Está en la página 1de 7

1.

Delhi Regulation Renewable Purchase Obligation (RPO) target Year (1) 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 Solar (2) 0.10% 0.15% 0.20% 0.25% 0.30% 0.35% Non Solar (3) 1.90% 3.25% 4.60% 5.95% 7.30% 8.65% Total (4) 2.00% 3.40% 4.80% 6.20% 7.60% 9.00%

2. Maharashtra Regulation Renewable Purchase Obligation (RPO) target Year Minimum Quantum of purchase (in %) from renewable energy sources (in terms of energy equivalent in kWh) Non-Solar (other RE) 5.75% 6.75% 7.75% 8.50% 8.50% 8.50% Total 6.0% 7.0% 8.0% 9.0% 9.0% 9.0%

2010-11 2011-12 2012-13 2013-14 2014-15 2015-16

Solar 0.25% 0.25% 0.25% 0.50% 0.50% 0.50%

3. Madhya Pradesh Renewable Purchase Obligation (RPO) target Financial Year Solar (%) 2010-11 2011-12 2012-13 2013-14 2014-15 0.40 0.60 0.80 1.00 Cogeneration and other Renewable Sources of Energy Non Solar (%) 0.80 2.10 3.40 4.70 6.00 Total (%) 0.80 2.50 4.00 5.50 7.00

4.Gujarat Renewable Purchase Obligation (RPO) target Minimum Quantum of purchase (in %) from renewable energy sources (in terms of energy in kWh) Total (2) Wind (3) Solar (4) Biomass, bagasse and others (5) 5% 6% 7% 4.50% 5.00% 5.50% 0.25% 0.50% 1.00% 0.25% 0.50% 0.50%

Year (1) 2010-11 2011-12 2012-13

5. Chattisgarh Renewable Purchase Obligation (RPO) target Renewable Energy Sources Biomass-based plants Small hydel plants Solar Energy (incl. PV and PV thermal systems) Wind, Bagasse based cogeneration & others Minimum quantum of electricity to be procured by licensees as percentage of total consumption. 5% 3% 2%

6. Karnataka Renewable Purchase Obligation (RPO) target ESCOM BESCOM MESCOM CESC HESCOM GESCOM Hukkeri Society RPO for RE sources other than Solar 10 % 10 % 10 % 7% 7% 7% Solar RPO 0.25 0.25 0.25 0.25 0.25 0.25 % % % % % %

7. Tamilnadu Renewable Purchase Obligation (RPO) target Sl.No. Year Minimum Quantum of total renewable purchase obligation in percentage. (in terms of energy in kWh) Distribution Captive Licensee and Open Access Consumers (3) 9% 9% Minimum quantum of solar renewable purchase obligation in percentage out of the total renewable purchase obligation Mentioned in column (3). (in terms of energy in kWh) Distribution Captive and Licensee Open Access Consumers

(1)

(2) 1 2011-12

(4) 0.05% 0.05%

8. Andhra Pradesh Every Distribution Licensee shall be required to purchase Electricity, not less than 5% of his consumption of energy, from RP sources as RPPO (Renewable Power Purchase Obligation) during each of the years 2009-10 to 2013-14. The solar power

purchase obligation starts with 0.25% in the Phase-1 and to go up to 3% by the Year 2022. 9. Kerala Every obligated entity shall purchase not less than 3% of its consumption of energy from renewable energy sources under the Renewable Purchase Obligation during each of the years from 2010. Provided that 0.25% of the consumption of energy shall be procured from generation based on solar as renewable energy source only; 10. Assam Year (1) 2010-11 2011-12 2012-13 2013-14 2014-15 Minimum Quantum of purchase (in %) from renewable sources (in terms of energy in kWh) of total consumption Non -Solar (2) 1.4% 2.8% 4.2% 5.6% 7%

Provided that 0.05 percentage point out of the renewable purchase obligation so specified in the year 2010-11 shall be procured from generation based on solar as renewable energy source and shall be increased at a rate of 0.05 percentage every year thereafter till 2014-15 or until reviewed by the Commission. 11. Manipur Mizoram Renewable Purchase Obligation (RPO) target Renewable Purchase Obligation of Licensee Year RPO for Manipur 2010-11 2% 2011-12 2012-13 3% 5% RPO for Mizorm 5.0% 6.0% 7.0%

Provided that 0.25% percentage point out of the total consumption shall be procured from generation based on solar as renewable energy source only.

