THU - Control de Avance Cimentación
THU - Control de Avance Cimentación
RESUMEN GENERAL
11/24/2022 1/13/2023
1/19/2023 1/13/2023
SU
30/11/22
04/12/22
14/12/22
20/12/22
24/12/22
26/12/22
30/12/22
03/01/23
26/11/22
28/11/22
02/12/22
06/12/22
08/12/22
10/12/22
12/12/22
16/12/22
18/12/22
22/12/22
28/12/22
01/01/23
0.0 12.5 13%
1.5 14.0 14%
1.5 15.4 16%
AVANCE REQUERIDO AVANC
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
0.0 15.4 16%
36.8 52.2 54%
0.0 52.2 54%
0.0 52.2 54%
0.0 52.2 54%
0.0 52.2 54%
0.0 52.2 54%
0.0 52.2 54%
12.8 65.0 67%
0.0 65.0 67%
2.8 67.8 70%
8.8 76.6 79%
20.3 97.0 100%
0.0 97.0 100%
0.0 97.0 100%
0.0 97.0 100%
0.0 97.0 100%
0.0 97.0 100%
0.0 97.0 100%
0.0 97.0 100%
0.0 97.0 100%
0.0 97.0 100%
0.0 97.0 100%
0.0 97.0 100%
0.0 97.0 100%
0.0 97.0 100%
96.96
CIMENTACIÓN CENTRAL - CA
VACIADO (M3)
120%
AVANCE REAL CIMENTACIÓN CENTRAL - CA
DIARIO ACUMULADO % AVANCE VACIADO (M3)
13.1 13.1 6%
120%
0.0 0.0 0%
0.0 0.0 0%
0.0 0.0 0% 100%
0.0 0.0 0%
0.0 0.0 0%
80%
0.0 0.0 0%
0.0 0.0 0%
0.0 0.0 0% 60%
0.0 0.0 0% 56%
0.0 0.0 0%
0.0 0.0 0% 40%
0.0 0.0 0%
0.0 0.0 0%
20%
9.5 9.5 4%
28.2 37.6 17%
0%
0.0 37.6 17% 0%
20/01/23
22/01/23
01/02/23
07/02/23
09/02/23
11/02/23
10/01/23
12/01/23
14/01/23
16/01/23
18/01/23
24/01/23
26/01/23
28/01/23
30/01/23
03/02/23
05/02/23
13/02/23
0.0 37.6 17%
10.8 48.4 22%
15.9 64.4 29%
0.0 64.4 29% AVANCE REQUERIDO AVAN
AVANCE REQUERIDO
26/12/22
28/12/22
30/12/22
VACIADO (M3)
01/01/23
03/01/23
05/01/23
AVANCE REAL
07/01/23
09/01/23
11/01/23
13/01/23
15/01/23
17/01/23
100%
100%
NTACIÓN CENTRAL - CANTIDAD DE
VACIADO (M3)
22/01/23
24/01/23
0%
26/01/23
28/01/23
56%
30/01/23
01/02/23
03/02/23
05/02/23
AVANCE REQUERIDO
07/02/23
09/02/23
11/02/23
VACIADO (M3)
13/02/23
15/02/23
17/02/23
AVANCE REAL
19/02/23
21/02/23
23/02/23
25/02/23
NTACIÓN CENTRAL - CANTIDAD DE
27/02/23
01/03/23
03/03/23
05/03/23
07/03/23
100%
SUPERVISIÓN DE OBRA
Data - Cimentación
COLOCAR F
HABILITACIÓN
EJE CÓD. CIMENTACIÓN TIPO
ACERO
VOL. VACIADO
(m3)
11.46
2.57
6.24
9.66
6.41
2.77
9.66
4.28
3.17
12.82
12.50
1.47
3.80
4.90
3.80
1.47
3.30
3.17
0.98
3.19
1.66
1.98
1.66
2.41
2.39
5.88
5.88
8.28
10.80
10.80
3.36
1.05
1.20
1.20
1.20
10.80
47.52
55.16
1.51
3.60
2.94
1.36
1.63
1.08
1.08
0.50
0.65
0.50
3.13
3.13
1.08
1.58
2.06
3.17
1.10
1.98
1.94
0.38
0.38
0.32
0.74
0.48
0.29