Item Descripción Unidad Metrado Precio Parcial Subtotal
Comunal
MANO DE OBRA
470032 TOPOGRAFO HH 4.375 161.83 707.99
470102 OPERARIO HH 4.375 2,503.52 10,755.39
470103 OFICIAL HH 3.750 26.32 98.70
470104 PEON HH 3.125 399.64 1,248.89
5E+05 PEON (APORTE COMUNAL DE LOS BENEFICIARIOS HH 3.125 23,760.76 74,252.38 87,063.34
MATERIALES
20007 ALAMBRE NEGRO RECOCIDO # 16 KG 4.50 16.67 75.02
020008 ALAMBRE NEGRO RECOCIDO # 8 KG 4.50 4.89 21.99
020103 CLAVOS PARA MADERA C/C 2" KG 4.50 35.94 161.74
020105 CLAVOS PARA MADERA C/C 3" KG 4.50 19.55 87.96
020107 CLAVOS PARA MADERA C/C 4" KG 4.50 7.73 34.79
030032 FIERRO CORRUGADO PROMEDIO KG 3.00 247.49 742.46
040000 ARENA FINA M3 40.00 2.38 95.32
053611 GRAVA 3/4 - 1/2 PULGADA M3 20.00 30.50 610.00
104112 GRIFO DE BRONCE 1/2" UND 12.00 61.00 732.00
210000 CEMENTO PORTLAND TIPO I P (42.5KG) BOL 22.00 183.21 4,030.66
290304 YESO BOL 5.00 0.38 1.89
290501 CINTA TEFLON RLL 1.10 31.00 34.10
292201 CORDEL M 80.00 0.93 74.40
304611 PEGAMENTO PARA PVC OATEY GLN 105.00 12.26 1,287.30
309980 WINCHA UND 40.00 4.00 159.94
329902 FLETE TERRESTRE GLB 492.88 1.00 492.88
3E+05 ROTURA DE BRIQUETAS DE CONCRETO UND 3.00 30.00 90.00
380000 HORMIGON M3 40.00 23.88 955.24
391317 CARTEL DE OBRA UND 150.00 1.00 150.00
399921 TAPA METALICA DE 0.20x0.25 m LLAVE DE TUERCAS E=1/8UND 32.00 69.00 2,208.00
430025 MADERA NACIONAL P/ENCOFRADO-CARP P2 1.80 136.82 246.28
437201 MADERA EUCALIPTO ROLLIZO P2 0.90 26.00 23.40
439901 MADERA CORRIENTE PARA ESTACAS P2 1.80 9.43 16.97
541190 PINTURA ESMALTE GLN 32.00 2.34 74.88
650227 CODO DE Fo. GALVANIZADO DE 1/2" x 900 UND 1.20 61.00 73.20
650501 UNION SIMPLE DE Fo. GALV. DE 1/2" UND 1.50 61.00 91.50
651406 NIPLE DE Fo Go DE 2" x 1/2" UND 2.90 61.00 176.90
680400 SUMIDERO DE BRONCE DE 2" UND 4.00 61.00 244.00
720016 TUB. PVC SAP PRESION C-10 EC DE 1/2" x5m M 2.60 16,034.00 41,688.40
720209 REDUCCION SP PVC SAP P/AGUA 3/4" A 1/2" UND 1.50 12.00 18.00
720210 REDUCCION SP PVC SAP P/AGUA 1" A 3/4" UND 1.50 6.00 9.00
720211 REDUCCION SP PVC SAP P/AGUA 1" A 1/2" UND 1.50 8.00 12.00
720214 REDUCCION SP PVC SAP P/AGUA 1 1/2" A 1/2" UND 4.50 1.00 4.50
720610 CODO DE 900 SP PVC SAP P/AGUA DE 1/2" UND 0.80 74.00 59.20
720615 CODO DE 900 SP PVC SAL DE 2" UND 4.00 183.00 732.00
720714 TEE SP PVC SAP P/AGUA DE 1/2" UND 1.50 15.00 22.50
