CALCULO HIDRAULICOS - AGUA POTABLE

"CREACION DEL SERVICIO MUNICIPAL EN LA LOCALIDAD DE NUEVO PUERTO PRADO, DISTRITO DE RIO TAMBO - SATIPO - JUNIN"

DISEÑO DE AGUA FRIA


CALCULO DE DOTACIONES DE AGUA POTABLE (AGUA DE EPS PUERTO PRADO)

DESCRIPCION AREA/UN UND. CANT. UND. DOT. UND. TOTAL UND.


Salon de Usos Multiples 1.00 Asientos 340.00 UND. 3.00 Lt./m2/dia 1,020.00 lt/día.
Oficina Sunat 1.00 m2 103.16 UND. 6.00 Lt./m2/dia 618.96 lt/día.
Oficina Banco de la Nacion 1.00 m2 114.67 UND. 6.00 Lt./m2/dia 688.02 lt/día.
PRIMER PISO
Oficina Reniec 1.00 m2 52.16 UND. 6.00 Lt./m2/dia 312.96 lt/día.
Palacio Municipal 1.00 m2 137.51 UND. 6.00 Lt./m2/dia 825.06 lt/día.
Oficina Estado Civil 1.00 m2 341.00 UND. 6.00 Lt./m2/dia 2,046.00 lt/día.
Gerencia Desarrollo Economico 1.00 m2 188.49 UND. 6.00 Lt./m2/dia 1,130.94 lt/día.
SEGUNDO PISO Gerencia Desarrollo Social 1.00 m2 206.71 UND. 6.00 Lt./m2/dia 1,240.26 lt/día.
Gerencia Administracion 1.00 m2 303.76 UND. 6.00 Lt./m2/dia 1,822.56 lt/día.
Defensa Civil 1.00 m2 303.76 UND. 6.00 Lt./m2/dia 1,822.56 lt/día.
Sala de regidores 1.00 m2 87.68 UND. 6.00 Lt./m2/dia 526.08 lt/día.
TERCER PISO
Alcaldia 1.00 m2 345.50 UND. 6.00 Lt./m2/dia 2,073.00 lt/día.
Unidad de Imagen Institucional 1.00 m2 38.06 UND. 6.00 Lt./m2/dia 228.36 lt/día.
Defensa Civil 1.00 m2 134.88 UND. 6.00 Lt./m2/dia 809.28 lt/día.
Sala de regidores 1.00 m2 240.55 UND. 6.00 Lt./m2/dia 1,443.30 lt/día.
CUARTO PISO
Alcaldia 1.00 m2 38.06 UND. 6.00 Lt./m2/dia 228.36 lt/día.
Unidad de Imagen Institucional 1.00 m2 303.76 UND. 6.00 Lt./m2/dia 1,822.56 lt/día.
TOTAL 18,658.26 lt/día.
DOTACION TOTAL = 18.66 m 3 / dia
CALCULO DE LA MAXIMA DEMANDA SIMULTANEA (Q MDS) Y CAUDAL DE BOMBEO

ESTA PROYECTANDO SISTEMA DE ABASTECIMIENTO DE AGUA:


1.- SISTEMA DE ABASTECIMIENTO DE AGUA FRIA
Inodoro Inodoro Urinario Grifo Ducha Lavatorio Lavadero Total
Tanque Flux. Valvula Riego
U.H. 5 8 3 3 4 2 3
SS.HH. Damas S.U.M. 2 - - - - 2 - 4
SS.HH. Varones S.U.M. 2 - 2 - - 2 - 6
SS.HH. Discapac. S.U.M. 1 - - - - 1 - 2
SS.HH. Sunat 1 - 1 - - 1 - 3
PRIMER PISO SS.HH. Banco Nacion 1 - 1 - - 1 - 3
SS.HH. D. Pueblos Ind. 1 - 1 - - 1 - 3
SS.HH. Damas P.M. 4 - - - - 4 - 8
SS.HH. Varones P.M. 3 - 4 - - 3 - 10
SS.HH. Discapac. P.M. 1 - - - - 1 - 2
SS.HH. G. Econom ico 1 - 1 - - 1 - 3
SS.HH. G. Promo. Social 1 - 1 - - 1 - 3
SS.HH. G. Contabilidad 1 - 1 - - 1 - 3
SEGUNDO PISO
SS.HH. Damas P.M. 4 - - - - 4 - 8
SS.HH. Varones P.M. 3 - 4 - - 3 - 10
SS.HH. Discapac. P.M. 1 - - - - 1 - 2
SS.HH. S. Regidores 1 - 1 - - 1 - 3
SS.HH. Alcaldia 1 - - - 1 1 1 4
SS.HH. G. Municipal 1 - 1 - - 1 - 3
TERCER PISO SS.HH. P.P. Municipal 1 - 1 - - 1 - 3
SS.HH. Damas P.M. 4 - - - - 4 - 8
SS.HH. Varones P.M. 3 - 4 - - 3 - 10
SS.HH. Discapac. P.M. 1 - - - - 1 - 2
SS.HH. S. Publicos 1 - 1 - - 1 - 3
SS.HH. G. Infraestruct. 1 - 1 - - 1 - 3
SS.HH. P.Presupuesto 1 - 1 - - 1 - 3
CUARTO PISO
SS.HH. Damas P.M. 4 - - - - 4 - 8
SS.HH. Varones P.M. 3 - 4 - - 3 - 10
SS.HH. Discapac. P.M. 1 - - - - 1 - 2

