PROYECTO: MEJORAMIENTO DE LOS EMISORES PRINCIPALES DE CHICLAYO

UBICACIÓN: DISTRITO - CHICLAYO PROVINCIA - CHICLAYO DEPARTAMENTO - LAMBAYEQ


CALCULO DE LA PROFUNDIDAD DE LOS BUZONES: COLECTO
tramo Diametro c.t.i. c.f.i. H. fondo
Inicio (m) (msnm) (msnm) (m) H < 2.00 m
I 0.60 25.165 20.389 4.776 - - 1.00
II 0.60 25.128 20.300 4.828 - - 1.00
III 0.60 25.086 20.211 4.875 - - 1.00
IV 0.60 24.919 20.123 4.796 - - 1.00
V 0.60 24.971 20.033 4.938 - - 1.00
VI 0.60 24.971 19.944 5.027 - - 1.00
VII 0.60 24.846 19.856 4.990 - - 1.00
VIII 0.60 24.644 19.767 4.877 - - 1.00
IX 0.60 24.782 19.677 5.105 - - 1.00
X 0.90 24.667 19.580 5.087 - - 1.00
XI 0.90 24.484 19.465 5.019 - - 1.00
XII 0.90 24.431 19.349 5.082 - - 1.00
XIII 0.40 24.281 22.611 1.670
XIV 0.40 24.351 22.331 2.020
XV 0.40 24.342 21.901 2.441
XVI 0.45 24.402 19.732 4.670
XVII 0.45 24.603 19.603 5.000
XVIII 0.45 24.513 19.113 5.400
XIX 0.45 24.524 19.142 5.382

I II 4.776 4.828 4.802 80.00 3.09


II III 4.828 4.875 4.852 80.00
III IV 4.875 4.796 4.836 80.00
IV V 4.796 4.938 4.867 80.50
V VI 4.938 5.027 4.983 80.00
VI VII 5.027 4.990 5.009 80.00
VII VIII 4.990 4.877 4.934 80.50
VIII IX 4.877 5.005 4.941 80.50
IX X 5.005 5.087 5.046 85.00
X XI 5.087 5.019 5.053 104.00
XI XII 5.019 5.082 5.051 101.50
XII B00 5.082 5.300 5.191 93.00
XIII XIV 1.670 2.020 1.845 60.00
XIV XV 2.020 2.441 2.231 65.00
XV XVI 2.441 4.670 3.556 71.00
XVI XVII 4.670 5.000 4.835 50.00
XVII XVIII 5.000 5.400 5.200 50.00 296.00
XVIII XIX 5.400 5.382 5.391 65.00
XIX B00 5.382 5.300 5.341 50.00 115.00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

BUZON ARRANQUE PENDIENTE BUZON LLEGADA


BZ. SAL. LONGITUD BZ. LLEG.
(o/oo)
COTA TAPA COTA FONDOPROFUNDIDAD COTA TAPA
I 25.165 20.389 1.20 80.00 1.10 II 25.128
II 25.128 20.301 4.83 80.00 1.10 III 25.086
III 25.086 20.213 4.87 80.00 1.10 IV 24.919
IV 24.919 20.125 4.79 80.50 1.10 V 24.971
V 24.971 20.036 4.93 80.00 1.10 VI 24.971
VI 24.971 19.948 5.02 80.00 1.10 VII 24.846
VII 24.846 19.860 4.99 80.50 1.10 VIII 24.644
VIII 24.644 19.772 4.87 80.50 1.10 IX 24.782
IX 24.782 19.683 5.10 85.00 1.10 X 24.667
X 24.667 19.590 5.08 104.00 1.10 XI 24.484
XI 24.484 19.475 5.01 101.50 1.10 XII 24.431
XII 24.431 19.364 5.07 93.00 1.10 B00 24.552
XIII 24.281 22.481 1.80 60.00 4.00 XIV 24.351
XIV 24.351 22.241 2.11 65.00 6.00 XV 24.342
XV 24.342 21.851 2.49 71.00 8.00 XVI 24.402
XVI 24.402 20.209 4.19 50.00 2.00 XVII 24.603
XVII 24.603 20.109 4.49 50.00 2.00 XVIII 24.513
XVIII 24.513 20.009 4.50 65.00 2.00 XIX 24.524
XIX 24.524 19.879 4.65 50.00 2.00 B00 24.552

1436.00

XIX 0.45 24.524 19.142 5.382


AMENTO - LAMBAYEQUE
NES: COLECTOR LOS INCAS

2.00 <H <2,50 2.50 <H <3.00 3.00 <H <3,50


- - 1.00 - 0 1 -
- - 1.00 - 0 1 -
- - 1.00 - 0 1 -
- - 1.00 - 0 1 -
- - 1.00 - 0 1 -
- - 1.00 - 0 1 -
- - 1.00 - 0 1 -
- - 1.00 - 0 1 -
- - 1.00 - 0 1 -
- - 1.00 - 0 1 -
- - 1.00 - 0 1 -
- - 1.00 - 0 1 -

