ANDRES PRESUPUESTO PARA A EJE Caso - Cálculo de candades de obra AVENDAÑO EDIFICACIONES II-COSTOS UNIVER de un proyecto de edifcación. BRAVO DIRECTOS SAL AR EA S EXC SO SOBR SW C T LIM VIGA DE PIS 3 WI TU AVA LA ECIMI COLU VIGAS RE TUB IC LA TO O E PIE S DE M O AL CH TO BE EJE A CION DO ENTO MNAS DE VO O HE MP MA D E LO ZA CIME UR EN CU A E M RI O AL R CIME e- EN CONFI CONFI QU VER SE AR CO O P NGI DESC Y NTA O CO BIE MB TR A A CUA TU E NTA 0.0 BLOQ NAMI NAMI E DE NC A RRI 9 V TU UENT DES CION EN NC RT RE IPL TR PV DRI RA A CION 5* UE ENTO ENTO 0.0 1/2" ILL DE ENT 0° C D OS CAP (0.40 BL RET A Nª E IFI C CUL M M (0.85 0.4 ALTU (0.10* (0.10* 1M (ELE O PA E 1 1 M OTE *0.3 O O M2 12 (U LA 1/ A 2 *0.4 0 RA 0.20) 0.20) (M CT) (U RE DO / / (M2 ) 0) (M 0) M3 0.50 (M3) UEQ M3 50.0 M 3) M (M ) NI NI D D BLE R 2" M 2 2 M3 3) (M2) D) " " (M A) 2) (A- 3 6, 39, 34. 34. D) 6,5 9, 1 65 81 8 (1-6) 7 2*V1 1 1 = 10 (A- 2, 3, 3,125 0.1 ,9 12, D) 6 3 8 M2 2.04 2 0.72 3 0,042 1 0,12 0,2 4,13 39 1 1 2 2. 1*P2 (A- 2, 9 =1.68 0.44 0.0 0.15 0, 0,0 23, D) 1,3 3 9 M2 2 26 6 0.65 0,084 7 0,02 1 7,9 7 1 3 4, 0.0 3 1,8 2, 3 0.63 37 4. 0,0 (A-D 7 3 0 58 4 0,22 0.935 0,042 07 0,03 8 4 1,1 5,4 (A-D 2,05 9 1 4 2 4 1P4+ 5 (B- 7, 1V3= D) 3,0 2, 0 1,84 0,0 6, 0,1 11,