Está en la página 1de 12

DB-GF2 DB-GF3 DB-GF4

EARTH
EARTH

EART
EARTH

EARTH
EA
RT
H
EA
H RT
RT H

EARTH
EA

EA
H RT

LE
RT H

AB
EA

-C
EL
EA

EL-C
H RT
RT H

ABL
EA

E
BL
E

-CA
EA
H

EL
RT
RT H
EA

EL-C

E
BL
ABL

EA
H

-CA
RT

RT
E
EA

EL

EA
H

E
RT

RT
EL-C

BL
EA

H
-CA
ABL

EL
E

E
BL
EARTH

-CA
EART

EL-C
H

EL
TH
EARTH EAR

ABL
EARTH

E
TH

E
EAR

BL
-CA
EL
H
RT

EL-C
EA

ABL

E
BL
E

-CA
EL
EL-C

E
BL
ABL

-CA
E

EL
EL

TH

E
EL-C

BL
-C

EAR
EL- EL-CAB EA

-CA
EL- AB

EA

EA EA
CAB CAB RT

ABLE

BLE
EL-CABLE
LE

EA

BLE

RT RT
RT

EL
LE LE LE H

EA
EA

RT

H H
H
RT

EL-CA
EL-CA
RT

H
H
H
EL-C
EL-C EL-C
ABLABLABL EL

EA
LE
EAREARTH
-C

EART

EART
E E E

EAEA

RT AB
AB

BLE
RT RT
LE

EL-C

-C
H
EA

THEL
H H

H
EL- EL-

RT
EL-C

EL-CA
CABCAB

ABL
H
ABL

BLE
EL-CABLE
BLE
E LE LE

E
EL

EART
EA EART

EL-CA
EL-CA
-C

EARTH
EARTH

E
RT
EL- EL- EL-C AB

BL
EARTH
H
CABCAB ABL

EAR
LE

-CA

H
EARTH
LE LE E

EL
TH

EL-C

BLE
EA
EL-EL- EL-C
CABCAB EL

RT

EL-CA
ABL
ABL

EARTH
LE LE E -C

BLE
EL-CABLE
BLE
AB

LE
EAR

EARTH
EAR
LE

AB

EARTH
EL-CA
EL-CA
TH

-C
EA EL- EL-
EL-C

TH

EL
RT CABCAB
ABL EARTH
H E LE LE EARTH
EARTH

EA EL-EL- EL-C

EAR
RT CABCAB

EAR
ABL
H LE LE E

TH
EARTH

TH
EARTH EARTH
EA EL-C
EL-CEL-C
RT ABLABLABL
H E E E EARTH

EAR
EL-CA EARTH
EARTH

EARTH

H
EA BLE

EART
TH
RT
H

EA
RT

EART

EL-CABLE
H

EARTH

EARTH

H
H

RT

EARTH
EA
EARTH

TH
EAR
EARTH

EA

EL-C
EARTH

TH
RT

EL-CABLE

EAR
H

ABL

EARTH
TH
H

EAR
EART
EARTH

H
EARTH

EART
EL-C

EARTH
EARTH
ABL

EL-CABLE
E

EARTH
H
EART

EL-C
BLE
TH CA LE

ABL
EL-
EAR CAB LE

EL-CABLE
EL-

H
CAB LE

RT
TH EL- CAB

EART TH
BLE

EA

H
EAR CA LE EL-

EAR
EL-
CAB LE
EL-

EL-C
CAB LE

H
EL- CAB

EA

RT
BLE

ABL

RT
CA EL-

EA
EL- BLE

TH
E
CA LE

EL-CABLE

TH
EAR
EL-
CAB LE

EAR
EL- CAB H
BLE
CA EL- RT
EL- BLE EA

EL-C
CA LE
EL-

H
CAB LE

RT
ABL
EL- CAB

H
H

EA
BLE

RT
EL-

E
CA RT
EL- BLE

EA
EA

EL-CABLE
CA LE
EL-CAB LE

H
EL- CAB

RT
EL-

EL-C