- - -

XIII XIV 1.670 2.020 1.845 60.00 60.00


XIV XV 2.020 2.441 2.231 65.00 65.00
XV XVI 2.441 4.670 3.556 71.00
I II 4.776 4.828 4.802 80.00
XVI XVII 4.670 5.000 4.835 50.00
III IV 4.875 4.796 4.836 80.00
II III 4.828 4.875 4.852 80.00
IV V 4.796 4.938 4.867 80.50
VII VIII 4.990 4.877 4.934 80.50
VIII IX 4.877 5.005 4.941 80.50
V VI 4.938 5.027 4.983 80.00 682.50
VI VII 5.027 4.990 5.009 80.00
IX X 5.005 5.087 5.046 85.00
XI XII 5.019 5.082 5.051 101.50
X XI 5.087 5.019 5.053 104.00
XII B00 5.082 5.300 5.191 93.00
XVII XVIII 5.000 5.400 5.200 50.00
XIX B00 5.382 5.300 5.341 50.00
XVIII XIX 5.400 5.382 5.391 65.00 628.50
1,436.00

XIII 1.670 hasta 2 1


XIV 2.020
XV 2.441 hasta 2.5 2
XVI 4.670
I 4.776
IV 4.796
II 4.828
III 4.875
VIII 4.877
V 4.938
VII 4.990
XVII 5.000 hasta 5 9
IX 5.005
XI 5.019
VI 5.027
XII 5.082
X 5.087
XIX 5.382
XVIII 5.400 hasta 5.5 7

BUZON LLEGADA
COTA FONDO PROFUNDIDAD
20.301 4.83 Av. Los Incas
20.213 4.87 Av. Los Incas
20.125 4.79 Av. Los Incas
20.036 4.93 Av. Los Incas
19.948 5.02 Av. Los Incas
19.860 4.99 Av. Los Incas
19.772 4.87 Av. Los Incas
19.683 5.10 Av. Los Incas
19.590 5.08 Av. Los Incas
19.475 5.01 Av. Los Incas
19.364 5.07 Av. Los Incas
19.262 5.29 Av. Los Incas
22.241 2.11 Av. Los Incas
21.851 2.49 Av. Los Incas
21.283 3.12 Av. Los Incas LLEGA 2.441
20.109 4.49 Av. Los Incas 4.67
20.009 4.50 Av. Los Incas 5
19.879 4.65 Av. Los Incas 5.4
19.779 4.77 Av. Los Incas LLEGA 5.382
LONG. X PROFUNDIDAD DEL TRAMO (m)
00 <H <3,50 3,50 <H < 4.00 4,00 <H < 4,50 4,50 <H < 5.00
0 1 - 0 1 - 1 1
0 1 - 0 1 - 1 1
0 1 - 0 1 - 1 1
0 1 - 0 1 - 1 1
0 1 - 0 1 - 1 1
0 1 - 0 1 - 0 1
0 1 - 0 1 - 1 1
0 1 - 0 1 - 1 1
0 1 - 0 1 - 0 1
0 1 - 0 1 - 0 1
0 1 - 0 1 - 0 1
0 1 - 0 1 - 0 1

- - -

hasta 2 1.35 81.00 1.5 2 1.75 141.75


hasta 2.5 1.35 87.75 1.5 2 1.75 153.56
1.35 95.85 2.5 3 2.75 263.59
1.35 108.00 2.5 3 2.75 297.00
1.35 67.50 2.5 3 2.75 185.63
1.35 108.00 2.5 3 2.75 297.00
1.35 108.00 2.5 3 2.75 297.00
1.35 108.68 2.5 3 2.75 298.86
1.35 108.68 2.5 3 2.75 298.86
1.35 108.68 2.5 3 2.75 298.86
hasta 5.00 1.35 108.00 2.5 3 2.75 297.00
1.35 108.00 2.5 3.5 3 324.00
1.35 114.75 2.5 3.5 3 344.25
1.65 167.48 2.5 3.5 3 502.43
1.65 171.60 2.5 3.5 3 514.80
1.65 153.45 2.5 3.5 3 460.35
1.35 67.50 2.5 3.5 3 202.50
1.35 67.50 2.5 3.5 3 202.50
hasta 5.50 1.35 87.75 2.5 3.5 3 263.25
5643.17
4,50 <H < 5.00 5,00 <H <5,50 5,50 <H < 6.00
1.00 1 0 - 1 0 - 1
1.00 1 0 - 1 0 - 1
1.00 1 0 - 1 0 - 1
1.00 1 0 - 1 0 - 1
1.00 1 0 - 1 0 - 1
- 1 1 1.00 1 0 - 1
1.00 1 0 - 1 0 - 1
1.00 1 0 - 1 0 - 1
- 1 1 1.00 1 0 - 1
- 1 1 1.00 1 0 - 1
- 1 1 1.00 1 0 - 1
- 1 1 1.00 1 0 - 1

7.00 5.00 -
6,00 <H < 6.50 6,50 <H < 7,00
7,00 <H < 7,50
0 - 1 0 - -
0 - 1 0 - -
0 - 1 0 - -
0 - 1 0 - -
0 - 1 0 - -
0 - 1 0 - -
0 - 1 0 - -
0 - 1 0 - -
0 - 1 0 - -
0 - 1 0 - -
0 - 1 0 - -
0 - 1 0 - -

