 C.19.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 11,171,037 11,171,038 0.00% 0 0.00% 0
C.19.7.1 n° Señales Laterales, Tipo 1, Sp = 0.5 m2 6.00 98,470 590,820 0.00% 0 0.00% 0.0
C.19.7.2 n° Baliza Luminosa 2.00 1,865,691 3,731,382 0.00% 0 0.00% 0.0
C.19.7.3 Km Demarcación, Línea de Eje Continua Simple 0.01 1,200,155 12,002 0.00% 0 0.00% 0.0
C.19.7.4 Km Demarcación, Línea de Eje segmentada 0.09 550,071 49,506 0.00% 0 0.00% 0.0
C.19.7.5 Km Demarcación, Línea Lateral Segmentada 0.03 1,600,206 48,006 0.00% 0 0.00% 0.0
C.19.7.6 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 492.00 11,001 5,412,492 0.00% 0 0.00% 0.0
C.19.7.7 n° Tachas Reflectantes 268.00 1,600 428,800 0.00% 0 0.00% 0.0
C.19.7.8 m Valla Peatonal 20.00 44,402 888,040 0.00% 0 0.00% 0.0
C.19.7.9 m Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 0.30 33,298 9,989 0.00% 0 0.00% 0.0
3 C.19.8 ILUMINACIÓN 1.00 8,866,578 8,866,578 29.06% 2,576,706 3.93% 348,477
RA03-21-I201 c/u Empalme por Compañía + Medidor Monofásico 1.00 428,041 428,041 0.00% 0 0.00% 0.0
RA03-21-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 1.00 281,717 281,717 0.00% 0 0.00% 0.0
RA03-21-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 97.65 12,597 1,230,097 100.01% 1,230,271 0.00% 0.0
RA03-21-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 44.62 28,707 1,280,906 0.00% 0 0.00% 0.0
RA03-21-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA03-21-I212 m3 Fabricación dado Hormigón Armado H 30 0,3x0,3x1,0 canalizaciones 2.37 20,826 49,358 0.00% 0 0.00% 0.0
RA03-21-I213 c/u Construcción Cámara BT (CBT-xxx) 1.00 126,117 126,117 40.46% 51,027 40.46% 51,027.0
RA03-21-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 5.00 14,619 73,095 40.38% 29,516 40.38% 29,516.0
RA03-21-I215 c/u Provisión y montaje Luminaria Vial 213 W, LED 5.00 214,952 1,074,760 0.00% 0 0.00% 0.0
RA03-21-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 400.33 4,232 1,694,197 0.00% 0 0.00% 0.0
RA03-21-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 145.46 6,007 873,778 100.00% 873,778 0.00% 0.0
RA03-21-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 1.22 183,540 223,919 100.08% 224,092 100.08% 224,092.0
RA03-21-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 0.00% 0 0.00% 0.0
RA03-21-I232 c/u Cámaras Registro Malla de Puesta Tierra 4.00 40,986 163,944 0.00% 0 0.00% 0.0
RA03-21-I233 c/u Tablero Control General iluminación Monofásico 1.00 476,354 476,354 0.00% 0 0.00% 0.0
RA03-21-I236 gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 100.00% 6,358 0.00% 0.0
RA03-21-I237 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 5.00 17,856 89,280 100.19% 89,454 0.00% 0.0
RA03-21-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 3.00 24,070 72,210 100.00% 72,210 60.71% 43,842.0
C.20 PARADERO DE TAXI Y SEGREGACIÓN PEATONAL SECTOR
2 1.00 38,125,597 38,125,594 60.54% 23,080,266 12.90% 4,917,196
PITRUFQUÉN KM 701,500
3 C.20.1 PREPARACION DEL AREA DE TRABAJO 1.00 1,049,494 1,049,494 100.00% 1,049,494 0.00% 0
C.20.1.1 m2 Remoción de pavimentos Asfáltico 85.16 1,740 148,178 100.00% 148,178 0.00% 0.0
C.20.1.2 m Remoción de Obras de Drenaje Superficial 58.75 3,345 196,519 100.00% 196,519 0.00% 0.0
C.20.1.3 nº Remoción de casetas de Paraderos para la locomoción colectiva 1.00 608,570 608,570 100.00% 608,570 0.00% 0.0
C.20.1.4 Km Despeje y Limpieza de Faja 0.01 4,500,581 45,006 100.00% 45,006 0.00% 0.0
C.20.1.5 nº Reubicación de Señalización Vertical Lateral 1.00 51,221 51,221 100.00% 51,221 0.00% 0.0
3 C.20.2 MOVIMIENTO DE TIERRAS 1.00 5,658,024 5,658,024 100.01% 5,658,723 0.00% 0
C.20.2.1 m3 Excavación de Escarpe 169.00 4,936 834,184 100.02% 834,358 0.00% 0.0
C.20.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 68.90 4,936 340,090 100.05% 340,264 0.00% 0.0
C.20.2.3 m3 Excavación en TCN para Obras de Drenaje 0.39 7,766 3,029 105.88% 3,207 0.00% 0.0
C.20.2.4 m3 Formación y Compactación de Terraplenes 377.00 10,801 4,071,977 100.00% 4,071,977 0.00% 0.0
C.20.2.5 m2 Preparación de la Subrasante 454.16 900 408,744 100.04% 408,917 0.00% 0.0
3 C.20.3 CAPAS GRANULARES 1.00 2,186,310 2,186,310 100.01% 2,186,483 0.00% 0
C.20.3.1 m3 Sub Base Granular, CBR = 50% 54.34 17,881 971,654 100.02% 971,827 0.00% 0.0
C.20.3.2 m3 Base Granular, CBR = 80% 67.93 17,881 1,214,656 100.00% 1,214,656 0.00% 0.0
3 C.20.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 6,077,391 6,077,390 76.04% 4,621,524 14.01% 851,672
C.20.4.1 m2 Imprimación 454.16 566 257,055 100.07% 257,228 0.00% 0.0
C.20.4.2 m3 Concreto Asfáltico de Rodadura 22.71 154,673 3,512,624 100.00% 3,512,624 0.00% 0.0
C.20.4.3 m2 Aceras de Hormigón 152.94 15,089 2,307,712 36.91% 851,672 36.91% 851,672.0
3 C.20.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 32,877 32,877 100.00% 32,877 0.00% 0
C.20.5.1 m3 Hormigón G05 0.05 75,880 3,794 100.00% 3,794 0.00% 0.0
C.20.5.2 m3 Hormigón G17 0.15 193,885 29,083 100.00% 29,083 0.00% 0.0
3 C.20.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 2,734,979 2,734,979 93.94% 2,569,277 82.34% 2,252,097
C.20.6.1 m Soleras Tipo "A" 143.00 14,709 2,103,387 99.99% 2,103,213 84.91% 1,786,033.0
C.20.6.2 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormi 11.70 3,394 39,710 73.49% 29,182 73.49% 29,182.0
C.20.6.3 m3 Revestimiento de Fosos y Contrafosos 1.99 297,428 591,882 73.81% 436,882 73.81% 436,882.0
3 C.20.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 8,055,202 8,055,202 5.71% 460,017 5.71% 460,017
C.20.7.1 n° Señales Laterales, Tipo 1, Sp = 0.5 m2 4.00 98,470 393,880 0.00% 0 0.00% 0.0
C.20.7.2 n° Señales Laterales, Tipo 2, Sp = 1 m2 2.00 146,476 292,952 0.00% 0 0.00% 0.0
C.20.7.3 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 2.00 281,276 562,552 0.00% 0 0.00% 0.0
C.20.7.4 Km Demarcación, Líneas Segmenta de Separación de Pistas 0.03 550,071 16,502 74.59% 12,308 74.59% 12,308.0
C.20.7.5 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 51.50 11,001 566,552 73.81% 418,169 73.81% 418,169.0
C.20.7.6 n° Tachas Reflectantes 25.00 1,600 40,000 73.85% 29,540 73.85% 29,540.0
C.20.7.7 n° Casetas para Paraderos de Locomoción Colectiva tipo Grau 1.00 3,506,452 3,506,452 0.00% 0 0.00% 0.0
C.20.7.8 m Valla Peatonal 48.00 44,402 2,131,296 0.00% 0 0.00% 0.0
C.20.7.9 n° Topes de Goma 14.00 29,416 411,824 0.00% 0 0.00% 0.0
C.20.7.10 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 4.00 33,298 133,192 0.00% 0 0.00% 0.0
3 C.20.8 ILUMINACIÓN 1.00 12,331,320 12,331,319 52.73% 6,501,871 10.98% 1,353,410
RA03-22-I200 un Empalme por Compañía + Medidor Trifasico 1.00 1,221,415 1,221,415 0.00% 0 0.00% 0.0
RA03-22-I207 c/u Ferretería instalación + desconectadores fusibles Trifásicos 1.00 805,275 805,275 0.00% 0 0.00% 0.0
RA03-22-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 77.73 12,597 979,165 100.00% 979,165 0.00% 0.0
RA03-22-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 22.07 28,707 633,563 0.00% 0 0.00% 0.0
RA03-22-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA03-22-I212 m3 Fabricación dado Hormigón Armado H 30 0,3x0,3x1,0 canalizaciones 2.28 20,826 47,483 0.00% 0 0.00% 0.0
RA03-22-I213 c/u Construcción Cámara BT (CBT-xxx) 1.00 126,117 126,117 100.00% 126,117 0.00% 0.0
RA03-22-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 7.00 14,619 102,333 100.00% 102,333 0.00% 0.0
RA03-22-I215 c/u Provisión y montaje Luminaria Vial 279 W, LED 2.00 214,952 429,904 100.00% 429,904 100.00% 429,904.0
RA03-22-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 1.00 238,377 238,377 57.16% 136,265 57.16% 136,265.0
RA03-22-I218 c/u Provisión y montaje Luminaria Vial 38 W, LED 4.00 141,294 565,176 0.00% 0 0.00% 0.0
RA03-22-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 57.50 3,679 211,543 100.00% 211,543 0.00% 0.0
RA03-22-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 309.96 4,232 1,311,751 100.00% 1,311,751 0.00% 0.0
RA03-22-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 139.80 6,007 839,779 100.00% 839,779 0.00% 0.0
RA03-22-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 4.00 129,331 517,324 100.00% 517,324 0.00% 0.0
RA03-22-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 3.00 273,789 821,367 100.00% 821,367 44.05% 361,776.0
RA03-22-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 1.70 183,540 312,018 100.00% 312,018 0.00% 0.0
RA03-22-I231 c/u Soldadura Termofusión. 22.00 30,775 677,050 62.84% 425,465 62.84% 425,465.0
RA03-22-I232 c/u Cámaras Registro Malla de Puesta Tierra 2.00 40,986 81,972 0.00% 0 0.00% 0.0
RA03-22-I233 c/u Tablero Control General iluminación Trifásica 1.00 2,013,921 2,013,921 0.00% 0 0.00% 0.0
RA03-22-II301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 12.00 24,070 288,840 100.00% 288,840 0.00% 0.0
C.21 ATRAVIESO PEATONAL ESTACION PITRUFQUEN LADO
2 1.00 22,046,670 22,046,670 94.01% 20,725,600 28.08% 6,190,391
ORIENTE KM 701,900
3 C.21.1 PREPARACION DEL AREA DE TRABAJO 1.00 780,468 780,468 100.00% 780,468 0.00% 0
C.21.1.1 m Remoción de Obras de Drenaje Superficial 15.50 3,345 51,848 100.00% 51,848 0.00% 0.0
C.21.1.2 m2 Remoción de Aceras 170.00 4,286 728,620 100.00% 728,620 0.00% 0.0
3 C.21.2 MOVIMIENTO DE TIERRAS 1.00 16,289 16,289 100.00% 16,289 0.00% 0
C.21.2.1 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 3.30 4,936 16,289 100.00% 16,289 0.00% 0.0
3 C.21.3 CAPAS GRANULARES 1.00 180,240 180,240 100.00% 180,240 0.00% 0
C.21.3.1 m3 Base Granular, CBR = 80% 10.08 17,881 180,240 100.00% 180,240 0.00% 0.0
3 C.21.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 1,045,969 1,045,969 100.00% 1,045,969 0.00% 0
C.21.4.1 m2 Aceras de Hormigón 69.32 15,089 1,045,969 100.00% 1,045,969 0.00% 0.0
3 C.21.5 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 2,112,019 2,112,019 100.01% 2,112,193 0.00% 0
C.21.5.1 m Soleras Tipo "A" 15.00 14,709 220,635 100.08% 220,809 0.00% 0.0
C.21.5.2 m Canaleta con Rejilla de Acero Inoxidable 8.00 236,423 1,891,384 100.00% 1,891,384 0.00% 0.0
3 C.21.6.1 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 9,615,865 9,615,865 98.61% 9,482,453 41.71% 4,010,875
C.21.6.1.1 n° Señales Laterales, Tipo 1, Sp = 0.5 m2 6.00 98,470 590,820 100.00% 590,820 5.96% 35,209.0
C.21.6.1.2 n° Baliza Luminosa 2.00 1,865,691 3,731,382 96.42% 3,597,970 90.47% 3,375,880.0
C.21.6.1.3 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas Termoplastic 180.00 11,001 1,980,180 100.00% 1,980,180 0.00% 0.0
C.21.6.1.4 m Valla Peatonal 46.00 44,402 2,042,492 100.00% 2,042,492 29.37% 599,786.0
C.21.6.1.5 m2 Baldosa Pododáctil tipo MINVU color amarillo 40x40 cm 30.00 33,298 998,940 100.00% 998,940 0.00% 0.0
C.21.6.1.6 gl Resalto plano 1.00 272,051 272,051 100.00% 272,051 0.00% 0.0
3 C.21.7 PAISAJISMO 1.00 1,636,987 1,636,987 100.00% 1,636,987 0.00% 0
C.21.7.1 Gl Obras de reposición de áreas verde 1.00 1,636,987 1,636,987 100.00% 1,636,987 0.00% 0.0
3 C.21.8 ILUMINACIÓN 1.00 4,158,510 4,158,510 93.11% 3,871,933 17.84% 742,056
RA03-23-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 38.05 12,597 479,316 100.00% 479,316 0.00% 0.0
RA03-23-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 3.00 28,707 86,121 0.00% 0 0.00% 0.0
RA03-23-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA03-23-I214 c/u Provisión y montaje Cámara Paso (CP-xxx) 2.00 14,619 29,238 100.00% 29,238 0.00% 0.0
RA03-23-I218 c/u Provisión y montaje Luminaria Vial 38 W, LED 2.00 141,294 282,588 99.94% 282,414 0.00% 0.0
RA03-23-I219 c/u Provisión y montaje Luminaria Vial 41,2 W, LED, ANTIVANDALICA 6.00 35,873 215,238 100.00% 215,238 77.41% 166,611.0
RA03-23-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 10.00 3,679 36,790 100.00% 36,790 0.00% 0.0
RA03-23-I221 m Provisión y montaje Cable 4 x 1 x 5,26 mm2, XTU 246.37 4,232 1,042,638 100.00% 1,042,638 0.00% 0.0
RA03-23-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 81.05 6,007 486,867 100.00% 486,867 0.00% 0.0
RA03-23-I229 c/u Instalación y provisión Poste 4,5m brazo simple iluminación Peatonal 2.00 129,331 258,662 100.00% 258,662 0.00% 0.0
RA03-23-I230 m3 Fundaciones y Anclajes postes metálicos 0,7x0,7x1,5 postes 12 m + c 0.45 183,540 82,593 100.00% 82,593 0.00% 0.0
RA03-23-I231 c/u Soldadura Termofusión. 20.00 30,775 615,500 100.06% 615,847 88.74% 546,169.0
RA03-23-I232 c/u Cámaras Registro Malla de Puesta Tierra 3.00 40,986 122,958 23.81% 29,276 23.81% 29,276.0
RA03-23-I237. Gl Retiro y normalización circuito alimentador postes Iluminación existen 1.00 6,358 6,358 100.00% 6,358 0.00% 0.0
RA03-23-I238 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 1.00 17,856 17,856 100.00% 17,856 0.00% 0.0
RA03-23-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 12.00 24,070 288,840 100.00% 288,840 0.00% 0.0
3 C.21.9 OBRAS COMPLEMETARIAS 1.00 2,500,323 2,500,323 63.95% 1,599,068 57.49% 1,437,460
C.21.9.2 GL Reubicación Poste Metálico Existente con cámara seguridad y normaliza 1.00 2,500,323 2,500,323 63.95% 1,599,068 57.49% 1,437,460.0
2 C.22 RAMALES ATRAVIESO QUINTA FAJA, GORBEA KM 717,000 1.00 481,920,373 481,920,373 84.47% 407,073,860 13.09% 63,081,614
3 C.22.1 PREPARACION DEL AREA DE TRABAJO 1.00 17,953,518 17,953,519 100.00% 17,953,016 0.44% 79,229
C.22.1.1 m3 Remoción de Estructuras 11.06 43,508 481,198 99.96% 481,025 0.00% 0.0
C.22.1.2 m2 Remoción de pavimentos Asfáltico 2,711.00 1,740 4,717,140 100.00% 4,717,140 0.00% 0.0
C.22.1.3 m Remoción de Obras de Drenaje Superficial 163.00 3,345 545,235 99.97% 545,061 0.00% 0.0
C.22.1.4 m Remoción de Barreras de Contención Laterales Metálicas 608.00 4,516 2,745,728 99.99% 2,745,554 0.00% 0.0
C.22.1.5 nº Remoción de Señalización Vertical Lateral 5.00 17,074 85,370 100.00% 85,370 0.00% 0.0
C.22.1.6 m Remoción de Cercos 187.00 2,791 521,917 100.00% 521,917 0.00% 0.0
C.22.1.7 Km Despeje y Limpieza de Faja 1.82 4,500,581 8,191,057 100.00% 8,191,076 0.00% 0.0
C.22.1.8 n° Reubicación de Señalización Vertical Lateral 13.00 51,221 665,873 100.00% 665,873 11.90% 79,229.0
3 C.22.2 MOVIMIENTO DE TIERRAS 1.00 62,918,134 62,918,134 99.76% 62,768,350 1.43% 901,646
C.22.2.1 m3 Excavación de Escarpe 2,695.00 4,936 13,302,520 100.00% 13,302,731 0.00% 0.0
C.22.2.2 m3 Excavación de Corte en Terreno de Cualquier Naturaleza 728.50 4,936 3,595,876 100.00% 3,595,946 0.00% 0.0
C.22.2.3 m3 Excavación en TCN para Obras de Drenaje 40.63 7,766 315,533 100.00% 315,533 0.00% 0.0
C.22.2.4 m3 Formación y Compactación de Terraplenes 3,420.37 10,801 36,943,416 100.00% 36,943,524 0.00% 0.0
C.22.2.5 m3 Relleno Estructural 45.00 23,376 1,051,920 85.71% 901,646 85.71% 901,646.0
C.22.2.6 m2 Preparación de la Subrasante 8,565.41 900 7,708,869 100.00% 7,708,970 0.00% 0.0
3 C.22.3 CAPAS GRANULARES 1.00 30,631,583 30,631,583 100.00% 30,631,236 0.00% 0
C.22.3.1 m3 Base Granular, CBR = 80% 1,713.08 17,881 30,631,583 100.00% 30,631,236 0.00% 0.0
3 C.22.4 REVESTIMIENTOS Y PAVIMENTOS 1.00 125,511,269 125,511,269 100.00% 125,510,749 0.00% 0
C.22.4.1 m2 Imprimación 6,263.62 566 3,545,209 100.00% 3,545,209 0.00% 0.0
C.22.4.2 m2 Riego de Liga 4,717.11 469 2,212,325 99.99% 2,212,152 0.00% 0.0
C.22.4.3 m3 Concreto Asfáltico de Rodadura 375.82 154,673 58,129,207 100.00% 58,129,033 0.00% 0.0
C.22.4.4 m3 Concreto Asfáltico Capa Intermedia 424.54 145,156 61,624,528 100.00% 61,624,355 0.00% 0.0
3 C.22.5 PUENTES Y ESTRUCTURAS Y OBRAS CONEXAS 1.00 15,142,488 15,142,488 100.00% 15,143,184 32.01% 4,847,314
C.22.5.1 m3 Hormigón G05 1.00 75,880 75,880 100.23% 76,054 0.00% 0.0
C.22.5.2 m3 Hormigón G17 73.20 193,885 14,192,382 100.00% 14,192,556 31.63% 4,489,482.0
C.22.5.3 Kg Acero para Armaduras A630-420H 228.00 1,250 285,000 100.06% 285,174 0.00% 0.0
C.22.5.4 m2 Revestimiento de Mampostería de Piedra 11.00 53,566 589,226 100.03% 589,400 60.73% 357,832.0
3 C.22.6 DRENAJE Y PROTECCION DE LA PLATAFORMA 1.00 12,309,957 12,309,957 63.59% 7,827,425 33.39% 4,110,890
C.22.6.1 m Tubos de Base Plana de Alta Resistencia de Hormigón Simple D=1,0 37.00 88,800 3,285,600 100.01% 3,285,947 0.00% 0.0
C.22.6.2 n° Embudos para Descargas de Agua 3.00 293,760 881,280 40.47% 356,638 40.47% 356,638.0
C.22.6.3 m Descargas de Agua en Tubos Corrugados de Media Caña, D = 0,60 12.00 116,607 1,399,284 60.32% 844,054 60.32% 844,054.0
C.22.6.4 m Soleras Tipo "A" 149.00 14,709 2,191,641 100.01% 2,191,815 80.36% 1,761,227.0
C.22.6.5 m Construcción de Canales, Fosos y Contrafosos sin Revestir 132.00 3,394 448,008 60.30% 270,150 60.30% 270,150.0
C.22.6.6 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 64.00 3,394 217,216 40.50% 87,983 40.50% 87,983.0
C.22.6.7 m Construcción de Canales, Fosos y Contrafosos a Revestir con Hormig 6.00 3,394 20,364 41.03% 8,354 41.03% 8,354.0
C.22.6.8 m3 Revestimiento de Fosos y Contrafosos 13.00 297,428 3,866,564 20.24% 782,484 20.24% 782,484.0
3 C.22.7 ELEMENTOS DE CONTROL Y SEGURIDAD 1.00 81,261,614 81,261,613 62.49% 50,783,827 49.29% 40,052,533
C.22.7.1 m Cerco de Alambre de Púas 80.00 7,620 609,600 100.03% 609,774 0.00% 0.0
C.22.7.2 n° Señales Laterales, Tipo 2, Sp = 1 m2 17.00 146,476 2,490,092 0.00% 0 0.00% 0.0
C.22.7.3 n° Señales Laterales, Tipo 3, 1 = Sp = 2 m2 9.00 281,276 2,531,484 0.00% 0 0.00% 0.0
C.22.7.4 n° Señales Laterales, Tipo 4, 2 = Sp = 3 m2 1.00 373,078 373,078 0.00% 0 0.00% 0.0
C.22.7.5 n° Señales Verticales Laterales Tipo 5 ,3 m2 < Sp<= 7 m2 6.00 1,027,331 6,163,986 0.00% 0 0.00% 0.0
C.22.7.6 n° Señales Verticales Laterales Tipo 7 ,12 m2 < Sp<= 14 m2 2.00 2,238,487 4,476,974 0.00% 0 0.00% 0.0
C.22.7.7 n° Señales Verticales Laterales Tipo 8 ,14 m2 < Sp<= 20 m2 1.00 2,788,558 2,788,558 0.00% 0 0.00% 0.0
C.22.7.8 n° Señales Verticales Laterales Tipo 9, 25 m2 < Sp<= 30 m2 1.00 4,098,727 4,098,727 0.00% 0 0.00% 0.0
C.22.7.9 n° Delineadores verticales 14.00 81,267 1,137,738 0.00% 0 0.00% 0.0
C.22.7.10 n° Delineador Direccional Simple 7.00 82,644 578,508 0.00% 0 0.00% 0.0
C.22.7.11 n° Hito de Vértice 1.00 51,545 51,545 0.00% 0 0.00% 0.0
C.22.7.12 Km Demarcación, Línea Lateral Segmentada 0.94 1,600,206 1,504,194 26.98% 405,891 26.98% 405,891.0
C.22.7.13 Km Demarcación, Línea Lateral Continua 1.76 1,200,155 2,112,273 26.98% 569,932 26.98% 569,932.0
C.22.7.14 m2 Demarcación, Líneas, Achurados, Símbolos y Leyendas 318.00 11,001 3,498,318 26.98% 943,952 26.98% 943,952.0
C.22.7.15 n° Tachas Reflectantes 507.00 1,600 811,200 26.99% 218,939 26.99% 218,939.0
C.22.7.16 m Barreras Metálicas de Contención Laterales, de Doble Onda 963.00 39,001 37,557,963 100.00% 37,558,137 80.36% 30,180,646.0
C.22.7.18 m Barreras Laterales de Hormigón en Sitio Alta 182.00 57,568 10,477,376 100.00% 10,477,202 73.81% 7,733,173.0
3 C.22.8 PAISAJISMO 1.00 1,636,987 1,636,987 36.19% 592,461 36.19% 592,461
C.22.8.1 Gl Obras de reposición de áreas verde 1.00 1,636,987 1,636,987 36.19% 592,461 36.19% 592,461.0
3 C.22.9 ILUMINACIÓN 1.00 131,554,436 131,554,436 72.87% 95,863,612 9.50% 12,497,541
RA03-24-I201 c/u Empalme por Compañía + Medidor Monofásico 2.00 428,041 856,082 0.00% 0 0.00% 0.0
RA03-24-I204 c/u Transformador 10 kVA 2f, norma COMPAÑÍA 1.00 1,567,301 1,567,301 0.00% 0 0.00% 0.0
RA03-24-I205 c/u Transformador 5 kVA 2f, norma COMPAÑÍA 1.00 1,151,499 1,151,499 0.00% 0 0.00% 0.0
RA03-24-I206 c/u Suministro y montaje postes para Transformador Bifásico/Trifasico 3.00 636,606 1,909,818 0.00% 0 0.00% 0.0
RA03-24-I207 c/u Ferretería instalación + desconectadores fusibles Bifásicos 2.00 281,717 563,434 0.00% 0 0.00% 0.0
RA03-24-I208 m. Provisión y montaje PVC 50 mm Sch40 con zanja + ladrillos + retape 1,471.36 12,597 18,534,722 100.00% 18,534,896 0.00% 0.0
RA03-24-I209 m. Provisión y montaje c.a.g. 2" ANSI C80.1 con zanja + retape 307.70 28,707 8,833,144 0.00% 0 0.00% 0.0
RA03-24-I210 m. Provisión y montaje c.a.g. 1 1/4" ANSI C80-1 (Poste Trafo) 3.00 35,649 106,947 0.00% 0 0.00% 0.0
RA03-24-I213 c/u Construcción Cámara BT (CBT-xxx) 12.00 126,117 1,513,404 100.05% 1,514,098 0.00% 0.0
RA03-24-I216 c/u Provisión y montaje Luminaria Vial 196 W, LED 62.00 238,377 14,779,374 32.99% 4,876,107 32.99% 4,876,107.0
RA03-24-I220 m Provisión y montaje Cable 3 x 1 x 3.31 mm2, XTU (P/V) (10m) 775.00 3,679 2,851,225 100.00% 2,851,225 0.00% 0.0
RA03-24-I223 m Provisión y montaje Cable 4 x 1 x 13,3 mm2, XTU 878.81 5,654 4,968,792 100.00% 4,968,965 0.00% 0.0
RA03-24-I224 m Provisión y montaje Cable 4 x 1 x 21,2 mm2, XTU 2,155.96 6,942 14,966,674 100.00% 14,966,848 0.00% 0.0
RA03-24-I226 m Provisión y montaje Cable 2 x 1 x 42,4 mm2, XTU 1,801.09 10,623 19,132,979 100.00% 19,133,153 0.00% 0.0
RA03-24-I227 m Provisión y montaje Cable Cu desnudo 16 mm2. 1,662.21 6,007 9,984,895 100.00% 9,984,895 0.00% 0.0
RA03-24-I228 c/u Instalación y provisión Poste 11m brazo simple iluminación vial 62.00 273,789 16,974,918 53.09% 9,012,781 40.24% 6,830,314.0
RA03-24-I231 c/u Soldadura Termofusión. 44.00 30,775 1,354,100 0.00% 0 0.00% 0.0
RA03-24-I232 c/u Cámaras Registro Malla de Puesta Tierra 13.00 40,986 532,818 0.00% 0 0.00% 0.0
RA03-24-I233 c/u Tablero Control General iluminación monofásico 2.00 476,354 952,708 0.00% 0 0.00% 0.0
RA03-24-I234 c/u Retiro y reemplazo de luminaria existente poste galvanizado/hormigó 23.00 304,384 7,000,832 100.00% 7,001,006 0.00% 0.0
RA03-24-I235 c/u Retiro Luminaria y Poste Metálico. 8.00 41,144 329,152 100.00% 329,152 0.00% 0.0
RA03-24-I236 c/u Reubicación Poste Metálico existente con Luminaria 1.00 2,965 2,965 105.88% 3,139 0.00% 0.0
RA03-24-I237 gl Retiro y normalización circuito alimentador postes Iluminación existen 3.00 6,358 19,074 101.82% 19,421 0.00% 0.0
RA03-24-I238 c/u Entrega en lugar de acopio brazos metálicos + iluminación vial 27.00 17,856 482,112 100.04% 482,286 0.00% 0.0
RA03-24-I240 km CONTRUCCIÓN NUEVA LÍNEA MT + CABLES MT +ELEM ELÉCTRI 0.28 7,031,559 1,968,837 100.01% 1,969,010 40.18% 791,120.0
RA03-24-I301 m Provisión y montaje c.a.g. 1 1/2" ANSI C80.1 con zanja + retape 9.00 24,070 216,630 100.00% 216,630 0.00% 0.0
3 C.22.10 OBRAS COMPLEMETARIAS 1.00 3,000,387 3,000,387 0.00% 0 0.00% 0
C.22.10.2 n° Postes SOS 1.00 3,000,387 3,000,387 0.00% 0 0.00% 0.0
RUTA 5 COLLIPULLI - GORBEA
Jun-22
Producción Anterior
% Avance Importe
48.27% 3,963,122,759 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22
70.26% 341,467,388 -
76.30% 136,568,937 -
76.30% 136,568,937 17
0.00% 0 18 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0%
0.00% 0 19 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0%
0.00% 0 20 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0%
0.00% 0 21 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0%
100.00% 24,449,769 22 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 23 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 24 0.0% 0.0% 0.0% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9%
0.00% 0 25 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 26 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.04% 883,166 27 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.01% 1,710,597 28 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
58.84% 10,660,304 29 0.0% 58.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
5.95% 319,614 30 0.0% 6.0% 96.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 31 0.0% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 4,613,292 32 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 48,044,190 33 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 13,647,437 34 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 23,592,941 35 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
64.00% 3,145,189 36 10.7% 64.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 5,218,042 37 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 38 0.0% 0.0% 22.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 39 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 40 0.0% 0.0% 0.0% 11.1% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 41 0.0% 0.0% 0.0% 11.1% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 284,396 42 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
72.10% 38,254,840 -
72.10% 38,254,840 554
0.00% 0 556 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
0.00% 0 557 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
0.00% 0 558 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
0.00% 0 559 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
100.01% 5,311,746 561 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 562 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 563 0.0% 0.0% 0.0% 0.0% 3.6% 94.0% 100.0% 100.0% 100.0%
0.00% 0 564 0.0% 0.0% 0.0% 0.0% 87.3% 100.0% 100.0% 100.0% 100.0%
100.02% 882,993 565 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.05% 321,792 566 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
100.00% 5,244,468 568 3.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
9.52% 154,520 569 0.0% 9.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 570 0.0% 0.0% 43.6% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9%
100.00% 1,214,070 571 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 11,661,206 572 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 3,886,529 573 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 6,023,358 575 80.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
99.99% 1,422,467 576 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 981,939 577 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
7.14% 61,538 578 0.0% 7.1% 98.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 579 0.0% 0.0% 12.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 581 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 389,934 583 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 698,280 584 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
57.51% 29,514,849 -
57.51% 29,514,849 739
0.00% 0 741 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
0.00% 0 742 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
0.00% 0 743 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
0.00% 0 744 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
100.00% 4,953,392 746 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 747 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 748 0.0% 0.0% 0.0% 0.0% 25.4% 100.0% 100.0% 100.0% 100.0%
0.00% 0 749 0.0% 0.0% 0.0% 0.0% 7.2% 100.2% 100.2% 100.2% 100.2%
0.00% 0 750 0.0% 0.0% 0.0% 0.0% 25.4% 100.0% 100.0% 100.0% 100.0%
0.00% 0 751 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0%
100.00% 630,585 752 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.06% 292,554 753 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
0.00% 0 755 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 756 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 757 0.0% 0.0% 0.0% 0.0% 81.0% 100.0% 100.0% 100.0% 100.0%
100.00% 1,103,700 758 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 6,130,636 759 67.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 4,838,956 760 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 3,848,752 761 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
9.52% 521,486 763 0.0% 9.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 764 0.0% 0.0% 43.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 892,004 765 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 766 0.0% 0.0% 0.0% 62.5% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 767 0.0% 0.0% 0.0% 25.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 769 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 5,571,897 771 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 95,913 772 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.03% 634,974 773 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
31.59% 11,402,783 -
31.59% 11,402,783 2,888
0.00% 0 2,889 0.0% 0.0% 0.0% 0.0% 0.0% 29.8% 100.0% 100.0% 100.0%
0.00% 0 2,890 0.0% 0.0% 0.0% 0.0% 0.0% 29.8% 100.0% 100.0% 100.0%
0.00% 0 2,891 0.0% 0.0% 0.0% 0.0% 0.0% 29.8% 100.0% 100.0% 100.0%
0.00% 0 2,892 0.0% 0.0% 0.0% 0.0% 0.0% 29.8% 100.0% 100.0% 100.0%
100.00% 4,045,149 2,894 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 2,895 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
0.00% 0 2,896 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
0.00% 0 2,897 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 2,898 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
0.00% 0 2,900 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 2,901 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 2,902 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 2,903 0.0% 0.0% 0.0% 0.0% 99.9% 99.9% 99.9% 99.9% 99.9%
0.00% 0 2,904 0.0% 0.0% 3.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 2,905 0.0% 0.0% 3.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 2,906 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 3,190,738 2,907 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 2,909 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 2,910 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 2,911 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
39.29% 210,547 2,912 0.0% 39.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 2,913 0.0% 0.0% 0.0% 0.0% 56.5% 100.0% 100.0% 100.0% 100.0%
0.00% 0 2,914 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
0.00% 0 2,916 0.0% 0.0% 0.0% 0.0% 0.0% 97.7% 100.0% 100.0% 100.0%
99.99% 3,448,162 2,918 99.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.07% 508,187 2,919 14.3% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
81.19% 73,247,133 -
2857.62% 80,465,124 1,207
100.30% 58,046 1,208 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3%
100.00% 139,152 1,209 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.05% 343,390 1,210 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
100.00% 68,296 1,211 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 1,217,140 1,212 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 990,128 1,213 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 17,479,421 1,214
100.00% 2,991,216 1,215 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.03% 693,731 1,216 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 13,794,474 1,217 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
