Está en la página 1de 1

N G1-21

SN
E

"/C
12

N
CS
BZ-24-18
VC
W

12"/
/P
m
0m
20
BZ-1133
1.80m S
BZ-1132

AS
1.20m
"MZ - C-7 URB. LA ARAPA GRANDE"

AM
ET
BZ-1206
LEYENDA

SR
1.25m

1.2 98 00
0
H: : 34 00.0
0m .80
N
CS

5
CF : 3
CT
8"/

. LA
Bz
BZ-1205
03
2.16m
8"/C TUBERIA PLANTEADA

m
SN

200m
BZ-1207

AV
Ø: 3
71% .4
SN

-12. ng: 24
TUBERIA EXISTENTE

8"/C

Lo
BZ-1204

P:
95
8.1 95
49 4.7 BUZON EXISTENTE

SN
: 3 49 m
CT F: 3 .40
C :3

C
H

12"/
BZ-1129
8"/C
Bz
02 P: Long
-1.2 :
5% 27.60
BUZON A EJECUTAR
CT: 3366.800
S N
Ø:
200m CF: 3362.600
m H: 4.10m

m
200m
Ø: 0
.7
1.85m

-1.3 ng: 20
0.8 5.0 5
Bz

0%
1.04m

H: 349 5.86
0m 65
BZ-1208

Lo
04
BZ-1210

9
C F : 34

P:
1.20m 8"/C

CT
6"

:
/C BZ-1211
SN
METRADO DE BUZONES

m
Bz SN

200m
Ø: 0
01

.50% : 30.0
P: -1 Long
BZ-1209
95.80
CT: 34 4.000
0
NOMBREDIAMETROALTURA (m) COORDENADAS
CF: 3490m 2.15m
H: 1.8 BZ-1212 8"/C
CT S N

m
Bz CF : 34

m
Bz - 01 0 : 200mm 0.80 m 8502198.208-185781.417

0
0 : 9
H: 349 4.82

Ø: 0
20
5

8% 6.1
1.5 3.3 4

1.0 g:
0m 24

PSJ

-1 Lon
B
06 z
E. A

P:
WA Bz - 02 0 : 200mm 3.40 m 8502216.961-185790.417
YM
AN
TO

N
BZ-1213

/CS
Bz - 03 0 : 200mm 1.20 m 8502239.501-185801.229

12"
BZ-1218

Bz - 04 0 : 200mm 4.20 m 8502205.325-185814.667


BZ-1215
Bz - 05 0 : 200mm 2.20 m 8502171.418-185805.989

PERFIL LONGITUDINAL: MZ - C-7 URB. LARAPA GRANDE PERFIL LONGITUDINAL: MZ - C-7 URB. LARAPA GRANDE
PROG: 0+000 - 0+84.40 Escalas - V: 200 H:1000 PROG: 0+000 - 0+88.13 Escalas - V: 200 H:1000
3502 3502

3501 3501 CT: 3500.000


CF: 3498.800
3500 3500 Bz-Ext.
CT: 3498.550 CT: 3498.550
3499
CT: 3498.195 CF: 3494.450 3499
N° 03 CT: 3498.195 CF: 3494.450 SECCION VERTICAL TIPO IA
CF: 3494.795 H=1.20m CF: 3494.795 ESC : 1/20
Bz-Ext. Bz-Ext.
3498 Bz-Ext. N° 04 3498 S= TR
Bz-Ext. N° 04 0.60

N° 02 12 AM N° 02 ver detalle de armado


H=4.10m .71
% O H=4.10m Tapa y Marco C° A°
H=3.40m I H=3.40m en planta
3497 CT: 3495.865 CT: 3495.800 3497 EN
D.I CT: 3495.800 de 25 Kg. DETALLE DE ZANJA PARA
.=2
CF: 3495.0.65 CF: 3494.000 4.4 CF: 3494.000 TUBERIA EN TERRENO NORMAL
3m
3496 CT: 3495.324 3496 C-F: 3495.695 CT: 3495.324
Bz-Ext. Bz Bz Bordes
TRAMO I
CF: 3493.324 Salto 0.90 CF: 3493.324 Redondeados
0.50 0,05

N° 01 N° 05 Bz N° 05 Bz
3495 H=0.80m
TRAMO II 3495 TRAMO II

S=1.30% EN D.I.=20 S=1.25% EN D.I.=27.6 TRAMO III H=1.80m N° 06 S=1.25% EN D.I.=27.6 TRAMO III H=1.80m N° 06
0m 0m
.70 m S=1.50% EN D.I.=3 H=1.50m S=1.50% EN D.I.=3 H=1.50m
3494 0.00 m 3494 0.00 m
Salto 0.50 Salto 0.50
3493 3493
1.00 ~ 3.00 F'c = 175 Kg/cm2
3492 3492 Concreto Simple
-0+10 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 -0+10 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00
3498.800 m 3495.865 m

