Está en la página 1de 91

TAREO DE PERSONAL EN OBR

OBRA FARAH
TAREO SEMANAL DE PERSONAL X Asistio F Falto T Tradanza P Permiso S S/ - S/ -
Rendimiento
Datos del Trabajador TAREO SEMANAL dia
Lu Ma Mi Ju Vi Sa Do Total de ENCHAPE
Total de Fragua (m2)
ITEM Nombre y Apellido DNI CAT HE HH Sueldo Jornal Diario
14/11 15/11 16/11 17/11 18/11 19/11 20/11 Asitencias Faltas S/ 3.00
Horas Hombre Total Semanal: 48.00 0.00 48.00 1.00 2.00 1.00 2.00 2.00 1.00 - Total de Planilla Semanal:
1.00 Erick Renzo, MARTINEZ LLACUA Cap 0 he 31 hh X X X X X X 6.00 - - S/ 1,080.00 S/ 180.00
9.00 Edwin Omar, CENTENO CEREZO Op 0 he 0 hh - - - S/ 900.00 S/ 150.00
10.00 0 he 0 hh - - - S/ -
11.00 0 he 0 hh - - - S/ -
12.00 0 he 0 hh - - - S/ -
14.00 Maria Jesus, MAIZ FELIX Ay 0 he 17 hh X X X 3.00 - 97.54 S/ -
15.00 Lery Shuña Araujo Ay 0 he 0 hh - - - S/ -
16.00 Fidelia Shuña Araujo Ay 0 he 0 hh - - - S/ -
39.00 0 he 0 hh - - - S/ -
40.00 0 he 0 hh - - - S/ -
41.00 GASTOS GENERALES - - S/ -
42.00 - - S/ -
43.00 SUPER - - S/ -
44.00 - - S/ -
45.00 Luis Peter, PINCHI COMETIVOS 43076765 GG - - S/ -
46.00 Orlando, OSORIO RIEVRA (Servicio) 48016766 JP - - S/ -

600
8.5 8.5 8.5 8.5 5.5 39.5 888.75
-
8.5 8.5 8.5 4.25 29.75 S/ 557.81

MAXIMINA 1105 1104 605 604


LERICK 1103 1002
25.5 DESCONTAR

FRANK SEMANA COMPLETA


JULIO FALTO MIERCOLES
CRISTOFERSEMANA COMPLETA
Enchape Valo 3
Nivelacion Valo 6
S/0.00
S/ - S/ - S/ - S/ -

RETENCION AL TRABAJADOR
Deuda Pago Jornal Pago Semanal Retencion Devolucion Pendinte
HE HE Semanal Estado de Deuda Banco Numero de Cuenta Observaciones
Pendiente Semanal por Trabajador en Dias en Dias Dias Soles
Total de Planilla Semanal: S/ 1,080.00 - S/1,772.62 Total de Deuda Retenida: S/ -
S/ 22.50 S/ 1,080.00 - S/ 1,080.00 - S/ - SIN DEUDA
S/ 18.75 S/ - - S/ - - S/ - SIN DEUDA
S/ - S/ - - S/ - - S/ - SIN DEUDA
S/ - S/ - - S/ - - S/ - SIN DEUDA
S/ - S/ - - S/ - - S/ - SIN DEUDA
S/ - S/ - - S/ 292.62 - S/ - SIN DEUDA
S/ - S/ - - S/ - - S/ - SIN DEUDA
S/ - S/ - - S/ - - S/ - SIN DEUDA
S/ - S/ - - S/ - - S/ - SIN DEUDA
S/ - S/ - - S/ - - S/ - SIN DEUDA
S/ - S/ - - S/ - - S/ - SIN DEUDA
S/ - S/ - - S/ - - S/ - SIN DEUDA
S/ - S/ - - S/ - - S/ - SIN DEUDA
S/ - S/ - - S/ - - S/ - SIN DEUDA
S/ - S/ - - S/ 200.00 - S/ - SIN DEUDA
S/ - S/ - - S/ 200.00 - S/ - SIN DEUDA
TAREO DE PERSONAL EN OBRA
OBRA FARAH

TAREO DIARIO DE PERSONAL

PARTIDAS CONTROL

Horas Hombre Total: 0 hh 0 he

ITEM TAREO Nombre y Apellido CAT HE

1.00 X Erick Renzo, MARTINEZ LLACUA Cap


2.00 - Luis LLACUA ALVARADO Op
3.00 - Nilton ESPINOZA LOZANO Op
4.00 - Sadan HUANCA CASANCA Op
5.00 - Waltter, ROJAS LLACUA Op
6.00 - Jesus Daniel, SANCHEZ HUAYCHO Op
7.00 - Bruz Huason, HUERTA YAÑACC Op
8.00 - Christopher Daniels, ESPINOZA HUAMAN Ay
9.00 - Edwin Omar, CENTENO CEREZO Op
10.00 - - -
11.00 - - -
12.00 - - -
13.00 L Areli Elizabet ARICARA YBERICO Ay
14.00 - Maria Jesus, MAIZ FELIX Ay
15.00 - Lery Shuña Araujo Ay
16.00 - Fidelia Shuña Araujo Ay
17.00 - - -
18.00 - - -
19.00 - - -
26.00 - - -
34.00 - - -
20.00 - - -
21.00 - - -
22.00 - - -
23.00 - - -
24.00 - - -
25.00 - - -
27.00 - - -
28.00 - - -
29.00 - - -
30.00 - - -
31.00 - - -
32.00 - - -
33.00 - - -
35.00 - - -
36.00 - - -
37.00 - - -
38.00 - - -
39.00 - - -
40.00 - - -
41.00 - GASTOS GENERALES -
42.00 - - -
43.00 - - SUPER
44.00 - - -
45.00 - Luis Peter, PINCHI COMETIVOS GG
46.00 - Orlando, OSORIO RIEVRA (Servicio) JP
PARTIDAS CONTROL NIVELACION
AVANCE DIARIO Peon
0 hh
0 m2 8.2 m2 0 m2 0 m2 0 ml 0 und 0 und 0 und 0 hh

Nivelacion Saridnel Sardinel bancas


HH Fragua (m2) Piso (m2) Zocalo (m2) CZ (ml)

Limpieza
de Piso (m2) (und) (ml) (ml)

0 hh
0 hh 0 m2 0 m2 0 m2 0 m2 0 m2 0 m2
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh 0 m2
0 hh
0 hh
0 hh
0 hh
0 hh 8.2 m2
0 hh 0 m2
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
NIVELACION DE PISO ENCHAPE
Peon Peon Op Peon Peon Peon Op
0 hh 8.5 hh

Forrado de Piso

Fragua de Dpto
Abastecedor

Abastecedor

Enchape de
Nivelacion

Columna1
Columna12
Amolado

Enchape

Dpto2
0 hh 0 hh 0 hh 0 hh 0 hh 0 hh 0 hh 8.5 hh -
8.50
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
METRADO POR DEPARTAMENTO

2 3
COCINA / LAVANDERIA
Piso (m2) Zocalo (m2)

Instalacion de Instalacion de
enchape en pisos enchape en
0.60X0.60 muros 0.30x0.60

#N/A #N/A
Erick Renzo, MARTINEZ LLACUA Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Erick Renzo, MARTINEZ LLACUA Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
AVANCE ENCHAPE

Erick Renzo, MARTINEZ LLACUA Avance Actual


Avance Acumulado 0.00 0.00
#N/A #N/A
Erick Renzo, MARTINEZ LLACUA Avance Actual
Avance Acumulado 0.00 0.00
SS01 0.00 0.00
Edwin Omar, CENTENO CEREZO Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00