76.19% 12,486,726 1,218
76.19% 12,486,726 1,219 33.6% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 1,640,348 1,220
100.00% 1,640,348 1,221 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,222
0.00% 0 1,223 0.0% 0.0% 0.0% 61.1% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,224 0.0% 0.0% 41.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,225 0.0% 0.0% 20.5% 72.9% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,226 0.0% 0.0% 0.0% 0.0% 41.9% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,227 0.0% 0.0% 54.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
30.41% 7,217,991 1,228
0.00% 0 1,230 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
0.00% 0 1,231 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
100.00% 3,216,770 1,233 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,234 0.0% 0.0% 0.0% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,235 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0%
92.08% 430,735 1,236 0.0% 92.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,238 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
9.53% 45,566 1,239 0.0% 9.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
6.35% 193,949 1,240 0.0% 6.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.01% 1,758,783 1,241 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,243 0.0% 0.0% 19.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
99.99% 1,427,768 1,244 81.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,245 0.0% 0.0% 0.0% 43.3% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,246 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,248 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0%
100.00% 144,420 1,250 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 -
0.00% 0 2,876
0.00% 0 2,877 0.0% 0.0% 88.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 2,878
0.00% 0 2,879 0.0% 0.0% 0.0% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9%
0.00% 0 2,880 0.0% 0.0% 0.0% 20.8% 100.0% 100.0% 100.0% 100.0% 100.0%
68.11% 47,666,852 -
100.01% 3,174,653 3,009
100.00% 66,900 3,010 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 126,448 3,011 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 139,550 3,012 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 2,790,360 3,013 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.34% 51,395 3,014 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3%
100.00% 32,909,776 3,015
99.99% 8,533,823 3,016 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 49,360 3,017 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 264,044 3,018 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 21,061,776 3,019 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.01% 3,000,773 3,020 43.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 3,021
0.00% 0 3,022 0.0% 0.0% 39.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
39.62% 1,545,287 3,023
100.00% 227,640 3,024 34.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
7.14% 181,223 3,025 0.0% 7.1% 98.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.02% 1,136,424 3,026 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1.82% 85,509 3,027
0.00% 0 3,028 0.0% 0.0% 0.0% 58.4% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 3,029 0.0% 0.0% 0.0% 29.2% 100.0% 100.0% 100.0% 100.0% 100.0%
2.86% 85,509 3,030 0.0% 2.9% 43.1% 85.0% 100.0% 100.0% 100.0% 100.0% 100.0%
60.85% 9,951,627 3,031
100.00% 9,449,147 3,032 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.03% 502,480 3,033 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 3,034 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
0.00% 0 3,035 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
0.00% 0 3,036 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
0.00% 0 3,037 0.0% 0.0% 0.0% 0.0% 47.6% 100.0% 100.0% 100.0% 100.0%
37.67% 1,697,216,779 -
49.20% 58,629,946 127 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
100.00% 2,605,597 134 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
100.00% 73,964 135 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 136,158 136 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 183,975 137 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 2,160,279 138 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 51,221 139 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 16,301,108 140
100.00% 3,045,512 141 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 202,376 142 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 132,100 143 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 12,602,565 144 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.05% 318,555 145 96.9% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
94.05% 13,559,200 146
94.05% 13,559,200 147 51.9% 94.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.01% 3,380,909 148
101.15% 15,350 149 101.1% 101.1% 101.1% 101.1% 101.1% 101.1% 101.1% 101.1% 101.1%
99.99% 2,328,385 150 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.02% 1,037,174 151 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
68.20% 9,708,138 152
1.19% 14,481 153 0.0% 1.2% 86.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 154 0.0% 0.0% 0.0% 91.7% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 502,312 155 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 8,982,152 156 23.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
15.08% 209,193 157 0.0% 15.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.01% 4,762 158
0.00% 0 159 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 160 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
0.00% 0 161 0.0% 0.0% 11.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1.59% 4,762 162 0.0% 1.6% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9%
42.37% 13,070,232 163
0.00% 0 164 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
0.00% 0 165 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
100.00% 5,286,253 166 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 167 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
0.00% 0 168 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
0.00% 0 169 0.0% 0.0% 0.0% 0.0% 0.0% 89.8% 99.2% 99.2% 99.2%
100.00% 252,234 170 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 511,665 171 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 172 0.0% 0.0% 0.0% 55.6% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 533,455 173 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
36.31% 1,874,144 174 0.0% 36.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 2,863,717 175 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 176 0.0% 0.0% 21.1% 81.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.03% 1,562,446 177 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 178 0.0% 0.0% 0.0% 27.8% 95.2% 100.0% 100.0% 100.0% 100.0%
0.00% 0 179 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
0.00% 0 180 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
97.30% 6,186 181 97.3% 97.3% 97.3% 97.3% 97.3% 97.3% 97.3% 97.3% 97.3%
100.00% 35,712 182 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 144,420 183 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
32.38% 51,632,744 -
100.00% 11,356,709 1,126
100.00% 617,814 1,127 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
99.94% 306,182 1,128 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9%
100.00% 7,417,324 1,129 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 3,015,389 1,130 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
96.30% 22,955,986 1,131
100.00% 4,259,768 1,132 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 365,779 1,133 84.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 18,112,718 1,134 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,135 0.0% 0.0% 0.0% 58.3% 100.0% 100.0% 100.0% 100.0% 100.0%
100.08% 217,721 1,136 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
100.00% 943,580 1,137
100.00% 419,309 1,138 84.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 524,271 1,139 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.32% 52,643 1,140
47.59% 52,643 1,141 0.0% 47.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,142 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,143 0.0% 0.0% 0.0% 19.4% 90.5% 100.0% 100.0% 100.0% 100.0%
9.35% 751,552 1,144
99.92% 231,260 1,145 0.0% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9%
0.00% 0 1,146 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,147 0.0% 0.0% 6.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
47.62% 520,292 1,148 0.0% 47.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1.63% 682,348 1,149
31.74% 682,348 1,150 0.0% 31.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,151 0.0% 0.0% 65.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,152 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,153 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,154 0.0% 0.0% 16.3% 86.1% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,155 0.0% 0.0% 0.0% 43.3% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,156 0.0% 0.0% 0.0% 0.0% 71.5% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,157 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,158 0.0% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0% 100.0%
26.24% 3,337,386 1,159
99.99% 3,337,386 1,160 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,161 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,162 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,163 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
27.88% 11,552,540 1,164
0.00% 0 1,165 0.0% 0.0% 0.0% 0.0% 0.0% 97.7% 100.0% 100.0% 100.0%
0.00% 0 1,166 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
0.00% 0 1,167 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
0.00% 0 1,168 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
100.00% 4,994,962 1,169 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,170 0.0% 0.0% 0.0% 29.2% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,171 0.0% 0.0% 0.0% 0.0% 21.4% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,172 0.0% 0.0% 0.0% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0%
88.11% 111,124 1,173 0.0% 88.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 511,665 1,174 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,175 0.0% 0.0% 0.0% 38.9% 100.0% 100.0% 100.0% 100.0% 100.0%
9.53% 50,822 1,176 0.0% 9.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,177 0.0% 0.0% 39.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 4,177,448 1,178 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,179 0.0% 0.0% 16.3% 86.1% 100.0% 100.0% 100.0% 100.0% 100.0%
100.01% 1,562,099 1,180 93.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,181 0.0% 0.0% 0.0% 23.3% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,182 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,183 0.0% 0.0% 0.0% 0.0% 21.4% 100.0% 100.0% 100.0% 100.0%
100.00% 144,420 1,184 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,185
0.00% 0 1,186 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
46.63% 9,353,744 -
46.63% 9,353,744 1,355
0.00% 0 1,356 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,357 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,358 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,359 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,360 0.0% 0.0% 0.0% 0.0% 96.8% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,361 0.0% 0.0% 0.0% 0.0% 96.8% 100.0% 100.0% 100.0% 100.0%
100.00% 378,351 1,362 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,363 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,364 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
26.19% 659,781 1,365 0.0% 26.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
26.19% 593,463 1,366 0.0% 26.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.01% 1,590,046 1,367 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,368 0.0% 0.0% 0.0% 75.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,369 0.0% 0.0% 0.0% 50.0% 100.1% 100.1% 100.1% 100.1% 100.1%
0.00% 0 1,370 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 5,624,437 1,371 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
99.97% 507,666 1,372 84.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
69.24% 295,123,579 -
99.50% 21,535,984 1,258
100.00% 58,301 1,259 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.01% 1,316,368 1,260 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 8,253,499 1,261 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.03% 621,809 1,262 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.01% 1,422,714 1,263 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.01% 1,492,645 1,264 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 1,144,533 1,265 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
91.07% 1,108,498 1,266 0.0% 91.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 5,400,697 1,267 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
99.98% 716,920 1,268 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
91.92% 28,166,387 1,269
100.01% 884,947 1,270 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 16,430,089 1,271 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 1,244,269 1,272 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 3,926,487 1,273 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,274 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 5,680,595 1,275 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 24,442,785 1,276
100.00% 24,442,785 1,277 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
94.49% 131,830,374 1,278
100.00% 3,572,226 1,279 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.01% 2,415,115 1,280 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 58,574,839 1,281 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 67,268,194 1,282 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,283 0.0% 0.0% 41.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
92.51% 4,894,608 1,284
100.00% 147,966 1,285 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
99.99% 4,247,673 1,286 50.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
26.21% 140,706 1,287 0.0% 26.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 358,263 1,288 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
84.38% 32,111,140 1,289
99.99% 2,495,826 1,290 61.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,291 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,292 0.0% 0.0% 23.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
77.89% 4,353,780 1,293 17.0% 77.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,294 0.0% 0.0% 0.0% 33.3% 100.0% 100.0% 100.0% 100.0% 100.0%
13.10% 360,515 1,295 0.0% 13.1% 80.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 24,901,019 1,296 42.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,297 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
0.00% 0 1,298 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
0.00% 0 1,299 0.0% 0.0% 0.0% 100.6% 100.6% 100.6% 100.6% 100.6% 100.6%
30.49% 30,884,289 1,300
100.15% 114,473 1,301 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2%
0.00% 0 1,302 0.0% 0.0% 0.0% 0.0% 100.2% 100.2% 100.2% 100.2% 100.2%
0.00% 0 1,303 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,304 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,305 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,306 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,307 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,308 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,309 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,310 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,311 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
45.43% 6,372,493 1,312 9.9% 45.4% 79.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,313 0.0% 0.0% 15.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,314 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,315 0.0% 0.0% 15.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,316 0.0% 0.0% 15.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 8,232,224 1,317 39.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
40.87% 16,165,099 1,318 0.0% 40.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,319 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
32.52% 21,258,012 1,320
100.00% 11,829,734 1,321 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
88.09% 553,740 1,322 0.0% 88.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,323 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
7.14% 141,260 1,324 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
4.76% 408,684 1,325 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
4.76% 556,726 1,326 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 5,791,222 1,327 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,328 0.0% 0.0% 16.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
99.98% 1,917,646 1,329 81.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.00% 0 1,330 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0%
100.00% 17,856 1,331 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
100.00% 41,144 1,332 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
22.86% 29,848,038 -
17.58% 13,635,592 -
30.94% 37,507,926 -
55.64% 35,365,821 -
-
17
18 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0%
19 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0%
20 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0%
21 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0%
22 0.00% 0.0% 20.4% 83.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
23 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
24 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9%
25 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
26 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
27 0.00% 0.0% 0.0% 18.5% 68.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
28 0.00% 0.0% 0.0% 18.5% 68.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
29 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 58.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
30 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.0% 96.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
31 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
32 0.00% 0.0% 0.0% 0.0% 1.2% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
33 0.00% 0.0% 0.0% 14.8% 54.8% 97.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
34 0.00% 0.0% 20.4% 83.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
35 0.00% 0.0% 0.0% 0.0% 24.8% 69.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
36 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 64.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
37 0.00% 0.0% 3.0% 56.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
38 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 22.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
39 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
40 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.1% 100.0% 100.0% 100.0% 100.0% 100.0%
41 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.1% 100.0% 100.0% 100.0% 100.0% 100.0%
42 0.00% 0.0% 0.0% 40.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
554
556 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
557 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
558 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
559 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
561 0.00% 32.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
562 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
563 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 94.0% 100.0% 100.0% 100.0%
564 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 87.3% 100.0% 100.0% 100.0% 100.0%
565 0.00% 0.0% 0.0% 32.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
566 0.00% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
568 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
569 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 9.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
570 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 43.6% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9%
571 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
572 0.00% 0.0% 0.0% 0.0% 37.8% 96.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
573 0.00% 9.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
575 0.00% 0.0% 0.0% 0.0% 0.0% 5.7% 80.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
576 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
577 0.00% 0.0% 63.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
578 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 98.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
579 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 12.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
581 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
583 0.00% 64.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
584 0.00% 0.0% 81.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
739
741 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
742 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
743 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
744 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
746 0.00% 0.0% 81.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
747 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
748 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 25.4% 100.0% 100.0% 100.0% 100.0%
749 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.2% 100.2% 100.2% 100.2% 100.2%
750 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 25.4% 100.0% 100.0% 100.0% 100.0%
751 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0%
752 0.00% 0.0% 0.0% 0.0% 0.0% 89.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
753 0.00% 0.0% 0.0% 0.0% 21.4% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
755 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
756 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
757 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.0% 100.0% 100.0% 100.0% 100.0%
758 0.00% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
759 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 67.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
760 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
761 0.00% 0.0% 75.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
763 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 9.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
764 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 43.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
765 0.00% 0.0% 0.0% 16.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
766 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 62.5% 100.0% 100.0% 100.0% 100.0% 100.0%
767 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 25.0% 100.0% 100.0% 100.0% 100.0% 100.0%
769 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
771 0.00% 0.0% 65.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
772 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
773 0.00% 0.0% 0.0% 21.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
2,888
2,889 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 29.8% 100.0% 100.0% 100.0%
2,890 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 29.8% 100.0% 100.0% 100.0%
2,891 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 29.8% 100.0% 100.0% 100.0%
2,892 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 29.8% 100.0% 100.0% 100.0%
2,894 0.00% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,895 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
2,896 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
2,897 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,898 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,900 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,901 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,902 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,903 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 99.9% 99.9% 99.9% 99.9% 99.9%
2,904 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,905 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,906 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,907 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,909 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,910 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,911 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,912 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 39.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,913 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 56.5% 100.0% 100.0% 100.0% 100.0%
2,914 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
2,916 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.7% 100.0% 100.0% 100.0%
2,918 0.00% 0.0% 0.0% 0.0% 0.0% 31.4% 99.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,919 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
-
1,207
1,208 0.00% 0.0% 0.0% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3%
1,209 0.00% 0.0% 0.0% 85.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,210 0.00% 0.0% 0.0% 4.8% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,211 0.00% 0.0% 0.0% 0.0% 60.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,212 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,213 0.00% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,214
1,215 0.00% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,216 0.00% 0.0% 0.0% 3.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,217 0.00% 0.0% 0.0% 0.0% 16.2% 97.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,218
1,219 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 33.6% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,220
1,221 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,222
1,223 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 61.1% 100.0% 100.0% 100.0% 100.0% 100.0%
1,224 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 41.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,225 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 20.5% 72.9% 100.0% 100.0% 100.0% 100.0% 100.0%
1,226 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 41.9% 100.0% 100.0% 100.0% 100.0%
1,227 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 54.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,228
1,230 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
1,231 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
1,233 0.00% 0.0% 0.0% 3.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,234 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0%
1,235 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0%
1,236 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 92.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,238 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,239 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 9.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,240 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,241 0.00% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,243 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 19.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,244 0.00% 0.0% 0.0% 0.0% 0.0% 24.8% 81.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,245 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 43.3% 100.0% 100.0% 100.0% 100.0% 100.0%
1,246 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,248 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0%
1,250 0.00% 0.0% 0.0% 0.0% 1.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
2,876
2,877 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,878
2,879 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9%
2,880 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 20.8% 100.0% 100.0% 100.0% 100.0% 100.0%
-
3,009
3,010 0.00% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,011 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,012 0.00% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,013 0.00% 42.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,014 0.00% 0.0% 0.0% 32.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3%
3,015
3,016 0.00% 0.0% 28.3% 83.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,017 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,018 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,019 0.00% 0.0% 0.0% 0.0% 10.7% 84.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,020 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 43.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,021
3,022 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 39.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,023
3,024 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 34.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,025 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 98.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,026 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,027
3,028 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 58.4% 100.0% 100.0% 100.0% 100.0% 100.0%
3,029 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 29.2% 100.0% 100.0% 100.0% 100.0% 100.0%
3,030 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.9% 43.1% 85.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,031
3,032 0.00% 0.0% 5.1% 66.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,033 0.00% 0.0% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,034 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
3,035 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