EA

H
RT
ABL

EA
H

E
EL-C RT
ABL EA

EL-CABLE
E H

ABLE
RT
EA

EL-C
EL-C

EL-C
ABL

ABL
E H
RT

E
EA
EL-C
ABL
E

ABLE
EL-CABLE
EL-C
EL-C

EL-C
ABL

ABL
E

E
EL-C
ABL
E

ABLE
EL-CABLE
EL-C

EL-C
DB-CHE.LAB

ABL
EARTH

E
EARTH
H
EART

ABLE
EL-C
TH

EL-CABLE
EAR

EL-C
ABL
E

ABLE
EL-C

EL-CABLE
ABL

EL-C
E

DB-GF4
EL-C

ABLE
ABL

EL-CABLE

EL-C
E
EL-
CA
BLE

EL-C

ABLE
EL-
CA

ABL
BLE

EL-C
EL-CABLE
E
EL- EARTH EARTH
CA EARTH
EARTH BLE

EL-C
EARTH

ABLE
ABL
EL-

EL-C
E
CA

EL-CABLE
EL-CA BLE
BLE
EL-CA
BLE EL-

EL-C
CA
BLE

ABLE
EL-CA

ABL
BLE

EL-C
EL-CA
BLE

EL-CABLE
EL-C
ABL
E

ABLE
H ABL
EART EL-CABLE

E
EL
-C

EL-C
EL-C E
AB

TH E ABL
LE

EL-CABLE
EAR ABL EL-C
EL-C E
ABL

EL-C
TH EL-C E
EAR E ABL

ABL
ABL EL-C
EL

ABLE
EL-C E
-C

ABL EARTH EARTH


AB

E
H EL-C E
LE

E ABL EARTH

EL-C
RT ABL
EA EL-C
EL-C E EARTH
ABL EARTH EARTH

EL-CABLE
EARTH
EL-CABLE

EL-C
EARTH
EL

EL-C EARTH
-C
AB

EARTH

ABL
EARTH E
LE

ABLE
BL

E
-CA E
EARTH EARTH EARTH EL EARTH BL

EL-C
-CA
EARTH EL BLE
EL

EARTH EARTH CA
EARTH
-C

EL-CABLE
EL-

EL-C
AB

BL
E
LE

-CA
EL BL

ABL
-CA
EL

ABLE
BLE

E
CA
E EL-
EL

BL

EL-C
-C

-CA E
AB

EL BL
LE

-CA

EL-C
EL BLE

EL-CABLE
CA

ABL
E EL-
BL
EL

E
-CA E

ABLE
BL
-C

EL
AB

-CA
EL BLE
LE

EL-C
CA
E EL-

EL-C
BL
-CA E
EL BL

EL-CABLE
EL

ABL
-CA
-C

EL CABLE
AB

EAR

E
TH
LE

EL-

ABLE
EAR

EL-C
TH
EL-CABLE

EL-C
EL
-C

EL-CABLE EA
AB

EL-CA

ABL
BLE EL-CABLE RT
LE

EL-CABLE
EL-C H EARTH
EL-CABLE

E
ABLE
EL-CA
EL-CABLE

ABLE
BLE TH
EA EL-CABLE EAR
EL-C RT
EL-CA
EL

ABL

EL-C
BLE H EL-CABLE
-C

EL-C
AB

EL-CABLE H
EL-CA RT
LE

BLE
EL-C BLE EL-CABLE EA

ABL
ABLE

CA
EL-CABLE

EL-CABLE

EL-
EL-C
EL

ABLE
ABLE
-C
AB
LE

EL-C
EL-C
EL-C

BLE
ABLE

ABL

CA
EARTH

EL-
EARTH
EL

E
-C

EARTH

EL-CABLE
AB

ABLE
LE

TH
EAR

EL-C
EL-C

BLE
CA
EL

ABL
-C

EL-
AB

E
LE

EL-CABLE

ABLE

BLE
EL-C
EL

EL-C
-C

CA
AB

ABL

EL-
LE

E
EL

EL-CABLE

ABLE

BLE
-C
AB

EL-C
TH

CA
EL-C
LE
EAR

EL-
ABL
E
EL
-C
AB

BLE
