ANEXOS
ANEXOS
FORMATOS DE EVALUACION
Capacaitacion 283,011.60
Salarios 1,829,400.00
Gastos Generales 138,794.61
Utilidad 92,529.74
Impuestos 931,774.50
B) COSTOS DE OPERACIÓN Y
MANTENIMIENTO CON PROYECTO (C/P)
1. Remuneraciones 102,000.00 102,000 102,000 102,000 102,000 102,000 102,000 102,000 102,000 102,000
2. Tarifas de Servicios Públicos 2,677.00 2,677.00 2,677.00 2,677.00 2,677.00 2,677.00 2,677.00 2,677.00 2,677.00 2,677.00
3. Bienes de Consumo 7,729.00 7,729.00 7,729.00 7,729.00 7,729.00 7,729.00 7,729.00 7,729.00 7,729.00 7,729.00
4. Servicios diversos 1,782.00 1,782.00 1,782.00 1,782.00 1,782.00 1,782.00 1,782.00 1,782.00 1,782.00 1,782.00
C) TOTAL COSTOS CON PROYECTO 5,835,850.85 114,188.00 114,188.00 114,188.00 114,188.00 114,188.00 114,188.00 114,188.00 114,188.00 114,188.00 114,188.00
(A + B)
D) COSTOS DE OPERACIÓN Y
MANTENIMIENTO SIN PROYECTO 54,359.00 54,359.00 54,359.00 54,359.00 54,359.00 54,359.00 54,359.00 54,359.00 54,359.00 54,359.00
VAC PP 11% 5,835,850.85 53,900.00 48,558.56 43,746.45 39,411.22 35,505.60 31,987.03 28,817.14 25,961.39 23,388.64 21,070.85
OBSERVACIONES
Inversión en Activos Fijos: obras civiles, maquinarias y equipo, terrenos, entre otros.
Subtotal costos de inversión 5,955,780.84
B) COSTOS DE OPERACIÓN Y
MANTENIMIENTO CON PROYECTO (C/P)
1. Remuneraciones 102,000.00 102,000 102,000 102,000 102,000 102,000 102,000 102,000 102,000 102,000
2. Tarifas de Servicios Públicos 2,677.00 2,677.00 2,677.00 2,677.00 2,677.00 2,677.00 2,677.00 2,677.00 2,677.00 2,677.00
3. Bienes de Consumo 7,729.00 7,729.00 7,729.00 7,729.00 7,729.00 7,729.00 7,729.00 7,729.00 7,729.00 7,729.00
4. Servicios diversos 1,642.00 1,642.00 1,642.00 1,642.00 1,642.00 1,642.00 1,642.00 1,642.00 1,642.00 1,642.00
C) TOTAL COSTOS CON PROYECTO 5,955,780.84 114,048.00 114,048.00 114,048.00 114,048.00 114,048.00 114,048.00 114,048.00 114,048.00 114,048.00 114,048.00
(A + B)
D) COSTOS DE OPERACIÓN Y
MANTENIMIENTO SIN PROYECTO 54,359.00 45,679.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VAC PP 11% 5,955,780.84 53,773.87 55,489.14 83,390.91 75,126.95 67,681.94 60,974.72 54,932.18 49,488.45 44,584.19 40,165.94
OBSERVACIONES
Mano de Obra Calificada 388,361.28
Mano de Obra No Calificada 345,413.10
Materiales de Construccion 756,619.16
Equipamiento 576,654.12
Capacaitacion 234,899.63
Salarios 1,536,696.00
Gastos Generales 116,587.48
Utilidad 782,690.58
B) COSTOS DE OPERACIÓN Y
MANTENIMIENTO
1. Remuneraciones 86,700.00 86,700.00 86,700.00 86,700.00 86,700.00 86,700.00 86,700.00 86,700.00 86,700.00 86,700.00
2. Tarifas de Servicios Públicos 2,275.45 2,275.45 2,275.45 2,275.45 2,275.45 2,275.45 2,275.45 2,275.45 2,275.45 2,275.45
3. Bienes de Consumo 5,101.14 5,101.14 5,101.14 5,101.14 5,101.14 5,101.14 5,101.14 5,101.14 5,101.14 5,101.14
4. Servicios diversos 1,942.38 1,942.38 1,942.38 1,942.38 1,942.38 1,942.38 1,942.38 1,942.38 1,942.38 1,942.38
C) COSTOS INCREMENTALES A PRECIOS 4,776,783.84 96,018.97 96,018.97 96,018.97 96,018.97 96,018.97 96,018.97 96,018.97 96,018.97 96,018.97 88,975.45
SOCIALES
CTA: PRECIOS SOCIALES (11%) 4,776,783.84 86,503.58 77,931.15 70,208.24 63,250.67 56,982.59 51,335.66 46,248.34 41,665.18 37,536.19 31,335.77
A PRECIOS SOCIALES CTA= 5,339,781.21 CAE = 906,702.47
RUBRO FACTOR
Mano de obra calificada 0.85
Mano de obra no calificada 0.63
Bienes transables 1.09 2012362.361
Bienes no transables 0.92
Combustibles 0.66
Maquinaria y equipo 0.83
Servicios 0.84
FUENTE: MEF, Normas del SNIP, "parametros de evaluación snip-09".