- - -
PLANILLA DE METRADOS
OBRA : MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS PERIMETRO ENTRE AV. UNION, LOS INCAS, LOS ANDES Y GRAU
UBICACIÓN : LA VICTORIA - CHICLAYO - LAMBAYEQUE
FORMULA : COLECTOR AV. LOS INCAS

DIMENSIONES
ITEM DESCRIPCIÓN UND ELEMENTO CANT PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
01.01.0 EMISOR SUR
01.01.1 TRABAJOS PRELIMINARES
01.01.2 TRAZO, NIVELACIÓN Y REPLANTEO INICIAL m 1,436.00
I II 1.00 80.00 80.00
II III 1.00 80.00 80.00
III IV 1.00 80.00 80.00
IV V 1.00 80.50 80.50
V VI 1.00 80.00 80.00
VI VII 1.00 80.00 80.00
VII VIII 1.00 80.50 80.50
VIII IX 1.00 80.50 80.50
IX X 1.00 85.00 85.00
X XI 1.00 104.00 104.00
XI XII 1.00 101.50 101.50
XII B00 1.00 93.00 93.00
XIII XIV 1.00 60.00 60.00
XIV XV 1.00 65.00 65.00
XV XVI 1.00 71.00 71.00
XVI XVII 1.00 50.00 50.00
XVII XVIII 1.00 50.00 50.00
XVIII XIX 1.00 65.00 65.00
XIX B00 1.00 50.00 50.00

01.01.2 TRAZO, NIVELACIÓN Y REPLANTEO DURANTE LA EJECUCIÓN DE OBRA m 1,436.00


I II 1.00 80.00 80.00
II III 1.00 80.00 80.00
III IV 1.00 80.00 80.00
IV V 1.00 80.50 80.50
V VI 1.00 80.00 80.00
PLANILLA DE METRADOS
OBRA : MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS PERIMETRO ENTRE AV. UNION, LOS INCAS, LOS ANDES Y GRAU
UBICACIÓN : LA VICTORIA - CHICLAYO - LAMBAYEQUE
FORMULA : COLECTOR AV. LOS INCAS

DIMENSIONES
ITEM DESCRIPCIÓN UND ELEMENTO CANT PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
VI VII 1.00 80.00 80.00
VII VIII 1.00 80.50 80.50
VIII IX 1.00 80.50 80.50
IX X 1.00 85.00 85.00
X XI 1.00 104.00 104.00
XI XII 1.00 101.50 101.50
XII B00 1.00 93.00 93.00
XIII XIV 1.00 60.00 60.00
XIV XV 1.00 65.00 65.00
XV XVI 1.00 71.00 71.00
XVI XVII 1.00 50.00 50.00
XVII XVIII 1.00 50.00 50.00
XVIII XIX 1.00 65.00 65.00
XIX B00 1.00 50.00 50.00

01.01.3 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00


1.00 1.00 1.00

01.01.4 DEMOLICION DE PAVIMENTO FLEXIBLE m2 18,124.40


PROPORCIONADO POR EL AUTOCAD AV LOS INCAS 1.00 18,124.40 18,124.40

01.02.0 MOVIMIENTO DE TIERRAS


01.02.01 EXCAVACION DE ZANJAS 1,436.00
01.02.01.1 EXCAVACION DE ZANJAS C/EQUIPO HASTA 2,00 m, af=1.50m m XIII XIV 1.00 60.00 60.00 60.00

01.02.01.2 EXCAVACION DE ZANJAS C/EQUIPO HASTA 2,50 m, af=1.50m m XIV XV 1.00 65.00 65.00 65.00

01.02.01.3 EXCAVACION DE ZANJAS C/EQUIPO HASTA 3,50 m, af=1.50m m XV XVI 1.00 71.00 71.00 71.00
PLANILLA DE METRADOS
OBRA : MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS PERIMETRO ENTRE AV. UNION, LOS INCAS, LOS ANDES Y GRAU
UBICACIÓN : LA VICTORIA - CHICLAYO - LAMBAYEQUE
FORMULA : COLECTOR AV. LOS INCAS

DIMENSIONES
ITEM DESCRIPCIÓN UND ELEMENTO CANT PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
01.02.01.4 EXCAVACION DE ZANJAS C/EQUIPO HASTA 5,00 m, af=2.50m m I II 1.00 80.00 80.00 611.50
XVI XVII 1.00 50.00 50.00
III IV 1.00 80.00 80.00
II III 1.00 80.00 80.00
IV V 1.00 80.50 80.50
VII VIII 1.00 80.50 80.50
VIII IX 1.00 80.50 80.50
V VI 1.00 80.00 80.00

01.02.01.5 EXCAVACION DE ZANJAS C/EQUIPO HASTA 5,50 m, af=2.50m m VI VII 1.00 80.00 80.00 628.50
IX X 1.00 85.00 85.00
XI XII 1.00 101.50 101.50
X XI 1.00 104.00 104.00
XII B00 1.00 93.00 93.00
XVII XVIII 1.00 50.00 50.00
XIX B00 1.00 50.00 50.00
XVIII XIX 1.00 65.00 65.00