TOTAL PARCIAL 250 - 90 - 4 100 3 447 UH

UNIDADES HUNTER 447 447 UH 440 4.27


% DE USO 100.00% 100% 447 4.32
Qmds 4.32 4.32 L/S 460 4.42
AGUA TRATADA

CALCULO DEL VOLUMEN DE CISTERNA DE AGUA POTABLE

CISTERNA DE AGUA POTABLE

CISTERNA
V(ACD) = (Dotacion) x (% De Uso) = 13.99 m3
Reserva 0.01 m3
Proyecto 14.00 m3
Largo L= 3.80 m.
Ancho A= 3.80 m.
Altura de Agua H= 1.00 m.
Altura Total Ht 1.35 m.
Vol Real = 14.44 m3 (Por Arquitectura)
CALCULO DEL VOLUMEN DE ELEVADO DE AGUA POTABLE

ELEVADO DE AGUA POTABLE

ELEVADO
V(ACD) = (Dotacion) x (% De Uso) = 6.22 m3
Reserva 3.78 m3
Proyecto 10.00 m3
Largo L= 10.10 m.
Ancho A= 2.00 m.
Altura de Agua H= 0.50 m.
Altura Total Ht 2.10 m.
Vol Real = 10.10 m3 (Por Arquitectura)

TUBERIA DE IMPULSION (Cisterna a los Servicios)


Caudal MDS 4.32 l/s
Velocidad Media 4.90 m/s
Diametro 1.48 Pulg (")
Diametro Tub. Impulcion 1.50 Pulg (") C = 140
Diametro Tub, Succion 2.00 Pulg (")

CALCULO DE PERDIDA DE CARGA RED AGUA POTABLE - Tanque Cisterna - Tanque Elevado - Palacio Municipal

(DESDE EL ELEVADO HASTA EL SERVICIOS HIGIENICO MAS ALEJADO Y DESFABORABLE)


C = 140 m. Pulgada m./seg. m./m. m. m. m.
Tramo L (m .) tees codos val. reduc. Le (a) U.H. (un) Q. (lt./seg.) H (Altura) Diametro V.(m/seg.) S.real(b)m /m. h. (real) P.(Inicial) P. Final

