Está en la página 1de 75

RESUMEN DE METRADOS INST.

ELECTRICAS-OBRAS NUEVAS- BLOQUE EXISTENTES

"ELABORACION DEL EXPEDIENTE TECNICO PARA LA ADECUACION, MEJORAMIENTO, SUSTITUCION DE LA INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO DE LA INSTITUCION
PROYECTO:
EDUCATIVA FRANCISCO ANTONIO DE ZELA, UBICADA EN EL DISTRITO DE TACNA -TACNA"
UBICACIÓN: DISTRITO, PROVINCIA, REGION TACNA

FECHA: AGOSTO 2,013 BLOQUE EXTERIORES

ESPECIALIDAD: DEMOLICION DE BLOQUE EXISTENTES

REVISOR: ING° JUAN RICARDO MENDOZA ALEJANDRO

ELABORADO POR : YURI MAX SIÑA CALDERON

CANT MEDIDAS
ITEM DESCRIPCION UNID. PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H) AREA

01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD


01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.44 CON GIGANTOGRAFIA und 2.00
1.00 2.00

01.01.02 CASETA DE ALMACEN Y GUARDIANIA m2 100.00


1.00 20.00 5.00 100.00

01.02 TRABAJOS PRELIMINARES


01.02.01 TRAZO NIVELES Y REPLANTEO m2 24545.00
1.00 24545.00 24545.00

01.03 DESMONTAJES Y DEMOLICIONES


01.03.01 DESMONTAJES
01.03.01.10 DESMONTAJE DE MALLA RACHEL m2 3068.19
PATIO 1 1.00 - 1152.53 1152.53
1.00 - 1100.59 1100.59
PATIO2 1.00 - 815.07 815.07

01.03.01.13 REMOCION DE AREAS VERDES m2 8724.86


1.00 - 4944.47 4944.47
1.00 - 139.89 139.89
1.00 - 497.29 497.29
1.00 - 80.97 1.00
1.00 - 15.00 15.00
1.00 - 47.32 47.32
1.00 - 12.06 12.06
1.00 - 22.69 22.69
1.00 - 36.44 36.44
1.00 - 33.76 33.76
1.00 - 43.87 43.87
1.00 - 36.81 36.81
1.00 - 27.96 27.96
1.00 - 46.34 46.34
1.00 - 24.47 24.47
1.00 - 3.37 3.37
1.00 - 3.78 3.78
1.00 - 14.94 14.94
1.00 - 5.68 5.68
1.00 - 15.05 15.05
1.00 - 14.23 14.23
1.00 - 53.42 53.42
1.00 - 862.62 862.62
1.00 - 246.14 246.14
1.00 - 797.65 797.65
1.00 - 778.61 778.61

01.03.01.14 DESBROCE Y TALA DE ARBOLES Y ARBUSTOS und 1.00


1.00 - 1.00 1.00

01.03.02 DESMONTAJE DE INSTALACIONES ELÉCTRICAS


01.03.02.18 DESMONTAJE DE SUB ESTACION DE P=50KV A 3 Ø220V. und 1.00
1.00 - 1.00 1.00

01.03.02.19 DESMONTAJE DE MEDIDOR DE ENERGIA SISTEMA 3 Ø 330/220V. und 1.00


1.00 - 1.00 1.00

01.03.03 DEMOLICIONES
01.03.03.13 DEMOLICION DE LOSAS DE CONCRETO C/MARTILLO m2 7494.69
LOSA DEPORTIVA Nº1 1.00 - 339.75 339.75
LOSA DEPORTIVA Nº2 1.00 - 447.04 447.04
LOSA DEPORTIVA Nº3 1.00 - 450.19 450.19
PATIO Nº1 1.00 - 2907.24 2907.24
PATIO Nº2 1.00 - 840.01 840.01
PATIO Nº3 1.00 - 1016.12 1016.12
1.00 - 185.01 185.01
PATIO Nº4 1.00 - 656.60 656.60
INGRESO PRIMARIO 1.00 - 44.05 44.05
INGRESO (LATERAL-PRINCIPAL - LATERAL) 1.00 - 608.68 608.68

01.03.03.14 DEMOLICION DE RAMPAS DE CONCRETO C/MARTILLO m2 37.94


RAMPA Nº1 1.00 - 9.93 9.93
RAMPA Nº2 1.00 - 13.96 13.96
RAMPA Nº3 1.00 - 10.82 10.82
RAMPA Nº4 1.00 - 3.23 3.23

01.03.03.15 DEMOLICION DE ESCALONES DE CONCRETO C/MARTILLO m3 58.62


ESCALON Nº1 1.00 11.57 0.33 3.82
ESCALON Nº2 1.00 5.13 0.97 4.98
ESCALON Nº3 1.00 10.68 0.48 5.13
ESCALON Nº4 1.00 2.98 0.64 1.91
ESCALON Nº5 1.00 4.84 0.37 1.79
ESCALON Nº6 1.00 1.89 0.85 1.61
ESCALON Nº7 1.00 2.38 0.58 1.38
ESCALON Nº8 1.00 3.46 0.86 2.98
ESCALON Nº9 1.00 4.46 0.88 3.92
ESCALON Nº10 1.00 3.47 0.24 0.83
ESCALON Nº11 1.00 7.21 1.91 13.77
ESCALON Nº12 1.00 6.31 2.13 13.44
ESCALON Nº13 1.00 3.00 0.58 1.74
ESCALON Nº14 1.00 3.90 0.34 1.33

01.03.03.16 DEMOLICION DE VEREDAS C/MARTILLO m2 1433.63


PLAZUELA 1.00 - 165.41 165.41
1.00 - 227.63 227.63
1.00 - 161.02 161.02
AREAS VERDES (GRUTA) 1.00 - 156.77 156.77
PABELLON A - F 1.00 - 163.09 163.09
PABELLON C1 1.00 - 25.27 25.27
PABELLON D 1.00 - 152.79 152.79
PABELLON E - F 1.00 - 33.71 33.71
1.00 - 203.17 203.17
PABELLON G 1.00 - 3.12 3.12
VESTIDORES 1.00 - 97.78 97.78
SS.HH 1.00 - 43.87 43.87

01.03.03.17 DEMOLICION DE PISCINA DE CONCRETO m3 140.71


LOSA FONDO 1.00 24.84 11.92 0.25 74.02
PAREDES 2.00 24.84 0.25 1.65 20.49
2.00 11.92 0.25 1.65 9.83
PISO 1.00 0.25 145.42 36.36

01.03.03.18 DEMOLICION DE TANQUE CISTERNA m3 13.82


ZONA PLAZUELA
LOSA 1.00 0.15 17.09 2.56
PAREDES 2.00 4.34 0.20 2.00 3.47
2.00 4.39 0.20 2.00 3.51
LOSA FONDO 1.00 0.25 17.09 4.27

01.03.03.19 DEMOLICION DE SARDINELES m3 PROMEDIO 50.35


AREAS VERDES (GRUTA) 1.00 159.57 0.20 0.35 11.17
PABELLON A - F 1.00 10.52 0.20 0.45 0.95
1.00 82.83 0.20 0.45 7.45
INGRESOS (LATERAL IZQ.) 1.00 46.69 0.20 0.80 7.47
INGRESO (LATERAL DER.) 1.00 52.77 0.20 0.55 5.80
PABELLON F 1.00 21.04 0.20 0.35 1.47
1.00 30.89 0.20 0.35 2.16
PLAZUELA 1.00 21.60 0.20 0.25 1.08
1.00 15.15 0.20 0.25 0.76
1.00 18.78 0.20 0.25 0.94
1.00 15.36 0.20 0.25 0.77
1.00 5.32 0.20 0.25 0.27
1.00 5.52 0.20 0.25 0.28
1.00 16.92 0.20 0.25 0.85
1.00 21.71 0.20 0.25 1.09
1.00 29.61 0.20 0.25 1.48
1.00 25.12 0.20 0.25 1.26
1.00 26.36 0.20 0.25 1.32
1.00 21.40 0.20 0.25 1.07
1.00 32.55 0.20 0.25 1.63
1.00 22.04 0.20 0.25 1.10

01.03.03.20 DEMOLICION DE SARDINELES ARMADOS m3 PROMEDIO 33.33


PABELLON D (ESCALON POSTERIOR) 1.00 3.03 0.20 1.40 0.85
1.00 3.00 0.20 1.10 0.66
1.00 5.46 0.20 0.50 0.55
RAMPA PABELLON C2 - C1 (INCL. BARANDA) 1.00 12.59 0.35 1.35 5.95
ESCALON C2 (INCL. BARANDA) 1.00 5.20 0.35 2.00 3.64
1.00 2.50 0.30 2.00 1.50
1.00 8.50 0.30 2.00 5.10
1.00 2.40 0.30 1.35 0.97
PATIO Nº3 -RAMPA 1.00 29.03 0.30 1.20 10.45
AREAS VERDES (POSTEIOR PABELLO D) 1.00 26.16 0.20 0.70 3.66

01.03.03.21 DEMOLICION DE LAVATORIO EXISTENTE m3 2.57


SS.HH. VESTIDORES
MURETES 2.00 0.15 0.33 0.10
POZA 2.00 3.02 0.09 0.54

SS.HH. PABELLON C1
MURETES 2.00 0.15 0.33 0.10
POZA 2.00 3.02 0.09 0.54

SS.HH. PABELLO C2
MURETES 2.00 0.15 0.33 0.10
POZA 2.00 3.02 0.09 0.54

PABELLON D (JARDIN)
MURETES 2.00 0.15 0.33 0.10
POZA 2.00 3.02 0.09 0.54
01.03.03.22 ACARREO DE MATERIAL EXCEDENTE PROVENIENTE DE LAS DEMOLICIONES HAS m3 10471.63
DEMOLICION DE MUROS 1.00 VOL = 1149.10 1.25 1436.37
DEMOLICION DE PARAPETOS 1.00 VOL = 120.22 1.25 150.27
DEMOLICION DE LOSA ALIGERADA 1.00 VOL = 1340.12 1.25 1675.16
DEMOLICION DE LOSA MACIZA 1.00 VOL = 93.98 1.25 117.48
DEMOLICION DE VIGAS 1.00 VOL = 694.89 1.25 868.61
DEMOLICION DE COLUMNAS 1.00 VOL = 733.21 1.25 916.52
DEMOLICION DE PARAPETOS DE CONCRETO 1.00 VOL = 19.45 1.25 24.31
DEMOLICION DE ESCALERAS DE CONCRETO 1.00 VOL = 44.39 1.25 55.49
DEMOLICION DE SOBRECIMIENTOS 1.00 VOL = 130.35 1.25 162.93
DEMOLICION DE CIMIENTOS 1.00 VOL = 391.04 1.25 488.80
DEMOLICION DE ZAPATAS 1.00 VOL = 859.96 1.25 1074.95
DEMOLICION DE PISOS 1.00 VOL = 781.53 1.25 976.91
DEMOLICION DE LOSAS 1.00 VOL = 1498.94 1.25 1873.67
DEMOLICION DE RAMPAS 1.00 VOL = 5.69 1.25 7.11
DEMOLICION DE ESCALONES DE CONCRETO 1.00 VOL = 58.62 1.25 73.27
DEMOLICION DE VEREDAS 1.00 VOL = 215.04 1.25 268.81
DEMOLICION DE PISCINA 1.00 VOL = 140.71 1.25 175.88
DEMOLICION DE TANQUE CISTERNA 1.00 VOL = 13.82 1.25 17.28
DEMOLICION DE SARDINELES 1.00 VOL = 50.35 1.25 62.94
DEMOLICION DE SARDINELES ARMADOS 1.00 VOL = 33.33 1.25 41.66
DEMOLICION DE LAVATORIOS 1.00 VOL = 2.57 1.25 3.21

01.03.03.23 ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO D=5 KM. m3 10471.63


ELIMINACION PRODUCTO DE LAS DEMOLICIONES 1.00 VOL = 10471.63 - 10471.63

01.03.03.24 LIMPIEZA DEL TERRENO EN FORMA MANUAL m2 24545.00


1.00 24545.00 24545.00

01.03.03.25 MOVILIZACION DE HERRAMIENTAS Y EQUIPOS glb 1.00


1.00 1.00

SUSTENTO DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON "A" - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


CANT MEDIDAS PARCIA
ITEM DESCRIPCION UNID. TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H) AREA L

02.03 DESMONTAJES Y DEMOLICIONES


02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 63.67
PABELLON "A"
PRIMER NIVEL
AULA 1,2,3,4 4.00 - 1.10 2.10 9.24
4.00 - 1.95 0.88 6.86
SALA DE PROFESORES 1.00 - 1.10 2.10 2.31
SS.HH. SALA DE P. 2.00 - 0.70 1.75 2.45
SS.HH. PASILLO 1.00 - 1.10 2.10 2.31
SS.HH. (INTERIOR) 7.00 - 0.70 1.75 8.58
SEGUNDO NIVEL
AULA 5,6,7,8 4.00 - 1.10 2.10 9.24
4.00 - 1.95 0.88 6.86
SALA DE PROFESORES 1.00 - 1.10 2.10 2.31
SS.HH. SALA DE P. 2.00 - 0.75 1.75 2.63
SS.HH. PASILLO 1.00 - 1.10 2.10 2.31
SS.HH. (INTERIOR) 7.00 - 0.70 1.75 8.58

02.03.01.04 DESMONTAJE DE PIZARRAS ACRILICAS und 8.00


PABELLON "A"
PRIMER NIVEL
AULAS 1,2,3,4 4.00 - - - 4.00
SEGUNDO NIVEL
AULAS 5,6,7,8 4.00 - - - 4.00

02.03.01.05 DESMONTAJE DE INODOROS und 16.00


PABELLON "A"
PRIMER NIVEL
SS.HH. SALA DE PROFESORES 1.00 - - - 1.00
SS.HH. ALUMNAS (BETERIA) 7.00 - - - 7.00
SEGUNDO NIVEL
SS.HH. SALA DE PROFESORES 1.00 - - - 1.00
SS.HH. ALUMNAS (BETERIA) 7.00 - - - 7.00

02.03.01.06 DESMONTAJE DE LAVATORIOS DE LOSA und 20.00


PABELLON "A"
PRIMER NIVEL
SS.HH. SALA DE PROFESORES 2.00 - - - 2.00
SS.HH. ALUMNAS (BETERIA) 8.00 - - - 8.00
SEGUNDO NIVEL
SS.HH. SALA DE PROFESORES 2.00 - - - 2.00
SS.HH. ALUMNAS (BETERIA) 8.00 - - - 8.00

02.03.01.08 DESMONTAJE DE VENTANAS DE MADERA m2 179.55


PABELLON "A"
PRIMER NIVEL
EJE A ENTRE 1 Y 2 1.00 2.75 - 1.37 3.77
EJE A ENTRE 3 Y 4 1.00 2.75 - 1.80 4.95
EJE A ENTRE 4 Y 5 1.00 2.72 - 1.80 4.90
EJE A ENTRE 5 Y 6 1.00 1.79 - 1.80 3.22
EJE A ENTRE 6 Y 7 1.00 2.74 - 1.80 4.93
EJE A ENTRE 7 Y 8 1.00 2.74 - 1.80 4.93
EJE A ENTRE 8 Y 9 1.00 1.79 - 1.80 3.22
EJE A ENTRE 10 Y 11 1.00 2.72 - 1.37 3.73
EJE A ENTRE 12 Y 13 1.00 2.75 - 1.80 4.95
EJE A ENTRE 13 Y 14 1.00 2.73 - 1.80 4.91
EJE A ENTRE 14 Y 15 1.00 1.80 - 1.80 3.24
EJE A ENTRE 15 Y 16 1.00 2.75 - 1.80 4.95
EJE A ENTRE 16 Y 17 1.00 2.73 - 1.80 4.91
EJE A ENTRE 17 Y 18 1.00 1.40 - 1.80 2.52
EJE C ENTRE 1 Y 2 1.00 1.50 - 0.60 0.90
EJE C ENTRE 3 Y 4 1.00 2.79 - 0.80 2.23
EJE C ENTRE 4 Y 5 1.00 2.93 - 0.80 2.34
EJE C ENTRE 5 Y 6 1.00 2.96 - 0.80 2.37
EJE C ENTRE 6 Y 7 1.00 2.95 - 0.80 2.36
EJE C ENTRE 7 Y 8 1.00 2.95 - 0.80 2.36
EJE C ENTRE 8 Y 9 1.00 2.91 - 0.80 2.33
EJE C ENTRE 10 Y 11 1.00 2.95 - 0.60 1.77
EJE C ENTRE 12 Y 13 1.00 3.26 - 0.80 2.61
EJE C ENTRE 13 Y 14 1.00 2.93 - 0.80 2.34
EJE C ENTRE 14 Y 15 1.00 2.92 - 0.80 2.34
EJE C ENTRE 15 Y 16 1.00 2.93 - 0.80 2.34
EJE C ENTRE 16 Y 17 1.00 2.92 - 0.80 2.34
EJE C ENTRE 17 Y 18 1.00 2.51 - 0.80 2.01
SEGUNDO NIVEL
EJE A ENTRE 1 Y 2 1.00 2.75 - 1.37 3.77
EJE A ENTRE 3 Y 4 1.00 2.75 - 1.80 4.95
EJE A ENTRE 4 Y 5 1.00 2.72 - 1.80 4.90
EJE A ENTRE 5 Y 6 1.00 1.79 - 1.80 3.22
EJE A ENTRE 6 Y 7 1.00 2.74 - 1.80 4.93
EJE A ENTRE 7 Y 8 1.00 2.74 - 1.80 4.93
EJE A ENTRE 8 Y 9 1.00 1.79 - 1.80 3.22
EJE A ENTRE 10 Y 11 1.00 2.72 - 1.37 3.73
EJE A ENTRE 12 Y 13 1.00 2.75 - 1.80 4.95
EJE A ENTRE 13 Y 14 1.00 2.73 - 1.80 4.91
EJE A ENTRE 14 Y 15 1.00 1.80 - 1.80 3.24
EJE A ENTRE 15 Y 16 1.00 2.75 - 1.80 4.95
EJE A ENTRE 16 Y 17 1.00 2.73 - 1.80 4.91
EJE A ENTRE 17 Y 18 1.00 1.40 - 1.80 2.52
EJE C ENTRE 1 Y 2 1.00 1.50 - 0.60 0.90
EJE C ENTRE 3 Y 4 1.00 2.79 - 0.80 2.23
EJE C ENTRE 4 Y 5 1.00 2.93 - 0.80 2.34
EJE C ENTRE 5 Y 6 1.00 2.96 - 0.80 2.37
EJE C ENTRE 6 Y 7 1.00 2.95 - 0.80 2.36
EJE C ENTRE 7 Y 8 1.00 2.95 - 0.80 2.36
EJE C ENTRE 8 Y 9 1.00 2.91 - 0.80 2.33
EJE C ENTRE 10 Y 11 1.00 2.95 - 0.60 1.77
EJE C ENTRE 12 Y 13 1.00 3.26 - 0.80 2.61
EJE C ENTRE 13 Y 14 1.00 2.93 - 0.80 2.34
EJE C ENTRE 14 Y 15 1.00 2.92 - 0.80 2.34
EJE C ENTRE 15 Y 16 1.00 2.93 - 0.80 2.34
EJE C ENTRE 16 Y 17 1.00 2.92 - 0.80 2.34
EJE C ENTRE 17 Y 18 1.00 2.51 - 0.80 2.01

02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS


02.03.01.15,01 DESMONTAJE DE ARTEFACTO O SOKET ADOSADO EN TECHO P/FOCO AHORRAD und 1.00
PABELLON "A"
PRIMER NIVEL 1.00 - 1.00 1.00

02.03.01.15,02 DESMONTAJE DE ARTEFACTO FLUORESCENTE EN TECHO C/LAMP. FLUORESCENTE und 10.00


PABELLON "A"
PRIMER NIVEL 1.00 - 5.00 5.00
SEGUNDO NIVEL 1.00 - 5.00 5.00

02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR und 5.00
PABELLON "A"
PRIMER NIVEL 1.00 - 2.00 2.00
SEGUNDO NIVEL 1.00 - 3.00 3.00

02.03.01.15,05 DESMONTAJE DE ARTEFACTO FLUORESCENTE ADOSADO C/LAMP. 1X40W und 51.00


PABELLON "A"
PRIMER NIVEL 1.00 - 25.00 25.00
SEGUNDO NIVEL 1.00 - 26.00 26.00

02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 8.00


PABELLON "A"
PRIMER NIVEL 1.00 - 4.00 4.00
SEGUNDO NIVEL 1.00 - 4.00 4.00

02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 15.00


PABELLON "A"
PRIMER NIVEL 1.00 - 7.00 7.00
SEGUNDO NIVEL 1.00 - 8.00 8.00

02.03.01.15,14 DESMONTAJE DE TIMBRE und 1.00


PABELLON "A"
SEGUNDO NIVEL 1.00 - 1.00 1.00

02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 2.00


PABELLON "A"
TD-A
PRIMER NIVEL 1.00 - 1.00 1.00
SEGUNDO NIVEL 1.00 - 1.00 1.00

02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 468.62


PABELLON "A"
PRIMER NIVEL 2.00 - 121.32 242.64
SEGUNDO NIVEL 2.00 - 112.99 225.98

02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 767.79
PABELLON "A"
PRIMER NIVEL
EJE A ENTRE 1 Y 2 1.00 - 9.64 9.64
EJE A ENTRE 3 Y 4 1.00 - 4.78 4.78
EJE A ENTRE 4 Y 5 1.00 - 3.73 3.73
EJE A ENTRE 5 Y 6 1.00 - 5.41 5.41
EJE A ENTRE 6 Y 7 1.00 - 3.93 3.93
EJE A ENTRE 7 Y 8 1.00 - 3.79 3.79
EJE A ENTRE 8 Y 9 1.00 - 5.37 5.37
EJE A ENTRE 10 Y 11 1.00 - 10.91 10.91
EJE A ENTRE 12 Y 13 1.00 - 4.70 4.70
EJE A ENTRE 13 Y 14 1.00 - 3.75 3.75
EJE A ENTRE 14 Y 15 1.00 - 5.43 5.43
EJE A ENTRE 15 Y 16 1.00 - 3.87 3.87
EJE A ENTRE 16 Y 17 1.00 - 3.52 3.52
EJE A ENTRE 17 Y 18 1.00 - 4.60 4.60
EJE C ENTRE 1 Y 2 1.00 - 10.78 10.78
EJE C ENTRE 3 Y 4 1.00 - 7.84 7.84
EJE C ENTRE 4 Y 5 1.00 - 7.06 7.06
EJE C ENTRE 5 Y 6 1.00 - 4.89 4.89
EJE C ENTRE 6 Y 7 1.00 - 7.05 7.05
EJE C ENTRE 7 Y 8 1.00 - 7.05 7.05
EJE C ENTRE 8 Y 9 1.00 - 4.71 4.71
EJE C ENTRE 10 Y 11 1.00 - 9.01 9.01
EJE C ENTRE 12 Y 13 1.00 - 7.72 7.72
EJE C ENTRE 13 Y 14 1.00 - 7.01 7.01
EJE C ENTRE 14 Y 15 1.00 - 4.77 4.77
EJE C ENTRE 15 Y 16 1.00 - 7.00 7.00
EJE C ENTRE 16 Y 17 1.00 - 6.98 6.98
EJE C ENTRE 17 Y 18 1.00 - 3.81 3.81
EJE 1,2,3,6,9,10,11,12,15,18 ENTRE A Y C 10.00 - 18.41 184.10
ENTRE EJES A Y C - 1 Y 2 SS.HH SALA DE PROFESORES 1.00 3.67 - 3.45 12.66
ENTRE EJES A Y C - 10 Y 11 SS.HH 6.00 1.60 - 1.75 16.80
ESCALERAS 0.00 0.00 - 0.00 0.00

SEGUNDO NIVEL
EJE A ENTRE 1 Y 2 1.00 - 9.66 9.66
EJE A ENTRE 3 Y 4 1.00 - 4.93 4.93
EJE A ENTRE 4 Y 5 1.00 - 4.03 4.03
EJE A ENTRE 5 Y 6 1.00 - 5.42 5.42
EJE A ENTRE 6 Y 7 1.00 - 4.08 4.08
EJE A ENTRE 7 Y 8 1.00 - 4.08 4.08
EJE A ENTRE 8 Y 9 1.00 - 5.53 5.53
EJE A ENTRE 10 Y 11 1.00 - 8.91 8.91
EJE A ENTRE 12 Y 13 1.00 - 4.84 4.84
EJE A ENTRE 13 Y 14 1.00 - 4.04 4.04
EJE A ENTRE 14 Y 15 1.00 - 5.43 5.43
EJE A ENTRE 15 Y 16 1.00 - 4.02 4.02
EJE A ENTRE 16 Y 17 1.00 - 3.99 3.99
EJE A ENTRE 17 Y 18 1.00 - 5.03 5.03
EJE C ENTRE 1 Y 2 1.00 - 10.73 10.73
EJE C ENTRE 3 Y 4 1.00 - 7.84 7.84
EJE C ENTRE 4 Y 5 1.00 - 7.06 7.06
EJE C ENTRE 5 Y 6 1.00 - 4.84 4.84
EJE C ENTRE 6 Y 7 1.00 - 7.05 7.05
EJE C ENTRE 7 Y 8 1.00 - 7.05 7.05
EJE C ENTRE 8 Y 9 1.00 - 4.66 4.66
EJE C ENTRE 10 Y 11 1.00 - 11.21 11.21
EJE C ENTRE 12 Y 13 1.00 - 7.72 7.72
EJE C ENTRE 13 Y 14 1.00 - 7.01 7.01
EJE C ENTRE 14 Y 15 1.00 - 4.72 4.72
EJE C ENTRE 15 Y 16 1.00 - 7.00 7.00
EJE C ENTRE 16 Y 17 1.00 - 6.98 6.98
EJE C ENTRE 17 Y 18 1.00 - 3.70 3.70
EJE 1,2,3,6,9,10,11,12,15,18 ENTRE A Y C 10.00 - 18.41 184.10
ENTRE EJES A Y C - 1 Y 2 SS.HH SALA DE PROFESORES 1.00 3.67 - 3.45 12.66
ENTRE EJES A Y C - 10 Y 11 SS.HH 6.00 1.60 - 1.75 16.80
ESCALERAS 0.00 0.00 - 0.00 0.00

02.03.02.02 DEMOLICION DE PARAPETOS m2 53.78


PABELLON "A"
PASILLO 2º NIVEL 1.00 44.82 - 1.20 53.78

02.03.02.03 DEMOLICION LOSA ALIGERADA m2 624.84


PABELLON "A"
PRIMER NIVEL
SALA DE PROFESORES 1.00 - 31.09 31.09
AULA 1 1.00 - 65.04 65.04
AULA 2 1.00 - 62.85 62.85
AULA 3 1.00 - 64.60 64.60
AULA 4 1.00 - 59.44 59.44
SS.HH. 1.00 - 29.42 29.42

SEGUNDO NIVEL
SALA DE PROFESORES 1.00 - 31.09 31.09
AULA5 1.00 - 65.02 65.02
AULA6 1.00 - 62.86 62.86
AULA7 1.00 - 64.57 64.57
AULA8 1.00 - 59.44 59.44
SS.HH. 1.00 - 29.42 29.42

02.03.02.05 DEMOLICION DE VIGAS m3 94.66


PABELLON "A"
PRIMER NIVEL
EJE A ENTRE 1 Y 2 1.00 4.45 0.25 0.70 0.78
EJE A ENTRE 3 Y 4 1.00 3.24 0.25 0.70 0.57
EJE A ENTRE 4 Y 5 1.00 2.93 0.25 0.70 0.51
EJE A ENTRE 5 Y 6 1.00 2.96 0.25 0.70 0.52
EJE A ENTRE 6 Y 7 1.00 2.95 0.25 0.70 0.52
EJE A ENTRE 7 Y 8 1.00 2.95 0.25 0.70 0.52
EJE A ENTRE 8 Y 9 1.00 2.91 0.25 0.70 0.51
EJE A ENTRE 10 Y 11 1.00 4.31 0.25 0.70 0.75
EJE A ENTRE 12 Y 13 1.00 3.26 0.25 0.70 0.57
EJE A ENTRE 13 Y 14 1.00 2.94 0.25 0.70 0.51
EJE A ENTRE 14 Y 15 1.00 2.91 0.25 0.70 0.51
EJE A ENTRE 15 Y 16 1.00 2.93 0.25 0.70 0.51
EJE A ENTRE 16 Y 17 1.00 2.92 0.25 0.70 0.51
EJE A ENTRE 17 Y 18 1.00 2.51 0.25 0.70 0.44
EJE B ENTRE 1 Y 2 1.00 4.55 0.25 0.70 0.80
EJE B ENTRE 10 Y 11 1.00 4.31 0.25 0.70 0.75
EJE C ENTRE 1 Y 2 1.00 4.45 0.25 0.50 0.56
EJE C ENTRE 3 Y 4 1.00 3.24 0.25 0.50 0.41
EJE C ENTRE 4 Y 5 1.00 2.93 0.25 0.50 0.37
EJE C ENTRE 5 Y 6 1.00 2.96 0.25 0.50 0.37
EJE C ENTRE 6 Y 7 1.00 2.95 0.25 0.50 0.37
EJE C ENTRE 7 Y 8 1.00 2.95 0.25 0.50 0.37
EJE C ENTRE 8 Y 9 1.00 2.91 0.25 0.50 0.36
EJE C ENTRE 10 Y 11 1.00 4.31 0.25 0.50 0.54
EJE C ENTRE 12 Y 13 1.00 3.26 0.25 0.50 0.41
EJE C ENTRE 13 Y 14 1.00 2.93 0.25 0.50 0.37
EJE C ENTRE 14 Y 15 1.00 2.92 0.25 0.50 0.37
EJE C ENTRE 15 Y 16 1.00 2.93 0.25 0.50 0.37
EJE C ENTRE 16 Y 17 1.00 2.92 0.25 0.50 0.37
EJE C ENTRE 17 Y 18 1.00 2.51 0.25 0.50 0.31
EJE 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18 ENTRE A Y C 18.00 6.23 0.25 0.70 19.62
VIGA EN PROYECCION DE VOLADO 1.00 49.04 0.35 0.70 12.01
VIGA EN PROYECCION DE VOLADO (VIGA CHATA EN LOSA) 11.00 3.12 0.32 0.20 2.20
SEGUNDO NIVEL
EJE A ENTRE 1 Y 2 1.00 4.45 0.25 0.65 0.72
EJE A ENTRE 3 Y 4 1.00 3.24 0.25 0.65 0.53
EJE A ENTRE 4 Y 5 1.00 2.93 0.25 0.65 0.48
EJE A ENTRE 5 Y 6 1.00 2.96 0.25 0.65 0.48
EJE A ENTRE 6 Y 7 1.00 2.95 0.25 0.65 0.48
EJE A ENTRE 7 Y 8 1.00 2.95 0.25 0.65 0.48
EJE A ENTRE 8 Y 9 1.00 2.91 0.25 0.65 0.47
EJE A ENTRE 10 Y 11 1.00 4.31 0.25 0.65 0.70
EJE A ENTRE 12 Y 13 1.00 3.26 0.25 0.65 0.53
EJE A ENTRE 13 Y 14 1.00 2.94 0.25 0.65 0.48
EJE A ENTRE 14 Y 15 1.00 2.91 0.25 0.65 0.47
EJE A ENTRE 15 Y 16 1.00 2.93 0.25 0.65 0.48
EJE A ENTRE 16 Y 17 1.00 2.92 0.25 0.65 0.47
EJE A ENTRE 17 Y 18 1.00 2.51 0.25 0.65 0.41
EJE B ENTRE 1 Y 2 1.00 4.55 0.25 0.65 0.74
EJE B ENTRE 10 Y 11 1.00 4.31 0.25 0.65 0.70
EJE C ENTRE 1 Y 2 1.00 4.45 0.25 0.45 0.50
EJE C ENTRE 3 Y 4 1.00 3.24 0.25 0.45 0.36
EJE C ENTRE 4 Y 5 1.00 2.93 0.25 0.45 0.33
EJE C ENTRE 5 Y 6 1.00 2.96 0.25 0.45 0.33
EJE C ENTRE 6 Y 7 1.00 2.95 0.25 0.45 0.33
EJE C ENTRE 7 Y 8 1.00 2.95 0.25 0.45 0.33
EJE C ENTRE 8 Y 9 1.00 2.91 0.25 0.45 0.33
EJE C ENTRE 10 Y 11 1.00 4.31 0.25 0.45 0.48
EJE C ENTRE 12 Y 13 1.00 3.26 0.25 0.45 0.37
EJE C ENTRE 13 Y 14 1.00 2.93 0.25 0.45 0.33
EJE C ENTRE 14 Y 15 1.00 2.92 0.25 0.45 0.33
EJE C ENTRE 15 Y 16 1.00 2.93 0.25 0.45 0.33
EJE C ENTRE 16 Y 17 1.00 2.92 0.25 0.45 0.33
EJE C ENTRE 17 Y 18 1.00 2.51 0.25 0.45 0.28
EJE 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18 ENTRE A Y C 18.00 6.23 0.25 0.65 18.22
VIGA EN PROYECCION DE VOLADO 1.00 49.04 0.35 0.70 12.01
VIGA EN PROYECCION DE VOLADO (VIGA CHATA EN LOSA) 11.00 3.12 0.32 0.20 2.20

02.03.02.06 DEMOLICION DE COLUMNAS m3 77.98


PABELLON "A"
EJE A - 1,2 2.00 0.55 0.29 8.80 2.81
EJE A - 3 1.00 0.55 0.35 8.80 1.69
EJE A - 4,5,6,7,8,9,13,14,15,16,17,18 12.00 0.55 0.40 8.80 23.23
EJE A - 10,11 2.00 0.55 0.30 8.80 2.90
EJE A - 12 1.00 0.55 0.30 8.80 1.45
EJE B - 1,2 2.00 0.55 0.29 8.80 2.81
EJE B - 3 1.00 0.55 0.35 8.80 1.69
EJE B - 4,5,6,7,8,9,13,14,15,16,17,18 12.00 0.55 0.40 8.80 23.23
EJE B - 10,11 2.00 0.55 0.30 8.80 2.90
EJE B - 12 1.00 0.55 0.30 8.80 1.45
ENTRE EJES 1 Y 16 PROYECCION DE VOLADO 14.00 0.35 0.32 8.80 13.80

02.03.02.07 DEMOLICION DE PARAPETOS DE CONCRETO ARMADO m3 2.62


PABELLON "A"
ESCALERA Nº1
Tramo 1 2.00 5.30 0.15 1.20 1.91
ESCALERA Nº2
Tramo 2 1.00 3.98 0.15 1.20 0.72

02.03.02.08 DEMOLICION DE ESCALERAS DE CONCRETO m3 7.44


PABELLON "A"
ESCALERA Nº1
Tramo 1 1.00 1.73 0.85 1.47
Descanso 1.00 4.05 1.90 0.15 1.15
Tramo 2 1.00 1.73 0.91 1.57
ESCALERA Nº2
Tramo 1 1.00 2.12 1.53 3.24

02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 15.98


PABELLON "A"
PRIMER NIVEL
EJE A ENTRE 1 Y 2 1.00 2.75 0.20 0.50 0.28
EJE A ENTRE 3 Y 4 1.00 3.23 0.20 0.50 0.32
EJE A ENTRE 4 Y 5 1.00 2.92 0.20 0.50 0.29
EJE A ENTRE 5 Y 6 1.00 2.96 0.20 0.50 0.30
EJE A ENTRE 6 Y 7 1.00 2.95 0.20 0.50 0.30
EJE A ENTRE 7 Y 8 1.00 2.95 0.20 0.50 0.30
EJE A ENTRE 8 Y 9 1.00 2.91 0.20 0.50 0.29
EJE A ENTRE 10 Y 11 1.00 4.31 0.20 0.50 0.43
EJE A ENTRE 12 Y 13 1.00 3.26 0.20 0.50 0.33
EJE A ENTRE 13 Y 14 1.00 2.94 0.20 0.50 0.29
EJE A ENTRE 14 Y 15 1.00 2.91 0.20 0.50 0.29
EJE A ENTRE 15 Y 16 1.00 2.93 0.20 0.50 0.29
EJE A ENTRE 16 Y 17 1.00 2.92 0.20 0.50 0.29
EJE A ENTRE 17 Y 18 1.00 2.51 0.20 0.50 0.25
EJE C ENTRE 1 Y 2 1.00 3.12 0.20 0.50 0.31
EJE C ENTRE 3 Y 4 1.00 3.24 0.20 0.50 0.32
EJE C ENTRE 4 Y 5 1.00 2.93 0.20 0.50 0.29
EJE C ENTRE 5 Y 6 1.00 2.96 0.20 0.50 0.30
EJE C ENTRE 6 Y 7 1.00 2.95 0.20 0.50 0.30
EJE C ENTRE 7 Y 8 1.00 2.95 0.20 0.50 0.30
EJE C ENTRE 8 Y 9 1.00 2.91 0.20 0.50 0.29
EJE C ENTRE 10 Y 11 1.00 3.26 0.20 0.50 0.33
EJE C ENTRE 12 Y 13 1.00 3.26 0.20 0.50 0.33
EJE C ENTRE 13 Y 14 1.00 2.93 0.20 0.50 0.29
EJE C ENTRE 14 Y 15 1.00 2.92 0.20 0.50 0.29
EJE C ENTRE 15 Y 16 1.00 2.92 0.20 0.50 0.29
EJE C ENTRE 16 Y 17 1.00 2.92 0.20 0.50 0.29
EJE C ENTRE 17 Y 18 1.00 2.51 0.20 0.50 0.25
EJE 1,2,3,6,9,10,11,12,15,18 ENTRE A Y C 10.00 6.23 0.20 0.50 6.23
ENTRE EJES A Y C - 1 Y 2 SS.HH SALA DE PROFESORES 1.00 3.67 0.20 0.50 0.37
ENTRE EJES A Y C - 10 Y 11 SS.HH 6.00 1.60 0.20 0.50 0.96
ESCALERAS 0.00 0.00 0.20 0.50 0.00

02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 47.94


PABELLON "A"
PRIMER NIVEL
EJE A ENTRE 1 Y 2 1.00 2.75 0.50 0.60 0.83
EJE A ENTRE 3 Y 4 1.00 3.23 0.50 0.60 0.97
EJE A ENTRE 4 Y 5 1.00 2.92 0.50 0.60 0.88
EJE A ENTRE 5 Y 6 1.00 2.96 0.50 0.60 0.89
EJE A ENTRE 6 Y 7 1.00 2.95 0.50 0.60 0.89
EJE A ENTRE 7 Y 8 1.00 2.95 0.50 0.60 0.89
EJE A ENTRE 8 Y 9 1.00 2.91 0.50 0.60 0.87
EJE A ENTRE 10 Y 11 1.00 4.31 0.50 0.60 1.29
EJE A ENTRE 12 Y 13 1.00 3.26 0.50 0.60 0.98
EJE A ENTRE 13 Y 14 1.00 2.94 0.50 0.60 0.88
EJE A ENTRE 14 Y 15 1.00 2.91 0.50 0.60 0.87
EJE A ENTRE 15 Y 16 1.00 2.93 0.50 0.60 0.88
EJE A ENTRE 16 Y 17 1.00 2.92 0.50 0.60 0.88
EJE A ENTRE 17 Y 18 1.00 2.51 0.50 0.60 0.75
EJE C ENTRE 1 Y 2 1.00 3.12 0.50 0.60 0.94
EJE C ENTRE 3 Y 4 1.00 3.24 0.50 0.60 0.97
EJE C ENTRE 4 Y 5 1.00 2.93 0.50 0.60 0.88
EJE C ENTRE 5 Y 6 1.00 2.96 0.50 0.60 0.89
EJE C ENTRE 6 Y 7 1.00 2.95 0.50 0.60 0.89
EJE C ENTRE 7 Y 8 1.00 2.95 0.50 0.60 0.89
EJE C ENTRE 8 Y 9 1.00 2.91 0.50 0.60 0.87
EJE C ENTRE 10 Y 11 1.00 3.26 0.50 0.60 0.98
EJE C ENTRE 12 Y 13 1.00 3.26 0.50 0.60 0.98
EJE C ENTRE 13 Y 14 1.00 2.93 0.50 0.60 0.88
EJE C ENTRE 14 Y 15 1.00 2.92 0.50 0.60 0.88
EJE C ENTRE 15 Y 16 1.00 2.92 0.50 0.60 0.88
EJE C ENTRE 16 Y 17 1.00 2.92 0.50 0.60 0.88
EJE C ENTRE 17 Y 18 1.00 2.51 0.50 0.60 0.75
EJE 1,2,3,6,9,10,11,12,15,18 ENTRE A Y C 10.00 6.23 0.50 0.60 18.69
ENTRE EJES A Y C - 1 Y 2 SS.HH SALA DE PROFESORES 1.00 3.67 0.50 0.60 1.10
ENTRE EJES A Y C - 10 Y 11 SS.HH 6.00 1.60 0.50 0.60 2.88
ESCALERAS 0.00 0.00 0.50 0.60 0.00

02.03.02.11 DEMOLICION DE ZAPATAS m3 57.40


PABELLON "A"
Z-1 42.00 1.45 1.45 0.65 57.40

02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 498.29


PABELLON "A"
SALA DE PROFESORES 1.00 - 30.40 30.40
AULA 1 1.00 - 68.14 68.14
AULA 2 1.00 - 66.00 66.00
AULA 3 1.00 - 67.63 67.63
AULA 4 1.00 - 62.63 62.63
SS.HH. 1.00 - 29.68 29.68
PASILLO 1.00 - 173.81 173.81

SUSTENTO DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON "B" - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


CANT MEDIDAS PARCIA
ITEM DESCRIPCION UNID. TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H) AREA L

02.03 DESMONTAJES Y DEMOLICIONES


02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 72.91
PABELLON "B"
PRIMER NIVEL
AULA 1,2,3,4 4.00 - 1.10 2.10 9.24
4.00 - 1.95 0.88 6.86
SALA DE PROFESORES 1.00 - 1.10 2.10 2.31
SS.HH. SALA DE P. 2.00 - 0.70 1.75 2.45
SS.HH. PASILLO 1.00 - 1.10 2.10 2.31
SS.HH. PASILLO INTERIOR 7.00 - 0.70 1.75 8.58
SEGUNDO NIVEL
AULA 5,6,7,8 8.00 - 1.10 2.10 18.48
4.00 - 1.95 0.88 6.86
SALA DE PROFESORES 1.00 - 1.10 2.10 2.31
SS.HH. SALA DE P. 2.00 - 0.75 1.75 2.63
SS.HH. PASILLO 1.00 - 1.10 2.10 2.31
SS.HH. PASILLO INTERIOR 7.00 - 0.70 1.75 8.58

02.03.01.04 DESMONTAJE DE PIZARRAS ACRILICAS und 8.00


PABELLON "B"
PRIMER NIVEL
AULAS 1,2,3,4 4.00 - - - 4.00
SEGUNDO NIVEL
AULAS 5,6,7,8 4.00 - - - 4.00

02.03.01.05 DESMONTAJE DE INODOROS und 16.00


PABELLON "B"
PRIMER NIVEL
SS.HH. SALA DE PROFESORES 1.00 - - - 1.00
SS.HH. ALUMNAS (BETERIA) 7.00 - - - 7.00
SEGUNDO NIVEL
SS.HH. SALA DE PROFESORES 1.00 - - - 1.00
SS.HH. ALUMNAS (BETERIA) 7.00 - - - 7.00

02.03.01.06 DESMONTAJE DE LAVATORIOS DE LOSA und 20.00


PABELLON "B"
PRIMER NIVEL
SS.HH. SALA DE PROFESORES 2.00 - - - 2.00
SS.HH. ALUMNAS (BETERIA) 8.00 - - - 8.00
SEGUNDO NIVEL
SS.HH. SALA DE PROFESORES 2.00 - - - 2.00
SS.HH. ALUMNAS (BETERIA) 8.00 - - - 8.00