5,000,000.00
4,000,000.00
3,000,000.00
2,000,000.00
114,048.00
114,188.00
114,048.00
114,048.00
114,188.00
114,048.00
114,048.00
114,188.00
114,188.00
114,048.00
114,188.00
114,048.00
114,188.00
114,188.00
114,048.00
114,188.00
114,188.00
114,048.00
1,000,000.00
0.00
1 2 3 4 5 6 7 8 9 10
ALT. 01 ALT. 02
A PRECIOS SOCIALES (SIN IGV)
A) INVERSION FIJA
1. Intangibles 39,661.14
- Expediente técnico 39,661.14
2. Inversión en Activos Fijos 4,833,937.22
Mano de Obra Calificada 408,565.12
Mano de Obra No Calificada 363,382.63
Materiales de Construccion 795,980.99
Equipamiento 576,654.12
Capacaitacion 234,899.63
Salarios 1,536,696.00
Gastos Generales 118,983.41
Utilidad 798,775.31
B) COSTOS DE OPERACIÓN Y
MANTENIMIENTO
1. Remuneraciones 86,700.00 86,700.00 86,700.00 86,700.00 86,700.00 86,700.00 86,700.00 86,700.00 86,700.00 86,700.00
2. Tarifas de Servicios Públicos 2,275.45 2,275.45 2,275.45 2,275.45 2,275.45 2,275.45 2,275.45 2,275.45 2,275.45 2,275.45
3. Bienes de Consumo 5,101.14 5,101.14 5,101.14 5,101.14 5,101.14 5,101.14 5,101.14 5,101.14 5,101.14 5,101.14
4. Servicios diversos 1,789.78 1,789.78 1,789.78 1,789.78 1,789.78 1,789.78 1,789.78 1,789.78 1,789.78 1,789.78
C) COSTOS INCREMENTALES A PRECIOS 4,873,598.36 95,866.37 95,866.37 95,866.37 95,866.37 95,866.37 95,866.37 95,866.37 95,866.37 95,866.37 88,975.45
SOCIALES
CTA: PRECIOS SOCIALES (11%) 4,873,598.36 86,366.10 77,807.30 70,096.66 63,150.15 56,892.02 51,254.08 46,174.84 41,598.96 37,476.54 31,335.77
A PRECIOS SOCIALES CTA= 5,435,750.78 CAE = 922,998.24
RUBRO FACTOR
Mano de obra calificada 0.85
Mano de obra no calificada 0.63
Bienes transables 1.09
Bienes no transables 0.92
Combustibles 0.66
Maquinaria y equipo 0.83
Servicios 0.84
FUENTE: MEF, Normas del SNIP, "parametros de evaluación snip-09".
PRESUPUESTO DE INFRAESTRUCTURA (ALTERNATIVA 01)
ALTERNATIVA 01 :
PRESUPUESTO DESAGREGADO DE LA CONSTRUCCION DE AMBIENTES PARA ESTIMULACION TEMPRANA EN 6 DISTRITOS
Descripción Und. Metrado Precio (S/.)