01.02.02 REFINE Y NIVELACION DE ZANJAS


01.02.02.1 REFINE Y NIVELACION DE FONDO DE ZANJAS m 1,436.00
I II 1.00 80.00 80.00
II III 1.00 80.00 80.00
III IV 1.00 80.00 80.00
IV V 1.00 80.50 80.50
V VI 1.00 80.00 80.00
VI VII 1.00 80.00 80.00
VII VIII 1.00 80.50 80.50
VIII IX 1.00 80.50 80.50
IX X 1.00 85.00 85.00
PLANILLA DE METRADOS
OBRA : MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS PERIMETRO ENTRE AV. UNION, LOS INCAS, LOS ANDES Y GRAU
UBICACIÓN : LA VICTORIA - CHICLAYO - LAMBAYEQUE
FORMULA : COLECTOR AV. LOS INCAS

DIMENSIONES
ITEM DESCRIPCIÓN UND ELEMENTO CANT PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
X XI 1.00 104.00 104.00
XI XII 1.00 101.50 101.50
XII B00 1.00 93.00 93.00
XIII XIV 1.00 60.00 60.00
XIV XV 1.00 65.00 65.00
XV XVI 1.00 71.00 71.00
XVI XVII 1.00 50.00 50.00
XVII XVIII 1.00 50.00 50.00
XVIII XIX 1.00 65.00 65.00
XIX B00 1.00 50.00 50.00

01.02.03 CAMA DE APOYO PARA TUBERIAS


01.02.03.1 CAMA DE APOYO (Equipo 2) C/RIPIO CORRIENTE Ø=3/4", af=2.50m m 1,436.00
I II 1.00 80.00 80.00
II III 1.00 80.00 80.00
III IV 1.00 80.00 80.00
IV V 1.00 80.50 80.50
V VI 1.00 80.00 80.00
VI VII 1.00 80.00 80.00
VII VIII 1.00 80.50 80.50
VIII IX 1.00 80.50 80.50
IX X 1.00 85.00 85.00
X XI 1.00 104.00 104.00
XI XII 1.00 101.50 101.50
XII B00 1.00 93.00 93.00
XIII XIV 1.00 60.00 60.00
XIV XV 1.00 65.00 65.00
XV XVI 1.00 71.00 71.00
XVI XVII 1.00 50.00 50.00
PLANILLA DE METRADOS
OBRA : MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS PERIMETRO ENTRE AV. UNION, LOS INCAS, LOS ANDES Y GRAU
UBICACIÓN : LA VICTORIA - CHICLAYO - LAMBAYEQUE
FORMULA : COLECTOR AV. LOS INCAS

DIMENSIONES
ITEM DESCRIPCIÓN UND ELEMENTO CANT PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
XVII XVIII 1.00 50.00 50.00
XVIII XIX 1.00 65.00 65.00
XIX B00 1.00 50.00 50.00

01.02.04 RELLENO, APISONADO Y COMP. LATERAL CON MATERIAL DE PRESTAMO


01.02.04.1 RELLENO LATERAL C/MATERIAL D/PRESTAMO (RIPIO CORRIENTE Ø=3/4") c/equipo/ p/t m 1,436.00
I II 1.00 80.00 80.00
II III 1.00 80.00 80.00
III IV 1.00 80.00 80.00
IV V 1.00 80.50 80.50
V VI 1.00 80.00 80.00
VI VII 1.00 80.00 80.00
VII VIII 1.00 80.50 80.50
VIII IX 1.00 80.50 80.50
IX X 1.00 85.00 85.00
X XI 1.00 104.00 104.00
XI XII 1.00 101.50 101.50
XII B00 1.00 93.00 93.00
XIII XIV 1.00 60.00 60.00
XIV XV 1.00 65.00 65.00
XV XVI 1.00 71.00 71.00
XVI XVII 1.00 50.00 50.00
XVII XVIII 1.00 50.00 50.00
XVIII XIX 1.00 65.00 65.00
XIX B00 1.00 50.00 50.00

01.02.04.2 RELLENO Y COMPACTACION (c/equipo1) Hasta 0.30m s/clave del tubo Ø1000 (Ripio Corrie m 1,436.00
I II 1.00 80.00 80.00
II III 1.00 80.00 80.00
PLANILLA DE METRADOS
OBRA : MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS PERIMETRO ENTRE AV. UNION, LOS INCAS, LOS ANDES Y GRAU
UBICACIÓN : LA VICTORIA - CHICLAYO - LAMBAYEQUE
FORMULA : COLECTOR AV. LOS INCAS

DIMENSIONES
ITEM DESCRIPCIÓN UND ELEMENTO CANT PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
III IV 1.00 80.00 80.00
IV V 1.00 80.50 80.50
V VI 1.00 80.00 80.00
VI VII 1.00 80.00 80.00
VII VIII 1.00 80.50 80.50
VIII IX 1.00 80.50 80.50
IX X 1.00 85.00 85.00
X XI 1.00 104.00 104.00
XI XII 1.00 101.50 101.50
XII B00 1.00 93.00 93.00
XIII XIV 1.00 60.00 60.00
XIV XV 1.00 65.00 65.00
XV XVI 1.00 71.00 71.00
XVI XVII 1.00 50.00 50.00
XVII XVIII 1.00 50.00 50.00
XVIII XIX 1.00 65.00 65.00
XIX B00 1.00 50.00 50.00