ABLE
LE

EL-CABLE
EL-C

CA
EL-
EL-C
ABL
DB-PHY.LAB

EL-C
ABL
EL

E
E
-C
AB
LE

EL-C

BLE
ABL
E

ABLE

CA
EL-C

EL-CABLE

EL-
EL-C
EL

EL-C
ABL
ABL
-C

E
AB

E
LE

EL-C

BLE
ABL
E

CA
EL

ABLE
EL-C

EL-
EL-C
-C

ABL

EL-CABLE
AB

ABL

EL-C
LE

BLE
EARTH EL-C
LE

DB-GF5
EL

ABLE

CA
TH CABLE
-C

EL-
EAR EL-CAB
AB

EL-C

ABLE
LE

EL- LE E EL-C
CAB ABL ABLE

ABL
E

EL-CABLE
TH EL-

EL-C
ABL EL-C
EAR
EL-C LE

E
CAB EL-C

BLE
EL

EL- LE E ABLE
-C

ABL

CA
CAB
AB

H LE EL- EL-C
LE

EL-
RT CAB LE EL-C
EL- ABLE

EL-C
EA CAB EARTH

ABLE
EL- LE E
ABL H

ABL
LE CAB EART EL-C
EL- EL-C ABLE
EL

EL-CABLE

EL-C
CAB

E
-C

LE

BLE
EL- H
TH

AB

CAB EART
LE ABLE
EAR

EL-C
LE

CA
EL-
CAB ABLE

EL-
LE EL-C TH
CAB EL- EAR EARTH

EL-C
EL- LE EARTH EL-C
CAB

ABLE
E ABLE
EL

EL- LE ABL TH EARTH

ABL
EARTHEAR
-C

CAB
AB

EL- EL-C EARTH EARTH TH

BLE
EL-C
E
EARTH EARTH EL-C
LE

EL-CABLE
EARTH EAR ABLE

CA
EL-
EL-C
ABLE
EL

EL-C
-C
AB

ABLE
EL-C ABL
LE

ABLE

BLE
E

EL-C

CA
EL-CABLE
EL-C

EL-
ABLE
EL
-C
AB

EL-C
EARTH

EL-C
LE
EARTH

ABLE
ABL

ABLE

BLE
EL-C
E

CA
ABLE

EL-C
EL

EL-
-C

EART

EL-CABLE
AB

EL-C H
LE
EARTH

ABLE
EARTH

EL-C

EAR
TH
EL-C

BLE
ABL

ABLE

ABLE
EL

CA
E
-C

EA
TH

AB

EL-
RT

EL-C
EL-C
EAR

LE

ABLE H
EARTH

EL-CABLE
EARTH

EL-C

EL-C
ABLE
EL

BLE
EL-CABLE

EA
ABL
-C
TH

EL-CABLE

RT
AB

CA
ABLE

EA
EAR

EL-C
E
LE

H
EL-CAB EL-CABLE
EL-
ABLE EL-CABLE

RT
LE EL-CABLE

H
EL-C
H

EL-CABLE EL-CAB EL-CABLE


H
EART

EL-C LE
EART
EARTH

ABLE EL-CABLE EL- EL-CABLE

EAR
EL-CAB
EL

CA
EL-CABLE

EL-CA
LE

EL-CA
BLE
TH

-C

EL-CABLE EARTH

EAR
AB

TH
EL-CAB EL-CABLE
EAR

EL-C EARTH
LE

ABLE EL-CABLE LE EL-CABLE

EL-

TH
BLE
BLE
EL-CABLE EL- EL-CAB EL-CABLE TH

CA
LE
TH

CA EL-CABLE EAR
TH

EL-C

BLE
EL-CABLE BLE EL-CAB
EAR

ABLE
EARTH

LE
EAR
EARTH

EAR
EL-

EL-CA
EL-CA

TH
CA

EAR
BLE

EL-
EL-CABLE EL-CABLE EL-CABLE EL-CABLE EL-CABLE EL-CABLE EL-CABLE EL-CABLE EL-CABLE EL-CABLE EL-CABLE EL-CABLE EL-CABLE EL-CABLE EL-C
TH