OBRAS PROVISIONALES DE OBRA GENERAL
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1 964.47
ALMACEN DE OBRA est 1 400.00
CERCO PERIMETRICO PROVISIONAL m 124.98 25.39
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1 1000.00
Rubros
ESTRUCTURAS GENERALES
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL m2 960.1 3.0
TRAZO, NIVELES Y REPLANTEO m2 33.57 3.0
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA ZAPATAS DE 1.00 MT A 1.40 MT DE PROFUNDIDAD m3 16.24 35.20
EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL M3 25.45 12.00
NIVELACION INTERIOR APISONADO MANUAL m2 33 6.50
ELIMINACION DE MATERIAL EXCEDENTE d=30 MTS m3 12.18 9.50
CONCRETO SIMPLE
SOLADO PARA ZAPATAS DE 3” MEZCLA 1:12 CEMENTO-HORMIGON m2 18 22.34
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 14.52 185.43
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 5.5 243.12
ENCOFRADO Y DEDESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT m2 71.49 35.34
CONCRETO EN FALSOPISO DE 4” DE 1:8 CEM-HOR m2 20.49 30.5
CONCRETO ARMADO
ZAPATAS
CONCRETO F’C=210 KG/CM2. PARA ZAPATAS m3 32.01 296.67
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 536.63 8.45
VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F’C= 210 KG/CM2 m3 16.09 356.21
ACERO EN VIGA DE CIMENTACION GRADO 60 kg 753.77 4.35
COLUMNAS
CONCRETO EN COLUMNAS F’C=210 KG/CM2 m3 34 384.33
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 202.11 35.32
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 835.3 4.35
VIGAS
CONCRETO F’C=210 KG/CM2. PARA VIGAS m3 45.5 353.02
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACISAS m2 85.6 38.98
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 529.5 4.35
TECHO LOSA MACISA E=0.10m
CONCRETO F’C=210 KG/CM2. PARA LOSAS MACISA DE TECHO e=0.10m m3 44.02 353.02
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACISAS m2 440.5 38.98
ACERO ESTRUCTURAL TRABAJADO P/LOSAS MACISAS DE TECHO kg 3,309.11 4.35
ROTURA A LA COMPRESION
ROTURA A LA COMPRESION DE CONCRETO und 20 20
ARQUITECTURA
ALBAÑILERIA
MURO DE CABEZA LADRILLO PANDERETA CON CEMENTO-CAL-ARENA m2 218.03 54.32
MURO DE SOGA LADRILLO PANDERETA CON CEMENTO-CAL-ARENA m2 50.4 51.23
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO EN MUROS INTERIORES Y EXTERIORES m2 130.79 25.5
TARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5 m2 36.25 20.0
TARRAJEO DE SUPERF. VIGAS m2 25.3 25.34
TARRAJEO DE COLUMNAS m2 32.5 20.0
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS. m 12.2 15.0
ENCHAPADO DE MUROS CON CERAMICA TIPO VITROREX O SIMILAR m2 11.25 52.33
ZOCALOS
CONTRAZOCALO CEMENTO S/COLOREAR H = 30 CM m 85.6 12.45
CONTRAZOCALO DE CEDRO DE ¾” X 3” RODON ¾” m 75.5 18.65
ZOCALO DE MAYOLICA DE 15 X 15 CM DE COLOR DE 1RA m2 10.25 80.34
PISOS Y PAVIMENTOS
CONTRAPISO DE 48 MM. m2 256.51 27.48
PISO DE 2” CONCRETO F’C 140 KG/CM2 X 4 CM.+ PULIDO 1:2 X 1CM m2 185.36 31.46
PISO DE CERAMICA CELIMA 30X30 CM m2 71.15 70.03
VEREDA DE CONCRETO DE 4” m2 4.15 40.76
CARPINTERIA DE MADERA
VENTANA DE MADERA CON HOJAS DE CEDRO DE 1x1.5 m und 6 123.02
VENTANA DE MADERA DE CEDRO DE 3x1.5 m und 9 115.42
VENTANA DE MADERA DE CEDRO DE (0.7x1.5 m) P/Baño und 5 142.02
PUERTA CONTRAPLACADA DE 35 MM TRIPLAY DE 1.0x2.8m und 14 200.0
PUERTA CONTRAPLACADA DE 35 MM TRIPLAY DE 0.70x2.8m und 6 200.0
CERRAJERIA
BISAGRA CAPUCHINA DE 3 ½” X 3 ½” pza 82 8.5
CHAPA DE 2 GOLPES INCL. JALADOR und 20 40.46
CHAPA PARA BAÑO, CON SEGURO INTERIOR Y PERILLA O MANIJA und 6 25.46
PINTURA
PINTURA LATEX EN MURO INTERIOR Y EXTERIOR m2 455.56 14.5
PINTURA LATEX EN CIELO RASO m2 282.16 20.34
PINTURA ESMALTE m2 25.2 20.34
PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2 101.92 14.34
VIDRIOS, CRISTALES Y SIMILARES
VIDRIO SEMIDOBLE. PROVISION Y COLOCACION EN VENTANAS FIERRO p2 480.5 8.6
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS
SALIDA PARA CENTRO DE LUZ pto 14 100.5
SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES pto 16 78.08
INTERRUPTORES BIPOLARES SIMPLES pto 14 124.89