01.02.06 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO

01.02.06.1 RELLENO Y COMPACTACION C/MAT DE PRESTAMO (RIPIO CORRIENTE) Cap. = 0.20m M 1,436.00
I II 1.00 80.00 80.00
II III 1.00 80.00 80.00
III IV 1.00 80.00 80.00
IV V 1.00 80.50 80.50
V VI 1.00 80.00 80.00
VI VII 1.00 80.00 80.00
VII VIII 1.00 80.50 80.50
VIII IX 1.00 80.50 80.50
PLANILLA DE METRADOS
OBRA : MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS PERIMETRO ENTRE AV. UNION, LOS INCAS, LOS ANDES Y GRAU
UBICACIÓN : LA VICTORIA - CHICLAYO - LAMBAYEQUE
FORMULA : COLECTOR AV. LOS INCAS

DIMENSIONES
ITEM DESCRIPCIÓN UND ELEMENTO CANT PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
IX X 1.00 85.00 85.00
X XI 1.00 104.00 104.00
XI XII 1.00 101.50 101.50
XII B00 1.00 93.00 93.00
XIII XIV 1.00 60.00 60.00
XIV XV 1.00 65.00 65.00
XV XVI 1.00 71.00 71.00
XVI XVII 1.00 50.00 50.00
XVII XVIII 1.00 50.00 50.00
XVIII XIX 1.00 65.00 65.00
XIX B00 1.00 50.00 50.00

01.02.06.2 RELLENO Y COMPACTACION C/MAT PROPIO SELECCIONADO Cap. = 0.20m M 1,436.00


I II 1.00 80.00 80.00
II III 1.00 80.00 80.00
III IV 1.00 80.00 80.00
IV V 1.00 80.50 80.50
V VI 1.00 80.00 80.00
VI VII 1.00 80.00 80.00
VII VIII 1.00 80.50 80.50
VIII IX 1.00 80.50 80.50
IX X 1.00 85.00 85.00
X XI 1.00 104.00 104.00
XI XII 1.00 101.50 101.50
XII B00 1.00 93.00 93.00
XIII XIV 1.00 60.00 60.00
XIV XV 1.00 65.00 65.00
XV XVI 1.00 71.00 71.00
XVI XVII 1.00 50.00 50.00
PLANILLA DE METRADOS
OBRA : MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS PERIMETRO ENTRE AV. UNION, LOS INCAS, LOS ANDES Y GRAU
UBICACIÓN : LA VICTORIA - CHICLAYO - LAMBAYEQUE
FORMULA : COLECTOR AV. LOS INCAS

DIMENSIONES
ITEM DESCRIPCIÓN UND ELEMENTO CANT PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
XVII XVIII 1.00 50.00 50.00
XVIII XIX 1.00 65.00 65.00
XIX B00 1.00 50.00 50.00
01.02.07 ACARREO Y ELIMINACION MATERIAL EXCEDENTE
01.02.07.1 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE Dist. min = 5.0Km m3 7,336.13
MATERIAL EXCAVADO
XIII XIV 1.00 141.75
XIV XV 1.00 153.56
XV XVI 1.00 263.59
I II 1.00 297.00
XVI XVII 1.00 185.63
III IV 1.00 297.00
II III 1.00 297.00
IV V 1.00 298.86
VII VIII 1.00 298.86
VIII IX 1.00 298.86
V VI 1.00 297.00
VI VII 1.00 324.00
IX X 1.00 344.25
XI XII 1.00 502.43
X XI 1.00 514.80
XII B00 1.00 460.35
XVII XVIII 1.00 202.50
XIX B00 1.00 202.50
XVIII XIX 1.00 263.25

MATERIAL A ELIMINAR 5,643.17


% ESPONJAMIENTO (30%) 1,692.95
TOTAL A ELIMINAR 7,336.13 7,336.13
PLANILLA DE METRADOS
OBRA : MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS PERIMETRO ENTRE AV. UNION, LOS INCAS, LOS ANDES Y GRAU
UBICACIÓN : LA VICTORIA - CHICLAYO - LAMBAYEQUE
FORMULA : COLECTOR AV. LOS INCAS

DIMENSIONES
ITEM DESCRIPCIÓN UND ELEMENTO CANT PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO

01.02.08 BOMBEO EN ZANJAS


01.02.08.1 DRENAJE DE ZANJAS C/EQUIPO HASTA 2.50 m m 125.00
XIII XIV 1.00 60.00 60.00
XIV XV 1.00 65.00 65.00

01.02.08.2 DRENAJE DE ZANJAS C/EQUIPO HASTA 5.00 m m 682.50


XV XVI 1.00 71.00 71.00
I II 1.00 80.00 80.00
XVI XVII 1.00 50.00 50.00
III IV 1.00 80.00 80.00
II III 1.00 80.00 80.00
IV V 1.00 80.50 80.50
VII VIII 1.00 80.50 80.50
VIII IX 1.00 80.50 80.50
V VI 1.00 80.00 80.00

01.02.08.3 DRENAJE DE ZANJAS C/EQUIPO HASTA 5.50 m m 628.50


VI VII 1.00 80.00 80.00
IX X 1.00 85.00 85.00
XI XII 1.00 101.50 101.50
X XI 1.00 104.00 104.00
XII B00 1.00 93.00 93.00
XVII XVIII 1.00 50.00 50.00
XIX B00 1.00 50.00 50.00
XVIII XIX 1.00 65.00 65.00

