Documentos de Académico
Documentos de Profesional
Documentos de Cultura
MZ C-7-Model
MZ C-7-Model
SN
E
"/C
12
N
CS
BZ-24-18
VC
W
12"/
/P
m
0m
20
BZ-1133
1.80m S
BZ-1132
AS
1.20m
"MZ - C-7 URB. LA ARAPA GRANDE"
AM
ET
BZ-1206
LEYENDA
SR
1.25m
1.2 98 00
0
H: : 34 00.0
0m .80
N
CS
5
CF : 3
CT
8"/
. LA
Bz
BZ-1205
03
2.16m
8"/C TUBERIA PLANTEADA
m
SN
200m
BZ-1207
AV
Ø: 3
71% .4
SN
-12. ng: 24
TUBERIA EXISTENTE
8"/C
Lo
BZ-1204
P:
95
8.1 95
49 4.7 BUZON EXISTENTE
SN
: 3 49 m
CT F: 3 .40
C :3
C
H
12"/
BZ-1129
8"/C
Bz
02 P: Long
-1.2 :
5% 27.60
BUZON A EJECUTAR
CT: 3366.800
S N
Ø:
200m CF: 3362.600
m H: 4.10m
m
200m
Ø: 0
.7
1.85m
-1.3 ng: 20
0.8 5.0 5
Bz
0%
1.04m
H: 349 5.86
0m 65
BZ-1208
Lo
04
BZ-1210
9
C F : 34
P:
1.20m 8"/C
CT
6"
:
/C BZ-1211
SN
METRADO DE BUZONES
m
Bz SN
200m
Ø: 0
01
.50% : 30.0
P: -1 Long
BZ-1209
95.80
CT: 34 4.000
0
NOMBREDIAMETROALTURA (m) COORDENADAS
CF: 3490m 2.15m
H: 1.8 BZ-1212 8"/C
CT S N
m
Bz CF : 34
m
Bz - 01 0 : 200mm 0.80 m 8502198.208-185781.417
0
0 : 9
H: 349 4.82
Ø: 0
20
5
8% 6.1
1.5 3.3 4
1.0 g:
0m 24
PSJ
-1 Lon
B
06 z
E. A
P:
WA Bz - 02 0 : 200mm 3.40 m 8502216.961-185790.417
YM
AN
TO
N
BZ-1213
/CS
Bz - 03 0 : 200mm 1.20 m 8502239.501-185801.229
12"
BZ-1218
PERFIL LONGITUDINAL: MZ - C-7 URB. LARAPA GRANDE PERFIL LONGITUDINAL: MZ - C-7 URB. LARAPA GRANDE
PROG: 0+000 - 0+84.40 Escalas - V: 200 H:1000 PROG: 0+000 - 0+88.13 Escalas - V: 200 H:1000
3502 3502
N° 01 N° 05 Bz N° 05 Bz
3495 H=0.80m
TRAMO II 3495 TRAMO II
S=1.30% EN D.I.=20 S=1.25% EN D.I.=27.6 TRAMO III H=1.80m N° 06 S=1.25% EN D.I.=27.6 TRAMO III H=1.80m N° 06
0m 0m
.70 m S=1.50% EN D.I.=3 H=1.50m S=1.50% EN D.I.=3 H=1.50m
3494 0.00 m 3494 0.00 m
Salto 0.50 Salto 0.50
3493 3493
1.00 ~ 3.00 F'c = 175 Kg/cm2
3492 3492 Concreto Simple
-0+10 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 -0+10 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00
3498.800 m 3495.865 m
3494.991 m 3496.365 m
3494.925 m 3496.710 m
3494.860 m 3497.840 m
3494.795 m 3498.195 m
3494.733 m 3498.104 m
3494.670 m 3498.195 m
3494.608 m 3498.245 m
3494.545 m 3498.390 m
3494.483 m 3498.465 m
3494.450 m 3498.550 m
3494.375 m 3498.095 m
3494.300 m 3497.648 m
3494.225 m 3497.189 m
3494.150 m 3496.723 m
3494.075 m 3496.259 m
3494.000 m 3495.800 m
3493.324 m 3494.824 m
3498.800 m 3500.000 m
3498.308 m 3499.632 m
3497.816 m 3499.330 m
3497.323 m 3498.880 m
3496.831 m 3498.470 m
3496.395 m 3498.195 m
3494.795 m 3498.195 m
3494.733 m 3498.104 m
3494.670 m 3498.195 m
3494.608 m 3498.245 m
3494.545 m 3498.390 m
3494.483 m 3498.465 m
3494.450 m 3498.550 m
3494.375 m 3498.095 m
3494.300 m 3497.648 m
3494.225 m 3497.189 m
3494.150 m 3496.723 m
3494.075 m 3496.259 m
3494.000 m 3495.800 m
3493.324 m 3494.824 m
Tarrajeo de muro c/imperm. acabado
Dejar Sup. Rugosa pulido C:A 1:5 E=1.5cm. H=0.5m.
0.30
COTA TERRENO COTA TERRENO
F'c = 175 Kg/cm2
Concreto Simple
0.10
Solado F'c = 100 Kg/cm2
COTA RASANTE COTA RASANTE
ALT.
0.20 0.20
1.51
0.80
2.48
3.40
3.37
3.53
3.64
3.80
3.99
4.10
3.72
3.35
2.96
2.57
2.18
3.40
3.37
3.53
3.64
3.80
3.99
4.10
3.72
3.35
2.96
2.57
2.18
1.37
1.79
1.80
1.50
1.20
1.33
1.56
1.64
1.80
1.80
1.50
PROPUESTO PROPUESTO
S= n 6.1
S= S= S=1 S= S= S=1
DIAGRAMA en 1.30 en 1.25%
DIAGRAMA en 12.71 en 1.25%
e
e
11 0m
11 0m
20 % 27.6 en .50% 24.4 % 27.6 en .50%
.08
.08
VERTICAL 30.0 VERTICAL 30.0
.70
m 0m 0m 3m 0m 0m GERENCIA DE INGENIERIA
%
OBRA : LAMINA N°
"MEJORAMIENTO DE REDES DE DESAGUE DE LA CIUDAD DEL CUSCO 2019 - 2023"
EJERCICIO 2022 - 339202177 S.B- 01
PLANO : SECTOR:
EN PLANTA Y PERFIL LONGITUDINAL MZ C-7 URB. LARAPA GRANDE