SCAlable & ReconfigurabLe Electronics plaTforms and Tools Towards the next generation of Integrated Modular Avionics
An introduction to SCARLETT
Mr. Didier Hainaut, Thales Avionics, SCARLETT Project Manager
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 1
Demonstration Objectives
IMA2G Enablers
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 2
Demonstration Objectives
IMA2G Enablers
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 3
F5
LRU
F2
L R U
Management of obsolescence
F3
L R U
F4
LRU
Maintenance Cost
Regarding costs, the federated architecture leads to serious drawbacks Requires specific hardware and Operating System for each LRU
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 4
Market drivers
Increase operational reliability
F2
L R U
F1
L R U
F5
LRU
F3
L R U
F4
LRU
Need to overcome the federated architecture drawbacks Provide an answer to new market drivers
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 5
IMA1G
IMA 1G
Incremental certification process
Toolset F1 Toolset Toolset F4 F5 Toolset F6
Reduction of P/N with common processing modules several different types of CPIOM modules
F2
F3
OS C P M I O
OS C P M I O
OS C P M I O
OS C P M I O
NonAFDX
switch
Sharing of resources AFDX Backbone Network by several applications (HW, basic SW, avionics network) For a selected number of application
Page 6
switch
switch
switch
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Very demaing ramp-up phase at Entry Into Service requires huge improvements in system maturity Increasing the set of function on board of the IMA: A way to reduce risks on core electronis maturity thanks to communalisation of Hardawre / Operating System solutions
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 7
Next generation of IMA platform will need more computing power & more interface capability
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 8
Toolset F1
Toolset
Toolset F4 F5
Toolset F6
F2
F3
OS C P M I O
OS C P M I O
OS C P M I O
OS C P M I O
NonAFDX
switch
switch
switch
switch
AFDX
Page 9
Toolset F1
Toolset
Toolset F4 F5
Toolset F6
F2
F3
OS C P M
I O
IMA-2G
OS OS
NonAFDX
OS C P M I O
C P M
I O
C P M
I O
switch
switch
switch
switch
AFDX
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
1 Provide a scalable
Distributed 5 Provide enhanced process and toolset Modular 6 Demonstrate fault tolerance Electronics -- through reconfiguration
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Demonstration Objectives
IMA2G Enablers
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 12
Innovation beyond IMA 1G Main Innovations For DME to meet the market needs
Toolset F1
Toolset F2
Toolset F4 F5
Toolset F6
F3
OS
OS C P M
OS C P M
OS C P M
C P IO IO NonM AFDX
IO
IO
IO
switch
switch
switch
switch
ADCN
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 13
- Minimizes the set of Remote Module types - Is adaptable to A/C needs in term of I/O - Enables increased independence of functions from H/W, hence flexibility of function allocation
REU
Toolset F1
Toolset F2
Toolset F4 F5
Toolset F6
F3
Sensor Actuator
OS R D C C PIO M
OS C P M
OS C P M
OS C P M
Field Bus
switch
switch
switch
switch
switch
switch
ADCN
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 14
Toolset F1 F2 F7 F8 F9
Toolset
Spare
OS R D C R P C R E U
OS
OS
OS
Field Bus
C P CPM M
switch
C P CPM M
switch
C CPM P M
switch
C CPM P M
switch
switch
switch
ADCN
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 15
Toolset F2 F6 F4 F1
Toolset
Spare
CPM
CPM
CPM
CPM
Field Bus
switch
switch
switch
switch
switch
switch
ADCN
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 16
- Isolates A/C functions from the supporting platform configuration - Provide enhanced application portability
Toolset F2 F6 F4 F1 Toolset F8 F12 F9 F11 Toolset Toolset F13 F14 15 F Spare
Field Bus
CPM
CPM
CPM
CPM
switch
switch
switch
switch
switch
switch
ADCN
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 17
Toolset F2 F6 F4 F1
Toolset
Spare
Field Bus
CPM
CPM
CPM
CPM
switch
switch
switch
switch
switch
switch
ADCN
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 18
F2
F6 F4 F1
Field Bus
CPM
CPM
CPM
CPM
switch
switch
switch
switch
switch
switch
ADCN
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 19
Field Bus
CPM
CPM
CPM
CPM
switch
switch
switch
switch
switch
switch
ADCN
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 20
Demonstration Objectives
IMA2G Enablers
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 21
I/O Intensive
Time Critical
Page 22
Cabin functions such as Ventilation Control System Fire Smoke Detection System
I/O Intensive
Time Critical
Page 23
Landing Gear function Anti-skid Braking Steering Flight Control (for Business Jets)
I/O Intensive
Time Critical
Page 24
I/O Intensive
Time Critical
Page 25
Questions?
Project WebSite http://www.scarlettproject.eu/ Project Manager Didier HAINAUT (Thales Avionics SA) didier.hainaut@fr.thalesgroup.com Dissemination Manager Margarida PINTO (Instituto de Soldadura e Qualidade) MMPinto@isq.pt
Visit us at Stand 12
@
This document is produced under the EC Grant Agreement ACP7-GA-2008-211439 . Public - This document has been approved by the SCARLETT Steering Committee
Page 26