02.03.01.08 DESMONTAJE DE VENTANAS DE MADERA m2 179.55


PABELLON "B"
PRIMER NIVEL
EJE A ENTRE 1 Y 2 1.00 2.75 - 1.37 3.77
EJE A ENTRE 3 Y 4 1.00 2.75 - 1.80 4.95
EJE A ENTRE 4 Y 5 1.00 2.72 - 1.80 4.90
EJE A ENTRE 5 Y 6 1.00 1.79 - 1.80 3.22
EJE A ENTRE 6 Y 7 1.00 2.74 - 1.80 4.93
EJE A ENTRE 7 Y 8 1.00 2.74 - 1.80 4.93
EJE A ENTRE 8 Y 9 1.00 1.79 - 1.80 3.22
EJE A ENTRE 10 Y 11 1.00 2.72 - 1.37 3.73
EJE A ENTRE 12 Y 13 1.00 2.75 - 1.80 4.95
EJE A ENTRE 13 Y 14 1.00 2.73 - 1.80 4.91
EJE A ENTRE 14 Y 15 1.00 1.80 - 1.80 3.24
EJE A ENTRE 15 Y 16 1.00 2.75 - 1.80 4.95
EJE A ENTRE 16 Y 17 1.00 2.73 - 1.80 4.91
EJE A ENTRE 17 Y 18 1.00 1.40 - 1.80 2.52
EJE C ENTRE 1 Y 2 1.00 1.50 - 0.60 0.90
EJE C ENTRE 3 Y 4 1.00 2.79 - 0.80 2.23
EJE C ENTRE 4 Y 5 1.00 2.93 - 0.80 2.34
EJE C ENTRE 5 Y 6 1.00 2.96 - 0.80 2.37
EJE C ENTRE 6 Y 7 1.00 2.95 - 0.80 2.36
EJE C ENTRE 7 Y 8 1.00 2.95 - 0.80 2.36
EJE C ENTRE 8 Y 9 1.00 2.91 - 0.80 2.33
EJE C ENTRE 10 Y 11 1.00 2.95 - 0.60 1.77
EJE C ENTRE 12 Y 13 1.00 3.26 - 0.80 2.61
EJE C ENTRE 13 Y 14 1.00 2.93 - 0.80 2.34
EJE C ENTRE 14 Y 15 1.00 2.92 - 0.80 2.34
EJE C ENTRE 15 Y 16 1.00 2.93 - 0.80 2.34
EJE C ENTRE 16 Y 17 1.00 2.92 - 0.80 2.34
EJE C ENTRE 17 Y 18 1.00 2.51 - 0.80 2.01
SEGUNDO NIVEL
EJE A ENTRE 1 Y 2 1.00 2.75 - 1.37 3.77
EJE A ENTRE 3 Y 4 1.00 2.75 - 1.80 4.95
EJE A ENTRE 4 Y 5 1.00 2.72 - 1.80 4.90
EJE A ENTRE 5 Y 6 1.00 1.79 - 1.80 3.22
EJE A ENTRE 6 Y 7 1.00 2.74 - 1.80 4.93
EJE A ENTRE 7 Y 8 1.00 2.74 - 1.80 4.93
EJE A ENTRE 8 Y 9 1.00 1.79 - 1.80 3.22
EJE A ENTRE 10 Y 11 1.00 2.72 - 1.37 3.73
EJE A ENTRE 12 Y 13 1.00 2.75 - 1.80 4.95
EJE A ENTRE 13 Y 14 1.00 2.73 - 1.80 4.91
EJE A ENTRE 14 Y 15 1.00 1.80 - 1.80 3.24
EJE A ENTRE 15 Y 16 1.00 2.75 - 1.80 4.95
EJE A ENTRE 16 Y 17 1.00 2.73 - 1.80 4.91
EJE A ENTRE 17 Y 18 1.00 1.40 - 1.80 2.52
EJE C ENTRE 1 Y 2 1.00 1.50 - 0.60 0.90
EJE C ENTRE 3 Y 4 1.00 2.79 - 0.80 2.23
EJE C ENTRE 4 Y 5 1.00 2.93 - 0.80 2.34
EJE C ENTRE 5 Y 6 1.00 2.96 - 0.80 2.37
EJE C ENTRE 6 Y 7 1.00 2.95 - 0.80 2.36
EJE C ENTRE 7 Y 8 1.00 2.95 - 0.80 2.36
EJE C ENTRE 8 Y 9 1.00 2.91 - 0.80 2.33
EJE C ENTRE 10 Y 11 1.00 2.95 - 0.60 1.77
EJE C ENTRE 12 Y 13 1.00 3.26 - 0.80 2.61
EJE C ENTRE 13 Y 14 1.00 2.93 - 0.80 2.34
EJE C ENTRE 14 Y 15 1.00 2.92 - 0.80 2.34
EJE C ENTRE 15 Y 16 1.00 2.93 - 0.80 2.34
EJE C ENTRE 16 Y 17 1.00 2.92 - 0.80 2.34
EJE C ENTRE 17 Y 18 1.00 2.51 - 0.80 2.01

02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS


02.03.01.15,01 DESMONTAJE DE ARTEFACTO O SOKET ADOSADO EN TECHO P/FOCO AHORRAD und 1.00
PABELLON "B"
PRIMER NIVEL 1.00 - 1.00 1.00

02.03.01.15,02 DESMONTAJE DE ARTEFACTO FLUORESCENTE EN TECHO C/LAMP. FLUORESCENTE und 10.00


PABELLON "B"
PRIMER NIVEL 1.00 - 5.00 5.00
SEGUNDO NIVEL 1.00 - 5.00 5.00

02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR und 5.00
PABELLON "B"
SEGUNDO NIVEL 1.00 - 5.00 5.00

02.03.01.15,04 DESMONTAJE DE ARTEFACTO FLUORESCENTE C/REJILLA DE ALUMINIO C/LAMP. und 2.00


PABELLON "B"
PRIMER NIVEL 1.00 - 2.00 2.00

02.03.01.15,05 DESMONTAJE DE ARTEFACTO FLUORESCENTE ADOSADO C/LAMP. 1X40W und 49.00


PABELLON "B"
PRIMER NIVEL 1.00 - 25.00 25.00
SEGUNDO NIVEL 1.00 - 24.00 24.00

02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 13.00


PABELLON "B"
PRIMER NIVEL 1.00 - 7.00 7.00
SEGUNDO NIVEL 1.00 - 6.00 6.00

02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 16.00


PABELLON "B"
PRIMER NIVEL 1.00 - 8.00 8.00
SEGUNDO NIVEL 1.00 - 8.00 8.00

02.03.01.15,13 DESMONTAJE DE LUCES DE EMERGENCIA und 3.00


PABELLON "B"
PRIMER NIVEL 1.00 - 1.00 1.00

PRIMER NIVEL 1.00 - 2.00 2.00

02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 2.00


PABELLON "B"
TD-B
PRIMER NIVEL 1.00 - 1.00 1.00
SEGUNDO NIVEL 1.00 - 1.00 1.00

02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 763.80


PABELLON "B"
PRIMER NIVEL 3.00 - 138.29 414.87
SEGUNDO NIVEL 3.00 - 116.31 348.93

02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 767.79
PABELLON "B"
PRIMER NIVEL
EJE A ENTRE 1 Y 2 1.00 - 9.64 9.64
EJE A ENTRE 3 Y 4 1.00 - 4.78 4.78
EJE A ENTRE 4 Y 5 1.00 - 3.73 3.73
EJE A ENTRE 5 Y 6 1.00 - 5.41 5.41
EJE A ENTRE 6 Y 7 1.00 - 3.93 3.93
EJE A ENTRE 7 Y 8 1.00 - 3.79 3.79
EJE A ENTRE 8 Y 9 1.00 - 5.37 5.37
EJE A ENTRE 10 Y 11 1.00 - 10.91 10.91
EJE A ENTRE 12 Y 13 1.00 - 4.70 4.70
EJE A ENTRE 13 Y 14 1.00 - 3.75 3.75
EJE A ENTRE 14 Y 15 1.00 - 5.43 5.43
EJE A ENTRE 15 Y 16 1.00 - 3.87 3.87
EJE A ENTRE 16 Y 17 1.00 - 3.52 3.52
EJE A ENTRE 17 Y 18 1.00 - 4.60 4.60
EJE C ENTRE 1 Y 2 1.00 - 10.78 10.78
EJE C ENTRE 3 Y 4 1.00 - 7.84 7.84
EJE C ENTRE 4 Y 5 1.00 - 7.06 7.06
EJE C ENTRE 5 Y 6 1.00 - 4.89 4.89
EJE C ENTRE 6 Y 7 1.00 - 7.05 7.05
EJE C ENTRE 7 Y 8 1.00 - 7.05 7.05
EJE C ENTRE 8 Y 9 1.00 - 4.71 4.71
EJE C ENTRE 10 Y 11 1.00 - 9.01 9.01
EJE C ENTRE 12 Y 13 1.00 - 7.72 7.72
EJE C ENTRE 13 Y 14 1.00 - 7.01 7.01
EJE C ENTRE 14 Y 15 1.00 - 4.77 4.77
EJE C ENTRE 15 Y 16 1.00 - 7.00 7.00
EJE C ENTRE 16 Y 17 1.00 - 6.98 6.98
EJE C ENTRE 17 Y 18 1.00 - 3.81 3.81
EJE 1,2,3,6,9,10,11,12,15,18 ENTRE A Y C 10.00 - 18.41 184.10
ENTRE EJES A Y C - 1 Y 2 SS.HH SALA DE PROFESORES 1.00 3.67 - 3.45 12.66
ENTRE EJES A Y C - 10 Y 11 SS.HH 6.00 1.60 - 1.75 16.80
ESCALERAS 0.00 0.00 - 0.00 0.00

SEGUNDO NIVEL
EJE A ENTRE 1 Y 2 1.00 - 9.66 9.66
EJE A ENTRE 3 Y 4 1.00 - 4.93 4.93
EJE A ENTRE 4 Y 5 1.00 - 4.03 4.03
EJE A ENTRE 5 Y 6 1.00 - 5.42 5.42
EJE A ENTRE 6 Y 7 1.00 - 4.08 4.08
EJE A ENTRE 7 Y 8 1.00 - 4.08 4.08
EJE A ENTRE 8 Y 9 1.00 - 5.53 5.53
EJE A ENTRE 10 Y 11 1.00 - 8.91 8.91
EJE A ENTRE 12 Y 13 1.00 - 4.84 4.84
EJE A ENTRE 13 Y 14 1.00 - 4.04 4.04
EJE A ENTRE 14 Y 15 1.00 - 5.43 5.43
EJE A ENTRE 15 Y 16 1.00 - 4.02 4.02
EJE A ENTRE 16 Y 17 1.00 - 3.99 3.99
EJE A ENTRE 17 Y 18 1.00 - 5.03 5.03
EJE C ENTRE 1 Y 2 1.00 - 10.73 10.73
EJE C ENTRE 3 Y 4 1.00 - 7.84 7.84
EJE C ENTRE 4 Y 5 1.00 - 7.06 7.06
EJE C ENTRE 5 Y 6 1.00 - 4.84 4.84
EJE C ENTRE 6 Y 7 1.00 - 7.05 7.05
EJE C ENTRE 7 Y 8 1.00 - 7.05 7.05
EJE C ENTRE 8 Y 9 1.00 - 4.66 4.66
EJE C ENTRE 10 Y 11 1.00 - 11.21 11.21
EJE C ENTRE 12 Y 13 1.00 - 7.72 7.72
EJE C ENTRE 13 Y 14 1.00 - 7.01 7.01
EJE C ENTRE 14 Y 15 1.00 - 4.72 4.72
EJE C ENTRE 15 Y 16 1.00 - 7.00 7.00
EJE C ENTRE 16 Y 17 1.00 - 6.98 6.98
EJE C ENTRE 17 Y 18 1.00 - 3.70 3.70
EJE 1,2,3,6,9,10,11,12,15,18 ENTRE A Y C 10.00 - 18.41 184.10
ENTRE EJES A Y C - 1 Y 2 SS.HH SALA DE PROFESORES 1.00 3.67 - 3.45 12.66
ENTRE EJES A Y C - 10 Y 11 SS.HH 6.00 1.60 - 1.75 16.80
ESCALERAS 0.00 0.00 - 0.00 0.00

02.03.02.02 DEMOLICION DE PARAPETOS m2 53.78


PABELLON "B"
PASILLO 2º NIVEL 1.00 44.82 - 1.20 53.78

02.03.02.03 DEMOLICION LOSA ALIGERADA m2 624.84


PABELLON "B"
PRIMER NIVEL
SALA DE PROFESORES 1.00 - 31.09 31.09
AULA 1 1.00 - 65.04 65.04
AULA 2 1.00 - 62.85 62.85
AULA 3 1.00 - 64.60 64.60
AULA 4 1.00 - 59.44 59.44
SS.HH. 1.00 - 29.42 29.42

SEGUNDO NIVEL
SALA DE PROFESORES 1.00 - 31.09 31.09
AULA5 1.00 - 65.02 65.02
AULA6 1.00 - 62.86 62.86
AULA7 1.00 - 64.57 64.57
AULA8 1.00 - 59.44 59.44
SS.HH. 1.00 - 29.42 29.42

02.03.02.05 DEMOLICION DE VIGAS m3 94.66


PABELLON "B"
PRIMER NIVEL
EJE A ENTRE 1 Y 2 1.00 4.45 0.25 0.70 0.78
EJE A ENTRE 3 Y 4 1.00 3.24 0.25 0.70 0.57
EJE A ENTRE 4 Y 5 1.00 2.93 0.25 0.70 0.51
EJE A ENTRE 5 Y 6 1.00 2.96 0.25 0.70 0.52
EJE A ENTRE 6 Y 7 1.00 2.95 0.25 0.70 0.52
EJE A ENTRE 7 Y 8 1.00 2.95 0.25 0.70 0.52
EJE A ENTRE 8 Y 9 1.00 2.91 0.25 0.70 0.51
EJE A ENTRE 10 Y 11 1.00 4.31 0.25 0.70 0.75
EJE A ENTRE 12 Y 13 1.00 3.26 0.25 0.70 0.57
EJE A ENTRE 13 Y 14 1.00 2.94 0.25 0.70 0.51
EJE A ENTRE 14 Y 15 1.00 2.91 0.25 0.70 0.51
EJE A ENTRE 15 Y 16 1.00 2.93 0.25 0.70 0.51
EJE A ENTRE 16 Y 17 1.00 2.92 0.25 0.70 0.51
EJE A ENTRE 17 Y 18 1.00 2.51 0.25 0.70 0.44
EJE B ENTRE 1 Y 2 1.00 4.55 0.25 0.70 0.80
EJE B ENTRE 10 Y 11 1.00 4.31 0.25 0.70 0.75
EJE C ENTRE 1 Y 2 1.00 4.45 0.25 0.50 0.56
EJE C ENTRE 3 Y 4 1.00 3.24 0.25 0.50 0.41
EJE C ENTRE 4 Y 5 1.00 2.93 0.25 0.50 0.37
EJE C ENTRE 5 Y 6 1.00 2.96 0.25 0.50 0.37
EJE C ENTRE 6 Y 7 1.00 2.95 0.25 0.50 0.37
EJE C ENTRE 7 Y 8 1.00 2.95 0.25 0.50 0.37
EJE C ENTRE 8 Y 9 1.00 2.91 0.25 0.50 0.36
EJE C ENTRE 10 Y 11 1.00 4.31 0.25 0.50 0.54
EJE C ENTRE 12 Y 13 1.00 3.26 0.25 0.50 0.41
EJE C ENTRE 13 Y 14 1.00 2.93 0.25 0.50 0.37
EJE C ENTRE 14 Y 15 1.00 2.92 0.25 0.50 0.37
EJE C ENTRE 15 Y 16 1.00 2.93 0.25 0.50 0.37
EJE C ENTRE 16 Y 17 1.00 2.92 0.25 0.50 0.37
EJE C ENTRE 17 Y 18 1.00 2.51 0.25 0.50 0.31
EJE 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18 ENTRE A Y C 18.00 6.23 0.25 0.70 19.62
VIGA EN PROYECCION DE VOLADO 1.00 49.04 0.35 0.70 12.01
VIGA EN PROYECCION DE VOLADO (VIGA CHATA EN LOSA) 11.00 3.12 0.32 0.20 2.20
SEGUNDO NIVEL
EJE A ENTRE 1 Y 2 1.00 4.45 0.25 0.65 0.72
EJE A ENTRE 3 Y 4 1.00 3.24 0.25 0.65 0.53
EJE A ENTRE 4 Y 5 1.00 2.93 0.25 0.65 0.48
EJE A ENTRE 5 Y 6 1.00 2.96 0.25 0.65 0.48
EJE A ENTRE 6 Y 7 1.00 2.95 0.25 0.65 0.48
EJE A ENTRE 7 Y 8 1.00 2.95 0.25 0.65 0.48
EJE A ENTRE 8 Y 9 1.00 2.91 0.25 0.65 0.47
EJE A ENTRE 10 Y 11 1.00 4.31 0.25 0.65 0.70
EJE A ENTRE 12 Y 13 1.00 3.26 0.25 0.65 0.53
EJE A ENTRE 13 Y 14 1.00 2.94 0.25 0.65 0.48
EJE A ENTRE 14 Y 15 1.00 2.91 0.25 0.65 0.47
EJE A ENTRE 15 Y 16 1.00 2.93 0.25 0.65 0.48
EJE A ENTRE 16 Y 17 1.00 2.92 0.25 0.65 0.47
EJE A ENTRE 17 Y 18 1.00 2.51 0.25 0.65 0.41
EJE B ENTRE 1 Y 2 1.00 4.55 0.25 0.65 0.74
EJE B ENTRE 10 Y 11 1.00 4.31 0.25 0.65 0.70
EJE C ENTRE 1 Y 2 1.00 4.45 0.25 0.45 0.50
EJE C ENTRE 3 Y 4 1.00 3.24 0.25 0.45 0.36
EJE C ENTRE 4 Y 5 1.00 2.93 0.25 0.45 0.33
EJE C ENTRE 5 Y 6 1.00 2.96 0.25 0.45 0.33
EJE C ENTRE 6 Y 7 1.00 2.95 0.25 0.45 0.33
EJE C ENTRE 7 Y 8 1.00 2.95 0.25 0.45 0.33
EJE C ENTRE 8 Y 9 1.00 2.91 0.25 0.45 0.33
EJE C ENTRE 10 Y 11 1.00 4.31 0.25 0.45 0.48
EJE C ENTRE 12 Y 13 1.00 3.26 0.25 0.45 0.37
EJE C ENTRE 13 Y 14 1.00 2.93 0.25 0.45 0.33
EJE C ENTRE 14 Y 15 1.00 2.92 0.25 0.45 0.33
EJE C ENTRE 15 Y 16 1.00 2.93 0.25 0.45 0.33
EJE C ENTRE 16 Y 17 1.00 2.92 0.25 0.45 0.33
EJE C ENTRE 17 Y 18 1.00 2.51 0.25 0.45 0.28
EJE 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18 ENTRE A Y C 18.00 6.23 0.25 0.65 18.22
VIGA EN PROYECCION DE VOLADO 1.00 49.04 0.35 0.70 12.01
VIGA EN PROYECCION DE VOLADO (VIGA CHATA EN LOSA) 11.00 3.12 0.32 0.20 2.20

02.03.02.06 DEMOLICION DE COLUMNAS m3 77.98


PABELLON "B"
EJE A - 1,2 2.00 0.55 0.29 8.80 2.81
EJE A - 3 1.00 0.55 0.35 8.80 1.69
EJE A - 4,5,6,7,8,9,13,14,15,16,17,18 12.00 0.55 0.40 8.80 23.23
EJE A - 10,11 2.00 0.55 0.30 8.80 2.90
EJE A - 12 1.00 0.55 0.30 8.80 1.45
EJE B - 1,2 2.00 0.55 0.29 8.80 2.81
EJE B - 3 1.00 0.55 0.35 8.80 1.69
EJE B - 4,5,6,7,8,9,13,14,15,16,17,18 12.00 0.55 0.40 8.80 23.23
EJE B - 10,11 2.00 0.55 0.30 8.80 2.90
EJE B - 12 1.00 0.55 0.30 8.80 1.45
ENTRE EJES 1 Y 16 PROYECCION DE VOLADO 14.00 0.35 0.32 8.80 13.80

02.03.02.07 DEMOLICION DE PARAPETOS DE CONCRETO ARMADO m3 3.22


PABELLON "B"
ESCALERA Nº1
Tramo 1 2.00 3.40 0.15 1.00 1.02
Descanso 1.00 7.85 0.15 1.00 1.18
Tramo 2 2.00 3.40 0.15 1.00 1.02

02.03.02.08 DEMOLICION DE ESCALERAS DE CONCRETO m3 8.99


PABELLON "B"
ESCALERA Nº1
Tramo 1 1.00 2.17 0.77 1.67
Descanso 1.00 4.27 1.94 0.15 1.24
Tramo 2 1.00 2.09 0.69 1.44
ESCALERA Nº2
Tramo 1 1.00 2.17 0.83 1.80
Descanso 1.00 4.06 1.90 0.15 1.16
Tramo 2 1.00 2.09 0.80 1.67

02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 15.98


PABELLON "B"
PRIMER NIVEL
EJE A ENTRE 1 Y 2 1.00 2.75 0.20 0.50 0.28
EJE A ENTRE 3 Y 4 1.00 3.23 0.20 0.50 0.32
EJE A ENTRE 4 Y 5 1.00 2.92 0.20 0.50 0.29
EJE A ENTRE 5 Y 6 1.00 2.96 0.20 0.50 0.30
EJE A ENTRE 6 Y 7 1.00 2.95 0.20 0.50 0.30
EJE A ENTRE 7 Y 8 1.00 2.95 0.20 0.50 0.30
EJE A ENTRE 8 Y 9 1.00 2.91 0.20 0.50 0.29
EJE A ENTRE 10 Y 11 1.00 4.31 0.20 0.50 0.43
EJE A ENTRE 12 Y 13 1.00 3.26 0.20 0.50 0.33
EJE A ENTRE 13 Y 14 1.00 2.94 0.20 0.50 0.29
EJE A ENTRE 14 Y 15 1.00 2.91 0.20 0.50 0.29
EJE A ENTRE 15 Y 16 1.00 2.93 0.20 0.50 0.29
EJE A ENTRE 16 Y 17 1.00 2.92 0.20 0.50 0.29
EJE A ENTRE 17 Y 18 1.00 2.51 0.20 0.50 0.25
EJE C ENTRE 1 Y 2 1.00 3.12 0.20 0.50 0.31
EJE C ENTRE 3 Y 4 1.00 3.24 0.20 0.50 0.32
EJE C ENTRE 4 Y 5 1.00 2.93 0.20 0.50 0.29
EJE C ENTRE 5 Y 6 1.00 2.96 0.20 0.50 0.30
EJE C ENTRE 6 Y 7 1.00 2.95 0.20 0.50 0.30
EJE C ENTRE 7 Y 8 1.00 2.95 0.20 0.50 0.30
EJE C ENTRE 8 Y 9 1.00 2.91 0.20 0.50 0.29
EJE C ENTRE 10 Y 11 1.00 3.26 0.20 0.50 0.33
EJE C ENTRE 12 Y 13 1.00 3.26 0.20 0.50 0.33
EJE C ENTRE 13 Y 14 1.00 2.93 0.20 0.50 0.29
EJE C ENTRE 14 Y 15 1.00 2.92 0.20 0.50 0.29
EJE C ENTRE 15 Y 16 1.00 2.92 0.20 0.50 0.29
EJE C ENTRE 16 Y 17 1.00 2.92 0.20 0.50 0.29
EJE C ENTRE 17 Y 18 1.00 2.51 0.20 0.50 0.25
EJE 1,2,3,6,9,10,11,12,15,18 ENTRE A Y C 10.00 6.23 0.20 0.50 6.23
ENTRE EJES A Y C - 1 Y 2 SS.HH SALA DE PROFESORES 1.00 3.67 0.20 0.50 0.37
ENTRE EJES A Y C - 10 Y 11 SS.HH 6.00 1.60 0.20 0.50 0.96
ESCALERAS 0.00 0.00 0.20 0.50 0.00

02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 47.94


PABELLON "B"
PRIMER NIVEL
EJE A ENTRE 1 Y 2 1.00 2.75 0.50 0.60 0.83
EJE A ENTRE 3 Y 4 1.00 3.23 0.50 0.60 0.97
EJE A ENTRE 4 Y 5 1.00 2.92 0.50 0.60 0.88
EJE A ENTRE 5 Y 6 1.00 2.96 0.50 0.60 0.89
EJE A ENTRE 6 Y 7 1.00 2.95 0.50 0.60 0.89
EJE A ENTRE 7 Y 8 1.00 2.95 0.50 0.60 0.89
EJE A ENTRE 8 Y 9 1.00 2.91 0.50 0.60 0.87
EJE A ENTRE 10 Y 11 1.00 4.31 0.50 0.60 1.29
EJE A ENTRE 12 Y 13 1.00 3.26 0.50 0.60 0.98
EJE A ENTRE 13 Y 14 1.00 2.94 0.50 0.60 0.88
EJE A ENTRE 14 Y 15 1.00 2.91 0.50 0.60 0.87
EJE A ENTRE 15 Y 16 1.00 2.93 0.50 0.60 0.88
EJE A ENTRE 16 Y 17 1.00 2.92 0.50 0.60 0.88
EJE A ENTRE 17 Y 18 1.00 2.51 0.50 0.60 0.75
EJE C ENTRE 1 Y 2 1.00 3.12 0.50 0.60 0.94
EJE C ENTRE 3 Y 4 1.00 3.24 0.50 0.60 0.97
EJE C ENTRE 4 Y 5 1.00 2.93 0.50 0.60 0.88
EJE C ENTRE 5 Y 6 1.00 2.96 0.50 0.60 0.89
EJE C ENTRE 6 Y 7 1.00 2.95 0.50 0.60 0.89
EJE C ENTRE 7 Y 8 1.00 2.95 0.50 0.60 0.89
EJE C ENTRE 8 Y 9 1.00 2.91 0.50 0.60 0.87
EJE C ENTRE 10 Y 11 1.00 3.26 0.50 0.60 0.98
EJE C ENTRE 12 Y 13 1.00 3.26 0.50 0.60 0.98
EJE C ENTRE 13 Y 14 1.00 2.93 0.50 0.60 0.88
EJE C ENTRE 14 Y 15 1.00 2.92 0.50 0.60 0.88
EJE C ENTRE 15 Y 16 1.00 2.92 0.50 0.60 0.88
EJE C ENTRE 16 Y 17 1.00 2.92 0.50 0.60 0.88
EJE C ENTRE 17 Y 18 1.00 2.51 0.50 0.60 0.75
EJE 1,2,3,6,9,10,11,12,15,18 ENTRE A Y C 10.00 6.23 0.50 0.60 18.69
ENTRE EJES A Y C - 1 Y 2 SS.HH SALA DE PROFESORES 1.00 3.67 0.50 0.60 1.10
ENTRE EJES A Y C - 10 Y 11 SS.HH 6.00 1.60 0.50 0.60 2.88
ESCALERAS 0.00 0.00 0.50 0.60 0.00

02.03.02.11 DEMOLICION DE ZAPATAS m3 57.40


PABELLON "B"
Z-1 42.00 1.45 1.45 0.65 57.40

02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 498.81


PABELLON "B"
SALA DE PROFESORES 1.00 - 30.40 30.40
AULA 1 1.00 - 68.14 68.14
AULA 2 1.00 - 66.00 66.00
AULA 3 1.00 - 67.63 67.63
AULA 4 1.00 - 62.63 62.63
SS.HH. 1.00 - 29.68 29.68
PASILLO 1.00 - 174.33 174.33

SUSTENTO DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON "C1" - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


CANT MEDIDAS PARCIA
ITEM DESCRIPCION UNID. TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H) AREA L

02.03 DESMONTAJES Y DEMOLICIONES


02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 13.17
PABELLON "C1"
PRIMER NIVEL
AULA 1,2,3 3.00 - 1.20 2.10 7.56
SS.HH. 1.00 - 1.00 2.10 2.10
SS.HH. INTERIOR 3.00 - 0.65 1.80 3.51

02.03.01.04 DESMONTAJE DE PIZARRAS ACRILICAS und 3.00


PABELLON "C1"
PRIMER NIVEL
AULAS 1,2,3 3.00 - - - 3.00

02.03.01.05 DESMONTAJE DE INODOROS und 3.00


PABELLON "C1"
PRIMER NIVEL
SS.HH. 3.00 - - - 3.00

02.03.01.06 DESMONTAJE DE LAVATORIOS DE LOSA und 2.00


PABELLON "C1"
PRIMER NIVEL
SS.HH. 2.00 - - - 2.00

02.03.01.08 DESMONTAJE DE VENTANAS DE MADERA m2 51.46


PABELLON "C1"
PRIMER NIVEL
EJE 5 ENTRE A Y B/B Y C 2.00 3.63 - 0.90 6.53
EJE 5 ENTRE C Y D 1.00 3.62 - 0.70 2.53
EJE 3 ENTRE A Y B 1.00 3.63 - 1.65 5.99
EJE 3 ENTRE B Y C 1.00 2.42 - 1.65 3.99
EJE E ENTRE 1 Y 2 1.00 3.63 - 1.65 5.99
EJE E ENTRE 2 Y 3 1.00 2.42 - 1.65 3.99
EJE E ENTRE 3 Y 4 1.00 2.15 - 1.65 3.55
EJE G ENTRE 1 Y 2/2 Y 3/3 Y 4/4 Y 5 4.00 3.63 - 1.30 18.88

02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS


02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR und 2.00
PABELLON "C1"
PRIMER NIVEL 1.00 - 2.00 2.00

02.03.01.15,04 DESMONTAJE DE ARTEFACTO FLUORESCENTE C/REJILLA DE ALUMINIO C/LAMP. und 16.00


PABELLON "C1"
PRIMER NIVEL 1.00 - 16.00 16.00

02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 6.00


PABELLON "C1"
SEGUNDO NIVEL 1.00 - 6.00 6.00

02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 3.00


PABELLON "C1"
SEGUNDO NIVEL 1.00 - 3.00 3.00

02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 1.00


PABELLON "C1"
TD-C1
PRIMER NIVEL 1.00 - 1.00 1.00

02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 163.54


PABELLON "C1"
PRIMER NIVEL 2.00 - 81.77 163.54

02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 188.72
PABELLON "C1"
PRIMER NIVEL
EJE 1 ENTRE E Y F/F Y G 2.00 - 9.04 18.08
EJE 3 ENTRE A Y B 1.00 - 4.47 4.47
EJE 3 ENTRE B Y C 1.00 - 3.00 3.00
EJE 3 ENTRE E Y F/F Y G 2.00 - 9.04 18.08
EJE 4 ENTRE C Y D 1.00 - 7.61 7.61
EJE 5 ENTRE A Y B/B Y C 2.00 - 7.16 14.32
EJE 5 ENTRE C Y D 1.00 - 7.86 7.86
EJE 5 ENTRE E Y F/F Y G 2.00 - 9.04 18.08
EJE A,C ENTRE 3 Y 4 2.00 - 9.46 18.93
EJE A,C ENTRE 4 Y 5 2.00 - 9.04 18.09
EJE D ENTRE 4 Y 5 1.00 - 9.04 9.04
EJE E ENTRE 1 Y 2 1.00 - 4.47 4.47
EJE E ENTRE 2 Y 3 1.00 - 3.02 3.02
EJE E ENTRE 3 Y 4 1.00 - 2.67 2.67
EJE E ENTRE 4 Y 5 1.00 - 10.35 10.35
EJE G ENTRE 1 Y 2/2 Y 3/3 Y 4/4 Y 5 4.00 - 5.81 23.23
ENTRE EJES 4 Y 5 - C Y D SS.HH 2.00 2.06 - 1.80 7.42

02.03.02.03 DEMOLICION LOSA ALIGERADA m2 223.76


PABELLON "C1"
PRIMER NIVEL
AULA 1 1.00 - 55.91 55.91
AULA 2 1.00 - 54.82 54.82
AULA 3 1.00 - 54.82 54.82
SS.HH. 1.00 - 13.87 13.87
ENTRE EJES 1 - 2/C- D 1.00 - 7.37 7.37
ENTRE EJES 2 - 3/A- B 1.00 - 6.80 6.80
ENTRE EJES 2 - 3/B- C 1.00 - 6.89 6.89
ENTRE EJES 2 - 3/C- D 1.00 - 10.14 10.14
ENTRE EJES 3 - 4/C- D 1.00 - 13.14 13.14
02.03.02.05 DEMOLICION DE VIGAS m3 12.07
PABELLON "C1"
PRIMER NIVEL
EJE 1 ENTRE E Y F/F Y G 2.00 3.23 0.25 0.50 0.81
EJE 2 ENTRE E Y G 1.00 6.86 0.25 0.50 0.86
EJE 3 ENTRE A Y B/B Y C/C Y D 3.00 3.63 0.15 0.40 0.65
EJE 3 ENTRE E Y F/F Y G 2.00 3.23 0.25 0.50 0.81
EJE 4 ENTRE C Y D 1.00 3.63 0.15 0.40 0.22
EJE 4 ENTRE E Y G 1.00 6.86 0.25 0.50 0.86
EJE 5 ENTRE A Y B/B Y C/C Y D 3.00 3.63 0.15 0.40 0.65
EJE 5 ENTRE E Y F/F Y G 2.00 3.23 0.25 0.50 0.81
EJE A ENTRE 3 Y 4 1.00 3.38 0.25 0.50 0.42
EJE A ENTRE 4 Y 5 1.00 3.23 0.25 0.50 0.40
EJE B ENTRE 3 Y 5 1.00 7.01 0.25 0.50 0.88
EJE C ENTRE 3 Y 4 1.00 3.38 0.25 0.50 0.42
EJE C ENTRE 4 Y 5 1.00 3.23 0.25 0.50 0.40
EJE D ENTRE 3 Y 4 1.00 3.38 0.25 0.50 0.42
EJE D ENTRE 4 Y 5 1.00 3.23 0.25 0.50 0.40
EJE E ENTRE 1 Y 2/2 Y 3/3 Y 4/4 Y 5 4.00 3.63 0.15 0.40 0.87
EJE G ENTRE 1 Y 2/2 Y 3/3 Y 4/4 Y 5 4.00 3.63 0.15 0.40 0.87
EJE 1,2 (VOLADO) 2.00 1.75 0.25 0.50 0.44
EJE A,B,C,D (VOLADO) 4.00 1.75 0.25 0.50 0.88

02.03.02.06 DEMOLICION DE COLUMNAS m3 14.48


PABELLON "C1"
EJE 1 - E,G 2.00 0.50 0.25 4.90 1.23
EJE 1 - F 1.00 0.40 0.25 4.90 0.49
EJE 2 - E,G 2.00 0.50 0.25 4.90 1.23
EJE 3 - A,B,C,E,G 5.00 0.50 0.25 4.90 3.06
EJE 3 - F 1.00 0.40 0.25 4.90 0.49
EJE 4 - A,C 2.00 0.40 0.25 4.90 0.98
EJE 4 - E,G 2.00 0.50 0.25 4.90 1.23
EJE 5 - A,B,C,D,E,G 6.00 0.50 0.25 4.90 3.68
EJE 5 - F 1.00 0.40 0.25 4.90 0.49
COLUMNETAS DE AMARRE
EJE 1 - E,G 2.00 0.25 0.15 1.25 0.09
EJE 2 - E 2.00 0.25 0.15 1.25 0.09
EJE 2 - G 2.00 0.25 0.15 1.60 0.12
EJE 2/3 - E 1.00 0.25 0.15 1.25 0.05
EJE 3 - A,B 3.00 0.25 0.15 1.25 0.14
EJE 3 - B/C 1.00 0.25 0.15 1.25 0.05
EJE 3 - E 1.00 0.25 0.15 2.80 0.11
EJE 3 - G 2.00 0.25 0.15 1.60 0.12
EJE 3/4 - E 1.00 0.25 0.15 1.25 0.05
EJE 4 - C/D 1.00 0.25 0.15 2.90 0.11
EJE 4 - E 1.00 0.25 0.15 1.25 0.05
EJE 4 - G 2.00 0.25 0.15 1.60 0.12
EJE 5 - A,B,C 4.00 0.25 0.15 2.00 0.30
EJE 5 - C,D 2.00 0.25 0.15 2.20 0.17
EJE 5 - G 1.00 0.25 0.15 1.60 0.06

02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 9.04


PABELLON "C1"
PRIMER NIVEL
EJE 1 ENTRE E Y F/F Y G 2.00 3.23 0.20 0.50 0.65
EJE 3 ENTRE A Y B 1.00 3.63 0.20 0.50 0.36
EJE 3 ENTRE B Y C 1.00 2.43 0.20 0.50 0.24
EJE 3 ENTRE E Y F/F Y G 2.00 6.85 0.20 0.50 1.37
EJE 4 ENTRE C Y D 1.00 2.62 0.20 0.50 0.26
EJE 5 ENTRE A Y B/B Y C 2.00 3.63 0.20 0.50 0.73
EJE 5 ENTRE C Y D 1.00 3.62 0.20 0.50 0.36
EJE 5 ENTRE E Y F/F Y G 2.00 3.23 0.20 0.50 0.65
EJE A,C ENTRE 3 Y 4 2.00 3.38 0.20 0.50 0.68
EJE A,C ENTRE 4 Y 5 2.00 3.23 0.20 0.50 0.65
EJE D ENTRE 4 Y 5 1.00 3.23 0.20 0.50 0.32
EJE E ENTRE 1 Y 2 1.00 3.63 0.20 0.50 0.36
EJE E ENTRE 2 Y 3 1.00 2.43 0.20 0.50 0.24
EJE E ENTRE 3 Y 4 1.00 2.15 0.20 0.50 0.22
EJE E ENTRE 4 Y 5 1.00 3.07 0.20 0.50 0.31
EJE G ENTRE 1 Y 2/2 Y 3/3 Y 4/4 Y 5 4.00 3.08 0.20 0.50 1.23
ENTRE EJES 4 Y 5 - C Y D SS.HH 2.00 2.06 0.20 0.50 0.41

02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 27.11


PABELLON "C1"
PRIMER NIVEL
EJE 1 ENTRE E Y F/F Y G 2.00 3.23 0.50 0.60 1.94
EJE 3 ENTRE A Y B 1.00 3.63 0.50 0.60 1.09
EJE 3 ENTRE B Y C 1.00 2.43 0.50 0.60 0.73
EJE 3 ENTRE E Y F/F Y G 2.00 6.85 0.50 0.60 4.11
EJE 4 ENTRE C Y D 1.00 2.62 0.50 0.60 0.79
EJE 5 ENTRE A Y B/B Y C 2.00 3.63 0.50 0.60 2.18
EJE 5 ENTRE C Y D 1.00 3.62 0.50 0.60 1.09
EJE 5 ENTRE E Y F/F Y G 2.00 3.23 0.50 0.60 1.94
EJE A,C ENTRE 3 Y 4 2.00 3.38 0.50 0.60 2.03
EJE A,C ENTRE 4 Y 5 2.00 3.23 0.50 0.60 1.94
EJE D ENTRE 4 Y 5 1.00 3.23 0.50 0.60 0.97
EJE E ENTRE 1 Y 2 1.00 3.63 0.50 0.60 1.09
EJE E ENTRE 2 Y 3 1.00 2.43 0.50 0.60 0.73
EJE E ENTRE 3 Y 4 1.00 2.15 0.50 0.60 0.64
EJE E ENTRE 4 Y 5 1.00 3.07 0.50 0.60 0.92
EJE G ENTRE 1 Y 2/2 Y 3/3 Y 4/4 Y 5 4.00 3.08 0.50 0.60 3.70
ENTRE EJES 4 Y 5 - C Y D SS.HH 2.00 2.06 0.50 0.60 1.24

02.03.02.11 DEMOLICION DE ZAPATAS m3 23.07


PABELLON "C1"
Z-1 21.00 1.30 1.30 0.65 23.07

02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 255.00


PABELLON "C1"
AULA 1 1.00 - 57.85 57.85
AULA 2 1.00 - 56.53 56.53
AULA 3 1.00 - 56.71 56.71
SS.HH. 1.00 - 14.02 14.02
EXTERIOR 1.00 - 69.89 69.89

SUSTENTO DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON "C2" - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


CANT MEDIDAS PARCIA
ITEM DESCRIPCION UNID. TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H) AREA L

02.03 DESMONTAJES Y DEMOLICIONES


02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 34.86
PABELLON "C2"
PRIMER NIVEL
AULA 1,2,3 3.00 - 1.10 2.10 6.93
SECRETARIA, SUBDIRECCION 2.00 - 1.10 2.10 4.62
COCINA, OFICINA, ESCALERA 3.00 - 0.90 2.10 5.67
SS.HH. (BATERIA) 1.00 0.80 - 2.10 1.68
4.00 0.80 - 2.10 6.72

SEGUNDO NIVEL
AULA 4,5,6,7 4.00 - 1.10 2.10 9.24

02.03.01.04 DESMONTAJE DE PIZARRAS ACRILICAS und 7.00


PABELLON "C2"
PRIMER NIVEL
AULAS 1,2,3 3.00 - - - 3.00
SEGUNDO NIVEL
AULAS 4,5,6,7 4.00 - - - 4.00

02.03.01.05 DESMONTAJE DE INODOROS und 6.00


PABELLON C2
PRIMER NIVEL
SS.HH. 1,2,3,4,5,6 (BATERIA) 6.00 - - - 6.00

02.03.01.06 DESMONTAJE DE LAVATORIOS DE LOSA und 7.00


PABELLON "C2"
PRIMER NIVEL
SECRETARIA 1.00 - - - 1.00
SS.HH. 1,2,3,4,5,6 (BATERIA) 6.00 - - - 6.00

02.03.01.07 DESMONTAJE DE LAVATORIOS DE ACERO INOXIDABLE DE 1 POZA und 1.00


PABELLON "C2"
PRIMER NIVEL
COCINA 1.00 - - - 1.00

02.03.01.08 DESMONTAJE DE VENTANAS DE MADERA m2 133.45


PABELLON "C2"
PRIMER NIVEL
EJE A ENTRE 1 Y 2 1.00 1.90 - 1.10 2.09
EJE A ENTRE 2 Y 3 1.00 3.00 - 1.10 3.30
EJE A ENTRE 3 Y 4 1.00 1.90 - 1.10 2.09
EJE A ENTRE 5 Y 6 1.00 3.00 - 1.10 3.30
EJE A ENTRE 6 Y 7 1.00 1.90 - 1.10 2.09
EJE A ENTRE 7 Y 8 1.00 3.00 - 1.10 3.30
EJE A ENTRE 8 Y 9 1.00 1.90 - 1.10 2.09
EJE A ENTRE 9 Y 10 1.00 3.00 - 1.10 3.30
EJE A ENTRE 10 Y 11 1.00 1.90 - 1.10 2.09
EJE B EN ESCALERA 1.00 3.15 - 0.60 1.89
EJE C ENTRE 1 Y 2/2 Y 3/3 Y 4/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10/10 Y 11 9.00 3.00 - 1.50 40.50
SS. HH. PABELLON C2 (BATERIA)
2.00 2.25 - 0.40 1.80
2.00 0.96 - 0.40 0.77
1.00 1.74 - 0.40 0.70
SEGUNDO NIVEL
EJE A ENTRE 1 Y 2 1.00 1.90 - 1.10 2.09
EJE A ENTRE 2 Y 3 1.00 3.00 - 1.10 3.30
EJE A ENTRE 3 Y 4 1.00 1.90 - 1.10 2.09
EJE A ENTRE 5 Y 6 1.00 3.00 - 1.10 3.30
EJE A ENTRE 6 Y 7 1.00 1.90 - 1.10 2.09
EJE A ENTRE 7 Y 8 1.00 3.00 - 1.10 3.30
EJE A ENTRE 8 Y 9 1.00 1.90 - 1.10 2.09
EJE A ENTRE 9 Y 10 1.00 3.00 - 1.10 3.30
EJE A ENTRE 10 Y 11 1.00 1.90 - 1.10 2.09
EJE C ENTRE 1 Y 2/2 Y 3/3 Y 4/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10/10 Y 11 9.00 3.00 - 1.50 40.50

02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS


02.03.01.15,01 DESMONTAJE DE ARTEFACTO O SOKET ADOSADO EN TECHO P/FOCO AHORRAD und 4.00
PABELLON "C2"
SEGUNDO NIVEL 1.00 - 4.00 4.00
02.03.01.15,02 DESMONTAJE DE ARTEFACTO FLUORESCENTE EN TECHO C/LAMP. FLUORESCENTE und 12.00
PABELLON "C2"
PRIMER NIVEL 1.00 - 12.00 12.00

02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR und 3.00
PABELLON "C2"
PRIMER NIVEL 1.00 - 1.00 1.00
PRIMER NIVEL (SS.HH. BATERÍA) 1.00 - 2.00 2.00

02.03.01.15,05 DESMONTAJE DE ARTEFACTO FLUORESCENTE ADOSADO C/LAMP. 1X40W und 6.00


PABELLON "C2"
SEGUNDO NIVEL 1.00 - 6.00 6.00

02.03.01.15,06 DESMONTAJE DE ARTEFACTO ADOSADO A TECHO TIPO BE 2X40W und 2.00


PABELLON "C2"
PRIMER NIVEL (SS.HH. BATERÍA) 1.00 - 2.00 2.00

02.03.01.15,07 DESMONTAJE DE ARTEFACTO ADOSADO A TECHO TIPO BE 3X40W und 19.00


PABELLON "C2"
PRIMER NIVEL 1.00 - 5.00 5.00
SEGUNDO NIVEL 1.00 - 14.00 14.00

02.03.01.15,08 DESMONTAJE DE ARTEFACTO DE ILUMINACION TIPO BRAQUET ADOSADO EN PA und 5.00


PABELLON "C2"
PRIMER NIVEL (SS.HH. BATERÍA) 1.00 - 4.00 4.00
SEGUNDO NIVEL (PASILLO) 1.00 - 1.00 1.00

02.03.01.15,09 DESMONTAJE DE ARTEFACTO EMPOTRADO EN TECHO C/PANTALLA DE ACRILICO und 10.00


PABELLON "C2"
PRIMER NIVEL 1.00 - 10.00 10.00

02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 14.00


PABELLON "C2"
PRIMER NIVEL 1.00 - 7.00 7.00
SEGUNDO NIVEL 1.00 - 7.00 7.00

02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 14.00


PABELLON "C2"
PRIMER NIVEL 1.00 - 6.00 6.00
PRIMER NIVEL (SS.HH. BATERÍA) 1.00 - 3.00 3.00
SEGUNDO NIVEL 1.00 - 5.00 5.00

02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 1.00


PABELLON "C2"
TD-C1
PRIMER NIVEL 1.00 - 1.00 1.00

02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 365.12


PABELLON "C2"
PRIMER NIVEL 2.00 - 95.64 191.28
PRIMER NIVEL (SS.HH. BATERÍA) 1.00 - 26.20 26.20
SEGUNDO NIVEL 2.00 - 73.82 147.64