PISO 2 Windows:
0.00 0.00
AVANCE FRAGUA

Remate Hall Ascensor Piso


Maria Jesus, MAIZ FELIX Avance Actual
2y3
Avance Acumulado 0.00 0.00
#N/A #N/A
Lery Shuña Araujo Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Fidelia Shuña Araujo Avance Actual
Avance Acumulado 0.00 0.00
4 5 6 7 8 9 10 11
A / LAVANDERIA TERRAZAS BALCONES
CZ (ml) Piso (m2) Piso (m2) CZ (ml) Zocalo (m2) Sardinel (ml) bancas (ml) Piso (m2)
Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de
contrazocalos Instalacion de Instalacion de contrazocalos Instalacion de contrazocalos contrazocalos
enchape en pisos
h=10cm enchape en pisos enchape en pisos h=10cm enchape en h=30cm h=30cm
y muro
(enchape de 0.60X0.60 0.45x0.90 (enchape de muros 0.30x0.60 (enchape de (enchape de
1.20x0.195
60x60) 60x60) 60x60) 1.20x0.195)
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


12 13 14 15 16 17 18 19
BALCONES BAÑO PRINCIPAL BAÑO SECUNDARIO
CZ (ml) Piso (m2) Zocalo (m2) Zocalo (m2) Sardinel (ml) Piso (m2) Zocalo (m2) Zocalo (m2)
Instalacion de
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
contrazocalo Instalacion de Instalacion de
enchape en pisos enchape en pisos sardinel de enchape en pisos enchape en pisos
h=10cm enchape en enchape en
y muro y muro ducha h=10cm y muro y muro
(enchape de muros 0.30x0.60 muros 0.30x0.60
1.20x0.195 1.20x0.195 de 1.20x0.195 1.20x0.195 1.20x0.195
1.20x0.60)
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


CARA 1
0.172
0.762

20 21 22 23 24 25 26 27
NDARIO PASAJES PARRILLA 1
Sardinel (ml) Piso (m2) CZ (ml) Sardinel (ml) Piso (m2) Zocalo (m2) CZ (ml) bancas (ml)
Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de Instalacion de
Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos contrazocalos
sardinel de enchape en pisos
enchape en pisos h=10cm h=30cm enchape en pisos h=10cm h=30cm
ducha h=10cm y muro
0.60X0.60 (enchape de (enchape de 0.45x0.90 (enchape de (enchape de
de 1.20x0.195 1.20x0.195
60x60) 60x60) 0.45x0.90) 1.20x0.195)
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 21.32 25.68 0.00 0.00 0.00 0.00 0.00


8.20
0.00 8.20 0.00 0.00 0.00 0.00 0.00 0.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


28 29 30 31 32 33 34 35
PARRILLA 2 SALA ESTAR SUM CONWORKING
Piso (m2) CZ (ml) bancas (ml) Piso (m2) CZ (ml) bancas (ml) Piso (m2) CZ (ml)
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos
enchape en pisos h=10cm h=30cm enchape en pisos h=10cm h=30cm enchape en pisos h=10cm
0.45x0.90 (enchape de (enchape de 0.45x0.90 (enchape de (enchape de 0.60X0.60 (enchape de
0.45x0.90) 1.20x0.195) 0.45x0.90) 1.20x0.195) 60x60)
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A

36 37 38 39 40 41 42 43
BAÑO AZOTEA 1 BAÑO AZOTEA 2 BAÑO AZOTEA 3 CUERTO DE BASURA
Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2)

Instalacion de
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
enchape en pisos
enchape en pisos enchape en enchape en enchape en pisos enchape en enchape en pisos enchape en
y muro
0.60X0.60 muros 0.30x0.60 muros 0.30x0.60 0.60X0.60 muros 0.30x0.60 0.60X0.60 muros 0.30x0.60
1.20x0.195

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 8.06 30.93

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 90.90

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


44
TO DE BASURA
CZ (ml)
Instalacion de
contrazocalos
h=10cm
(enchape de
60x60)
TAREO DE PERSONAL EN OBRA
OBRA FARAH

TAREO DIARIO DE PERSONAL

PARTIDAS CONTROL

Horas Hombre Total: 0 hh 0 he

ITEM TAREO Nombre y Apellido CAT HE

1.00 X Erick Renzo, MARTINEZ LLACUA Cap


2.00 L Luis LLACUA ALVARADO Op
3.00 L Nilton ESPINOZA LOZANO Op
4.00 L Sadan HUANCA CASANCA Op
5.00 - Waltter, ROJAS LLACUA Op
6.00 - Jesus Daniel, SANCHEZ HUAYCHO Op
7.00 - Bruz Huason, HUERTA YAÑACC Op
8.00 - Christopher Daniels, ESPINOZA HUAMAN Ay
9.00 - Edwin Omar, CENTENO CEREZO Op
10.00 - - -
11.00 - - -
12.00 - - -
13.00 L Areli Elizabet ARICARA YBERICO Ay
14.00 X Maria Jesus, MAIZ FELIX Ay
15.00 - Lery Shuña Araujo Ay
16.00 - Fidelia Shuña Araujo Ay
17.00 - - -
18.00 - - -
19.00 - - -
26.00 - - -
34.00 - - -
20.00 - - -
21.00 - - -
22.00 - - -
23.00 - - -
24.00 - - -
25.00 - - -
27.00 - - -
28.00 - - -
29.00 - - -
30.00 - - -
31.00 - - -
32.00 - - -
33.00 - - -
35.00 - - -
36.00 - - -
37.00 - - -
38.00 - - -
39.00 - - -
40.00 - - -
41.00 - GASTOS GENERALES -
42.00 - - -
43.00 - - SUPER
44.00 - - -
45.00 - Luis Peter, PINCHI COMETIVOS GG
46.00 - Orlando, OSORIO RIEVRA (Servicio) JP
PARTIDAS CONTROL NIVELACION
AVANCE DIARIO Peon
0 hh
0 m2 13.94 m2 0 m2 0 m2 0 ml 0 und 0 und 0 und 0 hh

Nivelacion Saridnel Sardinel bancas


HH Fragua (m2) Piso (m2) Zocalo (m2) CZ (ml)

Limpieza
de Piso (m2) (und) (ml) (ml)

0 hh
0 hh 0 m2 0 m2 0 m2 0 m2 0 m2 0 m2
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh 13.94 m2
0 hh 0 m2
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
1
NIVELACION DE PISO ENCHAPE 2
Peon Peon Op Peon Peon Peon Op 3
0 hh 17 hh 4

Forrado de Piso

Fragua de Dpto
Abastecedor

Abastecedor

Enchape de
Nivelacion

Columna1
Columna12
Amolado

Enchape

Dpto2
5
0 hh 0 hh 0 hh 0 hh 0 hh 0 hh 0 hh 17 hh -
8.50
-
-
-
-
-
-
-
-
-
-
-
-
8.50
-
-
-
-
-
-
-
-
-
-
-
-
-
-
METRADO POR DEPARTAMENTO
2 3
COCINA / LAVANDERIA
Piso (m2) Zocalo (m2)

Instalacion de Instalacion de
enchape en pisos enchape en
0.60X0.60 muros 0.30x0.60

301 6.77 0.54


Erick Renzo, MARTINEZ LLACUA Avance Actual
Avance Acumulado 0.00 0.00
302 7.82 3.84
Erick Renzo, MARTINEZ LLACUA Avance Actual
Avance Acumulado 0.00 0.00
303 5.43 0.57
AVANCE ENCHAPE

Erick Renzo, MARTINEZ LLACUA Avance Actual


Avance Acumulado 0.00 0.00
304 5.23 0.57
Erick Renzo, MARTINEZ LLACUA Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00

SS04 0.00 0.00


AVANCE FRAGUA

Maria Jesus, MAIZ FELIX Avance Actual


Avance Acumulado 0.00 0.00
#N/A #N/A
Lery Shuña Araujo Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00
4 5 6 7 8 9 10 11
A / LAVANDERIA TERRAZAS BALCONES
CZ (ml) Piso (m2) Piso (m2) CZ (ml) Zocalo (m2) Sardinel (ml) bancas (ml) Piso (m2)
Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de
contrazocalos Instalacion de Instalacion de contrazocalos Instalacion de contrazocalos contrazocalos
enchape en pisos
h=10cm enchape en pisos enchape en pisos h=10cm enchape en h=30cm h=30cm
y muro
(enchape de 0.60X0.60 0.45x0.90 (enchape de muros 0.30x0.60 (enchape de (enchape de
1.20x0.195
60x60) 60x60) 60x60) 1.20x0.195)
7.74 0.00 0.00 0.00 0.00 0.00 0.00 5.64

