Está en la página 1de 1

J'

INSIDE WALL

P
DN200 CHWR

849

858
BOP EL: 1340
DN300 CHWS - BOP EL: 433

1606
DN200 DN300

1858
2407

Do Not Scale - Use Figured Dimensions Only


T
T
P

TP
DN200 CHWR DN200 CHWS - BOP EL: 1340

T
T
BOP EL: 1340

TP
AV
QSS2/EX/XX/
FM/X/IF1-01

5159
5423

6278

6878
6878
7907

QSS2/EX/XX/
PACC/X/IF1-01
T
DN200 CHWS - BOP EL: 1340

10663
DN200
10923

FS

11778
DN300

K
K
12376

12378
DN200 DN200

DN300
DN200 CHWR - BOP EL: 1340
Q

DN200 CHWS - BOP EL: 1340


DN200 CHWR - BOP EL: 1340

T
T
P
IV

T
T
TP
DC

TP
AV
TP
FC

AV
TG
DC

QSS2/EX/XX/
STR
NRV

FM/X/IF1-02

DN200
T

16163
AIR VENT
STRAINER
TEST POINT

17278
ABBREVIATIONS:

ISOLATION VALVE

17878
DRAIN CONNECTION

NON RETURN VALVE

CHWP CHILLED WATER PUMP


TEMPERATURE GAUGE
FLEXIBLE CONNECTION

PIBCV PRESSURE INDEPENDENT

QSS2/EX/XX/
PACC/X/IF1-02
BALANCING CONTROL VALVE

19847
DN200 CHWR - BOP EL: 1340
DN200 CHWS - BOP EL: 1340

T
DN200
DN300

FS

DN300

TP
DN200 CHWR - BOP EL: 1340

K'
K'

DN200 DN200
DN300

DN200 CHWR - BOP EL: 1340 DN200 CHWS - BOP EL: 1340

T
T
T
T
P

TP
AV
TP

QSS2/EX/XX/
DC

FM/X/IF1-03

L
L

QSS2/EX/XX/
PACC/X/IF1-03
T

DN200 CHWR - BOP EL: 1340


DN200 CHWS - BOP EL: 1340
DN200
DN300
FS

DN200 CHWR - BOP EL: 1340


DN300

DN200 DN200
DN300

DN200 CHWR - BOP EL: 1340 DN200 CHWS - BOP EL: 1340
T
T

T
T
P

TP

TP
AV
DC

QSS2/EX/XX/
FM/X/IF1-04
DN200
T
11341

DN200 CHWR
BOP EL: 1340

3255
QSS2/EX/XX/
PACC/X/IF1-04
8327

6872

FS

DN200 CHWR - BOP EL: 1340


DN200 CHWS - BOP EL: 1340
DN300 CHWS - BOP EL: 928
DN300 DN200
5843

DN300
M
M

DN300 CHWR - BOP EL: 6058


T

TP
T
TP
O

DN300

DN300

DN300 DN300
3087

DN300 CHWS - BOP EL: 433


2993
2955
2784
1661

INSIDE WALL
QSS2-JEG-CW-01-DR-M-3520

DN300 CHWS - BOP EL: 433


DN300 CHWS - BOP EL: 433
CONNECTION TO FIRST FLOOR

DN300 CHWR - BOP EL: 433

3246
DN300 CHWR - BOP EL: 433
DN200 CHWS - BOP EL: 1340

1 : 40
QSS2-JEG-CW-01-DR-M-3520

4506
DN200 CHWR - BOP EL: 1340
DN200 CHWR - BOP EL: 2227
QSS2-JEG-CW-01-DR-M-3520
CONNECTION TO FIRST FLOOR

CONNECTION TO FIRST FLOOR

6011
6612
LEGENDS:

7023
8807
COUPLINGS

8862
10235
IT COOLING CHW-S
IT COOLING CHW-R

DN300 CHWS - BOP EL: 10428

13634
FLEXIBLE FIELD JOINT

QSS2-JEG-CW-01-DR-M-3520
FIELD JOINT ELEMENTS

14451
CONNECTION TO FIRST FLOOR
FIELD CUT SUIT PIPE ( FCS )

16759
MEP BLOCK -RF
AE
Dubai
Rev
C01
C02

Site:

Project:
Office BC-29
BSE 3D Ltd
Employer:

Riyadh 11423

Drawing By:
P.O. Box 18657
Notes

Drawing Title:

A B C D E F G H I J K L M N O P
T. +44 207 193 7146

GAS
S U PR ES SI ON
B OTTLE FM S TO R E
S TOR E FM S TO R E
MEP Contractor:

BD1 GF5
-5
BD1 GF5
-1 BD1 GF5
-7
MEP Consultant:

Dubai Investments Park,

C ORR I DOR
BD1 GF5
-2

S TA IR -3 ST
BD1 GF5
-4 BD1 GF5
-6
Kingdom of Saudi Arabia
B3 1FQ, United Kingdom

LL
Design Consultant:

TX ROOM
Drawing Reference:
Akaria Center 2, 4th Floor,
European Business Centre,

LV P AL N T BD1 GF4
-7
R OOM
BD1 GF4
-8
24775

Engineer of Record:

LV P AL N T
ME CH AN I CA L R OOM
P LA NT ROOM BD1 GF4
-9
BD1 GF5
-0 TX ROOM
BD1 GF4
-6

C ORR I DOR
BD1 GF4
-1

LV P AL N T
R OOM TX ROOM
BD1 GF4
-3 BD1 GF4
-5

LV P AL N T
R OOM
BD1 GF4
-2

TX ROOM
BD1 GF4
-4
Office No. 425, Main Olaya Street
2950
2950

S ER VI CE
C ORR I DOR
BD1 GF4
-0

1 1
90.
000°

C R A H R OOM
BD1 GF3
-3

LOAD I NG BA Y
BD1 GF3
-1
1A
E N T. MALE
WC MA LE WC /
BD1 GF2
-1 S H OWE R
FI BR E E N TR Y BD1 GF1
-9
B
Description

BD1 GF3
-2 C L.
BD1 GF7
-4
FE MALE WC /
S H OWE R FS FCA S D
BD1 GF1
-7 1B
E N T. FEMA LE
WC
BD1 GF2
-0

MA LE MA EL PR A YE R
MMR B A B LU TION
R OOM
BD1 GF2
-2 BD1 GF1
-5
BD1 GF1
-6
Checked By:

D A TA HA LL-1
BD1 GF3
-4
D I S WC
2 BD1 GF1
-4
2

C A NTEE N
BD1 GF1
-3

2A
C ONFER A NC E
R OOM
BD1 GF1
-2

GOOGLE
S TOR E
8

BD1 GF2
-3

FE MA LE
2B
LOCK ER S & MA LE
C H AN GIN G LOCK ER S &
BD1 GF1
-0 C H AN GIN G
BD1 GF1
-1

C ORR I DOR
BD1 GF6
-

2C
C R A H R OOM
BD1 GF3
-5
S TOR
BD1 GF9
-
FI R ST AI D
3 3
ISSUED FOR APPROVAL
ISSUED FOR APPROVAL

R OOM
BD1 GF7
-
St Pauls Place, 40 St Pauls Square,Birmingham

C ORR I DOR LI FT
59027

BD1 GF3
-0 BD1 GF8
-

S TA RI -1
BD1 GF5
-

4 4
R oom
BD1 GF3
-9 C R A H R OOM R oom
BD1 GF3
-6 BD1 GF2
-5

4A
D I S WC
BD1 GF4
-

R E C EP TIO N
BD1 GF1
-
S TA IR -2
BD1 GF2
-6

4B
I1hr

S E CU RI TY /
FI R E I N TER V EI W
C OMMAN D R OOM
BD1 GF2
- BD1 GF3
-

S TOR E
4C
QSS2-JEG-CW-RF-DR-M-3520

BD1 GF2
-7
Keyplan

D A TA HA LL-2
BD1 GF3
-7
5 5
Revision Schedule

MMR A
BD1 GF2
-8
DAMMAM KSA

C R A H R OOM
BD1 GF3
-8 FI BR E E N TR Y
A
BD1 GF2
-9
90

000°
.0

90.
00 °

6 6
250

250
QST
QST

N 290 4198. 25 m
E 39900 8. 76 m

10591

100878
Approved By:
Issued to

D4

111219

111219

A B C D E F G H I J K L M N O P
As
DAMMAM 2nd INDUSTRIAL CITY
QUANTUM SWITCH TAMASUK DC 2
Date

Tel: +971 45674929

C02
Scale @A1:
SW1V 1EH London
231 Vauxhall Bridge Road
F. +44(0) 121 233 2716
T. +44(0)121 314 6618

Tel: +966 112150528

Website: www.joneseng.com
Email: info@joneseng.com
25.10.2022
22.12.2022

Mechanical Services - Chilled Water Layout

indicated
(Mechanical Plant Room) - Roof - Sheet 4 of

CDE Status: CDE Rev:

También podría gustarte