CNDC Informe de la Programación de Mediano Plazo may/22 - abr/26

ANEXO 3A

DIFERENCIAS OBSERVADAS EN LA INFORMACION DE LOS AGENTES


Declaración Declaración
Elemento / Componente Nov/21 - Oct/25 May/22 - Abr/26

1. INGRESO DE NUEVOS PROYECTOS AL SIN

1.1 GENERACIÓN HIDROELÉCTRICA

Central Hidroeléctrica Cóndor (1.46 MW) 18-11-22 24-03-23

1.2 GENERACIÓN TERMOELECTRICA

Geotérmica Laguna Colorada (5 MW) 19-10-21 28-04-22

1.3 GENERACIÓN CON FUENTES RENOVABLES

Unidad 02 Eólica San Julián (3.6 MW) 30-10-21 01-05-22


Eólica Ventolera (24 MW) 23-10-23 30-11-24
Eólica Warnes 02 (21 MW) 23-10-23 30-11-24
Unidad 03 Eólica El Dorado (3.6 MW) 08-10-21 -

1.4 SISTEMA DE TRANSMISIÓN

1.4.1. ENDE TRANSMISIÓN

Transformador Yaguacua 230/132 kV - 31-03-22


Línea Yaguacua-Frontero 132 kV - 31-03-22
Línea Solar Oruro-Pagador I 115 kV 31-03-22 31-05-22
Línea Solar Oruro-Pagador II 115 kV 31-03-22 31-05-22
Línea Tarija-Angostura 115 kV 31-05-22 31-07-22
Línea Ventolera-Bermejo 115 kV 31-05-22 31-07-22
Transformador 1 Carrasco 500/230 kV 31-05-22 31-08-22
Transformador 2 Carrasco 500/230 kV 31-05-22 31-08-22
Transformador 1 Santivañez 500/230 kV 31-05-22 31-08-22
Transformador 2 Santivañez 500/230 kV 31-05-22 31-08-22
Bahía de transformador 115 kV Paraíso - 31-08-22
Línea Santivañez-Carrasco 500 kV 31-05-22 31-08-22
Bahía 115 Catavi, configuración anillo - 30-09-23
Línea Umapalca-Palca 230 kV 20-11-23 20-12-23
Transformador 1 Brechas 500/230 kV 31-03-23 31-12-23
Transformador 2 Brechas 500/230 kV 31-03-23 31-12-23
Línea Carraso-Brechas 500 kV 31-03-23 31-12-23
Línea Mizque-Sehuencas I 230 kV 31-07-24 31-12-23
Línea Mizque-Sehuencas II 230 kV 31-07-24 31-12-23
Línea Santivañez-Irpa Irpa 115 kv (repotenciada) - 31-12-23
Línea Santivañez-Mizque I 230 kV 31-07-24 31-12-23
Línea Santivañez-Mizque II 230 kV 31-07-24 31-12-23
Línea Mizque-Sucre 230 kV - 30-04-24
Línea Irpa Irpa-Sacaca 15 kV (repotenciada) - 30-06-24
Línea Palillada-Miguillas 230 kV - 20-12-24
Línea Catavi-Sacaca 115 kV (repotenciada) - 31-12-24
Transformador Jeruyo 115/69 kV - 31-08-25
Línea Los Troncos-San Ignacio de Velasco 230 kV - -
Transformador Potosí II 230/115 kV 30-04-25 -
Línea Mizque-Sucre II 230 kV 30-04-25 -
Línea Potosí II-Potosí 115 kV 30-04-25 -
Línea Potosí II-Punutuma 230 kV 30-04-25 -
Línea Sucre II-Sucre 230 kV 30-04-25 -
Línea Sucre II-Potosí II 230 kV 30-04-25 -

1.4.2. ENDE CORPORACIÓN

Transformador Paraíso 115/24.9/10.5 kV - 31-08-22


Línea Santivañez - Cumbre 230 kV 30-06-22 20-12-23
Línea Miguillas-Cumbre 230 kV - 20-12-24
Línea Palillada - Umapalca 230 kV 20-11-24 20-12-24
Línea Santivañez-Miguillas 230 kV - 20-12-24

2. RETIRO DE COMPONENTES DEL SIN

2.1 ENDE

Unidad MOS01 (1.40 MW) - 03-02-22


Unidad MOS02 (1.40 MW) - 03-02-22
Unidad MOS03 (1.40 MW) - 03-02-22
Unidad MOS04 (1.40 MW) - 03-02-22
Unidad MOS05 (1.40 MW) - 03-02-22
Unidad MOS06 (1.40 MW) - 03-02-22
Unidad MOS07 (1.40 MW) - 03-02-22
Unidad MOS08 (1.40 MW) - 03-02-22
Unidad MOS09 (1.40 MW) - 03-02-22
Unidad MOS10 (1.40 MW) - 03-02-22
Unidad MOS11 (1.40 MW) - 03-02-22
Unidad MOS12 (1.40 MW) - 03-02-22
Unidad MOS13 (1.40 MW) - 03-02-22
Unidad MOS14 (1.40 MW) - 03-02-22

Transformador Trinidad 115/24.9/10.5 kV - 01-08-22


Línea Santivañez - Palca II 230 kV 30-06-22 20-12-23
Línea Santivañez - Cumbre 230 kV - 20-12-24

2.2 ENDE TRANSMISION

Línea Solar Oruro-Pagador 115 kV 31-03-22 31-05-22


Línea Valle Hermoso - Irpa Irpa en 115 kV - 30-06-23
Línea Irpa Irpa - Sacaca en 115 kV - 31-12-23
Línea Catavi - Sacaca en 115 kV - 30-06-24

3. CARACTERISTICAS TÉCNICAS CENTRALES HIDROELÉCTRICAS

Topología, caudales y volúmenes

Toma Calachaka Jahuira vierte a Miguillas Umpalca, tiempo de viaje (hrs) - 0.67
Toma Carabuco vierte a Miguillas Umpalca, tiempo de viaje (hrs) - 1.00
Toma Chaca Jahuira vierte a Jalancha Umpalca, tiempo de viaje (hrs) - 0.42
Toma Chuca Loma vierte a Jalancha Umpalca, tiempo de viaje (hrs) - 0.42
Umapalca LG vierte a Jalancha Umpalca, tiempo de viaje (hrs) - 0.50
Calachaka Jahuira LG vierte a Calachaka Jahuira, tiempo de viaje (hrs) - 1.00
Calachaka Jahuira LG turbina a Calachaka Jahuira, tiempo de viaje (hrs) 1.00 -
Camara de Carga Umpalca turbina a Jalancha Umapalca, tiempo de viaje (hrs) 0.50 -