12. Meghalaya Renewable Purchase Obligation (RPO) target Year Minimum quantum of purchase (in %) from renewable energy sources (in kWh) Wind Solar Others Total 0.10% 0.20% 0.20% 0.50% 0.15% 0.30% 0.30% 0.75% 0.20% 0.40% 0.40% 1.00%

2010-11 2011-12 2012-13

13. Nagaland Renewable Purchase Obligation (RPO) target Renewable Purchase Obligation of Licensee Year RPO for Nagaland 2010-11 15% 2011-12 16% 2012-13 17% Provided that 0.25% percentage point out of the total consumption shall be procured from generation based on solar as renewable energy source only; 14. Haryana Renewable Purchase Obligation (RPO) target Year 2010-11 2011-12 2012-13 2013-14 Non Solar 1.5% 1.5% 2% 3%

Solar RPO shall be 0.25% of the overall RPO 15. Tripura Every obligated entity shall purchase not less than 1% during 1st year, 1% during 2nd year and 2% during 3rd year of its consumption of energy from renewable energy sources under the Renewable Purchase Obligation during each of the years from April to March. Provided that 0.1 (%) percentage points out the renewable purchase obligation so specified shall be procured from generation bases on solar as renewable energy source only:

16. Himachal Pradesh Renewable Purchase Obligation (RPO) target Year (1) 2010-11 2011-12 2012-13 Total (2) 10.1% 11.1% 12.1% Minimum Quantum of purchase (in %) from renewable sources (in terms of energy in kWh) of total consumption Non -Solar (3) 10 % 11% 12% Solar (4) 0% 0.1% 0.1%

17. JK Renewable Purchase Obligation (RPO) target Year (1) 2010-11 2011-12 2012-13 Total (2) 1% 3% 5% Minimum Quantum of purchase (in %) from renewable sources (in terms of energy in kWh) of total consumption Non -Solar (3) 0.98% 2.90% 4.75% Solar (4) 0.02% 0.1% 0.25%

18. Punjab Renewable Purchase Obligation (RPO) target Year 2011-12 2012-13 2013-14 2014-15 Total 2.4 2.9 3.5 4.0 Solar 0.03 0.07 0.13 0.19 Non Solar 2.37 2.83 3.37 3.81

19. Rajasthan Renewable Purchase Obligation (RPO) target 1 2 3 Year 2011-12 2012-13 2013-14 Wind 4.50 5.10 5.70 Biomass 1.00 1.25 1.50 Solar 0.50 0.75 1.00 Total 6.00 7.10 8.20

20. Uttar Pradesh Renewable Purchase Obligation (RPO) target Year (1) 2010-11 2011-12 2012-13 Solar (2) 0.25% 0.5% 1% Minimum Quantum of purchase (in %) from renewable sources (in terms of energy in kWh) of total consumption Non -Solar (3) 3.75% 4.5% 5% Total (4) 4% 5% 6%

21. Uttarakhand Renewable Purchase Obligation (RPO) target Year 2010-11 2011-12 2012-13 Renewable Purchase Obligation -Non-Solar 4.00% 4.50% 5.00% Renewable Purchase Obligation - Solar 0.000% 0.025% 0.050%

22. Jharkhand Renewable Purchase Obligation (RPO) target Year (1) 2010-11 2011-12 2012-13 Solar (2) 0.25% 0.5% 1% Minimum Quantum of purchase (in %) from renewable sources (in terms of energy in kWh) of total consumption Non -Solar (3) 1.75% 2.5% 3% Total (4) 2% 3% 4%

23. Bihar Renewable Purchase Obligation (RPO) target Year (1) 2010-11 2011-12 2012-13 2013-14 2014-15 Minimum Quantum of purchase (in %) from renewable sources (in terms of energy in kWh) of total consumption Non -Solar (2) 1.5% 2.5% 4% 4.5% 5%

Provided that 0.25% out of the renewable purchase obligation so specified in the year 2010-11 shall be procured from generation based on solar as renewable energy source and shall be increased at a rate of 0.25% every year thereafter till 2014-15 or until reviewed by the Commission. 24. Orissa Renewable Purchase Obligation (RPO) target Year (1) 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 Solar (2) 0.1% .15% .2% 0.25% 0.3% Minimum Quantum of purchase (in %) from renewable sources (in terms of energy in kWh) of total consumption Non -Solar (3) 1% 1.2% 1.4% 1.6% 1.8% 2% Co - generation 3.5% 3.7% 3.95% 4.2% 4.45% 4.7% Total (4) 4.5% 5% 5.5% 6% 6.5% 7%

25. West Bengal All efforts shall be made to meet the targets, in the table below for purchase of electricity by the licensees from cogeneration and renewable sources, expressed as percentage of their total consumption of electricity in a year during the years 2010 11 to 2012 13. year WBSEDCL % 2010-11 2011-12 2012-13 2 3 4 CESC Ltd % 2 3 4 Licensees DPL % 2 3 4 DPSC Ltd % 2 3 4 DVC % 2 3 4

The quantum of renewable purchase obligation indicated hereinbefore is with regard to the energy input in the system of a licensee after adjustment of losses. For subsequent years the increase shall be by 1% each year till 10% of the total consumption of electricity in the area of supply of a licensee is reached or the Commission fixes some other percentage of total consumption.

También podría gustarte