SUBJECT: 17CV81
COURSE OUTCOMES ATTAINMENT LVL-I A ATTAINMENT LVL-UNIVERSITY OVERALL DIRECT ATTAINMENT LVL OVERALL ATTAINMENT
CLASS STRENGTH 64
5 1BY17CV007 AMAN KUMAR SINGH 7 7 7 7 7 7 66% Y 7 66% Y 7 66% Y 7 66% Y 7 66% Y 44 73% Y
24 1BY17CV033 P JAYA PRAKASH NARAYAN 7 7 7 7 7 7 70% Y 7 70% Y 7 70% Y 7 70% Y 7 70% Y 35 58% N
32 1BY17CV046 RANUVA DATTAA KAILASH 7 7 7 7 7 7 70% Y 7 70% Y 7 70% Y 7 70% Y 7 70% Y 40 67% Y
Target >=60% 64 Target >=60% 64 Target >=60% 64 Target >=60% 64 Target >=60% 64 44
CO1 100.00% CO2 100.00% CO3 100.00% CO4 100.00% CO5 100.00% Avg. 69%
CO Target PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12 PSO1 PSO2 D-M
5 3 0 0 0 0 0 3 0 0 5 0 0 5 0
Direct Attainment CO RESULT PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12 PSO1 PSO2
Estimate the quantities of
various components in a
1 building/ road work / 3.00 3.00 3.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 3.00 0.00 0.00 3.00
building component using
suitable method
Summarise the detailed
estimate and abstract
2 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 3.00 0.00 0.00 3.00
estimate for buildings/ road
works
Develop specifications for
3 3.00 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 3.00
various civil works
Interpret the implications of
4 contract and their documents 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 2.00 0.00 0.00 2.00
for construction works.
ATTAINMENT 3.00 3.00 0.00 0.00 0.00 0.00 0.00 2.67 0.00 0.00 2.40 0.00 0.00 2.60