ABL
TH

TH

CA
BLE
BLE
E
EAR

EAR

BLE
EARTH
H
EARTH

EAR
RT EL-
H EL-C

EART
EA CA
TH
EARTH

EART ABLE

EA
BLE

TH
EAR

RT

EAR

H
TH

H
H EARTH EL-C
EAR

EL-
RT

EL-CA
EL-CA
LE

TH
EA ABLE EL-
TH
CAB

CA
CA
EL-CABLE

EL-CABLE

EL-
EL-CABLE
EL-CABLE

EAR BLE

EARTH
H

BLE
EAR
CA

BLE
BLE
EL-

EAR
RT EL-C

EARTH
EARTH

H
BLE
EARTH

EA ABL

TH
RT E

TH
H

EAR
EA RT EL-
EA CA
H

TH
BLE
RT

EL-
H EA
TH

CA
EL-CA
EL-CABLE
EL-

RT

EAR
H

EAR
EA
EAR

BLE
RT EL-
CA

EARTH
E

EL-CABLE

EA
EL-CABLE

CA

TH
EL-CABLE

TH
EL-CABL
EARTH

H
BLE

EAR

BLE
RT BLE
H EA

TH
RT H
EA RT

EL-
EA EL-
TH

EAR
CA

EAR EAR

CA
EAR

EL-

BLE

BLE
TH

EL-CA
EL-CABLE
CA

TH TH

EARTH
EARTH

BLE
E

EL-C

EL-
TH

TH
EL-C

EART
EL-C

EARTH
ABL

BLE
CA
EAR
H
EAR

EAR
H

BLE
RT
ABLE

RT
EL-C

ABLE

EART
ABLE

EAR

EL-
EA

EAR EAR
TH
EA

CA
EL-

TH

TH TH
H

EL-

BLE

EARTH
CA

CA
EARTH

BLE
TH

BLE
H

EL-CA
EL-CABLE
EAR
H
RT

EAR

EAR
RT

EA
RT
EA

ABLE
EA

RT
EL BL E

EA
EL

TH

EAR
EL-C
EL

EAR

TH

EAREAR

BLE
-CA E

EL-
H
-CA
-CA

EL-
LE CA

TH
TH
BL

TH TH
BLE
BL

CA
EL-CAB
EL-
E

BLE
H H

EARTH
LE EA
H
H

CA
EARTH

RT

RT

EL-CAB RT
EA

RT RT
EA
BLE
EA

EA
EA

EA
RT

LE H EL-
RT

EL-CAB EL EL EL CA
H
EA

EL-CA
EL-CABLETH
EAR
H

EAREAR
E -C -C -CAB BLE
RT

EL-CABL AB AB H EA

TH
H

LE LE LE H H

TH
E RT
RT RT EART EA EA

BLE
H

EL-CABL RT H RT
RT

EA EA
EL-

H H EL-
EL-CABLE CA
EA

CA

EAR BLE
EA

EL-CABLE TH EART
BLE
RT

EA EARTH H
H

RT
H EL-
H

CA
RT

EA EART BLE
EA

RT H
H
EL-CABLE

EARTH
EL-CABLE

EA EART
H
H

H
RT

RT
RT

H
EA
EA

EAR
TH
EAR
TH
H

H
RT

EART
EL-CABLE

EA
RT
ABLE

H
EA

RT
H
EA
EL-CABLE

EART

H
EL-C
H

TH

EAR
RT

EAR
EA

TH
EARTH
TH
EL-CABLE

ABLE

EAR
H
RT

EL-CABLE

EARTH
EA

EL-C

EARTH
RT
EA
EA

ABLE
EL-CABLE
RT
H

EL-CABLE

EL-C

TH
EAR
EARTH
EA
RT
H

TH
EA

EAR
RT
H

EARTH
EA

H
RT
EARTH

RT
H

EA
EL-CABLE

EL-CABLE

EL-CABLE

EL-CABLE
EL-CABLE

EARTH
EA
RT H
H RT
EA
EARTH

EA
RT TH
H EAR
EL-CABLE

EL-CABLE

EL-CABLE

EL-CABLE
EL-CABLE

EARTH
EARTH
EARTH

TELEPHON

H
RT
EA

EARTH
EL-CABLE

EL-CABLE

EL-CABLE

EL-CABLE
EL-CABLE

H
EART
E

EARTH

EARTH
TELEPHON
EL-CABLE
EL-CABLE

EL-CABLE

EL-CABLE

EL-CABLE

EARTH
EART
E

(SMALL POWER LAYOUT)


H

EARTH
EARTH
TELEPHON
E

DB-GF1 DB-GNR DB-GF5

GROUND FLOOR SMALL POWER LAYOUT


DB-FF4 DB-FF5 DB-FF6

DB-FF6
DB-FF3

DB-FF7
DB-FF2

DB-FF8
(SMALL POWER LAYOUT)

DB-FF2 DB-FF1 DB-FF8

FIRST FLOOR SMALL POWER LAYOUT


DB-SF4 DB-SF5 DB-SF6

DB-SF6
DB-SF3

DB-SF7
DB-SF2

DB-SF8
(SMALL POWER LAYOUT)