Bom-T. E 21.40 2.00 1.00 1.00 30.11 131 1.94 6.50 1.50 1.76 0.10 2.90 28.74 29.34
T.E.-A 2.10 1.00 4.00 1.00 1.00 2.10 131 1.94 0.00 1.00 3.95 0.69 1.46 29.34 27.88
A - M1 1.40 1.00 2.00 1.00 1.40 131 1.94 0.00 1.00 3.95 0.69 0.97 27.88 48.91
A - M2 3.55 1.00 2.00 3.55 98 1.75 0.00 1.00 3.57 0.57 2.04 48.91 53.88
A - M3 9.80 1.00 1.00 1.00 1.00 12.88 65 1.75 0.00 0.75 6.34 2.33 29.98 53.88 69.90
M1 B - SS.HH. P.M. 8.10 1.00 1.00 1.00 1.00 11.18 65 1.20 0.00 0.75 4.35 1.16 12.95 69.90 76.95
M2 B - SS.HH. G.S.P. 16.60 1.00 1.00 1.00 1.00 19.68 65 1.20 0.00 0.75 4.35 1.16 22.79 76.95 72.15
M2A B - M2B 6.40 1.00 1.00 9.03 65 1.00 0.00 0.75 3.62 0.83 7.47 76.95 85.48
M3 B - M3A 6.40 1.00 1.00 9.03 65 1.00 0.00 0.75 3.62 0.83 7.47 72.15 80.69
M3 B - M3B 6.40 1.00 1.00 9.03 65 1.00 0.00 0.75 3.62 0.83 7.47 85.48 94.01
B - M1 4.20 1.00 2.00 1.00 4.20 131 1.94 0.00 1.00 3.95 0.69 2.91 85.48 104.57
B - M2A 4.20 1.00 2.00 4.20 98 1.75 0.00 1.00 3.57 0.57 2.41 104.57 109.16
B - M2B 4.20 1.00 2.00 4.20 98 1.75 0.00 1.00 3.57 0.57 2.41 109.16 113.75
B - M3A 4.20 1.00 1.00 1.00 1.00 7.28 65 1.75 0.00 0.75 6.34 2.33 16.95 109.16 138.21
B - M3B 4.20 1.00 1.00 1.00 1.00 7.28 65 1.75 0.00 0.75 6.34 2.33 16.95 113.75 142.80
C - M1 4.20 1.00 2.00 1.00 4.20 131 1.94 0.00 1.00 3.95 0.69 2.91 113.75 132.84
C - M2A 4.20 1.00 2.00 4.20 98 1.75 0.00 1.00 3.57 0.57 2.41 132.84 137.43
C - M2B 4.20 1.00 2.00 4.20 98 1.75 0.00 1.00 3.57 0.57 2.41 137.43 142.02
C - M3A 4.20 1.00 1.00 1.00 1.00 7.28 65 1.75 0.00 0.75 6.34 2.33 16.95 137.43 166.48
C - M3B 4.20 1.00 1.00 1.00 1.00 7.28 65 1.75 0.00 0.75 6.34 2.33 16.95 142.02 171.07
D - M1 4.20 1.00 2.00 1.00 4.20 131 1.94 0.00 1.00 3.95 0.69 2.91 142.02 161.11
D - M2A 4.20 1.00 2.00 4.20 98 1.75 0.00 1.00 3.57 0.57 2.41 161.11 165.70
D - M3A 4.20 1.00 1.00 1.00 1.00 7.28 65 1.75 0.00 0.75 6.34 2.33 16.95 165.70 194.75
D - M3B 4.20 1.00 1.00 1.00 1.00 7.28 65 1.75 0.00 0.75 6.34 2.33 16.95 194.75 223.80
E - M1 4.20 1.00 2.00 1.00 4.20 131 1.94 0.00 1.00 3.95 0.69 2.91 223.80 242.89
E - M2A 4.20 1.00 2.00 4.20 98 1.75 0.00 1.00 3.57 0.57 2.41 242.89 247.48
E - M2B 4.20 1.00 2.00 4.20 98 1.75 0.00 1.00 3.57 0.57 2.41 247.48 252.07
E- M3A 4.20 1.00 1.00 1.00 1.00 7.28 65 1.75 0.00 0.75 6.34 2.33 16.95 252.07 281.12
E - M3B SS.HH. B.N. 13.70 1.00 1.00 1.00 1.00 16.78 65 1.75 0.00 0.75 6.34 2.33 39.06 281.12 288.07
E - M3B SS.HH. SUM 17.10 1.00 1.00 1.00 1.00 20.18 42 1.00 0.00 0.75 3.62 0.83 16.68 76.95 76.27

CALCULO DE POTENCIA DE BOMBAS PARA AGUA POTABLE (Cisterna a Tanque Elevado)

Caudal Bombeo Total 4.32 l/s tee codo val red


Verlocidad 3.91 m/s ok 1/2" 1.064 0.739 0.112 0.195
Numero de Bombas Total 1.00 UN 3/4" 1.554 1.080 0.164 0.285
Numero de Bombas Trabajando 1.00 UN 1" 2.045 1.420 0.216 0.375
Caudal Bombeo / Bomba 4.32 l/s 1.25" 2.618 1.618 0.278 0.480
ADT 28.74 m. 1.5" 3.109 2.159 0.328 0.570
Factor Conversion 75.00 2" 4.091 2.541 0.432 0.750
% Eficiencia Bomba 0.70 2.5" 5.154 3.580 0.544 0.945
% Eficiencia Motor 0.70 3" 6.136 4.261 0.648 1.125
% Eficiencia ElectroBomba 0.49 4" 8.182 5.682 0.864 1.500

