Está en la página 1de 1

1 2 3

2 Ø 3/8" 2 Ø 3/8"

VS-1 (0.25x0.20)
2 Ø 3/8 " 2 Ø 3/8 " PRIMER NIVEL ESC: 1/ 50
Ø 1/4" ,1@.05 , 5@.10 , R@.18 Ø 1/4" ,1@.05 , 5@.10 , R@.18

0.50 0.25 3.17 0.25 3.08 0.25

0.50 7.00

1 2 3
2 Ø 1/2 " 2 Ø 1/2 "

1 Ø 1/2 " 2 Ø 1/2 " 1 Ø 1/2 " 2 Ø 1/2 " V-101 (0.25x0.20)
Ø 1/4" ,1@.05 , 5@.10 , R@.18 Ø 1/4" ,1@.05 , 5@.10 , R@.18
PRIMER NIVEL ESC: 1/ 50

0.50 0.25 3.17 0.25 3.08 0.25

0.50 7.00

A B C D
2 Ø 3/8" 2 Ø 3/8"

VA-1 (0.25x0.20)
2 Ø 3/8" 2 Ø 3/8" PRIMER NIVEL ESC: 1/ 50
Ø 1/4" ,1@.05 , 5@.10 , R@.18

0.25 1.00 0.25 0.90 0.25 2.10 0.25

5.00

CONSTRUCTORA CAPON S.A.C.


LAMINA:
CASTILLEJO CRUZ, FLORA ISABEL

ING. ARTURO MARTIN OTERO RAMIREZ

CONSTRUCCIÓN EN SITIO PROPIO


C.I.P. 159999

ESTRUCTURAS: DETALLE EN VIGAS


E-03
C.P. BELLA ESPERANZA / SECTOR PAMPA SAN JOSE MZ. N LT. 1, DIST. DE PATIVILCA, PROV. DE BARRANCA, DEPT. LIMA

J.A.F CAPON ARQ AGOSTO 2020 1/100

También podría gustarte