Documentos de Académico
Documentos de Profesional
Documentos de Cultura
POR PESO
PESO UNIT. PESO PARCIAL COSTO COSTO
MATERIAL UND CANTIDAD
(Kg) (Kg) (Kg) PARCIAL
CLAVOS PARA MADERA C/C 3" KG 11.00 1.00 11.00 0.10 1.10
CLAVOS PARA MADERA S/C 2" KG 0.70 1.00 0.70 0.10 0.07
CLAVOS DE ALAMBRE PARA MADERA C/C DE 2" KG 28.56 1.00 28.56 0.10 2.86
FIERRO LISO DE 3/8" x 6 m. AREQUIPA VAR 0.60 3.48 2.09 0.10 0.21
FIERRO LISO DE 1/2" x 6m. AREQUIPA VAR 0.80 6.12 4.90 0.10 0.49
FIERRO LISO DE 3/4" x 6 m. AREQUIPA VAR 1.14 9.60 10.94 0.10 1.09
PERNOS 1/2" X 3" CON TUERCA Y 2 ARANDELAS PZA 8.00 0.10 0.80 0.10 0.08
PERNOS 3/8" X 4" CON TUERCA Y 2 ARANDELAS PZA 24.00 0.16 3.84 0.10 0.38
TUBO DE FIERRO GALVANIZADO DE 3" M 26.52 3.50 92.82 0.10 9.28
TUBO DE FIERRO GALVANIZADO DE 2" M 76.32 2.80 213.70 0.10 21.37
ASFALTO RC-250 GLN 94.88 5.00 474.40 0.10 47.44
CEMENTO PORTLAND TIPO I (42.5KG) BOL 637.44 42.50 27,091.20 0.10 2,709.12
YESO EN BOLSAS DE 25 KG. BOL 21.42 25.00 535.50 0.10 53.55
CORDEL M 428.40 0.01 4.28 0.10 0.43
SOLDADURA CELLOCORD KG 17.20 1.00 17.20 0.10 1.72
SOGA DE NYLON DE 3/8" M 24.00 1.50 36.00 0.10 3.60
COLA SINTETICA GLN 0.25 5.00 1.25 0.10 0.13
MADERA TORNILLO DE 2" X 4" P2 28.90 2.80 80.92 0.10 8.09
MADERA DE MONTAÑA CORRIENTE P2 549.05 2.80 1,537.34 0.10 153.73
MADERA MACHIHEMBRADA TORNILLO P2 66.00 2.80 184.80 0.10 18.48
ANGULO 1/2"x1/2"x3/16" M 11.60 1.56 18.10 0.10 1.81
PINTURA ESMALTE GLN 2.00 5.00 10.00 0.10 1.00
PINTURA PARA TRAFICO GLN 0.59 5.00 2.95 0.10 0.30
PLANCHA DE ACERO E=3/8" PLN 0.04 14.00 0.56 0.10 0.06
MALLA DE CORDEL NYLON GRUESO PARA ARCO DE FULBITO UND 2.00 9.00 18.00 0.10 1.80
MALLA DE CORDEL NYLON GRUESO PARA ARO DE BASQUET UND 2.00 1.50 3.00 0.10 0.30
MALLA DE CORDEL NYLON GRUESO PARA VOLEY UND 2.00 6.00 12.00 0.10 1.20
REGISTRO ROSCADO DE BRONCE DE 4" PZA 6.00 0.50 3.00 0.10 0.30
TOTAL 30,399.84
2.- FLETE TERRESTRE
FLETE POR PESO = Peso total x Flete por peso.
UNIDAD DE TRANSPORTE
CAPACIDAD DE CAMION (Kg) 6,000.00
COSTO POR VIAJE MATERIALES 600.00
FLETE POR (Kg) 0.10