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


7.41 0.00 0.00 0.00 0.00 0.00 0.00 5.64

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


8.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


8.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


12 13 14 15 16 17 18 19
BALCONES BAÑO PRINCIPAL BAÑO SECUNDARIO
CZ (ml) Piso (m2) Zocalo (m2) Zocalo (m2) Sardinel (ml) Piso (m2) Zocalo (m2) Zocalo (m2)
Instalacion de
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
contrazocalo Instalacion de Instalacion de
enchape en pisos enchape en pisos sardinel de enchape en pisos enchape en pisos
h=10cm enchape en enchape en
y muro y muro ducha h=10cm y muro y muro
(enchape de muros 0.30x0.60 muros 0.30x0.60
1.20x0.195 1.20x0.195 de 1.20x0.195 1.20x0.195 1.20x0.195
1.20x0.60)
7.07 2.89 2.18 13.37 0.90 2.72 0.00 14.81

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


7.05 2.94 2.19 13.29 0.92 2.69 0.00 14.80

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 2.78 2.17 13.30 0.91 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 3.18 3.22 12.46 1.35 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


CARA 1
0.172 4.23 4.058
0.762 4.23 3.468
1.5 1.5
9.026

20 21 22 23 24 25 26 27
NDARIO PASAJES PARRILLA 1
Sardinel (ml) Piso (m2) CZ (ml) Sardinel (ml) Piso (m2) Zocalo (m2) CZ (ml) bancas (ml)
Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de Instalacion de
Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos contrazocalos
sardinel de enchape en pisos
enchape en pisos h=10cm h=30cm enchape en pisos h=10cm h=30cm
ducha h=10cm y muro
0.60X0.60 (enchape de (enchape de 0.45x0.90 (enchape de (enchape de
de 1.20x0.195 1.20x0.195
60x60) 60x60) 0.45x0.90) 1.20x0.195)
0.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


13.94
0.00 13.94 0.00 0.00 0.00 0.00 0.00 0.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


28 29 30 31 32 33 34 35
PARRILLA 2 SALA ESTAR SUM CONWORKING
Piso (m2) CZ (ml) bancas (ml) Piso (m2) CZ (ml) bancas (ml) Piso (m2) CZ (ml)
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos
enchape en pisos h=10cm h=30cm enchape en pisos h=10cm h=30cm enchape en pisos h=10cm
0.45x0.90 (enchape de (enchape de 0.45x0.90 (enchape de (enchape de 0.60X0.60 (enchape de
0.45x0.90) 1.20x0.195) 0.45x0.90) 1.20x0.195) 60x60)
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


36 37 38 39 40 41 42 43
BAÑO AZOTEA 1 BAÑO AZOTEA 2 BAÑO AZOTEA 3 CUERTO DE BASURA
Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2)

Instalacion de
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
enchape en pisos
enchape en pisos enchape en enchape en enchape en pisos enchape en enchape en pisos enchape en
y muro
0.60X0.60 muros 0.30x0.60 muros 0.30x0.60 0.60X0.60 muros 0.30x0.60 0.60X0.60 muros 0.30x0.60
1.20x0.195

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


44
TO DE BASURA
CZ (ml)
Instalacion de
contrazocalos
h=10cm
(enchape de
60x60)
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
#N/A

0.00
#N/A

0.00
#N/A

0.00

0.00

0.00
#N/A

0.00
#N/A

0.00
TAREO DE PERSONAL EN OBRA
OBRA FARAH

TAREO DIARIO DE PERSONAL

PARTIDAS CONTROL

Horas Hombre Total: 8.5 hh 0 he

ITEM TAREO Nombre y Apellido CAT HE

1.00 X Erick Renzo, MARTINEZ LLACUA Cap


2.00 L Luis LLACUA ALVARADO Op
3.00 L Nilton ESPINOZA LOZANO Op
4.00 L Sadan HUANCA CASANCA Op
5.00 - Waltter, ROJAS LLACUA Op
6.00 - Jesus Daniel, SANCHEZ HUAYCHO Op
7.00 - Bruz Huason, HUERTA YAÑACC Op
8.00 - Christopher Daniels, ESPINOZA HUAMAN Ay
9.00 - Edwin Omar, CENTENO CEREZO Op
10.00 - - -
11.00 - - -
12.00 - - -
13.00 L Areli Elizabet ARICARA YBERICO Ay
14.00 - Maria Jesus, MAIZ FELIX Ay
15.00 - Lery Shuña Araujo Ay
16.00 - Fidelia Shuña Araujo Ay
17.00 - - -
18.00 - - -
19.00 - - -
26.00 - - -
34.00 - - -
20.00 - - -
21.00 - - -
22.00 - - -
23.00 - - -
24.00 - - -
25.00 - - -
27.00 - - -
28.00 - - -
29.00 - - -
30.00 - - -
31.00 - - -
32.00 - - -
33.00 - - -
35.00 - - -
36.00 - - -
37.00 - - -
38.00 - - -
39.00 - - -
40.00 - - -
41.00 - GASTOS GENERALES -
42.00 - - -
43.00 - - SUPER
44.00 - - -
45.00 - Luis Peter, PINCHI COMETIVOS GG
46.00 - Orlando, OSORIO RIEVRA (Servicio) JP
IDAS CONTROL NIVELACION DE PISO
AVANCE DIARIO Peon Peon Peon
8.5 hh
0 m2 36.3 m2 0 m2 0 m2 0 ml 0 und 0 hh

Abastecedor
Nivelacion Saridnel
HH Fragua (m2) Piso (m2) Zocalo (m2) CZ (ml)

Limpieza

Amolado
de Piso (m2) (und)

0 hh 0 hh 0 hh
8.5 hh 0 m2 0 m2 0 m2 0 m2
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh 36.3 m2
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
1
ELACION DE PISO ENCHAPE 2
Op Peon Peon Peon Op 3
0 hh 8.5 hh 4
Forrado de Piso

Fragua de Dpto

Abastecedor

Columna12
Enchape de
Nivelacion

Columna1

AVANCE

Enchape

Dpto2
5
0 hh 0 hh 0 hh 0 hh 0 hh 8.5 hh 0 hh
8.50
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
METRADO POR DEPARTAMENTO
2 3
COCINA / LAVANDERIA
Piso (m2) Zocalo (m2)

Instalacion de Instalacion de
enchape en pisos enchape en
0.60X0.60 muros 0.30x0.60

401 6.77 0.54


Erick Renzo, MARTINEZ LLACUA Avance Actual
Avance Acumulado 0.00 0.00
402 7.75 3.30
Erick Renzo, MARTINEZ LLACUA Avance Actual
Avance Acumulado 0.00 0.00
403 10.25 3.60
AVANCE ENCHAPE

Erick Renzo, MARTINEZ LLACUA Avance Actual


Avance Acumulado 0.00 0.00
#N/A #N/A
Erick Renzo, MARTINEZ LLACUA Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Jesus Daniel, SANCHEZ HUAYCHO Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Bruz Huason, HUERTA YAÑACC Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00

101 Windows:
7.97 14.00
AVANCE FRAGUA

Terraza Frotnal dpto 101


Maria Jesus, MAIZ FELIX Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00
4 5 6 7 8 9 10 11
A / LAVANDERIA TERRAZAS BALCONES
CZ (ml) Piso (m2) Piso (m2) CZ (ml) Zocalo (m2) Sardinel (ml) bancas (ml) Piso (m2)
Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de
contrazocalos Instalacion de Instalacion de contrazocalos Instalacion de contrazocalos contrazocalos
enchape en pisos
h=10cm enchape en pisos enchape en pisos h=10cm enchape en h=30cm h=30cm
y muro
(enchape de 0.60X0.60 0.45x0.90 (enchape de muros 0.30x0.60 (enchape de (enchape de
1.20x0.195
60x60) 60x60) 60x60) 1.20x0.195)
7.74 0.00 0.00 0.00 0.00 0.00 0.00 5.64