De los Datos Tenemos que:


Potencia Bomba 3.38 HP Potencia Teorica del Calculo Hidraulico
Potencia Bomba Aprox. 3.00 HP Potencia Real Ver Curva de la Bomba

CALCULO DE LA TUBERIA DE INGRESO (DE LA RED PUBLICA - MEDIDOR - CISTERNA)


ESTA TUBERIA SERA PARA ALIMENTAR A LA CISTERNA DE AGUA POTABLE QUE VIENE DE LA RED PUBLICA JASS PUERTO PRADO

A.- DATOS
1.- PRESION EN LA RED PUBLICA Pr. = 20.00 m (10 lb / pul2)
2.- PRESION MINIMA DE AGUA EN LA DESCARGA A LA CISTERNA Pm = 2.00 m
3.- DESNIVEL ENTRE LA RED PUBLICA Y EL PUNTO DE ENTREGA EN LA CISTERNA h1 = 1.00 m
4.- LONGITUD DE LA LINEA DE SERVICIO L = 9.90 m
5.- TIEMPO DE LLENADO DE LA CISTERNA T = 6.00 Horas
6.- VOLUMEN DE LA CISTERNA V = 5.00 m3
7.- ACCESORIOS A UTILIZAR:
1 VALVULA DE PASO
1 VALVULA DE COMPUERTA
6 CODOS DE 90°

B.- CALCULO DEL CAUDAL DE ENTRADA


Q=V/T Q = 0.23 lps
Q = 3.70 gpm

C.- CALCULO DE LA CARGA DISPONIBLE (H)


H = Pr + h1 - Pm H = 19.00 m
H = 26.60 lb / pul2
D.- SELECCIÓN DEL MEDIDOR:
SIENDO LA MAXIMA PERDIDA DE CARGA DEL NEDIDOR EL 50% DE LA CARGA DISPONIBLE, SE TIENE:
Hm = 4.20 lb / pul2 2.94 m

EN EL ABACO DE MEDIDORES SE TIENE:

PERDIDA DE CARGA
DIAMETRO
lb / pul2 m
1" 8.40 5.88 NO CUMPLE
3/4" 3.50 2.45 SI CUMPLE ok

POR LO TANTO SELECCIONAMOS EL MEDIDOR DE 3/4"

E.- CALCULO DE LA NUEVA CARGA DISPONIBLE (HF)


HF = H (Carga Disponible) - hm (perdida de Carga en el Medidor)
HF = 16.55 m

F.- ELECCION DEL DIAMETRO DE LA TUBERIA DE INGRESO A LA CISTERNA:

PARA 1": PARA 3/4":


ASUMIMOS UN DIAMETRO DE ACCESORIOS: ASUMIMOS UN DIAMETRO DE ACCESORIOS:
1 VALVULA DE PASO 22.72 m 1 VALVULA DE PASO 28.63 m
1 VALVULA DE COMPUERTA 0.43 m 1 VALVULA DE COMPUERTA 0.54 m
6 CODOS DE 90° 17.04 m 6 CODOS DE 90° 21.48 m
Le = 40.19 m Le = 50.65 m

LUEGO LA LONGITUD TOTAL ES: LUEGO LA LONGITUD TOTAL ES:


Lt = Le + L Lt = Le + L
Lt = 56.19 m Lt = 66.65 m

DETERMINAMOS LA PERDIDA DE CARGA TOTAL:


Perdida de Carga en Tuberia
Caudal (lps) D (pulg) Sh (m / m ) Hf (m ) V (m /seg)
1.94 1" 0.068 3.82 1.9 NO CUMPLE
1.94 3/4" 0.023 1.53 1.21 SI CUMPLE ok
COMPARANDO LA NUEVA CARGA DISPONIBLE CON LA PERDIDA DE CARGA EN LA TUBERIA

F.- CONCLUSION:
DIAMETRO DEL MEDIDOR 3/4" y DIAMETRO DE LA TUBERIA DE ENTRADA ES 3/4"