Calacha Jahuira Umpalca (Miguillas), caudales incrementales (m3/seg) Semanas 1-52 (Año 1961-2020) Semanas 1-52 (Año 1961-2020)
Chaca Jahuira Umapalca (Jalancha), caudales incrementales (m3/seg) Semanas 1-52 (Año 1961-2020) Semanas 1-52 (Año 1961-2020)
Toma Choro, caudales incrementales (m3/seg) Semanas 1-52 (Año 1961-2020) Semanas 1-52 (Año 1961-2020)
Toma Kewani, caudales incrementales (m3/seg) Semanas 1-52 (Año 1961-2020) Semanas 1-52 (Año 1961-2020)
Presa Calachajahuira, caudales incrementales (m3/seg) Semanas 1-52 (Año 1961-2020) Semanas 1-52 (Año 1961-2020)
Toma Calachaka Jahuira, caudales incrementales (m3/seg) Semanas 1-52 (Año 1961-2020) Semanas 1-52 (Año 1961-2020)
Toma Carabuco, caudales incrementales (m3/seg) Semanas 1-52 (Año 1961-2020) Semanas 1-52 (Año 1961-2020)
Toma Chaca Jahuira, caudales incrementales (m3/seg) Semanas 1-52 (Año 1961-2020) Semanas 1-52 (Año 1961-2020)
Toma Chuca Loma, caudales incrementales (m3/seg) Semanas 1-52 (Año 1961-2020) Semanas 1-52 (Año 1961-2020)

Central Carabuco, caudales incrementales (m3/s) Semanas 1 - 52 (años 2007-2020) Semanas 1 - 52 (años 2007-2020)
Aportes Carabuco Lago, caudales incrementales (m3/s) Semanas 1 - 52 (años 2007-2020) Semanas 1 - 52 (años 2007-2020)
CNDC Informe de la Programación de Mediano Plazo may/22 - abr/26

ANEXO 3A

DIFERENCIAS OBSERVADAS EN LA INFORMACION DE LOS AGENTES


Declaración Declaración
Elemento / Componente Nov/21 - Oct/25 May/22 - Abr/26
4. COSTOS VARIABLES O&M

Unidad 01 Bulo Bulo 7.500 / 8.000 / 8.500 4.000 / 5.500 / 8.500


Unidad 02 Bulo Bulo 7.500 / 8.000 / 8.500 4.000 / 5.500 / 8.500
Unidad 03 Bulo Bulo 7.500 / 8.000 / 8.500 4.000 / 5.500 / 8.500

Unidad AGU01 Max Resolución AE N° 404/2019 Max Resolución AE N° 423/2019


Unidad SBU01 Max Resolución AE N° 404/2019 Max Resolución AE N° 423/2019
Unidad UNA01 Max Resolución AE N° 404/2019 Max Resolución AE N° 423/2019
Unidad ARJ01 Max Resolución AE N° 404/2019 Max Resolución AE N° 423/2019
Unidad ARJ02 Max Resolución AE N° 404/2019 Max Resolución AE N° 423/2019
Unidad ARJ03 Max Resolución AE N° 404/2019 Max Resolución AE N° 423/2019
Unidad ARJ09 Max Resolución AE N° 404/2019 Max Resolución AE N° 423/2019
Unidad ARJ11 Max Resolución AE N° 404/2019 Max Resolución AE N° 423/2019
Unidad ARJ12 Max Resolución AE N° 404/2019 Max Resolución AE N° 423/2019
Unidad ARJ13 Max Resolución AE N° 404/2019 Max Resolución AE N° 423/2019
Unidad ARJ14 Max Resolución AE N° 404/2019 Max Resolución AE N° 423/2019
Unidad ARJ15 Max Resolución AE N° 404/2019 Max Resolución AE N° 423/2019

Unidad VHE05 Max. Según Resolución AE 423/2019 6.399 / 6.399 / 6.399


Unidad VHE06 Max. Según Resolución AE 423/2019 6.399 / 6.399 / 6.399
Unidad VHE07 Max. Según Resolución AE 423/2019 6.399 / 6.399 / 6.399
Unidad VHE08 Max. Según Resolución AE 423/2019 6.399 / 6.399 / 6.399
Unidad ALT02 Max. Según Resolución AE 423/2019 5.110 / 5.110 / 5.110

5. CARACTERÍSTICAS TÉCNICAS DE UNIDADES CON FUENTES


DE ENERGIAS RENOVABLES

Eólica el Dorado, Tiempo de vida (años) 30 20


Eólica San Julián, Tiempo de vida (años) 30 20
Eólica la Ventolera, Tiempo de vida (años) 30 20
Eólica Warnes 01, Tiempo de vida (años) 30 20
Eólica Warnes 02, Tiempo de vida (años) 30 20

Central Eólica Qollpana Fase I Curva de Potencia periodo Seco Curva de Potencia periodo Seco
Central Eólica Qollpana Fase I Curva de Potencia periodo lluvioso Curva de Potencia periodo lluvioso
Central Eólica Qollpana Fase 1, Factor de planta mensual Julio-Diciembre Julio-Diciembre
Central Eólica Qollpana Fase 2, Factor de planta mensual Julio-Diciembre Julio-Diciembre

Solar Uyuni, Factor de planta (%) Enero-Diciembre Enero-Diciembre


Solar Yunchara, Factor de planta (%) Enero-Diciembre Enero-Diciembre
Solar Uyuni, Potencia neta por hora y semana (MW) Año 2018-2025 Año 2018-2025
Solar Yunchara, Potencia neta por hora y semana (MW) Año 2018-2025 Año 2018-2025

6. CARACTERISTICAS TECNICAS DE LOS ELEMENTOS DE TRANSMISION

6.1 Líneas de Transmisión


6.1.1 Capacidad Operativa (MVA/MW)

Línea Catavi - Sacaca 115 kV repotenciada - 100 / 95


Línea Irpa Irpa - Sacaca 115 kV repotenciada - 100 / 95
Línea Mizque - Sucre 230 kV - 240 / 228
Línea Palillada - Miguillas 230 kV - 215.00 / 204.25
Línea Santivañez - Irpa Irpa 115 kV repotenciada - 100 / 95
Línea Troncos - San Ignacio de Velasco 230 kV - 94.74 / 90
Línea Umapalca-Palca 230 kV 261 / 247.95 215 / /204.25
Línea Yaguacua - Frontera 132 kV - 126.30 / 120
Línea Mizque - Sucre II 230 kV 283 / 268.85 -
Línea Potosi II-Potosi 115 kV 136 / 129.20 -
Línea Potosi II-Punutuma 230 kV 187.00 / 177.65 -
Línea Sucre II-Sucre 230 kV 390.00 / 370.50 -
Línea Sucre II-Potosi II 230 kV 187.00 / 177.65 -

Línea Caranavi-Yucumo 115 kV 35.00 / 33.25 78.00 / 74.00


Línea Miguillas-Cumbre 230 kV - 164.00 / 155.80
Línea Monteagudo-Camiri 115 kV 13.40 / 12.73 16.00 / 15.20
Línea San Ignacio deMoxos-Trinidad 115 kV 35.00 / 33.25 78.00 / 74.00
Línea Padilla-Monteagudo 115 kV 18.10 / 17.20 25.30 / 24.04
Línea Palillada-Umapalca 230 kV 269.00 / 255.55 215.00 / 204.25
Línea Santivañez-Miguillas 230 kV - 164.00 / 155.80
Línea San Borja-San Ignacio de Moxos 115 kV 35.00 / 33.25 78.00 / 74.00
Línea Yucumo-San Borja 115 kV 35.00 / 33.25 78.00 / 74.00