02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 428.26
PABELLON "C2"
PRIMER NIVEL
EJE A ENTRE 1 Y 2/3 Y 4/6 Y 7/8 Y 9/10 Y 11 5.00 1.37 - 1.55 10.62
EJE A ENTRE 2 Y 3/5 Y 6/7 Y 8/9 Y 10 4.00 2.45 - 1.55 15.19
EJE B ENTRE 1 Y 2 1.00 3.60 - 3.00 10.80
EJE C ENTRE 1 Y 2/2 Y 3/3 Y 4 3.00 2.45 - 1.15 8.45
EJE C ENTRE 5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10/10 Y 11 6.00 2.45 - 1.15 16.91
EJE 1 ENTRE A Y B 1.00 3.58 - 2.50 8.95
EJE 1 ENTRE B Y C 1.00 2.68 - 2.50 6.70
EJE 2 ENTRE A Y B/B Y C 2.00 3.28 - 2.50 16.40
EJE 4 ENTRE A Y B/B Y C 2.00 3.58 - 2.50 17.90
EJE 5 ENTRE A Y B/B Y C 2.00 3.58 - 2.50 17.90
EJE 7 ENTRE A Y B/B Y C 2.00 3.28 - 2.50 16.40
EJE 9 ENTRE A Y B/B Y C 2.00 3.28 - 2.50 16.40
EJE 11 ENTRE A Y B/B Y C 2.00 3.58 - 2.50 17.90
SS.HH. (BATERIA) 1.00 12.81 - 2.50 32.03
2.00 0.96 - 2.10 4.03
1.00 2.11 - 2.50 5.27
2.00 2.25 - 2.10 9.45
3.00 1.70 - 2.50 12.75
2.00 3.57 - 2.50 17.85
1.00 1.66 - 2.50 4.15
1.00 0.53 - 2.50 1.33
1.00 1.74 - 2.10 3.65
SEGUNDO NIVEL
EJE A ENTRE 1 Y 2 1.00 1.37 - 1.55 2.12
EJE A ENTRE 1 Y 3/3 Y 4 2.00 2.45 - 1.55 7.60
EJE A ENTRE 5 Y 6/7 Y 8/9 Y 10 3.00 2.45 - 1.55 11.39
EJE A ENTRE 6 Y 7/8 Y 9/10 Y 11 3.00 1.37 - 1.55 6.37
EJE C ENTRE 1 Y 2/2 Y 3/3 Y 4 3.00 2.45 - 1.15 8.45
EJE C ENTRE 5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10/10 Y 11 6.00 2.45 - 1.15 16.91
EJE 1 ENTRE A Y B/B Y C 2.00 3.58 - 2.50 17.90
EJE 4 ENTRE A Y B/B Y C 2.00 3.58 - 2.50 17.90
EJE 5 ENTRE A Y B/B Y C 2.00 3.58 - 2.50 17.90
EJE 7 ENTRE A Y B/B Y C 2.00 3.28 - 2.50 16.40
EJE 9 ENTRE A Y B/B Y C 2.00 3.28 - 2.50 16.40
EJE 11 ENTRE A Y B/B Y C 2.00 3.58 - 2.50 17.90
02.03.02.02 DEMOLICION DE PARAPETOS m2 52.37
PABELLON "C2"
PASILLO 2º NIVEL 1.00 43.64 - 1.20 52.37

02.03.02.03 DEMOLICION LOSA ALIGERADA m2 667.45


PABELLON "C2"
PRIMER NIVEL
COCINA, SECRETARIA 1.00 - 27.37 27.37
SUBDIRECCION 1.00 - 27.30 27.30
OFICINA 1.00 - 27.36 27.36
AULA 1 1.00 - 54.66 54.66
AULA 2 1.00 - 54.69 54.69
AULA 3 1.00 - 54.80 54.80
ENTRE EJES 1 Y 2/2 Y 3/3 Y 4 (PASILLO) 3.00 - 7.56 22.68
ENTRE EJES 4 Y 5(PASILLO) 1.00 - 9.24 9.24
ENTRE EJES 5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y10 (PASILLO) 6.00 - 7.56 45.36
SS.HH. (BATERIA) 1.00 - 34.52 34.52
SEGUNDO NIVEL
AULA 4 1.00 - 82.13 82.13
AULA 5,6,7 3.00 - 54.72 164.16
ENTRE EJES 1 Y 2/2 Y 3/3 Y 4 (PASILLO) 3.00 - 7.02 21.06
ENTRE EJES 5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y10 (PASILLO) 6.00 - 7.02 42.12

02.03.02.05 DEMOLICION DE VIGAS m3 51.73


PABELLON "C2"
PRIMER NIVEL
EJE A ENTRE 1 Y 2/2 Y 3/3 Y 4 3.00 3.00 0.25 0.45 1.01
EJE A ENTRE 4 Y 5 1.00 4.05 0.25 0.45 0.46
EJE A ENTRE 5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10/10 Y 11 6.00 3.00 0.25 0.45 2.03
EJE B ENTRE 4 Y 5 1.00 3.15 0.25 0.45 0.35
EJE C ENTRE 1 Y 2/2 Y 3/3 Y 4 3.00 3.00 0.25 0.45 1.01
EJE C ENTRE 5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10/10 Y 11 6.00 3.00 0.25 0.45 2.03
EJE 1,4,5,11 ENTRE 4 Y 5 4.00 7.15 0.30 0.70 6.01
EJE 2,7,9 ENTRE 4 Y 5 3.00 6.55 0.30 0.70 4.13
EJE 3,6,8,10 ENTRE 4 Y 5 4.00 6.80 0.30 0.70 5.71
EJE 4/5 ENTRE A Y B (ESCALERA) 1.00 2.90 0.15 0.25 0.11
EJE 1,2,3,4,5,6,7,8,9,10,11 (VOLADO) 11.00 2.10 0.30 0.45 3.12
EJE 4,5 (VOLADO - ESCALERA) 2.00 2.10 0.15 0.45 0.28
ENTRE EJES 1 Y 2/2 Y 3/3 Y 4/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10/10 Y 11 (VOLADO) 9.00 3.60 0.15 0.20 0.97
ENTRE EJES 4 Y 5 (VOLADO) 1.00 3.40 0.15 0.20 0.10
VIGAS DE AMARRE
EJE A ENTRE 1 Y 2/3 Y 4/6 Y 7/8 Y9/10 Y 11 5.00 1.90 0.15 0.10 0.14
EJE A ENTRE 2 Y 3/5 Y 6/7 Y 8/9 Y10 4.00 3.00 0.15 0.10 0.18
EJE A ENTRE 1 Y 2/2 Y 3/3 Y 4/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10/10 Y 11 9.00 3.00 0.15 0.10 0.41
ENTRE EJES 1 Y 11 (PARAPETO) 1.00 40.10 0.15 0.10 0.60
EJES 1,11 (PARAPETO) 2.00 1.95 0.15 0.10 0.06
EJES A ENTRE 4 Y 5 (PARAPETO ESCALERA) 1.00 1.85 0.15 0.10 0.03
EJES B ENTRE 4 Y 5 (PARAPETO ESCALERA) 1.00 4.05 0.15 0.10 0.06
EJES 4,5 ENTRE A Y B (PARAPETO ESCALERA) 2.00 5.33 0.15 0.10 0.16
EJES 4/5 ENTRE A Y B (PARAPETO ESCALERA) 1.00 2.13 0.15 0.10 0.03
EJES 4/5 ENTRE A Y B (PARAPETO ESCALERA) 1.00 2.13 0.15 0.10 0.03
SEGUNDO NIVEL
EJE A ENTRE 1 Y 2/2 Y 3/3 Y 4 3.00 3.00 0.25 0.45 1.01
EJE A ENTRE 5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10/10 Y 11 6.00 3.00 0.25 0.45 2.03
EJE C ENTRE 1 Y 2/2 Y 3/3 Y 4 3.00 3.00 0.25 0.45 1.01
EJE C ENTRE 5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10/10 Y 11 6.00 3.00 0.25 0.45 2.03
EJE 1,4,5,11 ENTRE 4 Y 5 4.00 7.15 0.30 0.70 6.01
EJE 7,9 ENTRE 4 Y 5 2.00 6.55 0.30 0.70 2.75
EJE 2,3,6,8,10 ENTRE 4 Y 5 5.00 6.80 0.30 0.70 7.14
VIGAS DE AMARRE
EJE A ENTRE 1 Y 2/6 Y 7/8 Y9/10 Y 11 4.00 1.90 0.15 0.10 0.11
EJE A ENTRE 2 Y 3/3 Y 4/5 Y 6/7 Y 8/9 Y10 5.00 3.00 0.15 0.10 0.23
EJE A ENTRE 1 Y 2/2 Y 3/3 Y 4/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10/10 Y 11 9.00 3.00 0.15 0.10 0.41

02.03.02.06 DEMOLICION DE COLUMNAS m3 48.26


PABELLON "C2"
EJE A - 1,4,5,11 4.00 0.60 0.25 7.80 4.68
EJE A - 2,3,6,7,8,9,10 7.00 7.80 0.31 16.93
EJE B - 1,2,4,5,7,9,11 (PIMER NIVEL) 7.00 0.30 0.25 3.90 2.05
EJE B - 1,4,5,7,9,11 (SEGUNDO NIVEL) 6.00 0.30 0.25 2.50 1.13
EJE C - 1,4,5,11 4.00 0.60 0.25 7.80 4.68
EJE C - 2,3,6,7,8,9,10 7.00 7.80 0.31 16.93
SS.HH. C2 (BATERIA) 8.00 0.40 0.15 3.90 1.87

02.03.02.08 DEMOLICION DE ESCALERAS DE CONCRETO m3 4.08


PABELLON "C2"
ESCALERA Nº1
Tramo 1 1.00 1.85 0.73 1.35
Descanso 1.00 4.06 2.20 0.15 1.34
Tramo 2 1.00 1.90 0.73 1.39

02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 8.97


PABELLON "C2"
PRIMER NIVEL
EJE A ENTRE 1 Y 2/3 Y 4/6 Y 7/8 Y 9/10 Y 11 5.00 1.37 0.20 0.50 0.69
EJE A ENTRE 2 Y 3/5 Y 6/7 Y 8/9 Y 10 4.00 2.45 0.20 0.50 0.98
EJE B ENTRE 1 Y 2 1.00 3.60 0.20 0.50 0.36
EJE C ENTRE 1 Y 2/2 Y 3/3 Y 4 3.00 2.45 0.20 0.50 0.74
EJE C ENTRE 5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10/10 Y 11 6.00 2.45 0.20 0.50 1.47
EJE 1 ENTRE A Y B 1.00 3.58 0.20 0.50 0.36
EJE 1 ENTRE B Y C 1.00 2.68 0.20 0.50 0.27
EJE 2 ENTRE A Y B/B Y C 2.00 3.28 0.20 0.50 0.66
EJE 4 ENTRE A Y B/B Y C 2.00 3.58 0.20 0.50 0.72
EJE 5 ENTRE A Y B/B Y C 2.00 3.58 0.20 0.50 0.72
EJE 7 ENTRE A Y B/B Y C 2.00 3.28 0.20 0.50 0.66
EJE 9 ENTRE A Y B/B Y C 2.00 3.28 0.20 0.50 0.66
EJE 11 ENTRE A Y B/B Y C 2.00 3.58 0.20 0.50 0.72

02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 26.92


PABELLON "C2"
PRIMER NIVEL
EJE A ENTRE 1 Y 2/3 Y 4/6 Y 7/8 Y 9/10 Y 11 5.00 1.37 0.50 0.60 2.06
EJE A ENTRE 2 Y 3/5 Y 6/7 Y 8/9 Y 10 4.00 2.45 0.50 0.60 2.94
EJE B ENTRE 1 Y 2 1.00 3.60 0.50 0.60 1.08
EJE C ENTRE 1 Y 2/2 Y 3/3 Y 4 3.00 2.45 0.50 0.60 2.21
EJE C ENTRE 5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10/10 Y 11 6.00 2.45 0.50 0.60 4.41
EJE 1 ENTRE A Y B 1.00 3.58 0.50 0.60 1.07
EJE 1 ENTRE B Y C 1.00 2.68 0.50 0.60 0.80
EJE 2 ENTRE A Y B/B Y C 2.00 3.28 0.50 0.60 1.97
EJE 4 ENTRE A Y B/B Y C 2.00 3.58 0.50 0.60 2.15
EJE 5 ENTRE A Y B/B Y C 2.00 3.58 0.50 0.60 2.15
EJE 7 ENTRE A Y B/B Y C 2.00 3.28 0.50 0.60 1.97
EJE 9 ENTRE A Y B/B Y C 2.00 3.28 0.50 0.60 1.97
EJE 11 ENTRE A Y B/B Y C 2.00 3.58 0.50 0.60 2.15

02.03.02.11 DEMOLICION DE ZAPATAS m3 28.03


PABELLON "C2"
Z-1 22.00 1.40 1.40 0.65 28.03

02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 355.32


PABELLON "C2"
COCINA 1.00 - 13.44 13.44
SECRETATIA 1.00 - 13.34 13.34
SUBDIRECCION - OFICINA 1.00 - 56.08 56.08
AULA 1 1.00 - 56.68 56.68
AULA 2 1.00 - 56.68 56.68
AULA 3 1.00 - 56.68 56.68
ESCALERA 1.00 - 18.23 18.23
PASILLO 1.00 - 84.19 84.19

SUSTENTO DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON "D" - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


CANT MEDIDAS PARCIA
ITEM DESCRIPCION UNID. TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H) AREA L

02.03 DESMONTAJES Y DEMOLICIONES


02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 75.71
PABELLON "D"
PRIMER NIVEL
AULA 1,2,3,4 4.00 - 1.40 2.10 11.76
AULA 5 1.00 - 1.10 2.10 2.31
AULA 6 1.00 - 0.95 2.10 1.99
TALLER DE CORTE Y CONF., TALLER DE REPOST., OFICINA, KITCHENET 02 4.00 - 1.40 2.10 11.76
OFICINA 1.00 - 1.00 2.10 2.10
DEPOSITO 1.00 - 0.95 2.10 1.99
KITCHENET 01 1.00 - 0.80 2.10 1.68
ESCALERA 2.00 - 0.90 2.10 3.78
SS.HH. 2.00 - 0.80 2.10 3.36

SEGUNDO NIVEL
AULA 7,8,9,10 4.00 - 1.40 2.10 11.76
AULA 11 1.00 - 0.95 2.10 1.99
AULA 12 1.00 - 1.10 2.10 2.31
TALLER DE VIDEO, TALLER DE CORTE Y CONFEC., INTERIOR TALLER DE VIDEO, KITCHENET 02 4.00 - 1.40 2.10 11.76
INTERIOR TALLER DE VIDEO 1.00 - 1.00 2.10 2.10
KITCHENET 01 1.00 - 0.80 2.10 1.68
SS.HH. 2.00 - 0.80 2.10 3.36

02.03.01.04 DESMONTAJE DE PIZARRAS ACRILICAS und 12.00


PABELLON "D"
PRIMER NIVEL
AULAS 1,2,3,4,5,6 6.00 - - - 6.00
SEGUNDO NIVEL
AULAS 7,8,9,10,11,12 6.00 - - - 6.00

02.03.01.05 DESMONTAJE DE INODOROS und 4.00


PABELLON "D"
PRIMER NIVEL
SS.HH. 1,2 2.00 - - - 2.00
SEGUNDO NIVEL
SS.HH. 1,2 2.00 - - - 2.00

02.03.01.06 DESMONTAJE DE LAVATORIOS DE LOSA und 8.00


PABELLON "D"
PRIMER NIVEL
SS.HH. 1,2 4.00 - - - 4.00
SEGUNDO NIVEL
SS.HH. 1,2 4.00 - - - 4.00

02.03.01.09 DESMONTAJE DE VENTANAS DE FIERRO m2 212.76


PABELLON "D"
PRIMER NIVEL
EJE A ENTRE 4 Y 5 1.00 3.45 - 1.85 6.38
EJE A ENTRE 5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 5.00 3.35 - 1.85 30.99
EJE A ENTRE 11 Y 13 1.00 3.00 - 1.85 5.55
EJE A ENTRE 13 Y 14 1.00 2.00 - 1.85 3.70
EJE A ENTRE 14 Y 16 1.00 3.00 - 1.85 5.55
EJE A ENTRE 16 Y 17 1.00 2.60 - 1.85 4.81
EJE B ENTRE 11 Y 13 1.00 3.20 - 0.60 1.92
EJE B ENTRE 13 Y 14 1.00 2.62 - 0.60 1.57
EJE B ENTRE 14 Y 16 1.00 3.12 - 0.60 1.87
EJE B ENTRE 16 Y 17 1.00 1.32 - 0.60 0.79
EJE C ENTRE 8 Y 9 1.00 1.50 - 0.60 0.90
EJE D ENTRE 4 Y 5/5 Y 6 2.00 3.55 - 1.00 7.10
EJE D ENTRE 6 Y 7/7 Y 8 2.00 3.55 - 0.85 6.03
EJE D ENTRE 8 Y 9/9 Y 10 2.00 3.55 - 1.00 7.10
EJE D ENTRE 11 Y 12 1.00 2.99 - 1.00 2.99
EJE D ENTRE 12 Y 13 1.00 3.05 - 0.85 2.59
EJE D ENTRE 13 Y 14 1.00 3.04 - 1.00 3.04
EJE D ENTRE 14 Y 15 1.00 3.04 - 0.85 2.58
EJE D ENTRE 15 Y 16 1.00 3.86 - 0.85 3.28
EJE D ENTRE 16 Y 17 1.00 3.04 - 1.00 3.04
EJE D ENTRE 16 Y 17 1.00 3.00 - 0.85 2.55

SEGUNDO NIVEL
EJE A ENTRE 4 Y 5 1.00 3.45 - 1.85 6.38
EJE A ENTRE 5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 5.00 3.35 - 1.85 30.99
EJE A ENTRE 11 Y 13 1.00 3.00 - 1.85 5.55
EJE A ENTRE 13 Y 14 1.00 2.00 - 1.85 3.70
EJE A ENTRE 14 Y 16 1.00 3.00 - 1.85 5.55
EJE A ENTRE 16 Y 17 1.00 2.60 - 1.85 4.81
EJE B ENTRE 11 Y 13 1.00 3.20 - 0.60 1.92
EJE B ENTRE 13 Y 14 1.00 2.62 - 0.60 1.57
EJE B ENTRE 14 Y 16 1.00 3.12 - 0.60 1.87
EJE B ENTRE 16 Y 17 1.00 1.32 - 0.60 0.79
EJE C ENTRE 8 Y 9 1.00 1.50 - 0.60 0.90
EJE D ENTRE 4 Y 5/5 Y 6 2.00 3.55 - 1.00 7.10
EJE D ENTRE 6 Y 7/7 Y 8 2.00 3.55 - 1.00 7.10
EJE D ENTRE 8 Y 9/9 Y 10 2.00 3.55 - 1.00 7.10
EJE D ENTRE 11 Y 18 4.00 5.77 - 1.00 23.08

02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS


02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR und 26.00
PABELLON "D"
PRIMER NIVEL 1.00 - 15.00 15.00
SEGUNDO NIVEL 1.00 - 11.00 11.00

02.03.01.15,04 DESMONTAJE DE ARTEFACTO FLUORESCENTE C/REJILLA DE ALUMINIO C/LAMP. und 13.00


PABELLON "D"
PRIMER NIVEL 1.00 - 12.00 12.00
PASILLO 1.00 - 1.00 1.00

02.03.01.15,05 DESMONTAJE DE ARTEFACTO FLUORESCENTE ADOSADO C/LAMP. 1X40W und 38.00


PABELLON "D"
PRIMER NIVEL 1.00 - 18.00 18.00
SEGUNDO NIVEL 1.00 - 20.00 20.00

02.03.01.15,06 DESMONTAJE DE ARTEFACTO ADOSADO A TECHO TIPO BE 2X40W und 20.00


PABELLON "D"
SEGUNDO NIVEL 1.00 - 20.00 20.00

02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 22.00


PABELLON "D"
PRIMER NIVEL 1.00 - 6.00 6.00
SEGUNDO NIVEL 1.00 - 16.00 16.00

02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 22.00


PABELLON "D"
PRIMER NIVEL 1.00 - 10.00 10.00
SEGUNDO NIVEL 1.00 - 12.00 12.00

02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 4.00


PABELLON "D"
TD-D1
PRIMER NIVEL 1.00 - 1.00 1.00
SEGUNDO NIVEL 1.00 - 1.00 1.00
TD-D2
PRIMER NIVEL 1.00 - 1.00 1.00
SEGUNDO NIVEL 1.00 - 1.00 1.00

02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 1602.80


PABELLON "D"
PRIMER NIVEL 4.00 - 206.97 827.88
SEGUNDO NIVEL 4.00 - 193.73 774.92

02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 1235.51
PABELLON "D"
PRIMER NIVEL
EJE A ENTRE 4 Y 5 1.00 3.55 - 1.25 4.44
EJE A ENTRE 5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 5.00 3.55 - 1.25 22.19
EJE A ENTRE 11 Y 13 1.00 - 10.68 10.68
EJE A ENTRE 13 Y 14 1.00 2.02 - 1.25 2.53
EJE A ENTRE 14 Y 16 1.00 3.00 - 1.25 3.75
EJE A ENTRE 16 Y 17 1.00 2.75 - 1.25 3.44
EJE A ENTRE 17 Y 18 1.00 0.75 - 3.10 2.33
EJE B ENTRE 11 Y 13 1.00 - 14.89 14.89
EJE B ENTRE 13 Y 15 1.00 - 15.23 15.23
EJE B ENTRE 15 Y 18 1.00 - 14.93 14.93
EJE B ENTRE 15 Y 18 1.00 - 16.52 16.52
EJE C ENTRE 4 Y 5 1.00 2.37 - 3.55 8.41
EJE C ENTRE 5 Y 6 1.00 2.62 - 3.55 9.30
EJE C ENTRE 6 Y 7 1.00 1.42 - 3.55 5.04
EJE C ENTRE 7 Y 8 1.00 1.42 - 3.55 5.04
EJE C ENTRE 8 Y 9 1.00 - 9.11 9.11
EJE C ENTRE 9 Y 10 1.00 - 10.27 10.27
EJE D ENTRE 4 Y 5 1.00 3.55 - 2.00 7.10
EJE D ENTRE 5 Y 6 1.00 3.55 - 2.00 7.10
EJE D ENTRE 6 Y 7 1.00 2.15 - 2.15 4.62
EJE D ENTRE 7 Y 8 1.00 2.15 - 2.15 4.62
EJE D ENTRE 8 Y 9 1.00 3.55 - 2.00 7.10
EJE D ENTRE 9 Y 10 1.00 3.55 - 2.00 7.10
EJE D ENTRE 11 Y 12 1.00 2.99 - 2.00 5.98
EJE D ENTRE 12 Y 13 1.00 1.65 - 2.15 3.55
EJE D ENTRE 13 Y 14 1.00 3.04 - 2.00 6.08
EJE D ENTRE 14 Y 15 1.00 1.63 - 2.15 3.50
EJE D ENTRE 15 Y 16 1.00 2.46 - 2.15 5.29
EJE D ENTRE 16 Y 17 1.00 2.51 - 2.00 5.02
EJE D ENTRE 17 Y 18 1.00 1.60 - 2.15 3.44
EJE 4 ENTRE A Y B 1.00 5.89 - 3.10 18.26
EJE 4 ENTRE B Y C 1.00 4.15 - 3.10 12.87
EJE 4 ENTRE C Y D 1.00 4.32 - 3.10 13.39
EJE 6 ENTRE C Y D 1.00 4.60 - 3.10 14.26
ENTRE EJES 6 Y 7 1.00 4.45 - 3.55 15.80
EJE 7 ENTRE A Y B 1.00 5.89 - 3.10 18.26
EJE 7 ENTRE B Y C 1.00 4.15 - 3.10 12.87
EJE 7 ENTRE C Y D 1.00 4.32 - 3.10 13.39
ENTRE EJES 7 Y 8 1.00 4.45 - 3.55 15.80
EJE 8 ENTRE C Y D 1.00 4.60 - 3.10 14.26
EJE 9 ENTRE C Y D 1.00 4.60 - 3.10 14.26
EJE 10 ENTRE A Y B 1.00 6.09 - 3.10 18.88
EJE 10 ENTRE B Y C 1.00 4.15 - 3.10 12.87
EJE 10 ENTRE C Y D 1.00 4.32 - 3.10 13.39
EJE 11 ENTRE A Y B 1.00 6.09 - 3.10 18.88
EJE 11 ENTRE B Y C 1.00 4.15 - 3.10 12.87
EJE 11 ENTRE C Y D 1.00 3.93 - 3.10 12.18
EJE 12/13 ENTRE B Y C 1.00 4.27 - 3.10 13.24
EJE 12/13 ENTRE C Y D 1.00 3.93 - 3.10 12.18
EJE 14/15 ENTRE B Y C 1.00 4.15 - 3.10 12.87
EJE 14/15 ENTRE C Y D 1.00 3.93 - 3.10 12.18
EJE 16/17 ENTRE B Y C 1.00 4.57 - 3.10 14.17
EJE 16/17 ENTRE C Y D 1.00 3.93 - 3.10 12.18
EJE 17 ENTRE C Y D 1.00 6.06 - 3.55 21.51
EJE 18 ENTRE A Y B 1.00 6.44 - 3.10 19.96
EJE 18 ENTRE B Y C 1.00 4.15 - 3.10 12.87
EJE 18 ENTRE C Y D 1.00 3.93 - 3.10 12.18

SEGUNDO NIVEL
EJE A ENTRE 4 Y 5 1.00 3.55 - 1.25 4.44
EJE A ENTRE 5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 5.00 3.55 - 1.25 22.19
EJE A ENTRE 11 Y 13 1.00 - 10.68 10.68
EJE A ENTRE 13 Y 14 1.00 2.02 - 1.25 2.53
EJE A ENTRE 14 Y 16 1.00 3.00 - 1.25 3.75
EJE A ENTRE 16 Y 17 1.00 2.75 - 1.25 3.44
EJE A ENTRE 17 Y 18 1.00 1.90 - 3.10 5.89
EJE B ENTRE 11 Y 13 1.00 - 14.89 14.89
EJE B ENTRE 13 Y 15 1.00 - 15.23 15.23
EJE B ENTRE 15 Y 18 1.00 - 14.93 14.93
EJE B ENTRE 15 Y 18 1.00 - 16.52 16.52
EJE C ENTRE 4 Y 5 1.00 2.37 - 3.55 8.41
EJE C ENTRE 5 Y 6 1.00 2.62 - 3.55 9.30
EJE C ENTRE 6 Y 7 1.00 1.42 - 3.55 5.04
EJE C ENTRE 7 Y 8 1.00 1.42 - 3.55 5.04
EJE C ENTRE 8 Y 9 1.00 - 9.11 9.11
EJE C ENTRE 9 Y 10 1.00 - 10.27 10.27
EJE D ENTRE 4 Y 5 1.00 3.55 - 2.00 7.10
EJE D ENTRE 5 Y 6 1.00 3.55 - 2.00 7.10
EJE D ENTRE 6 Y 7 1.00 2.15 - 2.15 4.62
EJE D ENTRE 7 Y 8 1.00 2.15 - 2.15 4.62
EJE D ENTRE 8 Y 9 1.00 3.55 - 2.00 7.10
EJE D ENTRE 9 Y 10 1.00 3.55 - 2.00 7.10
EJE D ENTRE 11 Y 13 1.00 4.39 - 2.15 9.44
EJE D ENTRE 13 Y 15 1.00 4.39 - 2.15 9.44
EJE D ENTRE 15 Y 16 1.00 4.39 - 2.15 9.44
EJE D ENTRE 16 Y 18 1.00 4.56 - 2.15 9.80
EJE 4 ENTRE A Y B 1.00 5.89 - 3.10 18.26
EJE 4 ENTRE B Y C 1.00 4.15 - 3.10 12.87
EJE 4 ENTRE C Y D 1.00 4.32 - 3.10 13.39
EJE 6 ENTRE C Y D 1.00 4.60 - 3.10 14.26
ENTRE EJES 6 Y 7 1.00 4.45 - 3.55 15.80
EJE 7 ENTRE A Y B 1.00 5.89 - 3.10 18.26
EJE 7 ENTRE B Y C 1.00 4.15 - 3.10 12.87
EJE 7 ENTRE C Y D 1.00 4.32 - 3.10 13.39
ENTRE EJES 7 Y 8 1.00 4.45 - 3.55 15.80
EJE 8 ENTRE C Y D 1.00 4.60 - 3.10 14.26
EJE 9 ENTRE C Y D 1.00 4.60 - 3.10 14.26
EJE 10 ENTRE A Y B 1.00 6.09 - 3.10 18.88
EJE 10 ENTRE B Y C 1.00 4.15 - 3.10 12.87
EJE 10 ENTRE C Y D 1.00 4.32 - 3.10 13.39
EJE 11 ENTRE A Y B 1.00 6.09 - 3.10 18.88
EJE 11 ENTRE B Y C 1.00 4.15 - 3.10 12.87
EJE 11 ENTRE C Y D 1.00 3.93 - 3.10 12.18
EJE 12/13 ENTRE B Y C 1.00 4.27 - 3.10 13.24
EJE 12/13 ENTRE C Y D 1.00 3.93 - 3.10 12.18
EJE 14/15 ENTRE B Y C 1.00 4.15 - 3.10 12.87
EJE 14/15 ENTRE C Y D 1.00 3.93 - 3.10 12.18
EJE 16/17 ENTRE B Y C 1.00 4.57 - 3.10 14.17
EJE 16/17 ENTRE C Y D 1.00 3.93 - 3.10 12.18
EJE 18 ENTRE A Y B 1.00 6.24 - 3.10 19.34
EJE 18 ENTRE B Y C 1.00 4.15 - 3.10 12.87
EJE 18 ENTRE C Y D 1.00 3.93 - 3.10 12.18

02.03.02.02 DEMOLICION DE PARAPETOS m2 67.15


PABELLON "D"
PASILLO 2º NIVEL 1.00 53.72 - 1.25 67.15

02.03.02.03 DEMOLICION LOSA ALIGERADA m2 1584.93


PABELLON "D"
PRIMER NIVEL
TALLER DE CORTE Y COFECCION 1.00 - 111.41 111.41
OFICINA 1.00 - 31.65 31.65
TALLER DE REPOSTERIA 1.00 - 110.01 110.01
KITCHENET 01 1.00 - 15.49 15.49
KITCHENET 02 1.00 - 15.50 15.50
AULA 1 1.00 - 50.81 50.81
AULA 2 1.00 - 49.46 49.46
AULA 3 1.00 - 49.50 49.50
AULA 4 1.00 - 50.97 50.97
AULA 5 1.00 - 71.52 71.52
AULA 6 1.00 - 35.49 35.49
DEPOSITO 1.00 - 37.27 37.27
SS.HH. 2.00 - 15.50 31.00
ENTRE EJES 1 Y 2 (PASILLO) 1.00 - 15.85 15.85
ENTRE EJES 2 Y 3 (PASILLO) 1.00 - 10.73 10.73
ENTRE EJES 4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 (PASILLO) 6.00 - 12.34 74.04
ENTRE EJES 11 Y 12 (PASILLO) 1.00 - 10.43 10.43
ENTRE EJES 12 Y 13 (PASILLO) 1.00 - 10.55 10.55
ENTRE EJES 13 Y 14 (PASILLO) 1.00 - 10.50 10.50
ENTRE EJES 14 Y 15 (PASILLO) 1.00 - 10.48 10.48
ENTRE EJES 15 Y 16 (PASILLO) 1.00 - 10.43 10.43
ENTRE EJES 16 Y 17 (PASILLO) 1.00 - 10.44 10.44
ENTRE EJES 17 Y 18 (PASILLO) 1.00 - 10.44 10.44
ENTRE EJES 18 Y 19 (PASILLO) 1.00 - 10.10 10.10
ENTRE EJES 20 Y 21 (PASILLO) 1.00 - 9.12 9.12
SEGUNDO NIVEL
TALLER DE VIDEO 1.00 - 143.13 143.13
TALLER DE CORTE Y COFECCION 1.00 - 109.87 109.87
KITCHENET 01 1.00 - 15.22 15.22
KITCHENET 02 1.00 - 15.53 15.53
AULA 7 1.00 - 51.01 51.01
AULA 8 1.00 - 49.70 49.70
AULA 9 1.00 - 49.39 49.39
AULA 10 1.00 - 50.75 50.75
AULA 11 1.00 - 70.23 70.23
AULA 12 1.00 - 71.81 71.81
SS.HH. 2.00 - 15.53 31.06
ENTRE EJES 4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 (PASILLO) 6.00 - 12.34 74.04

02.03.02.05 DEMOLICION DE VIGAS m3 107.52


PABELLON "D"
PRIMER NIVEL
EJE A ENTRE 4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 6.00 3.55 0.35 0.65 4.85
EJE A ENTRE 11 Y 17 1.00 4.95 0.35 0.65 1.13
1.00 4.27 0.35 0.65 0.97
1.00 3.30 0.35 0.65 0.75
1.00 2.75 0.35 0.65 0.63
EJE A ENTRE 17 Y 18 1.00 1.90 0.35 0.65 0.43
EJE B ENTRE 4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 6.00 3.55 0.35 0.65 4.85
EJE B ENTRE 11 Y 18 1.00 5.52 0.35 0.65 1.26
2.00 5.45 0.35 0.65 2.48
1.00 5.54 0.35 0.65 1.26
EJE C ENTRE 4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 6.00 3.55 0.35 0.65 4.85
EJE C ENTRE 11 Y 18 1.00 5.52 0.35 0.65 1.26
2.00 5.45 0.35 0.65 2.48
1.00 5.54 0.35 0.65 1.26
EJE D ENTRE 1 Y 2 1.00 2.99 0.35 0.65 0.68
EJE D ENTRE 3 Y 4 1.00 4.55 0.35 0.65 1.04
EJE D ENTRE 4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 6.00 3.55 0.35 0.65 4.85
EJE D ENTRE 11 Y 12 1.00 2.99 0.35 0.65 0.68
EJE D ENTRE 12 Y 13 1.00 3.06 0.35 0.65 0.70
EJE D ENTRE 13 Y 14 1.00 3.04 0.35 0.65 0.69
EJE D ENTRE 14 Y 15 1.00 3.04 0.35 0.65 0.69
EJE D ENTRE 15 Y 17 1.00 6.37 0.35 0.65 1.45
EJE D ENTRE 17 Y 18 1.00 3.00 0.35 0.65 0.68
EJE D ENTRE 18 Y 19 1.00 2.90 0.35 0.65 0.66
EJE D ENTRE 20 Y 21 1.00 2.62 0.35 0.65 0.60
EJE E ENTRE 1 Y 2 1.00 4.55 0.35 0.65 1.04
EJE E ENTRE 3 Y 4 1.00 3.08 0.35 0.65 0.70
EJE E ENTRE 4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 6.00 3.55 0.35 0.65 4.85
EJE E ENTRE 11 Y 12 1.00 2.97 0.35 0.65 0.68
EJE E ENTRE 12 Y 13 1.00 3.10 0.35 0.65 0.71
EJE E ENTRE 13 Y 14/14 Y 15 2.00 2.99 0.35 0.65 1.36
EJE E ENTRE 15 Y 16 1.00 3.00 0.35 0.65 0.68
EJE E ENTRE 16 Y 17/17 Y 18 2.00 2.98 0.35 0.65 1.36
EJE E ENTRE 18 Y 19 1.00 2.90 0.35 0.65 0.66
EJE E ENTRE 20 Y 21 1.00 2.62 0.35 0.65 0.60
SEGUNDO NIVEL
EJE A ENTRE 4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 6.00 3.55 0.35 0.65 4.85
EJE A ENTRE 11 Y 17 1.00 4.95 0.35 0.65 1.13
1.00 4.27 0.35 0.65 0.97
1.00 3.30 0.35 0.65 0.75
1.00 2.75 0.35 0.65 0.63
EJE A ENTRE 17 Y 18 1.00 1.90 0.35 0.65 0.43
EJE B ENTRE 4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 6.00 3.55 0.35 0.65 4.85
EJE B ENTRE 11 Y 18 1.00 5.52 0.35 0.65 1.26
2.00 5.45 0.35 0.65 2.48
1.00 5.54 0.35 0.65 1.26
EJE C ENTRE 4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 6.00 3.55 0.35 0.65 4.85
EJE C ENTRE 11 Y 18 1.00 5.52 0.35 0.65 1.26
2.00 5.45 0.35 0.65 2.48
1.00 5.54 0.35 0.65 1.26
EJE D ENTRE 1 Y 2 1.00 2.99 0.35 0.65 0.68
EJE D ENTRE 3 Y 4 1.00 4.55 0.35 0.65 1.04
EJE D ENTRE 4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 6.00 3.55 0.35 0.65 4.85
EJE D ENTRE 11 Y 12 1.00 2.99 0.35 0.65 0.68
EJE D ENTRE 12 Y 13 1.00 3.06 0.35 0.65 0.70
EJE D ENTRE 13 Y 14 1.00 3.04 0.35 0.65 0.69
EJE D ENTRE 14 Y 15 1.00 3.04 0.35 0.65 0.69
EJE D ENTRE 15 Y 17 1.00 6.37 0.35 0.65 1.45
EJE D ENTRE 17 Y 18 1.00 3.00 0.35 0.65 0.68
EJE D ENTRE 18 Y 19 1.00 2.90 0.35 0.65 0.66
EJE D ENTRE 20 Y 21 1.00 2.62 0.35 0.65 0.60
EJE E ENTRE 1 Y 2 1.00 4.55 0.35 0.65 1.04
EJE E ENTRE 3 Y 4 1.00 3.08 0.35 0.65 0.70
EJE E ENTRE 4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 6.00 3.55 0.35 0.65 4.85
EJE E ENTRE 11 Y 12 1.00 2.97 0.35 0.65 0.68
EJE E ENTRE 12 Y 13 1.00 3.10 0.35 0.65 0.71
EJE E ENTRE 13 Y 14/14 Y 15 2.00 2.99 0.35 0.65 1.36
EJE E ENTRE 15 Y 16 1.00 3.00 0.35 0.65 0.68
EJE E ENTRE 16 Y 17/17 Y 18 2.00 2.98 0.35 0.65 1.36
EJE E ENTRE 18 Y 19 1.00 2.90 0.35 0.65 0.66
EJE E ENTRE 20 Y 21 1.00 2.62 0.35 0.65 0.60

02.03.02.06 DEMOLICION DE COLUMNAS m3 123.88


PABELLON "D"
EJE A - 4,5,6,7,8,9 6.00 0.55 0.35 9.25 10.68
EJE A - 10,11 2.00 0.35 0.35 9.25 2.27
EJE A - 12/13 1.00 9.25 0.78 7.22
EJE A - 14/15 1.00 9.25 0.78 7.22
EJE A - 16/17 1.00 9.25 0.78 7.22
EJE A - 17 1.00 9.25 0.78 7.22
EJE B - 4,5,6,7,8,9,10,11 8.00 0.65 0.35 9.25 16.83
EJE B - 12/13 1.00 0.35 0.35 9.25 1.13
EJE B - 14/15 1.00 0.65 0.35 9.25 2.10
EJE B - 16/17 1.00 0.65 0.35 9.25 2.10
EJE B - 18 1.00 0.65 0.35 9.25 2.10
EJE C - 11 1.00 0.35 0.35 9.25 1.13
EJE C - 12/13 1.00 0.35 0.35 9.25 1.13
EJE C - 14/15 1.00 0.35 0.35 9.25 1.13
EJE C - 16/17 1.00 0.35 0.35 9.25 1.13
EJE C - 18 1.00 0.35 0.35 9.25 1.13
EJE D - 1.2.3.4,5,6,7,8,9,10,12,13,14,15,17,19,20,21 18.00 0.35 0.35 9.25 20.40
EJE D - 11 2.00 0.35 0.35 9.25 2.27
EJE D - 18 2.00 0.35 0.35 9.25 2.27
EJE D - 12/13 1.00 0.35 0.35 9.25 1.13
EJE D - 14/15 1.00 0.35 0.35 9.25 1.13
EJE D - 16/17 1.00 0.35 0.35 9.25 1.13
EJE E - 1.2.3.4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,20,21 21.00 0.35 0.35 9.25 23.80

02.03.02.07 DEMOLICION DE PARAPETOS DE CONCRETO ARMADO m3 12.04


PABELLON "D"
ESCALERA Nº1
Tramo 1 4.00 3.12 0.15 1.20 2.25
Descanso 1.00 1.00 0.15 1.20 0.18
Tramo 2 4.00 3.29 0.15 1.20 2.37
ESCALERA Nº2
Tramo 1 2.00 3.12 0.15 1.20 1.12
Descanso 1.00 6.60 0.15 1.20 1.19
Tramo 2 2.00 3.33 0.15 1.20 1.20
ESCALERA Nº3
Tramo 1 2.00 3.12 0.15 1.20 1.12
Descanso 1.00 7.85 0.15 1.20 1.41
Tramo 2 2.00 3.33 0.15 1.20 1.20

02.03.02.08 DEMOLICION DE ESCALERAS DE CONCRETO m3 13.18


PABELLON "D"
ESCALERA Nº1
Tramo 1 2.00 1.50 1.60 4.80
Descanso 1.00 3.00 2.55 0.15 1.15
ESCALERA Nº2
Tramo 1 1.00 1.85 0.74 1.37
Descanso 1.00 4.25 1.94 0.15 1.24
Tramo 2 1.00 1.90 0.73 1.39
ESCALERA Nº3
Tramo 1 1.00 1.49 0.69 1.03
Descanso 1.00 3.40 1.80 0.15 0.92
Tramo 2 1.00 1.70 0.76 1.29

02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 23.10


PABELLON "D"
PRIMER NIVEL
EJE A ENTRE 4 Y 5 1.00 3.55 0.20 0.50 0.36
EJE A ENTRE 5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 5.00 3.55 0.20 0.50 1.78
EJE A ENTRE 11 Y 13 1.00 4.95 0.20 0.50 0.50
EJE A ENTRE 13 Y 14 1.00 2.02 0.20 0.50 0.20
EJE A ENTRE 14 Y 16 1.00 3.00 0.20 0.50 0.30
EJE A ENTRE 16 Y 17 1.00 2.75 0.20 0.50 0.28
EJE A ENTRE 17 Y 18 1.00 0.75 0.20 0.50 0.08
EJE B ENTRE 11 Y 13 1.00 5.52 0.20 0.50 0.55
EJE B ENTRE 13 Y 15 1.00 5.45 0.20 0.50 0.55
EJE B ENTRE 15 Y 18 1.00 5.45 0.20 0.50 0.55
EJE B ENTRE 15 Y 18 1.00 5.54 0.20 0.50 0.55
EJE C ENTRE 4 Y 5 1.00 2.37 0.20 0.50 0.24
EJE C ENTRE 5 Y 6 1.00 2.62 0.20 0.50 0.26
EJE C ENTRE 6 Y 7 1.00 1.42 0.20 0.50 0.14
EJE C ENTRE 7 Y 8 1.00 1.42 0.20 0.50 0.14
EJE C ENTRE 8 Y 9 1.00 2.82 0.20 0.50 0.28
EJE C ENTRE 9 Y 10 1.00 3.72 0.20 0.50 0.37
EJE D ENTRE 4 Y 5 1.00 3.55 0.20 0.50 0.36
EJE D ENTRE 5 Y 6 1.00 3.55 0.20 0.50 0.36
EJE D ENTRE 6 Y 7 1.00 2.15 0.20 0.50 0.22
EJE D ENTRE 7 Y 8 1.00 2.15 0.20 0.50 0.22
EJE D ENTRE 8 Y 9 1.00 3.55 0.20 0.50 0.36
EJE D ENTRE 9 Y 10 1.00 3.55 0.20 0.50 0.36
EJE D ENTRE 11 Y 12 1.00 2.99 0.20 0.50 0.30
EJE D ENTRE 12 Y 13 1.00 1.65 0.20 0.50 0.17
EJE D ENTRE 13 Y 14 1.00 3.04 0.20 0.50 0.30
EJE D ENTRE 14 Y 15 1.00 1.63 0.20 0.50 0.16
EJE D ENTRE 15 Y 16 1.00 2.46 0.20 0.50 0.25
EJE D ENTRE 16 Y 17 1.00 2.51 0.20 0.50 0.25
EJE D ENTRE 17 Y 18 1.00 1.60 0.20 0.50 0.16
EJE 4 ENTRE A Y B 1.00 5.89 0.20 0.50 0.59
EJE 4 ENTRE B Y C 1.00 4.15 0.20 0.50 0.42
EJE 4 ENTRE C Y D 1.00 4.32 0.20 0.50 0.43
EJE 6 ENTRE C Y D 1.00 4.60 0.20 0.50 0.46
ENTRE EJES 6 Y 7 1.00 4.45 0.20 0.50 0.45
EJE 7 ENTRE A Y B 1.00 5.89 0.20 0.50 0.59
EJE 7 ENTRE B Y C 1.00 4.15 0.20 0.50 0.42
EJE 7 ENTRE C Y D 1.00 4.32 0.20 0.50 0.43
ENTRE EJES 7 Y 8 1.00 4.45 0.20 0.50 0.45
EJE 8 ENTRE C Y D 1.00 4.60 0.20 0.50 0.46
EJE 9 ENTRE C Y D 1.00 4.60 0.20 0.50 0.46
EJE 10 ENTRE A Y B 1.00 6.09 0.20 0.50 0.61
EJE 10 ENTRE B Y C 1.00 4.15 0.20 0.50 0.42
EJE 10 ENTRE C Y D 1.00 4.32 0.20 0.50 0.43
EJE 11 ENTRE A Y B 1.00 6.09 0.20 0.50 0.61
EJE 11 ENTRE B Y C 1.00 4.15 0.20 0.50 0.42
EJE 11 ENTRE C Y D 1.00 3.93 0.20 0.50 0.39
EJE 12/13 ENTRE B Y C 1.00 4.27 0.20 0.50 0.43
EJE 12/13 ENTRE C Y D 1.00 3.93 0.20 0.50 0.39
EJE 14/15 ENTRE B Y C 1.00 4.15 0.20 0.50 0.42
EJE 14/15 ENTRE C Y D 1.00 3.93 0.20 0.50 0.39
EJE 16/17 ENTRE B Y C 1.00 4.57 0.20 0.50 0.46
EJE 16/17 ENTRE C Y D 1.00 3.93 0.20 0.50 0.39
EJE 17 ENTRE C Y D 1.00 6.06 0.20 0.50 0.61
EJE 18 ENTRE A Y B 1.00 6.44 0.20 0.50 0.64
EJE 18 ENTRE B Y C 1.00 4.15 0.20 0.50 0.42
EJE 18 ENTRE C Y D 1.00 3.93 0.20 0.50 0.39