3,036 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
3,037 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 47.6% 100.0% 100.0% 100.0% 100.0%
-
127 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
134 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
135 0.00% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
136 0.00% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
137 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
138 0.00% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
139 0.00% 0.0% 0.0% 0.0% 85.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
140
141 0.00% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
142 0.00% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
143 0.00% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
144 0.00% 0.0% 0.0% 0.0% 36.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
145 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 96.9% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
146
147 0.00% 0.0% 0.0% 0.0% 0.0% 12.4% 51.9% 94.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
148
149 0.00% 0.0% 0.0% 0.0% 86.4% 101.1% 101.1% 101.1% 101.1% 101.1% 101.1% 101.1% 101.1% 101.1% 101.1%
150 0.00% 0.0% 0.0% 0.0% 0.0% 74.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
151 0.00% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
152
153 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.2% 86.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
154 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 91.7% 100.0% 100.0% 100.0% 100.0% 100.0%
155 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
156 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 23.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
157 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
158
159 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
160 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
161 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
162 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.6% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9%
163
164 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
165 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
166 0.00% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
167 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
168 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
169 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 89.8% 99.2% 99.2% 99.2%
170 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
171 0.00% 0.0% 0.0% 0.0% 0.0% 12.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
172 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 55.6% 100.0% 100.0% 100.0% 100.0% 100.0%
173 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
174 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 36.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
175 0.00% 0.0% 0.0% 40.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
176 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 21.1% 81.0% 100.0% 100.0% 100.0% 100.0% 100.0%
177 0.00% 0.0% 0.0% 0.0% 40.1% 98.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
178 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 27.8% 95.2% 100.0% 100.0% 100.0% 100.0%
179 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
180 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
181 0.00% 0.0% 69.5% 97.3% 97.3% 97.3% 97.3% 97.3% 97.3% 97.3% 97.3% 97.3% 97.3% 97.3% 97.3%
182 0.00% 0.0% 71.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
183 0.00% 0.0% 0.0% 40.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
1,126
1,127 0.00% 0.0% 0.0% 0.0% 70.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,128 0.00% 0.0% 0.0% 0.0% 0.0% 80.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9%
1,129 0.00% 0.0% 0.0% 70.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,130 0.00% 0.0% 47.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,131
1,132 0.00% 0.0% 0.0% 46.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,133 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 84.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,134 0.00% 0.0% 0.0% 0.0% 21.8% 94.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,135 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 58.3% 100.0% 100.0% 100.0% 100.0% 100.0%
1,136 0.00% 0.0% 0.0% 0.0% 0.0% 4.8% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,137
1,138 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 84.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,139 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,140
1,141 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 47.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,142 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,143 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 19.4% 90.5% 100.0% 100.0% 100.0% 100.0%
1,144
1,145 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9%
1,146 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,147 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,148 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 47.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,149
1,150 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 31.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,151 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 65.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,152 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,153 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,154 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.3% 86.1% 100.0% 100.0% 100.0% 100.0% 100.0%
1,155 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 43.3% 100.0% 100.0% 100.0% 100.0% 100.0%
1,156 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 71.5% 100.0% 100.0% 100.0% 100.0%
1,157 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0%
1,158 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0% 100.0%
1,159
1,160 0.00% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,161 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,162 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
1,163 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,164
1,165 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.7% 100.0% 100.0% 100.0%
1,166 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
1,167 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
1,168 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
1,169 0.00% 0.0% 0.0% 0.0% 26.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,170 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 29.2% 100.0% 100.0% 100.0% 100.0% 100.0%
1,171 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 21.4% 100.0% 100.0% 100.0% 100.0%
1,172 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0%
1,173 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,174 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,175 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.9% 100.0% 100.0% 100.0% 100.0% 100.0%
1,176 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 9.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,177 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 39.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,178 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,179 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.3% 86.1% 100.0% 100.0% 100.0% 100.0% 100.0%
1,180 0.00% 0.0% 0.0% 0.0% 0.0% 14.8% 93.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,181 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 23.3% 100.0% 100.0% 100.0% 100.0% 100.0%
1,182 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,183 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 21.4% 100.0% 100.0% 100.0% 100.0%
1,184 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,185
1,186 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
1,355
1,356 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
1,357 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
1,358 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
1,359 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
1,360 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 96.8% 100.0% 100.0% 100.0% 100.0%
1,361 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 96.8% 100.0% 100.0% 100.0% 100.0%
1,362 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,363 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,364 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,365 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 26.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,366 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 26.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,367 0.00% 0.0% 0.0% 0.0% 0.0% 52.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,368 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 75.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,369 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.1% 100.1% 100.1% 100.1% 100.1%
1,370 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,371 0.00% 0.0% 0.0% 0.0% 16.3% 79.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,372 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 84.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
1,258
1,259 0.00% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,260 0.00% 0.0% 0.0% 0.0% 39.3% 94.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,261 0.00% 0.0% 58.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,262 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,263 0.00% 0.0% 0.0% 0.0% 0.0% 11.4% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,264 0.00% 0.0% 0.0% 0.0% 22.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,265 0.00% 55.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,266 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 91.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,267 55.56% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,268 0.00% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,269
1,270 0.00% 88.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,271 0.00% 2.0% 53.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,272 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,273 0.00% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,274 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,275 0.00% 1.0% 36.0% 79.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,276
1,277 0.00% 0.0% 0.0% 49.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,278
1,279 0.00% 0.0% 0.0% 0.0% 62.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,280 0.00% 0.0% 0.0% 0.0% 0.5% 74.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,281 0.00% 0.0% 0.0% 0.0% 0.0% 44.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,282 0.00% 0.0% 0.0% 0.0% 32.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,283 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 41.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,284
1,285 0.00% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,286 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 50.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,287 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 26.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,288 0.00% 0.0% 0.0% 0.0% 0.0% 52.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,289
1,290 0.00% 0.0% 0.0% 0.0% 0.0% 17.5% 61.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,291 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,292 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 23.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,293 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 17.0% 77.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,294 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 33.3% 100.0% 100.0% 100.0% 100.0% 100.0%
1,295 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 13.1% 80.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,296 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 42.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,297 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,298 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,299 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.6% 100.6% 100.6% 100.6% 100.6% 100.6%
1,300
1,301 0.00% 0.0% 88.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2%
1,302 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.2% 100.2% 100.2% 100.2% 100.2%
1,303 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,304 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,305 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,306 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,307 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
1,308 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
1,309 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
1,310 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
1,311 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
1,312 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 9.9% 45.4% 79.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,313 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,314 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,315 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,316 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,317 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 39.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,318 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,319 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,320
1,321 0.00% 0.0% 0.0% 41.4% 81.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,322 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,323 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,324 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,325 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,326 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,327 0.00% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,328 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,329 0.00% 0.0% 0.0% 0.0% 0.0% 32.1% 81.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,330 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0%
1,331 0.00% 0.0% 88.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,332 0.00% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
1,597
1,598 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,599 0.00% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,600 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,601 0.00% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,602 0.00% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,603 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,604
1,605 0.00% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,606 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 98.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,607 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 45.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,608 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 8.2% 68.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,609 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 8.9% 97.6% 100.0% 100.0% 100.0%
1,610
1,611 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 33.3% 98.4% 100.0% 100.0% 100.0% 100.0%
1,612
1,613 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,614 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0%
1,615 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0%
1,616 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,617 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 96.8% 100.0% 100.0% 100.0%
1,618
1,619 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0%
1,620 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
1,621 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 45.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,622 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
1,623
1,624 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0%
1,625 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0%
1,626 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
1,627 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
1,628 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 100.0% 100.0% 100.0% 100.0%
1,629 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.1% 100.0% 100.0% 100.0%
1,630 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.0% 100.0% 100.0% 100.0%
1,631 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 8.9% 97.6% 100.0% 100.0% 100.0%
1,632 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.1% 100.1% 100.1% 100.1%
1,633
1,634 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.0% 100.0% 100.0% 100.0%
1,635 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.0% 100.0% 100.0% 100.0%
1,636 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.1% 100.0% 100.0% 100.0%
1,637 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.1% 100.1% 100.1% 100.1%
1,638 0.00% 0.0% 0.0% 0.0% 0.0% 36.7% 93.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,639 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,640 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,641 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.0% 100.0% 100.0% 100.0%
1,642 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 26.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,643 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 26.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,644 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.5% 100.0% 100.0% 100.0% 100.0%
1,645 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,646 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 36.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,647 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,648 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 25.8% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0%
1,649 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 30.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,650 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 31.5% 100.0% 100.0% 100.0% 100.0%
1,651 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1%
1,652 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,653 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,654
1,655 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 100.0% 100.0% 100.0% 100.0%
1,656 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 99.9% 99.9% 99.9% 99.9%
-
2,037
2,038 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,039 0.00% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,040 0.00% 0.0% 0.0% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,041 0.00% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,042 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,043
2,044 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,045 0.00% 0.0% 0.0% 0.0% 0.0% 79.5% 101.2% 101.2% 101.2% 101.2% 101.2% 101.2% 101.2% 101.2% 101.2%
2,046 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,047
2,048 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 19.0% 72.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,049
2,050 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,051 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 19.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,052 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,053
2,054 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,055 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 45.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,056 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,057 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.8% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,058
2,059 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,060 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1%
2,061 0.00% 0.0% 0.0% 0.0% 0.0% 89.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,062 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,063 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,064 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,065 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,066 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,067 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,068 0.00% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,069 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,070 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 98.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,071 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,072 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,073 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,074 0.00% 0.0% 0.0% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
2,409
2,410 0.00% 0.0% 0.0% 54.8% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,411 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
2,412 0.00% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,413 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 67.6% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,414 0.00% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,415 0.00% 0.0% 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
1,420
1,421 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
1,422 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
1,423 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 70.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,424 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.4% 100.0% 100.0% 100.0% 100.0%
1,425 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 31.0% 100.0% 100.0% 100.0% 100.0%
1,426 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 73.9% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,427 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 70.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,428 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.4% 100.0% 100.0% 100.0% 100.0% 100.0%
1,429 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
1,430 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,431 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,432 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 70.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,433 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.4% 100.0% 100.0% 100.0% 100.0% 100.0%
1,434 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,435 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,436 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,437 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,439 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 70.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
1,447
1,448 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.3% 100.0% 100.0% 100.0%
1,449 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0%
1,450 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 56.5% 100.0% 100.0% 100.0% 100.0%
1,451 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,452 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,453 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,454 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,455 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,456 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,457 0.00% 0.0% 0.0% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,458 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 39.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,459 0.00% 0.0% 0.0% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,460 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,461 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,462 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
1,340
1,341 0.00% 0.0% 0.0% 0.0% 16.3% 79.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,342
1,343 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 36.1% 94.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,344
1,345 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 37.7% 98.4% 100.0% 100.0% 100.0%
1,346
1,347 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.4% 38.1% 80.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
1,380
1,381 0.00% 0.0% 0.0% 0.0% 16.3% 79.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,382
1,383 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.0% 54.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,384
1,385 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 36.1% 94.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
1,393
1,394 0.00% 0.0% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,395 0.00% 0.0% 17.9% 72.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,396
1,397 0.00% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,398 0.00% 0.0% 0.0% 0.0% 0.0% 12.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,399
1,400 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 39.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,401
1,402 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 80.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,403 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,404
1,405 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 8.0% 36.7% 66.7% 96.6% 100.0% 100.0% 100.0% 100.0%
1,406 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 37.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,407
1,408 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,409 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 27.8% 95.2% 100.0% 100.0% 100.0% 100.0%
1,410
1,411 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 18.6% 61.2% 98.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,412 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 46.7% 89.3% 100.0% 100.0% 100.0% 100.0%
-
1,553
1,554 0.00% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,555 0.00% 0.0% 35.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,556
1,557 0.00% 0.0% 0.0% 0.0% 70.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,558 0.00% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,559
1,560 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 61.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,561
1,562 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 96.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,563 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,564
1,565 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 5.6% 42.2% 80.3% 100.0% 100.0% 100.0% 100.0% 100.0%
1,566 0.00% 0.0% 0.0% 0.0% 0.0% 15.6% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,567
1,568 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,569 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,570
1,571 0.00% 0.0% 0.0% 0.0% 0.0% 21.6% 47.9% 76.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
1,664
1,665 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,666 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,667 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,668 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,669 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,670
1,671 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,672 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,673 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,674 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 39.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,675 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,676
1,677 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,678
1,679 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 75.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,680 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,681 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 58.7% 100.0% 100.0% 100.0% 100.0%
1,682 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.7% 100.0% 100.0% 100.0% 100.0% 100.0%
1,683 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0%
1,684
1,685 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,686 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,687 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,688
1,689 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,690 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,691 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 44.0% 100.0% 100.0% 100.0%
1,692 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 44.1% 100.0% 100.0% 100.0%
1,693
1,694 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 44.0% 100.0% 100.0% 100.0%
1,695 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 44.0% 100.0% 100.0% 100.0%
1,696 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 29.4% 100.0% 100.0% 100.0%
1,697 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,698 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 92.1% 100.0% 100.0% 100.0%
1,699 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1%
1,700 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 72.0% 100.0% 100.0% 100.0%
1,701 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 62.7% 100.0% 100.0% 100.0%
1,702 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 72.0% 100.0% 100.0% 100.0%
1,703 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1%
1,704
1,705 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 44.0% 100.0% 100.0% 100.0%
1,706 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 44.1% 100.0% 100.0% 100.0%
1,708 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 82.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,709 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 29.7% 100.0% 100.0% 100.0% 100.0%