DB-SF2 DB-SF1 DB-SF8

SECOND FLOOR SMALL POWER LAYOUT


P.A.SYS
P.A.SYSTEM P.A.SYSTEM P.A.SYSTEM P.A.SYSTEM P.A.SYSTEM P.A.SYSTEM P.A.SYSTEM TEM
TEM
SYS P.A
P.A. .SY
STE
M

EM
ST
P.A

.SY
.SY

P.A
ST
EM

M
STE

P.A
.SY

.SY
P.A

ST
EM
M
YSTE

P.A.
SYS
P.A.S

TEM
TEM

P.A.S
P.A.SYS

YSTE
M
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

19

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

M
STE
.SY
M

P.A
STE
.SY
P.A
P.A

P.A
.SY
.SY

ST
ST

EM
EM

EM
ST
.SY
EM

P.A
ST
P.A
P.A

.SY
.SY
.SY

P.A
ST
ST

EM
EM

EM
ST
.SY
EM
ST P.A
P.A

P.A

.SY
.SY

.SY

P.A
ST

ST
EM

EM

EM M
ST STE
EM .SY .SY
ST P.A P.A
.SY
P.A
P.A

P.A
.SY

.SY

P.A
ST

ST

.SY TEM
EM

EM

ST M SYS
EM STE P.A.
TEM .SY
SYS P.A
P.A.
M
YSTE
P.A P.A P.A P.A.S
.SY M
.SY .SY STEM YSTE
STE ST ST P.A.SY P.A.S
M EM EM P.A.SYSTEM P.A.SYSTEM P.A.SYSTEM
P.A.SYSTEM STEM
P.A.SYSTEM P.A.SY
P.A.SYSTEM P.A.SYSTEM TEM
P.A.SYSTEM P.A.SYSTEM P.A.SYS
P.A.SYSTEM P.A.SYSTEM TEM
M P.A.SYS
P.A.SYSTE P.A.SYSTEM
P.A.SYSTEM P.A.SYSTEM P.A.SYSTEM
EM P.A.SYSTEM P.A.SYSTEM P.A.SYSTEM P.A.SYSTEM
P.A.SYST
EM P.A.SYSTEM
TEM P.A.SYST
P.A P.A.SYS P.A.SYSTEM
P.A .SY TEM M
P.A.SYS P.A.SYSTE
.SY STE TEM
STE M P.A P.A.SYS M
M .SY TEM P.A.SYSTE
P.A.SYS
ST
EM STEM TEM
P.A.SYS P.A.SYSTEM
P.A.SY STEM
M
P.A P.A P.A.SY P.A.SYSTE P.A.SY
.SY .SY TEM STEM
STE STE M P.A.SYS P.A.SYSTEM P.A.SYSTEM P.A.SYSTEM
M M YSTE
P.A P.A.S STEM EM P.A.SY
P.A.SYSTEM STEM P.A.SYST STEM
.SY P.A.S
ST P.A.SY P.A.SY
EM TEM YSTE
P.A. M M
SYS P.A YSTEM TEM P.A.SYS
TEM P.A.SYS
P.A.SYSTE P.A.SYSTE
.SY P.A.S STEM M
STE P.A.SY P.A.SYSTEM
M M
P.A.S P.A M YSTE
P.A.S
YSTEMM STEM
YSTE .SY YSTE
P.A.SY
M STE P.A.SYSTE
P.A.S
P.A.S
P.AM
.SY
P.A.SY STE
STEM M

(P.A. SYSTEM, TELEPHONE


& PROJECTOR LAYOUT)

GROUND FLOOR PLAN


(P.A. SYSTEM, TELEPHONE &
PROJECTOR LAYOUT)
P.A.SYSTEM P.A.SY
P.A.SYSTEM P.A.SYSTEM P.A.SYSTEM P.A.SYSTEM P.A.SYSTEM STEM
TEM
SYS
P.A.
P.A
.SY
STE
M

EM
ST
.SY
P.A
P.A
.SY
ST
EM

M
STE
.SY

P.A
P.A

.SY
ST
EM
M
YSTE

P.A.
P.A.S

SYS
TEM
TEM

P.A.S
P.A.SYS

YSTE
M
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
25
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

EM
ST
P.A.

.SY
SYS

P.A
TEM

EM
ST
.SY
P.A

P.A
.SY
STE
M

EM
ST
.SY
P.A
P.A
.SY
ST
EM

M
STE
.SY
P.A
P.A

M
.SY

STE
ST

.SY
P.A
EM

M
YSTE
P.A.S
P.A
.SY
ST TEM
P.A.SYS
EM
P.A.SYSTEM
P.A.SYSTEM
P.A.SYSTEM
P.A.SYSTEM
P.A.SYSTEM
P.A.SYSTEM
P.A.SYSTEM
EM
P.A.SYST
P.A
.SY EM
STE P.A.SYST
M
EM
P.A.SYST

TEM
P.A. P.A.SYS
SYS
TEM
TEM
P.A.SYS

P.A.S STEM
YSTE P.A.SY
M

(P.A. SYSTEM, TELEPHONE


& PROJECTOR LAYOUT)

FIRST FLOOR PLAN


(P.A. SYSTEM, TELEPHONE &
PROJECTOR LAYOUT)
P.A.SYSTEM P.A.SY
P.A.SYSTEM P.A.SYSTEM P.A.SYSTEM P.A.SYSTEM P.A.SYSTEM STEM
TEM
SYS
P.A.
P.A
.SY
STE
M

EM
ST
.SY
P.A
P.A
.SY
ST
EM

M
STE
.SY

P.A
P.A

.SY
ST
EM
M
YSTE

P.A.
P.A.S

SYS
TEM
TEM

P.A.S
P.A.SYS

YSTE
M
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

25

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

P.A.SYSTEM
P.A.SYSTEM

EM
ST
P.A.

.SY
SYS

P.A
TEM

EM
ST
.SY
P.A

P.A
.SY
STE
M

EM
ST
.SY
P.A
P.A
.SY
ST
EM

M
STE
.SY
P.A
P.A
.SY

TEM
SYS
ST

P.A.
EM

M
YSTE
P.A.S
P.A
.SY
TEM
ST P.A.SYS
EM
P.A.SYSTEM
P.A.SYSTEM
P.A.SYSTEM
P.A.SYSTEM
P.A.SYSTEM
M
P.A.SYSTE
P.A EM
.SY P.A.SYST
STE
M EM
P.A.SYST