SALIDA PARA INTERRUPTORES DOBLES pto 10 99.49
SALIDA DE INTERRUPTOR POR CONMUTACION pto 2 96.07
FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTALL und 14 65.61
ARTEFACTO WALL SOCKET und 14 26.18
SALIDA PARA SPOT-LIGHT CON PVC pto 10 92.79
SALIDA PARA BRAQUETTES pto 4 117.67
SALIDA PARA TELEFONO DIRECTO (DE SERVICIO PUBLICO) pto 1 81.83
SALIDA PARA ANTENA DE TELEVISION CON PVC pto 2 76.56
ACERO GRADO 60 EN VIGAS kg 270.56 4.38
ALBAÑILERIA
MURO DE BLOQUE HUECO DE CONCRETO E=15 CM. MEZCLA 1:5 m2 187.47 53.45
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO DE SUPERF.VIGAS PERALTADAS-INDEPEND.(EN EXTERIORES) m2 577.92 40.32
CARPINTERIA METALICA
PUERTA METALICA LAC 1/16” C/MARCO 2”X2”X1/4” Y REFUERZOS DE 1.7x2.8xHOJA m2 9.52 320.0
MALLA METALICA PROTECTORA CON ALAMBRE N.12 X COCADAS DE 1” m2 162.48 76.4
PLAN DE MITIGACION AMBIENTAL
AREAS LIBRES CON PLANTACION DE GRASS
VEREDAS CON PIEDRA GRANDES Y MORTERO 1:1 m2 56.53 61.05
PLANTACION DE GRASS PARA AREAS LIBRES m2 56.4 27.53
EQUIPAMIENTO Global 1 114415.50
CAPACITACION Global 1 94337.20
SALARIOS Global 1 1829400
Costo Directo
Gastos Generales (3%) 3%
Expediente Tecnico (1%) 1%
Utilidades (2%) 2%
Sub Total
Impuestos (IGV 19%) 19%
TOTAL PRESUPUESTO
Nota: La Valorizacion del presupuesto de obra y equipamiento es para los seis distritos, para ello se multiplicó por seis.
Con respecto a capacitacion y los salarios la valorizacion es de 3 años, debido a que el proyecto se ejecutará en tres años.
ALTERNATIVA 02:
PRESUPUESTO DESAGREGADO DE LA CONSTRUCCION DE AMBIENTES PARA ESTIMULACION TEMPRANA
Descripción Und. Metrado Precio (S/.)
OBRAS PROVISIONALES DE OBRA GENERAL
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1 964.47
ALMACEN DE OBRA est 1 400.00
CERCO PERIMETRICO PROVISIONAL m 124.98 25.39
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1 1000.00
Rubros
ESTRUCTURAS GENERALES
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL m2 960.1 3.0
TRAZO, NIVELES Y REPLANTEO m2 33.57 3.0
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA ZAPATAS DE 1.00 MT A 1.40 MT DE PROFUNDIDAD m3 16.24 35.20
EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL M3 25.45 12.00
NIVELACION INTERIOR APISONADO MANUAL m2 33 6.50
ELIMINACION DE MATERIAL EXCEDENTE d=30 MTS m3 12.18 9.50
CONCRETO SIMPLE
SOLADO PARA ZAPATAS DE 3” MEZCLA 1:12 CEMENTO-HORMIGON m2 18 22.34
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 14.52 185.43
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 5.5 243.12
ENCOFRADO Y DEDESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT m2 71.49 35.34
CONCRETO EN FALSOPISO DE 4” DE 1:8 CEM-HOR m2 20.49 30.5
CONCRETO ARMADO
ZAPATAS
CONCRETO F’C=210 KG/CM2. PARA ZAPATAS m3 32.01 296.67
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 536.63 8.45
VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F’C= 210 KG/CM2 m3 16.09 356.21
ACERO EN VIGA DE CIMENTACION GRADO 60 kg 753.77 4.35
COLUMNAS
CONCRETO EN COLUMNAS F’C=210 KG/CM2 m3 34 384.33
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 202.11 35.32
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 835.3 4.35
VIGAS
CONCRETO F’C=210 KG/CM2. PARA VIGAS m3 45.5 353.02
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACISAS m2 85.6 38.98
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 529.5 4.35
TECHO LOSA MACISA E=0.10m INCLINADO
CONCRETO F’C=210 KG/CM2. PARA LOSAS MACISA DE TECHO e=0.10m m3 44.02 353.02
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACISAS m2 440.5 38.98
ACERO ESTRUCTURAL TRABAJADO P/LOSAS MACISAS DE TECHO kg 3,309.11 6.43
ENTRAMADO DE MADERA
LISTONES DE MADERA DE 1" x 2mt Unid 120.00 4.20
TIJERALES DE MADERA DE 0,5" Unid 80.00 3.80
CLAVOS DE 3" PULGADAS Kg 8.00 4.40
TEJA ANDINA
PLANCHAS DE TEJA ANDINA Unid 220.00 32.0
PRESUPUESTO DE INFRAESTRUCTURA (ALTERNATIVA 02)
Utilidades (2%) 2%
Sub Total
Impuestos (IGV 19%) 19%
TOTAL PRESUPUESTO
Nota: La Valorizacion del presupuesto de obra y equipamiento es para los seis distritos, para ello se multiplicó por seis.
