FLASH REPORT Inspection

www.velosi.com THIS REPORT MUST BE COMPLETED BY HAND WHILE AT THE VENDOR AND FAXED FROM THE VENDOR TO VELOSI EUROPE BEFORE YOU DEPART FOR THE DAY.
Client : PERUNDING RANHILL WORLEY Vendor: BC PETROLCHEMICAL SND Sub-Vendor: VALBART SPA

Velosi Group of Companies

Project: DAYUNG EARLY GAS COMPRESSION (DEGC) PO No.: 4215017-PP-POD-7007 dated 19.08.2010

Location: via delle industrie ,Mezzago (MI) - Italy Job No.: 60501 / 10 Date of Visit: 07/06/2011 Next Visit: 08/06/2011

SO No.: 201-306 Client Reference: ---------

MATERIAL INSPECTED THIS VISIT Item No. 10 20 30 Quantity 1Pc 1Pc 1Pc Description Metal Seated Actuated Top Entry Ball Valve 6 FB 300# RF (TAG n SDV 3755) Metal Seated Actuated Top Entry Ball Valve 6 FB 300# RF (TAG n SDV 3765) Metal Seated Actuated Top Entry Ball Valve 6 x 4 FB 300# RF (TAG n SDV 2224)

RESULTS OF INSPECTION: *

Accepted

Non-compliance

ORDER STATUS: *

Complete

Incomplete

SUMMARY / AREAS OF CONCERN: Arrived at COLMAS S.r.l. at 8,30 am as promised the activities started at the presence of : Mr. Barcella ( VALBART Quality Control Department) Mr. Zakri Alwi ( BC Petrolchemical SND BH Project Director) Mr. Syed Ahmad Fuad Syed Mohamed (BC Petrolchemical SND BH Application Sales Engineer) Mr Crotti Luigi (Velosi Ispector SIAD Representative) Visual Examination Visual examination carried out on Items 10 - 20 - 30 (Valves / Actuator / Control panel , before Hydro-Pressure and Functional Test. Valves : On internal Side was evident presence of oxidation. Probably after internal tests the valves were not accurately dried and protected. We have asked and obtained to remove the oxidation by soft grinding (by hand) , and now the valves appear in acceptable condition Actuator : No remark Control Panel: Stainless Steel control panel visually examined show presence of iron contamination , and the pressure gauge oxidated must be replaced by new one. Supplementary name plate on control panel indicating the TAG n is required to maintain connection between conrtol panel/actuator & valve. Valbar assure that before final inspection all this observation will be comply Results: Remarks that are pending during today visit, will be evaluated during final inspection Valves
L5-FMT-060 Rev. 01

Before Cleaning Control Panels

After Cleaning

At 14,30 the activities started with Pressure and Functional Test Test carried out on Items 10 - 30 in compliance to applicable ITP n BC/GUTONG-E/ABV/Q00 (Valbart 060501) rev.03 and Valvart procedures n 60501-HYDR 60501-FAT as following detailed: . Item 030 (TAG n 2224): - Hydrostatic Shell test 76 barg for 1 Hour - Hydrostatic Seat test 56 barg for 15 Minutes - Functional test as detailed on applicable ITP - Pneumatic Seat test 6 barg for 15 Minutes Result : Satisfactory Item 010 (TAG n 3755): - Hydrostatic Shell test 76 barg for 1 Hour - Hydrostatic Seat test 56 barg for 15 Minutes - Functional test as detailed on applicable ITP - Pneumatic Seat test 6 barg for 15 Minutes (Will be performed during tomorrow visit) Result : Satisfactory waiting Pneumatic seat test At 19,00 the activity was suspended. Please Note: There is a conflict concerning the test condition, between approved ITP and Hydro-testing Procedure. We choose to follow the more restrictive condition indicated on Hydro-testing procedure TYPE OF VISIT: Pre-Inspection Meeting Intermediate Inspection Final Inspection Inspector: Crotti Luigi Signed: Strike through as applicable.

Witness Mechanical Tests Review all Certificates Witness NDT Review Radiographs Witness Performance Tests Page 2 of 2

Witness Pressure Tests Dimension & Workmanship Coating & Painting Packing & Marking Loading Copy of NCR/IRC must be attached

Velosi Form (12) 03.09.97 V:\forms.msw\Inspect.continuation.dot