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


9.36 0.00 0.00 0.00 0.00 0.00 0.00 5.64

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


8.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8.36 12.95 0.00 0.00 32.50 0.00 0.00 0.00


15.80 20.50
0.00 15.80 0.00 0.00 20.50 0.00 0.00 0.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


12 13 14 15 16 17 18 19
BALCONES BAÑO PRINCIPAL BAÑO SECUNDARIO
CZ (ml) Piso (m2) Zocalo (m2) Zocalo (m2) Sardinel (ml) Piso (m2) Zocalo (m2) Zocalo (m2)
Instalacion de
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
contrazocalo Instalacion de Instalacion de
enchape en pisos enchape en pisos sardinel de enchape en pisos enchape en pisos
h=10cm enchape en enchape en
y muro y muro ducha h=10cm y muro y muro
(enchape de muros 0.30x0.60 muros 0.30x0.60
1.20x0.195 1.20x0.195 de 1.20x0.195 1.20x0.195 1.20x0.195
1.20x0.60)
7.07 2.89 2.18 13.37 0.90 2.72 0.00 14.81

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


7.05 2.94 2.19 13.29 0.92 2.69 0.00 14.80

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 3.18 3.22 12.41 1.35 3.51 0.00 16.75

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 2.89 0.00 15.55 0.90 2.72 0.00 14.81

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


20 21 22 23 24 25 26 27
NDARIO PASAJES PARRILLA 1
Sardinel (ml) Piso (m2) CZ (ml) Sardinel (ml) Piso (m2) Zocalo (m2) CZ (ml) bancas (ml)
Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de Instalacion de
Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos contrazocalos
sardinel de enchape en pisos
enchape en pisos h=10cm h=30cm enchape en pisos h=10cm h=30cm
ducha h=10cm y muro
0.60X0.60 (enchape de (enchape de 0.45x0.90 (enchape de (enchape de
de 1.20x0.195 1.20x0.195
60x60) 60x60) 0.45x0.90) 1.20x0.195)
0.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


28 29 30 31 32 33 34 35
PARRILLA 2 SALA ESTAR SUM CONWORKING
Piso (m2) CZ (ml) bancas (ml) Piso (m2) CZ (ml) bancas (ml) Piso (m2) CZ (ml)
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos
enchape en pisos h=10cm h=30cm enchape en pisos h=10cm h=30cm enchape en pisos h=10cm
0.45x0.90 (enchape de (enchape de 0.45x0.90 (enchape de (enchape de 0.60X0.60 (enchape de
0.45x0.90) 1.20x0.195) 0.45x0.90) 1.20x0.195) 60x60)
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


36 37 38 39 40 41 42 43
BAÑO AZOTEA 1 BAÑO AZOTEA 2 BAÑO AZOTEA 3 CUERTO DE BASURA
Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2)

Instalacion de
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
enchape en pisos
enchape en pisos enchape en enchape en enchape en pisos enchape en enchape en pisos enchape en
y muro
0.60X0.60 muros 0.30x0.60 muros 0.30x0.60 0.60X0.60 muros 0.30x0.60 0.60X0.60 muros 0.30x0.60
1.20x0.195

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


44
TO DE BASURA
CZ (ml)
Instalacion de
contrazocalos
h=10cm
(enchape de
60x60)
TAREO DE PERSONAL EN OBRA
OBRA FARAH

TAREO DIARIO DE PERSONAL

PARTIDAS CONTROL

Horas Hombre Total: 17 hh 0 he

ITEM TAREO Nombre y Apellido CAT HE

1.00 X Erick Renzo, MARTINEZ LLACUA Cap


2.00 - Luis LLACUA ALVARADO Op
3.00 - Nilton ESPINOZA LOZANO Op
4.00 - Sadan HUANCA CASANCA Op
5.00 - Waltter, ROJAS LLACUA Op
6.00 - Jesus Daniel, SANCHEZ HUAYCHO Op
7.00 - Bruz Huason, HUERTA YAÑACC Op
8.00 - Christopher Daniels, ESPINOZA HUAMAN Ay
9.00 - Edwin Omar, CENTENO CEREZO Op
10.00 - - -
11.00 - - -
12.00 - - -
13.00 - Areli Elizabet ARICARA YBERICO Ay
14.00 X Maria Jesus, MAIZ FELIX Ay
15.00 - Lery Shuña Araujo Ay
16.00 - Fidelia Shuña Araujo Ay
17.00 - - -
18.00 - - -
19.00 - - -
26.00 - - -
34.00 - - -
20.00 - - -
21.00 - - -
22.00 - - -
23.00 - - -
24.00 - - -
25.00 - - -
27.00 - - -
28.00 - - -
29.00 - - -
30.00 - - -
31.00 - - -
32.00 - - -
33.00 - - -
35.00 - - -
36.00 - - -
37.00 - - -
38.00 - - -
39.00 - - -
40.00 - - -
41.00 - GASTOS GENERALES -
42.00 - - -
43.00 - - SUPER
44.00 - - -
45.00 - Luis Peter, PINCHI COMETIVOS GG
46.00 - Orlando, OSORIO RIEVRA (Servicio) JP
DAS CONTROL NIVELACION DE PISO
AVANCE DIARIO Peon Peon Peon
17 hh
0 m2 39.1 m2 0 m2 0 m2 0 ml 0 und 0 hh

Abastecedor
Nivelacion Saridnel
HH Fragua (m2) Piso (m2) Zocalo (m2) CZ (ml)

Limpieza

Amolado
de Piso (m2) (und)

0 hh 0 hh 0 hh
8.5 hh 0 m2 0 m2 0 m2 0 m2
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
8.5 hh 39.1 m2
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
ELACION DE PISO ENCHAPE
Op Peon Peon Peon Op
0 hh 17 hh
Forrado de Piso

Fragua de Dpto

Abastecedor

Columna12
Enchape de
Nivelacion

Columna1

AVANCE

Enchape

Dpto2
0 hh 0 hh 0 hh 8.5 hh 0 hh 8.5 hh 0 hh
8.50
-
-
-
-
-
-
-
-
-
-
-
-
8.50
-
-
-
-
-
-
-
-
-
-
-
-
-
-
METRADO POR DEPARTAMENTO
2 3
COCINA / LAVANDERIA
Piso (m2) Zocalo (m2)

Instalacion de Instalacion de
enchape en pisos enchape en
0.60X0.60 muros 0.30x0.60

501 6.77 0.54


Erick Renzo, MARTINEZ LLACUA Avance Actual
Avance Acumulado 0.00 0.00
502 7.75 3.30
Erick Renzo, MARTINEZ LLACUA 503
Avance Acumulado 0.00 0.00
503 5.43 0.57
AVANCE ENCHAPE

Erick Renzo, MARTINEZ LLACUA Avance Actual


Avance Acumulado 0.00 0.00
504 5.23 0.57
Erick Renzo, MARTINEZ LLACUA Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Jesus Daniel, SANCHEZ HUAYCHO Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Bruz Huason, HUERTA YAÑACC Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual Windows:
Avance Acumulado Baño
0.00infantil y lobby
0.00

PISO 1 0.00 0.00


AVANCE FRAGUA

Maria Jesus, MAIZ FELIX Avance Actual 3.50 17.50


Avance Acumulado 3.50 17.50
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00
4 5 6 7 8 9 10 11
A / LAVANDERIA TERRAZAS BALCONES
CZ (ml) Piso (m2) Piso (m2) CZ (ml) Zocalo (m2) Sardinel (ml) bancas (ml) Piso (m2)
Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de
contrazocalos Instalacion de Instalacion de contrazocalos Instalacion de contrazocalos contrazocalos
enchape en pisos
h=10cm enchape en pisos enchape en pisos h=10cm enchape en h=30cm h=30cm
y muro
(enchape de 0.60X0.60 0.45x0.90 (enchape de muros 0.30x0.60 (enchape de (enchape de
1.20x0.195
60x60) 60x60) 60x60) 1.20x0.195)
7.74 0.00 0.00 0.00 0.00 0.00 0.00 5.64