02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 69.30


PABELLON "D"
PRIMER NIVEL
EJE A ENTRE 4 Y 5 1.00 3.55 0.50 0.60 1.07
EJE A ENTRE 5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 5.00 3.55 0.50 0.60 5.33
EJE A ENTRE 11 Y 13 1.00 4.95 0.50 0.60 1.49
EJE A ENTRE 13 Y 14 1.00 2.02 0.50 0.60 0.61
EJE A ENTRE 14 Y 16 1.00 3.00 0.50 0.60 0.90
EJE A ENTRE 16 Y 17 1.00 2.75 0.50 0.60 0.83
EJE A ENTRE 17 Y 18 1.00 0.75 0.50 0.60 0.22
EJE B ENTRE 11 Y 13 1.00 5.52 0.50 0.60 1.66
EJE B ENTRE 13 Y 15 1.00 5.45 0.50 0.60 1.64
EJE B ENTRE 15 Y 18 1.00 5.45 0.50 0.60 1.64
EJE B ENTRE 15 Y 18 1.00 5.54 0.50 0.60 1.66
EJE C ENTRE 4 Y 5 1.00 2.37 0.50 0.60 0.71
EJE C ENTRE 5 Y 6 1.00 2.62 0.50 0.60 0.79
EJE C ENTRE 6 Y 7 1.00 1.42 0.50 0.60 0.43
EJE C ENTRE 7 Y 8 1.00 1.42 0.50 0.60 0.43
EJE C ENTRE 8 Y 9 1.00 2.82 0.50 0.60 0.85
EJE C ENTRE 9 Y 10 1.00 3.72 0.50 0.60 1.12
EJE D ENTRE 4 Y 5 1.00 3.55 0.50 0.60 1.07
EJE D ENTRE 5 Y 6 1.00 3.55 0.50 0.60 1.07
EJE D ENTRE 6 Y 7 1.00 2.15 0.50 0.60 0.64
EJE D ENTRE 7 Y 8 1.00 2.15 0.50 0.60 0.64
EJE D ENTRE 8 Y 9 1.00 3.55 0.50 0.60 1.07
EJE D ENTRE 9 Y 10 1.00 3.55 0.50 0.60 1.07
EJE D ENTRE 11 Y 12 1.00 2.99 0.50 0.60 0.90
EJE D ENTRE 12 Y 13 1.00 1.65 0.50 0.60 0.49
EJE D ENTRE 13 Y 14 1.00 3.04 0.50 0.60 0.91
EJE D ENTRE 14 Y 15 1.00 1.63 0.50 0.60 0.49
EJE D ENTRE 15 Y 16 1.00 2.46 0.50 0.60 0.74
EJE D ENTRE 16 Y 17 1.00 2.51 0.50 0.60 0.75
EJE D ENTRE 17 Y 18 1.00 1.60 0.50 0.60 0.48
EJE 4 ENTRE A Y B 1.00 5.89 0.50 0.60 1.77
EJE 4 ENTRE B Y C 1.00 4.15 0.50 0.60 1.25
EJE 4 ENTRE C Y D 1.00 4.32 0.50 0.60 1.30
EJE 6 ENTRE C Y D 1.00 4.60 0.50 0.60 1.38
ENTRE EJES 6 Y 7 1.00 4.45 0.50 0.60 1.34
EJE 7 ENTRE A Y B 1.00 5.89 0.50 0.60 1.77
EJE 7 ENTRE B Y C 1.00 4.15 0.50 0.60 1.25
EJE 7 ENTRE C Y D 1.00 4.32 0.50 0.60 1.30
ENTRE EJES 7 Y 8 1.00 4.45 0.50 0.60 1.34
EJE 8 ENTRE C Y D 1.00 4.60 0.50 0.60 1.38
EJE 9 ENTRE C Y D 1.00 4.60 0.50 0.60 1.38
EJE 10 ENTRE A Y B 1.00 6.09 0.50 0.60 1.83
EJE 10 ENTRE B Y C 1.00 4.15 0.50 0.60 1.25
EJE 10 ENTRE C Y D 1.00 4.32 0.50 0.60 1.30
EJE 11 ENTRE A Y B 1.00 6.09 0.50 0.60 1.83
EJE 11 ENTRE B Y C 1.00 4.15 0.50 0.60 1.25
EJE 11 ENTRE C Y D 1.00 3.93 0.50 0.60 1.18
EJE 12/13 ENTRE B Y C 1.00 4.27 0.50 0.60 1.28
EJE 12/13 ENTRE C Y D 1.00 3.93 0.50 0.60 1.18
EJE 14/15 ENTRE B Y C 1.00 4.15 0.50 0.60 1.25
EJE 14/15 ENTRE C Y D 1.00 3.93 0.50 0.60 1.18
EJE 16/17 ENTRE B Y C 1.00 4.57 0.50 0.60 1.37
EJE 16/17 ENTRE C Y D 1.00 3.93 0.50 0.60 1.18
EJE 17 ENTRE C Y D 1.00 6.06 0.50 0.60 1.82
EJE 18 ENTRE A Y B 1.00 6.44 0.50 0.60 1.93
EJE 18 ENTRE B Y C 1.00 4.15 0.50 0.60 1.25
EJE 18 ENTRE C Y D 1.00 3.93 0.50 0.60 1.18

02.03.02.11 DEMOLICION DE ZAPATAS m3 77.71


PABELLON "D"
Z-1 61.00 1.40 1.40 0.65 77.71

02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 970.91


PABELLON "D"
OFICINA 1.00 - 34.21 34.21
TALLER DE CORTE Y CONFECCION 1.00 - 135.08 135.08
TALLER DE REPOSTERIA 1.00 - 134.35 134.35
SS.HH. 1 1.00 - 9.15 9.15
SS.HH. 2 1.00 - 9.15 9.15
KITCHENET 1 1.00 - 16.25 16.25
KITCHENET 2 1.00 - 16.82 16.82
AULA 1 1.00 - 52.83 52.83
AULA 2 1.00 - 51.35 51.35
AULA 3 1.00 - 51.55 51.55
AULA 4 1.00 - 53.01 53.01
AULA 5 1.00 - 63.29 63.29
AULA 6 1.00 - 65.00 65.00
DEPOSITO 1.00 - 19.70 19.70
ESCALERA 1 1.00 - 12.67 12.67
ESCALERA 2 1.00 - 8.04 8.04
PASILLO 1.00 - 238.46 238.46

SUSTENTO DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON "E" - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


CANT MEDIDAS PARCIA
ITEM DESCRIPCION UNID. TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H) AREA L

02.03 DESMONTAJES Y DEMOLICIONES


02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 25.83
PABELLON "E"
PRIMER NIVEL
AUDITORIO (INGRESO PRINCIPAL) 1.00 - 3.53 2.10 7.41
AUDITORIO INBRESOS SECUNDARIOS 2.00 - 1.41 2.10 5.92
AUDITORIO ESCENARIO 2.00 - 0.80 2.10 3.36
DEPOSITO INGRESOS 2.00 - 1.00 2.10 4.20
DEPOSITO INTERIOR 1.00 - 0.65 2.10 1.37
ESCALERA 1.00 - 0.70 2.10 1.47
SEGUNDO NIVEL
AMBIENTE EN PASILLO 1.00 - 1.00 2.10 2.10

02.03.01.09 DESMONTAJE DE VENTANAS DE FIERRO m2 74.46


PABELLON "E"
PRIMER NIVEL
EJE A ENTRE 2 Y 3 1.00 1.80 - 0.90 1.62
EJE A ENTRE 3 Y 4 1.00 2.32 - 0.90 2.09
EJE A ENTRE 4 Y 5 1.00 1.76 - 0.90 1.58
EJE 1 ENTRE C Y D/D Y E/E Y F 3.00 3.42 - 0.80 8.21
EJE 2,5 ENTRE B Y C/C Y D 4.00 4.06 - 2.00 32.48
EJE 2,5 ENTRE D Y E 2.00 3.92 - 2.00 15.68
EJE 2,5 ENTRE E Y F 2.00 3.02 - 2.00 12.08
AMBIENTE EN PASILLO 2.00 0.90 - 0.40 0.72

02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS


02.03.01.15,01 DESMONTAJE DE ARTEFACTO O SOKET ADOSADO EN TECHO P/FOCO AHORRAD und 3.00
PABELLON "E"
PRIMER NIVEL 1.00 - 3.00 3.00

02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR und 6.00
PABELLON "E"
PRIMER NIVEL (PASILLO) 1.00 - 6.00 6.00

02.03.01.15,04 DESMONTAJE DE ARTEFACTO FLUORESCENTE C/REJILLA DE ALUMINIO C/LAMP. und 3.00


PABELLON "E"
PRIMER NIVEL (PASILLO) 1.00 - 3.00 3.00

02.03.01.15,05 DESMONTAJE DE ARTEFACTO FLUORESCENTE ADOSADO C/LAMP. 1X40W und 8.00


PABELLON "E"
PRIMER NIVEL 1.00 - 8.00 8.00

02.03.01.15,06 DESMONTAJE DE ARTEFACTO ADOSADO A TECHO TIPO BE 2X40W und 6.00


PABELLON "E"
PRIMER NIVEL 1.00 - 6.00 6.00

02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 11.00


PABELLON "E"
PRIMER NIVEL 1.00 - 11.00 11.00

02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 3.00


PABELLON "E"
PRIMER NIVEL 1.00 - 3.00 3.00

02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 1.00


PABELLON "E"
PRIMER NIVEL 1.00 - 1.00 1.00

02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 99.01


PABELLON "E"
PRIMER NIVEL 1.00 - 99.01 99.01

02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 233.58
PABELLON "E"
PRIMER NIVEL
EJE A ENTRE 2 Y 3 1.00 1.84 - 1.20 2.21
EJE A ENTRE 3 Y 4 1.00 2.32 - 1.20 2.78
EJE A ENTRE 4 Y 5 1.00 1.76 - 1.20 2.11
EJE C/D ENTRE 1 Y 2 1.00 3.16 - 2.20 6.95
EJE E ENTRE 1 Y 2 1.00 2.69 - 2.20 5.92
EJE F ENTRE 1 Y 2 1.00 2.73 - 2.20 6.01
EJE F ENTRE 2 Y 5 1.00 10.93 - 3.10 33.88
EJE 1 ENTRE C Y F 3.00 3.42 - 1.40 14.36
EJE 2,5 ENTRE B Y C 2.00 4.06 - 2.00 16.24
EJE 2,5 ENTRE C Y D 2.00 4.06 - 2.00 16.24
EJE 2,5 ENTRE D Y E 2.00 3.92 - 2.00 15.68
EJE 2,5 ENTRE E Y F 2.00 2.81 - 2.00 11.24
SEGUNDO NIVEL
EJE A ENTRE 2 Y 3 1.00 1.84 - 3.50 6.44
EJE A ENTRE 3 Y 4 1.00 2.32 - 3.50 8.12
EJE A ENTRE 4 Y 5 1.00 1.76 - 3.50 6.16
EJE F ENTRE 2 Y 5 1.00 14.46 - 3.10 44.83
AMBIENTE EN PASILLO 1.00 4.40 - 3.10 13.64
2.00 3.35 - 3.10 20.77

02.03.02.03 DEMOLICION LOSA ALIGERADA m2 55.11


PABELLON "E"
PRIMER NIVEL
DEPOSITO AUDITORIO 1.00 - 25.00 25.00
COCINA AUDITORIO 1.00 - 13.90 13.90
SEGUNDO NIVEL
DEPOSITO PASILLO 1.00 - 16.21 16.21

02.03.02.04 DEMOLICION DE LOSA MACIZA m3 93.98


PABELLON "E"
PRIMER NIVEL
AUDITORIO 1.00 0.30 313.28 93.98

02.03.02.05 DEMOLICION DE VIGAS m3 63.12


PABELLON "E"
PRIMER NIVEL
EJE 2 ENTRE A Y B 1.00 2.03 0.50 0.35 0.36
EJE 2 ENTRE B Y C 1.00 2.96 0.50 0.35 0.52
EJE 2 ENTRE C Y D 1.00 2.96 0.50 0.35 0.52
EJE 2 ENTRE D Y E 1.00 2.82 0.50 0.35 0.49
EJE 2 ENTRE E Y F 1.00 3.02 0.50 0.35 0.53
EJE 5 ENTRE A Y B 1.00 2.03 0.50 0.35 0.36
EJE 5 ENTRE B Y C 1.00 2.96 0.50 0.35 0.52
EJE 5 ENTRE C Y D 1.00 2.96 0.50 0.35 0.52
EJE 5 ENTRE D Y E 1.00 2.82 0.50 0.35 0.49
EJE 5 ENTRE E Y F 1.00 3.02 0.50 0.35 0.53
SEGUNDO NIVEL
EJE F ENTRE 2 Y 5 1.00 13.99 0.46 0.90 5.79
EJE B ENTRE 2 Y 5 1.00 14.84 0.46 0.90 6.14
EJE C ENTRE 2 Y 5 1.00 15.48 0.46 0.90 6.41
EJE D ENTRE 2 Y 5 1.00 16.11 0.46 0.90 6.67
EJE E ENTRE 2 Y 5 1.00 16.72 0.46 0.90 6.92
EJE F ENTRE 2 Y 5 1.00 17.38 0.46 0.90 7.20
EJE A/B ENTRE 2 Y 5 1.00 14.06 0.46 0.90 5.82
EJE 2 ENTRE A Y B 1.00 2.03 0.50 0.90 0.91
EJE 2 ENTRE B Y C 1.00 2.96 0.50 0.90 1.33
EJE 2 ENTRE C Y D 1.00 2.96 0.50 0.90 1.33
EJE 2 ENTRE D Y E 1.00 2.82 0.50 0.90 1.27
EJE 2 ENTRE E Y F 1.00 3.02 0.50 0.90 1.36
EJE 5 ENTRE A Y B 1.00 2.03 0.50 0.90 0.91
EJE 5 ENTRE B Y C 1.00 2.96 0.50 0.90 1.33
EJE 5 ENTRE C Y D 1.00 2.96 0.50 0.90 1.33
EJE 5 ENTRE D Y E 1.00 2.82 0.50 0.90 1.27
EJE 5 ENTRE E Y F 1.00 3.02 0.50 0.90 1.36
DEPOSITO
ENTRE EJES C Y F - 1 Y 2 1.00 2.73 0.25 0.45 0.31
3.00 0.42 0.25 0.45 0.14
1.00 4.25 0.25 0.45 0.48

02.03.02.06 DEMOLICION DE COLUMNAS m3 109.24


PABELLON "E"
EJE A - 2,5 2.00 6.15 0.64 7.87
EJE A - 3,4 2.00 6.15 0.84 10.33
EJE A/B - 2,5 2.00 6.15 0.89 10.95
2.00 6.15 0.36 4.43
EJE B - 2,5 2.00 6.15 1.13 13.90
EJE C - 2,5 2.00 6.15 1.13 13.90
EJE C/D - 1 1.00 0.35 0.35 6.15 0.75
EJE D - 2,5 2.00 6.15 1.13 13.90
EJE D/E - 1 1.00 0.35 0.35 6.15 0.75
EJE E - 2,5 2.00 6.15 1.13 13.90
EJE E/F - 1 1.00 0.35 0.35 6.15 0.75
EJE F - 2,5 2.00 6.15 1.17 14.39
EJE F - 1,3,4 3.00 0.43 0.43 6.15 3.41

02.03.02.08 DEMOLICION DE ESCALERAS DE CONCRETO m3 2.10


PABELLON "E"
ESCALERA Nº1
Tramo 1 1.00 1.16 0.54 0.63
Descanso 1.00 3.70 1.41 0.15 0.78
Tramo 2 1.00 1.16 0.60 0.70

02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 6.54


PABELLON "E"
PRIMER NIVEL
EJE A ENTRE 2 Y 3 1.00 1.84 0.20 0.50 0.18
EJE A ENTRE 3 Y 4 1.00 2.32 0.20 0.50 0.23
EJE A ENTRE 4 Y 5 1.00 1.76 0.20 0.50 0.18
EJE C/D ENTRE 1 Y 2 1.00 3.16 0.20 0.50 0.32
EJE E ENTRE 1 Y 2 1.00 2.69 0.20 0.50 0.27
EJE F ENTRE 1 Y 2 1.00 2.73 0.20 0.50 0.27
EJE F ENTRE 2 Y 5 1.00 10.93 0.20 0.50 1.09
EJE 1 ENTRE C Y F 3.00 3.42 0.20 0.50 1.03
EJE 2,5 ENTRE B Y C 2.00 4.06 0.20 0.50 0.81
EJE 2,5 ENTRE C Y D 2.00 4.06 0.20 0.50 0.81
EJE 2,5 ENTRE D Y E 2.00 3.92 0.20 0.50 0.78
EJE 2,5 ENTRE E Y F 2.00 2.81 0.20 0.50 0.56

02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 19.62


PABELLÓN "E"
PRIMER NIVEL
EJE A ENTRE 2 Y 3 1.00 1.84 0.50 0.60 0.55
EJE A ENTRE 3 Y 4 1.00 2.32 0.50 0.60 0.70
EJE A ENTRE 4 Y 5 1.00 1.76 0.50 0.60 0.53
EJE C/D ENTRE 1 Y 2 1.00 3.16 0.50 0.60 0.95
EJE E ENTRE 1 Y 2 1.00 2.69 0.50 0.60 0.81
EJE F ENTRE 1 Y 2 1.00 2.73 0.50 0.60 0.82
EJE F ENTRE 2 Y 5 1.00 10.93 0.50 0.60 3.28
EJE 1 ENTRE C Y F 3.00 3.42 0.50 0.60 3.08
EJE 2,5 ENTRE B Y C 2.00 4.06 0.50 0.60 2.44
EJE 2,5 ENTRE C Y D 2.00 4.06 0.50 0.60 2.44
EJE 2,5 ENTRE D Y E 2.00 3.92 0.50 0.60 2.35
EJE 2,5 ENTRE E Y F 2.00 2.81 0.50 0.60 1.69

02.03.02.11 DEMOLICION DE ZAPATAS m3 380.16


PABELLON "E"
Z-1 16.00 3.30 3.00 2.40 380.16

02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 349.05


PABELLON "E"
AUDITORIO 1.00 - 349.05 349.05

SUSTENTO DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON "F" - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


CANT MEDIDAS PARCIA
ITEM DESCRIPCION UNID. TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H) AREA L

02.03 DESMONTAJES Y DEMOLICIONES


02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 69.21
PABELLON "F"
PRIMER NIVEL
DIRECCION, DEPOSITO, RECEPCION ADMINISTRACION, SECRETARIA 7.00 - 0.90 2.10 13.23
CONTROL, ASESORIA/LETRAS 2.00 - 0.90 2.10 3.78
AMBIENTES S/DESCRIPCION EN PLANOS 3.00 - 0.90 2.10 5.67
ASESORIA LETRAS, ASESORIA, SUB DIREC., SALA DE PROF. DE COMUNICACIÓN. 4.00 - 0.85 2.10 7.14
AMBIENTES S/DESCRIPCION EN PLANOS 1.00 - 0.85 2.10 1.79
ASESORIA DE SOCIALES 1.00 - 1.05 2.10 2.21
SUB DIRECCION INTERIOR 1.00 - 0.95 2.10 1.99
SS. HH. 2.00 - 0.75 2.10 3.15
SS. HH. INTERIOR 4.00 - 0.60 1.80 4.32
SS. HH. DIRECCION 1.00 - 0.70 2.10 1.47

SEGUNDO NIVEL
LABORATORIO DE BIOLOGIA, QUIMICA, FISICA, SALA DE COMPUTO 4.00 - 1.40 2.10 11.76
SALA DE COMPUTO, AMBIENTES SIN DESCRIPCION 4.00 - 0.85 2.10 7.14
ACCESO A DEPOSITOS 2.00 - 0.95 2.10 3.99
DEPOSITO 1.00 - 0.75 2.10 1.58

02.03.01.02 DESMONTAJE DE PUERTA METALICA m2 16.07


PABELLON "F"
PRIMER NIVEL
PUERTA DE REJAS INGRESO LATERAL 1.00 - 4.12 3.90 16.07

02.03.01.03 DESMONTAJE DE MAMPARAS m2 11.13


PABELLON "F"
PRIMER NIVEL
MAMPARA INGRESO PRINCIPAL 1.00 - 3.65 3.05 11.13

02.03.01.05 DESMONTAJE DE INODOROS und 5.00


PABELLON "F"
PRIMER NIVEL
SS.HH. DIRECCION 1.00 - - - 1.00
SS.HH. 1,2 4.00 - - - 4.00

02.03.01.06 DESMONTAJE DE LAVATORIOS DE LOSA und 12.00


PABELLON "F"
PRIMER NIVEL
SS.HH. DIRECCION 1.00 - - - 1.00
SS.HH. 1,2 3.00 - - - 3.00
SEGUNDO NIVEL NIVEL
LABORATORIO DE BIOLOGIA. QUIMICA 8.00 - - - 8.00

02.03.01.09 DESMONTAJE DE VENTANAS DE FIERRO m2 231.17


PABELLON "F"
PRIMER NIVEL
EJE A ENTRE 18 Y 19 1.00 1.40 - 1.15 1.61
EJE B ENTRE 3 Y 4 1.00 2.08 - 0.80 1.66
EJE B ENTRE 4 Y 5 1.00 2.47 - 0.80 1.98
EJE B ENTRE 5 Y 6/6 Y 7 2.00 1.85 - 0.80 2.96
EJE B ENTRE 9 Y 10 1.00 3.05 - 0.80 2.44
EJE B ENTRE 10 Y 11 1.00 2.92 - 0.80 2.34
EJE B ENTRE 11 Y 12 1.00 2.96 - 0.80 2.37
EJE B ENTRE 12 Y 13 1.00 2.96 - 0.80 2.37
EJE B ENTRE 13 Y 14/14 Y 15/15 Y 16 3.00 2.96 - 0.80 7.10
EJE C ENTRE 2 Y 3 1.00 2.68 - 1.85 4.96
EJE C ENTRE 3 Y 4 1.00 2.10 - 1.85 3.89
EJE C ENTRE 4 Y 5 1.00 1.97 - 1.85 3.64
EJE C ENTRE 5 Y 6/6 Y 7 2.00 1.85 - 1.85 6.85
EJE C ENTRE 8 Y 9 1.00 2.00 - 1.85 3.70
EJE C ENTRE 9 Y 10 1.00 2.77 - 1.85 5.12
EJE C ENTRE 10 Y 11 1.00 2.62 - 1.85 4.85
EJE C ENTRE 11 Y 12/12 Y 13/13 Y 14/14 Y 15/15 Y 16 5.00 2.66 - 1.85 24.61
EJE C ENTRE 16 Y 17 EN ESCALERA 1.00 2.57 - 1.85 4.75
EJE 1 ENTRE B Y B' 1.00 2.00 - 0.70 1.40
EJE 1 ENTRE B' Y C 1.00 1.90 - 0.70 1.33
EJE 7 ENTRE B Y B' 1.00 1.45 - 1.15 1.67
EJE 17 ENTRE C Y D 1.00 2.70 - 2.20 5.94
EJE 17 ENTRE D Y E 1.00 1.30 - 2.20 2.86
EJE 18 ENTRE B Y B' 1.00 1.40 - 2.20 3.08
EJE 18 ENTRE D Y E 1.00 0.70 - 2.20 1.54
EJE 19 ENTRE A Y B/B Y B' 2.00 2.85 - 1.15 6.56
EJE 19 ENTRE B' Y C 1.00 2.88 - 1.15 3.31
EJE 19 ENTRE C Y D 1.00 2.79 - 1.15 3.21
EJE 19 ENTRE D Y E 1.00 2.86 - 1.15 3.29

SEGUNDO NIVEL
EJE A ENTRE 2 Y 3 1.00 3.05 - 0.80 2.44
EJE A ENTRE 3 Y 4 1.00 2.85 - 0.80 2.28
EJE A ENTRE 4 Y 5 1.00 2.47 - 0.80 1.98
EJE A ENTRE 5 Y 6 1.00 1.85 - 0.80 1.48
EJE A ENTRE 6 Y 7 1.00 1.45 - 0.80 1.16
EJE A ENTRE 9 Y 10 1.00 3.05 - 0.80 2.44
EJE A ENTRE 10 Y 11 1.00 2.92 - 0.80 2.34
EJE A ENTRE 11 Y 12/12 Y 13/13 Y 14/14 Y 15/15 Y 16 5.00 2.96 - 0.80 11.84
EJE B ENTRE 2 Y 3 1.00 2.68 - 1.85 4.96
EJE B ENTRE 3 Y 4 1.00 2.10 - 1.85 3.89
EJE B ENTRE 4 Y 5 1.00 1.97 - 1.85 3.64
EJE B ENTRE 5 Y 6/6 Y 7 2.00 1.85 - 1.85 6.85
EJE B ENTRE 7 Y 8 2.00 2.90 - 1.85 10.73
EJE B ENTRE 8 Y 9 1.00 2.00 - 1.85 3.70
EJE B ENTRE 9 Y 10 1.00 2.77 - 1.85 5.12
EJE B ENTRE 10 Y 11 1.00 2.62 - 1.85 4.85
EJE B ENTRE 11 Y 12/12 Y 13/13 Y 14/14 Y 15/15 Y 16 5.00 2.66 - 1.85 24.61
EJE B ENTRE 16 Y 17 1.00 2.57 - 1.85 4.75
EJE 18 ENTRE B Y B' 1.00 2.96 - 1.85 5.48
EJE 18 ENTRE B' Y C 1.00 2.85 - 1.85 5.27

02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS


02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR und 61.00
PABELLON "F"
PRIMER NIVEL 1.00 - 50.00 50.00
SEGUNDO NIVEL 1.00 - 11.00 11.00

02.03.01.15,04 DESMONTAJE DE ARTEFACTO FLUORESCENTE C/REJILLA DE ALUMINIO C/LAMP. und 17.00


PABELLON "F"
PRIMER NIVEL 1.00 - 2.00 2.00
PASILLO 1.00 - 3.00 3.00
SEGUNDO NIVEL 1.00 - 12.00 12.00

02.03.01.15,05 DESMONTAJE DE ARTEFACTO FLUORESCENTE ADOSADO C/LAMP. 1X40W und 18.00


PABELLON "F"
SEGUNDO NIVEL 1.00 - 18.00 18.00

02.03.01.15,06 DESMONTAJE DE ARTEFACTO ADOSADO A TECHO TIPO BE 2X40W und 4.00


PABELLON "F"
PRIMER NIVEL 1.00 - 2.00 2.00
SEGUNDO NIVEL 1.00 - 2.00 2.00

02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 16.00


PABELLON "F"
PRIMER NIVEL 1.00 - 11.00 11.00
SEGUNDO NIVEL 1.00 - 5.00 5.00

02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 29.00


PABELLON "F"
PRIMER NIVEL 1.00 - 21.00 21.00
SEGUNDO NIVEL 1.00 - 8.00 8.00

02.03.01.15,16 DESMONTAJE DE TABLERO GENERAL und 2.00


PABELLON "F"
PRIMER NIVEL 1.00 - 1.00 1.00
PRIMER NIVEL (EXTERIOR) 1.00 - 1.00 1.00

02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 3.00


PABELLON "F"
TD-F
PRIMER NIVEL 1.00 - 2.00 2.00
TD-F2
SEGUNDO NIVEL 1.00 - 1.00 1.00

02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 688.69


PABELLON "F"
PRIMER NIVEL 2.00 - 213.52 427.04
SEGUNDO NIVEL 2.00 - 130.83 261.65

02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 887.44
PABELLON "F"
PRIMER NIVEL
EJE B ENTRE 1 Y 2 1.00 - 7.87 7.87
EJE B ENTRE 2 Y 3 1.00 3.15 - 3.05 9.61
EJE B ENTRE 3 Y 4 1.00 2.17 - 2.30 4.99
EJE B ENTRE 4 Y 5 1.00 2.47 - 2.30 5.68
EJE B ENTRE 5 Y 6 1.00 0.95 - 2.30 2.18
EJE B ENTRE 6 Y 7 1.00 0.95 - 2.30 2.18
EJE B ENTRE 8 Y 9 1.00 - 3.91 3.91
EJE B ENTRE 9 Y 10 1.00 2.19 - 2.30 5.04
EJE B ENTRE 10 Y 11 1.00 2.10 - 2.30 4.83
EJE B ENTRE 12 Y 13 1.00 2.23 - 2.30 5.13
EJE B ENTRE 13 Y 14 1.00 2.11 - 2.30 4.85
EJE B ENTRE 14 Y 15 1.00 1.88 - 2.30 4.32
EJE B ENTRE 15 Y 16 1.00 2.96 - 2.30 6.81
EJE B/B' ENTRE 4 Y 5 1.00 3.18 - 3.55 11.29
EJE B/B' ENTRE 12 Y 13 1.00 3.20 - 3.55 11.36
EJE B/B' ENTRE 12 Y 13 1.00 3.20 - 3.55 11.36
EJE B' ENTRE 18 Y 19 1.00 6.60 - 3.10 20.46
EJE C ENTRE 1 Y 2 1.00 3.50 - 3.05 10.67
EJE C ENTRE 2 Y 3 1.00 2.68 - 1.20 3.22
EJE C ENTRE 3 Y 4 1.00 2.10 - 1.20 2.52
EJE C ENTRE 4 Y 5 1.00 1.98 - 1.20 2.38
EJE C ENTRE 5 Y 6/6 Y 7 2.00 1.85 - 1.20 4.44
EJE C ENTRE 8 Y 9 1.00 2.00 - 1.20 2.40
EJE C ENTRE 9 Y 10 1.00 3.07 - 1.20 3.68
EJE C ENTRE 10 Y 11 1.00 2.96 - 1.20 3.55
EJE C ENTRE 11 Y 12/12 Y 13/13 Y 14/14 Y 15/15 Y 16 5.00 3.00 - 1.20 18.00
EJE C ENTRE 16 Y 17 1.00 2.81 - 2.70 7.59
EJE C ENTRE 18 Y 19 1.00 6.21 - 3.10 19.25
EJE C/D ENTRE 18 Y 19 1.00 2.30 - 3.55 8.17
EJE D ENTRE 18 Y 19 1.00 5.05 - 3.10 15.66
EJE E ENTRE 18 Y 19 1.00 6.60 - 3.10 20.46
EJE 1 ENTRE B Y B' 1.00 2.00 - 2.60 5.20
EJE 1 ENTRE B' Y C 1.00 1.90 - 2.60 4.94
EJE 2 ENTRE B Y B' 1.00 3.20 - 2.60 8.32
EJE 2 ENTRE B' Y C 1.00 3.30 - 2.60 8.58
EJE 4 ENTRE B Y B' 1.00 3.15 - 2.60 8.19
EJE 4 ENTRE B' Y C 1.00 1.95 - 2.60 5.07
EJE 5 ENTRE B' Y C 1.00 3.15 - 2.60 8.19
EJE 6 ENTRE B Y B' 1.00 3.15 - 2.60 8.19
EJE 6 ENTRE B' Y C 1.00 1.90 - 2.60 4.94
EJE 7 ENTRE B Y B' 1.00 - 5.48 5.48
EJE 7 ENTRE B' Y C 1.00 2.85 - 2.60 7.41
EJE 8 ENTRE B Y B' 1.00 1.05 - 2.60 2.73
EJE 8 ENTRE B' Y C 1.00 2.85 - 2.60 7.41
EJE 9 ENTRE B Y C 1.00 6.85 - 2.60 17.81
EJE 9 ENTRE B Y C 1.00 6.39 - 2.60 16.61
EJE 10 ENTRE B Y B' 1.00 3.15 - 2.60 8.19
EJE 10 ENTRE B' Y C 1.00 2.31 - 2.60 6.01
EJE 11 ENTRE B Y C 1.00 6.45 - 2.60 16.77
EJE 12 ENTRE B Y B' 1.00 3.08 - 2.60 8.01
EJE 13 ENTRE B Y B' 1.00 3.19 - 2.60 8.29
EJE 13 ENTRE B' Y C 1.00 2.31 - 2.60 6.01
EJE 14 ENTRE B Y C 1.00 6.45 - 2.60 16.77
EJE 16 ENTRE B Y C 1.00 6.45 - 2.60 16.77
EJE 16/17 ENTRE B Y C (ESCALERA) 1.00 - 2.85 2.85
EJE 17 ENTRE B Y C 1.00 6.43 - 2.60 16.72
EJE 17 ENTRE C Y D 1.00 2.80 - 1.20 3.36
EJE 17 ENTRE D Y E 1.00 1.30 - 1.20 1.56
EJE 18 ENTRE A Y B 1.00 3.09 - 2.60 8.03
EJE 18 ENTRE B Y B' 1.00 - 3.83 3.83
EJE 18 ENTRE B' Y C 1.00 2.22 - 2.60 5.77
EJE 18 ENTRE C Y D 1.00 1.91 - 2.60 4.97
EJE 18 ENTRE D Y E 1.00 1.91 - 2.60 4.97
EJE 18 ENTRE D Y E 1.00 0.70 - 1.20 0.84
EJE 19 ENTRE A Y B 1.00 2.89 - 1.90 5.49
EJE 19 ENTRE B Y B' 1.00 2.96 - 1.90 5.62
EJE 19 ENTRE B' Y C 1.00 2.88 - 1.90 5.47
EJE 19 ENTRE C Y D 1.00 2.79 - 1.90 5.30
EJE 19 ENTRE D Y E 1.00 2.86 - 1.90 5.43

SEGUNDO NIVEL
EJE A ENTRE 2 Y 3 1.00 3.15 - 1.20 3.78
EJE A ENTRE 2 Y 3 1.00 2.95 - 1.20 3.54
EJE A ENTRE 4 Y 5 1.00 2.47 - 2.30 5.68
EJE A ENTRE 5 Y 6 1.00 1.85 - 2.30 4.26
EJE A ENTRE 6 Y 7 1.00 0.40 - 2.30 0.92
EJE A ENTRE 7 Y 8 1.00 6.00 - 3.10 18.60
EJE A ENTRE 8 Y 9 1.00 1.30 - 2.30 2.99
EJE A ENTRE 9 Y 10 1.00 3.05 - 2.30 7.01
EJE A ENTRE 10 Y 11 1.00 2.08 - 2.30 4.78
EJE A ENTRE 11 Y 12 1.00 2.11 - 2.30 4.85
EJE A ENTRE 12 Y 13 1.00 2.96 - 3.10 9.18
EJE A ENTRE 13 Y 14 1.00 2.11 - 2.30 4.85
EJE A ENTRE 14 Y 15 1.00 2.96 - 2.30 6.81
EJE A ENTRE 15 Y 16 1.00 1.56 - 2.30 3.59
EJE A ENTRE 17 Y 18 1.00 - 12.38 12.38
EJE B ENTRE 2 Y 3 1.00 2.68 - 1.20 3.22
EJE B ENTRE 3 Y 4 1.00 2.10 - 1.20 2.52
EJE B ENTRE 4 Y 5 1.00 1.97 - 1.20 2.36
EJE B ENTRE 5 Y 6/6 Y 7 2.00 1.85 - 1.20 4.44
EJE B ENTRE 7 Y 8 1.00 6.00 - 1.20 7.20
EJE B ENTRE 8 Y 9 1.00 2.00 - 1.20 2.40
EJE B ENTRE 9 Y 10 1.00 3.07 - 1.20 3.68
EJE B ENTRE 10 Y 11 1.00 2.96 - 1.20 3.55
EJE B ENTRE 11 Y 12/12 Y 13/13 Y 14/14 Y 15/15 Y 16 5.00 3.00 - 1.20 18.00
EJE B ENTRE 16 Y 17 (EN ESCALERA) 1.00 2.81 - 1.20 3.37
EJE B ENTRE 17 Y 18 1.00 4.66 - 3.10 14.45
EJE 2 ENTRE A Y A' 1.00 6.35 - 3.10 19.69
EJE 2 ENTRE A' Y B 1.00 3.45 - 2.60 8.97
EJE 4 ENTRE A Y A' 1.00 4.95 - 3.10 15.34
EJE 4 ENTRE A' Y B 1.00 2.85 - 2.60 7.41
EJE 7 ENTRE A Y A' 1.00 2.75 - 3.10 8.53
EJE 7 ENTRE A' Y B 1.00 2.85 - 2.60 7.41
EJE 9 ENTRE A Y B 1.00 3.85 - 2.60 10.01
EJE 9 ENTRE A Y B 1.00 6.39 - 2.60 16.61
EJE 10 ENTRE A Y A' 1.00 3.19 - 3.10 9.89
EJE 10 ENTRE A' Y B 1.00 2.31 - 2.60 6.01
EJE 12 ENTRE A Y B 1.00 6.45 - 2.60 16.77
EJE 13 ENTRE A Y A' 1.00 3.19 - 3.10 9.89
EJE 13 ENTRE A' Y B 1.00 2.31 - 2.60 6.01
EJE 16 ENTRE A Y B 1.00 6.45 - 2.60 16.77
EJE 17 ENTRE A Y B 1.00 6.43 - 2.60 16.72
EJE 18 ENTRE A Y B 1.00 2.89 - 2.60 7.51
EJE 18 ENTRE B Y B' 1.00 2.96 - 2.60 7.70
EJE 18 ENTRE B' Y C 1.00 3.01 - 2.60 7.83

02.03.02.02 DEMOLICION DE PARAPETOS m2 57.11


PABELLON "F"
PASILLO 2º NIVEL 1.00 45.69 - 1.25 57.11

02.03.02.03 DEMOLICION LOSA ALIGERADA m2 1275.79


PABELLON "F"
PRIMER NIVEL
DEPOSITO 1.00 - 24.33 24.33
DIRECCION 1.00 - 42.11 42.11
SECRETARIA 1.00 - 21.35 21.35
RECEPCION 1.00 - 20.09 20.09
ADMINISTRACION 1.00 - 21.32 21.32
INGRESO PRINCIPAL 1.00 - 41.96 41.96
CONTROL 1.00 - 22.03 22.03
ASESORIA DE LETRAS 1.00 - 21.95 21.95
ASESORIA 1.00 - 21.24 21.24
SUBDIRECCION 1.00 - 43.02 43.02
SALA DE PROFESORES DE COMUNICACIÓN 1.00 - 21.52 21.52
ASESORIA DE SOCIALES 1.00 - 42.96 42.96
ENTRE EJES A Y B - 18 Y 19 1.00 - 20.90 20.90
ENTRE EJES B Y B' - 18 Y 19 1.00 - 21.14 21.14
ENTRE EJES B' Y C - 18 Y 19 1.00 - 20.26 20.26
ENTRE EJES C Y D - 18 Y 19 6.00 - 19.66 117.96
ENTRE EJES D Y E - 18 Y 19 1.00 - 24.04 24.04
ENTRE EJES 1 Y 2 (PASILLO) 1.00 - 10.08 10.08
ENTRE EJES 2 Y 3 (PASILLO) 1.00 - 9.15 9.15
ENTRE EJES 3 Y 4 (PASILLO) 1.00 - 9.23 9.23
ENTRE EJES 4 Y 5 (PASILLO) 1.00 - 9.23 9.23
ENTRE EJES 5 Y 6 (PASILLO) 1.00 - 8.70 8.70
ENTRE EJES 6 Y 7 (PASILLO) 1.00 - 8.69 8.69
ENTRE EJES 7 Y 8 (PASILLO) 1.00 - 17.39 17.39
ENTRE EJES 8 Y 9 (PASILLO) 1.00 - 8.54 8.54
ENTRE EJES 9 Y 10 (PASILLO) 1.00 - 9.31 9.31
ENTRE EJES 10 Y 11/11 Y 12/ 12 Y13/13 Y 14/14 Y 15/15 Y 16/16 Y 17 (PASILLO) 7.00 - 9.15 64.05
ENTRE EJES A Y B - 17 Y 18 1.00 - 13.21 13.21
ENTRE EJES B Y C - 17 Y 18 1.00 - 29.96 29.96
ENTRE EJES C Y D - 17 Y 18 1.00 - 13.19 13.19
ENTRE EJES D Y E - 17 Y 18 1.00 - 9.08 9.08
SEGUNDO NIVEL
LABORATORIO DE BIOLOGIA 1.00 - 60.44 60.44
LABORATORIO DE QUIMICA 1.00 - 62.31 62.31
LABORATORIO DE FISICA 1.00 - 63.45 63.45
DEPOSITO 1 1.00 - 63.58 63.58
DEPOSITO 2 1.00 - 21.36 21.36
SALA DE COMPUTO 1.00 - 63.09 63.09
ENTRE EJES B Y C - 17 Y 18 1.00 - 33.18 33.18
ENTRE EJES 4 Y 5 (PASILLO) 1.00 - 8.70 8.70
ENTRE EJES 5 Y 6 (PASILLO) 1.00 - 8.70 8.70
ENTRE EJES 6 Y 7 (PASILLO) 1.00 - 8.70 8.70
ENTRE EJES 7 Y 8 (PASILLO) 1.00 - 17.85 17.85
ENTRE EJES 8 Y 9 (PASILLO) 1.00 - 9.30 9.30
ENTRE EJES 9 Y 10 (PASILLO) 1.00 - 9.31 9.31
ENTRE EJES 10 Y 11/11 Y 12/ 12 Y13/13 Y 14/14 Y 15/15 Y 16/16 Y 17 (PASILLO) 7.00 - 9.15 64.05
ENTRE EJES A Y B - 17 Y 18 1.00 - 13.78 13.78