01.02.09 ENTIBADO DE ZANJAS


01.02.09.1 ENTIBADO DE ZANJAS HASTA 2.50 m m 125.00
PLANILLA DE METRADOS
OBRA : MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS PERIMETRO ENTRE AV. UNION, LOS INCAS, LOS ANDES Y GRAU
UBICACIÓN : LA VICTORIA - CHICLAYO - LAMBAYEQUE
FORMULA : COLECTOR AV. LOS INCAS

DIMENSIONES
ITEM DESCRIPCIÓN UND ELEMENTO CANT PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
XIII XIV 1.00 60.00 60.00
XIV XV 1.00 65.00 65.00

01.02.09.2 ENTIBADO DE ZANJAS HASTA 5.00 m m 682.50


XV XVI 1.00 71.00 71.00
I II 1.00 80.00 80.00
XVI XVII 1.00 50.00 50.00
III IV 1.00 80.00 80.00
II III 1.00 80.00 80.00
IV V 1.00 80.50 80.50
VII VIII 1.00 80.50 80.50
VIII IX 1.00 80.50 80.50
V VI 1.00 80.00 80.00

01.02.09.3 ENTIBADO DE ZANJAS HASTA 5.50 m m 628.50


VI VII 1.00 80.00 80.00
IX X 1.00 85.00 85.00
XI XII 1.00 101.50 101.50
X XI 1.00 104.00 104.00
XII B00 1.00 93.00 93.00
XVII XVIII 1.00 50.00 50.00
XIX B00 1.00 50.00 50.00
XVIII XIX 1.00 65.00 65.00

01.03.00 TUBERIAS GRP PN 1 SN 2500 1,436.00


01.03.01.1 SUMINISTRO E INSTALACION TUB.GRP,PN 1 -SN 2500, Ø 400 mm X 5,80 m m 296.00
XIII XIV 1.00 60.00 60.00
XIV XV 1.00 65.00 65.00
XV XVI 1.00 71.00 71.00
PLANILLA DE METRADOS
OBRA : MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS PERIMETRO ENTRE AV. UNION, LOS INCAS, LOS ANDES Y GRAU
UBICACIÓN : LA VICTORIA - CHICLAYO - LAMBAYEQUE
FORMULA : COLECTOR AV. LOS INCAS

DIMENSIONES
ITEM DESCRIPCIÓN UND ELEMENTO CANT PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
XVI XVII 1.00 50.00 50.00
XVII XVIII 1.00 50.00 50.00

01.03.01.2 SUMINISTRO E INSTALACION TUB.GRP,PN 1 -SN 2500, Ø 450 mm X 5,80 m m 115.00


XVIII XIX 1.00 65.00 65.00
XIX B00 1.00 50.00 50.00

01.03.01.2 SUMINISTRO E INSTALACION TUB.GRP,PN 1 -SN 2500, Ø 600 mm X 5,80 m m 726.50


I II 1.00 80.00 80.00
III IV 1.00 80.00 80.00
II III 1.00 80.00 80.00
IV V 1.00 80.50 80.50
VII VIII 1.00 80.50 80.50
VIII IX 1.00 80.50 80.50
V VI 1.00 80.00 80.00
VI VII 1.00 80.00 80.00
IX X 1.00 85.00 85.00

01.03.01.2 SUMINISTRO E INSTALACION TUB.GRP,PN 1 -SN 2500, Ø 900 mm X 5,80 m m 298.50


XI XII 1.00 101.50 101.50
X XI 1.00 104.00 104.00
XII B00 1.00 93.00 93.00

01.04.00 PRUEBAS HIDRAULICAS


01.04.01 DOBLE PRUEBA HIDRAULICA P/TUB. GRP PN 1 SN 2500 Ø=400mm m 296.00
XIII XIV 1.00 60.00 60.00
XIV XV 1.00 65.00 65.00
XV XVI 1.00 71.00 71.00
XVI XVII 1.00 50.00 50.00
PLANILLA DE METRADOS
OBRA : MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS PERIMETRO ENTRE AV. UNION, LOS INCAS, LOS ANDES Y GRAU
UBICACIÓN : LA VICTORIA - CHICLAYO - LAMBAYEQUE
FORMULA : COLECTOR AV. LOS INCAS

DIMENSIONES
ITEM DESCRIPCIÓN UND ELEMENTO CANT PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
XVII XVIII 1.00 50.00 50.00

01.04.02 DOBLE PRUEBA HIDRAULICA P/TUB. GRP PN 1 SN 2500 Ø=450mm m 115.00


XVIII XIX 1.00 65.00 65.00
XIX B00 1.00 50.00 50.00

01.04.03 DOBLE PRUEBA HIDRAULICA P/TUB. GRP PN 1 SN 2500 Ø=600mm m 726.50


I II 1.00 80.00 80.00
III IV 1.00 80.00 80.00
II III 1.00 80.00 80.00
IV V 1.00 80.50 80.50
VII VIII 1.00 80.50 80.50
VIII IX 1.00 80.50 80.50
V VI 1.00 80.00 80.00
VI VII 1.00 80.00 80.00
IX X 1.00 85.00 85.00