723106 ADAPTADOR PVC SAP 1/2" UND 0.80 169.00 135.20
730126 TUBERIA PVC SAL 2" UND 10.00 104.31 1,043.10
731303 TEE PVC SAL 2" X 2" PZA 3.00 61.00 183.00
780224 VALVULA ESFERICA DE 1/2" UND 17.00 69.00 1,173.00 58,072.70
EQUIPOS
375316 BALDE PRUEBA-TAPON-ABRAZ. Y ACCESORIOS HE 0.80 159.94 127.95
484504 TAMIZ 3/4" HE 0.20 639.76 127.95
491903 NIVEL HE 5.00 160.57 802.86 1,058.77
HERRAMIENTAS
370101 HERRAMIENTAS MANUALES %MO 2,617.86 2,617.86
TIEMPO EN MESES
PART. DESCRIPCIÓN UND METRADO P.U. PRESUPUESTO 1ER 2DO
MES MES
1.0 INSTALACIONES PROVISIONALE Und 1.00 181.77 181.77 181.77 0.00
2.0 PILETAS PUBLICAS Und 61.00 16600.02 16600.02 16600.02 0.00
3.0 LINEA DE DISTRIBUCION ml 19.00 130479.22 130479.22 65239.61 65239.61
4.0 CAJA DE VALVULA DE CONTROL Und 1.00 968.79 968.79 0.00 968.79
5.0 FLETES Und 1.00 492.88 492.88 492.88 0.00
6.0 PRUEBAS DE LABORATORIO Und 3.00 30.00 90.00 60.00 30.00
SUB TOTAL 148812.67 82574.28 66238.40
Gastos Generales (12% C.D) Glb 1.00 8947.23 8947.23 4473.62 4473.62
Gastos de Supervision (3.34 % C.D. Glb 1.00 2492.47 2492.47 1246.24 1246.24
Gastos de pre Inversion Glb 1.00 4000.00 4000.00 4000.00
TOTAL GENERAL 164,252.38 92,294.13 71,958.25
CRONOGRAMA DE ADQUISICION DE MATERIALES
TIEMPO EN MESES
METRA PRESUPUE
PART. DESCRIPCIÓN UND P.U. 1ER 2DO
DO STO
MES MES
1 TOPOGRAFO HH 4.375 161.83 707.99 353.99 353.99
2 OPERARIO HH 4.375 2,503.52 10,755.39 5377.69 5377.69
3 OFICIAL HH 3.750 26.32 98.70 98.70 0.00
4 PEON HH 3.125 399.64 1,248.89 624.45 624.45
5 PEON (APORTE COMUNAL DE LOS BENHH 3.125 23,760.76 74,252.38 37126.19 37126.19
6 ALAMBRE NEGRO RECOCIDO # 16 KG 4.50 16.67 75.02 75.02
7 ALAMBRE NEGRO RECOCIDO # 8 KG 4.50 4.89 21.99 21.99
8 CLAVOS PARA MADERA C/C 2" KG 4.50 35.94 161.74 161.74
9 CLAVOS PARA MADERA C/C 3" KG 4.50 19.55 87.96 87.96
10 CLAVOS PARA MADERA C/C 4" KG 4.50 7.73 34.79 34.79
11 FIERRO CORRUGADO PROMEDIO KG 3.00 247.49 742.46 742.46
12 ARENA FINA M3 40.00 2.38 95.32 95.32
13 GRAVA 3/4 - 1/2 PULGADA M3 20.00 30.50 610.00 610.00
14 GRIFO DE BRONCE 1/2" UND 12.00 61.00 732.00 732.00
15 CEMENTO PORTLAND TIPO I P (42.5KG)BOL 22.00 183.21 4,030.66 4030.66
16 YESO BOL 5.00 0.38 1.89 1.89
17 CINTA TEFLON RLL 1.10 31.00 34.10 34.10
18 CORDEL M 80.00 0.93 74.40 74.40
19 PEGAMENTO PARA PVC OATEY GLN 105.00 12.26 1,287.30 1287.30
20 WINCHA UND 40.00 4.00 159.94 159.94