02.03.02.05 DEMOLICION DE VIGAS m3 117.55


PABELLON "F"
PRIMER NIVEL
EJE A ENTRE 2 Y 3/3 Y 4/4 Y 5/5 Y 6/6 Y 7 5.00 3.05 0.35 0.65 3.47
EJE A ENTRE 7 Y 8 2.00 3.05 0.35 0.65 1.39
EJE A ENTRE 8 Y 9/9 Y 10 2.00 3.10 0.35 0.65 1.41
EJE A ENTRE 10 Y 11/11 Y 12/12 Y 13/13 Y 14/14 Y 15/15 Y 16/16 Y 17 7.00 3.05 0.35 0.65 4.86
EJE A ENTRE 18 Y 19 1.00 6.15 0.25 0.50 0.77
EJE B ENTRE 1 Y 2 1.00 3.20 0.35 0.65 0.73
EJE B ENTRE 2 Y 3 1.00 3.15 0.15 0.65 0.31
EJE B ENTRE 3 Y 4 1.00 3.07 0.15 0.65 0.30
EJE B ENTRE 4 Y 5 1.00 3.05 0.15 0.65 0.30
EJE B ENTRE 5 Y 6 1.00 1.85 0.15 0.65 0.18
EJE B ENTRE 6 Y 7 1.00 1.85 0.15 0.65 0.18
EJE B ENTRE 7 Y 8 1.00 6.35 0.15 0.65 0.62
EJE B ENTRE 8 Y 9 1.00 2.60 0.15 0.65 0.25
EJE B ENTRE 9 Y 10 1.00 3.05 0.15 0.65 0.30
EJE B ENTRE 10 Y 11 1.00 2.93 0.15 0.65 0.29
EJE B ENTRE 11 Y 12/12 Y 13/13 Y 14/14 Y 15/15 Y 16 5.00 2.96 0.15 0.65 1.44
EJE B ENTRE 16 Y 17 1.00 2.77 0.15 0.65 0.27
EJE B ENTRE 17 Y 18 1.00 4.57 0.15 0.65 0.45
EJE B ENTRE 18 Y 19 1.00 4.57 0.15 0.65 0.45
EJE B' ENTRE 7 Y 8 1.00 4.57 0.40 0.65 1.19
EJE B' ENTRE 18 Y 19 1.00 4.57 0.25 0.50 0.57
EJE C ENTRE 1 Y 2 1.00 3.50 0.15 0.70 0.37
EJE C ENTRE 2 Y 3 1.00 2.68 0.15 0.70 0.28
EJE C ENTRE 3 Y 4 1.00 2.10 0.15 0.70 0.22
EJE C ENTRE 4 Y 5 1.00 1.97 0.15 0.70 0.21
EJE C ENTRE 5 Y 6 1.00 1.85 0.15 0.70 0.19
EJE C ENTRE 6 Y 7 1.00 1.85 0.15 0.70 0.19
EJE C ENTRE 7 Y 8 1.00 6.35 0.15 0.70 0.67
EJE C ENTRE 8 Y 9 1.00 2.00 0.15 0.70 0.21
EJE C ENTRE 9 Y 10 1.00 3.07 0.15 0.70 0.32
EJE C ENTRE 10 Y 11 1.00 2.96 0.15 0.70 0.31
EJE C ENTRE 11 Y 12/12 Y 13/13 Y 14/14 Y 15/15 Y 16 5.00 3.00 0.15 0.70 1.58
EJE C ENTRE 16 Y 17 1.00 2.81 0.15 0.70 0.30
EJE C ENTRE 17 Y 18 1.00 4.66 0.15 0.70 0.49
EJE C ENTRE 18 Y 19 1.00 6.22 0.25 0.50 0.78
EJE D ENTRE 17 Y 18 1.00 4.66 0.35 0.65 1.06
EJE D ENTRE 18 Y 19 1.00 6.22 0.25 0.50 0.78
EJE D/E ENTRE 17 Y 18 1.00 4.39 0.35 0.65 1.00
EJE E ENTRE 18 Y 19 1.00 4.39 0.25 0.50 0.55
EJE 1 ENTRE A Y B 1.00 2.90 0.35 0.65 0.66
EJE 1 ENTRE B Y B' 1.00 2.00 0.35 0.65 0.45
EJE 1 ENTRE B' Y C 1.00 2.10 0.35 0.65 0.48
EJE 2 ENTRE B Y B' 1.00 2.90 0.35 0.65 0.66
EJE 2 ENTRE B' Y C 1.00 2.85 0.35 0.65 0.65
EJE 3 ENTRE B Y C 1.00 6.15 0.35 0.65 1.40
EJE 4 ENTRE B Y C 1.00 5.75 0.35 0.65 1.31
EJE 5 ENTRE B Y C 1.00 6.00 0.35 0.65 1.36
EJE 6 ENTRE B Y C 1.00 6.00 0.35 0.65 1.36
EJE 7 ENTRE B Y C 1.00 2.75 0.35 0.65 0.63
EJE 7 ENTRE B Y C 1.00 2.85 0.35 0.65 0.65
EJE 8 ENTRE B Y C 1.00 2.75 0.35 0.65 0.63
EJE 8 ENTRE B Y C 1.00 2.85 0.35 0.65 0.65
EJE 9 ENTRE B Y C 1.00 6.85 0.35 0.65 1.56
EJE 9 ENTRE B Y C 1.00 6.39 0.35 0.65 1.45
EJE 10 ENTRE B Y C 1.00 6.45 0.35 0.65 1.47
EJE 11 ENTRE B Y C 1.00 6.45 0.35 0.65 1.47
EJE 12 ENTRE B Y C 1.00 6.45 0.35 0.65 1.47
EJE 13 ENTRE B Y C 1.00 6.45 0.35 0.65 1.47
EJE 14 ENTRE B Y C 1.00 6.45 0.35 0.65 1.47
EJE 15 ENTRE B Y C 1.00 6.45 0.35 0.65 1.47
EJE 16 ENTRE B Y C 1.00 6.45 0.35 0.65 1.47
EJE 17 ENTRE B Y C 1.00 6.45 0.35 0.65 1.47
EJE 18 ENTRE A Y B 1.00 3.09 0.25 0.50 0.39
EJE 18 ENTRE B Y B' 1.00 3.11 0.25 0.50 0.39
EJE 18 ENTRE B' Y C 1.00 3.07 0.25 0.50 0.38
EJE 18 ENTRE C Y D 1.00 2.79 0.25 0.50 0.35
EJE 18 ENTRE D Y E 1.00 2.26 0.25 0.50 0.28
EJE 18 ENTRE D Y E 1.00 0.70 0.25 0.50 0.09
EJE 19 ENTRE A Y B 1.00 2.89 0.25 0.50 0.36
EJE 19 ENTRE B Y B' 1.00 2.96 0.25 0.50 0.37
EJE 19 ENTRE B' Y C 1.00 2.88 0.25 0.50 0.36
EJE 19 ENTRE C Y D 1.00 2.79 0.25 0.50 0.35
EJE 19 ENTRE D Y E 1.00 2.86 0.25 0.50 0.36
EJE 2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17 ENTRE D Y E (VIGA CHATA - PASILLO) 16.00 3.00 0.35 0.20 3.36
SEGUNDO NIVEL
EJE A ENTRE 1 Y 2 1.00 3.50 0.35 0.65 0.80
EJE A ENTRE 2 Y 3/3 Y 4/4 Y 5/5 Y 6/6 Y 7 5.00 3.05 0.35 0.65 3.47
EJE A ENTRE 7 Y 8 2.00 3.05 0.35 0.65 1.39
EJE A ENTRE 8 Y 9/9 Y 10 2.00 3.10 0.35 0.65 1.41
EJE A ENTRE 10 Y 11/11 Y 12/12 Y 13/13 Y 14/14 Y 15/15 Y 16/16 Y 17 7.00 3.05 0.35 0.65 4.86
EJE B ENTRE 1 Y 2 1.00 3.20 0.35 0.65 0.73
EJE B ENTRE 2 Y 4 1.00 6.58 0.15 0.65 0.64
EJE B ENTRE 4 Y 5 1.00 2.47 0.15 0.65 0.24
EJE B ENTRE 5 Y 6 1.00 1.85 0.15 0.65 0.18
EJE B ENTRE 6 Y 7 1.00 1.85 0.15 0.65 0.18
EJE B ENTRE 7 Y 8 1.00 3.00 0.15 0.65 0.29
EJE B ENTRE 7 Y 8 1.00 3.00 0.15 0.65 0.29
EJE B ENTRE 8 Y 9 1.00 2.60 0.15 0.65 0.25
EJE B ENTRE 9 Y 10 1.00 3.05 0.15 0.65 0.30
EJE B ENTRE 10 Y 11 1.00 2.93 0.15 0.65 0.29
EJE B ENTRE 11 Y 12/12 Y 13/13 Y 14/14 Y 15/15 Y 16 5.00 2.96 0.15 0.65 1.44
EJE B ENTRE 16 Y 17 1.00 2.77 0.15 0.65 0.27
EJE B ENTRE 17 Y 18 1.00 4.57 0.15 0.65 0.45
EJE C ENTRE 1 Y 2 1.00 3.50 0.15 0.70 0.37
EJE C ENTRE 2 Y 3 1.00 2.68 0.15 0.70 0.28
EJE C ENTRE 3 Y 4 1.00 2.10 0.15 0.70 0.22
EJE C ENTRE 4 Y 5 1.00 1.97 0.15 0.70 0.21
EJE C ENTRE 5 Y 6 1.00 1.85 0.15 0.70 0.19
EJE C ENTRE 6 Y 7 1.00 1.85 0.15 0.70 0.19
EJE C ENTRE 7 Y 8 1.00 6.35 0.15 0.70 0.67
EJE C ENTRE 8 Y 9 1.00 2.00 0.15 0.70 0.21
EJE C ENTRE 9 Y 10 1.00 3.07 0.15 0.70 0.32
EJE C ENTRE 10 Y 11 1.00 2.96 0.15 0.70 0.31
EJE C ENTRE 11 Y 12/12 Y 13/13 Y 14/14 Y 15/15 Y 16 5.00 3.00 0.15 0.70 1.58
EJE C ENTRE 16 Y 17 1.00 2.81 0.15 0.70 0.30
EJE C ENTRE 17 Y 18 1.00 4.66 0.15 0.70 0.49
EJE 1 ENTRE A Y B 1.00 2.90 0.35 0.65 0.66
EJE 1 ENTRE B Y B' 1.00 2.00 0.35 0.65 0.45
EJE 1 ENTRE B' Y C 1.00 2.10 0.35 0.65 0.48
EJE 2 ENTRE A Y B 1.00 3.00 0.35 0.65 0.68
EJE 2 ENTRE B Y B' 1.00 2.90 0.35 0.65 0.66
EJE 2 ENTRE B' Y C 1.00 2.85 0.35 0.65 0.65
EJE 3 ENTRE B Y B' 1.00 2.95 0.35 0.65 0.67
EJE 3 ENTRE B' Y C 1.00 2.85 0.35 0.65 0.65
EJE 4 ENTRE B Y C 1.00 3.00 0.35 0.65 0.68
EJE 4 ENTRE B Y C 1.00 5.75 0.35 0.65 1.31
EJE 5 ENTRE B Y C 1.00 6.00 0.35 0.65 1.36
EJE 6 ENTRE B Y C 1.00 6.00 0.35 0.65 1.36
EJE 7 ENTRE B Y C 1.00 2.75 0.35 0.65 0.63
EJE 7 ENTRE B Y C 1.00 2.85 0.35 0.65 0.65
EJE 7/8 ENTRE B Y C 1.00 6.15 0.35 0.65 1.40
EJE 8 ENTRE B Y C 1.00 6.00 0.35 0.65 1.36
EJE 9 ENTRE B Y C 1.00 6.85 0.35 0.65 1.56
EJE 9 ENTRE B Y C 1.00 6.39 0.35 0.65 1.45
EJE 10 ENTRE B Y C 1.00 6.45 0.35 0.65 1.47
EJE 11 ENTRE B Y C 1.00 6.45 0.35 0.65 1.47
EJE 12 ENTRE B Y C 1.00 6.45 0.35 0.65 1.47
EJE 13 ENTRE B Y C 1.00 6.45 0.35 0.65 1.47
EJE 14 ENTRE B Y C 1.00 6.45 0.35 0.65 1.47
EJE 15 ENTRE B Y C 1.00 6.45 0.35 0.65 1.47
EJE 16 ENTRE B Y C 1.00 6.45 0.35 0.65 1.47
EJE 17 ENTRE B Y C 1.00 6.43 0.35 0.65 1.46
EJE 18 ENTRE A Y B 1.00 2.89 0.25 0.50 0.36
EJE 18 ENTRE B Y B' 1.00 2.96 0.25 0.50 0.37
EJE 18 ENTRE B' Y C 1.00 3.00 0.25 0.50 0.38
EJE 2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17 ENTRE D Y E (VIGA CHATA - PASILLO) 16.00 3.00 0.35 0.20 3.36

02.03.02.06 DEMOLICION DE COLUMNAS m3 177.94


PABELLON "F"
EJE A - 1,2,3,4,5,6,7,8,10,11,12,13,14,15,16,17 16.00 0.35 0.35 9.25 18.13
EJE A - 9 2.00 0.25 0.40 9.25 1.85
EJE A - 18 1.00 0.45 0.45 9.25 1.87
EJE A - 19 1.00 0.45 0.45 5.40 1.09
EJE B - 1 1.00 9.25 0.57 5.27
EJE B - 2 1.00 0.40 0.25 9.25 0.93
EJE B - 3 1.00 0.45 0.35 9.25 1.46
EJE B - 4 1.00 0.85 0.30 9.25 2.36
EJE B - 5,6 2.00 9.25 0.73 13.50
EJE B - 7,8 2.00 9.25 0.50 9.25
EJE B - 9 1.00 0.48 0.32 9.25 1.42
EJE B - 9 1.00 0.85 0.20 9.25 1.57
EJE B - 10,11,12,13,14,15,16,17,18 9.00 9.25 0.50 41.63
EJE B - 19 1.00 9.25 0.50 4.63
EJE B' - 1 1.00 0.45 0.45 9.25 1.87
EJE B' - 2 1.00 0.40 0.25 9.25 0.93
EJE B' - 7,8 1.00 0.45 0.45 9.25 1.87
EJE B' - 18 1.00 0.25 0.60 9.25 1.39
EJE B' - 19 1.00 0.25 0.60 5.40 0.81
EJE C - 1 1.00 0.85 0.30 9.25 2.36
EJE C - 2 1.00 0.40 0.25 9.25 0.93
EJE C - 3,4 2.00 9.25 0.66 12.21
EJE C - 5,6 2.00 9.25 0.73 13.50
EJE C - 7,8 2.00 9.25 0.50 9.25
EJE C - 9 1.00 0.75 0.30 9.25 2.08
EJE C - 9 1.00 0.48 0.32 9.25 1.42
EJE C - 10,11,12,13,14,15,16,18 9.00 0.45 0.40 9.25 14.99
EJE C - 17 1.00 0.48 0.32 9.25 1.42
EJE C - 19 1.00 0.45 0.40 5.40 0.97
EJE D - 17 1.00 0.37 0.32 5.40 0.64
EJE D - 18,19 2.00 0.45 0.40 5.40 1.94
EJE D/E - 17 1.00 0.65 0.32 5.40 1.12
EJE D/E - 18 1.00 0.52 0.35 5.40 0.98
EJE E - 18,19 2.00 0.85 0.25 5.40 2.30

02.03.02.08 DEMOLICION DE ESCALERAS DE CONCRETO m3 3.27


PABELLON "F"
ESCALERA Nº1
Tramo 1 1.00 1.34 0.75 1.01
Descanso 1.00 2.96 2.78 0.15 1.23
Tramo 2 1.00 1.37 0.75 1.03

02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 22.30


PABELLON "F"
PRIMER NIVEL
EJE B ENTRE 1 Y 2 1.00 2.30 0.20 0.50 0.23
EJE B ENTRE 2 Y 3 1.00 3.15 0.20 0.50 0.32
EJE B ENTRE 3 Y 4 1.00 2.17 0.20 0.50 0.22
EJE B ENTRE 4 Y 5 1.00 2.47 0.20 0.50 0.25
EJE B ENTRE 5 Y 6 1.00 0.95 0.20 0.50 0.10
EJE B ENTRE 6 Y 7 1.00 0.95 0.20 0.50 0.10
EJE B ENTRE 8 Y 9 1.00 1.70 0.20 0.50 0.17
EJE B ENTRE 9 Y 10 1.00 2.19 0.20 0.50 0.22
EJE B ENTRE 10 Y 11 1.00 2.10 0.20 0.50 0.21
EJE B ENTRE 12 Y 13 1.00 2.23 0.20 0.50 0.22
EJE B ENTRE 13 Y 14 1.00 2.11 0.20 0.50 0.21
EJE B ENTRE 14 Y 15 1.00 1.88 0.20 0.50 0.19
EJE B ENTRE 15 Y 16 1.00 2.96 0.20 0.50 0.30
EJE B/B' ENTRE 4 Y 5 1.00 3.18 0.20 0.50 0.32
EJE B/B' ENTRE 12 Y 13 1.00 3.20 0.20 0.50 0.32
EJE B/B' ENTRE 12 Y 13 1.00 3.20 0.20 0.50 0.32
EJE B' ENTRE 18 Y 19 1.00 6.60 0.20 0.50 0.66
EJE C ENTRE 1 Y 2 1.00 3.50 0.20 0.50 0.35
EJE C ENTRE 2 Y 3 1.00 2.68 0.20 0.50 0.27
EJE C ENTRE 3 Y 4 1.00 2.10 0.20 0.50 0.21
EJE C ENTRE 4 Y 5 1.00 1.98 0.20 0.50 0.20
EJE C ENTRE 5 Y 6/6 Y 7 2.00 1.85 0.20 0.50 0.37
EJE C ENTRE 8 Y 9 1.00 2.00 0.20 0.50 0.20
EJE C ENTRE 9 Y 10 1.00 3.07 0.20 0.50 0.31
EJE C ENTRE 10 Y 11 1.00 2.96 0.20 0.50 0.30
EJE C ENTRE 11 Y 12/12 Y 13/13 Y 14/14 Y 15/15 Y 16 5.00 3.00 0.20 0.50 1.50
EJE C ENTRE 16 Y 17 1.00 2.81 0.20 0.50 0.28
EJE C ENTRE 18 Y 19 1.00 6.21 0.20 0.50 0.62
EJE C/D ENTRE 18 Y 19 1.00 2.30 0.20 0.50 0.23
EJE D ENTRE 18 Y 19 1.00 5.05 0.20 0.50 0.51
EJE E ENTRE 18 Y 19 1.00 6.60 0.20 0.50 0.66
EJE 1 ENTRE B Y B' 1.00 2.00 0.20 0.50 0.20
EJE 1 ENTRE B' Y C 1.00 1.90 0.20 0.50 0.19
EJE 2 ENTRE B Y B' 1.00 3.20 0.20 0.50 0.32
EJE 2 ENTRE B' Y C 1.00 3.30 0.20 0.50 0.33
EJE 4 ENTRE B Y B' 1.00 3.15 0.20 0.50 0.32
EJE 4 ENTRE B' Y C 1.00 1.95 0.20 0.50 0.20
EJE 5 ENTRE B' Y C 1.00 3.15 0.20 0.50 0.32
EJE 6 ENTRE B Y B' 1.00 3.15 0.20 0.50 0.32
EJE 6 ENTRE B' Y C 1.00 1.90 0.20 0.50 0.19
EJE 7 ENTRE B Y B' 1.00 2.75 0.20 0.50 0.28
EJE 7 ENTRE B' Y C 1.00 2.85 0.20 0.50 0.29
EJE 8 ENTRE B Y B' 1.00 1.05 0.20 0.50 0.11
EJE 8 ENTRE B' Y C 1.00 2.85 0.20 0.50 0.29
EJE 9 ENTRE B Y C 1.00 6.85 0.20 0.50 0.69
EJE 9 ENTRE B Y C 1.00 6.39 0.20 0.50 0.64
EJE 10 ENTRE B Y B' 1.00 3.15 0.20 0.50 0.32
EJE 10 ENTRE B' Y C 1.00 2.31 0.20 0.50 0.23
EJE 11 ENTRE B Y C 1.00 6.45 0.20 0.50 0.65
EJE 12 ENTRE B Y B' 1.00 3.08 0.20 0.50 0.31
EJE 13 ENTRE B Y B' 1.00 3.19 0.20 0.50 0.32
EJE 13 ENTRE B' Y C 1.00 2.31 0.20 0.50 0.23
EJE 14 ENTRE B Y C 1.00 6.45 0.20 0.50 0.65
EJE 16 ENTRE B Y C 1.00 6.45 0.20 0.50 0.65
EJE 16/17 ENTRE B Y C (ESCALERA) 1.00 3.00 0.20 0.50 0.30
EJE 17 ENTRE B Y C 1.00 6.43 0.20 0.50 0.64
EJE 17 ENTRE C Y D 1.00 2.80 0.20 0.50 0.28
EJE 17 ENTRE D Y E 1.00 1.30 0.20 0.50 0.13
EJE 18 ENTRE A Y B 1.00 3.09 0.20 0.50 0.31
EJE 18 ENTRE B Y B' 1.00 2.12 0.20 0.50 0.21
EJE 18 ENTRE B' Y C 1.00 2.22 0.20 0.50 0.22
EJE 18 ENTRE C Y D 1.00 1.91 0.20 0.50 0.19
EJE 18 ENTRE D Y E 1.00 1.91 0.20 0.50 0.19
EJE 18 ENTRE D Y E 1.00 0.70 0.20 0.50 0.07
EJE 19 ENTRE A Y B 1.00 2.89 0.20 0.50 0.29
EJE 19 ENTRE B Y B' 1.00 2.96 0.20 0.50 0.30
EJE 19 ENTRE B' Y C 1.00 2.88 0.20 0.50 0.29
EJE 19 ENTRE C Y D 1.00 2.79 0.20 0.50 0.28
EJE 19 ENTRE D Y E 1.00 2.86 0.20 0.50 0.29

02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 66.90


PABELLON "F"
PRIMER NIVEL
EJE B ENTRE 1 Y 2 1.00 2.30 0.50 0.60 0.69
EJE B ENTRE 2 Y 3 1.00 3.15 0.50 0.60 0.95
EJE B ENTRE 3 Y 4 1.00 2.17 0.50 0.60 0.65
EJE B ENTRE 4 Y 5 1.00 2.47 0.50 0.60 0.74
EJE B ENTRE 5 Y 6 1.00 0.95 0.50 0.60 0.29
EJE B ENTRE 6 Y 7 1.00 0.95 0.50 0.60 0.29
EJE B ENTRE 8 Y 9 1.00 1.70 0.50 0.60 0.51
EJE B ENTRE 9 Y 10 1.00 2.19 0.50 0.60 0.66
EJE B ENTRE 10 Y 11 1.00 2.10 0.50 0.60 0.63
EJE B ENTRE 12 Y 13 1.00 2.23 0.50 0.60 0.67
EJE B ENTRE 13 Y 14 1.00 2.11 0.50 0.60 0.63
EJE B ENTRE 14 Y 15 1.00 1.88 0.50 0.60 0.56
EJE B ENTRE 15 Y 16 1.00 2.96 0.50 0.60 0.89
EJE B/B' ENTRE 4 Y 5 1.00 3.18 0.50 0.60 0.95
EJE B/B' ENTRE 12 Y 13 1.00 3.20 0.50 0.60 0.96
EJE B/B' ENTRE 12 Y 13 1.00 3.20 0.50 0.60 0.96
EJE B' ENTRE 18 Y 19 1.00 6.60 0.50 0.60 1.98
EJE C ENTRE 1 Y 2 1.00 3.50 0.50 0.60 1.05
EJE C ENTRE 2 Y 3 1.00 2.68 0.50 0.60 0.80
EJE C ENTRE 3 Y 4 1.00 2.10 0.50 0.60 0.63
EJE C ENTRE 4 Y 5 1.00 1.98 0.50 0.60 0.59
EJE C ENTRE 5 Y 6/6 Y 7 2.00 1.85 0.50 0.60 1.11
EJE C ENTRE 8 Y 9 1.00 2.00 0.50 0.60 0.60
EJE C ENTRE 9 Y 10 1.00 3.07 0.50 0.60 0.92
EJE C ENTRE 10 Y 11 1.00 2.96 0.50 0.60 0.89
EJE C ENTRE 11 Y 12/12 Y 13/13 Y 14/14 Y 15/15 Y 16 5.00 3.00 0.50 0.60 4.50
EJE C ENTRE 16 Y 17 1.00 2.81 0.50 0.60 0.84
EJE C ENTRE 18 Y 19 1.00 6.21 0.50 0.60 1.86
EJE C/D ENTRE 18 Y 19 1.00 2.30 0.50 0.60 0.69
EJE D ENTRE 18 Y 19 1.00 5.05 0.50 0.60 1.52
EJE E ENTRE 18 Y 19 1.00 6.60 0.50 0.60 1.98
EJE 1 ENTRE B Y B' 1.00 2.00 0.50 0.60 0.60
EJE 1 ENTRE B' Y C 1.00 1.90 0.50 0.60 0.57
EJE 2 ENTRE B Y B' 1.00 3.20 0.50 0.60 0.96
EJE 2 ENTRE B' Y C 1.00 3.30 0.50 0.60 0.99
EJE 4 ENTRE B Y B' 1.00 3.15 0.50 0.60 0.95
EJE 4 ENTRE B' Y C 1.00 1.95 0.50 0.60 0.59
EJE 5 ENTRE B' Y C 1.00 3.15 0.50 0.60 0.95
EJE 6 ENTRE B Y B' 1.00 3.15 0.50 0.60 0.95
EJE 6 ENTRE B' Y C 1.00 1.90 0.50 0.60 0.57
EJE 7 ENTRE B Y B' 1.00 2.75 0.50 0.60 0.83
EJE 7 ENTRE B' Y C 1.00 2.85 0.50 0.60 0.86
EJE 8 ENTRE B Y B' 1.00 1.05 0.50 0.60 0.32
EJE 8 ENTRE B' Y C 1.00 2.85 0.50 0.60 0.86
EJE 9 ENTRE B Y C 1.00 6.85 0.50 0.60 2.05
EJE 9 ENTRE B Y C 1.00 6.39 0.50 0.60 1.92
EJE 10 ENTRE B Y B' 1.00 3.15 0.50 0.60 0.95
EJE 10 ENTRE B' Y C 1.00 2.31 0.50 0.60 0.69
EJE 11 ENTRE B Y C 1.00 6.45 0.50 0.60 1.94
EJE 12 ENTRE B Y B' 1.00 3.08 0.50 0.60 0.92
EJE 13 ENTRE B Y B' 1.00 3.19 0.50 0.60 0.96
EJE 13 ENTRE B' Y C 1.00 2.31 0.50 0.60 0.69
EJE 14 ENTRE B Y C 1.00 6.45 0.50 0.60 1.94
EJE 16 ENTRE B Y C 1.00 6.45 0.50 0.60 1.94
EJE 16/17 ENTRE B Y C (ESCALERA) 1.00 3.00 0.50 0.60 0.90
EJE 17 ENTRE B Y C 1.00 6.43 0.50 0.60 1.93
EJE 17 ENTRE C Y D 1.00 2.80 0.50 0.60 0.84
EJE 17 ENTRE D Y E 1.00 1.30 0.50 0.60 0.39
EJE 18 ENTRE A Y B 1.00 3.09 0.50 0.60 0.93
EJE 18 ENTRE B Y B' 1.00 2.12 0.50 0.60 0.64
EJE 18 ENTRE B' Y C 1.00 2.22 0.50 0.60 0.67
EJE 18 ENTRE C Y D 1.00 1.91 0.50 0.60 0.57
EJE 18 ENTRE D Y E 1.00 1.91 0.50 0.60 0.57
EJE 18 ENTRE D Y E 1.00 0.70 0.50 0.60 0.21
EJE 19 ENTRE A Y B 1.00 2.89 0.50 0.60 0.87
EJE 19 ENTRE B Y B' 1.00 2.96 0.50 0.60 0.89
EJE 19 ENTRE B' Y C 1.00 2.88 0.50 0.60 0.86
EJE 19 ENTRE C Y D 1.00 2.79 0.50 0.60 0.84
EJE 19 ENTRE D Y E 1.00 2.86 0.50 0.60 0.86

02.03.02.11 DEMOLICION DE ZAPATAS m3 89.18


PABELLON "F"
Z-1 70.00 1.40 1.40 0.65 89.18

02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 750.85


PABELLON "F"
DEPOSITO 1.00 - 24.76 24.76
DIRECCION 1.00 - 45.02 45.02
SECRETARIA - RECEPCOON 1.00 - 35.70 35.70
SS.HH. 1 1.00 - 2.51 2.51
SS.HH. 2 1.00 - 5.24 5.24
ADMINISTACION 1.00 - 22.33 22.33
INGRESO PRINCIPAL 1.00 - 47.83 47.83
CONTROL 1.00 - 22.97 22.97
ASESORIA LETRAS 1.00 - 22.16 22.16
ASESORIA 1.00 - 21.69 21.69
SUB DIRECCION 1.00 - 36.75 36.75
SALA DE PROFES. DE COMUNICACIÓN 1.00 - 21.96 21.96
ASESORIA DE SOCIALES 1.00 - 44.90 44.90
SS.HH. 3 1.00 - 7.34 7.34
ESCALERA 1.00 - 10.46 10.46
PSICOLOGIA OFIC. DE COORDINACION 1.00 - 43.96 43.96
COORD. DE ACTIVIDADES 1.00 - 20.47 20.47
CONTRO DE NOTAS 1.00 - 19.48 19.48
CONTRO DE NOTAS - SS.HH. DOSCENTES 1.00 - 24.05 24.05
PASILLO 1.00 - 271.27 271.27

SUSTENTO DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON "G" - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


CANT MEDIDAS PARCIA
ITEM DESCRIPCION UNID. TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H) AREA L

02.03 DESMONTAJES Y DEMOLICIONES


02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 90.45
PABELLON "G"
PRIMER NIVEL
AULAS 1,2,3,4,5,6 12.00 - 1.00 2.90 34.80
SS.HH. 1.00 - 1.00 2.90 2.90
SS.HH. INTERIOR 4.00 - 0.60 1.43 3.43

SEGUNDO NIVEL
AULAS 7,8,9,10,11,12 12.00 - 1.00 2.90 34.80
SS.HH. 1.00 - 1.00 2.90 2.90
SS.HH. INTERIOR 4.00 - 0.60 1.43 3.43
SS. HH. PABELLON G
PRIMER NIVEL
SS.HH. 1.00 0.70 - 2.10 1.47
1.00 0.80 - 2.10 1.68
SS.HH. INTERIOR 4.00 0.70 - 1.80 5.04

02.03.01.02 DESMONTAJE DE PUERTA METALICA m2 2.90


PABELLON "G"
PRIMER NIVEL
ESCALERA 1.00 - 1.00 2.90 2.90

02.03.01.04 DESMONTAJE DE PIZARRAS ACRILICAS und 12.00


PABELLON "G"
PRIMER NIVEL
AULAS 1,2,3,4,5,6 6.00 - - - 6.00
SEGUNDO NIVEL
AULAS 7,8,9,10,11,12 6.00 - - - 6.00

02.03.01.05 DESMONTAJE DE INODOROS und 13.00


PABELLON "G"
PRIMER NIVEL
SS.HH. 4.00 - - - 4.00
SEGUNDO NIVEL
SS.HH. 4.00 - - - 4.00
SS. HH. PABELLON G
PRIMER NIVEL
SS.HH. 1,2,3,4,5 (BATERIA) 5.00 - - - 5.00

02.03.01.06 DESMONTAJE DE LAVATORIOS DE LOSA und 10.00


PABELLON "G"
PRIMER NIVEL
SS.HH. 3.00 - - - 3.00
SS.HH. 1,2,3,4 (BATERIA) 4.00 - - - 4.00
SEGUNDO NIVEL
SS.HH. 3.00 - - - 3.00

02.03.01.08 DESMONTAJE DE VENTANAS DE MADERA m2 2.06


PABELLON "G"
PRIMER NIVEL
SS.HH. (BATERIA)
EJE B 1.00 0.90 - 0.40 0.36
EJE A 1.00 3.40 - 0.50 1.70

02.03.01.09 DESMONTAJE DE VENTANAS DE FIERRO m2 182.29


PABELLON "G"
PRIMER NIVEL
EJE A ENTRE 1 Y 2/2 Y 3/3 Y 4/4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y10 9.00 2.99 - 0.50 13.46
EJE A ENTRE 12 Y 13 1.00 2.40 - 0.50 1.20
EJE A ENTRE 13 Y 14 1.00 2.97 - 0.50 1.49
EJE A ENTRE 14 Y 15 1.00 2.94 - 0.50 1.47
EJE A ENTRE 15 Y 16/17 Y 18 2.00 2.97 - 0.50 2.97
EJE A ENTRE 18 Y 19 1.00 2.94 - 0.50 1.47
EJE A ENTRE 19 Y 20/20 Y 21 2.00 2.97 - 0.50 2.97
EJE A ENTRE 21 Y 22 1.00 2.94 - 0.50 1.47
EJE A ENTRE 22 Y 23 1.00 2.97 - 0.50 1.49
EJE B ENTRE 1 Y 2 1.00 1.99 - 1.50 2.99
EJE B ENTRE 2 Y 3 1.00 2.99 - 1.50 4.49
EJE B ENTRE 3 Y 4/4 Y 5 2.00 1.99 - 1.50 5.97
EJE B ENTRE 5 Y 6 1.00 2.99 - 1.50 4.49
EJE B ENTRE 6 Y 7/7 Y 8 2.00 1.99 - 1.50 5.97
EJE B ENTRE 8 Y 9 1.00 2.99 - 1.50 4.49
EJE B ENTRE 9 Y 10 1.00 1.99 - 1.50 2.99
EJE B ENTRE 13 Y 14 1.00 1.97 - 1.50 2.96
EJE B ENTRE 14 Y 15 1.00 2.94 - 1.50 4.41
EJE B ENTRE 15 Y 16/17 Y 18 2.00 1.97 - 1.50 5.91
EJE B ENTRE 18 Y 19 1.00 2.94 - 1.50 4.41
EJE B ENTRE 19 Y 20/20 Y 21 2.00 1.97 - 1.50 5.91
EJE B ENTRE 21 Y 22 1.00 2.94 - 1.50 4.41
EJE B ENTRE 22 Y 23 1.00 1.97 - 1.50 2.96
SEGUNDO NIVEL
EJE A ENTRE 1 Y 2/2 Y 3/3 Y 4/4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y10 9.00 2.99 - 0.50 13.46
EJE A ENTRE 12 Y 13 1.00 2.40 - 0.50 1.20
EJE A ENTRE 13 Y 14 1.00 2.97 - 0.50 1.49
EJE A ENTRE 14 Y 15 1.00 2.94 - 0.50 1.47
EJE A ENTRE 15 Y 16/17 Y 18 2.00 2.97 - 0.50 2.97
EJE A ENTRE 18 Y 19 1.00 2.94 - 0.50 1.47
EJE A ENTRE 19 Y 20/20 Y 21 2.00 2.97 - 0.50 2.97
EJE A ENTRE 21 Y 22 1.00 2.94 - 0.50 1.47
EJE A ENTRE 22 Y 23 1.00 2.97 - 0.50 1.49
EJE A ENTRE 23 Y 24 EN ESCALERA 1.00 3.35 - 0.50 1.68
EJE B ENTRE 1 Y 2 1.00 1.99 - 1.50 2.99
EJE B ENTRE 2 Y 3 1.00 2.99 - 1.50 4.49
EJE B ENTRE 3 Y 4/4 Y 5 2.00 1.99 - 1.50 5.97
EJE B ENTRE 5 Y 6 1.00 2.99 - 1.50 4.49
EJE B ENTRE 6 Y 7/7 Y 8 2.00 1.99 - 1.50 5.97
EJE B ENTRE 8 Y 9 1.00 2.99 - 1.50 4.49
EJE B ENTRE 9 Y 10 1.00 1.99 - 1.50 2.99
EJE B ENTRE 13 Y 14 1.00 1.97 - 1.50 2.96
EJE B ENTRE 14 Y 15 1.00 2.94 - 1.50 4.41
EJE B ENTRE 15 Y 16/17 Y 18 2.00 1.97 - 1.50 5.91
EJE B ENTRE 18 Y 19 1.00 2.94 - 1.50 4.41
EJE B ENTRE 19 Y 20/20 Y 21 2.00 1.97 - 1.50 5.91
EJE B ENTRE 21 Y 22 1.00 2.94 - 1.50 4.41
EJE B ENTRE 22 Y 23 1.00 1.97 - 1.50 2.96

02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS


02.03.01.15,01 DESMONTAJE DE ARTEFACTO O SOKET ADOSADO EN TECHO P/FOCO AHORRAD und 14.00
PABELLON "G"
PRIMER NIVEL 1.00 - 2.00 2.00
SEGUNDO NIVEL 1.00 - 12.00 12.00

02.03.01.15,02 DESMONTAJE DE ARTEFACTO FLUORESCENTE EN TECHO C/LAMP. FLUORESCENTE und 32.00


PABELLON "G"
PRIMER NIVEL 1.00 - 20.00 20.00
SEGUNDO NIVEL 1.00 - 12.00 12.00

02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR und 7.00
PABELLON "G"
PRIMER NIVEL 1.00 - 7.00 7.00

02.03.01.15,04 DESMONTAJE DE ARTEFACTO FLUORESCENTE C/REJILLA DE ALUMINIO C/LAMP. und 18.00


PABELLON "G"
SEGUNDO NIVEL 1.00 - 18.00 18.00

02.03.01.15,05 DESMONTAJE DE ARTEFACTO FLUORESCENTE ADOSADO C/LAMP. 1X40W und 1.00


PABELLON "G"
SEGUNDO NIVEL 1.00 - 1.00 1.00

02.03.01.15,06 DESMONTAJE DE ARTEFACTO ADOSADO A TECHO TIPO BE 2X40W und 31.00


PABELLON "G"
PRIMER NIVEL 1.00 - 18.00 18.00
SEGUNDO NIVEL 1.00 - 13.00 13.00

02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 28.00


PABELLON "G"
PRIMER NIVEL 1.00 - 11.00 11.00
SEGUNDO NIVEL 1.00 - 17.00 17.00

02.03.01.15,11 DESMONTAJE DE TOMACORRIENTE + PATA EN PISO O MURETE und 54.00


PABELLON "G"
SEGUNDO NIVEL 1.00 - 54.00 54.00

02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 21.00


PABELLON "G"
PRIMER NIVEL 1.00 - 11.00 11.00
SEGUNDO NIVEL 1.00 - 10.00 10.00
02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 2.00
PABELLON "G"
TD-G
PRIMER NIVEL 1.00 - 1.00 1.00
SEGUNDO NIVEL 1.00 - 1.00 1.00

02.03.01.15,18 DESMONTAJE DE TABLERO ELECTROBOMBA und 1.00


PABELLON "G"
TD-G
PRIMER NIVEL (TANQUE Nº 02) 1.00 - 1.00 1.00

02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 725.00


PABELLON "G"
PRIMER NIVEL 4.00 - 143.39 573.56
SEGUNDO NIVEL 1.00 - 151.44 151.44

02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 891.41
PABELLON "G"
PRIMER NIVEL
EJE A ENTRE 1 Y 2/2 Y 3/3 Y 4/4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 9.00 2.99 - 2.50 67.28
EJE A ENTRE 11 Y 12 (ESCALERA) 1.00 3.35 - 2.60 8.71
EJE A ENTRE 12 Y 13 1.00 2.40 - 2.50 6.00
EJE A ENTRE 13 Y 14 1.00 2.97 - 2.50 7.43
EJE A ENTRE 14 Y 15 1.00 2.94 - 2.50 7.35
EJE A ENTRE 15 Y 16/17 Y 18 2.00 2.97 - 2.50 14.85
EJE A ENTRE 18 Y 19 1.00 2.94 - 2.50 7.35
EJE A ENTRE 19 Y 20/20 Y 21 2.00 2.97 - 2.50 14.85
EJE A ENTRE 21 Y 22 1.00 2.94 - 2.50 7.35
EJE A ENTRE 22 Y 23 1.00 2.97 - 2.50 7.43
EJE A ENTRE 23 Y 24 (ESCALERA) 1.00 3.35 - 2.60 8.71
EJE A,B ENTRE 11 Y 12 (ESCALERA) 1.00 0.71 - 3.00 2.13
EJE B ENTRE 1 Y 2/3 Y 4/4 Y 5/6 Y 7/7 Y 8/9 Y 10 6.00 1.99 - 1.50 17.91
EJE B ENTRE 2 Y 3/5 Y 6/8 Y 9 3.00 2.99 - 1.50 13.46
EJE B ENTRE 12 Y 13 1.00 1.40 - 1.50 2.10
EJE B ENTRE 13 Y 14/15 Y 16/17 Y 18/19 Y 20/20 Y 21/22 Y 23 6.00 1.97 - 1.50 17.73
EJE B ENTRE 14 Y 15/18 Y 19/21 Y 22 3.00 2.94 - 1.50 13.23
EJE 1,4,7,10 ENTRE A Y B 4.00 6.25 - 2.70 67.50
EJE 11 ENTRE A Y B 1.00 5.70 - 2.70 15.39
EJE 11/12 ENTRE A Y B (ESCALERA) 1.00 - 12.97 12.97
EJE 12 ENTRE A Y B 1.00 2.40 - 2.70 6.48
EJE 13,16,17,20,23 ENTRE A Y B 5.00 5.40 - 2.70 72.90
EJE 23/24 ENTRE A Y B (ESCALERA) 1.00 - 8.59 8.59
EJE 24 ENTRE A Y B 1.00 5.70 - 2.70 15.39
TABIQUES EN SS.HH. 4.00 1.70 - 1.43 9.72
SS.HH. (BATERIA) 1.00 0.88 - 2.30 2.02
1.00 1.07 - 2.70 2.89
1.00 2.77 - 2.70 7.48
1.00 3.57 - 2.30 8.21
1.00 6.07 - 2.70 16.39
3.00 2.15 - 1.43 9.22
SEGUNDO NIVEL
EJE A ENTRE 1 Y 2/2 Y 3/3 Y 4/4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 9.00 2.99 - 2.40 64.58
EJE A ENTRE 11 Y 12 (ESCALERA) 1.00 3.35 - 2.40 8.04
EJE A ENTRE 12 Y 13 1.00 2.40 - 2.40 5.76
EJE A ENTRE 13 Y 14 1.00 2.97 - 2.40 7.13
EJE A ENTRE 14 Y 15 1.00 2.94 - 2.40 7.06
EJE A ENTRE 15 Y 16/17 Y 18 2.00 2.97 - 2.40 14.26
EJE A ENTRE 18 Y 19 1.00 2.94 - 2.40 7.06
EJE A ENTRE 19 Y 20/20 Y 21 2.00 2.97 - 2.40 14.26
EJE A ENTRE 21 Y 22 1.00 2.94 - 2.40 7.06
EJE A ENTRE 22 Y 23 1.00 2.97 - 2.40 7.13
EJE A ENTRE 23 Y 24 (ESCALERA) 1.00 3.35 - 2.40 8.04
EJE A,B ENTRE 11 Y 12 (ESCALERA) 1.00 0.71 - 3.00 2.13
EJE B ENTRE 1 Y 2/3 Y 4/4 Y 5/6 Y 7/7 Y 8/9 Y 10 6.00 1.99 - 1.50 17.91
EJE B ENTRE 2 Y 3/5 Y 6/8 Y 9 3.00 2.99 - 1.50 13.46
EJE B ENTRE 12 Y 13 1.00 1.40 - 1.50 2.10
EJE B ENTRE 13 Y 14/15 Y 16/17 Y 18/19 Y 20/20 Y 21/22 Y 23 6.00 1.97 - 1.50 17.73
EJE B ENTRE 14 Y 15/18 Y 19/21 Y 22 3.00 2.94 - 1.50 13.23
EJE 1,4,7,10 ENTRE A Y B 4.00 6.25 - 2.70 67.50
EJE 11 ENTRE A Y B 1.00 5.70 - 2.70 15.39
EJE 12 ENTRE A Y B 1.00 5.40 - 2.70 14.58
EJE 13,16,17,20,23 ENTRE A Y B 5.00 5.40 - 2.70 72.90
EJE 24 ENTRE A Y B 1.00 5.70 - 2.70 15.39
TABIQUES EN SS.HH. 4.00 1.70 - 1.43 9.72

02.03.02.02 DEMOLICION DE PARAPETOS m2 87.60


PABELLON "G"
PASILLO 2º NIVEL 1.00 73.00 - 1.20 87.60

02.03.02.03 DEMOLICION LOSA ALIGERADA m2 1001.26


PABELLON "G"
PRIMER NIVEL
AULA 1 1.00 - 55.39 55.39
AULA 2 1.00 - 55.38 55.38
AULA 3 1.00 - 55.69 55.69
AULA 4 1.00 - 62.34 62.34
AULA 5 1.00 - 62.34 62.34
AULA 6 1.00 - 62.21 62.21
SS.HH. 1.00 - 15.50 15.50
ENTRE EJES 1 Y 2/2 Y 3/3 Y 4/4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 (PASILLO) 9.00 - 5.98 53.82
ENTRE EJES 11 Y 12 (PASILLO) 1.00 - 6.70 6.70
ENTRE EJES 12 Y 13 (PASILLO) 1.00 - 4.80 4.80
ENTRE EJES 13 Y 14/15 Y 16/17 Y 18/19 Y 20/20 Y 21/22 Y 23 (PASILLO) 6.00 - 5.94 35.64
ENTRE EJES 14 Y 15/18 Y 19/21 Y 22 (PASILLO) 3.00 - 5.88 17.64
ENTRE EJES 23 Y 24 (PASILLO) 1.00 - 6.70 6.70
SS.HH. (BATERIA) 1.00 - 21.68 21.68
SEGUNDO NIVEL
AULA 7,8,9 3.00 - 55.69 167.07
AULA 10,11,12 3.00 - 62.34 187.02
SS.HH. 1.00 - 15.50 15.50
ENTRE EJES 1 Y 2/2 Y 3/3 Y 4/4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 (PASILLO) 9.00 - 5.53 49.77
ENTRE EJES 11 Y 12 (PASILLO) 1.00 - 6.17 6.17
ENTRE EJES 12 Y 13 (PASILLO) 1.00 - 4.44 4.44
ENTRE EJES 13 Y 14/15 Y 16/17 Y 18/19 Y 20/20 Y 21/22 Y 23 (PASILLO) 6.00 - 5.49 32.94
ENTRE EJES 14 Y 15/18 Y 19/21 Y 22 (PASILLO) 3.00 - 5.44 16.32
ENTRE EJES 23 Y 24 (PASILLO) 1.00 - 6.20 6.20

02.03.02.05 DEMOLICION DE VIGAS m3 73.35


PABELLON "G"
PRIMER NIVEL
EJE A ENTRE 1 Y 2/2 Y 3/3 Y 4/4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 9.00 2.99 0.50 0.20 2.69
EJE A ENTRE 11 Y 12 1.00 3.35 0.50 0.20 0.34
EJE A ENTRE 12 Y 13 1.00 2.40 0.50 0.20 0.24
EJE A ENTRE 13 Y 14 1.00 2.97 0.50 0.20 0.30
EJE A ENTRE 14 Y 15 1.00 2.94 0.50 0.20 0.29
EJE A ENTRE 15 Y 16 1.00 2.97 0.50 0.20 0.30
EJE A ENTRE 17 Y 18 1.00 2.97 0.50 0.20 0.30
EJE A ENTRE 18 Y 19 1.00 2.94 0.50 0.20 0.29
EJE A ENTRE 19 Y 20 1.00 2.97 0.50 0.20 0.30
EJE A ENTRE 20 Y 21 1.00 2.97 0.50 0.20 0.30
EJE A ENTRE 21 Y 22 1.00 2.94 0.50 0.20 0.29
EJE A ENTRE 22 Y 23 1.00 2.97 0.50 0.20 0.30
EJE A ENTRE 23 Y 24 1.00 3.35 0.50 0.20 0.34
EJE B ENTRE 1 Y 2/2 Y 3/3 Y 4/4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 9.00 2.99 0.50 0.20 2.69
EJE B ENTRE 11 Y 12 1.00 3.35 0.50 0.20 0.34
EJE B ENTRE 12 Y 13 1.00 2.40 0.50 0.20 0.24
EJE B ENTRE 13 Y 14 1.00 2.97 0.50 0.20 0.30
EJE B ENTRE 14 Y 15 1.00 2.94 0.50 0.20 0.29
EJE B ENTRE 15 Y 16 1.00 2.97 0.50 0.20 0.30
EJE B ENTRE 17 Y 18 1.00 2.97 0.50 0.20 0.30
EJE B ENTRE 18 Y 19 1.00 2.94 0.50 0.20 0.29
EJE B ENTRE 19 Y 20 1.00 2.97 0.50 0.20 0.30
EJE B ENTRE 20 Y 21 1.00 2.97 0.50 0.20 0.30
EJE B ENTRE 21 Y 22 1.00 2.94 0.50 0.20 0.29
EJE B ENTRE 22 Y 23 1.00 2.97 0.50 0.20 0.30
EJE B ENTRE 23 Y 24 1.00 3.35 0.50 0.20 0.34
EJE 1,2,3,4,5,6,7,8,9,10 ENTRE A Y B 10.00 6.25 0.25 0.50 7.81
EJE 11,12,13,14,15,16,17,18,19,20,21,22,23,24 ENTRE A Y B 14.00 6.25 0.30 0.50 13.13
EJE 1,2,3,4,5,6,7,8,9,10 ENTRE A Y B (VOLADO) 10.00 0.25 0.30 0.75
EJE 11,12,13,14,15,16,17,18,19,20,21,22,23,24 (VOLADO) 14.00 0.30 0.30 1.26
VIGA DE BORDE (VOLADO)
ENTRE EJES 1 Y 2/2 Y 3/3 Y 4/4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 9.00 2.99 0.15 0.20 0.81
ENTRE EJES 11 Y 12 1.00 2.99 0.15 0.20 0.09
ENTRE EJES 12 Y 13 1.00 2.40 0.15 0.20 0.07
ENTRE 13 Y 14 1.00 2.97 0.15 0.20 0.09
ENTRE 14 Y 15 1.00 2.94 0.15 0.20 0.09
ENTRE 15 Y 16 1.00 2.97 0.15 0.20 0.09
ENTRE 17 Y 18 1.00 2.97 0.15 0.20 0.09
ENTRE 18 Y 19 1.00 2.94 0.15 0.20 0.09
ENTRE 19 Y 20 1.00 2.97 0.15 0.20 0.09
ENTRE 20 Y 21 1.00 2.97 0.15 0.20 0.09
ENTRE 21 Y 22 1.00 2.94 0.15 0.20 0.09
ENTRE 22 Y 23 1.00 2.97 0.15 0.20 0.09
ENTRE 23 Y 24 1.00 3.35 0.15 0.20 0.10
SEGUNDO NIVEL
EJE A ENTRE 1 Y 2/2 Y 3/3 Y 4/4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 9.00 2.99 0.25 0.30 2.02
EJE A ENTRE 11 Y 12 1.00 3.35 0.50 0.20 0.34
EJE A ENTRE 12 Y 13 1.00 2.40 0.50 0.20 0.24
EJE A ENTRE 13 Y 14 1.00 2.97 0.50 0.20 0.30
EJE A ENTRE 14 Y 15 1.00 2.94 0.50 0.20 0.29
EJE A ENTRE 15 Y 16 1.00 2.97 0.50 0.20 0.30
EJE A ENTRE 17 Y 18 1.00 2.97 0.50 0.20 0.30
EJE A ENTRE 18 Y 19 1.00 2.94 0.50 0.20 0.29
EJE A ENTRE 19 Y 20 1.00 2.97 0.50 0.20 0.30
EJE A ENTRE 20 Y 21 1.00 2.97 0.50 0.20 0.30
EJE A ENTRE 21 Y 22 1.00 2.94 0.50 0.20 0.29
EJE A ENTRE 22 Y 23 1.00 2.97 0.50 0.20 0.30
EJE A ENTRE 23 Y 24 1.00 3.35 0.50 0.20 0.34
EJE B ENTRE 1 Y 2/2 Y 3/3 Y 4/4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 9.00 2.99 0.25 0.30 2.02
EJE B ENTRE 11 Y 12 1.00 3.35 0.50 0.20 0.34
EJE B ENTRE 12 Y 13 1.00 2.40 0.50 0.20 0.24
EJE B ENTRE 13 Y 14 1.00 2.97 0.50 0.20 0.30
EJE B ENTRE 14 Y 15 1.00 2.94 0.50 0.20 0.29
EJE B ENTRE 15 Y 16 1.00 2.97 0.50 0.20 0.30
EJE B ENTRE 17 Y 18 1.00 2.97 0.50 0.20 0.30
EJE B ENTRE 18 Y 19 1.00 2.94 0.50 0.20 0.29
EJE B ENTRE 19 Y 20 1.00 2.97 0.50 0.20 0.30
EJE B ENTRE 20 Y 21 1.00 2.97 0.50 0.20 0.30
EJE B ENTRE 21 Y 22 1.00 2.94 0.50 0.20 0.29
EJE B ENTRE 22 Y 23 1.00 2.97 0.50 0.20 0.30
EJE B ENTRE 23 Y 24 1.00 3.35 0.50 0.20 0.34
EJE 1,2,3,4,5,6,7,8,9,10 ENTRE A Y B 10.00 6.25 0.25 0.50 7.81
EJE 11,12,13,14,15,16,17,18,19,20,21,22,23,24 ENTRE A Y B 14.00 6.25 0.30 0.50 13.13
EJE 1,2,3,4,5,6,7,8,9,10 ENTRE A Y B (VOLADO) 10.00 0.25 0.30 0.75
EJE 11,12,13,14,15,16,17,18,19,20,21,22,23,24 (VOLADO) 14.00 0.30 0.30 1.26
VIGA DE BORDE (VOLADO)
ENTRE EJES 1 Y 2/2 Y 3/3 Y 4/4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 9.00 2.99 0.15 0.20 0.81
ENTRE EJES 11 Y 12 1.00 2.99 0.15 0.20 0.09
ENTRE EJES 12 Y 13 1.00 2.40 0.15 0.20 0.07
ENTRE 13 Y 14 1.00 2.97 0.15 0.20 0.09
ENTRE 14 Y 15 1.00 2.94 0.15 0.20 0.09
ENTRE 15 Y 16 1.00 2.97 0.15 0.20 0.09
ENTRE 17 Y 18 1.00 2.97 0.15 0.20 0.09
ENTRE 18 Y 19 1.00 2.94 0.15 0.20 0.09
ENTRE 19 Y 20 1.00 2.97 0.15 0.20 0.09
ENTRE 20 Y 21 1.00 2.97 0.15 0.20 0.09
ENTRE 21 Y 22 1.00 2.94 0.15 0.20 0.09
ENTRE 22 Y 23 1.00 2.97 0.15 0.20 0.09
ENTRE 23 Y 24 1.00 3.35 0.15 0.20 0.10