01.04.04 DOBLE PRUEBA HIDRAULICA P/TUB. GRP PN 1 SN 2500 Ø=900mm m 298.50


XI XII 1.00 101.50 101.50
X XI 1.00 104.00 104.00
XII B00 1.00 93.00 93.00

01.05.00 BUZONES
01.05.01 BUZON TIPO "A" Ø Int. 1.20m ,PROF.= 2.00 m und 1.00
XIII 1.00 1.00

01.05.02 BUZON TIPO "A" Ø Int. 1.20m ,PROF.= 2.50 m und 2.00
XIV 1.00 1.00
XV 1.00 1.00
PLANILLA DE METRADOS
OBRA : MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS PERIMETRO ENTRE AV. UNION, LOS INCAS, LOS ANDES Y GRAU
UBICACIÓN : LA VICTORIA - CHICLAYO - LAMBAYEQUE
FORMULA : COLECTOR AV. LOS INCAS

DIMENSIONES
ITEM DESCRIPCIÓN UND ELEMENTO CANT PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO

01.05.03 BUZON TIPO "C" Ø Int. 1.50m ,PROF.= 5,00 m und 9.00
XVI 1.00 1.00
I 1.00 1.00
IV 1.00 1.00
II 1.00 1.00
III 1.00 1.00
VIII 1.00 1.00
V 1.00 1.00
VII 1.00 1.00
XVII 1.00 1.00

01.05.04 BUZON TIPO "C" Ø Int. 1.50m ,PROF. = 5,50 m und 7.00
IX 1.00 1.00
XI 1.00 1.00
VI 1.00 1.00
XII 1.00 1.00
X 1.00 1.00
XIX 1.00 1.00
XVIII 1.00 1.00

01.05.05 EMPALME A BUZON Y CONSTRUCCION DADO D/CONCRETO 0.80 X 0.80X 0,80 F'C=175 und 42.00
42.00 42.00

01.05.06 EMPALME A BUZON Y CONSTRUCCION DADO D/CONCRETO 1.20 X 1.20X 0,80 F'C=175 und 6.00
6.00 6.00

01.05.07 BY PASS DE AGUAS SERVIDAS m 1,436.00


I II 1.00 80.00 80.00
PLANILLA DE METRADOS
OBRA : MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS PERIMETRO ENTRE AV. UNION, LOS INCAS, LOS ANDES Y GRAU
UBICACIÓN : LA VICTORIA - CHICLAYO - LAMBAYEQUE
FORMULA : COLECTOR AV. LOS INCAS

DIMENSIONES
ITEM DESCRIPCIÓN UND ELEMENTO CANT PARCIAL TOTAL OBSERVACIONES
LARGO ANCHO ALTO
II III 1.00 80.00 80.00
III IV 1.00 80.00 80.00
IV V 1.00 80.50 80.50
V VI 1.00 80.00 80.00
VI VII 1.00 80.00 80.00
VII VIII 1.00 80.50 80.50
VIII IX 1.00 80.50 80.50
IX X 1.00 85.00 85.00
X XI 1.00 104.00 104.00
XI XII 1.00 101.50 101.50
XII B00 1.00 93.00 93.00
XIII XIV 1.00 60.00 60.00
XIV XV 1.00 65.00 65.00
XV XVI 1.00 71.00 71.00
XVI XVII 1.00 50.00 50.00
XVII XVIII 1.00 50.00 50.00
XVIII XIX 1.00 65.00 65.00
XIX B00 1.00 50.00 50.00

01.06.00 REPOSICION DE PAVIMENTOS


01.06.01 REPOSICIÓN DE PAVIMENTO FLEXIBLE EN CALIENTE E = 2" m2 18,124.40
PROPORCIONADO POR EL AUTOCAD AV LOS INCAS 1.00 18,124.40 18,124.40

01.07.00 VARIOS 1.00


01.07.01 REPOSICION DE CONEXIONES DETERIORADAS GLB 1.00 1.00 1.00
HOJA DE METRADOS

MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES


OBRA :
DOMICILIARIAS PERIMETRO ENTRE AV. UNION, LOS INCAS, LOS ANDES Y GRAU
UBICACIÓN : CHICLAYO - LAMBAYEQUE
FORMULA : COLECTOR AV. LOS INCAS