Con respecto a capacitacion y los salarios la valorizacion es de 3 años, debido a que el proyecto se ejecutará en tres años.
ALTERNATIVA 0 2:
PRESUPUESTO DESAGREGADO DE LA CONSTRUCCION DE AMBIENTES PARA ESTIMULACION TEMPRANA
Descripción Und. Metrado Precio (S/.)
OBRAS PROVISIONALES DE OBRA GENERAL
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1 964.47
ALMACEN DE OBRA est 1 400.00
CERCO PERIMETRICO PROVISIONAL m 124.98 25.39
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1 1000.00
Rubros
ESTRUCTURAS GENERALES
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL m2 960.1 3.0
TRAZO, NIVELES Y REPLANTEO m2 33.57 3.0
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA ZAPATAS DE 1.00 MT A 1.40 MT DE PROFUNDIDAD m3 16.24 35.20
EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL M3 25.45 12.00
NIVELACION INTERIOR APISONADO MANUAL m2 33 6.50
ELIMINACION DE MATERIAL EXCEDENTE d=30 MTS m3 12.18 9.50
CONCRETO SIMPLE
SOLADO PARA ZAPATAS DE 3” MEZCLA 1:12 CEMENTO-HORMIGON m2 18 22.34
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 14.52 185.43
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 5.5 243.12
ENCOFRADO Y DEDESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT m2 71.49 35.34
CONCRETO EN FALSOPISO DE 4” DE 1:8 CEM-HOR m2 20.49 30.5
CONCRETO ARMADO
ZAPATAS
CONCRETO F’C=210 KG/CM2. PARA ZAPATAS m3 32.01 296.67
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 536.63 8.45
VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F’C= 210 KG/CM2 m3 16.09 356.21
ACERO EN VIGA DE CIMENTACION GRADO 60 kg 753.77 4.35
COLUMNAS
CONCRETO EN COLUMNAS F’C=210 KG/CM2 m3 34 384.33
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 202.11 35.32
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 835.3 4.35
VIGAS
CONCRETO F’C=210 KG/CM2. PARA VIGAS m3 45.5 353.02
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACISAS m2 85.6 38.98
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 529.5 4.35
TECHO LOSA MACISA E=0.10m INCLINADO
CONCRETO F’C=210 KG/CM2. PARA LOSAS MACISA DE TECHO e=0.10m m3 44.02 353.02
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACISAS m2 440.5 38.98
ACERO ESTRUCTURAL TRABAJADO P/LOSAS MACISAS DE TECHO kg 3,309.11 6.43
ENTRAMADO DE MADERA
LISTONES DE MADERA DE 1" x 2mt Unid 120.00 4.20
TIJERALES DE MADERA DE 0,5" Unid 80.00 3.80
CLAVOS DE 3" PULGADAS Kg 8.00 4.40
TEJA ANDINA
PLANCHAS DE TEJA ANDINA Unid 220.00 32.0