02.03.02.06 DEMOLICION DE COLUMNAS m3 55.46


PABELLON "G"
EJE A - 1,2,3,4,5,6,7,8,10 10.00 0.50 0.25 7.80 9.75
EJE A - 11 1.00 0.40 0.25 7.80 0.78
EJE A - 12,13,14,15,16,17,18,19,20,21,22,23 12.00 0.55 0.30 7.80 15.44
EJE A - 24 1.00 0.40 0.25 7.80 0.78
EJE B - 1,2,3,4,5,6,7,8,10 10.00 0.50 0.25 7.80 9.75
EJE B - 11 1.00 0.40 0.25 7.80 0.78
EJE B - 12,13,14,15,16,17,18,19,20,21,22,23 12.00 0.55 0.30 7.80 15.44
EJE B - 24 1.00 0.40 0.25 7.80 0.78
SS.HH. (BATERIA) 4.00 0.50 0.25 3.90 1.95

02.03.02.07 DEMOLICION DE PARAPETOS DE CONCRETO ARMADO m3 1.57


PABELLON "G"
ESCALERA Nº1
Tramo 2 1.00 4.34 0.15 1.20 0.78
ESCALERA Nº2
Tramo 2 1.00 4.36 0.15 1.20 0.78

02.03.02.08 DEMOLICION DE ESCALERAS DE CONCRETO m3 5.34


PABELLON "G"
ESCALERA Nº1
Tramo 1 1.00 1.34 0.61 0.82
Descanso 1.00 3.50 1.75 0.15 0.92
Tramo 2 1.00 1.37 0.68 0.93

ESCALERA Nº2
Tramo 1 1.00 1.34 0.61 0.82
Descanso 1.00 3.50 1.75 0.15 0.92
Tramo 2 1.00 1.37 0.68 0.93

02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 18.55


PABELLON "G"
PRIMER NIVEL
EJE A ENTRE 1 Y 2/2 Y 3/3 Y 4/4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 9.00 2.99 0.20 0.50 2.69
EJE A ENTRE 11 Y 12 (ESCALERA) 1.00 3.35 0.20 0.50 0.34
EJE A ENTRE 12 Y 13 1.00 2.40 0.20 0.50 0.24
EJE A ENTRE 13 Y 14 1.00 2.97 0.20 0.50 0.30
EJE A ENTRE 14 Y 15 1.00 2.94 0.20 0.50 0.29
EJE A ENTRE 15 Y 16/17 Y 18 2.00 2.97 0.20 0.50 0.59
EJE A ENTRE 18 Y 19 1.00 2.94 0.20 0.50 0.29
EJE A ENTRE 19 Y 20/20 Y 21 2.00 2.97 0.20 0.50 0.59
EJE A ENTRE 21 Y 22 1.00 2.94 0.20 0.50 0.29
EJE A ENTRE 22 Y 23 1.00 2.97 0.20 0.50 0.30
EJE A ENTRE 23 Y 24 (ESCALERA) 1.00 3.35 0.20 0.50 0.34
EJE A,B ENTRE 11 Y 12 (ESCALERA) 1.00 0.71 0.20 0.50 0.07
EJE B ENTRE 1 Y 2/3 Y 4/4 Y 5/6 Y 7/7 Y 8/9 Y 10 6.00 1.99 0.20 0.50 1.19
EJE B ENTRE 2 Y 3/5 Y 6/8 Y 9 3.00 2.99 0.20 0.50 0.90
EJE B ENTRE 12 Y 13 1.00 1.40 0.20 0.50 0.14
EJE B ENTRE 13 Y 14/15 Y 16/17 Y 18/19 Y 20/20 Y 21/22 Y 23 6.00 1.97 0.20 0.50 1.18
EJE B ENTRE 14 Y 15/18 Y 19/21 Y 22 3.00 2.94 0.20 0.50 0.88
EJE 1,4,7,10 ENTRE A Y B 4.00 6.25 0.20 0.50 2.50
EJE 11 ENTRE A Y B 1.00 5.70 0.20 0.50 0.57
EJE 11/12 ENTRE A Y B (ESCALERA) 1.00 4.42 0.20 0.50 0.44
EJE 12 ENTRE A Y B 1.00 2.40 0.20 0.50 0.24
EJE 13,16,17,20,23 ENTRE A Y B 5.00 5.40 0.20 0.50 2.70
EJE 23/24 ENTRE A Y B (ESCALERA) 1.00 2.16 0.20 0.50 0.22
EJE 24 ENTRE A Y B 1.00 5.70 0.20 0.50 0.57
TABIQUES EN SS.HH. 4.00 1.70 0.20 0.50 0.68

02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 55.65


PABELLON "G"
PRIMER NIVEL
EJE A ENTRE 1 Y 2/2 Y 3/3 Y 4/4 Y 5/5 Y 6/6 Y 7/7 Y 8/8 Y 9/9 Y 10 9.00 2.99 0.50 0.60 8.07
EJE A ENTRE 11 Y 12 (ESCALERA) 1.00 3.35 0.50 0.60 1.01
EJE A ENTRE 12 Y 13 1.00 2.40 0.50 0.60 0.72
EJE A ENTRE 13 Y 14 1.00 2.97 0.50 0.60 0.89
EJE A ENTRE 14 Y 15 1.00 2.94 0.50 0.60 0.88
EJE A ENTRE 15 Y 16/17 Y 18 2.00 2.97 0.50 0.60 1.78
EJE A ENTRE 18 Y 19 1.00 2.94 0.50 0.60 0.88
EJE A ENTRE 19 Y 20/20 Y 21 2.00 2.97 0.50 0.60 1.78
EJE A ENTRE 21 Y 22 1.00 2.94 0.50 0.60 0.88
EJE A ENTRE 22 Y 23 1.00 2.97 0.50 0.60 0.89
EJE A ENTRE 23 Y 24 (ESCALERA) 1.00 3.35 0.50 0.60 1.01
EJE A,B ENTRE 11 Y 12 (ESCALERA) 1.00 0.71 0.50 0.60 0.21
EJE B ENTRE 1 Y 2/3 Y 4/4 Y 5/6 Y 7/7 Y 8/9 Y 10 6.00 1.99 0.50 0.60 3.58
EJE B ENTRE 2 Y 3/5 Y 6/8 Y 9 3.00 2.99 0.50 0.60 2.69
EJE B ENTRE 12 Y 13 1.00 1.40 0.50 0.60 0.42
EJE B ENTRE 13 Y 14/15 Y 16/17 Y 18/19 Y 20/20 Y 21/22 Y 23 6.00 1.97 0.50 0.60 3.55
EJE B ENTRE 14 Y 15/18 Y 19/21 Y 22 3.00 2.94 0.50 0.60 2.65
EJE 1,4,7,10 ENTRE A Y B 4.00 6.25 0.50 0.60 7.50
EJE 11 ENTRE A Y B 1.00 5.70 0.50 0.60 1.71
EJE 11/12 ENTRE A Y B (ESCALERA) 1.00 4.42 0.50 0.60 1.33
EJE 12 ENTRE A Y B 1.00 2.40 0.50 0.60 0.72
EJE 13,16,17,20,23 ENTRE A Y B 5.00 5.40 0.50 0.60 8.10
EJE 23/24 ENTRE A Y B (ESCALERA) 1.00 2.16 0.50 0.60 0.65
EJE 24 ENTRE A Y B 1.00 5.70 0.50 0.60 1.71
TABIQUES EN SS.HH. 4.00 1.70 0.50 0.60 2.04

02.03.02.11 DEMOLICION DE ZAPATAS m3 67.28


PABELLON "G"
Z-1 46.00 1.50 1.50 0.65 67.28

02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 564.63


PABELLON "G"
AULA 1 1.00 - 59.14 59.14
AULA 2 1.00 - 59.15 59.15
AULA 3 1.00 - 59.15 59.15
AULA 4 1.00 - 65.78 65.78
AULA 5 1.00 - 65.78 65.78
AULA 6 1.00 - 65.78 65.78
SS.HH. 1.00 - 15.57 15.57
ESCALERA 1 1.00 - 11.81 11.81
ESCALERA 2 1.00 - 8.94 8.94
PASILLO 1.00 - 153.53 153.53

SUSTENTO DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON VESTIDORES - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


CANT MEDIDAS PARCIA
ITEM DESCRIPCION UNID. TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H) AREA L

02.03 DESMONTAJES Y DEMOLICIONES


02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 36.98
PABELLON VESTIDORES
PRIMER NIVEL
DESTIDORES 1,2,3,4,5,6,7,8,9,10,11,12 12.00 - 0.75 2.20 19.80
SS.HH. 2.00 - 0.75 2.20 3.30
SS. HH. DETRÁS VESTIDORES
PRIMER NIVEL
SS.HH. 1.00 0.91 - 2.10 1.91
1.00 1.50 - 2.10 3.15
SS.HH. INTERIOR 3.00 0.70 - 1.80 3.78
4.00 0.70 - 1.80 5.04

02.03.01.05 DESMONTAJE DE INODOROS und 9.00


PABELLON DE VESTIDORES
PRIMER NIVEL
SS.HH. 1,2 2.00 - - - 2.00
SS. HH. DETRÁS VESTIDORES
PRIMER NIVEL
SS.HH. 1,2,3,4,5,6,7 7.00 - - - 7.00

02.03.01.06 DESMONTAJE DE LAVATORIOS DE LOSA und 2.00


PABELLON DE VESTIDORES
PRIMER NIVEL
SS.HH. 1,2 2.00 - - - 2.00

02.03.01.08 DESMONTAJE DE VENTANAS DE MADERA m2 2.18


PABELLON DE VESTIDORES
PRIMER NIVEL
EJE B ENTRE 1 Y 2 2.00 0.45 - 0.30 0.27
EJE B ENTRE 2 Y 3 2.00 0.45 - 0.30 0.27
EJE B ENTRE 3 Y 4 2.00 0.45 - 0.30 0.27
EJE B ENTRE 4 Y 5/5 Y 6 2.00 0.93 - 0.30 0.56
EJE B ENTRE 6 Y 7 2.00 0.45 - 0.30 0.27
EJE B ENTRE 7 Y 8 2.00 0.45 - 0.30 0.27
EJE B ENTRE 8 Y 9 2.00 0.45 - 0.30 0.27

02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS


02.03.01.15,01 DESMONTAJE DE ARTEFACTO O SOKET ADOSADO EN TECHO P/FOCO AHORRAD und 17.00
PABELLON DE VESTIDORES
PRIMER NIVEL (PISCINA) 1.00 - 15.00 15.00
PRIMER NIVEL (TANQUE Nº 03) 1.00 - 2.00 2.00

02.03.01.15,05 DESMONTAJE DE ARTEFACTO FLUORESCENTE ADOSADO C/LAMP. 1X40W und 5.00


PABELLON DE VESTIDORES
PRIMER NIVEL 1.00 - 5.00 5.00

02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 2.00


PABELLON DE VESTIDORES
PRIMER NIVEL 1.00 - 1.00 1.00
PRIMER NIVEL (TANQUE Nº03) 1.00 - 1.00 1.00

02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 1.00


PABELLON DE VESTIDORES
PRIMER NIVEL 1.00 - 1.00 1.00

02.03.01.15,18 DESMONTAJE DE TABLERO ELECTROBOMBA und 2.00


PABELLON DE VESTIDORES
TD-A
PRIMER NIVEL (TANQUE Nº03) 1.00 - 1.00 1.00
TD-B
PRIMER NIVEL (TANQUE Nº03) 1.00 - 1.00 1.00

02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 65.88


PABELLON DE VESTIDORES
PRIMER NIVEL 1.00 - 49.00 49.00
PRIMER NIVEL (TANQUE Nº 03) 1.00 - 16.88 16.88

02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 231.90
PABELLON VESTIDORES
EJE A ENTRE 1 Y 2/2 Y 3/3 Y4 3.00 2.55 - 2.50 19.13
EJE A ENTRE 4 Y 5/5 Y 6 2.00 1.68 - 2.60 8.74
EJE A ENTRE 6 Y 7/7 Y 8/8 Y9 3.00 2.55 - 2.50 19.13
EJE B ENTRE 1 Y 2/2 Y 3/3 Y4 6.00 0.45 - 2.30 6.21
EJE B ENTRE 4 Y 5/5 Y 6 2.00 0.93 - 2.30 4.28
EJE B ENTRE 6 Y 7/7 Y 8/8 Y9 6.00 0.45 - 2.30 6.21
EJE 1,2,3,4,6,7,8,9 ENTRE A Y B 8.00 1.90 - 2.50 38.00
EJE 5 ENTRE A Y B 1.00 1.60 - 2.60 4.16
SS.HH. DETRÁS DE VESTIDORES 1.00 10.62 - 2.50 26.55
1.00 4.28 - 2.50 10.70
1.00 4.63 - 2.50 11.58
1.00 1.40 - 2.50 3.50
1.00 3.00 - 2.50 7.50
1.00 0.51 - 2.50 1.28
5.00 1.86 - 1.70 15.81
DEPOSITO DETRÁS DE VESTIDORES 1.00 6.32 - 2.50 15.80
1.00 5.64 - 2.50 14.10
1.00 1.91 - 2.50 4.77
1.00 5.79 - 2.50 14.48

02.03.02.03 DEMOLICION LOSA ALIGERADA m2 109.47


PABELLON VESTIDORES
PRIMER NIVEL
ENTRE EJES A Y B - 1 Y 2/2 Y 3/3 Y 4/6 Y 7/7 Y 8/8 Y 9 6.00 - 6.84 41.04
ENTRE EJES A Y B - 4 Y 5/5 Y 6 2.00 - 4.77 9.54
SS.HH. (DETRÁS DE VESTIDORES 1.00 - 26.93 26.93
DEPOSITO 1.00 - 31.96 31.96

02.03.02.05 DEMOLICION DE VIGAS m3 3.57


PABELLON VESTIDORES
PRIMER NIVEL
EJE A ENTRE 1 Y 2/2 Y 3/3 Y 4 3.00 2.55 0.15 0.20 0.23
EJE A ENTRE 4 Y 5/5 Y 6 2.00 1.68 0.15 0.20 0.10
EJE A ENTRE 6 Y 7/7 Y 8/8 Y 9 3.00 2.55 0.15 0.20 0.23
EJE B ENTRE 1 Y 2/2 Y 3/3 Y 4 3.00 2.55 0.15 0.20 0.23
EJE B ENTRE 4 Y 5/5 Y 6 2.00 1.68 0.15 0.20 0.10
EJE B ENTRE 6 Y 7/7 Y 8/8 Y 9 3.00 2.55 0.15 0.20 0.23
EJE 1,2,3,4,6,7,8,9 ENTRE A Y B 8.00 2.40 0.40 0.20 1.54
EJE 5 ENTRE A Y B 1.00 2.10 0.40 0.20 0.17
EJE 1,2,3,4,6,7,8,9 VOLADO 9.00 0.45 0.15 0.20 0.12
EJE 5 VOLADO 1.00 0.75 0.15 0.20 0.02
VIGA DE AMRRE VOLADO
ENTRE EJE 1 Y 9 1.00 20.00 0.15 0.20 0.60

02.03.02.06 DEMOLICION DE COLUMNAS m3 2.27


PABELLON VESTIDORES
EJE A - 1,2,3,4,5,6,7,8,9 9.00 0.25 0.15 3.37 1.14
EJE B - 1,2,3,4,5,6,7,8,9 9.00 0.25 0.15 3.37 1.14

02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 4.27


PABELLON VESTIDORES
EJE A ENTRE 1 Y 2/2 Y 3/3 Y4 3.00 2.55 0.20 0.50 0.77
EJE A ENTRE 4 Y 5/5 Y 6 2.00 1.68 0.20 0.50 0.34
EJE A ENTRE 6 Y 7/7 Y 8/8 Y9 3.00 2.55 0.20 0.50 0.77
EJE B ENTRE 1 Y 2/2 Y 3/3 Y4 6.00 0.45 0.20 0.50 0.27
EJE B ENTRE 4 Y 5/5 Y 6 2.00 0.93 0.20 0.50 0.19
EJE B ENTRE 6 Y 7/7 Y 8/8 Y9 6.00 0.45 0.20 0.50 0.27
EJE 1,2,3,4,6,7,8,9 ENTRE A Y B 8.00 1.90 0.20 0.50 1.52
EJE 5 ENTRE A Y B 1.00 1.60 0.20 0.50 0.16

02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 12.82


PABELLON VESTIDORES
EJE A ENTRE 1 Y 2/2 Y 3/3 Y4 3.00 2.55 0.50 0.60 2.30
EJE A ENTRE 4 Y 5/5 Y 6 2.00 1.68 0.50 0.60 1.01
EJE A ENTRE 6 Y 7/7 Y 8/8 Y9 3.00 2.55 0.50 0.60 2.30
EJE B ENTRE 1 Y 2/2 Y 3/3 Y4 6.00 0.45 0.50 0.60 0.81
EJE B ENTRE 4 Y 5/5 Y 6 2.00 0.93 0.50 0.60 0.56
EJE B ENTRE 6 Y 7/7 Y 8/8 Y9 6.00 0.45 0.50 0.60 0.81
EJE 1,2,3,4,6,7,8,9 ENTRE A Y B 8.00 1.90 0.50 0.60 4.56
EJE 5 ENTRE A Y B 1.00 1.60 0.50 0.60 0.48

02.03.02.11 DEMOLICION DE ZAPATAS m3 8.19


PABELLON VESTIDORES
Z-1 18.00 1.00 0.70 0.65 8.19

02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 38.66


PABELLON VESTIDORES
BAÑERA 1.2.3.4.5.6.7.8.9.10.11.12 12.00 - 2.70 32.40
SS.HH. 1,2 2.00 - 3.13 6.26

SUSTENTO DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON BIBLIOTECA - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING
METRADO: ING FECHA: OCTUBRE DE 2012
CANT MEDIDAS PARCIA
ITEM DESCRIPCION UNID. TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H) AREA L

02.03 DESMONTAJES Y DEMOLICIONES


02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 6.34
PABELLON DE BIBLIOTECA
PRIMER NIVEL
SALA DE LECTURA 1.00 - 1.40 2.10 2.94
DEPOSITO DE LIBROS 1.00 - 1.00 2.10 2.10
AMBIENTE S/DESCRIPCION EN PLANOS 1.00 - 0.65 2.00 1.30

02.03.01.08 DESMONTAJE DE VENTANAS DE MADERA m2 63.58


PABELLON DE BIBLIOTECA
PRIMER NIVEL
EJE A ENTRE 1 Y 2 1.00 3.15 - 1.80 5.67
EJE A ENTRE 2 Y 3 1.00 3.10 - 1.80 5.58
EJE A ENTRE 3 Y 4 1.00 3.05 - 1.80 5.49
EJE A ENTRE 4 Y 5 1.00 3.10 - 1.80 5.58
EJE A ENTRE 5 Y 6 1.00 3.00 - 1.80 5.40
EJE A ENTRE 6 Y 7 1.00 3.13 - 1.80 5.63
EJE B ENTRE 1 Y 2 1.00 3.15 - 1.80 5.67
EJE B ENTRE 2 Y 3 1.00 3.10 - 1.80 5.58
EJE B ENTRE 3 Y 4 1.00 3.05 - 1.80 5.49
EJE B ENTRE 4 Y 5 1.00 3.10 - 1.80 5.58
EJE B ENTRE 5 Y 6 1.00 3.00 - 1.80 5.40
EJE B ENTRE 6 Y 7 1.00 3.13 - 0.80 2.50

02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS


02.03.01.15,02 DESMONTAJE DE ARTEFACTO FLUORESCENTE EN TECHO C/LAMP. FLUORESCENTE und 1.00
PABELLON DE BIBLIOTECA
PRIMER NIVEL 1.00 - 1.00 1.00

02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR und 6.00
PABELLON DE BIBLIOTECA
PRIMER NIVEL 1.00 - 6.00 6.00

02.03.01.15,04 DESMONTAJE DE ARTEFACTO FLUORESCENTE C/REJILLA DE ALUMINIO C/LAMP. und 6.00


PABELLON DE BIBLIOTECA
PRIMER NIVEL 1.00 - 6.00 6.00

02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 2.00


PABELLON DE BIBLIOTECA
PRIMER NIVEL 1.00 - 2.00 2.00

02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 3.00


PABELLON DE BIBLIOTECA
PRIMER NIVEL 1.00 - 3.00 3.00

02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 1.00


PABELLON DE BIBLIOTECA
TD-BIB
PRIMER NIVEL 1.00 - 1.00 1.00

02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 69.60


PABELLON DE BIBLIOTECA
PRIMER NIVEL 2.00 - 34.80 69.60

02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 113.09
PABELLON BIBLIOTECA
EJE A ENTRE 1 Y 2 1.00 3.15 - 1.10 3.47
EJE A ENTRE 2 Y 3 1.00 3.10 - 1.10 3.41
EJE A ENTRE 3 Y 4 1.00 3.05 - 1.10 3.36
EJE A ENTRE 4 Y 5 1.00 3.10 - 1.10 3.41
EJE A ENTRE 5 Y 6 1.00 3.00 - 1.10 3.30
EJE A ENTRE 6 Y 7 1.00 3.13 - 1.10 3.44
EJE B ENTRE 1 Y 2 1.00 3.15 - 2.10 6.62
EJE B ENTRE 2 Y 3 1.00 3.10 - 2.10 6.51
EJE B ENTRE 3 Y 4 1.00 3.05 - 2.10 6.41
EJE B ENTRE 4 Y 5 1.00 3.10 - 2.10 6.51
EJE B ENTRE 5 Y 6 1.00 3.00 - 2.10 6.30
EJE B ENTRE 6 Y 7 1.00 2.13 - 2.10 4.47
ENTRE AJES A Y B (CASETA) 1.00 5.25 - 2.00 10.50
EJE 1,4 ENTRE A Y B 2.00 - 14.14 28.28
EJE 7 ENTRE A Y B 1.00 5.90 - 2.90 17.11

02.03.02.03 DEMOLICION LOSA ALIGERADA m2 177.93


PABELLON BIBLIOTECA
PRIMER NIVEL
SALA DE LECTURA 1.00 - 58.60 58.60
DEPOSITO DE LIBROS 1.00 - 58.13 58.13
PASILLO 1.00 - 57.68 57.68
DEPOSITO 1.00 - 3.52 3.52

02.03.02.05 DEMOLICION DE VIGAS m3 17.47


PABELLON BIBLIOTECA
EJE A ENTRE 1 Y 2 1.00 3.15 0.25 0.40 0.32
EJE A ENTRE 2 Y 3 1.00 3.10 0.25 0.40 0.31
EJE A ENTRE 3 Y 4 1.00 3.05 0.25 0.40 0.31
EJE A ENTRE 4 Y 5 1.00 3.10 0.25 0.40 0.31
EJE A ENTRE 5 Y 6 1.00 3.00 0.25 0.40 0.30
EJE A ENTRE 6 Y 7 1.00 3.13 0.25 0.40 0.31
EJE B ENTRE 1 Y 2 1.00 3.15 0.25 0.40 0.32
EJE B ENTRE 2 Y 3 1.00 3.10 0.25 0.40 0.31
EJE B ENTRE 3 Y 4 1.00 3.05 0.25 0.40 0.31
EJE B ENTRE 4 Y 5 1.00 3.10 0.25 0.40 0.31
EJE B ENTRE 5 Y 6 1.00 3.00 0.25 0.40 0.30
EJE B ENTRE 6 Y 7 1.00 3.13 0.25 0.40 0.31
EJE 1 ENTRE A Y B 1.00 5.90 0.35 0.60 1.24
EJE 2 ENTRE A Y B 1.00 5.90 0.35 0.60 1.24
EJE 3 ENTRE A Y B 1.00 5.90 0.35 0.60 1.24
EJE 4 ENTRE A Y B 1.00 5.90 0.35 0.60 1.24
EJE 5 ENTRE A Y B 1.00 5.90 0.35 0.60 1.24
EJE 6 ENTRE A Y B 1.00 5.90 0.35 0.60 1.24
EJE 7 ENTRE A Y B 1.00 5.90 0.35 0.60 1.24
VIGA EXTERIOR EN PASILLO
ENTRE EJE 1 Y 7 3.00 4.75 0.35 0.60 2.99
1.00 4.98 0.35 0.60 1.05
EJE 1,7 (VIGA CHTA VOLADO) 2.00 3.00 0.35 0.20 0.42
3.00 3.00 0.35 0.20 0.63

02.03.02.06 DEMOLICION DE COLUMNAS m3 11.17


PABELLON BIBLIOTECA
EJE A - 1,2,3,4,5,6,7 7.00 0.35 0.35 4.80 4.12
EJE B - 1,2,3,4,5,6,7 7.00 0.35 0.35 4.80 4.12
ENTRE EJES 1 Y 7 (PASILLO) 5.00 0.35 0.35 4.80 2.94

02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 5.62


PABELLON BIBLIOTECA
EJE A ENTRE 1 Y 2 1.00 3.15 0.20 0.50 0.32
EJE A ENTRE 2 Y 3 1.00 3.10 0.20 0.50 0.31
EJE A ENTRE 3 Y 4 1.00 3.05 0.20 0.50 0.31
EJE A ENTRE 4 Y 5 1.00 3.10 0.20 0.50 0.31
EJE A ENTRE 5 Y 6 1.00 3.00 0.20 0.50 0.30
EJE A ENTRE 6 Y 7 1.00 3.13 0.20 0.50 0.31
EJE B ENTRE 1 Y 2 1.00 3.15 0.20 0.50 0.32
EJE B ENTRE 2 Y 3 1.00 3.10 0.20 0.50 0.31
EJE B ENTRE 3 Y 4 1.00 3.05 0.20 0.50 0.31
EJE B ENTRE 4 Y 5 1.00 3.10 0.20 0.50 0.31
EJE B ENTRE 5 Y 6 1.00 3.00 0.20 0.50 0.30
EJE B ENTRE 6 Y 7 1.00 2.13 0.20 0.50 0.21
ENTRE AJES A Y B (CASETA) 1.00 5.25 0.20 0.50 0.53
EJE 1,4 ENTRE A Y B 2.00 4.50 0.20 0.50 0.90
EJE 7 ENTRE A Y B 1.00 5.90 0.20 0.50 0.59

02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 16.86


PABELLON BIBLIOTECA
EJE A ENTRE 1 Y 2 1.00 3.15 0.50 0.60 0.95
EJE A ENTRE 2 Y 3 1.00 3.10 0.50 0.60 0.93
EJE A ENTRE 3 Y 4 1.00 3.05 0.50 0.60 0.91
EJE A ENTRE 4 Y 5 1.00 3.10 0.50 0.60 0.93
EJE A ENTRE 5 Y 6 1.00 3.00 0.50 0.60 0.90
EJE A ENTRE 6 Y 7 1.00 3.13 0.50 0.60 0.94
EJE B ENTRE 1 Y 2 1.00 3.15 0.50 0.60 0.95
EJE B ENTRE 2 Y 3 1.00 3.10 0.50 0.60 0.93
EJE B ENTRE 3 Y 4 1.00 3.05 0.50 0.60 0.91
EJE B ENTRE 4 Y 5 1.00 3.10 0.50 0.60 0.93
EJE B ENTRE 5 Y 6 1.00 3.00 0.50 0.60 0.90
EJE B ENTRE 6 Y 7 1.00 2.13 0.50 0.60 0.64
ENTRE AJES A Y B (CASETA) 1.00 5.25 0.50 0.60 1.58
EJE 1,4 ENTRE A Y B 2.00 4.50 0.50 0.60 2.70
EJE 7 ENTRE A Y B 1.00 5.90 0.50 0.60 1.77

02.03.02.11 DEMOLICION DE ZAPATAS m3 22.34


PABELLON BIBLIOTECA
Z-1 19.00 1.40 1.40 0.60 22.34

02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 202.99


PABELLON BIBLIOTECA
SALA DE LECTURA 1.00 - 64.71 64.71
DEPOSITO DE LIBROS 1.00 - 64.39 64.39
CASETA BOMBA 1.00 - 3.61 3.61
PASILLO 1.00 - 70.28 70.28

SUSTENTO DE METRADOS
PROYECTO: DEMOLICIONES - PASILLO - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


CANT MEDIDAS PARCIA
ITEM DESCRIPCION UNID. TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H) AREA L

02.03 DESMONTAJES Y DEMOLICIONES


02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS
02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR und 10.00
02.03.01.15,04 DESMONTAJE DE ARTEFACTO FLUORESCENTE C/REJILLA DE ALUMINIO C/LAMP. und 1.00
02.03.01.15,15 DESMONTAJE DE CAJA DE PASO und 6.00
02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 94.21
02.03.02 DEMOLICIONES
02.03.02.02 DEMOLICION DE PARAPETOS m2 229.29
02.03.02.03 DEMOLICION LOSA ALIGERADA m2 355.24
02.03.02.05 DEMOLICION DE VIGAS m3 59.20
02.03.02.06 DEMOLICION DE COLUMNAS m3 34.56
02.03.02.11 DEMOLICION DE ZAPATAS m3 49.21
02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 454.73

SUSTENTO DE METRADOS
PROYECTO: DEMOLICIONES - MODULO PREFABRICADO - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


CANT MEDIDAS PARCIA
ITEM DESCRIPCION UNID. TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H) AREA L

02.03 DESMONTAJES Y DEMOLICIONES


02.03.01 DESMONTAJES
02.03.01.11 DESMONTAJE DE MODULOS PREFABRICADOS m2 156.18
MODULO 1
PAREDES 1.00 - 31.32 31.32
1.00 - 29.22 29.22
1.00 - 7.88 7.88
1.00 - 9.67 9.67
MODULO 2
PAREDES 1.00 - 31.32 31.32
1.00 - 29.22 29.22
1.00 - 7.88 7.88
1.00 - 9.67 9.67

02.03.01.12 DESMONTAJE DE COBERTURA LIVIANA MODULOS PREFABRICADOS m2 95.56


MODULO 1
DOS AGUAS 1.00 - 47.78 47.78
MODULO 2
DOS AGUAS 1.00 - 47.78 47.78

02.03.02 DEMOLICIONES
02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 270.93
MODULOS PRE FRABRICADOS
MODULO 1,2 1.00 - 270.93 270.93
RESUMEN DE METRADOS
PROYECTO: DEMOLICIONES - GENERAL - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


ITEM DESCRIPCION UNID. TOTAL

01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD


01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.44 CON GIGANTOGRAFIA und 2.00
01.01.02 CASETA DE ALMACEN Y GUARDIANIA m2 100.00
01.02 TRABAJOS PRELIMINARES
01.02.01 TRAZO NIVELES Y REPLANTEO m2 24545.00
01.03 DESMONTAJES Y DEMOLICIONES
01.03.01 DESMONTAJES
01.03.01.10 DESMONTAJE DE MALLA RACHEL m2 3068.19
01.03.01.13 REMOCION DE AREAS VERDES m2 8724.86
01.03.01.14 DESBROCE Y TALA DE ARBOLES Y ARBUSTOS und 1.00
01.03.02 DESMONTAJE DE INSTALACIONES ELÉCTRICAS
01.03.02.18 DESMONTAJE DE SUB ESTACION DE P=50KV A 3 Ø220V. und 1.00
01.03.02.19 DESMONTAJE DE MEDIDOR DE ENERGIA SISTEMA 3 Ø 330/220V. und 1.00
01.03.03 DEMOLICIONES
01.03.03.13 DEMOLICION DE LOSAS DE CONCRETO C/MARTILLO m2 7494.69
01.03.03.14 DEMOLICION DE RAMPAS DE CONCRETO C/MARTILLO m2 37.94
01.03.03.15 DEMOLICION DE ESCALONES DE CONCRETO C/MARTILLO m3 58.62
01.03.03.16 DEMOLICION DE VEREDAS C/MARTILLO m2 1433.63
01.03.03.17 DEMOLICION DE PISCINA DE CONCRETO m3 140.71
01.03.03.18 DEMOLICION DE TANQUE CISTERNA m3 13.82
01.03.03.19 DEMOLICION DE SARDINELES m3 50.35
01.03.03.20 DEMOLICION DE SARDINELES ARMADOS m3 33.33
01.03.03.21 DEMOLICION DE LAVATORIO EXISTENTE m3 2.57
01.03.03.22 ACARREO DE MATERIAL EXCEDENTE PROVENIENTE DE LAS DEMOLICIONES HASTA 30 M m3 10471.63
01.03.03.23 ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO D=5 KM. m3 10471.63
01.03.03.24 LIMPIEZA DEL TERRENO EN FORMA MANUAL m2 24545.00
01.03.03.25 MOVILIZACION DE HERRAMIENTAS Y EQUIPOS glb 1.00

RESUMEN DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON "A" - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


ITEM DESCRIPCION UNID. TOTAL
01.03 DESMONTAJES Y DEMOLICIONES
01.03.01 DESMONTAJES
01.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 63.67
01.03.01.04 DESMONTAJE DE PIZARRAS ACRILICAS und 8.00
01.03.01.05 DESMONTAJE DE INODOROS und 16.00
01.03.01.06 DESMONTAJE DE LAVATORIOS DE LOSA und 20.00
01.03.01.08 DESMONTAJE DE VENTANAS DE MADERA m2 179.55
01.03.02 DESMONTAJE DE INSTALACIONES ELÉCTRICAS
01.03.02.01 DESMONTAJE DE ARTEFACTO O SOKET ADOSADO EN TECHO P/FOCO AHORRADOR und 1.00
01.03.02.02 DESMONTAJE DE ARTEFACTO FLUORESCENTE EN TECHO C/LAMP. FLUORESCENTE 1X22W TIPO BE und 10.00
01.03.02.04 DESMONTAJE DE ARTEFACTO FLUORESCENTE ADOSADO C/LAMP. 1X40W und 51.00
01.03.02.09 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 8.00
01.03.02.11 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 15.00
01.03.02.13 DESMONTAJE DE TIMBRE und 1.00
01.03.02.16 DESMONTAJE DE TABLERO DE DISTRIBUCION und 2.00
01.03.03 DEMOLICIONES
01.03.03.01 DEMOLICION DE MURO m2 767.79
01.03.03.02 DEMOLICION DE PARAPETOS m2 53.78
01.03.03.03 DEMOLICION LOSA ALIGERADA m2 624.84
01.03.03.05 DEMOLICION DE VIGAS m3 94.66
01.03.03.06 DEMOLICION DE COLUMNAS m3 77.98
01.03.03.07 DEMOLICION DE PARAPETOS DE CONCRETO ARMADO m3 2.62
01.03.03.08 DEMOLICION DE ESCALERAS DE CONCRETO m3 7.44
01.03.03.09 DEMOLICION DE SOBRECIMIENTO m3 15.98
01.03.03.10 DEMOLICION DE CIMIENTO CORRIDO m3 47.94
01.03.03.11 DEMOLICION DE ZAPATAS m3 57.40
01.03.03.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 498.29

RESUMEN DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON "B" - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


ITEM DESCRIPCION UNID. TOTAL
02.03 DESMONTAJES Y DEMOLICIONES
02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 72.91
02.03.01.04 DESMONTAJE DE PIZARRAS ACRILICAS und 8.00
02.03.01.05 DESMONTAJE DE INODOROS und 16.00
02.03.01.06 DESMONTAJE DE LAVATORIOS DE LOSA und 20.00
02.03.01.08 DESMONTAJE DE VENTANAS DE MADERA m2 179.55
02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS
02.03.01.15,01 DESMONTAJE DE ARTEFACTO O SOKET ADOSADO EN TECHO P/FOCO AHORRADOR und 1.00
02.03.01.15,02 DESMONTAJE DE ARTEFACTO FLUORESCENTE EN TECHO C/LAMP. FLUORESCENTE 1X22W TIPO BE und 10.00
02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR 1X32W und 5.00
02.03.01.15,04 DESMONTAJE DE ARTEFACTO FLUORESCENTE C/REJILLA DE ALUMINIO C/LAMP. 3X36W und 2.00
02.03.01.15,05 DESMONTAJE DE ARTEFACTO FLUORESCENTE ADOSADO C/LAMP. 1X40W und 49.00
02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 13.00
02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 16.00
02.03.01.15,13 DESMONTAJE DE LUCES DE EMERGENCIA und 3.00
02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 2.00
02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 763.80
02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 767.79
02.03.02.02 DEMOLICION DE PARAPETOS m2 53.78
02.03.02.03 DEMOLICION LOSA ALIGERADA m2 624.84
02.03.02.05 DEMOLICION DE VIGAS m3 94.66
02.03.02.06 DEMOLICION DE COLUMNAS m3 77.98
02.03.02.07 DEMOLICION DE PARAPETOS DE CONCRETO ARMADO m3 3.22
02.03.02.08 DEMOLICION DE ESCALERAS DE CONCRETO m3 8.99
02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 15.98
02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 47.94
02.03.02.11 DEMOLICION DE ZAPATAS m3 57.40
02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 498.81

RESUMEN DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON "C1" - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


ITEM DESCRIPCION UNID. TOTAL
02.03 DESMONTAJES Y DEMOLICIONES
02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 13.17
02.03.01.04 DESMONTAJE DE PIZARRAS ACRILICAS und 3.00
02.03.01.05 DESMONTAJE DE INODOROS und 3.00
02.03.01.06 DESMONTAJE DE LAVATORIOS DE LOSA und 2.00
02.03.01.08 DESMONTAJE DE VENTANAS DE MADERA m2 51.46
02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS
02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR 1X32W und 2.00
02.03.01.15,04 DESMONTAJE DE ARTEFACTO FLUORESCENTE C/REJILLA DE ALUMINIO C/LAMP. 3X36W und 16.00
02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 6.00
02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 3.00
02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 1.00
02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 163.54
02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 188.72
02.03.02.03 DEMOLICION LOSA ALIGERADA m2 223.76
02.03.02.05 DEMOLICION DE VIGAS m3 12.07
02.03.02.06 DEMOLICION DE COLUMNAS m3 14.48
02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 9.04
02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 27.11
02.03.02.11 DEMOLICION DE ZAPATAS m3 23.07
02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 255.00

RESUMEN DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON "C2" - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


ITEM DESCRIPCION UNID. TOTAL
02.03 DESMONTAJES Y DEMOLICIONES
02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 34.86
02.03.01.04 DESMONTAJE DE PIZARRAS ACRILICAS und 7.00
02.03.01.05 DESMONTAJE DE INODOROS und 6.00
02.03.01.06 DESMONTAJE DE LAVATORIOS DE LOSA und 7.00
02.03.01.07 DESMONTAJE DE LAVATORIOS DE ACERO INOXIDABLE DE 1 POZA und 1.00
02.03.01.08 DESMONTAJE DE VENTANAS DE MADERA m2 133.45
02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS
02.03.01.15,01 DESMONTAJE DE ARTEFACTO O SOKET ADOSADO EN TECHO P/FOCO AHORRADOR und 4.00
02.03.01.15,02 DESMONTAJE DE ARTEFACTO FLUORESCENTE EN TECHO C/LAMP. FLUORESCENTE 1X22W TIPO BE und 12.00
02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR 1X32W und 3.00
02.03.01.15,05 DESMONTAJE DE ARTEFACTO FLUORESCENTE ADOSADO C/LAMP. 1X40W und 6.00
02.03.01.15,06 DESMONTAJE DE ARTEFACTO ADOSADO A TECHO TIPO BE 2X40W und 2.00
02.03.01.15,07 DESMONTAJE DE ARTEFACTO ADOSADO A TECHO TIPO BE 3X40W und 19.00
02.03.01.15,08 DESMONTAJE DE ARTEFACTO DE ILUMINACION TIPO BRAQUET ADOSADO EN PARED 2X18W und 5.00
02.03.01.15,09 DESMONTAJE DE ARTEFACTO EMPOTRADO EN TECHO C/PANTALLA DE ACRILICO OPAL C/ LAMP. 2X20W und 10.00
02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 14.00
02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 14.00
02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 1.00
02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 365.12
02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 428.26
02.03.02.02 DEMOLICION DE PARAPETOS m2 52.37
02.03.02.03 DEMOLICION LOSA ALIGERADA m2 667.45
02.03.02.05 DEMOLICION DE VIGAS m3 51.73
02.03.02.06 DEMOLICION DE COLUMNAS m3 48.26
02.03.02.08 DEMOLICION DE ESCALERAS DE CONCRETO m3 4.08
02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 8.97
02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 26.92
02.03.02.11 DEMOLICION DE ZAPATAS m3 28.03
02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 355.32
RESUMEN DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON "D" - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


ITEM DESCRIPCION UNID. TOTAL
02.03 DESMONTAJES Y DEMOLICIONES
02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 75.71
02.03.01.04 DESMONTAJE DE PIZARRAS ACRILICAS und 12.00
02.03.01.05 DESMONTAJE DE INODOROS und 4.00
02.03.01.06 DESMONTAJE DE LAVATORIOS DE LOSA und 8.00
02.03.01.09 DESMONTAJE DE VENTANAS DE FIERRO m2 212.76
02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS
02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR 1X32W und 26.00
02.03.01.15,04 DESMONTAJE DE ARTEFACTO FLUORESCENTE C/REJILLA DE ALUMINIO C/LAMP. 3X36W und 13.00
02.03.01.15,05 DESMONTAJE DE ARTEFACTO FLUORESCENTE ADOSADO C/LAMP. 1X40W und 38.00
02.03.01.15,06 DESMONTAJE DE ARTEFACTO ADOSADO A TECHO TIPO BE 2X40W und 20.00
02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 22.00
02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 22.00
02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 4.00
02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 1602.80
02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 1235.51
02.03.02.02 DEMOLICION DE PARAPETOS m2 67.15
02.03.02.03 DEMOLICION LOSA ALIGERADA m2 1584.93
02.03.02.05 DEMOLICION DE VIGAS m3 107.52
02.03.02.06 DEMOLICION DE COLUMNAS m3 123.88
02.03.02.07 DEMOLICION DE PARAPETOS DE CONCRETO ARMADO m3 12.04
02.03.02.08 DEMOLICION DE ESCALERAS DE CONCRETO m3 13.18
02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 23.10
02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 69.30
02.03.02.11 DEMOLICION DE ZAPATAS m3 77.71
02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 970.91

RESUMEN DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON "E" - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