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


9.36 0.00 0.00 0.00 0.00 0.00 0.00 5.64

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


8.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


8.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


3.00 15.10
0.00 3.00 0.00 0.00 15.10 0.00 0.00 0.00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


12 13 14 15 16 17 18 19
BALCONES BAÑO PRINCIPAL BAÑO SECUNDARIO
CZ (ml) Piso (m2) Zocalo (m2) Zocalo (m2) Sardinel (ml) Piso (m2) Zocalo (m2) Zocalo (m2)
Instalacion de
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
contrazocalo Instalacion de Instalacion de
enchape en pisos enchape en pisos sardinel de enchape en pisos enchape en pisos
h=10cm enchape en enchape en
y muro y muro ducha h=10cm y muro y muro
(enchape de muros 0.30x0.60 muros 0.30x0.60
1.20x0.195 1.20x0.195 de 1.20x0.195 1.20x0.195 1.20x0.195
1.20x0.60)
7.07 2.89 2.18 13.37 0.90 2.72 0.00 14.81

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


7.05 2.94 2.19 13.29 0.92 2.69 0.00 14.80

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 2.78 2.17 13.30 0.91 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 3.18 3.22 12.46 1.35 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


20 21 22 23 24 25 26 27
NDARIO PASAJES PARRILLA 1
Sardinel (ml) Piso (m2) CZ (ml) Sardinel (ml) Piso (m2) Zocalo (m2) CZ (ml) bancas (ml)
Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de Instalacion de
Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos contrazocalos
sardinel de enchape en pisos
enchape en pisos h=10cm h=30cm enchape en pisos h=10cm h=30cm
ducha h=10cm y muro
0.60X0.60 (enchape de (enchape de 0.45x0.90 (enchape de (enchape de
de 1.20x0.195 1.20x0.195
60x60) 60x60) 0.45x0.90) 1.20x0.195)
0.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


28 29 30 31 32 33 34 35
PARRILLA 2 SALA ESTAR SUM CONWORKING
Piso (m2) CZ (ml) bancas (ml) Piso (m2) CZ (ml) bancas (ml) Piso (m2) CZ (ml)
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos
enchape en pisos h=10cm h=30cm enchape en pisos h=10cm h=30cm enchape en pisos h=10cm
0.45x0.90 (enchape de (enchape de 0.45x0.90 (enchape de (enchape de 0.60X0.60 (enchape de
0.45x0.90) 1.20x0.195) 0.45x0.90) 1.20x0.195) 60x60)
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


36 37 38 39 40 41 42 43
BAÑO AZOTEA 1 BAÑO AZOTEA 2 BAÑO AZOTEA 3 CUERTO DE BASURA
Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2)

Instalacion de
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
enchape en pisos
enchape en pisos enchape en enchape en enchape en pisos enchape en enchape en pisos enchape en
y muro
0.60X0.60 muros 0.30x0.60 muros 0.30x0.60 0.60X0.60 muros 0.30x0.60 0.60X0.60 muros 0.30x0.60
1.20x0.195

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


44
TO DE BASURA
CZ (ml)
Instalacion de
contrazocalos
h=10cm
(enchape de
60x60)
TAREO DE PERSONAL EN OBRA
OBRA FARAH

TAREO DIARIO DE PERSONAL

PARTIDAS CONTROL

Horas Hombre Total: 17 hh 0 he

ITEM TAREO Nombre y Apellido CAT HE

1.00 X Erick Renzo, MARTINEZ LLACUA Cap


2.00 - Luis LLACUA ALVARADO Op
3.00 - Nilton ESPINOZA LOZANO Op
4.00 - Sadan HUANCA CASANCA Op
5.00 - Waltter, ROJAS LLACUA Op
6.00 - Jesus Daniel, SANCHEZ HUAYCHO Op
7.00 - Bruz Huason, HUERTA YAÑACC Op
8.00 - Christopher Daniels, ESPINOZA HUAMAN Ay
9.00 - Edwin Omar, CENTENO CEREZO Op
10.00 - - -
11.00 - - -
12.00 - - -
13.00 - Areli Elizabet ARICARA YBERICO Ay
14.00 X Maria Jesus, MAIZ FELIX Ay
15.00 - Lery Shuña Araujo Ay
16.00 - Fidelia Shuña Araujo Ay
17.00 - - -
18.00 - - -
19.00 - - -
26.00 - - -
34.00 - - -
20.00 - - -
21.00 - - -
22.00 - - -
23.00 - - -
24.00 - - -
25.00 - - -
27.00 - - -
28.00 - - -
29.00 - - -
30.00 - - -
31.00 - - -
32.00 - - -
33.00 - - -
35.00 - - -
36.00 - - -
37.00 - - -
38.00 - - -
39.00 - - -
40.00 - - -
41.00 - GASTOS GENERALES -
42.00 - - -
43.00 - - SUPER
44.00 - - -
45.00 - Luis Peter, PINCHI COMETIVOS GG
46.00 - Orlando, OSORIO RIEVRA (Servicio) JP
DAS CONTROL NIVELACION DE PISO
AVANCE DIARIO Peon Peon Peon
17 hh
0 m2 0 m2 0 m2 0 m2 0 ml 0 und 0 hh

Abastecedor
Nivelacion Saridnel
HH Fragua (m2) Piso (m2) Zocalo (m2) CZ (ml)

Limpieza

Amolado
de Piso (m2) (und)

0 hh 0 hh 0 hh
8.5 hh 0 m2 0 m2 0 m2 0 m2
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
8.5 hh 0 m2
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
1
ELACION DE PISO ENCHAPE 2
Op Peon Peon Peon Op 3
0 hh 17 hh 4
Forrado de Piso

Fragua de Dpto

Abastecedor

Columna12
Enchape de
Nivelacion

Columna1

AVANCE

Enchape

Dpto2
5
0 hh 0 hh 0 hh 8.5 hh 0 hh 8.5 hh 0 hh
8.50
-
-
-
-
-
-
-
-
-
-
-
-
8.50
-
-
-
-
-
-
-
-
-
-
-
-
-
-
METRADO POR DEPARTAMENTO
2 3
COCINA / LAVANDERIA
Piso (m2) Zocalo (m2)

Instalacion de Instalacion de
enchape en pisos enchape en
0.60X0.60 muros 0.30x0.60

601 6.77 0.54


Erick Renzo, MARTINEZ LLACUA Avance Actual
Avance Acumulado 0.00 0.00
602 7.75 3.30
Erick Renzo, MARTINEZ LLACUA Avance Actual
Avance Acumulado 0.00 0.00
603 10.25 3.60
AVANCE ENCHAPE

Erick Renzo, MARTINEZ LLACUA Avance Actual


Avance Acumulado 0.00 0.00
#N/A #N/A
Erick Renzo, MARTINEZ LLACUA Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
- Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00

#N/A #N/A
AVANCE FRAGUA

Maria Jesus, MAIZ FELIX Avance Actual


Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00
4 5 6 7 8 9 10 11
A / LAVANDERIA TERRAZAS BALCONES
CZ (ml) Piso (m2) Piso (m2) CZ (ml) Zocalo (m2) Sardinel (ml) bancas (ml) Piso (m2)
Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de
contrazocalos Instalacion de Instalacion de contrazocalos Instalacion de contrazocalos contrazocalos
enchape en pisos
h=10cm enchape en pisos enchape en pisos h=10cm enchape en h=30cm h=30cm
y muro
(enchape de 0.60X0.60 0.45x0.90 (enchape de muros 0.30x0.60 (enchape de (enchape de
1.20x0.195
60x60) 60x60) 60x60) 1.20x0.195)
7.74 0.00 0.00 0.00 0.00 0.00 0.00 5.64