1,710 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,711 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,712 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 57.2% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,714 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,715 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,716 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,717 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,718 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,720 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 66.7% 100.0% 100.0% 100.0% 100.0% 100.0%
1,721 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 66.7% 100.0% 100.0% 100.0% 100.0% 100.0%
1,722 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,723 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,724 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1%
1,726 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0%
1,728 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 76.4% 100.4% 100.4% 100.4% 100.4% 100.4% 100.4% 100.4% 100.4%
1,729 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 76.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,730 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,732 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 56.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
2,011
2,012 0.00% 0.0% 0.0% 0.0% 38.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,013 0.00% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,014
2,015 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 98.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,016 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 19.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,017
2,018 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,019
2,020 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.3% 99.7% 99.7% 99.7% 99.7% 99.7% 99.7%
2,021 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,022
2,023 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.0% 37.0% 69.2% 99.3% 100.0% 100.0% 100.0% 100.0%
2,024 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,025
2,026 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,027 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,028
2,029 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 3.8% 31.9% 58.7% 86.7% 100.0% 100.0% 100.0% 100.0% 100.0%
-
1,194
1,195 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 65.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,196 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,197
1,198 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 25.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,199 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 87.3% 100.0% 100.0% 100.0% 100.0%
184
191
192 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 65.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
193
194 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
195 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
196 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 87.3% 100.0% 100.0% 100.0% 100.0%
197 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 94.0% 100.0% 100.0% 100.0%
198 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.0% 100.0% 100.0% 100.0%
-
2,394
2,395 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 65.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,396 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,397
2,398 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,399 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 87.3% 100.0% 100.0% 100.0% 100.0%
2,400 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0%
2,401 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
-
1,579
1,580 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 65.6% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,581 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 65.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,582
1,583 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,584 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,585 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,586 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,587 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 87.3% 100.0% 100.0% 100.0% 100.0%
1,588 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0%
1,589 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
-
472
473 0.00% 0.0% 0.0% 0.0% 0.0% 19.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
474 0.00% 0.0% 0.0% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
475 0.00% 0.0% 0.0% 2.4% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
476 0.00% 0.0% 0.0% 0.0% 4.8% 100.4% 100.4% 100.4% 100.4% 100.4% 100.4% 100.4% 100.4% 100.4% 100.4%
477 0.00% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
478 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
479 0.00% 0.0% 47.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
480
481 0.00% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
482 0.00% 0.0% 0.0% 2.4% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
483 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
484 0.00% 0.0% 0.0% 0.0% 7.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
485 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
486 0.00% 0.0% 0.0% 0.0% 0.0% 44.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
487
488 0.00% 0.0% 0.0% 0.0% 0.0% 10.5% 67.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
489
490 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 48.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
491 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 79.2% 100.0% 100.0% 100.0% 100.0% 100.0%
492 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
493 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 49.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
494 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0% 100.0%
495
496 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
497 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.2% 86.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
498 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 70.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
499
500 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
501 0.00% 0.0% 0.0% 0.0% 0.0% 14.8% 93.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
502 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
503 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 41.7% 100.0% 100.0% 100.0% 100.0% 100.0%
504 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0%
505 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 5.4% 95.2% 100.0% 100.0% 100.0%
506
507 0.00% 0.0% 0.0% 3.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
508 0.00% 0.0% 0.0% 0.0% 20.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
509 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 77.4% 100.0% 100.0% 100.0%
510 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 77.4% 100.0% 100.0% 100.0%
511 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 77.4% 100.0% 100.0% 100.0%
512 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
513 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
514 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
515 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
516 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 54.2% 100.0% 100.0% 100.0% 100.0% 100.0%
517 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.7% 100.0% 100.0% 100.0%
518 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 51.6% 100.0% 100.0% 100.0%
519 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.7% 100.0% 100.0% 100.0%
520 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
521
522 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 60.7% 100.0% 100.0% 100.0%
523 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0%
524 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0%
525 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.8% 100.1% 100.1% 100.1%
527 0.00% 0.0% 0.0% 2.4% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
528 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 96.8% 100.0% 100.0% 100.0%
529 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
530 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
531 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 28.6% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
533 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
534 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
535 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
536 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
537 0.00% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
539 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.4% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0%
540 0.00% 0.0% 0.0% 0.0% 0.0% 14.3% 98.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
541 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.6% 100.0% 100.0% 100.0% 100.0%
542 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 63.1% 100.0% 100.0% 100.0% 100.0%
544 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
546 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
959
960 0.00% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
961 0.00% 0.0% 0.0% 2.4% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
962 0.00% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
963
964 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
965 0.00% 0.0% 0.0% 22.6% 72.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
966 0.00% 0.0% 0.0% 0.0% 0.0% 19.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
967 0.00% 0.0% 0.0% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
968 0.00% 0.0% 0.0% 0.0% 0.0% 12.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
969
970 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 29.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
971
972 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 48.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
973 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 49.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
974 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
975 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
976 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 33.3% 100.0% 100.0% 100.0% 100.0% 100.0%
977
978 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 73.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
979 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
980 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2%
981
982 0.00% 0.0% 0.0% 0.0% 0.0% 9.5% 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
983 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0%
984 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
985 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 33.3% 100.0% 100.0% 100.0% 100.0% 100.0%
986 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 41.7% 100.0% 100.0% 100.0% 100.0% 100.0%
987 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 70.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
988 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.0% 69.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
989 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
990
991 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.4% 100.0% 100.0% 100.0% 100.0%
992 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.4% 100.0% 100.0% 100.0% 100.0%
993 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.5% 100.0% 100.0% 100.0% 100.0%
994 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.4% 100.0% 100.0% 100.0% 100.0%
995 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.5% 100.1% 100.1% 100.1% 100.1%
996 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 23.2% 100.0% 100.0% 100.0% 100.0%
997 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 23.2% 100.0% 100.0% 100.0% 100.0%
998 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.7% 100.0% 100.0% 100.0% 100.0% 100.0%
999 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.5% 100.1% 100.1% 100.1% 100.1%
1,000
1,001 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,002 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,003 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,004 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1%
1,006 0.00% 0.0% 0.0% 0.0% 0.0% 7.6% 83.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,007 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0%
1,008 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0%
1,009 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,010 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,012 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,013 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,014 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 48.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,015 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 48.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,016 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 32.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,017 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,019 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,020 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,021 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 73.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,022 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.3% 88.6% 100.0% 100.0% 100.0% 100.0%
1,023 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 71.5% 100.1% 100.1% 100.1% 100.1%
1,025 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 71.5% 100.0% 100.0% 100.0% 100.0%
1,027 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
681
682 0.00% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
683 0.00% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
684
685 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
686 0.00% 0.0% 0.0% 86.0% 100.6% 100.6% 100.6% 100.6% 100.6% 100.6% 100.6% 100.6% 100.6% 100.6% 100.6%
687 0.00% 0.0% 0.0% 0.0% 85.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
688 0.00% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
689 0.00% 0.0% 0.0% 0.0% 85.8% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
690
691 0.00% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
692
693 0.00% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
694 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 28.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
695 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
696 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
697 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 19.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
698
699 0.00% 0.0% 0.0% 0.0% 4.8% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
700 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
701 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
702 0.00% 0.0% 0.0% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
703 0.00% 0.0% 0.0% 0.0% 0.0% 19.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
704
705 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
706 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
707
708 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.5% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
709 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 39.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
710 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
711 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
712 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
713 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
714
716 0.00% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
717 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
718 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
719 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
721 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
722 0.00% 0.0% 0.0% 0.0% 0.0% 62.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
723 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
724 0.00% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
726 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
727 0.00% 0.0% 0.0% 0.0% 40.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
728 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
729 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 70.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
731 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
592
593 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 94.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
594 0.00% 0.0% 0.0% 0.0% 16.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
595 0.00% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
596 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 67.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
597 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
598 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
599 0.00% 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
600 0.00% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
601 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 96.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
602 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 94.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
603
604 0.00% 0.0% 0.0% 1.8% 89.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
605 0.00% 0.0% 0.0% 1.0% 52.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
606 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
607 0.00% 0.0% 0.0% 0.0% 30.6% 93.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
608 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1%
609 0.00% 0.0% 0.0% 0.0% 0.0% 31.4% 99.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
610
611 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 11.4% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
612
613 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 26.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
614 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 27.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
615 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
616 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
617 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
618
619 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
620 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
621 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 75.0% 100.0% 100.0% 100.0% 100.0% 100.0%
622 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
623 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
624
625 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 42.1% 100.0% 100.0% 100.0% 100.0%
626 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
627 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 56.5% 100.0% 100.0% 100.0% 100.0%
628 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
629 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
630 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
631
632 0.00% 0.0% 0.0% 0.0% 21.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
633 0.00% 0.0% 0.0% 0.0% 0.0% 51.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
634 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.3% 100.1% 100.1% 100.1%
635 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0%
636 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0%
637 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0%
638 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 65.2% 100.0% 100.0% 100.0% 100.0%
639 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
640 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
641 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
642 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
643 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 56.5% 100.0% 100.0% 100.0% 100.0%
644 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 100.0% 100.0% 100.0% 100.0%
645 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0%
646 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 65.2% 100.0% 100.0% 100.0% 100.0%
647 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
648 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0%
649 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 63.1% 100.0% 100.0% 100.0% 100.0%
650
651 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.0% 100.0% 100.0% 100.0%
652 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.0% 100.0% 100.0% 100.0%
653 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.1% 100.0% 100.0% 100.0%
654 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.1% 100.1% 100.1% 100.1%
656 0.00% 0.0% 0.0% 0.0% 1.0% 58.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
657 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
658 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
659 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 39.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
661 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
662 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
663 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 20.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
664 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
666 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 60.0% 100.0% 100.0% 100.0% 100.0% 100.0%
667 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
668 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.2% 100.0% 100.0% 100.0% 100.0%
669 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 63.1% 100.0% 100.0% 100.0% 100.0%
671 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
673 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
50
51 0.00% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
52 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 50.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
53 0.00% 0.0% 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
54 0.00% 0.0% 0.0% 54.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
55 0.00% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
56
57 0.00% 0.0% 0.0% 0.0% 52.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
58 0.00% 0.0% 0.0% 0.0% 37.8% 96.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
59 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 94.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
60 0.00% 0.0% 0.0% 0.0% 23.5% 86.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
61 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
62 0.00% 0.0% 0.0% 0.0% 9.2% 72.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
63
64 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 28.9% 89.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
65
66 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 82.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
67 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 37.5% 100.0% 100.0% 100.0% 100.0% 100.0%
68 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.0% 100.0% 100.0% 100.0% 100.0%
69 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 9.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
70 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 84.5% 100.0% 100.0% 100.0%
71
72 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
73 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
74 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 57.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
75 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
76 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 29.4% 100.0% 100.0% 100.0%
77
78 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.0% 100.0% 100.0% 100.0%
79 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 79.4% 100.0% 100.0% 100.0%
80 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
81 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 72.0% 100.0% 100.0% 100.0%
82 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
83 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.7% 100.0% 100.0% 100.0% 100.0% 100.0%
84
85 0.00% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
86 0.00% 0.0% 0.0% 0.0% 0.0% 51.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
87 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0%
88 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0%
89 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0%
90 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
91 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
92 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
93 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
94 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 67.6% 100.0% 100.0% 100.0%
95 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 29.4% 100.0% 100.0% 100.0%
96 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 72.0% 100.0% 100.0% 100.0%
97 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 92.1% 100.0% 100.0% 100.0%
98 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.1% 100.1% 100.1% 100.1%
99
100 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
101 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
102 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
103 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1%
105 0.00% 0.0% 0.0% 23.5% 80.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
106 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0%
107 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
108 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
109 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 34.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
111 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
112 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
113 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
114 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 32.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
115 0.00% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
117 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 43.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
118 0.00% 0.0% 0.0% 0.0% 0.0% 76.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
119 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 30.0% 100.0% 100.0% 100.0% 100.0% 100.0%
120 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
122 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0%
124 0.00% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
125
126 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0%
-
781
782 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 94.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
783 0.00% 0.0% 0.0% 0.0% 12.9% 95.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
784 0.00% 0.0% 0.0% 0.0% 0.0% 14.3% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
785 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
786 0.00% 0.0% 0.0% 54.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
787
788 0.00% 0.0% 0.0% 0.0% 44.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
789 0.00% 0.0% 0.0% 0.0% 2.0% 65.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
790 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
791 0.00% 0.0% 0.0% 0.0% 0.0% 7.6% 83.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
792 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1%
793 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 37.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
794
795 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 52.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
796
797 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
798 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 44.4% 100.0% 100.0% 100.0% 100.0% 100.0%
799 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 8.3% 100.0% 100.0% 100.0% 100.0% 100.0%
800 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
801 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 51.9% 100.0% 100.0% 100.0% 100.0%
802
803 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 70.5% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3%
804 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 49.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
805 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.9% 100.0% 100.0% 100.0% 100.0% 100.0%
806 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
807
808 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0%
809 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0%
810 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 29.8% 100.0% 100.0% 100.0% 100.0%
811 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 19.8% 100.0% 100.0% 100.0% 100.0%
812 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0%
813 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
814 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
815 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
816
817 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0%
818 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0%
819 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0%
820 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 57.2% 100.0% 100.0% 100.0%
821 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0%
822 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 51.4% 100.0% 100.0% 100.0%
823 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 51.4% 100.0% 100.0% 100.0%
824 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 51.4% 100.0% 100.0% 100.0%
825 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0%
826 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 34.9% 100.0% 100.0% 100.0%