6.1.2 Longitud de línea (km)

Línea Catavi - Sacaca 115 kV repotenciada - 43.38


Línea Guarayos-Paraiso I 230 kV 228.13 230.55
Línea Guarayos-Paraiso II 230 kV 228.13 230.55
Línea Irpa Irpa - Sacaca 115 kV repotenciada - 43.23
Línea Mizque - Sucre 230 kV - 145.00
Línea Palillada - Miguillas 230 kV - 13.30
Línea Paraiso-Trinidad I 115 kV 11.27 11.14
Línea Paraiso-Trinidad II 115 kV 11.27 11.14
Línea Santivañez - Irpa Irpa 115 kV repotenciada - 28.00
Línea Los Troncos-Guarayos I 230 kV 160.76 141.61
Línea Los Troncos-Guarayos II 230 kV 160.76 141.61
Línea Troncos - San Ignacio de Velasco 230 kV - 235.00
Línea Yaguacua - Frontera 132 kV - 46.47
Línea Mizque - Sucre II 230 kV 155.00 -
Línea Potosi II-Potosi 115 kV 13.00 -
Línea Potosi II-Punutuma 230 kV 68.00 -
Línea Sucre II-Sucre 230 kV 30.00 -
Línea Sucre II-Potosi II 230 kV 107.00 -

Línea Miguillas-Cumbre 230 kV - 102.20


Línea Monteagudo-Camiri 115 kV 53.00 52.78
Línea Padilla-Monteagudo 115 kV 69.00 69.21
Línea Santivañez-Miguillas 230 kV - 175.20
CNDC Informe de la Programación de Mediano Plazo may/22 - abr/26

ANEXO 3A

DIFERENCIAS OBSERVADAS EN LA INFORMACION DE LOS AGENTES


Declaración Declaración
Elemento / Componente Nov/21 - Oct/25 May/22 - Abr/26
6.1.3 Resistencia (%) / Reactancia (%) / Susceptancia (MVAr)

Línea Bélgica - Troncos en 230 kV 0.8534 / 5.4711 / 20.5729 0.8461 / 5.4694 / 20.6401
Línea Bélgica-Troncos II 230 kV 0.8534 / 5.4711 / 20.5729 0.8461 / 5.4694 / 20.6401
Línea Catavi - Sacaca 115 kV repotenciada - 2.0097 / 12.9592 / 1.672
Línea Guarayos-Paraiso I 230 kV 1.9661 / 12.9827 / 46.326 1.9863 / 12.8729 / 47.7836
Línea Guarayos-Paraiso II 230 kV 1.9661 / 12.9827 / 46.326 1.9863 / 12.8729 / 47.7836
Línea Irpa Irpa - Sacaca 115 kV repotenciada - 2.0028 / 12.9144 / 1.6662
Línea Mizque - Sucre 230 kV - 1.2472 / 8.3546 / 29.0083
Línea Palillada - Miguillas 230 kV - 0.1305 / 0.7464 / 2.6959
Línea Paraiso-Trinidad I 115 kV 0.7634 / 3.3242 / 0.4339 0.7634 / 3.4733 / 0.4149
Línea Paraiso-Trinidad II 115 kV 0.7640 / 3.3230 / 0.4339 0.7611 / 3.4780 / 0.4148
Línea Santivañez - Irpa Irpa 115 kV repotenciada - 1.2972 / 8.3646 / 1.0792
Línea Los Troncos-Guarayos I 230 kV 1.3855 / 9.1487 / 32.6453 1.2202 / 7.9266 / 29.2774
Línea Los Troncos-Guarayos II 230 kV 1.3855 / 9.1487 / 32.6453 1.2202 / 7.9266 / 29.2774
Línea Troncos - San Ignacio de Velasco 230 kV - 2.0089 / 12.2860 / 51.5469
Línea Umapalca-Palca 230 kV 0.8276 / 4.8781 / 17.6708 0.7467 / 4.8634 / 17.7921
Línea Yaguacua - Frontera 132 kV - 1.6082 / 5.3900 / 4.6187
Línea Mizque - Sucre II 230 kV 1.3358 / 8.6290 / 32.1078 -
Línea Potosi II-Potosi 115 kV 0.5976 / 4.033 / 0.4835 -
Línea Potosi II-Punutuma 230 kV 0.5860 / 3.7856 / 14.086 -
Línea Sucre II-Sucre 230 kV 0.2575 / 1.6770 / 6.1352 -
Línea Sucre II-Potosi II 230 kV 0.9221 / 5.9568 / 22.1648 -

Línea Miguillas-Cumbre 230 kV - 1.1856 / 7.9405 / 15.1950


Línea Monteagudo-Camiri 115 kV 5.7694 / 16.6805 / 1.9229 5.7509 / 16.7340 / 1.9039
Línea Padilla-Monteagudo 115 kV 7.9471 / 22.9716 / 2.6485 7.5359 / 21.9326 / 2.4981
Línea Palillada-Umapalca 230 kV 0.1401 / 0.9651 / 1.7184 0.1175 / 0.6735 / 2.4324
Línea Santivañez-Miguillas 230 kV - 2.0332 / 13.4517 / 26.3757

6.1.4 Capacidad de Sobrecarga % (15 min/30 min)

Línea Catavi - Sacaca 115 kV repotenciada - 0/0


Línea Irpa Irpa - Sacaca 115 kV repotenciada - 0/0
Línea Mizque - Sucre 230 kV - 13.75 / 7.08
Línea Palillada - Miguillas 230 kV - 20 / 10
Línea Santivañez - Irpa Irpa 115 kV repotenciada - 0/0
Línea Troncos - San Ignacio de Velasco 230 kV - 79 / 45
Línea Umapalca-Palca 230 kV 20.50 / 11.42 20 / 10
Línea Yaguacua - Frontera 132 kV - 37.77 / 28.27
Línea Mizque - Sucre II 230 kV 0/0 -
Línea Potosi II-Potosi 115 kV 0/0 -
Línea Potosi II-Punutuma 230 kV 20.86 / 17.65 -
Línea Sucre II-Sucre 230 kV 0/0 -
Línea Sucre II-Potosi II 230 kV 20.86 / 17.65 -

Línea Miguillas-Cumbre 230 kV - 20 / 10


Línea Monteagudo-Camiri 115 kV 3.00 / 1.70 12.50 / 6.90
Línea Padilla-Monteagudo 115 kV 3.00 / 1.60 10.70 / 5.50
Línea Palillada-Umapalca 230 kV 20 / 10 20 / 10
Línea Santivañez-Miguillas 230 kV - 20 / 10

6.2 Transformadores

6.2.1 Capacidad Operativa (MVA/MW)

Transformador Yaguacua 230/132 kV - 150.0 / 142.5


Transformador Jeruyo 115/69 kV - 50.0 / 42.5
Transformador Potosi II 230/115 kV 150.0 / 142.5 -

Transformador Paraiso 115/24.9/10.5 kV - 25.00 / 23.75

6.2.2 Capacidad de Sobrecarga (15 min % / 30 min %)

Transformador Yaguacua 230/132 kV - 0/0


Transformador Jeruyo 115/69 kV - 0/0
Transformador Paraiso 230/115 kV 20 / 10 20 / 20
Transformador Potosi II 230/115 kV 20 / 10 -

Transformador Paraiso 115/24.9/10.5 kV - 20 / 10

6.2.3 Resistencia (%) / Reactancia (%)

Transformador Yaguacua 230/132 kV - 0.1528 / 5.4333


Transformador Jeruyo 115/69 kV - 0.2966 / 10.1000
Transformador Paraiso 230/115 kV 0.1383 / 5.6416 0.1545 / 6.2033
Transformador Potosi II 230/115 kV 0.1340 / 5.7784 -