3494.991 m 3496.365 m

3494.925 m 3496.710 m

3494.860 m 3497.840 m

3494.795 m 3498.195 m

3494.733 m 3498.104 m

3494.670 m 3498.195 m

3494.608 m 3498.245 m

3494.545 m 3498.390 m

3494.483 m 3498.465 m
3494.450 m 3498.550 m

3494.375 m 3498.095 m

3494.300 m 3497.648 m

3494.225 m 3497.189 m

3494.150 m 3496.723 m

3494.075 m 3496.259 m

3494.000 m 3495.800 m

3493.324 m 3494.824 m

3498.800 m 3500.000 m

3498.308 m 3499.632 m

3497.816 m 3499.330 m

3497.323 m 3498.880 m

3496.831 m 3498.470 m

3496.395 m 3498.195 m
3494.795 m 3498.195 m
3494.733 m 3498.104 m

3494.670 m 3498.195 m

3494.608 m 3498.245 m

3494.545 m 3498.390 m

3494.483 m 3498.465 m
3494.450 m 3498.550 m

3494.375 m 3498.095 m

3494.300 m 3497.648 m

3494.225 m 3497.189 m

3494.150 m 3496.723 m

3494.075 m 3496.259 m

3494.000 m 3495.800 m

3493.324 m 3494.824 m
Tarrajeo de muro c/imperm. acabado
Dejar Sup. Rugosa pulido C:A 1:5 E=1.5cm. H=0.5m.

0.30
COTA TERRENO COTA TERRENO
F'c = 175 Kg/cm2
Concreto Simple

0.10
Solado F'c = 100 Kg/cm2
COTA RASANTE COTA RASANTE

CORTE CORTE 1.10


ALT.

ALT.

0.20 0.20
1.51
0.80

2.48

3.40

3.37

3.53

3.64

3.80

3.99
4.10

3.72

3.35

2.96

2.57

2.18

3.40
3.37

3.53

3.64

3.80

3.99
4.10

3.72

3.35

2.96

2.57

2.18
1.37

1.79

1.80

1.50

1.20

1.33

1.56

1.64

1.80

1.80

1.50
PROPUESTO PROPUESTO

EPS. SEDACUSCO S.A.


S= n 6.1

S= n 6.1
S= S= S=1 S= S= S=1
DIAGRAMA en 1.30 en 1.25%
DIAGRAMA en 12.71 en 1.25%
e

e
11 0m

11 0m
20 % 27.6 en .50% 24.4 % 27.6 en .50%
.08

.08
VERTICAL 30.0 VERTICAL 30.0
.70
m 0m 0m 3m 0m 0m GERENCIA DE INGENIERIA
%

OBRA : LAMINA N°
"MEJORAMIENTO DE REDES DE DESAGUE DE LA CIUDAD DEL CUSCO 2019 - 2023"
EJERCICIO 2022 - 339202177 S.B- 01
PLANO : SECTOR:
EN PLANTA Y PERFIL LONGITUDINAL MZ C-7 URB. LARAPA GRANDE

RESIDENTE: DIGITALIZACIÓN: UBIC. DIST.SAN JERONIMO


ING. ANALUZ DELGADO CACERES TEC. ORLANDO FLORES PANDO PROV.CUSCO
DPTO.CUSCO
REVISADO : SUPERVISOR DE OBRA . GERENTE DE INGENIERIA : FECHA:
ING. NINFA ADELAIDA QUISPE CONDORI ING. HECTOR PEREZ CAMACHO AGOSTO - 2022

También podría gustarte

  • Patacalle
    Patacalle
    Documento7 páginas
    Patacalle
    Noel Anibal Curasi Taco
    Aún no hay calificaciones
  • Wispampa
    Wispampa
    Documento4 páginas
    Wispampa
    Noel Anibal Curasi Taco
    Aún no hay calificaciones
  • G - 4 Larapa Grande
    G - 4 Larapa Grande
    Documento8 páginas
    G - 4 Larapa Grande
    Noel Anibal Curasi Taco
    Aún no hay calificaciones
  • 03195
    03195
    Documento12 páginas
    03195
    Noel Anibal Curasi Taco
    Aún no hay calificaciones
  • Calle e 7 Layout1
    Calle e 7 Layout1
    Documento1 página
    Calle e 7 Layout1
    Noel Anibal Curasi Taco
    Aún no hay calificaciones