827 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.8% 100.0% 100.0% 100.0%
828 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0%
829 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 19.8% 100.0% 100.0% 100.0% 100.0%
830 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0%
831
832 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0%
833 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0%
834 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0%
835 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1%
837 0.00% 0.0% 0.0% 0.0% 12.9% 95.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
838 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 72.0% 100.0% 100.0% 100.0%
839 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 100.0% 100.0% 100.0%
840 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 65.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
841 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 67.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
843 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0%
844 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 96.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
845 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 19.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
846 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 87.5% 100.0% 100.0% 100.0% 100.0% 100.0%
847 0.00% 0.0% 0.0% 0.0% 0.0% 89.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
849 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 37.5% 100.0% 100.0% 100.0% 100.0% 100.0%
850 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 75.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
851 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0%
852 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0%
854 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.2% 100.0% 100.0% 100.0% 100.0%
856 0.00% 0.0% 0.0% 0.0% 0.0% 53.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
864
865 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1%
866 0.00% 0.0% 0.0% 0.0% 0.0% 8.2% 64.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
867 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.8% 47.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
868 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 82.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
869 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
870 0.00% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
871 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0%
872 0.00% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
873 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.3% 100.0% 100.0% 100.0%
874
875 0.00% 0.0% 0.0% 0.0% 0.0% 32.1% 81.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
876 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 31.5% 84.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
877 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
878 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 39.8% 95.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
879 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.0% 100.0% 100.0% 100.0%
880 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.0% 100.0% 100.0% 100.0%
881 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.1% 100.0% 100.0% 100.0%
882 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
883
884 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 13.5% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
885
886 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 5.6% 100.0% 100.0% 100.0% 100.0% 100.0%
887 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 36.5% 100.0% 100.0% 100.0% 100.0%
888 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0%
889 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0%
890 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 67.9% 100.0% 100.0% 100.0%
891
892 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 99.9% 99.9% 99.9% 99.9% 99.9%
893 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 63.1% 100.0% 100.0% 100.0% 100.0%
894 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 31.5% 100.0% 100.0% 100.0% 100.0%
895 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
896
897 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 71.0% 100.0% 100.0% 100.0% 100.0%
898 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
899 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.6% 100.0% 100.0% 100.0% 100.0%
900 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0%
901 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 67.9% 100.0% 100.0% 100.0%
902 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 96.8% 100.0% 100.0% 100.0% 100.0%
903 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 96.8% 100.0% 100.0% 100.0% 100.0%
904 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0%
905 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0%
906 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0%
907
908 0.00% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
909 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0%
910 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0%
911 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0%
912 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0%
913 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.8% 100.3% 100.3% 100.3%
914 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.8% 100.4% 100.4% 100.4%
915 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0%
916 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0%
917 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0%
918 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0%
919 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 67.9% 100.0% 100.0% 100.0%
920 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0%
921 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 25.2% 100.0% 100.0% 100.0%
922 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0%
923 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.1% 100.1% 100.1%
924
925 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 47.6% 100.0% 100.0% 100.0%
926 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 47.6% 100.0% 100.0% 100.0%
927 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 47.6% 100.0% 100.0% 100.0%
928 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 47.6% 100.0% 100.0% 100.0%
930 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 55.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
931 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.3% 100.2% 100.2% 100.2%
932 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0%
933 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0%
934 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
935 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
937 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0%
938 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
939 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
940 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 33.3% 100.0% 100.0% 100.0% 100.0% 100.0%
941 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
943 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 20.0% 98.1% 100.0% 100.0% 100.0% 100.0%
944 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
945 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 75.2% 100.0% 100.0% 100.0% 100.0%
946 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0%
948 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.3% 100.0% 100.0% 100.0%
950 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 55.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
951 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 60.4% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
-
1,928
1,929 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 76.4% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5%
1,930 0.00% 0.0% 0.0% 0.0% 0.0% 78.7% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2%
1,931 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5%
1,932 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,933 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 82.8% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0%
1,934 0.00% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,935 0.00% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,936 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.2% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3%
1,937
1,938 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,939 0.00% 0.0% 0.0% 0.0% 0.0% 52.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,940 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,941 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 84.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,942 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0%
1,943 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,944
1,945 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,946
1,947 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.5% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8%
1,948 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,949 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 75.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,950 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 19.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,951 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.7% 90.5% 100.0% 100.0% 100.0% 100.0%
1,952
1,953 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,954 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,955 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 42.1% 100.0% 100.0% 100.0% 100.0%
1,956 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.5% 100.0% 100.0% 100.0% 100.0%
1,957 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 27.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,958 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 66.7% 100.0% 100.0% 100.0% 100.0% 100.0%
1,959
1,960 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,961 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 44.1% 100.0% 100.0% 100.0% 100.0%
1,962 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,963 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.8% 92.9% 100.0% 100.0% 100.0%
1,964 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0%
1,965 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,966 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 44.0% 100.0% 100.0% 100.0% 100.0%
1,967 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
1,968
1,969 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0%
1,970 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.0% 100.0% 100.0% 100.0% 100.0%
1,971 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.0% 100.0% 100.0% 100.0% 100.0%
1,972 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.0% 100.0% 100.0% 100.0% 100.0%
1,973 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.4% 100.5% 100.5% 100.5% 100.5%
1,974 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0%
1,975 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.8% 92.9% 100.0% 100.0% 100.0%
1,976 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,977 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 76.3% 100.1% 100.1% 100.1% 100.1%
1,978
1,979 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.7% 100.0% 100.0% 100.0%
1,980 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
1,981 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
1,982 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0%
1,984 0.00% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,985 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0%
1,986 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 47.6% 100.0% 100.0% 100.0% 100.0%
1,987 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,988 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,990 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.9% 100.0% 100.0% 100.0% 100.0% 100.0%
1,991 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
1,992 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 22.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,993 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.2% 86.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,994 0.00% 0.0% 0.0% 0.0% 0.0% 52.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,996 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 91.7% 100.0% 100.0% 100.0% 100.0% 100.0%
1,997 0.00% 0.0% 0.0% 0.0% 0.0% 41.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,998 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 91.7% 100.0% 100.0% 100.0% 100.0% 100.0%
1,999 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
2,001 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,003 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
2,153
2,154 0.00% 0.0% 0.0% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,155 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5%
2,156 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,157 0.00% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,158 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,159
2,160 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,161 0.00% 0.0% 0.0% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,162 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,163 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 76.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,164
2,165 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 94.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,166
2,167 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,168 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 57.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3%
2,169 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,170 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 92.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,171 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,172
2,173 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.7% 100.0% 100.0% 100.0% 100.0% 100.0%
2,174
2,175 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,176 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,177 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 66.8% 100.2% 100.2% 100.2% 100.2% 100.2%
2,178 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 66.8% 100.0% 100.0% 100.0% 100.0% 100.0%
2,179 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 66.9% 100.3% 100.3% 100.3% 100.3% 100.3%
2,180 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 66.8% 100.0% 100.0% 100.0% 100.0% 100.0%
2,181 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 64.9% 100.0% 100.0% 100.0% 100.0%
2,182 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,183 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,184
2,185 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,186 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,188 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,189 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,190 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.4% 100.0% 100.0% 100.0% 100.0%
2,191 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 22.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,193 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 23.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,194 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,195 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,196 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,198 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 23.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,199 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,200 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 66.7% 100.1% 100.1% 100.1% 100.1% 100.1%
2,201 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 33.3% 100.1% 100.1% 100.1% 100.1% 100.1%
2,203 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,205 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,206 0.00% 0.0% 0.0% 0.0% 0.0% 79.3% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0%
2,208 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 14.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
3,045
3,046 0.00% 0.0% 0.0% 86.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,047 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,048 0.00% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,049 0.00% 0.0% 0.0% 4.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,050
3,051 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,052 0.00% 0.0% 0.0% 85.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,053 0.00% 0.0% 0.0% 0.0% 40.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,054 0.00% 0.0% 0.0% 3.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,055 0.00% 0.0% 0.0% 0.0% 40.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,056
3,057 0.00% 0.0% 0.0% 0.0% 0.0% 70.3% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
3,058
3,059 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,060 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5%
3,061 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,062 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 67.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,063 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,064
3,065 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,066 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,067 0.00% 0.0% 0.0% 0.0% 0.0% 61.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,068
3,069 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 89.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,070
3,071 0.00% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,072 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 8.3% 100.0% 100.0% 100.0% 100.0% 100.0%
3,073 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,074 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3%
3,075 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,076 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.2% 100.0% 100.0% 100.0% 100.0% 100.0%
3,077 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.2% 100.0% 100.0% 100.0% 100.0% 100.0%
3,078 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 8.4% 100.1% 100.1% 100.1% 100.1% 100.1%
3,079
3,080 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.3% 100.0% 100.0% 100.0%
3,081 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0%
3,082 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0%
3,083 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0%
3,085 0.00% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,086 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 66.7% 100.0% 100.0% 100.0% 100.0% 100.0%
3,087 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
3,088 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 66.8% 100.0% 100.0% 100.0% 100.0% 100.0%
3,089 0.00% 0.0% 0.0% 0.0% 0.0% 45.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,090 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,092 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,093 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,094 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 42.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,095 0.00% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,097 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,098 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 56.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,099 0.00% 0.0% 0.0% 0.0% 23.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,100 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,101 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,103 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.3% 100.0% 100.0% 100.0% 100.0%
3,105 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
2,927
2,928 0.00% 0.0% 0.0% 0.0% 0.0% 93.0% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2%
2,929 0.00% 0.0% 0.0% 0.0% 0.0% 7.6% 83.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,930 0.00% 0.0% 0.0% 0.0% 56.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,931 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,932 0.00% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,933 0.00% 0.0% 35.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,934 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 70.6% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3%
2,935
2,936 0.00% 0.0% 0.0% 25.8% 83.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,937 0.00% 0.0% 0.0% 9.2% 66.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,938 0.00% 0.0% 0.0% 0.0% 0.0% 89.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,939 0.00% 0.0% 0.0% 0.7% 49.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,940 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,941 0.00% 0.0% 0.0% 0.0% 6.2% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,942
2,943 0.00% 0.0% 0.0% 0.0% 0.0% 68.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,944
2,945 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,946 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 20.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,947 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 41.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,948 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,949 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 87.5% 100.0% 100.0% 100.0% 100.0% 100.0%
2,950
2,951 0.00% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,952 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,953 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 94.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3%
2,954
2,955 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 94.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,956 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,957 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.0% 100.0% 100.0% 100.0% 100.0%
2,958 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 91.7% 100.0% 100.0% 100.0% 100.0% 100.0%
2,959 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 33.7% 93.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,960 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.2% 45.5% 97.9% 100.0% 100.0% 100.0% 100.0% 100.0%
2,961 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,962
2,963 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0%
2,964 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0%
2,965 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0%
2,966 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0%
2,967 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0%
2,968 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0%
2,969 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0%
2,970 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0%
2,971 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0%
2,972 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 30.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,973 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 9.5% 100.0% 100.0% 100.0% 100.0%
2,974 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 45.8% 100.0% 100.0% 100.0% 100.0% 100.0%
2,975 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1%
2,976
2,977 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
2,978 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
2,979 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
2,980 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
2,982 0.00% 0.0% 20.4% 83.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,983 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,984 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
2,985 0.00% 0.0% 0.0% 0.0% 0.0% 56.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,986 0.00% 0.0% 0.0% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,988 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.2% 86.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,989 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,990 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 73.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,991 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 54.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,992 0.00% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,994 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.0% 92.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,995 0.00% 0.0% 0.0% 0.0% 56.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,996 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 73.3% 100.0% 100.0% 100.0% 100.0% 100.0%
2,997 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 33.3% 100.0% 100.0% 100.0% 100.0% 100.0%
2,999 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
3,001 0.00% 0.0% 0.0% 40.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
3,212
3,213 0.00% 0.0% 0.0% 0.0% 0.0% 78.6% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
3,214 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,215 0.00% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,216 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
3,217
3,218 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,219 0.00% 0.0% 0.0% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,220 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,221 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,222 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,223
3,224 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 94.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,225
3,226 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
3,227 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,228 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,229 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,230 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,231
3,232 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
3,233 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,234 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,235 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
3,236 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0%
3,237 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 82.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,238 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,239
3,240 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 29.8% 100.0% 100.0% 100.0% 100.0%
3,241 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 29.8% 100.0% 100.0% 100.0% 100.0%
3,242 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.7% 100.0% 100.0% 100.0% 100.0% 100.0%
3,243 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 64.9% 100.0% 100.0% 100.0% 100.0%
3,244 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 84.1% 100.0% 100.0% 100.0% 100.0%
3,245 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 84.1% 100.0% 100.0% 100.0% 100.0%
3,246 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.2% 100.2% 100.2% 100.2% 100.2%
3,247
3,248 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0%
3,249 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.7% 100.2% 100.2% 100.2% 100.2% 100.2%
3,250 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.6% 100.0% 100.0% 100.0% 100.0% 100.0%
3,251 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.7% 100.3% 100.3% 100.3% 100.3% 100.3%
3,252 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.7% 100.3% 100.3% 100.3% 100.3% 100.3%
3,253 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.9% 100.0% 100.0% 100.0% 100.0%
3,254 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
3,255 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 29.8% 100.1% 100.1% 100.1% 100.1%
3,256
3,257 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
3,258 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
3,260 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,261 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.3% 100.0% 100.0% 100.0% 100.0%
3,262 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.2% 100.0% 100.0% 100.0% 100.0%
3,263 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
3,265 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,266 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 39.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,267 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 39.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,268 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,270 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,271 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,272 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,273 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.1% 100.1% 100.1% 100.1% 100.1%
3,274 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1%
3,276 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.0% 100.0% 100.0% 100.0% 100.0%
3,278 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
2,311
2,312 0.00% 0.0% 0.0% 0.0% 3.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,313 0.00% 0.0% 0.0% 2.4% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,314 0.00% 0.0% 0.0% 0.0% 0.0% 61.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,315 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,316 0.00% 0.0% 0.0% 85.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,317 0.00% 0.0% 35.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,318 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,319