Transformador Paraiso 115/24.9/10.5 kV - 2.0400 / 31.9200

6.2.4 Tap mínimo / Tap máximo (p.u.)

Transformador Yaguacua 230/132 kV - 0.85 / 1.10


Transformador Jeruyo 115/69 kV - 0.90 / 1.10
Transformador Potosi II 230/115 kV 0.90 / 1.1 -

Transformador Paraiso 115/24.9/10.5 kV - 0.90 / 1.10


Informe de la Programación de Mediano Plazo may/22 - abr/26

ANEXO 3A

DIFERENCIAS OBSERVADAS EN LA INFORMACION DE LOS AGENTES

Observación
Pagina 1 de 3

Nota ENDE-UTDI-2/20-22

Nota ENDE-UTDI-2/20-22

Nota ENDE-UTDI-2/20-22
"
"
"

Nota GP-0281-22
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
Nota GP-1184-21
"
"
"
"
"

Nota ENDE-UTDI-2/20-22
"
"
"
"

Nota ENDE-UTDI-2/20-22
"
"
"
"
"
"
"
"
"
"
"
"
"

Nota ENDE-UTDI-2/20-22
"
"

Nota GP-0281-22
"
"
"

Nota ENDE-UTDI-2/20-22
"
"
"
"
"
"
"

Nota ENDE-UTDI-2/20-22
"
"
"
"
"
"
"
"

Nota L-SDC-0115-2022
"
Informe de la Programación de Mediano Plazo may/22 - abr/26

ANEXO 3A

DIFERENCIAS OBSERVADAS EN LA INFORMACION DE LOS AGENTES

Observación
Pagina 2 de 3

Nota CECBB-0122-2022
"
"

Nota EGSA-GG-079-DCR-094-2022
"
"
"
"
"
"
"
"
"
"
"

Nota EVH-GGN-099/22
"
"
"
"

Nota ENDE-UTDI-2/20-22
"
"
"
"

Nota EC-GG-22/2-2022
"
"
"

Nota EGSA-GG-079-DCR-094-2022
"
"
"

Nota GP-0281-22
"
"
"
"
"
"
"
Nota GP-1184-21
"
"
"
"

Nota ENDE-UTDI-2/20-22
"
"
"
"
"
"
"
"

Nota GP-0281-22
"
"
"
"
"
"
"
"
"
"
"
"
Nota GP-1184-21
"
"
"
"

Nota ENDE-UTDI-2/20-22
"
"
"
Informe de la Programación de Mediano Plazo may/22 - abr/26

ANEXO 3A

DIFERENCIAS OBSERVADAS EN LA INFORMACION DE LOS AGENTES

Observación
Pagina 3 de 3

Nota GP-0281-22
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
Nota GP-1184-21
"
"
"
"

Nota ENDE-UTDI-2/20-22
"
"
"
"

Nota GP-0281-22
"
"
"
"
"
"
"
Nota GP-1184-21
"
"
"
"

Nota ENDE-UTDI-2/20-22
"
"
"
"

Nota GP-0281-22
"

Nota ENDE-UTDI-2/20-22

Nota GP-0281-22
"
"

Nota ENDE-UTDI-2/20-22

Nota GP-0281-22
"
"

Nota ENDE-UTDI-2/20-22

Nota GP-0281-22
"
"

Nota ENDE-UTDI-2/20-22
CNDC Informe de la Programación de Mediano Plazo may/22 - abr/26