PEGAMENTO ESPECIAL Unid 50.00 18.0
OTROS Unid 12.00 15
ROTURA A LA COMPRESION
ROTURA A LA COMPRESION DE CONCRETO und 20 20
ARQUITECTURA
ALBAÑILERIA
MURO DE CABEZA LADRILLO PANDERETA CON CEMENTO-CAL-ARENA m2 218.03 54.32
MURO DE SOGA LADRILLO PANDERETA CON CEMENTO-CAL-ARENA m2 50.4 51.23
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO EN MUROS INTERIORES Y EXTERIORES m2 130.79 25.5
TARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5 m2 36.25 20.0
TARRAJEO DE SUPERF. VIGAS m2 25.3 25.34
TARRAJEO DE COLUMNAS m2 32.5 20.0
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS. m 12.2 15.0
ENCHAPADO DE MUROS CON CERAMICA TIPO VITROREX O SIMILAR m2 11.25 52.33
ZOCALOS
CONTRAZOCALO CEMENTO S/COLOREAR H = 30 CM m 85.6 12.45
CONTRAZOCALO DE CEDRO DE ¾” X 3” RODON ¾” m 75.5 18.65
ZOCALO DE MAYOLICA DE 15 X 15 CM DE COLOR DE 1RA m2 10.25 80.34
PISOS Y PAVIMENTOS
CONTRAPISO DE 48 MM. m2 256.51 27.48
PISO DE 2” CONCRETO F’C 140 KG/CM2 X 4 CM.+ PULIDO 1:2 X 1CM m2 185.36 31.46
PISO DE CERAMICA CELIMA 30X30 CM m2 71.15 70.03
VEREDA DE CONCRETO DE 4” m2 4.15 40.76
CARPINTERIA DE MADERA
VENTANA DE MADERA CON HOJAS DE CEDRO DE 1x1.5 m und 6 123.02
VENTANA DE MADERA DE CEDRO DE 3x1.5 m und 9 115.42
VENTANA DE MADERA DE CEDRO DE (0.7x1.5 m) P/Baño und 5 142.02
PUERTA CONTRAPLACADA DE 35 MM TRIPLAY DE 1.0x2.8m und 14 200.0
MURO DE BLOQUE HUECO DE CONCRETO E=15 CM. MEZCLA 1 :5 m2 187.47 53.45
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO DE SUPERF.VIGAS PERALTADAS-INDEPEND.(EN EXTERIORES) m2 577.92 40.32
CARPINTERIA METALICA
PUERTA METALICA LAC 1/16” C/MARCO 2”X2”X1/4” Y REFUERZOS DE 1.7x2.8xHOJA m2 9.52 320.0
MALLA METALICA PROTECTORA CON ALAMBRE N.12 X COCADAS DE 1” m2 162.48 76.4
PLAN DE MITIGACION AMBIENTAL
AREAS LIBRES CON PLANTACION DE GRASS
VEREDAS CON PIEDRA GRANDES Y MORTERO 1:1 m2 56.53 61.05
PLANTACION DE GRASS PARA AREAS LIBRES m2 56.4 27.53
EQUIPAMIENTO Global 1 114415.50
CAPACITACION Global 1 94337.20
SALARIOS Global 1 1829 400.00
Costo Directo
Gastos Generales (3%) 3%
Expediente Tecnico (1%) 1%
Utilidades (2%) 2%
Sub Total
Impuestos (IGV 19%) 19%
TOTAL PRESUPUESTO
Nota: La Valorizacion d el presupuesto de obra y equipamiento es p ara los seis distritos, para ello se multiplic ó por seis.
Con respecto a capac itacion y los salarios la valo rizacion es de 3 años, debido a que el proyecto se ejecutará en tres años.
RELACIÓN DE LOS EQUIPOS Y MATERIALES (ALTERNATIVA 01 Y 02).