TEM
P.A.SYS
P.A
.SY
STE STEM
M P.A.SY

STEM
P.A.SY
P.A
.SY
STE STEM
M P.A.SY

M
YSTE
P.A. P.A.S
SYS
TEM

(P.A. SYSTEM, TELEPHONE


& PROJECTOR LAYOUT)
SECOND FLOOR PLAN
(P.A. SYSTEM, TELEPHONE &
PROJECTOR LAYOUT)
DB-GF2 DB-GF3 DB-GF4

5 22

NOTES
1. ALL SOCKETS FOR STUDENTS COMPUTER SHALL BE KEPT AT 500MM
ABOVE FFL.
2. ALL CONDUITS SHALL BE CONCEALED PVC.
3. PROVIDES SEPRATE EARTH SYSTEM WITH EARTH PITS TO PATCH PANEL
CABINETS.
4. ALL STRUCTURED CABLE (COMPUTER NETWORK) INSTALLATION SHALL
BE DONE THROUGH SPECIALISED CONTRATOR WITH TRAINED AND
EXPERIENCED TECHNICIANS AND SHALL SUBMIT THE DETAILS BEFORE
COMMENCEMENT OF THE INSTALLATION.
5. THE TESTER SHALL BE USED WITH CALIBRATION PERIOD RECOMMENDED
BY THE VENDOR IN ORDER TO ACHIEVE THE VENDOR SPECIFIED
MEASUREMENT ACCURACY AND SHALL SUBMIT THE ORIGINAL
CERTIFICATE BEFORE COMMENCEMENT OF THE INSTALLATION.
FIBER

97 + 70 6. ALL COMPONENT OF COMPUTER NETWORK SHALL BE PROVIDED FROM


THE SAME MANUFACTURER.
OPTICAL

7. PULLING OF CABLE SHALL BE DONE ONLY AFTER THE COMPLETION OF


TILING AND ONE COAT OF PAINT.
CABLE
DB-CHE.LAB

8. THE INSTALLATION SHALL BE DONE TO TIA/EIA 568 A AND B

32 8 + 71 (DRAFT 7 OR LATEST) AND ISO/IEC 11801 (2ND EDITION OR LATEST)


AND SHALL MEET OR EXCEED CATEGORY 6A SPECIFICATIONS.
FIBER

22 9. CHANNELS COMPRISED EXCLUSIVELY OF PASSIVE PRODUCTS END TO


END SHALL BE CAPABLE OF DELIVERING 1.2 GB PER SECOND TO THE
OPTICAL

DB-GF4
WORK STATION IN ACCORDANCE WITH APPLICATION STANDARDS.

5 10.THE TEST SHALL BE CONDUCTED FOR PERMANENT LINK AND CHANNEL


CABLE

AND TO OBTAIN A PASS CERTIFICATE TO EACH CIRCUITS. THE TEST


CERTIFICATE (ONE ORIGINAL & TWO COPIES) SHALL BE SUBMITTED
BEFORE 7 DAYS OF HAND OVER OF THE PROJECTS.

11.TESTING THE SYSTEM-TESTING SHALL BE 100% ON ALL CIRCUITS


INCLUDING THE FOLLOWING TESTS TO TIA/EIA 568 B CATEGORY 6A.
PATCH PANEL-B(PPB)

12.WIRE MAP-OPEN SHOT AND PAIR SEQUENCE, LENGTH-THE PASS/FAIL


CRITERIA OR BASED ON MAXIMUM LENGTH ALLOWED FOR THE
PERMANENT LINK CONFIGURATION (90MTS OR 295FT) ATTENUATION,
FIBER

NEXT LOSS, PS NEXT LOSS, ELFEXT, PSELFEXT RETURN LOSS, ACR,


PSACR, DELAY SKEW.
OPTICA

13.0.50MT LENGTH PATCH CORDS (CAT6A) CABLE SHALL BE PROVIDED


L

TO EACH PORT OF THE PATCH PANEL AND 3.0 MTS LENGTH DROP
CABLE

LEADS (CAT6A) TO ALL RJ45 CAT 6A SOCKETS.

14.THE CONTRACTOR AND THE MANUFACTURER SHALL PROVIDE A


GUARANTEE FOR THE COMPONENTS AND THE INSTALLATION FOR
PERIOD OF MINIMUM 25 YEARS.
FIBER

15.THE PERMITED MAXIMUM LENGTH OF THE UTP CABLES SHALL BE


L
OPTICA

90MTS, IF ANY OUTLET POINTS EXCEED 90MTS FIBER OPTICS CABLES


WITH ALL CONNECTORS, PATCH PANEL, PATCH CORDS ETC. TO
COMPLETE THE NETWORK.
CABLE

16.LABELLING SHALL BE DONE TO ALL COMPUTER OUTLETS BOTH ENDS


OF THE CABLE & AT PATCH PANEL WITH RESPECT TO THE ROOMS.
17.ALL POWER SOCKETS SHALL BE LABELLED WITH RESPECT TO THE
FIBER

DISTRIBUTION BOARD.