ANEXO 3B
SISTEMA DE TRANSMISIÓN UTILIZADO EN LA SIMULACIÓN DE LA OPERACIÓN
SBU-115
RURRENABAQUE 95
YUC-115
MOX-115 T 53
55 S. BUENAVENTURA 64
SANTA ANA T YUCUMO
31.10 [MW] T CRN-115
T 4.31 [MVAr] 127
12.862+j36.912 CHS-115
TRI-115 SAN IGNACIO 126
SBO-115 5 [MVAr] CUMBRE
56 T 54 123
63 62 61 135 134 133 142.50 [MW]
C. MOXOS 0.1383+j5.6433 132
74.00 [MW] 74.00 [MW] 74.00 [MW] 74.00 [MW] 74.00 [MW] 90.00 [MW] 123
T 155.8 [MW] T max: 1.1 pu
PARAISO 3.12 [MVAr] 5.09 [MVAr] 1.48 [MVAr] 3.82 [MVAr] 2.32 [MVAr] MIG-230 1.60 [MVAr]
Tmin: 0.9 pu
111
118.83 [MW]
69.54 [MW] 9.2378+j26.839 15.318+j44.019 4.5104+j13.028 10.098+j29.858 6.9385+j20.074 26.38 [MVAr] 270 4.8883+j14.446 0.26 [MVAr]
178 SAN BORJA 362 138 125.08 [MW]
21 MVAr 179 0.41 [MVAr] 279 9 MVAr SANTIVAÑEZ 2.0332+j13.452
18-45 0.31 [MVAr] 0.6168+j2.0806
0.7634+j3.4733 T PIC-115 32
155.8 [MW] 12 MVAr 0.8266+j2.7627
277 130 128 204.25 [MW] 364
15.20 [MVAr] PALCA
YANACACHI 2.70 [MVAr]
366 MVAr CHQ-115 129
1.1856+j7.9405 137 121
21 142.50 [MW] 69.54 [MW] 0.1305+j0.7464 204.25 [MW] 119.00 [MW]
0.41 [MVAr] 278 H 58.70 [MW] 204.25 [MW]
[MVAr] 0.1545+j6.2033 STAT
5.0000+j24.740 179 118.83 [MW] AAR-115 CTC-115 CHA-115 1.05 [MVAr]
COM +/-50 152 2.43 [MVAr] 151 17.79 [MVAr]
T max: 1.1 pu 0.7611+j3.4780 0.15 [MVAr] 109 120 119 117 2.4783+j8.3592
T min: 0.9 pu [MVAr] 129 206 0.1175+j0.6735 0.7467+j4.8634 0.3707+j1.2639 113 115 117 119
CHOJLLA 300 PAM-115
40.80 [MW] 170.30 [MW] H 258 H 259 122 147.00 [MW] 147.00 [MW] 92.72 [MW] 93.10 [MW]
H 90.00 [MW] 12 MVAr 131 90.00 [MW]
8.5000+j32.600 180 0.39 [MVAr] 136 427.50 [MW] 18 MVAr 41.02 [MVAr] PALILLADA UMAPALCA 0.16 [MVAr] 6.99 [MVAr] 2.19 [MVAr] 1.22 [MVAr] 2.41 [MVAr]
(*) 3.1740+j21.106 124
125 1.1960+j3.5110 0.0297+j2.4369 0.4469+j1.4116 0.2069+j0.8204 0.0648+j0.2568 0.1046+j0.2644 0.3423+j0.9798
CHOJLLA 1 T max: 1.15 pu BOL-115 TEM-115 ALP-115 ALI-115
63-105 MVAr Tmin: 0.9 pu 155.90 [MW] 116
1.25 [MW] 18 MVAr
271 186 187 188
303 302 36.73 [MVAr] 121
155.90 [MW] 143 130
99.000+j99.000 177 2.8315+j18.734 170
161 4.48 [MVAr] 90.00 [MW] 100.0 [MW]
831.54 [MW] 18 MVAr 0.14 [MVAr] 122.0 [MW] 100.0 [MW]
105 427.50 [MW] 12 MVAr 0.3594+j2.4737 3.07 [MVAr]
286.63 [MVAr] 33 0.2398+j0.7078 0.11 [MVAr] 4.23 [MVAr]
MVAr 0.0297+j2.4369 142.50 [MW] 0.0910+j0.3604
0.170+j2.246 T max: 1.15 pu CLC-115 0.0413+j0.2232 0.1252+j0.4960
Tmin: 0.9 pu 155.90 [MW] 0.1386+j5.5853 113 138
(*) T max: 1.1 pu AAC-115
270 36.74 [MVAr] (*) 122.00 [MW]
PAGADOR 2.8395+j18.714 189.0 [MW] Tmin: 0.9 pu 128 104 90.00 [MW]
141 0.51 [MVAr] 2.68 [MVAr]
219.0 [MW] 96 229.9 [MW] VINTO 10.73 [MVAr] 112 137
12 MVAr 163 90.00 [MW] 0.099+j0.3634
0.2089+j1.3940 0.18 [MVAr] 96.00 [MW] 7.940+j23.648
22.00 [MVAr] 4.81 [MVAr] 19 90.00 [MW] 119.00 [MW]
0.18 [MVAr] 0.3433+j1.0086 VST-115 106 0.36 [MVAr]
1.1232+j6.8913 0.2428+j1.4664 0.77 [MVAr]
9 MVAr 0.5567+j1.6195 185 0.8160+j2.7285
1.8357+j6.5055 ZON-115
15.6 247 248
[MVAr] 122 106
21 KENKO
9 MVAr 338.20 [MW] 338.20 [MW] 119.00[MW]
RSE-115 160 12.00 [MW]
139 21.53 [MVAr] 21.53 [MVAr] 1.19 [MVAr]
142.50 [MW]
142.50 [MW] EL ALTO 102 0.9195+j6.1261 0.9195+j6.1261 2.8520+j9.6332
114 23.76+j16.430
0.0887+j6.4311 122.00 [MW]
T 105
92 0.1473+j7.020 COT-115 0.55 [MVAr]
249
T max: 1.1 pu 12 [MVAr] 260 261 119.00 [MW]
T max: 1.1 pu Tmin: 0.9 pu 114 0.1056+j0.3877 96.00 [MW] 108 0.28 [MVAr] ZONGO
Tmin: 0.9 pu 98 MAZOCRUZ 125 90.00 [MW] 0.35 [MVAr] 0.6665+j2.3620
45 126 H
21 MVAr 0.17 [MVAr] 0.7840+j2.6215
73.00 [MW] 49 46 0.5062+j1.4252
110
TIG-115
280 1.52 [MVAr] 50 90.00 [MW] JUNTAS 108
230 [kV] 130.00 [MW] 4.3535+j12.680
241
0.41 [MVAr] 115 104 119.00 [MW]
115 [kV] 130.00 [MW] 130.00 [MW] 1.2324+j3.4697 MAL-115 SEH H 1.23 [MVAr]
VALLE HERMOSO 12 3.26 [MVAr] 73.00 [MW]
17 48 26.86 [MVAr] 142.50 [MW] 0.77 [MVAr]
162 12.00 [MW]
0.2587+j1.8055 1.52 [MVAr] 22 212 2.8840+j9.5525 20.66+j14.430
6
4.3535+j12.680 2.2258+j6.9362 0.1364+j5.6933 0.6367+j3.5432 116
146.00 [MW] (*) T max: 1.05 pu 107
130.00 [MW] Tmin: 0.85 pu 96.00 [MW] H
35
3.03 [MVAr] VINTO 69 [kV] 0.22 [MVAr] COS-115 308.75 [MW] 119.00 [MW]
8.58 [MVAr] 142.50 [MW] 97 95.00 [MW] 15 MVAr 100.0 [MW] 102
TIQUIMANI
245
2.1767+j6.3399 172 0.5130+j1.7670 SEHUENCAS 13.04 [MVAr] 0.10 [MVAr]
0.6804+j4.7485 0.1369+j5.7550 51 ORURO 0.2472+j8.5325 18 QUEHATA 155 0.65 [MVAr] 100
0.2288+j0.8107 H
T max: 1.05 pu T max: 1.05 pu H 0.7407+j4.2057 308.75 [MW] 0.6439+j3.7976
115 [kV] S 275.00 [MW] VIP-115
Tmin: 0.85 pu Tmin: 0.85 pu 165 CONTORNO 175 13.04 [MVAr] 263 BOT-115
240
CAIHUASI 47.50 [MW] 23 6.6 [MVAr] 4.63 [MVAr] BAJO 174 110
0.1986+j1.3112 0.643+j3.7996
CORANI 0.3580+j10.046 157
T max: 1.1 pu 262 164 12.00 [MW]
AROCAGUA 74.00 [MW] 74.00 [MW] 12 [MVAr] Tmin: 0.9 pu 275.00 [MW] 100.0 [MW] (***) 118
H 43 94 7.2 [MVAr] MIZQUE 15.50+j10.830
8 10 4.27 [MVAr] JERUYO 242 1.04 [MVAr] 169
4.63 [MVAr]
167 142.50[MW] 35.8 [MW]
45 13.057+j38.342 74.00 [MW] 3.2234+j9.6126 0.1244+j5.7750 0.36 [MVAr] 210 119.00 [MW] 109
29 0.1986+j1.3112
199
65.25 [MW] 74.00 [MW] 74.00 [MW] 1.64 [MVAr] 93
243 T max: 1.1 pu 0.4621+j2.2088 21 0.04 [MVAr]
BOTIJLACA
183.35 [MW] 4.9679+j14.523 12 [MVAr] H Tmin: 0.9 pu MVAr 115 [kV] SUBESTACION 0.0932+j0.3303
0.6220+j16.355 1.43 [MVAr] 14 0.20 [MVAr] 24
H
0.87 [MVAr] 42.5 [MW] 47.50 [MW] 21 21.21 [MW] MIGUILLAS TIQUIMANI
4.1387+j11.444 0.5853+j1.6186 0.2966+j10.1 74.00 [MW] 0.2960+j10.100 31 0.00 [MVAr] 112