JUGUETES FLOTADORES JUEGO DE DIFERENTES MODELOS Unidad 1 9.00 9.00
ANIMAL SOUNDS PALS (ANIMALITOS DE TELA CON SONIDOS DIVERTIDOS) Unidad 1 36.00 36.00
CARRUSEL DE LAS AVEJAS PARA NIÑOS CON ALMOHADA Unidad 1 28.00 28.00
TARJETAS DE SECUENCIA LOGICA II (etapas del desar. de los seres) Unidad 1 16.00 16.00
TARJETAS DE SECUENCIA LOGICA III (mi horario de vida) Unidad 1 14.00 14.00
CARTONES DUPLEX PARA LA ELABORACION DE DIBUJOS PARA NIÑOS Unidad 1 14.00 14.00
PLANTILLA DE PUNZADO CON MATERIAL SUAVE Y LAVABLE DE TENOPOR POR A4 Unidad 1 14.00 14.00
CARRO POPYTYPOP COCHE DE DIVERSION CON SONIDOS Y VARIOS COLORES Unidad 1 18.00 18.00
CACEROLA CON FIGURAS DE ENCAJE DE PLASTICO DE FORMA DIFERENTE Unidad 1 18.00 18.00
CLASIFICADOR DE CILINDROS TAB Y 25 BARRAS DE DIVER TAM Y COL-ARBOLITO Unidad 1 36.00 36.00
COSEDOR EN FORMA DE CIRCULO CON PUNZON Y CUERDA DE NYLON Unidad 1 12.00 12.00
DOMINOS DE RELACION CON FIGURAS DIVERSAS C/FICHA 9X4.5-ARBOLITO Unidad 1 25.00 25.00
ROMPECABEZA EL GUSANITO CIEN PIES C/NUMEROS DEL 1 AL 10-ARBOLITO Unidad 1 17.00 17.00
ENCAJE BASICO DE FIGURAS GEOM CIRCULO CUADRADO Y TRIANGULO-ARBOLITO Unidad 1 11.00 11.00
ENCAJE DE TORTUGA CON ABC CON NUMEROS PRIMOS-ARBOLITO Unidad 1 21.00 21.00
INTEGRACION PARTE TODO DIVERSAS FIGURAS C/FICHA 7.5X3.5-ARBOLITO Unidad 1 26.00 26.00
ENCAJE DE TORTUGA CON ABC CON NUMEROS PRIMOS-ARBOLITO Unidad 1 21.00 21.00
INTEGRACION PARTE TODO DIVERSAS FIGURAS C/FICHA 7.5X3.5-ARBOLITO Unidad 1 26.00 26.00
LOTERIA DE COLORES (TABLERO BASE CON 6 DIBUJOS Y 24 ARGOLLAS-ARBOLITO Unidad 1 43.00 43.00
LOTERIA DE IDENTICOS (2 TABLEROS CON 12 FICHAS CON FIG DIVERSAS)-ARBOLITO Unidad 1 25.00 25.00
MINI BUS DE ARRASTRE CON 7 PASAJEROS 15 X 3.5 CM-ARBOLITO Unidad 1 26.00 26.00
PLANTADO DE CIRCULOS CON OBTACULOS EN COLORES DIFERENTES -ARBOLITO Unidad 1 21.00 21.00
PLANTADO OSITO CON DIVERSAS EXPRES USANDO BLOQ DE FIG. GEOM.-ARBOLITO Unidad 1 54.00 54.00
REGLETAS BASICAS 2-10 TABLILLAS 15X20CM CON TRAZOS DOBLES-ARBOLITO Unidad 1 25.00 25.00
RELOJ DIDACTICO GRANDE Y CHICO CON BASE DE MADERA-ARBOLITO Unidad 1 25.00 25.00
SOPA DE LETRA LIGADA 150 TABLILLAS DE LETRAS Y 30 DE IMÁGENES-ARBOLITO Unidad 1 62.00 62.00
SOPA DE LETRAS SCRIP 202 TABLILLAS IMPRESAS EN SCRIP-ARBOLITO Unidad 1 62.00 62.00
TABLERO CON 44 AGUJEROS P/ INSERTAR Y ANUDAR LOS PASADORES-ARBOLITO Unidad 1 11.00 11.00
TABLERO RECTANGULAR CON 15 PERFORA PUNZON Y CUERDA NYLON-ARBOLITO Unidad 1 11.00 11.00
TREN DE CARGA BLOQUES EN DIFERENTES FORMAS Y PINES P/ ENCAJAR-ARBOLITO Unidad 1 46.00 46.00
ZAPATON CON PASADORES Y TERMINALES CON PUNZON DE MADERA -ARBOLITO Unidad 1 17.00 17.00
COLUMPIO TRICOLOR ESTRUCTURA METALICA CON PARANTES TUBO ASIENTO PLASTICO Unidad 1 112.00 112.00
TRICILO DE PLASTICO COLOR SOPORTEMETAL CON SONIDOS PEQUEÑOS Unidad 1 150.00 150.00
PLANTADOS DE OSITOS 30X21 CM CON DIVERSAS FIGURAS DE MADERA Unidad 1 23.00 23.00
