1- DATOS GENERALES
A-POR PESO
MATERIALES UNIDAD AFECTO IGV PESO.UNIT. PESO.TOTAL
MADERA P2 12,815.11 1.49 19,094.51
ALAMBRE KG 2,199.06 1.00 2,199.06
CEMENTO PORTLAND BL. 45,996.06 42.50 1,954,832.55
CLAVOS KG 1,197.35 1.00 1,197.35
ACERO KG. 27,236.31 1.50 40,854.47
B-POR VOLUMEN
EN AGREGADOS Y MADERA
DESCRIPC. UNIDAD AFECTOS IGV SIN IGV
ARENA M3
PIEDRAS M3
HORMIGON M3
GRAVA O CASCAJO M3
MADERA P2
P2
VOLUMEN TOTAL
CAPACIDAD DEL CAMION (M3) 30.00 30.00
NUMERO DE VIAJES
REDONDEO
2- FLETE TERRESTRE
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTE
CAPACIDAD DEL CAMION ( M3 ) 10.00 CAPACIDAD DEL CAMION ( M3 )
COSTO POR VIAJE S/. 150.00 COSTO POR VIAJE S/.
CAPACIDAD DEL CAMION (KG) 30,000.00 CAPACIDAD DEL CAMION (KG)
FLETE POR KG 0.01
AFECTO IGV SIN IGV FLETE POR PESO =Peso Total * Flete por peso
FLETE POR PESO 20,181.78 FLETE POR VOLUMEN=No viajes*costo por viaje
FLETE POR VOLUMEN 0.00
AGREGADOS
TUBERIA 0.00
COSTO TOTAL FLETE TERR. 20,181.78
1250.00
400.00
500.00
560.00
600.00
Item Descripcion Und. Metrado P.U.
01 PLAN DE MANEJO AMBIENTAL
01.01 PLAN DE PARTICIPACIÓN CIUDADANA
01.01.02 Pl a n de Educa ci ón Sa ni ta ri a Und 1.00 2,000.00
01.01.03 Pl a n de Ca pa ci ta ci ón a JASS Und 1.00 1,000.00
01.01.04 Pl a n de Ca pa ci ta ci ón Muni ci pa l Und 1.00 1,000.00
PROGRAMA DE MEDIDAS DE: PREVENCION,
01.02
MITIGACION, REMEDIACION Y COMPENSACION
01.02.01 Eje cuci ón Gl b 1.00 1,000.00
01.02.02 Opera ci ón Gl b 1.00 1,000.00
01.02.03 Ma nteni mi ento Gl b 1.00 1,000.00
01.02.04 Ci erre de e jecuci ón Gl b 1.00 1,000.00
01.02.05 Aba ndono Gl b 1.00 1,000.00
PROGRAMA DE MANEJO DE RESIDUOS SÓLIDOS Y
01.03
LÍQUIDOS
01.03.01 Ma ne jo de res i duos s ol i dos Und 2.00 1,000.00
01.03.02 Ma ne jo de res i duos l íqui dos Und 2.00 1,000.00
01.04 PROGRAMA DE SEGUIMIENTO Y CONTROL
01.04.01 Progra ma de s e gui mi ento y control Und 1.00 1,000.00
01.04.02 Progra ma de moni tore o. Und 1.00 1,000.00
01.05 PROGRAMA/ PLAN DE CONTINGENCIA
01.05.01 Ca pa ci ta ci ón en medi das de conti nge nci a y pri meros
Und a uxi l i os 1.00 1,000.00
01.05.02 Uni da d de conti ngenci a Und 1.00 1,000.00
PROGRAMA DE CIERRE DE EJECUCIÓN DE OBRA Y
01.06
DE ABANDONO
01.06.01 Eta pa de ci erre de ejecuci ón de obra Gl b 1.00 1,500.00
01.06.02 Eta pa de a ba ndono Gl b 1.00 1,500.00
Und. Metrado P.U. Parcial
20,000.00
4,000.00
Und 1.00 2,000.00 2,000.00
Und 1.00 1,000.00 1,000.00
Und 1.00 1,000.00 1,000.00
5,000.00
Gl b 1.00 1,000.00 1,000.00
Gl b 1.00 1,000.00 1,000.00
Gl b 1.00 1,000.00 1,000.00
Gl b 1.00 1,000.00 1,000.00
Gl b 1.00 1,000.00 1,000.00
4,000.00
Und 2.00 1,000.00 2,000.00
Und 2.00 1,000.00 2,000.00
2,000.00
Und 1.00 1,000.00 1,000.00
Und 1.00 1,000.00 1,000.00
2,000.00
eros
Und a uxi l i os 1.00 1,000.00 1,000.00
Und 1.00 1,000.00 1,000.00
3,000.00
Gl b 1.00 1,500.00 1,500.00
Gl b 1.00 1,500.00 1,500.00
CANTIDAD UNIDAD MATERIAL
70.00
8.00
90.00
70.00
15.00
15.00
70.00
45.00
CON IGV
1.50 2 0.18 0.36 1.64
8.00 12 0.18 2.16 9.84
10.00 15 0.18 2.7 12.3
12.00 15 0.18 2.7 12.3
10.00 15 0.18 2.7 12.3
30.00 35 0.18 6.3 28.7
15.00 20 0.18 3.6 16.4
40.00 55 0.18 9.9 45.1
50.00 65 0.18 11.7 53.3
90.00 110 0.18 19.8 90.2
65.00 90 0.18 16.2 73.8
115.00 140 0.18 25.2 114.8
145.00 180 0.18 32.4 147.6
240.00 300 0.18 54 246
145.00 210 0.18 37.8 172.2
grupobarry gm
FONCODES / DEPI FLETE DE PIEDRAS Y RELLENO
1- DATOS GENERALES
A-POR PESO
PESO TOTAL
B-POR VOLUMEN
EN AGREGADOS Y MADERA
DESCRIPC. UNIDAD AFECTOS IGV SIN IGV
ARENA M3 Fina + Gruesa
PIEDRAS M3 62.18
HORMIGON M3 P.CH. + HORMIG.
GRAVA O CASCAJO M3 59.76 Relleno Clasificado
MADERA P2
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTE
CAPACIDAD DEL CAMION ( M3 ) 8.00 CAPACIDAD DEL CAMION ( M3 ) 8.00
COSTO POR VIAJE S/. COSTO POR VIAJE S/. 120.00
CAPACIDAD DEL CAMION (KG) 10,000.00 CAPACIDAD DEL CAMION (KG) 10,000.00
FLETE POR KG
AFECTO IGV SIN IGV FLETE POR PESO =Peso Total * Flete por peso
FLETE POR PESO FLETE POR VOLUMEN=No viajes*costo por viaje
FLETE POR VOLUMEN
AGREGADOS 1,800.00
TUBERIA
COSTO TOTAL FLETE TERR. 1,800.00
3- FLETE FLUVIAL
AFECTO IGV SIN IGV FLETE POR PESO =Peso Total * Flete por peso
FLETE POR PESO FLETE POR VOLUMEN=No viajes*costo por viaje
FLETE POR VOLUMEN
AGREGADOS
TUBERIA
COSTO TOTAL FLETE FLUV
4- FLETE EN ACEMILA
Flete no
Afecto a IGV