0.9919+j6.3208 8 21
360 T max: 1.10 pu 1.54 [MVAr] T max: 1.1 pu 27.850+j53.822 [MVAr] TIQ-115
74.00 [MW] 4.7034+j13.812 Tmin: 0.9 pu 146
Tmin: 0.90 pu 46 140
0.24 [MVAr] 9 69 [kV] 260 144
S. ISABEL 119.00 [MW] 119.00 [MW]
0.6940+j1.9573 30 20 CATARICAGUA 0.49 [MVAr]
H 42 115 [kV] 0.20 [MVAr] 119.00 [MW]
7 LUCIANITA 1.1377+j3.6807 0.37 [MVAr]
44 74.00 [MW] 358 0.4849+j1.7216
74.00 [MW] 23 0.8412+j2.7327
109.00 [MW] VALLE 0.18 [MVAr] 20 1.19 [MVAr] 228.00 [MW] CUT-115 SAI-115
0.2870+j11.722 SACABA HERMOSO 0.5203+j1.5305 3.6414+j10.693 OCURI POTOSI 29.01 [MVAr] 132 140
11 115 [kV] 115 [kV]
T 32
15 22 1.2472+j8.3546 142
166 29.00 [MW] 170 12.00 [MW]
10 19 25 8.84+j6.1800 22.72+j15.880
148
74.00 [MW] 95.00 [MW] 119.00 [MW] 131 139
IRPA IRPA 74.00 [MW] 74.00 [MW] EPO-115 LA PLATA 0.05 [MVAr] 113.00 [MW]
1.18 [MVAr] 355 1.08 [MVAr] 91 3.44 [MVAr] 115 [kV]
PAY-115 3.4058+j9.4200 74.00 [MW] SACACA 74.00 [MW] 2.97 [MVAr] 90 0.1277+j0.4534 CUTICUCHO 0.13 [MVAr] SAINANI
QOLLPANA 1.2972+j8.3646 (*)
82 84 11 246 1.63 [MVAr] 14 (*) 1.63 [MVAr] 10.658+j31.824 9.1923+j27.448 81 H 0.2957+j0.9453 H
7 190 60
4.6913+j13.004 4.7111+j13.027 27.17 [MW] 40.66 [MW]
74.00 [MW]
E
90.00 [MW] 90.00 [MW] 74.00 [MW] (*)
CATAVI 16 0.73 [MVAr] 94 0.27 [MVAr] SRO-115 CHR-115
74.00 [MW] 74.00 [MW] (**) 95.00 [MW] 95.00 [MW] 92
134 136
0.32 [MVAr] 2.45 [MVAr] 0.92 [MVAr] 191 0.56 [MVAr] 17 69 [kV] 2.1381+j6.0969 0.7897+j2.2453
0.19 [MVAr] 244 1.75 [MVAr] 12 [MVAr] 1.67 [MVAr] 1.67 [MVAr] 172
0.9707+j2.8505 7.2570+j21.372 2.5874+j7.3896 1.6225+j4.4887 20.00 [MW] 29.00 [MW]
0.5859+j1.7205 5.0439+j13.965 2.0028+j12.914 2.0097+j12.959 23.75 [MW] 83 168
13.76+j9.6100 9.38+j6.5500
QUI-115 (**) 0.7342+j9.6800
KAR-69 80 150
85 T max: 1.1 pu 12 [MVAr] 93 133 135
Tmin: 0.8 pu 7.2 25 12 [MVAr]
COL-115 CEN-115 112.00 [MW] [MVAr] 69 [kV] 31.83 [MW] SANTA ROSA 238.00 [MW]
115 [kV] KANATA 41 86 87 0.26 [MVAr] 26 24 0.32 [MVAr]
43 27 91 47.50 [MW] 0.09 [MVAr] H
6 H
192 198 193 0.7236+j2.0013 191.00 [MW] 23.75 [MW] 18 0.2966+j10.100 0.1796+j0.5893 CHURURAQUI
197 0.01 [MVAr] 0.7270+j9.8000 2.0812+j6.1412 H HAR-115
10.69 [MW] 112.00 [MW] 112.00 [MW] 183.00 [MW] (**) 23.00 [MW] T max: 1.1 pu
0.03 [MVAr] 0.0138+j0.0937 T max: 1.1 pu 47.50 [MW]
SAN JOSE 0.32 [MVAr] 0.27 [MVAr] 0.27 [MVAr]
Tmin: 0.8 pu 0.2963+j10.040
0.13 [MVAr] Tmin: 0.9 pu 142
230 [kV] V. TUNARI 60.560+j164.53 0.8964+j2.4792 0.7560+j2.0909 0.3080+j1.9626 4.5882+j8.7865
CHIMORE 69 [kV] PIN-069
S ANTA T max: 1.1 pu 22.00 [MW] 154 174 30.00 [MW]
5 78 4 MIS-115 RUR-115 GUARACACHI 95.00 [MW]
64 Tmin: 0.9 pu 7.2 [MVAr] 0.21 [MVAr]
28 8.93+j6.2400
5 186 185 3 88 89 1 CRUZ VIR-069 WAR-069 238.00 [MW]
MISICUNI 195 196 0.10 [MVAr] NJE-069 41 7.3218+j14.022 0.38 [MVAr] 141
71.25 [MW] T 0.7740+j4.1138 74 T 65 66 67
130.00 [MW] 130.00 [MW] 130.00 [MW] H 78 79 12 [MVAr] 40 YURA 0.2205+j0.7294 HARCA
150.10 [MW] 135.85 [MW] 0.3187+j10.901
71.25 [MW] 6.77 [MVAr] 4.97 [MVAr] 11.13 [MVAr] 0.59 [MVAr] 0.64 [MVAr] T max: 1.05 pu 89.00 [MW] 89.00 [MW] 45.00 [MW] 45.00 [MW] 74.00 [MW] H H
PMA-069 89.00 [MW] 2.73 [MVAr]
0.2619+j8.0367 0.5236+j3.5642 0.3841+j2.6146 0.8607+j5.8584 0.6479+j3.8605 0.7220+j4.2053 Tmin: 0.85 pu 0.08 [MVAr] 0.07 [MVAr] 0.13 [MVAr] 0.25 [MVAr] 26
63 0.10 [MVAr] 8.0912+j22.139 30.0 [MW] CAH-115
T max: 1.05 pu 230 [kV] 0.7540+j4.5240 75
0.8840+j5.3040 76 0.6370+j3.8220 77 2.7622+j5.9305 5.3720+j11.534 42 0.00 [MVAr] H DON DIEGO 146
333.45 [MW] MIGUELITO
Tmin: 0.85 pu ENTRERIOS 2 2
69 [kV] 31 44.770+j27.448 CÓNDOR
1 57
220 0.65 [MVAr] 180 307.00 [MW] 307.00 [MW] 254 89.00 [MW] 89.00 [MW] 95.00 [MW] 115 [kV] 29 32.00 [MW] 176
0.029+j0.2016 ZOO-069 0.08 [MVAr] 0.23 [MVAr] 72 158
0.38 [MVAr] 181 1.56 [MVAr] 182 0.09 [MVAr] 22.00 [MW] 8.43+j5.8900 238.00 [MW]
142.50 [MW] 62 95.00 [MW] 57.00 [MW]
0.020+j0.1197 0.0814+j0.4866
292
T 0.6989+j3.7128 71 0.6528+j3.4680 73 1.7162+j9.3995 S 74.00 [MW]
0.41 [MVAr]
98
145 0.34 [MVAr]
5.27 [MVAr] 3.89 [MVAr] 65 184 0.2290+j8.3870 0.5167+j17.083
219.00 [MW] 448.00 [MW] 89.00 [MW] 94.05 [MW] S.UYUNI 14.305+j27.394 54.00 [MW] 0.2108+j0.7624
0.07 [MVAr] 0.3961+j2.605 235 11.540+j31.576 T max: 1.1 pu T max: 1.1 pu CAHUA
9 16.02 [MVAr] 219 H 218 H 448.00 [MW] 0.07 [MVAr] 0.28 [MVAr] 222 40 27 3.20 [MVAr]
0.0055+j0.0358 206 34 FER-069 Tmin: 0.9 pu Tmin: 0.9 pu 35 H
0.6808+j4.5037 SAN JOSÉ 1 SAN JOSÉ 2 0.28 [MVAr] 0.5504+j2.9240 69 2.0857+j11.491 MARIACA 9.4405+j27.811 HUA-115
61 234 230 [kV]
219.00 [MW] ENTRERIOS 0.0207+j0.134 232 PUNUTUMA 150
71.25 [MW] ATOCHA 58 SVC+100/-100 30
320 16.02 [MVAr] T 105 215.65 [MW] 140.00 [MW] 56 40.00 [MW] 178
294 63-105 0.3187+j10.901 128.00 [MW] PAR-69 106.00 [MW] CAÑ-69 128.00 [MW] 115 [kV] [MVAr] 22.00 [MW] 5.86+j4.0900
0.6808+j4.5037 MVAr 1.00 [MVAr] 36 1.59 [MVAr] 38 0.02 [MVAr] 0.66 [MVAr] 13.65 [MVAr] 23.75 [MW]
MVAr T max: 1.05 pu 150.00 [MW] 0.57 [MVAr]
250 224 0.0532+j0.3702 0.7280+j23.520 149
202 Tmin: 0.85 pu 0.2759+j1.5146 84 0.3416+j0.3495 85 0.1920+j1.0200 86 0.8706+j7.1346
26.35 [MVAr] 2 X 12 19.621+j37.575
427.50 [MW] 427.50 [MW] 66 T max: 1.11 pu 7.2 [MVAr]
12 290
94.05 [MW] 190 UYUNI Tmin: 0.91 pu 2.3078+j14.525 [MVAr] 28 HUAJI
MVAr 448.00 [MW] 0.0297+j2.4369 0.0297+j2.4369 75 MVAr 98.78 [MW] 89.00 [MW] 0.15 [MVAr] 15 140.00MW] 21 H
53 0.21 [MVAr] Tmax: 1.15 pu Tmax: 1.15 pu 0.35 [MVAr] TRO-69 0.08 [MVAr] [MVAr] 11.24 [MVAr] 59 ATOCHA 12 [MVAr] 42.00 [MW]
