Está en la página 1de 1

13Ø1/2" c./0.20 P5(L=2.00m) 17Ø5/8" c./0.17 P8(L=2.

08m)

0.18
0.15

17Ø5/8" c./0.17 P8(L=2.08m)


13Ø1/2" c./0.20 P5(L=2.00m)

0.18
0.15

32Ø5/8" c./0.17 P10(L=4.15-3.46m)


26Ø1/2" c./0.20 P7(L=4.07-3.38m)
7Ø1/2" c./0.20

1.65
6Ø1/2" c./0.20 P14(L=8.58m)

1.65
B

B
P15(L=3.38m)

3.72-3.03
3.72-3.03
0.20
0.25

10Ø1/2" c./0.20 10Ø1/2" c./0.20 19Ø3/8" c./0.17 P4(L=4.09-8.29m)


A

A
P12(L=3.10m) P11(L=3.57m) 25Ø1/2" c./0.15 P1(L=3.55m)

0.20

0.25

25Ø1/2" c./0.15 P1(L=3.55m)

21Ø1/2" c./0.15 P3(L=4.19-8.39m)


13Ø1/2" c./0.20 P7(L=4.07-3.38m) 13Ø1/2" c./0.20 P7(L=4.07-3.38m) 16Ø5/8" c./0.17 P10(L=4.15-3.46m) 16Ø5/8" c./0.17 P10(L=4.15-3.46m)

ALCANTARILLA H=3.50m
REFUERZO MURO CONTRARIO AL LLENO ALCANTARILLA H=3.50m
Escala 1:50 REFUERZO MURO CONTRA EL LLENO
Escala 1:50
50Ø1/2" c./0.15 P1(L=3.55m)
3.15
0.20 0.20

ALCANTARILLA H=3.50m
REFUERZO EN ZAPATA CARTE C-C
Escala 1:50
7Ø1/2" c./0.20
P16(L=3.90m)

10Ø1/2" c./0.20 10Ø1/2" c./0.20


7Ø1/2" c./0.20
P11(L=3.57m) P11(L=3.57m)
P14(L=8.58m)

0.20

0.20
3.15

10Ø1/2" c./0.20 11Ø1/2" c./0.20 0.15 0.15


P15(L=3.38m) P15(L=3.38m) B=Variable
10Ø1/2" c./0.20 10Ø1/2" c./0.20
P12(L=3.10m) P12(L=3.10m) 0.15 0.15
B=Variable

0.13 0.13
0.58 0.58
B=Variable
7Ø1/2" c./0.20 P14(L=8.58m)
0.15 0.15

0.20
0.15
10
)
m

2.90
Ø
57

1/

1.65
3.

2"
L=

c.
1(

/0

0.20
0.25 0.25 0.15
P1

.2

69 0.15 0.15
2.

2.
0

B=Variable
69

P1
.2

69

2.
/0

2.

69
1(

0.30 0.30
c.

L=

0.25
0.18
2"

3.
1/

10
)

57


)
m

1.65

m
Ø

m
10
10

38

1/
1/

)
3.

2"
3.
2"

0.20
0.15
L=

c.
50

2.

(L
c.
2(

/0
50
/0

5
2.

0.

.2
B=Variable
P1

P1
.2 8

2.
.2

c. 2.9
15

0
15

98 (L=
0
0

P1
0
P1

0.
.2
0.

0.58

5
15
/0

3.46

/0
2(

15
c.

L=

22

0.
0.

69
2"

3
2"

22
0.15
3.

7Ø1/2" c./0.20 P16(L=3.90m)

0.

.3

2.
1/

1/
10

8m
5
Ø


0.

1
m

0.
10

5
)
15
)

1
0.
15

0.
15
0.
ALCANTARILLA H=3.50m ALCANTARILLA H=3.50m 0.15
REFUERZO MURO CORTE A-A REFUERZO MURO CORTE B-B 0.30
Escala 1:50

50
15
Escala 1:50

2.
0.
2.90

2.
9

6
6

9
2.
15

0.
15
0.
0.15
25Ø1/2" c./0.15 P1(L=3.55m) 25Ø1/2" c./0.15 P1(L=3.55m)

0.
14Ø1/2" c./0.15 P2(L=2.26*m) 14Ø1/2" c./0.15 P2(L=2.26*m) 14Ø1/2" c./0.15 P2(L=2.26*m) 14Ø1/2" c./0.15 P2(L=2.26*m) 2.98

25
3.46
C

0.
2

22
2
0.
19Ø3/8" c./0.17 P4(L=4.09-8.29m) 21Ø1/2" c./0.15 P3(L=4.19-8.39m)

0.11

0.29
0.1
1

0.18 0.18
C

2.23
0.13 0.13 0.15 0.15
a=3.83-8.03 a=3.89-8.09
19Ø3/8" c./0.17 P4(L=4.09-8.29m) 21Ø1/2" c./0.15 P3(L=4.19-8.39m)

ALCANTARILLA H=3.50m ALCANTARILLA H=3.50m


REFUERZO SUPERIOR EN ZAPATA REFUERZO INFERIOR EN ZAPATA
Escala 1:50 Escala 1:50

PROYECTO: REVISIONES: LEVANTAMIENTO TOPOGRÁFICO: DIRECTOR DE CONSULTORÍA: DIRECTOR DE INTERVENTORÍA : CONTIENE: ESCALA : PLANCHA No :
CONTRATO DE CONSULTORÍA 02800/2019
ESTUDIOS Y DISEÑOS PARA EL MEJORAMIENTO DE LA VÍA ASTILLEROS-TIBÚ VERSIÓN 0: JUNIO 2020
TOPOCONSTRUCCIONES JORGE BARRERA CORTES MAIRA ALEJANDRA PICÓN GARCÍA
Luis Medina Navarro. M. P. 01-14186 DETALLES ESTRUCTURALES, TABLAS Y NOTAS
TRAMOS PR 41+000-PR 42+500, PR 43+200-PR 44+000 Y PR 53+000-PR 67+700 MP. 54202 - 35226 NTS Esp. en vías terrestres MP. 54202-100974 NTS
INDICADA
DEPARTAMENTO DE NORTE DE SANTANDER DISEÑO GEOMÉTRICO: DISEÑO ESTRUCTURAL: REVISÓ : BOX CULVERT K59+510
OBRAS DE MANEJO DE AGUAS SUPERFICIALES
01 DE 05
CONSULTOR: INTERVENTOR: LUIS CARLOS RIVERA EDGAR VILLEGAS PALLARES VÍA ASTILLEROS-TIBÚ
Esp. en estructuras MP. 54202-148944 NTS M.P. 54202-136467 NTS ARCHIVO :

P&D UNIÓN TEMPORAL ASTILLEROS - TIBÚ


DIGITALIZÓ: ESTUDIO GEOTÉCNICO: SUPERVISOR DELEGADO POR LA GOBERNACIÓN:
CÓDIGO PLANCHA:
AST-TIB-OMAS-K59+510.DWG

FECHA :
CONSECUTIVO:
PLANEACIÓN Y DESARROLLO LTDA.
CONSULTORES
LEIDY PAOLA ARENAS MALDONADO
MP.54202 - 430026 NTS
CAMILO GARCÍA DIAZ
Esp. en geotécnica vial MP. 15202-242664 BYC
JORGE ARIAS SANGUINO
M.P. 54202-007398 NTS AST-TIB-OMAS-K59+510 - 01 JUNIO 2020
01 DE 05

También podría gustarte