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


9.36 0.00 0.00 0.00 0.00 0.00 0.00 5.64

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


8.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


12 13 14 15 16 17 18 19
BALCONES BAÑO PRINCIPAL BAÑO SECUNDARIO
CZ (ml) Piso (m2) Zocalo (m2) Zocalo (m2) Sardinel (ml) Piso (m2) Zocalo (m2) Zocalo (m2)
Instalacion de
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
contrazocalo Instalacion de Instalacion de
enchape en pisos enchape en pisos sardinel de enchape en pisos enchape en pisos
h=10cm enchape en enchape en
y muro y muro ducha h=10cm y muro y muro
(enchape de muros 0.30x0.60 muros 0.30x0.60
1.20x0.195 1.20x0.195 de 1.20x0.195 1.20x0.195 1.20x0.195
1.20x0.60)
7.07 2.89 2.18 13.37 0.90 2.72 0.00 14.81

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


7.05 2.94 2.19 13.29 0.92 2.69 0.00 14.80

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 3.18 3.22 12.41 1.35 3.51 0.00 16.75

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


20 21 22 23 24 25 26 27
NDARIO PASAJES PARRILLA 1
Sardinel (ml) Piso (m2) CZ (ml) Sardinel (ml) Piso (m2) Zocalo (m2) CZ (ml) bancas (ml)
Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de Instalacion de
Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos contrazocalos
sardinel de enchape en pisos
enchape en pisos h=10cm h=30cm enchape en pisos h=10cm h=30cm
ducha h=10cm y muro
0.60X0.60 (enchape de (enchape de 0.45x0.90 (enchape de (enchape de
de 1.20x0.195 1.20x0.195
60x60) 60x60) 0.45x0.90) 1.20x0.195)
0.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


28 29 30 31 32 33 34 35
PARRILLA 2 SALA ESTAR SUM CONWORKING
Piso (m2) CZ (ml) bancas (ml) Piso (m2) CZ (ml) bancas (ml) Piso (m2) CZ (ml)
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos
enchape en pisos h=10cm h=30cm enchape en pisos h=10cm h=30cm enchape en pisos h=10cm
0.45x0.90 (enchape de (enchape de 0.45x0.90 (enchape de (enchape de 0.60X0.60 (enchape de
0.45x0.90) 1.20x0.195) 0.45x0.90) 1.20x0.195) 60x60)
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


36 37 38 39 40 41 42 43
BAÑO AZOTEA 1 BAÑO AZOTEA 2 BAÑO AZOTEA 3 CUERTO DE BASURA
Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2)

Instalacion de
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
enchape en pisos
enchape en pisos enchape en enchape en enchape en pisos enchape en enchape en pisos enchape en
y muro
0.60X0.60 muros 0.30x0.60 muros 0.30x0.60 0.60X0.60 muros 0.30x0.60 0.60X0.60 muros 0.30x0.60
1.20x0.195

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00

#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


44
TO DE BASURA
CZ (ml)
Instalacion de
contrazocalos
h=10cm
(enchape de
60x60)
TAREO DE PERSONAL EN OBRA
OBRA FARAH

TAREO DIARIO DE PERSONAL

PARTIDAS CONTROL

Horas Hombre Total: 5.5 hh 0 he

ITEM TAREO Nombre y Apellido CAT HE

1.00 X Erick Renzo, MARTINEZ LLACUA Cap


2.00 - Luis LLACUA ALVARADO Op
3.00 - Nilton ESPINOZA LOZANO Op
4.00 - Sadan HUANCA CASANCA Op
5.00 - Waltter, ROJAS LLACUA Op
6.00 - Jesus Daniel, SANCHEZ HUAYCHO Op
7.00 - Bruz Huason, HUERTA YAÑACC Op
8.00 - Christopher Daniels, ESPINOZA HUAMAN Ay
9.00 - Edwin Omar, CENTENO CEREZO Op
10.00 - - -
11.00 - - -
12.00 - - -
13.00 - Areli Elizabet ARICARA YBERICO Ay
14.00 - Maria Jesus, MAIZ FELIX Ay
15.00 - Lery Shuña Araujo Ay
16.00 - Fidelia Shuña Araujo Ay
17.00 - - -
18.00 - - -
19.00 - - -
26.00 - - -
34.00 - - -
20.00 - - -
21.00 - - -
22.00 - - -
23.00 - - -
24.00 - - -
25.00 - - -
27.00 - - -
28.00 - - -
29.00 - - -
30.00 - - -
31.00 - - -
32.00 - - -
33.00 - - -
35.00 - - -
36.00 - - -
37.00 - - -
38.00 - - -
39.00 - - -
40.00 - - -
41.00 - GASTOS GENERALES -
42.00 - - -
43.00 - - SUPER
44.00 - - -
45.00 - Luis Peter, PINCHI COMETIVOS GG
46.00 - Orlando, OSORIO RIEVRA (Servicio) JP
DAS CONTROL NIVELACION DE PISO
AVANCE DIARIO Peon Peon Peon
5.5 hh
0 m2 0 m2 0 m2 0 m2 0 ml 0 und 0 hh

Abastecedor
Nivelacion Saridnel
HH Fragua (m2) Piso (m2) Zocalo (m2) CZ (ml)

Limpieza

Amolado
de Piso (m2) (und)

0 hh 0 hh 0 hh
5.5 hh 0 m2 0 m2 0 m2 0 m2
0 hh
0 hh 0 m2 0 m2 0 m2 0 m2
0 hh 0 m2 0 m2 0 m2 0 m2
0 hh 0 m2 0 m2 0 m2 0 m2
0 hh 0 m2 0 m2 0 m2 0 m2
0 hh 0 m2 0 m2 0 m2 0 m2
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh 0 m2
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
0 hh
1
ELACION DE PISO ENCHAPE 2
Op Peon Peon Peon Op 3
0 hh 5.5 hh 4
Forrado de Piso

Fragua de Dpto

Abastecedor

Columna12
Enchape de
Nivelacion

Columna1

AVANCE

Enchape

Dpto2
5
0 hh 0 hh 0 hh 0 hh 0 hh 5.5 hh 0 hh
5.50
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
METRADO POR DEPARTAMENTO
2 3
COCINA / LAVANDERIA
Piso (m2) Zocalo (m2)

Instalacion de Instalacion de
enchape en pisos enchape en
0.60X0.60 muros 0.30x0.60

101 7.97 14.00


Erick Renzo, MARTINEZ LLACUA Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Luis LLACUA ALVARADO Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
AVANCE ENCHAPE

Nilton ESPINOZA LOZANO Avance Actual


Avance Acumulado 0.00 0.00
#N/A #N/A
Sadan HUANCA CASANCA Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
- Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00

#N/A #N/A
AVANCE FRAGUA

Maria Jesus, MAIZ FELIX Avance Actual


Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00
#N/A #N/A
Avance Actual
Avance Acumulado 0.00 0.00
4 5 6 7 8 9 10 11
A / LAVANDERIA TERRAZAS BALCONES
CZ (ml) Piso (m2) Piso (m2) CZ (ml) Zocalo (m2) Sardinel (ml) bancas (ml) Piso (m2)
Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de
contrazocalos Instalacion de Instalacion de contrazocalos Instalacion de contrazocalos contrazocalos
enchape en pisos
h=10cm enchape en pisos enchape en pisos h=10cm enchape en h=30cm h=30cm
y muro
(enchape de 0.60X0.60 0.45x0.90 (enchape de muros 0.30x0.60 (enchape de (enchape de
1.20x0.195
60x60) 60x60) 60x60) 1.20x0.195)
8.36 12.95 0.00 0.00 32.50 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


12 13 14 15 16 17 18 19
BALCONES BAÑO PRINCIPAL BAÑO SECUNDARIO
CZ (ml) Piso (m2) Zocalo (m2) Zocalo (m2) Sardinel (ml) Piso (m2) Zocalo (m2) Zocalo (m2)
Instalacion de
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
contrazocalo Instalacion de Instalacion de
enchape en pisos enchape en pisos sardinel de enchape en pisos enchape en pisos
h=10cm enchape en enchape en
y muro y muro ducha h=10cm y muro y muro
(enchape de muros 0.30x0.60 muros 0.30x0.60
1.20x0.195 1.20x0.195 de 1.20x0.195 1.20x0.195 1.20x0.195
1.20x0.60)
0.00 2.89 0.00 15.55 0.90 2.72 0.00 14.81