SET ABC X 6 PZS (45 cm Alt) CON COLCHONETAS Unidad 1 560.00 560.00
LIBRO “LAS HOJAS DE CRIANZA“ EDIC 2006 - EXONERADO DE I.G.V. Unidad 1 19.00 19.00
LIBRO “LAS HOJAS DE CRIANZA“ EDIC 2006 - EXONERADO DE I.G.V. Unidad 1 19.00 19.00
ACTIV ROLL 15 CM LARGE GREEN (RODILLO VERDE P/MASAJES) Unidad 1 48.00 48.00
MALETA CON 450 REGLETAS (TRABAJANDO CON REGLETAS) - LADO Unidad 1 342.00 342.00
MEMOBITS JUEGO X 4 CAJAS (CINTA, M.PICCHU, ALLOSAURIUS, DR GACHET) - Unidad 1 70.00 70.00
MASSAGEBALL- REFLEX 120 GRAMS 9 CM DIAM GREEN - PELOTA P/MASAJE Unidad 1 26.00 26.00
MASSAGEBALL- REFLEX 150 GRAMS 10 CM DIAM GREEN - PELOTA P/MASAJE Unidad 1 33.00 33.00
MASSAGEBALL- REFLEX 85 GRAMS 8 CM DIAM GREEN - PELOTA P/MASAJE Unidad 1 25.00 25.00
PELOTA PHYSIO ROLL 70 CM DIAM. BLUE (115 LGO) Unidad 1 440.00 440.00
ESPEJOS 4MTDE LARGO POR 2.90 DE ALTO CON BARRA METALICA Unidad 1 87.00 87.00
MASSAGEBALL- REFLEX 120 GRAMS 9 CM DIAM GREEN - PELOTA P/MASAJE Unidad 1 26.00 26.00
MASSAGEBALL- REFLEX 150 GRAMS 10 CM DIAM GREEN - PELOTA P/MASAJE Unidad 1 33.00 33.00
MASSAGEBALL- REFLEX 85 GRAMS 8 CM DIAM GREEN - PELOTA P/MASAJE Unidad 1 25.00 25.00
PELOTA PHYSIO ROLL 70 CM DIAM. BLUE (115 LGO) Unidad 1 440.00 440.00
ESPEJOS 4MTDE LARGO POR 2.90 DE ALTO CON BARRA METALICA Unidad 1 87.00 87.00
TALLÍMETRO MÓVIL DE MADERA PARA MUJERES Y VARONES ADULTOS. PARA TRABAJO DE CAMPO UNIDAD 1 455 455.00
TALLÍMETRO MÓVIL DE MADERA PARA NIÑO(A) MENOR DE CINCO AÑOS. PARA TRABAJO DE CAMPO UNIDAD 1 305 305.00
INFANTÓMETRO PARA NIÑO(A)S MENORES DE DOS AÑOS- 110 CM UNIDAD 1 240 240.00
MOCHILA ACOLCHADA PORTA TALLÍMETRO ( ADULTO / MENOR 5 AÑOS) SEGÚN ESPECIFICACIONES CENAN/UNICEF. ESPECIAL PARA
TRABAJO DE CAMPO UNIDAD 1 50 50.00
BALDES PARA ALMACENAR ALIMENTOS LIBRE DE AMTERIALES TOXICOS UNIDAD 20 5.00 100.00
TOALLA DE BAÑO DE FELPA DE 1.20 X 80 CM CON FIGURAS INFANTILES Unidad 8 13.00 104.00
TOTAL 114415.50
ALTERNATIVA O1 Y O2
DESCRIPCION DE DESAGREGADO
ESPECIFICACIONES
CUNA DE MADERA ESPECIAL PARA BEBES MENORES DE 1 AÑO ALTO 1MT POR 0.96 M LARGO X0.85
CAPACITACION:
Desarrollo de capacidades E.T. Talleres presenciales personal de salud y educación
Remuneraciones
TOTAL
Plano de distribución
PROPUESTA MENOR
CERCO =120.66 ML
Atrio de ingreso
almacen
s.h.d.
Patio inyterior
Estimulacion 2-3 s.h.v.
Estim. gestantes,psicologico,cret,etc.
Jardin interior
PANEL DE FOTOGRAFIAS
a. 02 ( ), b. 03 ( ), c. 04 ( ), d. 05 ( ), e. 06 ( )
La encuesta fue realizado en tres distritos en tres fechas distintas, con la finalidad de fortalecer
el diagnostico del proyecto, por que dicha informacion es muy limitada. Los Distrito fueron Jose Crespo
y Castillo, por tener mayor poblacion, el Distrito de Mariano Damaso Beraun, por presentar
indices de pobreza y desnutricion mayor y el distrito de Hermilio Valdizan por estar en el
quintil uno de pobreza.