2,320 0.00% 0.0% 0.0% 36.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,321 0.00% 0.0% 0.0% 0.0% 27.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,322 0.00% 0.0% 0.0% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,323 0.00% 0.0% 0.0% 0.0% 16.2% 97.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,324 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,325 0.00% 0.0% 0.0% 0.0% 0.0% 76.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,326
2,327 0.00% 0.0% 0.0% 0.0% 0.0% 51.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,328
2,329 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 50.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,330 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,331 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 20.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,332 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,333 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,334
2,335 0.00% 0.0% 0.0% 0.0% 0.0% 12.7% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9%
2,336 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,337 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 61.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,338 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,339
2,340 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,341 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0%
2,342 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 75.4% 100.0% 100.0% 100.0% 100.0%
2,343 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 33.3% 100.0% 100.0% 100.0% 100.0% 100.0%
2,344 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 75.4% 100.0% 100.0% 100.0% 100.0%
2,345 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 63.1% 100.0% 100.0% 100.0% 100.0%
2,346 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 25.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,347 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 25.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,348 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 63.1% 100.0% 100.0% 100.0% 100.0%
2,349 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 63.1% 100.0% 100.0% 100.0% 100.0%
2,350 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 63.1% 100.1% 100.1% 100.1% 100.1%
2,351
2,352 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.3% 100.0% 100.0% 100.0% 100.0%
2,353 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0%
2,354 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 42.1% 100.0% 100.0% 100.0% 100.0%
2,355 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 42.1% 100.0% 100.0% 100.0% 100.0%
2,356 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 42.0% 100.0% 100.0% 100.0% 100.0%
2,357 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 56.5% 100.0% 100.0% 100.0% 100.0%
2,358 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0%
2,359 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 63.1% 100.0% 100.0% 100.0% 100.0%
2,360 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 25.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,361 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0%
2,362
2,363 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
2,364 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
2,365 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
2,366 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
2,368 0.00% 0.0% 0.0% 0.0% 11.6% 74.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,369 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.2% 100.0% 100.0% 100.0% 100.0%
2,370 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
2,371 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 64.4% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,372 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,374 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,375 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,376 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,377 0.00% 0.0% 0.0% 0.0% 0.0% 19.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,379 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 12.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,380 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 51.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,381 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 30.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,382 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,384 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
2,386 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
#N/A
#N/A
-
1,844
1,845 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,846 0.00% 0.0% 0.0% 0.0% 0.0% 52.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,847 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 84.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,848 0.00% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,849 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,850
1,851 0.00% 0.0% 0.0% 0.0% 0.0% 89.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,852 0.00% 0.0% 0.0% 0.0% 0.0% 46.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,853 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 19.4% 80.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,854 0.00% 0.0% 0.0% 0.0% 1.7% 62.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,855 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.7% 96.2% 100.0% 100.0% 100.0% 100.0%
1,856 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 95.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,857
1,858 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 39.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,859
1,860 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,861 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 73.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,862 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,863 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,864 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.7% 100.0% 100.0% 100.0% 100.0% 100.0%
1,865
1,866 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,867 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,868 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 32.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,869
1,870 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 22.2% 100.0% 100.0% 100.0% 100.0% 100.0%
1,871 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,872 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 23.2% 100.0% 100.0% 100.0% 100.0%
1,873 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.4% 100.0% 100.0% 100.0% 100.0%
1,874 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.4% 100.0% 100.0% 100.0% 100.0%
1,875 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.4% 100.0% 100.0% 100.0% 100.0%
1,876
1,877 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
1,878 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.4% 100.0% 100.0% 100.0%
1,879 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
1,880 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 30.9% 100.0% 100.0% 100.0% 100.0%
1,881 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 31.0% 100.0% 100.0% 100.0% 100.0%
1,882 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 31.0% 100.0% 100.0% 100.0% 100.0%
1,883 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 31.0% 100.0% 100.0% 100.0% 100.0%
1,884 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.7% 100.0% 100.0% 100.0% 100.0% 100.0%
1,885 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.4% 100.0% 100.0% 100.0% 100.0%
1,886 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 23.2% 100.0% 100.0% 100.0% 100.0%
1,887 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 18.6% 96.2% 100.0% 100.0% 100.0%
1,888 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,889 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.7% 100.0% 100.0% 100.0% 100.0% 100.0%
1,890 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.4% 100.0% 100.0% 100.0% 100.0%
1,891
1,892 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 77.4% 100.0% 100.0% 100.0%
1,893 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 77.4% 100.0% 100.0% 100.0%
1,894 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 77.4% 100.0% 100.0% 100.0%
1,895 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 77.4% 100.0% 100.0% 100.0%
1,897 0.00% 0.0% 0.0% 0.0% 0.0% 52.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,898 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 63.1% 100.0% 100.0% 100.0% 100.0%
1,899 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,900 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,901 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,903 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,904 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,905 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,906 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,907 0.00% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,909 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,910 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,911 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,912 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 25.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,913 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,915 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,917 0.00% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,918 0.00% 0.0% 0.0% 0.0% 0.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0%
1,920 0.00% 0.0% 0.0% 0.0% 0.0% 45.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
-
206
207 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
208 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 84.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
209 0.00% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
210 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
211 0.00% 0.0% 0.0% 0.0% 22.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
212 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 82.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
213
214 0.00% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
215 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 84.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
216 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
217 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
218 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
219 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
220
221 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
222
223 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 45.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
224 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 99.9% 99.9% 99.9% 99.9% 99.9%
225 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0%
226 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
227 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 56.5% 100.0% 100.0% 100.0% 100.0%
228
229 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
230 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
231 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 63.1% 100.0% 100.0% 100.0% 100.0%
232 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
233 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
234
235 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
236 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 100.0% 100.0% 100.0% 100.0%
237 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
238 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.0% 100.0% 100.0% 100.0%
239
240 0.00% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
241 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
242 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.3% 100.3% 100.3% 100.3%
243 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.1% 100.1% 100.1% 100.1%
244 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.8% 100.0% 100.0% 100.0% 100.0%
245 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 100.1% 100.1% 100.1% 100.1%
246 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 23.2% 100.0% 100.0% 100.0% 100.0%
247 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 31.5% 100.0% 100.0% 100.0% 100.0%
248 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 100.0% 100.0% 100.0% 100.0%
249 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.1% 100.1% 100.1% 100.1%
250
251 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 52.4% 100.0% 100.0% 100.0%
252 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 52.4% 100.1% 100.1% 100.1%
254 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
255 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 82.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
256 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 52.4% 100.0% 100.0% 100.0%
257 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
258 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
260 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 54.8% 100.0% 100.0% 100.0% 100.0%
261 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
262 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 44.4% 100.0% 100.0% 100.0% 100.0% 100.0%
263 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
265 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
266 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
267 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 77.4% 100.0% 100.0% 100.0% 100.0%
268 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
270 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 52.4% 100.0% 100.0% 100.0%
272 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 19.8% 100.0% 100.0% 100.0% 100.0%
274 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 94.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
282
283 0.00% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
284 0.00% 0.0% 0.0% 0.0% 70.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
285 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
286 0.00% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
287 0.00% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
288
289 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
290 0.00% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
291 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
292 0.00% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
293 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
294 0.00% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
295
296 0.00% 0.0% 0.0% 0.0% 3.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
297
298 0.00% 0.0% 0.0% 0.0% 0.0% 31.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
299 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.3% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
300 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
301 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 23.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
302
303 0.00% 0.0% 0.0% 0.0% 0.0% 60.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
304 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
305 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9%
306
307 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
308 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0%
309 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 27.8% 95.2% 100.0% 100.0% 100.0% 100.0%
310 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
311 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
312 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 36.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
313 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 73.8% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
314
315 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
316 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
317 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 5.4% 95.2% 100.0% 100.0% 100.0%
318 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
319 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 33.3% 100.0% 100.0% 100.0% 100.0% 100.0%
320 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
321 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 31.0% 100.0% 100.0% 100.0% 100.0%
322 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.6% 100.2% 100.2% 100.2%
323 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 5.4% 95.2% 100.0% 100.0% 100.0%
324
325 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
326 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
328 0.00% 0.0% 0.0% 0.0% 0.0% 19.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
329 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2%
330 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
332 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 39.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
333 0.00% 0.0% 0.0% 0.0% 0.0% 12.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
335 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 49.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
336 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 73.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
338 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 91.7% 100.0% 100.0% 100.0% 100.0% 100.0%
340 0.00% 0.0% 0.0% 0.0% 27.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
341 0.00% 0.0% 0.0% 3.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
342 0.00% 0.0% 0.0% 0.0% 0.0% 93.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
343 0.00% 0.0% 0.0% 0.0% 0.0% 19.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
345 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
346
347 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
355
356 0.00% 0.0% 0.0% 0.0% 3.6% 101.3% 101.3% 101.3% 101.3% 101.3% 101.3% 101.3% 101.3% 101.3% 101.3%
357 0.00% 0.0% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
358 0.00% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
359 0.00% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
360
361 0.00% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
362 0.00% 0.0% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
363 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
364 0.00% 0.0% 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
365 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
366 0.00% 0.0% 0.0% 0.0% 0.0% 53.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
367
368 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 75.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
369
370 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
371 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 43.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
372 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 62.5% 100.0% 100.0% 100.0% 100.0% 100.0%
373 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 98.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
374
375 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 51.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
376 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
377 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 64.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
378 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
379
380 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 65.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
381 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
382 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
383 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 32.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
384 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 75.0% 100.0% 100.0% 100.0% 100.0% 100.0%
385 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 75.1% 100.1% 100.1% 100.1% 100.1% 100.1%
386 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 75.3% 100.6% 100.6% 100.6% 100.6% 100.6%
387
388 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0%
389 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0%
390 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 25.4% 100.0% 100.0% 100.0% 100.0%
391 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 25.4% 100.0% 100.0% 100.0% 100.0%
392 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
393 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
394 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1%
395 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
396 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
397
398 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 54.8% 100.0% 100.0% 100.0% 100.0%
399 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 54.8% 100.0% 100.0% 100.0% 100.0%
401 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 96.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
402 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 54.8% 100.0% 100.0% 100.0% 100.0%
403 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8%
405 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
406 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
407 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 31.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
408 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 96.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
409 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
410 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 21.5% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
411 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
412 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
413 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 20.8% 100.0% 100.0% 100.0% 100.0% 100.0%
414 0.00% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
415 0.00% 0.0% 0.0% 0.0% 0.0% 89.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
416 0.00% 0.0% 0.0% 0.0% 0.0% 14.4% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0%
-
424
425 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
426 0.00% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
427
428 0.00% 0.0% 0.0% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
429 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 101.8% 101.8% 101.8% 101.8% 101.8% 101.8% 101.8% 101.8% 101.8%
430 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
431 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
432
433 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 82.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
434 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
435
436 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.8% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
437 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
438 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.4% 100.0% 100.0% 100.0% 100.0%
439
440 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
441
442 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1%
443 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 33.3% 100.0% 100.0% 100.0% 100.0% 100.0%
444 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15.5% 84.1% 100.0% 100.0% 100.0%
445 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
446 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
447
449 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
450 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0%
451 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0%
452 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 92.6% 99.7% 99.7% 99.7% 99.7% 99.7% 99.7%
454 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.7% 100.0% 100.0% 100.0% 100.0% 100.0%
455 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
456 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
457 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
459 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.7% 100.0% 100.0% 100.0% 100.0% 100.0%
460 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
461 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.1% 100.1% 100.1% 100.1%
462 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0%
464 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 94.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
1,035
1,036 0.00% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,037 0.00% 0.0% 0.0% 0.0% 85.8% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,038 0.00% 0.0% 0.0% 54.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,039 0.00% 0.0% 45.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,040 0.00% 42.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,041
1,042 0.00% 0.0% 25.1% 73.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,043 0.00% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,044 0.00% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,045 0.00% 0.0% 0.0% 34.9% 79.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,046 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,047 0.00% 0.0% 0.0% 12.7% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,048
1,049 0.00% 0.0% 0.0% 0.0% 23.5% 86.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,050
1,051 0.00% 0.0% 0.0% 0.0% 0.0% 58.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,052 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 62.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,053 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 47.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,054 0.00% 0.0% 0.0% 0.0% 0.0% 12.9% 69.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,055 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 62.7% 100.0% 100.0% 100.0% 100.0%
1,056
1,057 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 50.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,058 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,059 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,060 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 39.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,061
1,062 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 19.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,063 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 94.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,064 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,065 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 8.3% 79.4% 100.0% 100.0% 100.0% 100.0%
1,066 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.0% 100.0% 100.0% 100.0% 100.0%
1,067 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 68.0% 100.0% 100.0% 100.0% 100.0%
1,068 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 39.5% 96.6% 100.0% 100.0% 100.0%
1,069 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 5.9% 100.0% 100.0% 100.0%
1,070 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 5.9% 100.0% 100.0% 100.0%
1,071
1,072 0.00% 0.0% 0.0% 54.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,073 0.00% 0.0% 0.0% 0.0% 37.8% 96.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,074 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.0% 100.0% 100.0% 100.0%
1,075 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.0% 100.0% 100.0% 100.0%
1,076 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.0% 100.0% 100.0% 100.0%
1,077 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 5.9% 100.0% 100.0% 100.0%
1,078 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.2% 100.2% 100.2% 100.2%
1,079 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 92.1% 100.1% 100.1% 100.1%
1,080 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 92.1% 100.0% 100.0% 100.0%
1,081 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 92.1% 100.0% 100.0% 100.0%
1,082 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 92.1% 100.0% 100.0% 100.0%
1,083 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 92.1% 100.0% 100.0% 100.0%
1,084 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 58.7% 100.0% 100.0% 100.0% 100.0%
1,085 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,086 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 8.3% 79.4% 100.0% 100.0% 100.0% 100.0%
1,087
1,088 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.0% 100.0% 100.0% 100.0%
1,089 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.0% 100.0% 100.0% 100.0%
1,090 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.0% 100.0% 100.0% 100.0%
1,091 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 5.9% 100.0% 100.0% 100.0%
1,093 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 42.0% 94.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,094 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 94.0% 100.0% 100.0% 100.0%
1,095 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.2% 100.2% 100.2% 100.2%
1,096 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,098 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 19.0% 100.0% 100.0% 100.0% 100.0%
1,099 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 25.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,100 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.7% 100.0% 100.0% 100.0% 100.0% 100.0%
1,101 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 12.5% 100.0% 100.0% 100.0% 100.0% 100.0%
1,102 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 84.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,104 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 55.2% 100.0% 100.0% 100.0% 100.0%
1,105 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 32.6% 90.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,106 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15.2% 95.2% 100.0% 100.0% 100.0%