1.1658+j6.5774 69 [kV] 7.2 [MVAr]
0.0157+j0.1016 Tmin: 0.9 pu 306 Tmin: 0.9 pu 305 0.8341+j3.9794 87 60 0.6016+j3.1960 68 233
0.7211+j5.8747
[MVAr] CARRERAS 0.18 [MVAr]
130.00 [MW] 250
3 15 [MVAr] 50 3.9800+j9.4500
32.48 [MVAr] 89.00 [MW] 95.00 [MW] PLM-69 MAP-69 95.00 [MW] LITIO (*)
2.6014+j17.984 226
T 0.07 [MVAr] 0.10 [MVAr] 72 74 191 23.75 [MW] 12 12 ARANJUEZ
T 750.50 [MW] 90
0.14 [MVAr] 142.50 [MW] 7.2 [MVAr] 0.02 [MVAr] [MVAr] [MVAr]
57 39
38
130.00 [MW] 228.11 [MVAr] 0.5577+j2.9241 67 0.8065+j4.2869 1.0150+j5.6557 238 T
CARRASCO 11.16 [MVAr] BULO 308 0.1252+j5.7517 0.4820+j1.3188 231 150.00 [MW]
0.8539+j5.7761 BULO 0.1565+j1.7315 94.0 [MW] 88
97.64 [MW]
0.20 [MVAr]
70 30.00 [MVAr] T max: 1.1 pu 195
TELAMAYU 10.79 [MVAr] 142.50 [MW] 69 [kV] 34
YAPACANI 192 Tmin: 0.9 pu 0.9462+j5.9537 25.69 [MVAr]
164 0.48 [MVAr] 1.4092+j7.5289 47 115 [kV] 22.00 [MW] 175.80 [MW] 2.3756+j14.143 57.00 [MW] 37
142.50 [MW] 228 3.3986+j18.336 214 142.50 [MW] 47 142.50 [MW] 251 0.36 [MVAr] 16.46 [MVAr] 0.4333+j17.083
75 MVAr 160 T max: 1.1 pu
0.1169+j6.1089 227 130.00 [MW] 204 309 0.1913+j6.7533 0.1275+j6.6087 12.583+j24.097 0.7069+j4.7048
Tmin: 0.9 pu
T max: 1.1 pu 10.56 [MVAr] T max: 1.1 pu T max: 1.1 pu 239
196 230 [kV] SUCRE
Tmin: 0.9 pu Tmin: 0.9 pu 54.40 [MW] PORTUGALETE 33
0.8085+j5.4693 427.50 [MW] 94.0 [MW] Tmin: 0.9 pu 213 9 [MVAr] 16.74 [MVAr]
165 BÉLGICA 0.51 [MVAr] 216 90.00 [MW]
0.0297+j2.4369 URUBO 44 22.00 [MW] 0.2900+j9.1600
166 63-105 MVAr T max: 1.15 pu 3.7031+j19.994 142.50 [MW] 6.2253+j23.926
TRONCOS 142.50 [MW] 194 252 0.39 [MVAr]
296 Tmin: 0.9 pu 0.1179+j6.0567 T max: 1.1 pu
167 0.1176+j6.1022 21 SALAR 155.80 [MW] 237 13.504+j25.860 Tmin: 0.9 pu
MVAr
310 T max: 1.1 pu 31.76 [MVAr] 39
T max: 1.1 pu 77 SAN JULIAN Tmin: 0.9 pu 197 2 X 12 115 [kV]
Tmin: 0.9 pu 211 1.3587+j8.9705 CHILCOBIJA 230
[MVAr]
168 209 427.50 [MW] 73
163 75 0.0297+j2.4369 BRECHAS 23.75 [MW] 185.25 [MW] 31.30 [MW]
160.55 [MW] 183
GUARAYOS E Tmax: 1.15 pu 142.50 [MW] 217 253 0.48 [MVAr] 16.72 [MVAr] 4.04 [MVAr]
177 113.62 [MW] 275.00 [MW] 225 142.50 [MW] Tmin: 0.9 pu 0.1650+j7.1233 161 0.74 [MVAr] 16.741+j32.059 0.7153+j4.7437 13.125+j37.717
12 MVAr 142.50 [MW] 0.7388+j4.1976
70.02 [MW] 21 20.64 [MVAr] 208 2.61 [MVAr] 163.00 [MW] 0.1175+j6.0922 163.00 [MW] T max: 1.1 pu
76.38 [MW] 0.1138+j7.2200 198 T. HUAYCO
47.78 [MVAr] 276 [MVAr] 0.8461+j5.4694 0.1903+j1.2173 11.51 [MVAr] T max: 1.1 pu 13.48 [MVAr] Tmin: 0.9 pu
15 MVAr 29.28 [MVAr] T max: 1.1 pu 0.4669+j2.9692 286 Tmin: 0.9 pu 223 0.5546+j3.5713
1.9863+j12.873 274 1.2202+j7.9266 Tmin: 0.9 pu 113.62 [MW] 215 71.25 [MW]
20.64 [MVAr] 291 207 FER-115 254
0.3224+j11.877
0.8461+j5.4694 163.00 [MW] 163.00 [MW] 204 157 24 [MVAr] T max: 1.1 pu 6
70.02 [MW] 76.38 [MW] 275.00 [MW] 21 MVAr Tmin: 0.9 pu
15 21 288 11.51 [MVAr] 13.48 [MVAr] 221 159 [MVAr]
47.78 [MVAr] 275 [MVAr] [MVAr] 29.28 [MVAr]
273
21 MVAr 2.61[MVAr] 0.4698+j2.9629 0.5582+j3.5639 199
1.9863+j12.873 1.2202+j7.9266 0.1903+j1.2173 E
678.30 [MW] EL DORADO 79 PADILLA
20.81 [MVAr] 298 24.04 [MW]
CTO-115
154 0.2214+j1.4687 2.50 [MVAr]
TARIJA 230 [kV] 255 7.5359+j21.933
162 51 4.8-7.2 [MVAr]
159.6 [MW]
LAS LOMAS
YAGUACUA 58
71.25 [MW]
103
71.25 [MW]
330 0.74 [MVAr] ARBOLEDA 37
203 142.50 [MW]
155 0.2859+j8.5670 0.2643+j8.8983 222 MONTEAGUDO
0.7361+j4.2013 0.1626+j7.250 230 [kV] T max: 1.10 pu T max: 1.10 pu
WARNES GUP-115 89 SUR 15.2 [MW]
158 T max: 1.1 pu 48 Tmin: 0.90 pu Tmin: 0.90 pu 256
76
PTM-115 Tmin: 0.9 pu 229.9 [MW] 142.50 [MW] T 15 229 160.00 [MW] 115 [kV] 1.90 [MVAr]
142.50 [MW] 164.63 [MW] [MVAr] 20.56 [MVAr] 5.7509+j16.734
95
169 1.94 [MVAr] 8.48 [MVAr] 99 99 52
0.1007+j5.5320 1.20 [MVAr] 54
1.6055+j10.850 60.8 [MW]
210 0.1521+j1.0363 1.0501+j5.2366 69 [kV] S 4.8-7.2 [MVAr]
T max: 1.1 pu 1.2090+j7.0190 272 1.59 [MVAr]
T Tmin: 0.9 pu 162.45 [MW] 156.75 [MW] 90.00 [MW] GBE-013 15 52 160.00 [MW] 4.8167+j14.075 YUNCHARA SAN JACINTO 224
200 0.58 [MVAr] 212 1.75 [MVAr] 0.1460+j8.7134
71.25 [MW]
[MVAr] 20.56 [MVAr] 220 CAMIRI
C WARNES 83 MON-115 GBE-115 70 0.2973+j10.683
0.5818+j3.3806 1.7543+j9.9741 T max: 1.1 pu
68 GUABIRA 1.6504+j10.915 H
Tmin: 0.9 pu 49 69 80 T max: 1.1 pu 281 VENTOLERA
VLU-115 E 82 81 T E
Tmin: 0.9 pu 26.03 [MW]
153 WARNES 142.50 [MW] 76.10 [MW] IAGS A
74.00 [MW] 30.40 [MW] 5.24 [MVAr]
CHN-115 13.95 [MVAr] 59 55
1.87 [MVAr] 0.28 [MVAr] 1.5313+j41.313 T
71 1.7276+j8.6150 5.8752+j14.515 15.790+j45.744
162.0 [MW] 162.0 [MW] 0.7072+j1.7836 T max: 1.05 pu 221
332 0.82 [MVAr] 334 0.31 [MVAr]
164.35 [MW] 164.35 [MW] MIN-115 Tmin: 0.95 pu BERMEJO
0.8281+j4.8092 0.3133+j1.8197 100 0.31 [MVAr] 101 0.73 [MVAr] 13 157.00 [MW]
0.7320+j4.2350 UNAGRO T 1.50 [MVAr] REFERENCIAS :
0.3140+j1.8190 12
1.5130+j8.7865 265
230.00 [MW]
AGUAÍ T 5.99 [MVAr]
T Generación Térmica Nivel de Tensión 69 KV Las características en itálica son elementos
142.50 [MW] 0.4512+j2.9937 Nivel de Tensión 115 KV equivalentes calculados para la simulación
H Generación Hidro del SDDP.
35.53 [MVAr] Nivel de Tensión 230 KV
2.8367+j19.601 E Generación Eólica La reactancia de la línea Vinto-Mazocruz
Nivel de Tensión 500 KV sin capacitor serie es j15.1163
S Generación Solar Proyectos (*) Retiro instalación en este periodo
3 (**) Repotenciamiento LT en este periodo
3 N° Circuito y dirección
N° de Nodo (***) Nueva capacidad
Positiva del Flujo