22
OPTICAL

16
DB-PHY.LAB

5
CABLE

DB-GF5
FIBER
OPTICAL
CABLE
FIBER
OPTICAL
CABLE
FIBER
OPTICAL
CA
BL
E

FIBE
R
OPTIC
AL CABLE OPTICAL CABLE FIBER
FIBER
OPTIC
AL
CA
BL
E

FIBER
OPTICAL
CABLE
FIBER OPTICAL CABLE FIBER OPTICAL
CABLE

FIB
ER
O
PT
IC
AL
CA
BL
E

FIB
ER

8 4
OP
TICA
L CABLE

(STRUCTURED CABLING &


POWER SOCKET LAYOUT)

DB-GF1 DB-GNR DB-GF5

PATCH PANEL-A(PPA)

GROUND FLOOR PLAN


(STRUCTURED CABLING & POWER SOCKET LAYOUT)
DB-FF4 DB-FF5 DB-FF6

NOTES
1. ALL SOCKETS FOR STUDENTS COMPUTER SHALL BE KEPT AT 500MM
ABOVE FFL.
2. ALL CONDUITS SHALL BE CONCEALED PVC.
3. PROVIDES SEPRATE EARTH SYSTEM WITH EARTH PITS TO PATCH PANEL
CABINETS.
4. ALL STRUCTURED CABLE (COMPUTER NETWORK) INSTALLATION SHALL

DB-FF6
BE DONE THROUGH SPECIALISED CONTRATOR WITH TRAINED AND
EXPERIENCED TECHNICIANS AND SHALL SUBMIT THE DETAILS BEFORE
COMMENCEMENT OF THE INSTALLATION.
5. THE TESTER SHALL BE USED WITH CALIBRATION PERIOD RECOMMENDED

128 BY THE VENDOR IN ORDER TO ACHIEVE THE VENDOR SPECIFIED


MEASUREMENT ACCURACY AND SHALL SUBMIT THE ORIGINAL
CERTIFICATE BEFORE COMMENCEMENT OF THE INSTALLATION.
6. ALL COMPONENT OF COMPUTER NETWORK SHALL BE PROVIDED FROM
THE SAME MANUFACTURER.

4
7. PULLING OF CABLE SHALL BE DONE ONLY AFTER THE COMPLETION OF
TILING AND ONE COAT OF PAINT.
8. THE INSTALLATION SHALL BE DONE TO TIA/EIA 568 A AND B
(DRAFT 7 OR LATEST) AND ISO/IEC 11801 (2ND EDITION OR LATEST)
AND SHALL MEET OR EXCEED CATEGORY 6A SPECIFICATIONS.
DB-FF3

9. CHANNELS COMPRISED EXCLUSIVELY OF PASSIVE PRODUCTS END TO


END SHALL BE CAPABLE OF DELIVERING 1.2 GB PER SECOND TO THE
WORK STATION IN ACCORDANCE WITH APPLICATION STANDARDS.

10.THE TEST SHALL BE CONDUCTED FOR PERMANENT LINK AND CHANNEL


AND TO OBTAIN A PASS CERTIFICATE TO EACH CIRCUITS. THE TEST
CERTIFICATE (ONE ORIGINAL & TWO COPIES) SHALL BE SUBMITTED
BEFORE 7 DAYS OF HAND OVER OF THE PROJECTS.

11.TESTING THE SYSTEM-TESTING SHALL BE 100% ON ALL CIRCUITS


INCLUDING THE FOLLOWING TESTS TO TIA/EIA 568 B CATEGORY 6A.
PATCH PANEL-B(PPB)

12.WIRE MAP-OPEN SHOT AND PAIR SEQUENCE, LENGTH-THE PASS/FAIL


CRITERIA OR BASED ON MAXIMUM LENGTH ALLOWED FOR THE
PERMANENT LINK CONFIGURATION (90MTS OR 295FT) ATTENUATION,

DB-FF7
NEXT LOSS, PS NEXT LOSS, ELFEXT, PSELFEXT RETURN LOSS, ACR,
PSACR, DELAY SKEW.
13.0.50MT LENGTH PATCH CORDS (CAT6A) CABLE SHALL BE PROVIDED
TO EACH PORT OF THE PATCH PANEL AND 3.0 MTS LENGTH DROP
LEADS (CAT6A) TO ALL RJ45 CAT 6A SOCKETS.

14.THE CONTRACTOR AND THE MANUFACTURER SHALL PROVIDE A


GUARANTEE FOR THE COMPONENTS AND THE INSTALLATION FOR
PERIOD OF MINIMUM 25 YEARS.
15.THE PERMITED MAXIMUM LENGTH OF THE UTP CABLES SHALL BE
90MTS, IF ANY OUTLET POINTS EXCEED 90MTS FIBER OPTICS CABLES
WITH ALL CONNECTORS, PATCH PANEL, PATCH CORDS ETC. TO
COMPLETE THE NETWORK.
16.LABELLING SHALL BE DONE TO ALL COMPUTER OUTLETS BOTH ENDS
OF THE CABLE & AT PATCH PANEL WITH RESPECT TO THE ROOMS.
17.ALL POWER SOCKETS SHALL BE LABELLED WITH RESPECT TO THE
DISTRIBUTION BOARD.
DB-FF2

DB-FF8
(STRUCTURED CABLING &
POWER SOCKET LAYOUT)
DB-FF2 DB-FF1 DB-FF8

PATCH PANEL-A(PPA)