ITEM DESCRIPCION UNID. TOTAL
02.03 DESMONTAJES Y DEMOLICIONES
02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 25.83
02.03.01.09 DESMONTAJE DE VENTANAS DE FIERRO m2 74.46
02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS
02.03.01.15,01 DESMONTAJE DE ARTEFACTO O SOKET ADOSADO EN TECHO P/FOCO AHORRADOR und 3.00
02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR 1X32W und 6.00
02.03.01.15,04 DESMONTAJE DE ARTEFACTO FLUORESCENTE C/REJILLA DE ALUMINIO C/LAMP. 3X36W und 3.00
02.03.01.15,05 DESMONTAJE DE ARTEFACTO FLUORESCENTE ADOSADO C/LAMP. 1X40W und 8.00
02.03.01.15,06 DESMONTAJE DE ARTEFACTO ADOSADO A TECHO TIPO BE 2X40W und 6.00
02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 11.00
02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 3.00
02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 1.00
02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 99.01
02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 233.58
02.03.02.03 DEMOLICION LOSA ALIGERADA m2 55.11
02.03.02.04 DEMOLICION DE LOSA MACIZA m3 93.98
02.03.02.05 DEMOLICION DE VIGAS m3 63.12
02.03.02.06 DEMOLICION DE COLUMNAS m3 109.24
02.03.02.08 DEMOLICION DE ESCALERAS DE CONCRETO m3 2.10
02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 6.54
02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 19.62
02.03.02.11 DEMOLICION DE ZAPATAS m3 380.16
02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 349.05

RESUMEN DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON "F" - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


ITEM DESCRIPCION UNID. TOTAL
02.03 DESMONTAJES Y DEMOLICIONES
02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 69.21
02.03.01.02 DESMONTAJE DE PUERTA METALICA m2 16.07
02.03.01.03 DESMONTAJE DE MAMPARAS m2 11.13
02.03.01.05 DESMONTAJE DE INODOROS und 5.00
02.03.01.06 DESMONTAJE DE LAVATORIOS DE LOSA und 12.00
02.03.01.09 DESMONTAJE DE VENTANAS DE FIERRO m2 231.17
02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS
02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR 1X32W und 61.00
02.03.01.15,04 DESMONTAJE DE ARTEFACTO FLUORESCENTE C/REJILLA DE ALUMINIO C/LAMP. 3X36W und 17.00
02.03.01.15,05 DESMONTAJE DE ARTEFACTO FLUORESCENTE ADOSADO C/LAMP. 1X40W und 18.00
02.03.01.15,06 DESMONTAJE DE ARTEFACTO ADOSADO A TECHO TIPO BE 2X40W und 4.00
02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 16.00
02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 29.00
02.03.01.15,16 DESMONTAJE DE TABLERO GENERAL und 2.00
02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 3.00
02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 688.69
02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 887.44
02.03.02.02 DEMOLICION DE PARAPETOS m2 57.11
02.03.02.03 DEMOLICION LOSA ALIGERADA m2 1275.79
02.03.02.05 DEMOLICION DE VIGAS m3 117.55
02.03.02.06 DEMOLICION DE COLUMNAS m3 177.94
02.03.02.08 DEMOLICION DE ESCALERAS DE CONCRETO m3 3.27
02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 22.30
02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 66.90
02.03.02.11 DEMOLICION DE ZAPATAS m3 89.18
02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 750.85

RESUMEN DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON "G" - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


ITEM DESCRIPCION UNID. TOTAL
02.03 DESMONTAJES Y DEMOLICIONES
02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 90.45
02.03.01.02 DESMONTAJE DE PUERTA METALICA m2 2.90
02.03.01.04 DESMONTAJE DE PIZARRAS ACRILICAS und 12.00
02.03.01.05 DESMONTAJE DE INODOROS und 13.00
02.03.01.06 DESMONTAJE DE LAVATORIOS DE LOSA und 10.00
02.03.01.08 DESMONTAJE DE VENTANAS DE MADERA m2 2.06
02.03.01.09 DESMONTAJE DE VENTANAS DE FIERRO m2 182.29
02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS
02.03.01.15,01 DESMONTAJE DE ARTEFACTO O SOKET ADOSADO EN TECHO P/FOCO AHORRADOR und 14.00
02.03.01.15,02 DESMONTAJE DE ARTEFACTO FLUORESCENTE EN TECHO C/LAMP. FLUORESCENTE 1X22W TIPO BE und 32.00
02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR 1X32W und 7.00
02.03.01.15,04 DESMONTAJE DE ARTEFACTO FLUORESCENTE C/REJILLA DE ALUMINIO C/LAMP. 3X36W und 18.00
02.03.01.15,05 DESMONTAJE DE ARTEFACTO FLUORESCENTE ADOSADO C/LAMP. 1X40W und 1.00
02.03.01.15,06 DESMONTAJE DE ARTEFACTO ADOSADO A TECHO TIPO BE 2X40W und 31.00
02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 28.00
02.03.01.15,11 DESMONTAJE DE TOMACORRIENTE + PATA EN PISO O MURETE und 54.00
02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 21.00
02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 2.00
02.03.01.15,18 DESMONTAJE DE TABLERO ELECTROBOMBA und 1.00
02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 725.00
02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 891.41
02.03.02.02 DEMOLICION DE PARAPETOS m2 87.60
02.03.02.03 DEMOLICION LOSA ALIGERADA m2 1001.26
02.03.02.05 DEMOLICION DE VIGAS m3 73.35
02.03.02.06 DEMOLICION DE COLUMNAS m3 55.46
02.03.02.07 DEMOLICION DE PARAPETOS DE CONCRETO ARMADO m3 1.57
02.03.02.08 DEMOLICION DE ESCALERAS DE CONCRETO m3 5.34
02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 18.55
02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 55.65
02.03.02.11 DEMOLICION DE ZAPATAS m3 67.28
02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 564.63

RESUMEN DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON VESTIDORES - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


ITEM DESCRIPCION UNID. TOTAL
02.03 DESMONTAJES Y DEMOLICIONES
02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 36.98
02.03.01.05 DESMONTAJE DE INODOROS und 9.00
02.03.01.06 DESMONTAJE DE LAVATORIOS DE LOSA und 2.00
02.03.01.08 DESMONTAJE DE VENTANAS DE MADERA m2 2.18
02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS
02.03.01.15,01 DESMONTAJE DE ARTEFACTO O SOKET ADOSADO EN TECHO P/FOCO AHORRADOR und 17.00
02.03.01.15,05 DESMONTAJE DE ARTEFACTO FLUORESCENTE ADOSADO C/LAMP. 1X40W und 5.00
02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 2.00
02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 1.00
02.03.01.15,18 DESMONTAJE DE TABLERO ELECTROBOMBA und 2.00
02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 65.88
02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 231.90
02.03.02.03 DEMOLICION LOSA ALIGERADA m2 109.47
02.03.02.05 DEMOLICION DE VIGAS m3 3.57
02.03.02.06 DEMOLICION DE COLUMNAS m3 2.27
02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 4.27
02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 12.82
02.03.02.11 DEMOLICION DE ZAPATAS m3 8.19
02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 38.66

RESUMEN DE METRADOS
PROYECTO: DEMOLICIONES - PABELLON BIBLIOTECA - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA


PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


ITEM DESCRIPCION UNID. TOTAL
02.03 DESMONTAJES Y DEMOLICIONES
02.03.01 DESMONTAJES
02.03.01.01 DESMONTAJE DE PUERTAS DE MADERA m2 6.34
02.03.01.08 DESMONTAJE DE VENTANAS DE MADERA m2 63.58
02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS
02.03.01.15,02 DESMONTAJE DE ARTEFACTO FLUORESCENTE EN TECHO C/LAMP. FLUORESCENTE 1X22W TIPO BE und 1.00
02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR 1X32W und 6.00
02.03.01.15,04 DESMONTAJE DE ARTEFACTO FLUORESCENTE C/REJILLA DE ALUMINIO C/LAMP. 3X36W und 6.00
02.03.01.15,10 DESMONTAJE DE TOMACORRIENTE S/LINEA A TIERRA A=0.40M und 2.00
02.03.01.15,12 DESMONTAJE DE INTERRUPTOR UNIPOLAR und 3.00
02.03.01.15,17 DESMONTAJE DE TABLERO DE DISTRIBUCION und 1.00
02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 69.60
02.03.02 DEMOLICIONES
02.03.02.01 DEMOLICION DE MURO m2 113.09
02.03.02.03 DEMOLICION LOSA ALIGERADA m2 177.93
02.03.02.05 DEMOLICION DE VIGAS m3 17.47
02.03.02.06 DEMOLICION DE COLUMNAS m3 11.17
02.03.02.09 DEMOLICION DE SOBRECIMIENTO m3 5.62
02.03.02.10 DEMOLICION DE CIMIENTO CORRIDO m3 16.86
02.03.02.11 DEMOLICION DE ZAPATAS m3 22.34
02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 202.99

RESUMEN DE METRADOS
PROYECTO: DEMOLICIONES - PASILLO - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


ITEM DESCRIPCION UNID. TOTAL
02.03 DESMONTAJES Y DEMOLICIONES
02.03.01.15 DESMONTAJE DE INSTALACIONES ELÉCTRICAS
02.03.01.15,03 DESMONTAJE DE LAMPARA CIRCULAR ADOSADO EN TECHO C/LAMP. CIRCULAR 1X32W und 10.00
02.03.01.15,04 DESMONTAJE DE ARTEFACTO FLUORESCENTE C/REJILLA DE ALUMINIO C/LAMP. 3X36W und 1.00
02.03.01.15,15 DESMONTAJE DE CAJA DE PASO und 6.00
02.03.01.15,21 DESMONTAJE DE CONDUCTOR ELÉCTRICO m 94.21
02.03.02 DEMOLICIONES
02.03.02.02 DEMOLICION DE PARAPETOS m2 229.29
02.03.02.03 DEMOLICION LOSA ALIGERADA m2 355.24
02.03.02.05 DEMOLICION DE VIGAS m3 59.20
02.03.02.06 DEMOLICION DE COLUMNAS m3 34.56
02.03.02.11 DEMOLICION DE ZAPATAS m3 49.21
02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 454.73

RESUMEN DE METRADOS
PROYECTO: DEMOLICIONES - MODULO PREFABRICADO - PRIMARIA/SECUNDARIA

INST. EDUC.: "INSTITUCION EDUCATIVA FRANCISCO ANTONI DE ZELA"

UBICACIÓN: DISTRITO DE TACNA - PROVINCIA DE TACNA - DEPARTAMENTO DE TACNA

PROYECTISTA: ING

METRADO: ING FECHA: OCTUBRE DE 2012


ITEM DESCRIPCION UNID. TOTAL
02.03 DESMONTAJES Y DEMOLICIONES
02.03.01 DESMONTAJES
02.03.01.11 DESMONTAJE DE MODULOS PREFABRICADOS m2 156.18
02.03.01.12 DESMONTAJE DE COBERTURA LIVIANA MODULOS PREFABRICADOS m2 95.56
02.03.02 DEMOLICIONES
02.03.02.12 DEMOLICION DE PISOS DE CONCRETO C/MARTILLO m2 270.93
PLANILLA DE METRADOS
PROTECTO :"HABILITACION Y MONTAJE DE AULAS PREFABRICADAS EN INSTITUCIONES EDUCATIVAS REGION -TACNA"
UBICACIÓN : DISTRITO, PROVINCIA, REGION TACNA
FECHA : MAYO 2015
EJECUCION : GOBIERNO REGIONAL DE TACNA

ITEM MEDIDAS
DESCRIPCION UND TOTAL
Nº DE VECES LARGO ANCHO ALTURA PARCIAL

1.00 OBRAS PROVISIONALES


1.01 OFICINAS M2 25.00
1.00 AREA= 25.00 25.00
1.02 ALMACEN M2 25.00
1.00 AREA= 25.00 25.00

2.00 OBRAS PRELIMINARES


2.01 TRAZO Y REPLANTEO PRELIMINAR M2 484.75
7.00 AREA= 69.25 484.75
TABUL 7/10/2015 1.00 7.40 9.36 69.25 484.75
PRADERA 7/11/2015 1.00 7.40 9.36 69.25
RIO SECO 1 7/14/2015 1.00 7.40 9.36 69.25
RIO SECO 2 7/16/2015 1.00 7.40 9.36 69.25
28 DE OCTUBRE 1/17/1900 1.00 7.40 9.36 69.25
NUEVO COPARE 1 7/20/2015 1.00 7.40 9.36 69.25
NUEVO COPARE 2 7/22/2015 1.00 7.40 9.36 69.25

3.00 SEGURIDAD Y SALUD


3.01 EQUIPO DE PROTECCION PERSONAL UND 16.00
16.00 16.00
EPPs: LENTES, CASCO, GUANTES, CHALECO y ZAPATOS 7/13/2015 6.00 6.00 16.00
EPPs: LENTES, CASCO, GUANTES, CHALECO y ZAPATOS 7/24/2015 5.00 5.00
EPPs: LENTES, CASCO, GUANTES, CHALECO y ZAPATOS 8/8/2015 5.00 5.00

3.02 EQUIPO DE PROTECCION COLECTIVA UND 2.00


2.00 2.00
SEÑALIZACION DENTRO DE PLANTA - ALMACEN DE OBRA 7/13/2015 1.00 1.00 2.00
TABUL - SEÑALES COLECTIVAS 7/30/2015 0.14 0.14
RIO SECO - SEÑALES COLECTIVAS 8/8/2015 0.29 0.29
PRADERA - SEÑALES COLECTIVAS 8/21/2015 0.14 0.14
28 DE OCTUBRE - SEÑALES COLECTIVAS 8/24/2015 0.14 0.14
N. COPARE 1 - SEÑALES COLECTIVAS 9/1/2015 0.14 0.14
N. COPARE 2 - SEÑALES COLECTIVAS 0.14 0.14

3.03 SEÑALIZACION TEMPORAL DE SEGURIDAD UND 2.00


2.00 2.00
TABUL - SEÑALIZACION PARA CARGA Y DESCARGA 1 7/30/2015 0.29 0.29 2.00
TABUL - SEÑALIZACION PARA CARGA Y DESCARGA 2 8/4/2015 0.07 0.07
RIO SECO - SEÑALIZACION PARA CARGA Y DESCARGA 1 8/11/2015 0.21 0.21
RIO SECO - SEÑALIZACION PARA CARGA Y DESCARGA 2 8/12/2015 0.29 0.29
PRADERA - SEÑALIZACION PARA CARGA Y DESCARGA 8/20/2015 0.29 0.29
28 DE OCTUBRE - SEÑALIZACION PARA CARGA Y DESCARGA 8/21/2015 0.29 0.29
N. COPARE - SEÑALIZACION PARA CARGA Y DESCARGA 1 8/27/2015 0.29 0.29
N. COPARE - SEÑALIZACION PARA CARGA Y DESCARGA 2 8/31/2015 0.29 0.29

3.04 RECURSO PARA RESPUESTA ANTE EMERGENCIA EN S. Y S. DURANTE EL TRABAJO UND 2.00
2.00 2.00
VALORIZACION DIARIA HASTA TERMINAR EJECUCION 41.00 0.049 2.00

4.00 HABILITACION Y MONTAJE PARA MODULOS PREFABRICADOS : 07 UNIDADES

4.01 OBRAS PRELIMINARES


04.01.01 MOVILIZACION Y DESMOVILIZACION DE MATERIALES Y EQUIPOS UND 7.00
7.00 7.00
MOVILIZACION HACIA TABUL - 1 7/30/2015 1.00 0.40 0.40 7.00
MOVILIZACION HACIA TABUL - 2 8/4/2015 1.00 0.40 0.40
MOVILIZACION HACIA TABUL - 3 8/6/2015 1.00 0.10 0.10
MOVILIZACION HACIA TABUL - 4 8/7/2015 1.00 0.10 0.10 1.00
MOVILIZACION HACIA RIO SECO - 1 8/11/2015 2.00 0.10 0.20
MOVILIZACION HACIA RIO SECO - 2 8/11/2015 2.00 0.35 0.70
MOVILIZACION HACIA RIO SECO - 3 8/12/2015 2.00 0.35 0.70
MOVILIZACION HACIA RIO SECO - 4 8/14/2015 2.00 0.10 0.20
MOVILIZACION HACIA RIO SECO - 5 8/17/2015 2.00 0.10 0.20 2.00
MOVILIZACION HACIA PRADERA - 1 8/20/2015 1.00 0.60 0.60
MOVILIZACION HACIA PRADERA - 2 8/21/2015 1.00 0.20 0.20
MOVILIZACION HACIA 28 OCTUBRE - 1 8/21/2015 1.00 0.50 0.50
MOVILIZACION HACIA PRADERA - 3 8/22/2015 1.00 0.10 0.10
MOVILIZACION HACIA PRADERA - 4 8/24/2015 1.00 0.10 0.10 1.50
MOVILIZACION HACIA 28 OCTUBRE - 2 8/25/2015 1.00 0.30 0.30
MOVILIZACION HACIA 28 OCTUBRE - 3 8/26/2015 1.00 0.20 0.20 0.50
MOVILIZACION HACIA N. COPARE - 1 8/27/2015 2.00 0.40 0.80
MOVILIZACION HACIA N. COPARE - 2 8/31/2015 2.00 0.40 0.80
MOVILIZACION HACIA N. COPARE - 3 9/2/2015 2.00 0.05 0.10
MOVILIZACION HACIA N. COPARE - 4 9/3/2015 2.00 0.03 0.05
MOVILIZACION HACIA N. COPARE - 5 9/4/2015 2.00 0.05 0.10
MOVILIZACION HACIA N. COPARE - 6 9/5/2015 2.00 0.03 0.05
MOVILIZACION HACIA N. COPARE - 7 2.00 0.05 0.10 2.00
4.02 ESTRUCTURAS
04.02.01 MOVIMIENTO DE TIERRAS
04.02.01.01 CORTE Y PERFILADO DE TERRENO -- MANUAL M3 (7.40x9.36) 12 DIAS 193.90
7.00 AREA= 69.25 0.40 193.90 16.16
TABUL 7/10/2015 1.00 7.40 9.36 0.25 17.32 193.91
TABUL 7/11/2015 1.00 7.40 9.36 0.15 10.39
PRADERA 7/11/2015 1.00 7.40 9.36 0.10 6.93
PRADERA 7/13/2015 1.00 7.40 9.36 0.20 13.85
PRADERA 7/14/2015 1.00 7.40 9.36 0.10 6.93
RIO SECO 7/14/2015 1.00 7.40 9.36 0.15 10.39
RIO SECO 7/15/2015 1.00 7.40 9.36 0.23 15.93
RIO SECO 7/16/2015 1.00 7.40 9.36 0.27 18.70
RIO SECO 7/17/2015 1.00 7.40 9.36 0.15 10.39
28 DE OCTUBRE 7/18/2015 1.00 7.40 9.36 0.25 17.32
28 DE OCTUBRE 7/20/2015 1.00 7.40 9.36 0.15 10.39
NUEVO COPARE 7/20/2015 1.00 7.40 9.36 0.10 6.93
NUEVO COPARE 7/21/2015 1.00 7.40 9.36 0.20 13.85
NUEVO COPARE 7/22/2015 1.00 7.40 9.35 0.25 17.30
NUEVO COPARE 7/23/2015 1.00 7.40 9.35 0.25 17.30

04.02.01.02 NIVELACION DE TERRENO Y COMPACTADO C/0.40 MT M2 484.75


7.00 AREA= 69.25 484.75
TABUL 7/24/2015 1.00 7.40 9.36 69.25 484.75
RIO SECO - AULAS 1 y 2 7/31/2015 2.00 7.40 9.36 138.50
PRADERA 8/20/2015 1.00 7.40 9.36 69.25
28 DE OCTUBRE 8/26/2015 1.00 7.40 9.36 69.25
NUEVO COPARE 1 8/31/2015 1.00 7.40 9.36 69.25
NUEVO COPARE 2 9/1/2015 1.00 7.40 9.36 69.25

04.02.01.03 EXCAVACION MANUAL PARA DADOS M3 3.58


TABUL - Dado 1A 7/24/2015 8.00 0.50 0.50 0.15 0.30 3.58
TABUL - Dado 1B 7/24/2015 2.00 0.50 0.50 0.15 0.08
TABUL - Dado 2 7/24/2015 2.00 0.60 0.60 0.13 0.09
TABUL - Dado 3 7/24/2015 2.00 0.30 0.30 0.13 0.02
TABUL - Dado 4 7/24/2015 2.00 0.30 0.30 0.11 0.02 0.51
RIO SECO - AULA 1 7/31/2015 DADOS DE 01 AULA PREFABRICADA = 0.51
RIO SECO - AULA 2 8/1/2015 DADOS DE 01 AULA PREFABRICADA = 0.51 1.02
PRADERA - DADOS 1A,1B,2,3,4 8/21/2015 DADOS DE 01 AULA PREFABRICADA = 0.51 0.51
28 DE OCTUBRE - DADOS 1A,1B,2,3,4 8/27/2015 DADOS DE 01 AULA PREFABRICADA = 0.51 0.51
NUEVO COPARE - AULA 1 9/1/2015 DADOS DE 01 AULA PREFABRICADA = 0.51
NUEVO COPARE - AULA 2 9/2/2015 DADOS DE 01 AULA PREFABRICADA = 0.51 1.02

04.02.01.04 ACARREO DE MATERIAL EXCEDENTE HASTA 50 M F.E 4.48


De EXCAVACION MANUAL DE DADOS 1.00 3.58 1.25 4.48
DE TABUL 7/25/2015 1.00 0.51 1.25 0.64 4.48
RIO SECO - AULA 1 1/30/1900 1.00 0.51 1.25 0.64
RIO SECO - AULA 2 8/1/2015 1.00 0.51 1.25 0.64
DE PRADERA 8/21/2015 1.00 0.51 1.25 0.64
DE 28 DE OCTUBRE 8/27/2015 1.00 0.51 1.25 0.64
DE NUEVO COPARE 9/2/2015 2.00 0.51 1.25 1.28

04.02.01.05 ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO D=5KM. M3 F.E 4.48


De EXCAVACION MANUAL DE DADOS 1.00 3.58 1.25 4.48
DE TABUL 7/25/2015 1.00 0.51 1.25 0.64 4.48
RIO SECO - AULA 1 1/30/1900 1.00 0.51 1.25 0.64
RIO SECO - AULA 2 8/1/2015 1.00 0.51 1.25 0.64
DE PRADERA 8/21/2015 1.00 0.51 1.25 0.64
DE 28 DE OCTUBRE 8/27/2015 1.00 0.51 1.25 0.64
DE NUEVO COPARE 9/2/2015 2.00 0.51 1.25 1.28

04.02.01.06 COLOCACION DE DADOS DE CONCRETO UND 112.00


7.00 16.00 112.00
TABUL (USO DE PLANCHA COMPACTADORA) 7/27/2015 1.00 16.00 16.00 96.00
RIO SECO - AULA 1 (PLANCHA COMPACTADORA) 8/1/2015 1.00 16.00 16.00
RIO SECO - AULA 2 (PLANCHA COMPACTADORA) 8/3/2015 1.00 16.00 16.00
PRADERA (PLANCHA COMPACTADORA) 8/22/2015 1.00 16.00 16.00
28 DE OCTUBRE (PLANCHA COMPACTADORA) 8/28/2015 1.00 16.00 16.00
NUEVO COPARE - AULA 1 (PLANCHA COMPACTADORA) 9/2/2015 1.00 16.00 16.00
NUEVO COPARE - AULA 3 (PLANCHA COMPACTADORA) 9/3/2015 1.00 16.00 16.00

04.02.02 MONTAJE
04.02.02.01 MONTAJE DE MODULOS PREFABRICADOS COMPLETO UND 7.00
7.00 7.00 7.000
ARMADO DE TIJERALES - 4 und 7/10/2015 1.00 0.016
ARMADO DE TIJERALES - 4 und 7/11/2015 1.00 0.016
ARMADO DE TIJERALES - 4 und 7/13/2015 1.00 0.016
ARMADO DE TIJERALES - 4 und 7/14/2015 1.00 0.016
ARMADO DE TIJERALES - 4 und 7/15/2015 1.00 0.016
ARMADO DE TIJERALES - 4 und 7/16/2015 1.00 0.016
ARMADO DE TIJERALES - 4 und 7/17/2015 1.00 0.016
ARMADO DE COLUMNAS - 8 und 7/18/2015 1.00 0.015
ARMADO DE COLUMNAS - 8 und 7/20/2015 1.00 0.015
ARMADO DE COLUMNAS - 8 und 7/21/2015 1.00 0.015
ARMADO DE COLUMNAS - 8 und 7/22/2015 1.00 0.015
ARMADO DE COLUMNAS - 8 und 7/23/2015 1.00 0.015
ARMADO DE COLUMNAS - 8 und 7/24/2015 1.00 0.015
ARMADO DE COLUMNAS - 8 und 7/25/2015 1.00 0.015 0.217
TABUL - PLATAFORMA, TEMPLADORES, RAMPA 7/30/2015 1.00 0.012 0.012
TABUL - BORDES, ZOCALO 7/31/2015 1.00 0.007 0.007
TABUL - TRIPLAY 8/1/2015 1.00 0.007 0.007
TABUL - COLUMNAS, VIGAS 8/3/2015 1.00 0.007 0.007
TABUL - TIJERALES 8/4/2015 1.00 0.007 0.007
TABUL - REFUERZOS, CORREA 8/5/2015 1.00 0.007 0.007
TABUL - ARRIOSTRE 8/6/2015 1.00 0.007 0.007
TABUL - MUROS, PUERTA, VENTANAS 8/7/2015 1.00 0.014 0.014
REGULARIZAR METRADO NO VALORIZADO DE TIJERALES Y COLUMNAS 8/8/2015 6.00 0.217 1.302
TABUL - TECHO, CANALETA, BAJADA LLUV, CERRAMIENTO, C.E. 8/8/2015 1.00 0.200 0.200
TABUL - TECHO, CANALETA, BAJADA LLUV, CERRAMIENTO, C.E. 8/10/2015 1.00 0.200 0.200
TABUL - TECHO, CANALETA, BAJADA LLUV, CERRAMIENTO, C.E. 8/11/2015 1.00 0.200 0.200
TABUL - ELECTRICAS, PIZARRA 8/12/2015 1.00 0.114 0.114 2.085
RIO SECO - PASO 2 8/13/2015 2.00 0.083 0.166
RIO SECO - PASO 3 8/14/2015 2.00 0.100 0.200
RIO SECO - PASO 4 8/15/2015 2.00 0.050 0.100
RIO SECO - PASO 5 8/17/2015 2.00 0.075 0.150
RIO SECO - PASO 5 8/18/2015 2.00 0.075 0.150
RIO SECO - PASO 6 8/19/2015 2.00 0.100 0.200
RIO SECO - PASO 7 8/20/2015 2.00 0.063 0.125
RIO SECO - PASO 7 8/21/2015 2.00 0.063 0.125
RIO SECO - PASO 7 8/22/2015 2.00 0.063 0.125
RIO SECO - PASO 7 8/24/2015 2.00 0.063 0.125
RIO SECO - PASO 8 8/25/2015 2.00 0.050 0.100 1.566
PRADERA - PASO 2 8/26/2015 1.00 0.083 0.083
PRADERA - PASO 3 Y 4 8/27/2015 1.00 0.150 0.150
PRADERA - PASO 5 8/28/2015 1.00 0.150 0.150
PRADERA - PASO 6 8/29/2015 1.00 0.100 0.100
PRADERA - PASO 7 8/31/2015 1.00 0.200 0.200
PRADERA - PASO 7 Y 8 9/1/2015 1.00 0.100 0.100 0.783
28 DE OCTUBRE - PASO 2 9/2/2015 1.00 0.042 0.042
28 DE OCTUBRE - PASO 2 9/3/2015 1.00 0.042 0.042 0.083
NUEVO COPARE 1 - PASO 2 9/4/2015 1.00 0.083 0.083
NUEVO COPARE 1 - PASO 3 Y 4 9/5/2015 1.00 0.150 0.150
NUEVO COPARE 1 - PASO 5 9/7/2015 1.00 0.150 0.150
NUEVO COPARE 1 - PASO 6 9/8/2015 1.00 0.100 0.100
NUEVO COPARE 1 - PASO 7 9/9/2015 1.00 0.200 0.200
NUEVO COPARE 1 - PASO 7 Y 8 9/10/2015 1.00 0.100 0.100 0.783
28 DE OCTUBRE - PASO 3 Y 4 9/11/2015 1.00 0.150 0.150
28 DE OCTUBRE - PASO 5 9/12/2015 1.00 0.150 0.150
28 DE OCTUBRE - PASO 6 9/14/2015 1.00 0.100 0.100
29 DE OCTUBRE - PASO 7 9/15/2015 1.00 0.200 0.200
28 DE OCTUBRE - PASO 7 Y 8 9/16/2015 1.00 0.100 0.100 0.700
NUEVO COPARE 2 - PASO 2 9/17/2015 1.00 0.083 0.083
NUEVO COPARE 2 - PASO 3 Y 4 9/18/2015 1.00 0.150 0.150
NUEVO COPARE 2 - PASO 5 9/19/2015 1.00 0.150 0.150
NUEVO COPARE 2 - PASO 6 9/21/2015 1.00 0.100 0.100
NUEVO COPARE 2 - PASO 7 9/22/2015 1.00 0.200 0.200
NUEVO COPARE 2 - PASO 7 Y 8 9/23/2015 1.00 0.100 0.100 0.783
9/24/2015 1.00
9/25/2015

04.02.03 OBRAS COMPLEMENTARIAS


04.02.03.01 LIMPIEZA GENERAL DE OBRA M2 484.75
7.00 AREA= 69.25 484.75
TABUL 9/21/2015 1.00 69.25 69.25 484.75
RIO SECO 9/22/2015 2.00 69.25 138.50
PRADERA 9/23/2015 1.00 69.25 69.25
28 DE OCTUBRE 9/24/2015 1.00 69.25 69.25
NUEVO COPARE 9/25/2015 2.00 69.25 138.50

04.02.03.02 ACOMETIDA ELECTRICA ML 175.00


7.00 25.00 175.00
TABUL 1.00 25.000 25.00 175.00
RIO SECO 2.00 25.000 50.00
PRADERA 1.00 25.000 25.00
28 DE OCTUBRE 1.00 25.000 25.00
NUEVO COPARE 2.00 25.000 50.00

04.02.03.03 TRABAJO NO PREVISTOS GLB 1.00


1.00 NºAulas 1.00
ACARREO Y ELIMINACION MANUAL DEL CORTE DE TERRENO 7/14/2015 2.00 0.143 2.00 0.571 2.000
ACARREO Y ELIMINACION MANUAL DEL CORTE DE TERRENO 7/17/2015 2.00 0.143 2.00 0.571
ACARREO Y ELIMINACION MANUAL DEL CORTE DE TERRENO 7/21/2015 2.00 0.143 1.00 0.286
ACARREO Y ELIMINACION MANUAL DEL CORTE DE TERRENO 7/24/2015 2.00 0.143 2.00 0.571
7.00

5.00 MONTAJE PARCIAL DE MODULOS PREFABRICADOS : 13 UNIDADES

5.01 MONTAJE
05.01.01 MONTAJE PARCIAL DE MODULOS PREFABRICADOS UND 13.00
13.00 13.00
CONSORCIO INDICE DE CONTENIDOS
CHAPI FOLIO
CAPITULO 01: VALORIZACION N° 01 - DICIEMBRE 2022
1.1 Ficha técnica

1.2 Hoja de resumen de liquidación de pago de valorización

1.3 Resumen de Metrados mensual ejecutado

1.4 Planilla de metrados ejecutados durante el periodo valorizado

1.5 Valorización mensual

1.6 Curva S de Valorización

CAPITULO 2: ANEXOS

2.1 Adendas y/o resoluciones

2.2 Cartas fianzas vigente


2.3 Cronograma valorizado reprogramado

2.4 Informe mensual de Seguridad y Salud Ocupacional

2.5 Copias de pruebas - Control de calidad y protocolos realizados

2.6 Copia de Cuaderno de Obra

2.7 Panel Fotográfico


MDVY
MUNICIPALIDAD DISTRITAL DE TIABAYA
FICHA TÉCNICA
DE LA FICHA TECNICA

NOMBRE DEL PROYECTO


“MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO
DE TIABAYA – PROVINCIA DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”

RESIENTE DEL PROYECTO ING. GERSON AUGUSTO MANRIQUE JAEGER


CODIGO SNIP
RESOLUCION DE APROBACION DEL
EXPEDIENTE TECNICO RESOLUCION DE GERENCIA MUNICIPAL N°259-2022-GM-MDT
UBICACIÓN
DISTRITO TIABAYA SECTOR CANALES LA VALENCIA Y LA GALDOS
UBICACIÓN PROVINCIA AREQUIPA
REGIÓN AREQUIPA
DEPARTAMENTO AREQUIPA
DEL CONTRATO
OBJETO DEL CONTRATO
El objetivo central es el incremento de los niveles de productividad de los cultivos de los sectores La Valencia y La Galdos del distrito de Tiabaya

PROCESO DE SELECCIÓN Adjudicacion Simplificada N°012-2022-MDVY - 1


TIPO Y Nº DE CONTRATO CONTRATO N°020-2022-MDT MODALIDAD PRECIOS UNITARIOS
FECHA DE CONTRATO
VALOR REFERENCIAL S/. 609,266.07 PRECIOS AL MES
FACTOR DE RELACIÓN 1.00000 AGOSTO - 2022
MONTO CONTRATADO S/. 548,339.47 DE
DEL CONTRATANTE
CLIENTE MUNICIPALIDAD DISTRITAL DE TIABAYA
RUC Nº 20171312222
DOMICILIO LEGAL CALLE PARDO N°301 - TIABAYA
REPRESENTANTE LEGAL PACHECO FIGUEROA CHRISTOPHER DAVID
CARGO GERENTE DE ADMINISTRACION FINANCIERA
DNI REPRESENTANTE LEGAL N° 44734946
DEL CONTRATISTA
EMPRESA CONSORCIO CHAPI
DOMICILIO LEGAL AV. LAS CONVENCIONES A-08 JOSE LUIS BUSTAMANTE Y RIVERO
REPRESENTANTE LEGAL CAROLAY FIORELLA PONCE SUBIA
DNI REPRESENTANTE LEGAL N° 73006947
DEL RESIDENTE
RESIDENTE DE OBRA GERSON MANRIQUE JAEGER
CIP 224907
DE LA SUPERVISIÓN
SUPERVISOR / INSPECTOR ING. JUAN GUILLERNO SOTO MUÑOZ
CIP 85180
DE LAS CARTAS FIANZA
FIEL CUMPLIMIENTO NO APLICA MONTO S/. VIGENCIA
ADELANTO DIRECTO NO APLICA MONTO S/. VIGENCIA
DE LOS ADICIONALES
DEDUCTIVO N° 01 DE OBRA S/. NO APLICA MOTIVO
ADICIONAL N° 01 DE OBRA S/. NO APLICA MOTIVO
AMPLIACIÓN DE PLAZO Nº 01 DIAS NO APLICA MOTIVO
RESOLUCIÓN DE APROBACIÓN Nº Fecha:
DE LAS VALORIZACIONES

CONCEPTO Val. del Periodo Reajustes Deducciones Val. Bruta Amortización Val. Neta I.G.V. 18% Retención Pago efectivo
(10%)
VALORIZACION Nº 01 16,038.09 0.00 0.00 16,038.09 0.00 16,038.09 2,886.86 54,833.95 -38,795.86
VALORIZACION Nº 02
TOTAL 16,038.09 0.00 0.00 16,038.09 0.00 16,038.09 2,886.86 -38,795.86
DEL PLAZO CONTRACTUAL
ENTREGA DE LA FICHA TECNICA AL
27-Dec-22 CARTA GERENCIAL N° 1121-2022-GIDUR-MDT
CONTRATISTA
ACREDITACIÓN DEL SUPERVISOR 27-Dec-22 CARTA GERENCIAL N° 1121-2022-GIDUR-MDT
ENTREGA DE TERRENO 29-Dec-22 ACTA ACTA DE ENTREGA DE TERRENO
ENTREGA ADELANTO DIRECTO NO APLICA
ENTREGA ADELANTO MATERIALES NO APLICA
INICIO DE EJECUCION 30-Dec-22 ACTA DE INICIO DE EJECUCION
PLAZO DE EJECUCIÓN DE OBRA 75 DÍAS CALENDARIO
AMPLI. PLAZO PARCIAL Nº 01 0 DÍAS CALENDARIO
PLAZO TOTAL 75 DÍAS CALENDARIO
FECHA PREVISTA DE TÉRMINO 14-Mar-23
FECHA REAL DE TÉRMINO
RECEPCIÓN DE OBRA
OBSERVACIÓN
AREQUIPA, Jan-23
CONTROL DE AMORTIZACIONES Y RETENCIONES DE VALORIZACION
“MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA – PROVINCIA DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”

FINANCIAMIENTO: MUNICIPALIDAD DISTRITAL DE TIABAYA MONTO TOTAL CONTRATADO: 548,339.47


EJECUTA: CONSORCIO CHAPI FECHA DE INICIO DE OBRA: 12/30/2022
RESIDENTE: ING. GERSON MANRIQUE JAEGER FECHA DE TERMINO DE OBRA: 3/14/2023
SUPERVISOR:ING. JUAN SOTO MUÑOZ
UBICACIÓN: TIABAYA -AREQUIPA

RETENCION POR GARANTIA DE FIEL


MONTO TOTAL DE VALORIZACIÓN A

VALORIZACION DEL MES (S/.) S/IGV

DEDUCCION DE REAJUSTE QUE NO

DEDUCCION DE REAJUSTE QUE NO

VALORIZACION EFECTIVA TOTAL A


AMORTIZACION DEL ADELANTO DE

VALORIZACION EFECTIVA TOTAL


CORRESPONDE DEL ADELANTO

CORRESPONDE DEL ADELANTO

AMORTIZACION DEL ADELANTO


PERIODO DE VALORIZACION

VALORIZACION DEL MES (%)

CUMPLIMIENTO (10% DEL

MATERIALES (20 %)
PARA MATERIALES
COSTO DIRECTO

SUB TOTAL (S/.)


DIRECTO (10 %)
VALORIZACION

REAJUSTES

DEPOSITAR
CONTRATO

I.G.V. (18%)
FACTURAR

DIRECTO
ITEM

1 Nº 01 Jan-23 S/ 19,492.69 S/ 13,726.32 S/ 16,038.09 2.92% 481.14 S/ 1,949.27 0 0 0 0 16,519.23 2,973.46 19,492.69 17,543.43
TOTAL (S/.) S/ 16,038.09 2.92% 481.14 S/ 1,949.27 0 0 0 0 16,519.23 2,973.46 19,492.69 17,543.43
CONTROL DE PAGOS
VALORIZACION N°01 - MAYORES METRADOS
Jan-23
OBRA “MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA – PROVINCIA DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”
ENTIDAD MUNICIPALIDAD DISTRITAL DE TIABAYA
PERIODO 30 DE DICIEMBRE 2022 @ 31 DE DICIEMBRE 2022
CONTRATISTA CONSORCIO CHAPI
SUPERVISOR ING. JUAN GUILLERMO SOTO MUÑOZ LOCALIDAD CANAL LA GALDOS Y LA VALENCIA
PPTO.CONTRATAS/.548,339.47 DISTRITO TIABAYA
PLAZO EJECUCI 75 DIAS CALENDARIO PROVINCIA AREQUIPA
PPTO. BASE S/.548,339.47 DEPARTAMENTO AREQUIPA

PRESUPUESTO ANTERIOR ACTUAL ACUMULADO SALDO


ITEM PARTIDA
REFERENCIAL MONTO S/. % MONTO S/. % MONTO S/. % MONTO S/. %

“MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA


01
PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA 13,726.32 0.00 0.00% 13,726.32 100.00% 13,726.32 100.00% 0.00 0.00%
GALDOS, EN EL DISTRITO DE TIABAYA – PROVINCIA DE
AREQUIPA – DEPARTAMENTO DE AREQUIPA”

COSTO DIRECTO 13,726.32 0.00 13,726.32 13,726.32 -


GASTOS GENERALES 10.84% 1,488.18 0.00 1,488.18 1,488.18 0.00
UTILIDAD 6.00% 823.58 0.00 823.58 823.58 0.00
SUB TOTAL 16,038.09 0.00 0.00% 16,038.09 100.00% 16,038.09 100.00% 0.00 0.00%

SUB TOTAL CORREGIDO (VALOR. BRUTA) 1.00 16,038.09 0.00 16,038.09 16,038.09 0.00

IGV 18% 18.00% 2,886.86 0.00 2,886.86 2,886.86 0.00

TOTAL PRESUPUESTO DE EJECUCION DE OBRA 18,924.95 0.00 18,924.94 18,924.94 0.00


CONSORCIO
CHAPI CUADRO DE LIQUIDACION MENSUAL Y ACUMULADO

OBRA:
“MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA –
PROVINCIA DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”

MES ENERO DEL 2023


ENTIDAD MUNICIPALIDAD DISTRITAL DE TIABAYA
PRESUPUESTO CONTRACTUAL: 548,339.47

VALORIZACION
DESCRIPCIÓN ANTERIOR ACUMULADO
ACTUAL (S/.)
ACUMULADO(S/.) (S/.)