1,107 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0%
1,109 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0%
1,111 0.00% 0.0% 0.0% 0.0% 54.8% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,112 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,113 0.00% 0.0% 0.0% 0.0% 0.0% 35.9% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3%
1,115 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 31.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,116
1,117 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.0% 100.0% 100.0% 100.0%
1,118 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.0% 100.2% 100.2% 100.2%
-
1,470
1,471 0.00% 0.0% 60.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,472 0.00% 0.0% 0.0% 40.1% 95.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,473 0.00% 0.0% 0.0% 0.0% 2.4% 96.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,474 0.00% 48.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,475 0.00% 0.0% 0.0% 0.0% 0.0% 19.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,476
1,477 0.00% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,478 0.00% 0.0% 6.8% 68.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,479 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,480 0.00% 0.0% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,481 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,482 0.00% 0.0% 0.0% 20.5% 70.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,483
1,484 0.00% 0.0% 0.0% 8.0% 58.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,485
1,486 0.00% 0.0% 0.0% 0.0% 0.0% 76.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,487 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,488 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 5.7% 86.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,489 0.00% 0.0% 0.0% 0.0% 0.0% 21.4% 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,490 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 87.5% 100.0% 100.0% 100.0% 100.0% 100.0%
1,491
1,492 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 44.0% 95.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,493 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,494 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,495 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.2% 100.0% 100.0% 100.0% 100.0%
1,496 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,497 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,498
1,499 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 32.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,500 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 30.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,501 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 25.4% 100.0% 100.0% 100.0% 100.0%
1,502 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0%
1,503 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,504 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
1,505 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.4% 100.4% 100.4% 100.4% 100.4%
1,506 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.4% 100.5% 100.5% 100.5% 100.5%
1,507
1,508 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,509 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0%
1,510 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0%
1,511 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0%
1,512 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0%
1,513 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0%
1,514 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0%
1,515 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.1% 100.0% 100.0% 100.0% 100.0%
1,516 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0%
1,517 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 87.5% 100.0% 100.0% 100.0% 100.0% 100.0%
1,518 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,519 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,520 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,521
1,522 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
1,523 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
1,524 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.0% 100.0% 100.0% 100.0%
1,525 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.7% 100.1% 100.1% 100.1% 100.1%
1,527 0.00% 0.0% 1.7% 61.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,528 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,529 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
1,530 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0%
1,531 0.00% 0.0% 0.0% 0.0% 0.0% 19.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,533 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 82.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,534 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 95.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,535 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 23.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,536 0.00% 0.0% 0.0% 10.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,538 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 9.0% 89.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,539 0.00% 0.0% 0.0% 0.0% 2.4% 96.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,540 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 73.3% 100.0% 100.0% 100.0% 100.0% 100.0%
1,541 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,543 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,545 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
1,740
1,741 0.00% 0.0% 0.0% 0.0% 0.0% 39.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,742 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 38.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,743 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 82.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,744 0.00% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,745
1,746 0.00% 0.0% 0.0% 0.0% 0.0% 52.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,747 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 50.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,748 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,749 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,750 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,751 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,752
1,753 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,754
1,755 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3%
1,756 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,757 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 65.2% 100.0% 100.0% 100.0% 100.0%
1,758
1,759 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,760 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 25.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,761 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 63.1% 100.0% 100.0% 100.0% 100.0%
1,762 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,763 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.3% 100.0% 100.0% 100.0%
1,764
1,765 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,766 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,767 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,768 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.5% 100.0% 100.0% 100.0% 100.0%
1,769 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.5% 100.0% 100.0% 100.0% 100.0%
1,770 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 31.6% 100.0% 100.0% 100.0% 100.0%
1,771 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.6% 100.0% 100.0% 100.0% 100.0%
1,772 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 75.4% 100.0% 100.0% 100.0% 100.0%
1,773 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.5% 100.0% 100.0% 100.0% 100.0%
1,774
1,775 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,776 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 42.1% 100.0% 100.0% 100.0% 100.0%
1,777 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0%
1,778
1,779 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.3% 100.0% 100.0% 100.0%
1,780 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0%
1,782 0.00% 0.0% 0.0% 0.0% 0.0% 8.2% 64.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,783 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 8.9% 97.6% 100.0% 100.0% 100.0%
1,784 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,786 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 100.0% 100.0% 100.0% 100.0%
1,787 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.8% 100.0% 100.0% 100.0% 100.0%
1,788 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,789 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1.6% 66.7% 100.0% 100.0% 100.0% 100.0% 100.0%
1,790 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,792 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0%
1,793 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0%
1,794 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,795 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 56.5% 100.0% 100.0% 100.0% 100.0%
1,796 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
1,798 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
1,800 0.00% 0.0% 0.0% 0.0% 22.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,801 0.00% 0.0% 0.0% 0.0% 0.0% 102.7% 102.7% 102.7% 102.7% 102.7% 102.7% 102.7% 102.7% 102.7% 102.7%
1,802 0.00% 0.0% 0.0% 0.0% 0.0% 11.5% 90.7% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2%
1,803
1,804 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.1% 100.1% 100.1% 100.1% 100.1%
1,805 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,806 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,807 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
1,815
1,816 0.00% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,817 0.00% 0.0% 0.0% 1.4% 72.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,818 0.00% 0.0% 0.0% 0.0% 0.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0% 101.0%
1,819 0.00% 0.0% 0.0% 0.0% 0.0% 53.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,820
1,821 0.00% 0.0% 0.0% 41.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,822 0.00% 0.0% 0.0% 0.0% 78.6% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,823
1,824 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,825
1,826 0.00% 0.0% 0.0% 0.0% 0.0% 53.6% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
1,827 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,828
1,829 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 43.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,830 0.00% 0.0% 0.0% 0.0% 23.5% 86.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,831
1,832 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 51.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,833 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,834 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
1,835
1,836 0.00% 0.0% 0.0% 0.0% 12.3% 45.5% 75.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
2,082
2,083 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,084 0.00% 0.0% 0.0% 0.0% 0.0% 78.7% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2%
2,085 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,086 0.00% 0.0% 0.0% 0.0% 57.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,087
2,088 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,089 0.00% 0.0% 0.0% 0.0% 0.0% 39.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,090 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,091 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,092 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0%
2,093 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,094
2,095 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,096 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,097
2,098 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,099 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 75.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,100 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.5% 100.0% 100.0% 100.0% 100.0%
2,101
2,102 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,103 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.9% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,104 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 60.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,105 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 82.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,106 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,107
2,108 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,109 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 25.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,110 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,111 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.5% 100.0% 100.0% 100.0% 100.0%
2,112 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.5% 100.0% 100.0% 100.0% 100.0%
2,113 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,114
2,115 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,116 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1%
2,117 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,118 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 96.8% 100.0% 100.0% 100.0% 100.0%
2,119 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 96.8% 100.0% 100.0% 100.0%
2,120 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 96.8% 100.0% 100.0% 100.0%
2,121 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 63.1% 100.1% 100.1% 100.1% 100.1%
2,122
2,123 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
2,124 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
2,125 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
2,126 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.8% 100.1% 100.1% 100.1% 100.1%
2,128 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,129 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,130 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 39.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,131 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,133 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,134 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 22.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,135 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,136 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,137 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,139 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 22.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,140 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 22.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,141 0.00% 0.0% 0.0% 0.0% 0.0% 61.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,142 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 49.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,143 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
2,145 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
2,216
2,217 0.00% 26.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,218 0.00% 0.0% 58.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,219 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,220 0.00% 0.0% 17.7% 61.6% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2%
2,221 0.00% 0.0% 44.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,222 0.00% 55.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,223 55.56% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,224 0.00% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,225
2,226 0.00% 31.0% 75.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,227 0.00% 2.9% 42.6% 86.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,228 0.00% 0.0% 0.0% 0.0% 15.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,229 0.00% 0.0% 10.3% 59.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,230 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,231 0.00% 0.0% 0.0% 39.8% 79.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,232
2,233 0.00% 0.0% 0.0% 0.7% 49.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,234
2,235 0.00% 0.0% 0.0% 0.0% 0.0% 28.1% 98.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,236 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 27.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,237 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 26.5% 87.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,238 0.00% 0.0% 0.0% 0.0% 0.0% 20.1% 76.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,239 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.7% 100.0% 100.0% 100.0% 100.0% 100.0%
2,240
2,241 0.00% 0.0% 0.0% 0.0% 0.0% 19.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,242 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 9.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,243 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,244
2,245 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,246 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 53.2% 100.0% 100.0% 100.0% 100.0%
2,247 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 53.2% 100.0% 100.0% 100.0% 100.0%
2,248 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 44.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,249 0.00% 0.0% 0.0% 0.0% 0.0% 30.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,250 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 61.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,251 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 78.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,252
2,253 0.00% 0.0% 58.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,254 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0%
2,255 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0%
2,256 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0%
2,257 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0%
2,258 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 100.1% 100.1% 100.1% 100.1%
2,259 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 100.2% 100.2% 100.2% 100.2%
2,260 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0%
2,261 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1%
2,262 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,263 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0% 100.0%
2,264 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0% 100.0%
2,265 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0% 100.0%
2,266 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 39.9% 100.0% 100.0% 100.0% 100.0%
2,267 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.3% 100.0% 100.0% 100.0% 100.0% 100.0%
2,268 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 53.2% 100.0% 100.0% 100.0% 100.0%
2,269 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,270 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,271 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,272 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 76.2% 100.0% 100.0% 100.0% 100.0%
2,273
2,274 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.0% 100.0% 100.0% 100.0%
2,275 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.0% 100.0% 100.0% 100.0%
2,276 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.1% 100.0% 100.0% 100.0%
2,277 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.1% 100.1% 100.1% 100.1%
2,279 0.00% 0.0% 0.0% 0.0% 0.0% 7.1% 56.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,280 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,281 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,282 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,283 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,285 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.9% 100.0% 100.0% 100.0% 100.0%
2,286 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.9% 100.0% 100.0% 100.0% 100.0%
2,287 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,288 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,289 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0%
2,290 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 26.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,292 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.2% 100.0% 100.0% 100.0% 100.0%
2,293 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.9% 76.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,294 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 55.3% 100.0% 100.0% 100.0% 100.0%
2,295 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,297 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,299 0.00% 0.0% 0.0% 1.0% 52.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,300 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,301 0.00% 0.0% 0.0% 0.0% 0.0% 15.3% 71.7% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8%
2,303 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 82.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,423
2,424 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,425 0.00% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,426 0.00% 0.0% 0.0% 0.0% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5%
2,427 0.00% 0.0% 0.0% 0.0% 27.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,428 0.00% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,429 0.00% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,430
2,431 0.00% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,432 0.00% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,433 0.00% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,434 0.00% 0.0% 0.0% 0.0% 3.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,435
2,436 0.00% 0.0% 0.0% 0.0% 0.0% 3.2% 99.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,437
2,438 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 35.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,439 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 9.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,440 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 65.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,441 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 92.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,442 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 38.9% 100.0% 100.0% 100.0% 100.0% 100.0%
2,443
2,444 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,445 0.00% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,446 0.00% 0.0% 0.0% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,447
2,448 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,449 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,450 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,451 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 63.3% 100.0% 100.0% 100.0% 100.0% 100.0%
2,452 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.0% 100.0% 100.0% 100.0% 100.0%
2,453 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.0% 100.0% 100.0% 100.0% 100.0%
2,454 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 80.9% 99.9% 99.9% 99.9% 99.9%
2,455 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 80.9% 99.9% 99.9% 99.9% 99.9%
2,456 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,457 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,458 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,459 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 63.3% 100.0% 100.0% 100.0% 100.0% 100.0%
2,460 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.0% 100.0% 100.0% 100.0% 100.0%
2,461
2,462 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0%
2,463 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0%
2,465 0.00% 0.0% 0.0% 0.0% 27.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,466 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,467 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,468 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 28.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,469 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 97.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,471 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,472 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,473 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 26.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,474 0.00% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,476 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,477 0.00% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,478 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.4% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,479 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,481 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,483 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,484 0.00% 0.0% 0.0% 0.0% 39.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,485 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,487 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
2,495
2,496 0.00% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,497 0.00% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,498 0.00% 0.0% 0.0% 0.0% 78.8% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3%
2,499
2,500 0.00% 0.0% 0.0% 0.0% 2.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,501
2,502 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,503 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 32.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,504 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 51.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,505 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,506 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 64.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,507 0.00% 0.0% 0.0% 0.0% 0.0% 26.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,508 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 51.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,509 0.00% 0.0% 0.0% 0.0% 0.0% 53.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,510
2,512 0.00% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,513 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,514 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.0% 100.0% 100.0% 100.0% 100.0%
2,515 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 99.6% 99.6% 99.6% 99.6% 99.6% 99.6% 99.6% 99.6% 99.6%
2,517 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 64.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,518 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,519 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 51.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,520 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,521 0.00% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,523 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 64.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,524 0.00% 0.0% 0.0% 0.0% 0.0% 53.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,525 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 32.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,526 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 75.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,528 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,536
2,537 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0%
2,538 0.00% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,539 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,540 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,541 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0%
2,542 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,543 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,544 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,545 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,546 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,547 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,548 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,549 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,550 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,551 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,552 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,553 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,554 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,555 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,556 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,557 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,558 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,559 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,560 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,561 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,562 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,563 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,564 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,565 0.00% 0.0% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,566 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 98.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,567 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.2% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,568 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,569 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,570 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 47.3% 96.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,571 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,572 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 28.6% 89.4% 100.0% 100.0% 100.0% 100.0%