ITEM DESCRIPCION UND TOTAL

01.01.0 EMISOR SUR


01.01.1 TRABAJOS PRELIMINARES
01.01.2 TRAZO, NIVELACIÓN Y REPLANTEO INICIAL m 1,436.00
01.01.2 TRAZO, NIVELACIÓN Y REPLANTEO DURANTE LA EJECUCIÓN DE OBRA m 1,436.00
01.01.3 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00
01.01.4 DEMOLICION DE PAVIMENTO FLEXIBLE m2 18,124.40
01.02.0 MOVIMIENTO DE TIERRAS
01.02.01 EXCAVACION DE ZANJAS 1,436.00
01.02.01.1 EXCAVACION DE ZANJAS C/EQUIPO HASTA 2,00 m, af=1.50m m 60.00
01.02.01.2 EXCAVACION DE ZANJAS C/EQUIPO HASTA 2,50 m, af=1.50m m 65.00
01.02.01.3 EXCAVACION DE ZANJAS C/EQUIPO HASTA 3,50 m, af=1.50m m 71.00
01.02.01.4 EXCAVACION DE ZANJAS C/EQUIPO HASTA 5,00 m, af=2.50m m 611.50
01.02.01.5 EXCAVACION DE ZANJAS C/EQUIPO HASTA 5,50 m, af=2.50m m 628.50
01.02.02 REFINE Y NIVELACION DE ZANJAS
01.02.02.1 REFINE Y NIVELACION DE FONDO DE ZANJAS m 1,436.00
01.02.03 CAMA DE APOYO PARA TUBERIAS
01.02.03.1 CAMA DE APOYO (Equipo 2) C/RIPIO CORRIENTE Ø=3/4", af=2.50m m 1,436.00
01.02.04 RELLENO, APISONADO Y COMP. LATERAL CON MATERIAL DE PRESTAMO
01.02.04.1 RELLENO LATERAL C/MATERIAL D/PRESTAMO (RIPIO CORRIENTE Ø=3/4") c/equipo/ p/tub Ø1 m 1,436.00
01.02.04.2 RELLENO Y COMPACTACION (c/equipo1) Hasta 0.30m s/clave del tubo Ø1000 (Ripio Corriente) m 1,436.00
01.02.06 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO
01.02.06.1 RELLENO Y COMPACTACION C/MAT DE PRESTAMO (RIPIO CORRIENTE) Cap. = 0.20m M 1,436.00
01.02.06.2 RELLENO Y COMPACTACION C/MAT PROPIO SELECCIONADO Cap. = 0.20m M 1,436.00
01.02.07 ACARREO Y ELIMINACION MATERIAL EXCEDENTE
01.02.07.1 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE Dist. min = 5.0Km m3 7,336.13
01.02.08 BOMBEO EN ZANJAS
01.02.08.1 DRENAJE DE ZANJAS C/EQUIPO HASTA 2.50 m m 125.00
01.02.08.2 DRENAJE DE ZANJAS C/EQUIPO HASTA 5.00 m m 682.50
01.02.08.3 DRENAJE DE ZANJAS C/EQUIPO HASTA 5.50 m m 628.50
01.02.09 ENTIBADO DE ZANJAS
01.02.09.1 ENTIBADO DE ZANJAS HASTA 2.50 m m 125.00
01.02.09.2 ENTIBADO DE ZANJAS HASTA 5.00 m m 682.50
01.02.09.3 ENTIBADO DE ZANJAS HASTA 5.50 m m 628.50
01.03.00 TUBERIAS GRP PN 1 SN 2500
01.03.01.1 SUMINISTRO E INSTALACION TUB.GRP,PN 1 -SN 2500, Ø 400 mm X 5,80 m m 296.00
01.03.01.2 SUMINISTRO E INSTALACION TUB.GRP,PN 1 -SN 2500, Ø 450 mm X 5,80 m m 115.00
HOJA DE METRADOS

MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES


OBRA :
DOMICILIARIAS PERIMETRO ENTRE AV. UNION, LOS INCAS, LOS ANDES Y GRAU
UBICACIÓN : CHICLAYO - LAMBAYEQUE
FORMULA : COLECTOR AV. LOS INCAS

ITEM DESCRIPCION UND TOTAL

01.03.01.3 SUMINISTRO E INSTALACION TUB.GRP,PN 1 -SN 2500, Ø 600 mm X 5,80 m m 726.50


01.03.01.4 SUMINISTRO E INSTALACION TUB.GRP,PN 1 -SN 2500, Ø 900 mm X 5,80 m m 298.50
01.04.00 PRUEBAS HIDRAULICAS
01.04.01 DOBLE PRUEBA HIDRAULICA P/TUB. GRP PN 1 SN 2500 Ø=400mm m 296.00
01.04.02 DOBLE PRUEBA HIDRAULICA P/TUB. GRP PN 1 SN 2500 Ø=450mm m 115.00
01.04.03 DOBLE PRUEBA HIDRAULICA P/TUB. GRP PN 1 SN 2500 Ø=600mm m 726.50
01.04.04 DOBLE PRUEBA HIDRAULICA P/TUB. GRP PN 1 SN 2500 Ø=900mm m 298.50
01.05.00 BUZONES
01.05.01 BUZON TIPO "A" Ø Int. 1.20m ,PROF.= 2.00 m und 1.00
01.05.02 BUZON TIPO "A" Ø Int. 1.20m ,PROF.= 2.50 m und 2.00
01.05.03 BUZON TIPO "C" Ø Int. 1.50m ,PROF.= 5,00 m und 9.00
01.05.04 BUZON TIPO "C" Ø Int. 1.50m ,PROF. = 5,50 m und 7.00
01.05.05 EMPALME A BUZON Y CONSTRUCCION DADO D/CONCRETO 0.80 X 0.80X 0,80 F'C=175 KG/CM und 42.00
01.05.06 EMPALME A BUZON Y CONSTRUCCION DADO D/CONCRETO 1.20 X 1.20X 0,80 F'C=175 KG/CM und 6.00
01.05.07 BY PASS DE AGUAS SERVIDAS m 1,436.00
01.06.00 REPOSICION DE PAVIMENTOS
01.06.01 REPOSICIÓN DE PAVIMENTO FLEXIBLE EN CALIENTE E = 2" m2 18,124.40
01.07.00 VARIOS 1.00