FIRST FLOOR PLAN


(STRUCTURED CABLING & POWER SOCKET LAYOUT)
DB-SF4 DB-SF5 DB-SF6

NOTES
1. ALL SOCKETS FOR STUDENTS COMPUTER SHALL BE KEPT AT 500MM
ABOVE FFL.
2. ALL CONDUITS SHALL BE CONCEALED PVC.
3. PROVIDES SEPRATE EARTH SYSTEM WITH EARTH PITS TO PATCH PANEL
CABINETS.
4. ALL STRUCTURED CABLE (COMPUTER NETWORK) INSTALLATION SHALL
BE DONE THROUGH SPECIALISED CONTRATOR WITH TRAINED AND
EXPERIENCED TECHNICIANS AND SHALL SUBMIT THE DETAILS BEFORE

DB-SF6
COMMENCEMENT OF THE INSTALLATION.
5. THE TESTER SHALL BE USED WITH CALIBRATION PERIOD RECOMMENDED
126 BY THE VENDOR IN ORDER TO ACHIEVE THE VENDOR SPECIFIED
MEASUREMENT ACCURACY AND SHALL SUBMIT THE ORIGINAL
CERTIFICATE BEFORE COMMENCEMENT OF THE INSTALLATION.
6. ALL COMPONENT OF COMPUTER NETWORK SHALL BE PROVIDED FROM
THE SAME MANUFACTURER.

6 7. PULLING OF CABLE SHALL BE DONE ONLY AFTER THE COMPLETION OF


TILING AND ONE COAT OF PAINT.
8. THE INSTALLATION SHALL BE DONE TO TIA/EIA 568 A AND B
(DRAFT 7 OR LATEST) AND ISO/IEC 11801 (2ND EDITION OR LATEST)
AND SHALL MEET OR EXCEED CATEGORY 6A SPECIFICATIONS.
9. CHANNELS COMPRISED EXCLUSIVELY OF PASSIVE PRODUCTS END TO
DB-SF3

END SHALL BE CAPABLE OF DELIVERING 1.2 GB PER SECOND TO THE


WORK STATION IN ACCORDANCE WITH APPLICATION STANDARDS.

10.THE TEST SHALL BE CONDUCTED FOR PERMANENT LINK AND CHANNEL


AND TO OBTAIN A PASS CERTIFICATE TO EACH CIRCUITS. THE TEST
CERTIFICATE (ONE ORIGINAL & TWO COPIES) SHALL BE SUBMITTED
BEFORE 7 DAYS OF HAND OVER OF THE PROJECTS.

11.TESTING THE SYSTEM-TESTING SHALL BE 100% ON ALL CIRCUITS


INCLUDING THE FOLLOWING TESTS TO TIA/EIA 568 B CATEGORY 6A.
12.WIRE MAP-OPEN SHOT AND PAIR SEQUENCE, LENGTH-THE PASS/FAIL
CRITERIA OR BASED ON MAXIMUM LENGTH ALLOWED FOR THE
PATCH PANEL-B(PPB)

PERMANENT LINK CONFIGURATION (90MTS OR 295FT) ATTENUATION,


NEXT LOSS, PS NEXT LOSS, ELFEXT, PSELFEXT RETURN LOSS, ACR,
PSACR, DELAY SKEW.

DB-SF7
13.0.50MT LENGTH PATCH CORDS (CAT6A) CABLE SHALL BE PROVIDED
TO EACH PORT OF THE PATCH PANEL AND 3.0 MTS LENGTH DROP
LEADS (CAT6A) TO ALL RJ45 CAT 6A SOCKETS.

14.THE CONTRACTOR AND THE MANUFACTURER SHALL PROVIDE A


GUARANTEE FOR THE COMPONENTS AND THE INSTALLATION FOR
PERIOD OF MINIMUM 25 YEARS.
15.THE PERMITED MAXIMUM LENGTH OF THE UTP CABLES SHALL BE
90MTS, IF ANY OUTLET POINTS EXCEED 90MTS FIBER OPTICS CABLES
WITH ALL CONNECTORS, PATCH PANEL, PATCH CORDS ETC. TO
COMPLETE THE NETWORK.
16.LABELLING SHALL BE DONE TO ALL COMPUTER OUTLETS BOTH ENDS
OF THE CABLE & AT PATCH PANEL WITH RESPECT TO THE ROOMS.
17.ALL POWER SOCKETS SHALL BE LABELLED WITH RESPECT TO THE
DISTRIBUTION BOARD.
DB-SF2

DB-SF8
(STRUCTURED CABLING &
POWER SOCKET LAYOUT)
DB-SF2 DB-SF1 DB-SF8

PATCH PANEL-A(PPA)

SECOND FLOOR PLAN


(STRUCTURED CABLING & POWER SOCKET LAYOUT)
GUARD & DRIVER ROOM , KIOSK PLAN
(ELECTRICAL LAYOUT)

    


  

 

  


  

 
 
 

 

   


   
 
 

 
 

También podría gustarte