21 FLETE TERRESTRE GLB 492.88 1.00 492.88 492.88
22 ROTURA DE BRIQUETAS DE CONCRET UND 3.00 30.00 90.00 90.00
23 HORMIGON M3 40.00 23.88 955.24 955.24
24 CARTEL DE OBRA UND 150.00 1.00 150.00 150.00
25 TAPA METALICA DE 0.20x0.25 m LLAVE UND 32.00 69.00 2,208.00 2208.00
26 MADERA NACIONAL P/ENCOFRADO-CAP2 1.80 136.82 246.28 246.28
27 MADERA EUCALIPTO ROLLIZO P2 0.90 26.00 23.40 23.40
28 MADERA CORRIENTE PARA ESTACAS P2 1.80 9.43 16.97 16.97
29 PINTURA ESMALTE GLN 32.00 2.34 74.88 74.88
30 CODO DE Fo. GALVANIZADO DE 1/2" x 9UND 1.20 61.00 73.20 73.20
31 UNION SIMPLE DE Fo. GALV. DE 1/2" UND 1.50 61.00 91.50 91.50
32 NIPLE DE Fo Go DE 2" x 1/2" UND 2.90 61.00 176.90 176.90
33 SUMIDERO DE BRONCE DE 2" UND 4.00 61.00 244.00 244.00
34 TUB. PVC SAP PRESION C-10 EC DE 1/2M 2.60 16,034.00 41,688.40 41688.40
35 REDUCCION SP PVC SAP P/AGUA 3/4" AUND 1.50 12.00 18.00 18.00
36 REDUCCION SP PVC SAP P/AGUA 1" A 3UND 1.50 6.00 9.00 9.00
37 REDUCCION SP PVC SAP P/AGUA 1" A 1UND 1.50 8.00 12.00 12.00
38 REDUCCION SP PVC SAP P/AGUA 1 1/2"UND 4.50 1.00 4.50 4.50
39 CODO DE 900 SP PVC SAP P/AGUA DE 1UND 0.80 74.00 59.20 59.20
40 CODO DE 900 SP PVC SAL DE 2" UND 4.00 183.00 732.00 732.00
41 TEE SP PVC SAP P/AGUA DE 1/2" UND 1.50 15.00 22.50 22.50
42 ADAPTADOR PVC SAP 1/2" UND 0.80 169.00 135.20 135.20
43 TUBERIA PVC SAL 2" UND 10.00 104.31 1,043.10 1043.10
44 TEE PVC SAL 2" X 2" PZA 3.00 61.00 183.00 183.00
45 BALDE PRUEBA-TAPON-ABRAZ. Y ACC HE 0.80 159.94 127.95 127.95
46 TAMIZ 3/4" HE 0.20 639.76 127.95 127.95
47 NIVEL HE 5.00 160.57 802.86 802.86
48 HERRAMIENTAS MANUALES %MO 2,617.86 2617.86
PESO DE LOS MATERIALES A TRANSPORTAR
PRESUPUESTO ANALITICO
OBRA AMPLIACION DE AGUA POTABLE PUCACANCHA
CLIENTE MUNICIPALIDAD DISTRITAL DE KUNTURKANKI
PRECIO
DESCRIPCION UNIDAD CANTIDAD TOTAL
UNITARIO
Pago de honorarios de Residencia Mes 2.50 2,500.00 6,250.00
Utiles en gasto de liquidación Mes 1.00 417.23 417.23
Vestuario para Operario y Oficial Glb 3.00 460.00 1,380.00
Materiales de Escritorio Mes 2.00 250.00 500.00
Movilidad y viaticos Comité de Obr Mes 2.00 200.00 400.00
TOTAL 8,947.23
GASTOS DE SUPERVISION
PRECIO
DESCRIPCION UNIDAD CANTIDAD TOTAL
UNITARIO
Gastos de capacitacion Glb 1.00 992.47 992.47
Movilidad y viaticos supervisor Mes 2.50 400.00 1,000.00
Materiales de Escritorio Mes 2.50 200.00 500.00