Diagrama Unifilar de Energía del STI con proyectos (STI_ENmay22) Periodo May22-Abr26
CNDC Informe de la Programación de Mediano Plazo may/22 - abr/26

ANEXO 3C

CONSUMOS PROPIOS, VENTAS DIRECTAS Y PERDIDAS


ENTRE BORNES DE GENERADOR Y EL SMEC (GWh)

AÑO 2021

GENERACIÓN INYECCIÓN AL PERDIDAS Y OTROS


CENTRAL
BRUTA SISTEMA(*) GWh %

ZONGO 911.2 884.8 26.5 2.9%

CORANI 372.5 366.6 5.8 1.6%


S. ISABEL 547.4 543.8 3.6 0.7%

SAN JOSÉ 712.5 706.4 6.1 0.9%

TAQUESI 343.3 334.6 8.7 2.5%

MIGUILLAS 102.7 98.8 3.9 3.8%

YURA 71.7 68.2 3.5 4.9%

KANATA 21.7 21.0 0.7 3.1%

QUEHATA 8.5 8.1 0.4 4.3%

SAN JACINTO 25.7 25.2 0.5 1.8%

MISICUNI 115.8 114.5 1.3 1.1%

QOLLPANA 57.8 56.8 1.0 1.7%

YUNCHARA 11.9 10.8 1.1 9.3%

UYUNI 138.8 138.0 0.8 0.6%

ORURO 195.3 192.6 2.7 1.4%

GUARACACHI 800.7 768.0 32.7 4.1%

SANTA CRUZ 26.2 25.7 0.6 2.2%

UNAGRO 68.6 68.1 0.5 0.7%


AGUAÍ 43.5 43.1 0.4 0.8%

EASBA 6.0 5.9 0.1 1.2%


BULO BULO 14.8 14.2 0.6 3.8%

CARRASCO 89.0 86.4 2.6 2.9%

ENTRE RIOS 0.2 0.2 0.0 0.5%

ENTRE RIOS II 1,184.9 1,139.6 45.3 3.8%

T. DEL SUR 1,328.6 1,265.9 62.7 4.7%


WARNES 2,220.6 2,138.7 81.9 3.7%

VALLE HERMOSO 100.4 99.4 1.0 1.0%

EL ALTO 163.0 161.0 2.0 1.2%

ARANJUEZ 110.6 108.4 2.2 2.0%

KARACHIPAMPA 0.0 0.0 0.0 0.0%


GUABIRA 64.1 63.0 1.1 1.7%
IAGSA 0.0 0.0 0.0 0.0%

MOXOS 45.3 43.9 1.3 2.9%


SAN BORJA 0.0 0.0 0.0 2.2%
RURRENABAQUE 0.1 0.1 0.0 2.2%
YUCUMO 0.0 0.0 0.0 1.0%

SANTA ANA DE YACUMA 0.4 0.4 0.0 0.9%

SAN IGNACIO DE MOXOS 0.1 0.1 0.0 0.7%


EÓLICA WARNES 17.4 17.0 0.4 2.1%
EÓLICA SAN JULIÁN 21.0 20.9 0.1 0.5%
EÓLICA EL DORADO 23.5 23.0 0.5 2.0%

(*) Inyecciones registradas en el Sistema de Medición Comercial cuando la central está operando.