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


20 21 22 23 24 25 26 27
NDARIO PASAJES PARRILLA 1
Sardinel (ml) Piso (m2) CZ (ml) Sardinel (ml) Piso (m2) Zocalo (m2) CZ (ml) bancas (ml)
Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de Instalacion de
Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos contrazocalos
sardinel de enchape en pisos
enchape en pisos h=10cm h=30cm enchape en pisos h=10cm h=30cm
ducha h=10cm y muro
0.60X0.60 (enchape de (enchape de 0.45x0.90 (enchape de (enchape de
de 1.20x0.195 1.20x0.195
60x60) 60x60) 0.45x0.90) 1.20x0.195)
0.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


28 29 30 31 32 33 34 35
PARRILLA 2 SALA ESTAR SUM CONWORKING
Piso (m2) CZ (ml) bancas (ml) Piso (m2) CZ (ml) bancas (ml) Piso (m2) CZ (ml)
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos contrazocalos Instalacion de contrazocalos
enchape en pisos h=10cm h=30cm enchape en pisos h=10cm h=30cm enchape en pisos h=10cm
0.45x0.90 (enchape de (enchape de 0.45x0.90 (enchape de (enchape de 0.60X0.60 (enchape de
0.45x0.90) 1.20x0.195) 0.45x0.90) 1.20x0.195) 60x60)
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


36 37 38 39 40 41 42 43
BAÑO AZOTEA 1 BAÑO AZOTEA 2 BAÑO AZOTEA 3 CUERTO DE BASURA
Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2)

Instalacion de
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
enchape en pisos
enchape en pisos enchape en enchape en enchape en pisos enchape en enchape en pisos enchape en
y muro
0.60X0.60 muros 0.30x0.60 muros 0.30x0.60 0.60X0.60 muros 0.30x0.60 0.60X0.60 muros 0.30x0.60
1.20x0.195

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00

#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


#N/A #N/A #N/A #N/A #N/A #N/A

0.00 0.00 0.00 0.00 0.00 0.00


44
TO DE BASURA
CZ (ml)
Instalacion de
contrazocalos
h=10cm
(enchape de
60x60)
AVANCE POR DEPARTAMENTO
OBRA VYV BRAVO
AVANCE POR PISO Y DEPARTAMENTPO

Avance ACUMULADO
OPERARIO PISO N6 Metrado % Metrado %
93.26 100% 0.00 0.00%
105.28 100% 0.00 0.00%
74.71 100% 0.00 0.00%
74.11 100% 0.00 0.00%
76.25 100% 0.00 0.00%
89.93 100% 0.00 0.00%
PISO N8
93.26 100% 0.00 0.00%
105.28 100% 0.00 0.00%
Jeason, LOPEZ SERPA 74.71 100% 0.00 0.00%
74.11 100% 0.00 0.00%
76.25 100% 0.00 0.00%
89.93 100% 0.00 0.00%
PISO N9
93.26 100% 0.00 0.00%
105.28 100% 0.00 0.00%
74.71 100% 0.00 0.00%
74.11 100% 0.00 0.00%
76.25 100% 0.00 0.00%
89.93 100% 0.00 0.00%
PISO N10
Bruz Huason, HUERTA YAÑACC 93.26 100% 0.00 0.00%
Raul Emilio, CAMONES DE LA CRUZ 105.28 100% 0.00 0.00%
Jeason, LOPEZ SERPA 74.71 100% 0.00 0.00%
Raul Emilio, CAMONES DE LA CRUZ 74.11 100% 0.00 0.00%
Jeanpol, GONZALES ACOSTA 76.25 100% 0.00 0.00%
Jeason, LOPEZ SERPA 89.93 100% 0.00 0.00%
PISO N11
93.26 100% 0.00 0.00%
105.28 100% 0.00 0.00%
74.71 100% 0.00 0.00%
74.11 100% 0.00 0.00%
76.25 100% 0.00 0.00%
89.93 100% 0.00 0.00%
NTO

Avance ACUMULADO Avance S10 Avance S11 Avance S12 Avance S13 Avance S14
BARRA Metrado Metrado Metrado Metrado Metrado
Avance S15 Avance S16 Avance S17 Avance S18 Avance S19
Metrado Metrado Metrado Metrado Metrado
1 2 3 4 5 6 7
COCINA / LAVANDERIA TERRAZAS
Piso (m2) Zocalo (m2) CZ (ml) Piso (m2) Piso (m2) CZ (ml)

Instalacion de Instalacion de
Instalacion de Instalacion de Instalacion de Instalacion de
contrazocalos contrazocalos
enchape en enchape en enchape en enchape en
h=10cm h=10cm
pisos muros pisos pisos
(enchape de (enchape de
0.60X0.60 0.30x0.60 0.60X0.60 0.45x0.90
60x60) 60x60)

SEMISOTANO
SS01
SS02
SS03
SS04
PISO 1
101 7.97 14.00 8.36 12.95
102 5.43 0.57 8.43 17.22 18.35
103 5.24 0.58 8.36 17.13 16.43
PISO 2
201 6.77 0.54 7.74
202 7.75 3.30 9.36
203 10.25 3.60 8.63
PISO 3
301 6.77 0.54 7.74
302 7.82 3.84 7.41
303 5.43 0.57 8.44
304 5.23 0.57 8.25
PISO 4
401 6.77 0.54 7.74
402 7.75 3.30 9.36
403 10.25 3.60 8.63
PISO 5
501 6.77 0.54 7.74
502 7.75 3.30 9.36
503 5.43 0.57 8.44
504 5.23 0.57 8.25
PISO 6
601 6.77 0.54 7.74
602 7.75 3.30 9.36
603 10.25 3.60 8.63
PISO 7
701 6.77 0.54 7.74
702 7.75 3.30 9.36
703 5.43 0.57 8.44
704 5.23 0.57 8.25
PISO 8
801 6.77 0.54 7.74
802 7.82 4.09 7.24
803 10.25 3.60 8.63
PISO 9
AZOTEA 35.05 22.13

TOTAL 193.36 61.21 225.34 47.30 35.05 56.91

OBRA 195.43 59.64


8 9 10 11 12 13 14 15
TERRAZAS BALCONES BAÑO PRINCIPAL
Zocalo (m2) Sardinel (ml) bancas (ml) Piso (m2) CZ (ml) Piso (m2) Zocalo (m2) Zocalo (m2)

Instalacion de Instalacion de Instalacion de


Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
contrazocalos contrazocalos contrazocalo
enchape en enchape en enchape en enchape en enchape en
h=30cm h=30cm h=10cm
muros pisos y muro pisos y muro pisos y muro muros
(enchape de (enchape de (enchape de
0.30x0.60 1.20x0.195 1.20x0.195 1.20x0.195 0.30x0.60
60x60) 1.20x0.195) 1.20x0.60)

32.50 2.89 - 15.55


3.42 2.79 3.15 12.33
1.90 4.22 3.22 12.40

5.64 7.07 2.89 2.18 13.37


5.64 7.05 2.94 2.19 13.29
- - 3.18 3.22 12.41

5.64 7.07 2.89 2.18 13.37


5.64 7.05 2.94 2.19 13.29
- - 2.78 2.17 13.30
- - 3.18 3.22 12.46

5.64 7.07 2.89 2.18 13.37


5.64 7.05 2.94 2.19 13.29
- - 3.18 3.22 12.41

5.64 7.07 2.89 2.18 13.37


5.64 7.05 2.94 2.19 13.29
- - 2.78 2.17 13.30
- - 3.18 3.22 12.46

5.64 7.07 2.89 2.18 13.37


5.64 7.05 2.94 2.19 13.29
- - 3.18 3.22 12.41

5.64 7.07 2.89 2.18 13.37


5.64 7.05 2.94 2.19 13.29
- - 2.78 2.17 13.30
- - 3.18 3.22 12.46

5.64 7.07 2.89 2.18 13.37


5.64 7.05 2.94 2.19 13.29
- - 3.18 3.22 12.41

26.74
27 27
32.50 5.32 26.74 78.96 98.84 81.33 65.95 353.82

32.50 74.41 123.41 152.62 353.82


16 17 18 19 20 21 22 23
NCIPAL BAÑO SECUNDARIO PASAJES
Sardinel (ml) Piso (m2) Zocalo (m2) Zocalo (m2) Sardinel (ml) Piso (m2) CZ (ml) Sardinel (ml)