2,573 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,574 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 39.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,575 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,576 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.6% 100.6% 100.6% 100.6% 100.6%
2,577 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,578 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,579 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3%
2,580 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,581 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 27.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,582 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.6% 100.0% 100.0% 100.0% 100.0%
2,583 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 96.9% 101.7% 101.7% 101.7% 101.7%
2,584 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,585 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 75.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,586 0.00% 0.0% 0.0% 0.0% 0.0% 52.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,587 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 84.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,588 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 60.9% 100.0% 100.0% 100.0% 100.0%
-
2,596
2,597 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,598 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,599 0.00% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,600 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,601 0.00% 0.0% 0.0% 0.0% 13.5% 87.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,602 0.00% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,603 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,604
2,605 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,606 0.00% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,607 0.00% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,608 0.00% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,609 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,610 0.00% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,611
2,612 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,613
2,614 0.00% 0.0% 0.0% 0.0% 0.0% 28.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,615 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,616 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,617 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 84.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,618 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,619
2,620 0.00% 0.0% 0.0% 0.0% 4.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,621 0.00% 0.0% 0.0% 0.0% 0.0% 19.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,622 0.00% 0.0% 0.0% 0.0% 0.0% 92.9% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,623
2,624 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,625 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 27.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,626 0.00% 0.0% 0.0% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,627 0.00% 0.0% 0.0% 0.0% 0.0% 19.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,628 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,629 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,630 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,631 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,632 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 22.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,633
2,634 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,635 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,636 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,637 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,638 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,639 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 101.6% 101.6% 101.6% 101.6% 101.6% 101.6% 101.6%
2,640 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,641 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 90.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,642 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,643 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,644
2,646 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 95.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,647 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 95.3% 100.0% 100.0% 100.0% 100.0%
2,648 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 75.4% 100.0% 100.0% 100.0% 100.0%
2,649 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 17.8% 100.0% 100.0% 100.0% 100.0%
2,650 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,651 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,653 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,654 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,655 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,656 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,657 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,659 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,660 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,661 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 82.3% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2%
2,662 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,663 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,665 0.00% 0.0% 0.0% 36.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,666 0.00% 0.0% 0.0% 0.0% 39.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,667 0.00% 0.0% 0.0% 0.0% 0.0% 65.0% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2%
2,669 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,670
2,671 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 66.7% 100.0% 100.0% 100.0% 100.0% 100.0%
-
2,679
2,680 0.00% 0.0% 0.0% 3.6% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,681 0.00% 0.0% 0.0% 0.0% 54.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,682 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,683 0.00% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,684
2,685 0.00% 0.0% 0.0% 3.6% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,686 0.00% 0.0% 0.0% 0.0% 78.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,687 0.00% 0.0% 0.0% 0.0% 3.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,688 0.00% 0.0% 0.0% 0.0% 3.6% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5% 100.5%
2,689 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,690 0.00% 0.0% 0.0% 0.0% 0.0% 69.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,691
2,692 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 59.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,693
2,694 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,695 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,696 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,697 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 48.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,698
2,699 0.00% 0.0% 0.0% 0.0% 0.0% 89.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,700 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 94.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,701 0.00% 0.0% 0.0% 0.0% 0.0% 14.3% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,702
2,703 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 41.7% 100.0% 100.0% 100.0% 100.0% 100.0%
2,704 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 9.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,705 0.00% 0.0% 0.0% 0.0% 0.0% 89.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,706 0.00% 0.0% 0.0% 0.0% 0.0% 7.1% 97.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,707 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,708 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,709 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,710 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,711
2,712 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.4% 100.0% 100.0% 100.0% 100.0%
2,713 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.4% 100.0% 100.0% 100.0% 100.0%
2,714 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 84.1% 101.4% 101.4% 101.4% 101.4% 101.4%
2,715 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.5% 100.4% 100.4% 100.4% 100.4% 100.4%
2,716 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.4% 100.0% 100.0% 100.0% 100.0% 100.0%
2,717 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 33.3% 100.0% 100.0% 100.0% 100.0% 100.0%
2,718 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 33.3% 100.0% 100.0% 100.0% 100.0% 100.0%
2,719 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 46.4% 100.0% 100.0% 100.0% 100.0%
2,720 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 82.8% 100.0% 100.0% 100.0% 100.0% 100.0%
2,721
2,722 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.0% 100.0% 100.0% 100.0%
2,723 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 69.1% 100.1% 100.1% 100.1%
2,725 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,726 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,727 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,728 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,729 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,730 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.4% 99.8% 99.8% 99.8% 99.8% 99.8% 99.8%
2,732 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,733 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,734 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,736 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,737 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.6% 100.1% 100.1% 100.1% 100.1%
2,738 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 63.1% 100.1% 100.1% 100.1% 100.1%
2,740 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,742 0.00% 0.0% 0.0% 0.0% 0.0% 89.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,743 0.00% 0.0% 0.0% 0.0% 0.0% 5.7% 80.6% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2%
2,745 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 39.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
2,753
2,754 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,755 0.00% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,756 0.00% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,757 0.00% 0.0% 71.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,758 0.00% 0.0% 0.0% 0.0% 85.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,759
2,760 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,761 0.00% 0.0% 0.0% 85.7% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,762 0.00% 0.0% 0.0% 0.0% 42.9% 105.9% 105.9% 105.9% 105.9% 105.9% 105.9% 105.9% 105.9% 105.9% 105.9%
2,763 0.00% 0.0% 0.0% 3.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,764 0.00% 0.0% 0.0% 0.0% 27.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,765
2,766 0.00% 0.0% 0.0% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,767 0.00% 0.0% 0.0% 0.0% 0.0% 19.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,768
2,769 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 95.3% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,770 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,771 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 36.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,772
2,773 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,774 0.00% 0.0% 0.0% 0.0% 0.0% 61.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,775
2,776 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,777 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 73.5% 99.6% 99.6% 99.6% 99.6% 99.6% 99.6%
2,778 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 73.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,779
2,780 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
2,781 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
2,782 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
2,783 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 74.6% 101.1% 101.1% 101.1% 101.1% 101.1% 101.1%
2,784 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 73.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,785 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 73.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,786 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 41.7% 100.0% 100.0% 100.0% 100.0% 100.0%
2,787 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 22.2% 100.0% 100.0% 100.0% 100.0% 100.0%
2,788 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0%
2,789 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 83.4% 100.1% 100.1% 100.1% 100.1% 100.1%
2,790
2,791 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 60.7% 100.0% 100.0% 100.0%
2,792 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 60.7% 100.0% 100.0% 100.0%
2,794 0.00% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,795 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 16.7% 100.0% 100.0% 100.0% 100.0% 100.0%
2,796 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0%
2,797 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,798 0.00% 0.0% 0.0% 0.0% 0.0% 45.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,799 0.00% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,801 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,802 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 57.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,803 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,804 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,805 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 42.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,806 0.00% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,808 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,809 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 56.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,810 0.00% 0.0% 0.0% 0.0% 23.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,811 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 62.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,812 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,814 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 54.8% 100.0% 100.0% 100.0% 100.0%
2,816 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
2,824
2,825 0.00% 0.0% 71.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,826 0.00% 36.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,827
2,828 0.00% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,829
2,830 0.00% 0.0% 0.0% 23.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,831
2,832 0.00% 0.0% 0.0% 0.0% 11.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,833
2,834 0.00% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,835 0.00% 0.0% 0.0% 0.0% 0.0% 30.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,836
2,837 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 94.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,838 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.0% 96.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,839 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 46.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,840 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 70.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,841 0.00% 0.0% 0.0% 0.0% 0.0% 45.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,842 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,843
2,844 0.00% 0.0% 0.0% 0.0% 0.0% 11.3% 60.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,845
2,847 0.00% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,848 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,849 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,850 0.00% 0.0% 0.0% 0.0% 0.0% 19.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,852 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9% 99.9%
2,853 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 22.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,854 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 95.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,855 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 14.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,856 0.00% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,858 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,859 0.00% 0.0% 0.0% 0.0% 0.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,860 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 11.3% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
2,861 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 23.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,863 0.00% 0.0% 0.0% 39.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,864 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,866 0.00% 0.0% 0.0% 0.0% 4.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
2,867
2,868 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.5% 64.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
-
3,113
3,114 0.00% 0.0% 0.0% 71.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,115 0.00% 35.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,116 0.00% 0.0% 25.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,117 0.00% 0.0% 0.0% 0.0% 34.9% 84.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,118 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 63.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,119 0.00% 44.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,120 41.67% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,121 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 88.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,122
3,123 0.00% 22.3% 72.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,124 0.00% 0.0% 0.0% 53.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,125 0.00% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,126 0.00% 0.0% 19.6% 68.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,127 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 85.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,128 0.00% 0.0% 20.2% 56.7% 90.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,129
3,130 0.00% 0.0% 0.0% 20.1% 64.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,131
3,132 0.00% 0.0% 0.0% 0.0% 21.1% 84.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,133 0.00% 0.0% 0.0% 0.0% 0.0% 22.4% 78.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,134 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 50.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,135 0.00% 0.0% 0.0% 0.0% 0.7% 55.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,136
3,137 0.00% 0.0% 0.0% 0.0% 7.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2% 100.2%
3,138 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 8.2% 68.4% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,139 0.00% 0.0% 0.0% 0.0% 0.0% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1% 100.1%
3,140 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 39.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,141
3,142 0.00% 0.0% 0.0% 0.0% 0.0% 14.3% 98.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,143 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,144 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,145 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 19.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,146 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 60.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,147 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,148 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 41.0% 100.9% 100.9% 100.9% 100.9% 100.9% 100.9%
3,149 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 20.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,150
3,151 0.00% 0.0% 58.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,152 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,153 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,154 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,155 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,156 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,157 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,158 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,159 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,160 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,161 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.3% 100.3% 100.3% 100.3% 100.3% 100.3%
3,162 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 27.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,163 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 27.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,164 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 27.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,165 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 27.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,166 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 19.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,167 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 26.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,168
3,169 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 36.2% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,170
3,171 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0%
3,172 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0%
3,173 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0%
3,174 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0%
3,175 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 100.0% 100.0% 100.0% 100.0%
3,177 0.00% 0.0% 0.0% 52.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,178 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 50.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,179 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.0% 100.0% 100.0% 100.0% 100.0%
3,180 0.00% 0.0% 0.0% 30.4% 63.7% 98.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,181 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 33.0% 92.9% 100.0% 100.0% 100.0% 100.0% 100.0%
3,183 0.00% 0.0% 0.0% 0.0% 0.0% 9.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,184 0.00% 0.0% 0.0% 0.0% 0.0% 9.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,185 0.00% 0.0% 0.0% 0.0% 0.0% 5.7% 80.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,186 0.00% 0.0% 0.0% 0.0% 0.0% 4.1% 57.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,187 0.00% 0.0% 0.0% 0.0% 16.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,189 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 12.9% 53.1% 95.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,190 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 43.7% 95.2% 100.0% 100.0% 100.0% 100.0%
3,191 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 87.3% 100.0% 100.0% 100.0% 100.0%
3,193 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 81.0% 100.0% 100.0% 100.0% 100.0%
3,195 0.00% 44.6% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,196 0.00% 0.0% 44.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,197 0.00% 0.0% 0.0% 105.9% 105.9% 105.9% 105.9% 105.9% 105.9% 105.9% 105.9% 105.9% 105.9% 105.9% 105.9%
3,198 0.00% 0.0% 0.0% 2.1% 60.3% 101.8% 101.8% 101.8% 101.8% 101.8% 101.8% 101.8% 101.8% 101.8% 101.8%
3,199 0.00% 0.0% 0.0% 0.0% 0.0% 31.5% 99.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,200 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 7.1% 59.8% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,202 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
3,203
3,204 0.00% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
OBRA: VAC INFRAESTRUCTURA / O-259 RUTA 5 COLLIPULLI - GORBEA
COSTO INDIRECTO PLANIFICADO Mes: Jun-22 COSTO INDIRECTO REAL Jun-22 DIFERENCIA Jun-22
PRESUPUESTO L0 Costo Acumulado Costo Mensual Costo Anterior Costo Acumulado Costo Mensual Costo Acumulado Costo Mensual
Resumen Importe Importe % Avance Importe % Avance Importe % Avance Importe % Avance Importe % Avance Importe % Avance Importe % Avance
RUTA 5 COLLIPULLI-GORBEA 5,925,477,774 4,172,170,948 70% 464,530,441 8% 3,707,640,507 63% 2,531,411,169 43% 447,725,067 43% 1,640,759,778 28% 16,805,374 -35%
Mano de Obra Indirecta 2,660,645,561 1,833,947,017 68.9% 232,427,372 17% 1,601,519,644 51.5% 1,069,381,124 40.2% 0 40% 764,565,893 28.7% 232,427,372 -23%
Remuneraciones 2,193,219,561 1,500,899,017 68.4% 194,003,372 18% 1,306,895,644 50.7% 851,692,807 38.8% 0 39% 649,206,210 29.6% 194,003,372 -21%
Alimentación, Alojamiento y viáticos 467,426,000 333,048,000 71.3% 38,424,000 16% 294,624,000 54.8% 217,688,317 46.6% 0 47% 115,359,683 24.7% 38,424,000 -30%
Vehículos y Maq. Indirecta 675,955,055 474,685,089 70.2% 55,890,120 17% 418,794,969 53.7% 324,140,991 48.0% 0 48% 150,544,098 22.3% 55,890,120 -31%
Maquinaria Indirecta 675,955,055 474,685,089 70.2% 55,890,120 17% 418,794,969 53.7% 324,140,991 48.0% 0 48% 150,544,098 22.3% 55,890,120 -31%
Señalización y Desvíos 305,564,320 251,741,452 82.4% 13,455,717 10% 238,285,735 72.7% 208,412,660 68.2% 0 68% 43,328,792 14.2% 13,455,717 -59%
Señalización y Desvíos 305,564,320 251,741,452 82.4% 13,455,717 10% 238,285,735 72.7% 208,412,660 68.2% 0 68% 43,328,792 14.2% 13,455,717 -59%
Seguridad, Calidad y Medio Amb. 119,608,214 93,671,277 78.3% 9,387,256 16% 84,284,020 62.6% 112,451,077 94.0% 0 94% -18,779,800 -15.7% 9,387,256 -78%
Prevención 95,208,214 73,271,277 77.0% 8,387,256 18% 64,884,020 59.3% 105,001,776 110.3% 0 110% -31,730,499 -33.3% 8,387,256 -93%
Topografia 24,400,000 20,400,000 83.6% 1,000,000 8% 19,400,000 75.4% 7,449,301 30.5% 0 31% 12,950,699 53.1% 1,000,000 -22%
Instalación de faena y oficinas 679,131,157 472,068,900 69.5% 42,240,911 13% 429,827,989 57.0% 277,916,545 40.9% 0 41% 194,152,355 28.6% 42,240,911 -28%
Comunicaciones 13,390,801 9,270,555 69.2% 1,030,062 15% 8,240,493 53.8% 5,479,833 40.9% 0 41% 3,790,722 28.3% 1,030,062 -26% 1.97%
Artículos de Oficina 53,236,870 39,842,915 74.8% 3,541,981 13% 36,300,934 61.5% 21,785,787 40.9% 0 41% 18,057,127 33.9% 3,541,981 -28% 7.84%
Instalación de faena Principal y Terreno 494,683,058 348,973,931 70.5% 30,805,369 13% 318,168,562 58.0% 202,436,017 40.9% 0 41% 146,537,914 29.6% 30,805,369 -28% 72.84%
Movilización y Desmovilización IF 75,221,429 45,450,000 60.4% 4,050,000 11% 41,400,000 49.7% 30,782,389 40.9% 0 41% 14,667,611 19.5% 4,050,000 -30% 11.08%
Consumos de Oficina 42,599,000 28,531,500 67.0% 2,813,500 13% 25,718,000 53.8% 17,432,519 40.9% 0 41% 11,098,981 26.1% 2,813,500 -28% 6.27%
Costos ind. Externos y varios 106,195,641 91,795,641 86.4% 5,100,000 8% 86,695,641 78.7% 49,624,596 46.7% 0 47% 42,171,045 39.7% 5,100,000 -39%
Planos y Caja Chica 23,950,000 17,950,000 74.9% 1,500,000 13% 16,450,000 62.4% 0.0% 0% 17,950,000 74.9% 1,500,000 13%
Asesorías externas y Visitas Oficina Central 82,245,641 73,845,641 89.8% 3,600,000 6% 70,245,641 83.5% 49,624,596 60.3% 0 60% 24,221,045 29.4% 3,600,000 -54%
Costos ind. Proporcionales 1,378,377,826 954,261,572 69.2% 106,029,064 15% 848,232,508 53.8% 489,484,176 35.5% 0 36% 464,777,395 33.7% 106,029,064 -20%
Impuestos, Garantías y Seguros 616,422,002 426,753,693 69.2% 47,417,077 15% 379,336,616 53.8% 183,444,216 29.8% 0 30% 243,309,477 39.5% 47,417,077 -14%
Oficina Central 502,890,844 348,155,200 69.2% 38,683,911 15% 309,471,289 53.8% 201,986,374 40.2% 0 40% 146,168,826 29.1% 38,683,911 -25%
Back Office 106,673,815 73,851,103 69.2% 8,205,678 15% 65,645,425 53.8% 42,845,594 40.2% 0 40% 31,005,508 29.1% 8,205,678 -25%
Imprevistos 152,391,165 105,501,576 69.2% 11,722,397 15% 93,779,178 53.8% 61,207,992 40.2% 0 40% 44,293,584 29.1% 11,722,397 -25%
Total Costos Indirectos 5,925,477,774 4,172,170,948 70% 464,530,441 8% 3,707,640,507 63% 2,531,411,169 43% - 0% 1,640,759,778 63% 464,530,441 63%
Control de Costos Oficina Técnica Administrador de Contrato Oficina Técnica Oficina Técnica
27,000,000
0.20%
54,000
Carlos Albornoz Patricio Fregosi Iván Barrantes Patricio Fregosi Patricio Fregosi
COSTO INDIRECTO PLANIFICADO
CLASIFICACIÓN Presupuesto Oct-21 Nov-21
Mano de Obra Indirecta 2,660,645,561 146,208,927 160,236,927
Remuneraciones 2,193,219,561 112,012,927 125,212,927
Alimentación, Alojamiento y viáticos 467,426,000 34,196,000 35,024,000
Vehículos y Maq. Indirecta 675,955,055 41,066,994 47,218,865
Maquinaria Indirecta 675,955,055 41,066,994 47,218,865
Señalización y Desvíos 305,564,320 36,368,717 36,368,717
Señalización y Desvíos 305,564,320 36,368,717 36,368,717
Seguridad, Calidad y Medio Amb. 119,608,214 10,465,135 10,709,329
Prevención 95,208,214 7,565,135 7,809,329
Topografia 24,400,000 2,900,000 2,900,000
Instalación de faena y oficinas 679,131,157 72,496,689 60,835,632
Comunicaciones 13,390,801 1,030,062 1,030,062
Artículos de Oficina 53,236,870 9,654,242 3,343,337
Instalación de faena Principal y Terreno 494,683,058 51,981,885 46,631,733
Movilización y Desmovilización IF 75,221,429 6,675,000 6,675,000
Consumos de Oficina 42,599,000 3,155,500 3,155,500
Costos ind. Externos y varios 106,195,641 24,664,271 13,214,271
Planos y Caja Chica 23,950,000 5,950,000 1,500,000
Asesorías externas y Visitas Oficina Centra 82,245,641 18,714,271 11,714,271
Costos ind. Proporcionales 1,378,377,826 106,029,064 106,029,064
Impuestos, Garantías y Seguros 616,422,002 47,417,077 47,417,077
Oficina Central 502,890,844 38,683,911 38,683,911
Back Office 106,673,815 8,205,678 8,205,678
Imprevistos 152,391,165 11,722,397 11,722,397
Total Costos Indirectos 5,925,477,774 437,299,797 434,612,806
Mes: Jun-22
Dec-22 Total
- 8,442,238,078
6,812,146,078
1,630,092,000
- 2,279,511,027
2,279,511,027
- 1,463,587,262
1,463,587,262
- 479,107,328
360,007,328
119,100,000
- 2,588,110,572
46,352,773
222,283,196
1,921,397,103
252,000,000
146,077,500
- 596,926,640
107,550,000
489,376,640
- 4,771,307,858
2,133,768,467
1,740,775,998
369,255,515
527,507,878
- ###