VALORIZACIÓN (V) 0.00 16,038.09 16,038.09

REAJUSTES (R) 0.00 481.14 481.14

DEDUCCIONES (D)
POR ADELANTO EN EFECTIVO 0.00 0.00 0.00
POR ADELANTO PARA MATERIALES 0.00 0.00 0.00

TOTAL DEDUCCIONES 0.00 0.00 0.00

VALORIZACIÓN BRUTA (VB = V + R - D) 0.00 16,519.23 16,519.23

AMORTIZACIONES (A)
AMORTIZACION DEL ADELANTO EN EFECTIVO 0.00 0.00 0.00
AMORTIZACION DEL ADELANTO PARA MATERIALES 0.00 0.00 0.00
AMORTIZACIONES (APC)
AMORTIZACION DEL ADELANTO EN EFECTIVO PLAN COV-19 0.00 0.00 0.00
AMORTIZACION DEL ADELANTO PARA MATERIALES PLAN COV-19 0.00 0.00 0.00

TOTAL AMORTIZACIONES (A) 0.00 0.00 0.00

VALORIZACIÓN NETA (VN = VB - A) 0.00 16,519.23 16,519.23

MONTO TOTAL CON I.G.V. (18.00%) 0.00 2,973.46 2,973.46

MONTO A FACTURAR POR EL CONTRATISTA 0.00 19,492.69 19,492.69

MONTO TOTAL A PAGAR AL CONTRATISTA S/. 19,492.69

SON: Veintitres mil novescientos dos con 48/100 soles


CONSORCIO
CHAPI CALCULO DE REAJUSTE
“MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS,
EN EL DISTRITO DE TIABAYA – PROVINCIA DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”

MES ENERO DEL 2023


ENTIDAD MUNICIPALIDAD DISTRITAL DE TIABAYA
FECHA DEL PRESUPUESTO BASE : AGOSTO DEL 2022
AREA GEOGRAFICA :4
UBICACIÓN TIABAYA
PRESUPUESTO CONTRATADO S/ 548,339.47

COEFICIENTE DE
TOTAL VALORIZADO REINTEGRO
DESCRIPCION REAJUSTES
S/. (K) R=V*(K-1)
ESTRUCTURAS 16038.09 1.03000 481.14
TOTALES 481.14
CONSORCIO
CHAPI CALCULO DE COEFICIENTE DE REAJUSTE
MES ENERO DEL 2023
ENTIDAD MUNICIPALIDAD DISTRITAL DE TIABAYA
“MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE
OBRA
TIABAYA – PROVINCIA DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”
FECHA DEL
: AGOSTO DEL 2022
PRESUPUESTO BASE
AREA GEOGRAFICA :4
UBICACIÓN TIABAYA
PRESUPUESTO S/ 548,339.47
CONTRATADO

CALCULO DE VALOR DE REAJUSTE "K"


FORMULA POLINÓMICA Nro 01 - ESTRUCTURAS

K = 0.053*(ACr / ACo) + 0,057*(AGr / AGo) + 0.063*(CrE / CEo) + 0.435*(IGr / IGo) + 0.059*(MAr/ Mao)+0.265*(MOr/ MOo)+0.068*(MQr/ MQo)

SIMBOLO COEF INCID INDICE BASE Dec-22


IU DESCRIPCIÓN
% ( AGOS- 2022) IU K
03 ACERO DE CONSTRUCCION CORRUGADO AC 0.053 100% 898.31 890.03 0.053
05 AGREGADO GRUESO AG 0.057 100% 623.17 625.31 0.057
21 CEMENTO PORTLAND TIPO I CE 0.063 100% 502.67 502.67 0.063
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR IG 0.435 100% 530.50 542.16 0.445
43 MADERA NACIONAL PARA ENCOFRADOS MA 0.059 100% 863.76 861.74 0.059
47 MANO DE OBRA INC LEYES SOCIALES MO 0.265 100% 650.44 702.10 0.286
48 MAQUINARIA Y EQUIPO NACIONAL MQ 0.068 100% 408.65 407.45 0.068
1.00 1.030

k= 1.030
CONSORCIO
CHAPI
RESUMEN DE AVANCE DE OBRA ACUMULADO
MES ENERO DEL 2023
ENTIDAD MUNICIPALIDAD DISTRITAL DE TIABAYA

“MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA – PROVINCIA DE AREQUIPA – DEPARTAMENTO DE
OBRA
AREQUIPA”

TIEMPO DE EJECUCION 75 DIAS CALENDARIO


FECHA DE INICIO DE OBRA 12/30/2022
FECHA DE TERMINO PROGRAMADO 3/14/2023

AVANCE ACTUAL ACUMULADO ACTUAL SALDO

P.U.
Descripción METRADO (S/.) Parcial (S/.)
(S/.) Metrado Valorizacion % Metrado Valorizacion % Metrado Valorizacion %

COSTO DIRECTO (S/.) (A) S/. 13,726.32 S/. 13,726.32 S/. 13,726.32 S/. 0.00
GASTOS GENERALES 10.84% 1,488.18 10.84% 1,488.18 10.84% 1,488.18 10.84% 0.00
UTILIDAD 6.00% 823.58 6.00% 823.58 6.00% 823.58 6.00% 0.00
SUBTOTAL S/. 16,038.09 S/. 16,038.09 S/. 16,038.09 S/. 0.00
IGV (18%) S/. 2,886.86 S/. 2,886.86 S/. 2,886.86 S/. 0.00
TOTAL EJECUTADO S/. 18,924.95 S/. 18,924.95 S/. 18,924.95 S/. 0.00
PORCENTAJE DE AVANCE 100.00% 100.00% 0.00%
CONSORCIO
CHAPI VALORIZACION FISICA MAYORES METRADOS Nro 01 - Enero del 2023
ESTRUCTURAS
PROYECTO “MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA – PROVINCIA DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”

ENTIDAD. MUNICIPALIDAD DISTRITAL DE TIABAYA


CONTRATISTA CONSORCIO CHAPI
SUPERVISIÓN ING. JUAN GUILLERMO SOTO MUÑOZ
LUGAR AREQUIPA
METRADO P.U. ANTERIOR AVANCE ACTUAL ACUMULADO ACTUAL SALDO
Item Descripción UND Parcial (S/.)
(S/.) (S/.) Metrado Valorizacion % Metrado Valorizacion % Metrado Valorizacion % Metrado Valorizacion %
05 CANAL LA GALDOS 6,621.79 - 0.00% - 6,621.79 100.00% - 6,621.79 100.00% - - 0.00%
05.01 MOVIMIENTO DE TIERRAS EN CANAL 1,398.23 - 0.00% - 1,398.23 100.00% - 1,398.23 100.00% - - 0.00%
05.01.01 TRAZO Y REPLANTEO C/TOPOGRAFO M2 24.00 3.36 80.64 - 0.00% 24.00 80.64 100.00% 24.00 80.64 100.00% - - 0.00%
05.01.02 EXCAVACION EN TERRENO NORMAL PARA CAJA DE CANAL m3 7.18 40.71 292.30 - 0.00% 7.18 292.30 100.00% 7.18 292.30 100.00% - - 0.00%
05.01.03 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 13.91 21.39 297.50 - 0.00% 13.91 297.50 100.00% 13.91 297.50 100.00% - - 0.00%
05.01.04 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL M2 24.00 5.65 135.60 - 0.00% 24.00 135.60 100.00% 24.00 135.60 100.00% - - 0.00%
05.01.05 RELLENO CON MATERIAL PROPIO COMPACTADO C/EQUIPO M3 3.95 19.72 77.83 - 0.00% 3.95 77.83 100.00% 3.95 77.83 100.00% - - 0.00%
05.01.06 ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETES M3 22.00 23.38 514.36 - 0.00% 22.00 514.36 100.00% 22.00 514.36 100.00% - - 0.00%
CONSORCIO
CHAPI VALORIZACION FISICA MAYORES METRADOS Nro 01 - Enero del 2023
ESTRUCTURAS
PROYECTO “MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA – PROVINCIA DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”

ENTIDAD. MUNICIPALIDAD DISTRITAL DE TIABAYA


CONTRATISTA CONSORCIO CHAPI
SUPERVISIÓN ING. JUAN GUILLERMO SOTO MUÑOZ
LUGAR AREQUIPA
METRADO P.U. ANTERIOR AVANCE ACTUAL ACUMULADO ACTUAL SALDO
Item Descripción UND Parcial (S/.)
(S/.) (S/.) Metrado Valorizacion % Metrado Valorizacion % Metrado Valorizacion % Metrado Valorizacion %
05.02 CONCRETO SIMPLE PARA CANAL 1,461.55 - 0.00% - 1,461.55 100.00% - 1,461.55 100.00% - - 0.00%
05.02.01 CONCRETO f'c=175 kg/cm2 M3 3.68 397.70 1,461.55 - 0.00% 3.68 1,461.55 100.00% 3.68 1,461.55 100.00% - - 0.00%
05.03 OBRAS DE CONCRETO ARMADO - CANAL TECHADO 929.55 - 0.00% - 929.55 100.00% - 929.55 100.00% - - 0.00%
05.03.01 SOLADO PARA CANAL TECHADO (e=10cm) MEZCLA 1:10 CEMENTO-HO M2 0.72 40.30 29.02 - 0.00% 0.72 29.02 100.00% 0.72 29.02 100.00% - - 0.00%
05.03.02 CONCRETO f'c=210 kg/cm2 M3 0.22 427.82 92.41 - 0.00% 0.22 92.41 100.00% 0.22 92.41 100.00% - - 0.00%
05.03.03 ENCOFRADO Y DESENCOFRADO DE CANAL M2 0.72 64.01 46.09 - 0.00% 0.72 46.09 100.00% 0.72 46.09 100.00% - - 0.00%
05.03.04 ACERO DE REFUERZO GRADO 60 f´y=4200 kg/cm2 KG 102.98 7.40 762.04 - 0.00% 102.98 762.04 100.00% 102.98 762.04 100.00% - - 0.00%
05.05 REVESTIMIENTO CANAL 303.81 - 0.00% - 303.81 100.00% - 303.81 100.00% - - 0.00%
05.05.01 ENLUCIDO DE SECCION DE CANAL (PISOS - MUROS) M2 25.53 11.90 303.81 - 0.00% 25.53 303.81 100.00% 25.53 303.81 100.00% - - 0.00%
05.06 ACCESORIOS 1,840.00 - 0.00% - 1,840.00 100.00% - 1,840.00 100.00% - - 0.00%
05.06.01 COMPUERTA METALICA TIPO TARJETA UND 2.00 920.00 1,840.00 - 0.00% 2.00 1,840.00 100.00% 2.00 1,840.00 100.00% - - 0.00%
05.07 JUNTAS 688.66 - 0.00% - 688.66 100.00% - 688.66 100.00% - - 0.00%
05.07.01 JUNTA TRANSVERSAL DE DILATACIÓN DE E=1" CADA 9 M CON TECNO M 3.53 104.92 370.37 - 0.00% 3.53 370.37 100.00% 3.53 370.37 100.00% - - 0.00%
05.07.02 JUNTAS TRANSVERSAL DE CONTRACCION CON POLIURETANO CADA 3 M 7.07 45.02 318.29 - 0.00% 7.07 318.29 100.00% 7.07 318.29 100.00% - - 0.00%

06 CANAL LA VALENCIA 7,104.53 - 0.00% - 7,104.53 100.00% - 7,104.53 100.00% - - 0.00%


06.01 MOVIMIENTO DE TIERRAS EN CANAL 2,013.92 - 0.00% - 2,013.92 100.00% - 2,013.92 100.00% - - 0.00%
06.01.01 TRAZO Y REPLANTEO C/TOPOGRAFO M2 24.00 3.36 80.64 - 0.00% 24.00 80.64 100.00% 24.00 80.64 100.00% - - 0.00%
06.01.02 EXCAVACION EN TERRENO NORMAL PARA CAJA DE CANAL m3 2.99 40.71 121.63 - 0.00% 2.99 121.63 100.00% 2.99 121.63 100.00% - - 0.00%
06.01.03 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 3.73 21.39 79.88 - 0.00% 3.73 79.88 100.00% 3.73 79.88 100.00% - - 0.00%
06.01.04 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL M2 24.92 5.65 140.80 - 0.00% 24.92 140.80 100.00% 24.92 140.80 100.00% - - 0.00%
06.01.05 RELLENO CON MATERIAL PROPIO COMPACTADO C/EQUIPO M3 4.45 19.72 87.82 - 0.00% 4.45 87.82 100.00% 4.45 87.82 100.00% - - 0.00%
06.01.06 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO M3 13.74 109.40 1,503.16 - 0.00% 13.74 1,503.16 100.00% 13.74 1,503.16 100.00% - - 0.00%
06.02 CONCRETO SIMPLE PARA CANAL 1,467.51 - 0.00% - 1,467.51 100.00% - 1,467.51 100.00% - - 0.00%
06.02.01 CONCRETO f'c=175 kg/cm2 M3 3.69 397.70 1,467.51 - 0.00% 3.69 1,467.51 100.00% 3.69 1,467.51 100.00% - - 0.00%
06.04 REVESTIMIENTO CANAL 307.02 - 0.00% - 307.02 100.00% - 307.02 100.00% - - 0.00%
06.04.01 ENLUCIDO DE SECCION DE CANAL (PISOS - MUROS) M2 25.80 11.90 307.02 - 0.00% 25.80 307.02 100.00% 25.80 307.02 100.00% - - 0.00%
06.05 ACCESORIOS 2,760.00 - 0.00% - 2,760.00 100.00% - 2,760.00 100.00% - - 0.00%
06.05.01 COMPUERTA METALICA TIPO TARJETA UND 3.00 920.00 2,760.00 - 0.00% 3.00 2,760.00 100.00% 3.00 2,760.00 100.00% - - 0.00%
06.06 JUNTAS 556.08 - 0.00% - 556.08 100.00% - 556.08 100.00% - - 0.00%
06.06.01 JUNTA TRANSVERSAL DE DILATACIÓN DE E=1" CADA 9 M CON TECNO M 5.30 104.92 556.08 - 0.00% 5.30 556.08 100.00% 5.30 556.08 100.00% - - 0.00%
COSTO DIRECTO (S/.) (A) S/. 13,726.32 S/. 0.00 S/. 13,726.32 S/. 13,726.32 S/. 0.00
GASTOS GENERALES S/. 0.12 10.84% 1,488.18 10.84% 0.00 10.84% 1,488.18 10.84% 1,488.18 10.84% 0.00
UTILIDAD S/. 0.07 6.00% 823.58 6.00% 0.00 6.00% 823.58 6.00% 823.58 6.00% 0.00
SUBTOTAL S/. 16,038.09 S/. 0.00 S/. 16,038.09 S/. 16,038.09 S/. 0.00
IGV (18%) S/. 2,886.86 S/. 0.00 S/. 2,886.86 S/. 2,886.86 S/. 0.00
TOTAL EJECUTADO S/. 18,924.95 S/. 0.00 S/. 18,924.95 S/. 18,924.95 S/. 0.00
PORCENTAJE DE AVANCE 100.00% 0.00% 100.00% 100.00% 0.00%
CONSORCIO
CHAPI
CURVA "s" PROGRAMADO Vs EJECUTADO
MES Jan-23
ENTIDAD MUNICIPALIDAD DISTRITAL DE TIABAYA

OBRA “MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA – PROVINCIA DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”

TIEMPO DE EJECUCION 75 DC
FECHA DE INICIO DE OBRA 12/30/2022

FECHA DE TERMINO PROGRAMADO 3/14/2023

PROGRAMADO ACUMULADO - EJECUTADO ACUMULADO

CURVA S

110.00%

90.00%

70.00%
PORCENTAJE

50.00%

30.00%

10.00%

INICIO DICIEMBRE ENERO FEBRERO MARZO


PROGRAMADO 0.00% 3.90% 33.59% 88.59% 100.00%
EJECUTADO 0.00% 3.45% #FMT #FMT #FMT

CURVA S
PROGRAMADO EJECUTADO
VALORIZACIÓN
% VALORIZACIÓN
MENSUAL %ACUMULADO % MENSUAL %ACUMULADO
MENSUAL MENSUAL (SOLES)
(SOLES)
MESES
INICIO S/. 0.00 0.00% 0.00% S/. 0.00 0.00% 0.00%
DICIEMBRE S/. 21,381.88 3.90% 3.90% S/. 18,924.95 3.45% 3.45%
ENERO S/. 162,830.42 29.70% 33.59%
FEBRERO S/. 301,534.88 54.99% 88.59%
MARZO S/. 62,592.30 11.41% 100.00%
TOTAL S/. 548,339.47 100.00% S/. 18,924.95 3.45%

LA OBRA PRESENTA UN : 88.51% DE EJECUCION ACUMULADA DE ACUERDO AL REPROGRAMADO QUE ES MAYOR EL 80%

OBSERVACIONES:
1.- Según el Artículo N°203 de la Ley de contrataciones con el Estado, el porcentaje de avance acumulado debe ser mayor al 80%,
en base a ello se tiene un monto acumulado de ejecución de S/.18924.95 y un monto acumulado programado de S/.21381,88
dividiendo ambos montos se tiene un ratio de 88.51% que es mayor al 8 que es mayor al 80%.
CONSORCIO
CHAPI RESUMEN DE MAYORES METRADOS

Proyecto “MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA – PROVINCIA DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”
Cliente MUNICIPALIDAD DISTRITAL DE TIABAYA
Ubicación TIABAYA
CONTRATISTA CONSORCIO CHAPI
2022
P.U. PORCENTAJE PORCENTAJE DE
Item Descripción UND METRADO Parcial (S/.) METRADO ENERO
(S/.) EJECUTADO ACUM. SALDO
05 CANAL LA GALDOS
05.01 MOVIMIENTO DE TIERRAS EN CANAL
05.01.01 TRAZO Y REPLANTEO C/TOPOGRAFO M2 24.00 3.36 80.64 24.00 100.00% 0.00%
05.01.02 EXCAVACION EN TERRENO NORMAL PARA CAJA DE CANAL m3 7.18 40.71 292.30 7.18 100.00% 0.00%
05.01.03 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 13.91 21.39 297.50 13.91 100.00% 0.00%
05.01.04 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL M2 24.00 5.65 135.60 24.00 100.00% 0.00%
05.01.05 RELLENO CON MATERIAL PROPIO COMPACTADO C/EQUIPO M3 3.95 19.72 77.83 3.95 100.00% 0.00%
05.01.06 ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETES M3 22.00 23.38 514.36 22.00 100.00% 0.00%
05.02 CONCRETO SIMPLE PARA CANAL
05.02.01 CONCRETO f'c=175 kg/cm2 M3 3.68 397.70 1,461.55 3.68 100.00% 0.00%
05.03 OBRAS DE CONCRETO ARMADO - CANAL TECHADO
05.03.01 SOLADO PARA CANAL TECHADO (e=10cm) MEZCLA 1:10 CEMENTO-HORMIGON M2 0.72 40.30 29.02 0.72 100.00% 0.00%
05.03.02 CONCRETO f'c=210 kg/cm2 M3 0.22 427.82 92.41 0.22 100.00% 0.00%
05.03.03 ENCOFRADO Y DESENCOFRADO DE CANAL M2 0.72 64.01 46.09 0.72 100.00% 0.00%
05.03.04 ACERO DE REFUERZO GRADO 60 f´y=4200 kg/cm2 KG 102.98 7.40 762.04 102.98 100.00% 0.00%
05.05 REVESTIMIENTO CANAL
05.05.01 ENLUCIDO DE SECCION DE CANAL (PISOS - MUROS) M2 25.53 11.90 303.81 25.53 100.00% 0.00%
05.06 ACCESORIOS
05.06.01 COMPUERTA METALICA TIPO TARJETA und 2.00 920.00 1,840.00 2.00 100.00% 0.00%
05.07 JUNTAS
05.07.01 JUNTA TRANSVERSAL DE DILATACIÓN DE E=1" CADA 9 M CON TECNOPOR M 3.53 104.92 370.37 3.53 100.00% 0.00%
05.07.02 JUNTAS TRANSVERSAL DE CONTRACCION CON POLIURETANO CADA 3M M 7.07 45.02 318.29 7.07 100.00% 0.00%

06 CANAL LA VALENCIA
06.01 MOVIMIENTO DE TIERRAS EN CANAL
06.01.01 TRAZO Y REPLANTEO C/TOPOGRAFO M2 24.00 3.36 80.64 24.00 100.00% 0.00%
06.01.02 EXCAVACION EN TERRENO NORMAL PARA CAJA DE CANAL m3 2.99 40.71 121.63 2.99 100.00% 0.00%
06.01.03 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 3.73 21.39 79.88 3.73 100.00% 0.00%
06.01.04 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL M2 24.92 5.65 140.80 24.92 100.00% 0.00%
06.01.05 RELLENO CON MATERIAL PROPIO COMPACTADO C/EQUIPO M3 4.45 19.72 87.82 4.45 100.00% 0.00%
06.01.06 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO M3 13.74 109.40 1,503.16 13.74 100.00% 0.00%
06.02 CONCRETO SIMPLE PARA CANAL
06.02.01 CONCRETO f'c=175 kg/cm2 M3 3.69 397.70 1,467.51 3.69 100.00% 0.00%
06.04 REVESTIMIENTO CANAL
06.04.01 ENLUCIDO DE SECCION DE CANAL (PISOS - MUROS) M2 25.80 11.90 307.02 25.80 100.00% 0.00%
06.05 ACCESORIOS
06.05.01 COMPUERTA METALICA TIPO TARJETA UND 3.00 920.00 2,760.00 3.00 100.00% 0.00%
06.06 JUNTAS
06.06.01 JUNTA TRANSVERSAL DE DILATACIÓN DE E=1" CADA 9 M CON TECNOPOR M 5.30 104.92 556.08 5.30 100.00% 0.00%
CONSORCIO
CHAPI PLANILLA DE METRADOS -ENERO DEL 2022
“MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA – PROVINCIA
Proyecto
DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”
Cliente MUNICIPALIDAD DISTRITAL DE TIABAYA
Ubicación TIABAYA
Contratista CONSORCIO CHAPI
Medidas
Item Descripción Und Cant
Largo Ancho Alto
Parcial Total

05 CANAL LA GALDOS
05.01 MOVIMIENTO DE TIERRAS EN CANAL
05.01.01 TRAZO Y REPLANTEO C/TOPOGRAFO M2 24.00
Tramo canal La Galdos 1.00 240.00 0.10 24.00
05.01.02 EXCAVACION EN TERRENO NORMAL PARA CAJA DE CANAL m3 7.18
0+005 5.00 0.10 0.28 0.14
0+010 5.00 0.10 0.89 0.45
0+015 5.00 0.10 0.25 0.13
0+020 5.00 0.10 0.12 0.06
0+025 5.00 0.10 0.03 0.01
0+030 5.00 0.10 0.01 0.01
0+035 5.00 0.10 0.01 0.01
0+040 5.00 0.10 0.01 0.01
0+045 5.00 0.10 0.01 0.01
0+050 5.00 0.10 0.01 0.01
0+055 5.00 0.10 0.07 0.03
0+060 5.00 0.10 0.01 0.01
0+065 5.00 0.10 0.01 0.01
0+070 5.00 0.10 0.05 0.03
0+075 5.00 0.10 0.03 0.01
0+080 5.00 0.10 0.01 0.01
0+085 5.00 0.10 0.03 0.01
0+090 5.00 0.10 0.04 0.02
0+095 5.00 0.10 0.04 0.02
0+100 5.00 0.10 0.07 0.03
0+105 5.00 0.10 0.03 0.01
0+110 5.00 0.10 0.08 0.04
0+115 5.00 0.10 0.07 0.03
0+120 5.00 0.10 0.07 0.03
0+125 5.00 0.10 0.36 0.18
0+130 5.00 0.10 0.33 0.17
0+135 5.00 0.10 0.11 0.05
0+140 5.00 0.10 0.05 0.03
0+145 5.00 0.10 0.37 0.19
0+150 5.00 0.10 0.36 0.18
0+155 5.00 0.10 0.32 0.16
0+160 5.00 0.10 0.43 0.21
0+165 5.00 0.10 0.40 0.20
0+170 5.00 0.10 0.37 0.19
0+175 5.00 0.10 0.37 0.19
0+180 5.00 0.10 0.29 0.15
0+185 5.00 0.10 0.17 0.09
0+190 5.00 0.10 0.12 0.06
0+195 5.00 0.10 0.23 0.11
0+200 5.00 0.10 0.23 0.11
0+205 5.00 0.10 0.28 0.14
0+210 5.00 0.10 0.40 0.20
0+215 5.00 0.10 0.47 0.23
0+220 5.00 0.10 0.47 0.23
0+225 5.00 0.10 0.47 0.23
0+230 5.00 0.10 0.45 0.23
0+235 5.00 0.10 0.39 0.19
0+240 5.00 0.10 0.35 0.17
0+245 5.00 0.10 0.24 0.12
0+250 5.00 0.10 0.16 0.08
0+255 5.00 0.10 0.21 0.11
0+260 5.00 0.10 0.16 0.08
0+265 5.00 0.10 0.25 0.13
0+270 5.00 0.10 0.51 0.25
0+275 5.00 0.10 0.15 0.07
0+280 5.00 0.10 0.09 0.05
0+285 5.00 0.10 0.24 0.12
0+290 5.00 0.10 0.44 0.22
0+295 5.00 0.10 0.33 0.17
0+300 5.00 0.10 0.25 0.13
0+305 5.00 0.10 0.21 0.11
0+310 5.00 0.10 0.13 0.07
0+315 5.00 0.10 0.20 0.10
0+320 5.00 0.10 0.24 0.12
0+325 5.00 0.10 0.33 0.17

P.67/75
CONSORCIO
CHAPI PLANILLA DE METRADOS -ENERO DEL 2022
“MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA – PROVINCIA
Proyecto
DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”
Cliente MUNICIPALIDAD DISTRITAL DE TIABAYA
Ubicación TIABAYA
Contratista CONSORCIO CHAPI
0+330 5.00 0.10 0.17 0.09
05.01.03 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 - - - 13.91
Acarreo de material excavado tramos La Galdos 7.18 7.18
Descontar relleno c/material propio 3.95 3.95
ESPONJAMIENTO (25%) 2.78
13.91
05.01.04 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL M2 1.00 240.00 0.10 - 24.00 24.00
05.01.05 RELLENO CON MATERIAL PROPIO COMPACTADO C/EQUIPO M3 3.95
0+005 5.00 0.10 0.07 0.03
0+010 5.00 0.10 0.05 0.03
0+015 5.00 0.10 0.15 0.08
0+020 5.00 0.10 0.10 0.05
0+025 5.00 0.10 0.12 0.06
0+030 5.00 0.10 0.31 0.15
0+035 5.00 0.10 0.29 0.15
0+040 5.00 0.10 0.50 0.25
0+045 5.00 0.10 0.47 0.23
0+050 5.00 0.10 0.32 0.16
0+055 5.00 0.10 0.23 0.11
0+060 5.00 0.10 0.35 0.17
0+065 5.00 0.10 0.29 0.15
0+070 5.00 0.10 0.28 0.14
0+075 5.00 0.10 0.36 0.18
0+080 5.00 0.10 0.29 0.15
0+085 5.00 0.10 0.27 0.13
0+090 5.00 0.10 0.28 0.14
0+095 5.00 0.10 0.24 0.12
0+100 5.00 0.10 0.21 0.11
0+105 5.00 0.10 0.24 0.12
0+110 5.00 0.10 0.15 0.07
0+115 5.00 0.10 0.10 0.05
0+120 5.00 0.10 0.15 0.07
0+125 5.00 0.10 0.05 0.03
0+130 5.00 0.10 0.05 0.03
0+135 5.00 0.10 0.09 0.05
0+140 5.00 0.10 0.09 0.05
0+145 5.00 0.10 0.05 0.03
0+150 5.00 0.10 0.05 0.03
0+155 5.00 0.10 0.30 0.15
0+160 5.00 0.10 0.05 0.03
0+165 5.00 0.10 0.02 0.01
0+170 5.00 0.10 0.15 0.08
0+175 5.00 0.10 0.03 0.01
0+180 5.00 0.10 0.09 0.05
0+185 5.00 0.10 0.09 0.05
0+190 5.00 0.10 0.19 0.09
0+195 5.00 0.10 0.12 0.06
0+200 5.00 0.10 0.19 0.10
0+205 5.00 0.10 0.05 0.03
0+210 5.00 0.10 0.04 0.02
0+215 5.00 0.10 0.05 0.03
0+220 5.00 0.10 0.12 0.06
0+225 5.00 0.10 0.05 0.03
0+230 5.00 0.10 0.05 0.03
0+235 5.00 0.10 0.05 0.03
0+240 5.00 0.10 0.07 0.03
05.01.06 ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETES M3 22.00 - - 22.00
05.02 CONCRETO SIMPLE PARA CANAL
05.02.01 CONCRETO f'c=175 kg/cm2 M3 3.68
Piso de concreto para canal tramo La Galdos (L=476.6 m) 1.00 245.00 0.10 0.15 3.68
05.03 OBRAS DE CONCRETO ARMADO - CANAL TECHADO
05.03.01 SOLADO PARA CANAL TECHADO (e=10cm) MEZCLA 1:10 CEMENTO-HORMIGON M2 0.72
Solado de canal techado. Tramo La Galdos 1.00 7.20 0.10 0.72
05.03.02 CONCRETO f'c=210 kg/cm2 M3 0.22
Concreto piso de canal techado. Tramo La Galdos (L=7.20 m) 3.00 4.80 0.10 0.15 0.22
05.03.03 ENCOFRADO Y DESENCOFRADO DE CANAL M2 0.72
Encofrado de canal techado. Tramo La Galdos (L=7.20 m) 1.00 7.20 0.10 0.72
05.03.04 ACERO DE REFUERZO GRADO 60 f´y=4200 kg/cm2 KG 102.98
N Estr. N Elem N Var. L Varilla L Total Peso/m Peso
Acero longitudinal piso de canal techado. Tramo La Galdos 1.00 1.00 1.00 7.20 10.20 0.99 10.14
Acero transversal piso de canal techado. Tramo La Galdos 1.00 1.00 30.00 0.10 32.10 0.99 31.91
Acero longitudinal techo de canal. Tramo La Galdos 1.00 1.00 1.00 7.20 10.20 0.99 10.14

P.68/75
CONSORCIO
CHAPI PLANILLA DE METRADOS -ENERO DEL 2022
“MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA – PROVINCIA
Proyecto
DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”
Cliente MUNICIPALIDAD DISTRITAL DE TIABAYA
Ubicación TIABAYA
Contratista CONSORCIO CHAPI
Acero transversal techo de canal. Tramo La Galdos 1.00 1.00 49.00 0.10 51.10 0.99 50.79
05.05 REVESTIMIENTO CANAL
05.05.01 ENLUCIDO DE SECCION DE CANAL (PISOS - MUROS) M2 25.53
Enlucido de piso de canal tramo La Galdos (L=476.60 m) 1.00 255.30 0.10 25.53
05.06 ACCESORIOS
05.06.01 COMPUERTA METALICA TIPO TARJETA UND 2.00 2.00 2.00
05.07 JUNTAS
05.07.01 JUNTA TRANSVERSAL DE DILATACIÓN DE E=1" CADA 9 M CON TECNOPOR M 35.30 0.10 3.53 3.53
05.07.02 JUNTAS TRANSVERSAL DE CONTRACCION CON POLIURETANO CADA 3M M 70.70 0.10 - 7.07 7.07

06 CANAL LA VALENCIA
06.01 MOVIMIENTO DE TIERRAS EN CANAL
06.01.01 TRAZO Y REPLANTEO C/TOPOGvertical M2 24.00
Tramo canal La Galdos 1.00 240.00 0.10 24.00
06.01.02 EXCAVACION EN TERRENO NORMAL PARA CAJA DE CANAL M3 2.99
0+005 5.00 0.10 0.45 0.23
0+010 5.00 0.10 0.45 0.23
0+015 5.00 0.10 0.50 0.25
0+020 5.00 0.10 0.45 0.23
0+025 5.00 0.10 0.30 0.15
0+030 5.00 0.10 0.10 0.05
0+035 5.00 0.10 0.10 0.05
0+040 5.00 0.10 0.08 0.04
0+045 5.00 0.10 0.06 0.03
0+050 5.00 0.10 0.03 0.02
0+055 5.00 0.10 0.10 0.05
0+060 5.00 0.10 0.10 0.05
0+065 5.00 0.10 0.10 0.05
0+070 5.00 0.10 0.10 0.05
0+075 5.00 0.10 0.05 0.03
0+080 5.00 0.10 0.10 0.05
0+085 5.00 0.10 0.10 0.05
0+090 5.00 0.10 0.10 0.05
0+095 5.00 0.10 0.01 0.01
0+100 5.00 0.10 0.10 0.05
0+105 5.00 0.10 0.10 0.05
0+110 5.00 0.10 0.10 0.05
0+115 5.00 0.10 0.10 0.05
0+120 5.00 0.10 0.10 0.05
0+125 5.00 0.10 0.10 0.05
0+130 5.00 0.10 0.10 0.05
0+135 5.00 0.10 0.10 0.05
0+140 5.00 0.10 0.04 0.02
0+145 5.00 0.10 0.25 0.13
0+150 5.00 0.10 0.15 0.08
0+155 5.00 0.10 0.01 0.01
0+160 5.00 0.10 0.15 0.08
0+165 5.00 0.10 0.15 0.08
0+170 5.00 0.10 0.15 0.08
0+175 5.00 0.10 0.15 0.08
0+180 5.00 0.10 0.15 0.08
0+185 5.00 0.10 0.15 0.08
0+190 5.00 0.10 0.15 0.08
0+195 5.00 0.10 0.13 0.07
0+200 5.00 0.10 0.12 0.06
0+205 5.00 0.10 0.13 0.07
06.01.03 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 1.00 - - - 3.73 3.73

P.69/75
CONSORCIO
CHAPI PLANILLA DE METRADOS -ENERO DEL 2022
“MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA – PROVINCIA
Proyecto
DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”
Cliente MUNICIPALIDAD DISTRITAL DE TIABAYA
Ubicación TIABAYA
Contratista CONSORCIO CHAPI
06.01.04 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL M2 1.00 249.20 0.10 24.92 24.92
06.01.05 RELLENO CON MATERIAL PROPIO COMPACTADO C/EQUIPO M3 4.45
0+005 5.00 0.10 0.01 0.01
0+010 5.00 0.10 0.36 0.18
0+015 5.00 0.10 0.45 0.23
0+020 5.00 0.10 0.27 0.13
0+025 5.00 0.10 0.08 0.04
0+030 5.00 0.10 0.19 0.09
0+035 5.00 0.10 0.28 0.14
0+040 5.00 0.10 0.43 0.21
0+045 5.00 0.10 0.52 0.26
0+050 5.00 0.10 0.31 0.15
0+055 5.00 0.10 0.47 0.23
0+060 5.00 0.10 0.48 0.24
0+065 5.00 0.10 0.51 0.25
0+070 5.00 0.10 0.53 0.27
0+075 5.00 0.10 0.55 0.27
0+080 5.00 0.10 0.35 0.17
0+085 5.00 0.10 0.36 0.18
0+090 5.00 0.10 0.37 0.19
0+095 5.00 0.10 0.35 0.17
0+100 5.00 0.10 0.32 0.16
0+105 5.00 0.10 0.31 0.15
0+110 5.00 0.10 0.29 0.15
0+115 5.00 0.10 0.28 0.14
0+120 5.00 0.10 0.27 0.13
0+125 5.00 0.10 0.24 0.12
0+130 5.00 0.10 0.17 0.09
0+135 5.00 0.10 0.09 0.05
0+140 5.00 0.10 0.08 0.04
06.01.06 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO M3 13.74
0+145 5.00 0.10 0.19 0.09
0+150 5.00 0.10 0.21 0.11
0+155 5.00 0.10 0.28 0.14
0+160 5.00 0.10 0.15 0.07
0+165 5.00 0.10 0.11 0.05
0+170 5.00 0.10 0.12 0.06
0+175 5.00 0.10 0.15 0.07
0+180 5.00 0.10 0.31 0.15
0+185 5.00 0.10 0.23 0.11
0+190 5.00 0.10 0.27 0.13
0+195 5.00 0.10 0.23 0.11
0+200 5.00 0.10 0.15 0.07
0+205 5.00 0.10 0.09 0.05
0+210 5.00 0.10 0.09 0.05
0+215 5.00 0.10 0.11 0.05
0+220 5.00 0.10 0.11 0.05
0+225 5.00 0.10 0.11 0.05
0+230 5.00 0.10 0.13 0.07
0+235 5.00 0.10 0.32 0.16
0+240 5.00 0.10 0.15 0.07
Mejoramiento de suelo como mayores metrados Canal Galdos (0+014.8 @ 0+120) 7.00
Mejoramiento de suelo como mayores metrados Canal Galdos (0+127 @ 0+137.20) 5.00
06.02 CONCRETO SIMPLE PARA CANAL
06.02.01 CONCRETO f'c=175 kg/cm2 M3 - 3.69
Piso de concreto para canal tramo La Valencia (L=464.31 m) 1.00 246.00 0.10 0.15 3.69
06.04 REVESTIMIENTO CANAL
06.04.01 ENLUCIDO DE SECCION DE CANAL (PISOS - MUROS) M2 25.80
Enlucido de piso de canal tramo La Valencia (L=464.31 m) 1.00 245.50 0.10 24.55
Enlucido de piso de canal de derivación tramo La Valencia (L=464.31 m) 12.00 0.50 0.10 0.60
Enlucido de piso de canal de derivación tramo La Valencia (L=464.31 m) 13.00 0.50 0.10 0.65
06.05 ACCESORIOS
06.05.01 COMPUERTA METALICA TIPO TARJETA UND 3.00 3.00 3.00
06.06 JUNTAS
06.06.01 JUNTA TRANSVERSAL DE DILATACIÓN DE E=1" CADA 9 M CON TECNOPOR M 53.00 0.10 - 5.30 5.30

P.70/75
CONSORCIO
PANEL FOTOGRAFICO - DICIEMBRE DEL 2022
CHAPI
ENTIDAD MUNICIPALIDAD DISTRITAL DE TIABAYA
“MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA
OBRA
– PROVINCIA DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”

21 de diciiembre 2021 10:32:27


Aeropuerto CORPAC S.A.
Arequipa

Vista en foto: CARTEL DE OBRA Vista en foto: OFICINA, COMEDOR Y CASETA DE GUARDIANIA

20 de diciembre 2021 12:11:17


Aeropuerto CORPAC S.A.
Arequipa

Vista en foto: OFICINA Vista en foto: OFICINA


71 de 75
CONSORCIO
PANEL FOTOGRAFICO - DICIEMBRE DEL 2022
CHAPI
ENTIDAD MUNICIPALIDAD DISTRITAL DE TIABAYA
“MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA
OBRA
– PROVINCIA DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”
03 de diciembre 2021 13:29:23
Aeropuerto CORPAC S.A.
Arequipa

Vista en foto: ALMACEN Vista en foto: ALMACEN

Vista en foto: ALMACEN Vista en foto: RECURSOS DE RESPUESTA ANTE EMERGENCIAS


72 de 75
CONSORCIO
PANEL FOTOGRAFICO - DICIEMBRE DEL 2022
CHAPI
ENTIDAD MUNICIPALIDAD DISTRITAL DE TIABAYA
“MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA
OBRA
– PROVINCIA DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”

Vista en foto: PROGRAMA DE CAPACITACION AMBIENTAL Y EQUIPOS DE PROTECCION


Vista en foto: LIMPIEZA Y DESBROCE DE MATERIAL ORGANICO
PERSONAL

73 de 75
CALENDARIO VALORIZADO ACTUALIZADO DE AVANCE DE OBRA

Proyecto “MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA – PROVINCIA DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”
Cliente MUNICIPALIDAD DISTRITAL DE TIABAYA
Ubicación AREQUIPA
CONTRATISTA CONSORCIO CHAPI
PLAZO DE EJECUCION
02 Días 31 Días 28 Días 14 Días 75 Dias
P.U.
Item Descripción UND METRADO Parcial (S/.)
(S/.) TOTAL
DICIEMBRE ENERO FEBRERO MARZO
75 Dias
01 OBRAS PROVISIONALES 10,260.55 8,927.22 906.67 320.00 106.66 10,260.55
01.01 CARTEL DE IDENTIFICACION DE OBRA und 1.00 1,338.55 1,338.55 1,338.55
01.02 OFICINA, ALMACEN, COMEDOR Y CASETA DE GUARDIANIA M2 57.00 100.00 5,700.00 5,700.00
01.03 CERCO PERIMETRICO PROVISIONAL CON ROLLIZO EUCALIPTO 3" Y MALLA ARPILLERA M 60.00 11.20 672.00 112.00 560.00
01.04 SUMINISTRO E INSTALACION DE BAÑOS QUIMICOS PORTATIL MES 2.50 700.00 1,750.00 1,750.00
01.05 RECURSOS DE RESPUESTA ANTE EMERGENCIAS glb 1.00 800.00 800.00 26.67 346.67 320.00 106.66
- - - -
02 OBRAS PRELIMINARES 26,234.03 3,300.00 22,934.03 26,234.03
02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO vje 2.00 2,500.00 5,000.00 2,500.00 2,500.00
02.02 FLETE TERRESTRE PARA TRANSPORTE DE MATERIALES GLB 2.00 800.00 1,600.00 800.00 800.00
02.03 LIMPIEZA DESBROCE Y ELIMINACION MATERIAL ORGANICO M2 2,821.80 1.55 4,373.79 4,373.79
02.04 TRAZO Y REPLANTEO PRELIMINAR M 940.60 3.73 3,508.44 3,508.44
02.05 DEMOLICION DE CANAL EXISTENTE M3 30.22 95.99 2,900.82 2,900.82
02.06 ACARREO DE MATERIAL PARA LA CONSTRUCCION M3 531.91 16.64 8,850.98 8,850.98
- - - -
03 SEGURIDAD Y SALUD 9,700.00 3,133.33 6,566.67 9,700.00
03.01 ELABORACION IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN UND 1.00 2,200.00 2,200.00 733.33 1,466.67
03.02 EQUIPOS DE PROTECCION PERSONAL JGO 30.00 160.00 4,800.00 2,400.00 2,400.00
03.03 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 500.00 500.00 500.00
03.04 IMPLEMENTACION DE PLAN COVID-19 GLB 1.00 2,200.00 2,200.00 2,200.00
- - - -
04 CAPACITACION 9,000.00 9,000.00 9,000.00
04.01 PROGRAMA DE CAPACITACION EN SISTEMAS DE RIESGO MES 2.50 1,800.00 4,500.00 4,500.00
04.02 PROGRAMA DE CAPACITACION AMBIENTAL MES 2.50 1,800.00 4,500.00 4,500.00
- - - -
05 CANAL LA GALDOS 180,313.08 64,650.61 113,293.59 2,368.88 180,313.08
05.01 MOVIMIENTO DE TIERRAS EN CANAL 22,169.44 20,996.74 1,172.71
05.01.01 TRAZO Y REPLANTEO C/TOPOGRAFO M2 1,429.80 3.36 4,804.13 4,804.13
05.01.02 EXCAVACION EN TERRENO NORMAL PARA CAJA DE CANAL m3 180.59 40.71 7,351.82 7,351.82
05.01.03 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 182.28 21.39 3,898.97 3,898.97
05.01.04 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL M2 357.45 5.65 2,019.59 2,019.59
05.01.05 RELLENO CON MATERIAL PROPIO COMPACTADO C/EQUIPO M3 34.77 19.72 685.66 685.66
05.01.06 ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETES M3 145.82 23.38 3,409.27 2,922.23 487.04
05.02 CONCRETO SIMPLE PARA CANAL 106,808.85 43,332.28 63,476.57
05.02.01 CONCRETO f'c=175 kg/cm2 M3 115.15 397.70 45,795.16 16,486.26 29,308.90
05.02.02 ENCOFRADO Y DESENCOFRADO DE CANAL M2 953.19 64.01 61,013.69 26,846.02 34,167.67
05.03 OBRAS DE CONCRETO ARMADO - CANAL TECHADO 16,167.87 321.59 15,846.28
05.03.01 SOLADO PARA CANAL TECHADO (e=10cm) MEZCLA 1:10 CEMENTO-HORMIGON M2 23.94 40.30 964.78 321.59 643.19
05.03.02 CONCRETO f'c=210 kg/cm2 M3 9.07 427.82 3,880.33 3,880.33
05.03.03 ENCOFRADO Y DESENCOFRADO DE CANAL M2 71.82 64.01 4,597.20 4,597.20
05.03.04 ACERO DE REFUERZO GRADO 60 f´y=4200 kg/cm2 KG 908.86 7.40 6,725.56 6,725.56
05.04 RAPIDAS DE CANAL 3,238.50 3,238.50
05.04.01 SOLADO PARA RAPIDAS DE CANAL (e=10cm) MEZCLA 1:10 CEMENTO-HORMIGON M2 9.95 40.30 400.98 400.98
05.04.02 CONCRETO f'c=210 kg/cm2 M3 3.10 427.82 1,326.24 1,326.24
05.04.03 ENCOFRADO Y DESENCOFRADO RAPIDAS DE CANAL M2 23.61 64.01 1,511.28 1,511.28
05.05 REVESTIMIENTO CANAL 7,944.92 7,944.92
05.05.01 ENLUCIDO DE SECCION DE CANAL (PISOS - MUROS) M2 667.64 11.90 7,944.92 7,944.92
05.06 ACCESORIOS 9,200.00 9,200.00
CALENDARIO VALORIZADO ACTUALIZADO DE AVANCE DE OBRA

Proyecto “MEJORAMIENTO DEL SERVICIO DE PROVISION DE AGUA PARA RIEGO EN LOS TRAMOS LA VALENCIA Y LA GALDOS, EN EL DISTRITO DE TIABAYA – PROVINCIA DE AREQUIPA – DEPARTAMENTO DE AREQUIPA”
Cliente MUNICIPALIDAD DISTRITAL DE TIABAYA
Ubicación AREQUIPA
CONTRATISTA CONSORCIO CHAPI
PLAZO DE EJECUCION
02 Días 31 Días 28 Días 14 Días 75 Dias
P.U.
Item Descripción UND METRADO Parcial (S/.)
(S/.) TOTAL
DICIEMBRE ENERO FEBRERO MARZO
75 Dias
05.06.01 COMPUERTA METALICA TIPO TARJETA und 10.00 920.00 9,200.00 9,200.00
05.07 JUNTAS 14,783.50 12,414.62 2,368.88
05.07.01 JUNTA TRANSVERSAL DE DILATACIÓN DE E=1" CADA 9 M CON TECNOPOR M 79.50 104.92 8,341.14 7,582.85 758.29
05.07.02 JUNTAS TRANSVERSAL DE CONTRACCION CON POLIURETANO CADA 3M M 143.10 45.02 6,442.36 4,831.77 1,610.59
- - - -
06 CANAL LA VALENCIA 159,366.35 12,585.25 103,999.33 42,781.77 159,366.36
06.01 MOVIMIENTO DE TIERRAS EN CANAL 13,716.34 6,695.79 2,204.70 4,815.85
06.01.01 TRAZO Y REPLANTEO C/TOPOGRAFO M2 1,392.93 3.36 4,680.24 4,680.24
06.01.02 EXCAVACION EN TERRENO NORMAL PARA CAJA DE CANAL m3 33.40 40.71 1,359.71 1,359.71
06.01.03 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 41.75 21.39 893.03 893.03
06.01.04 REFINE, NIVELACION Y COMPACTACION EN T. NORMAL M2 348.23 5.65 1,967.50 655.83 1,311.67
06.01.05 RELLENO CON MATERIAL PROPIO COMPACTADO C/EQUIPO M3 33.40 19.72 658.65 658.65
06.01.06 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO M3 38.00 109.40 4,157.20 4,157.20
06.02 CONCRETO SIMPLE PARA CANAL 107,215.62 99,276.11 7,939.51
06.02.01 CONCRETO f'c=175 kg/cm2 M3 114.75 397.70 45,636.08 40,159.75 5,476.32
06.02.02 ENCOFRADO Y DESENCOFRADO DE CANAL M2 962.03 64.01 61,579.54 59,116.36 2,463.18
06.03 OBRAS DE CONCRETO ARMADO 5,889.46 5,889.46
06.03.01 SOLADO PARA CANAL TECHADO (e=10cm) MEZCLA 1:10 CEMENTO-HORMIGON M2 8.74 40.30 352.22 352.22
06.03.02 CONCRETO f'c=210 kg/cm2 M3 3.31 427.82 1,416.08 1,416.08
06.03.03 ENCOFRADO Y DESENCOFRADO DE CANAL M2 26.22 64.01 1,678.34 1,678.34
06.03.04 ACERO DE REFUERZO GRADO 60 f´y=4200 kg/cm2 KG 330.11 7.40 2,442.81 2,442.81
06.04 REVESTIMIENTO CANAL 7,555.55 2,518.52 5,037.03
06.04.01 ENLUCIDO DE SECCION DE CANAL (PISOS - MUROS) M2 634.92 11.90 7,555.55 2,518.52 5,037.03
06.05 ACCESORIOS 11,040.00 11,040.00
06.05.01 COMPUERTA METALICA TIPO TARJETA und 12.00 920.00 11,040.00 11,040.00
06.06 JUNTAS 13,949.39 13,949.39
06.06.01 JUNTA TRANSVERSAL DE DILATACIÓN DE E=1" CADA 9 M CON TECNOPOR M 71.55 104.92 7,507.03 7,507.03
06.06.02 JUNTAS TRANSVERSAL DE CONTRACCION CON POLIURETANO CADA 3M M 143.10 45.02 6,442.36 6,442.36
- - - -
07 VARIOS 2,838.44 147.80 1,458.22 1,091.33 141.09 2,838.44
07.01 PLACA RECORDATORIA DE MARMOL und 1.00 640.06 640.06 640.06
07.02 PRUEBAS DE CALIDAD DEL CONCRETO (DISEÑO DE MEZCLAS) UND 2.00 350.00 700.00 700.00
07.03 PRUEBAS DE CALIDAD DEL CONCRETO (ROTURA DE PROBETAS) UND 40.00 11.93 477.20 167.02 310.18
07.04 PRUEBA DE COMPACTACION DENSIDAD IN SITU und 10.00 73.90 739.00 147.80 591.20
07.05 LIMPIEZA FINAL DE OBRA m2 2,821.80 0.10 282.18 141.09 141.09
COSTO DIRECTO (S/.) (A) S/. 397,712.4549000 S/. 15,508.35 S/. 118,101.45 S/. 218,704.26 S/. 45,398.41 S/. 397,712.46
GASTOS GENERALES S/. 0.12 10.84% 43,119.27 1,681.39 12,804.35 23,711.52 4,922.01 43,119.27
UTILIDAD S/. 0.07 6.00% 23,862.75 930.50 7,086.09 13,122.26 2,723.90 23,862.75
SUBTOTAL S/. 464,694.47 S/. 18,120.24 S/. 137,991.88 S/. 255,538.03 S/. 53,044.32 S/. 464,694.47
IGV (18%) S/. 83,645.00 S/. 3,261.64 S/. 24,838.54 S/. 45,996.85 S/. 9,547.98 S/. 83,645.00
TOTAL EJECUTADO S/. 548,339.47 S/. 21,381.88 S/. 162,830.42 S/. 301,534.88 S/. 62,592.30 S/. 548,339.47
PORCENTAJE DE AVANCE 100.00% 3.90% 29.70% 54.99% 11.41% 100.00%