TOTAL 2,492.47
PRECIO
DESCRIPCION UNIDAD CANTIDAD TOTAL
UNITARIO
Elaboracion del expediente tecnico Glb 1.00 4,000.00 4,000.00
TOTAL 4,000.00
COSTO TOTAL DE FINANCIAMIENTO
DESCRIPCION MONTO
COSTO DIRECTO CON APORTE COMUNAL 148,812.67
COSTO DIRECTO SIN APORTE COMUNAL 74,560.29
APORTE DE LA COMUNIDAD 74,252.38
GASTOS GENERALES 8,947.23
GASTOS DE PRE INVERSION 4,000.00
GASTOS DE SUPERVISION 2,492.47
COSTO TOTAL DEL PROYECTO 90,000.00
SON:
NOVENTA MIL CON 00/100 NUEVOS SOLES
PRECIO
DESCRIPCION UNIDAD CANTIDAD TOTAL
UNITARIO
TOTAL 74,252.38
CRONOGRAMA DE EJECUCION FISICA DEL PROYECTO
OBRA AMPLIACION DE AGUA POTABLE PUCACANCHA
CLIENTE MUNICIPALIDAD DISTRITAL DE KUNTURKANKI
MES 1 MES 2
PARTIDA DESCRIPCION UND CANTIDAD
S-1 S-2 S-3 S-4 S-1 S-2 S-3 S-4
Nº Sub Observa
Concepto Und Vece Cantidad Altura Ancho Largo Total
Total ciones
s
PILETAS DOMICILIARIAS
TRAZO Y REPLANTEO m2 61.00 1.00 1.00 1.50 1.00 91.50 91.50
EXCAVACION MANUAL m3 61.00 1.00 1.00 1.00 1.00 61.00 61.00
ENCOFRADO Y DESENCOFRADO m2 61.00 2.00 0.70 1.00 0.25 21.44 72.13
m2 61.00 2.00 0.20 1.00 0.85 20.74
m2 61.00 2.00 0.16 1.00 0.80 15.40
m2 61.00 4.00 0.10 1.00 0.60 14.64
CONCRETO F'C= 175 KG/CM2 m3 61.00 1.00 0.30 0.85 0.80 12.44 20.15
m3 61.00 1.00 0.10 0.80 0.85 4.15
m3 61.00 2.00 0.10 0.10 0.85 1.04
m3 61.00 2.00 0.10 0.13 0.60 0.91
m3 61.00 1.00 0.70 0.15 0.25 1.60
TARRAJEO EXTERIOR MEZCLA 1:5 m2 61.00 2.00 0.70 1.00 0.25 21.44 79.43
m2 61.00 2.00 0.11 1.00 0.85 11.72
m2 61.00 2.00 0.10 1.00 0.80 9.76
m2 61.00 4.00 0.10 1.00 0.60 14.64
m2 61.00 1.00 1.00 0.60 0.60 21.96
ACERO FY= 4,200 KG/CM2 kg 61.00 0.28 1.00 1.00 13.80 235.72 235.72
COLOCACION DE ACCESORIOS glb 61.00 1.00 1.00 1.00 1.00 61.00 61.00
FILTRO DE GRAVA m3 61.00 1.00 1.00 0.50 1.00 30.50 30.50
LINEA DE DISTRIBUCION
Trazo y replanteo ml 1.00 1.00 1.00 1.00 ### ### 15,994.00
Excavación material suelto 0.45x0ml 1.00 1.00 1.00 1.00 ### ### 15,994.00
Refine y nivelación terreno normalml 1.00 1.00 1.00 1.00 ### ### 15,994.00
Cama de apoyo ml 1.00 1.00 1.00 1.00 ### ### 15,994.00
Relleno material propio ml 1.00 1.00 1.00 1.00 ### ### 15,994.00
Sumin.e instal.Tubo PVC 1/2" C-1ml 1.00 1.00 1.00 1.00 ### ### 15,994.00
Instalación de accesorios gbl 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Prueba hidráulica ml 1.00 1.00 1.00 1.00 ### ### 15,994.00