FECHA: 10/10/2023 Día hábil:
Días Total: 30
A. Cuadro Resumen
250 CX 9380 60.00 42.00 48.80 81% ARMADO DE CUADRO 1.5 ARMADO DE CUADRO 1.5 18.0 16.9
210 CH 9330 3.00 2.10 0.00 0%
210 CX 9343N 20.00 14.00 8.00 40%
Zona 150
210 GAL9364W 60.00 42.00 20.10 34% 1.5 1.5 1.5 1.5
210 CH 9355 30.00 21.00 16.00 53% 1.1 1.1 1.1 13.6 13.6
210 CH 9255 30.00 21.00 0.00 0%
210 SN 9305 W 20.00 14.00 6.40 32%
210 SN 9255 E 30.00 21.00 15.54 52%
210 SN 9255 W 30.00 21.00 34.20 114% 1.5 1.5 1.5 1.5 10.6 10.7
Sub total 283.0 198.1 149.0 53% 3.0 5.6 4.1 5.6
1250 GA 6895 E 15.00 10.50 29.90 199% 1.5 ARMADO DE CUADRO 1.5 15.5 16.9
690 GA 8756 E 50.00 35.00 30.60 61% 1.5 1.5 DESQ. DESMONTE 1.5 15.5 16.9
690 BY 8360 15.00 10.50 20.50 137% 1.5 1.5 1.5 15.5 16.9
Mercedes Baja
Sub total 130.0 91.0 75.9 58% 3.0 3.0 0.0 3.0
Cumplimiento 80%
Otros Trabajos
Zona Nivel Labor Descripción
C. Gráficas
1 2 3 4 4 5 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 P MENS
24 26 27 28 29 30 31 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 441.00 CUMPLIMIENTO
ZONA NIVEL LABOR FASE PROG. M VAR D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N EJEC/PROG MENSUAL
ZONA 150 210 CX9343N EXPLORACIÓN 20 PROG 1.5 1.5 1.5 1.5 1.5 1.5 LIMPIEZA 9
ZONA 150 EXPLORACIÓN EJEC 1.6 1.6 1.6 1.6 IMPRODUCTIVO 1.6 LIMPIEZA 8 40%
CUMPL 95% 80% 87% 66% 77% 72% 78% 78% 74% 79% 78% 89% 84% 95% 79% 124% 70% 55% 90% 59% 69% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 16.8028932325 63%
FECHA 9-Oct 10-Oct 11-Oct 12-Oct 13-Oct 14-Oct
PROG 16.29 16.29 16.29 16.29 16.29 16.29
EJEC 16.1 14 15 14.3 15.4 12.7
CUMPL 99% 86% 92% 88% 95% 78%
PROGRAMA EJECUTADO A LA SE
15-Oct FECHA 9-Oct 10-Oct 11-Oct 12-Oct
16.29 PROG 16.29 16.29 16.29 16.29
16.1 EJEC 16.1 14 15 14.3
99% CUMPL 99% 86% 92% 88%
CUTADO A LA SEMANA
13-Oct 14-Oct 15-Oct CUMP.
16.29 16.29 16.29 114.03
15.4 12.7 16.1 103.6
95% 78% 99% 91%