Instalacion de Instalacion de
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
contrazocalos contrazocalos
sardinel de enchape en enchape en enchape en sardinel de enchape en
h=10cm h=30cm
ducha h=10cm pisos y muro pisos y muro muros ducha h=10cm pisos
(enchape de (enchape de
de 1.20x0.195 1.20x0.195 1.20x0.195 0.30x0.60 de 1.20x0.195 0.60X0.60
60x60) 60x60)

0.90 2.72 - 14.81 0.96


0.90 - - - -
1.35 - - - -
21.32 25.68
0.90 2.72 - 14.81 0.96
0.92 2.69 - 14.80 0.94
1.35 3.51 - 16.75 1.33
21.32 25.68
0.90 2.72 - 14.81 0.96
0.92 2.69 - 14.80 0.94
0.91 - - - -
1.35 - - - -
21.32 25.68
0.90 2.72 - 14.81 0.96
0.92 2.69 - 14.80 0.94
1.35 3.51 - 16.75 1.33
21.32 25.68
0.90 2.72 - 14.81 0.96
0.92 2.69 - 14.80 0.94
0.91 - - - -
1.35 - - - -
21.32 25.68
0.90 2.72 - 14.81 0.96
0.92 2.69 - 14.80 0.94
1.35 3.51 - 16.75 1.33
21.32 25.68
0.90 2.72 - 14.81 0.96
0.92 2.69 - 14.80 0.94
0.91 - - - -
1.35 - - - -
21.32 25.68
0.90 2.72 - 14.81 0.96
0.92 2.69 - 14.80 0.94
1.35 3.51 - 16.75 1.33
32.76 39.48 4.22

28.07 54.62 - 289.11 19.58 182.00 219.21 4.22

84.23 56.62 289.11 58.69


24 25 26 27 28 29 30 31
PARRILLA 1 PARRILLA 2 SALA ESTAR
Piso (m2) Zocalo (m2) CZ (ml) bancas (ml) Piso (m2) CZ (ml) bancas (ml) Piso (m2)

Instalacion de Instalacion de Instalacion de Instalacion de


Instalacion de Instalacion de Instalacion de Instalacion de
contrazocalos contrazocalos contrazocalos contrazocalos
enchape en enchape en enchape en enchape en
h=10cm h=30cm h=10cm h=30cm
pisos pisos y muro pisos pisos
(enchape de (enchape de (enchape de (enchape de
0.45x0.90 1.20x0.195 0.45x0.90 0.45x0.90
0.45x0.90) 1.20x0.195) 0.45x0.90) 1.20x0.195)

14.40 11.62 12.54 14.17 16.89 10.48 23.86

14.40 - 11.62 12.54 14.17 16.89 10.48 23.86


32 33 34 35 36 37 38 39
SALA ESTAR SUM CONWORKING BAÑO AZOTEA 1 BAÑO AZOTEA 2
CZ (ml) bancas (ml) Piso (m2) CZ (ml) Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2)

Instalacion de Instalacion de Instalacion de


Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
contrazocalos contrazocalos contrazocalos
enchape en enchape en enchape en enchape en enchape en
h=10cm h=30cm h=10cm
pisos pisos muros pisos y muro muros
(enchape de (enchape de (enchape de
0.60X0.60 0.60X0.60 0.30x0.60 1.20x0.195 0.30x0.60
0.45x0.90) 1.20x0.195) 60x60)

8.34 4.04 54.15 2.26 10.22 2.11 9.65

8.34 4.04 54.15 - 2.26 10.22 2.11 9.65


40 41 42 43 44
BAÑO AZOTEA 3 CUERTO DE BASURA
Piso (m2) Zocalo (m2) Piso (m2) Zocalo (m2) CZ (ml) M2

Instalacion de
Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de Instalacion de
contrazocalos
enchape en enchape en enchape en enchape en enchape en enchape en enchape en
h=10cm
pisos muros pisos muros pisos pisos y muro muros
(enchape de
0.60X0.60 0.30x0.60 0.60X0.60 0.30x0.60 0.60X0.60 1.20x0.195 0.30x0.60
60x60)

8.06 30.93 3.96 8.06 - 30.93


- - -
- - -
- - -
- - -
20.92 5.62 76.86
22.65 5.93 12.90
22.36 7.43 12.97
21.32 - -
6.77 13.43 28.73
7.75 13.45 31.39
10.25 9.91 32.76
21.32 - -
6.77 13.43 28.73
7.82 13.45 31.93
5.43 4.96 13.87
5.23 6.40 13.04
21.32 - -
6.77 13.43 28.73
7.75 13.45 31.39
10.25 9.91 32.76
21.32 - -
6.77 13.43 28.73
7.75 13.45 31.39
5.43 4.96 13.87
5.23 6.40 13.04
21.32 - -
6.77 13.43 28.73
7.75 13.45 31.39
10.25 9.91 32.76
21.32 - -
6.77 13.43 28.73
7.75 13.45 31.39
5.43 4.96 13.87
5.23 6.40 13.04
21.32 - -
6.77 13.43 28.73
7.82 13.45 32.18
10.25 9.91 32.76
32.76 - -
2.03 9.42 58.44 2.11 29.29

2.03 9.42 8.06 30.93 3.96 489.15 282.97 796.86

644.00 207.34 808.97


154.85 - 75.63 12.11
RESUMEN TOTAL
M2 ML

Instalacion de Instalacion de Instalacion de Instalacion de


Instalacion de Instalacion de
contrazocalos contrazocalo contrazocalos contrazocalos
enchape en sardinel de
h=10cm h=10cm h=30cm h=30cm
pisos ducha h=10cm
(enchape de (enchape de (enchape de (enchape de
0.45x0.90 de 1.20x0.195
60x60) 1.20x0.60) 60x60) 1.20x0.195)

- - - 3.96 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - 8.36 1.86 - - -
- - - 26.78 0.90 - 3.42 -
- - - 24.79 1.35 - 1.90 -
- - - 25.68 - - - -
- - - 7.74 1.86 7.07 - -
- - - 9.36 1.86 7.05 - -
- - - 8.63 2.68 - - -
- - - 25.68 - - - -
- - - 7.74 1.86 7.07 - -
- - - 7.41 1.86 7.05 - -
- - - 8.44 0.91 - - -
- - - 8.25 1.35 - - -
- - - 25.68 - - - -
- - - 7.74 1.86 7.07 - -
- - - 9.36 1.86 7.05 - -
- - - 8.63 2.68 - - -
- - - 25.68 - - - -
- - - 7.74 1.86 7.07 - -
- - - 9.36 1.86 7.05 - -
- - - 8.44 0.91 - - -
- - - 8.25 1.35 - - -
- - - 25.68 - - - -
- - - 7.74 1.86 7.07 - -
- - - 9.36 1.86 7.05 - -
- - - 8.63 2.68 - - -
- - - 25.68 - - - -
- - - 7.74 1.86 7.07 - -
- - - 9.36 1.86 7.05 - -
- - - 8.44 0.91 - - -
- - - 8.25 1.35 - - -
- - - 25.68 - - - -
- - - 7.74 1.86 7.07 - -
- - - 7.24 1.86 7.05 - -
- - - 8.63 2.68 - - -
- - - 39.48 - - 4.22 -
87.48 - - 22.13 - - - 53.80

87.48 - - 505.43 47.65 98.84 9.54 53.80

683.17 142.92 15.68


- 87.48 - - 177.74 95.27 - 83.16 - 9.54 - 53.80

También podría gustarte