03.02 ELIMINACION DE MATERIAL PROVENIENTE DE CORTE DE TERRENO m3 1.00 276.68 1.35 373.51
06.01.01.02 TRAZO Y REPLANTEO DE EJES Y NIVELES DURANTE EL PROCESO m2 1.00 1.00 4.60 1.30 5.98
06.01.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.00 2.00 1.60 1.30 0.10 0.42
Compacta
Esponjamient
06.01.02.03 ELIMINACION DE MATERIAL PROVENIENTE DE EXCAVACION m3 cion 7.07 1.25 8.84
o (1.25)
(0.80)
06.01.03 CONCRETO SIMPLE
06.01.03.01 SOLADO PARA ZAPATAS DE 4" m2 1.00 2.00 1.60 1.30 4.16
06.01.04.02 COLUMNAS
06.01.04.02.01 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 1.00 2.00 perimetro= 2.10 6.32 26.54
2.00 2.00 perimetro= 0.63 5.02 12.61
2.00 2.00 perimetro= 1.20 0.85 4.08
06.01.04.02.02 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 1.00 2.00 0.80 0.25 6.32 2.53
2.00 2.00 area= 0.03 5.02 0.63
2.00 2.00 area= 0.09 0.85 0.31
06.01.04.03 VIGAS
06.01.04.03.01 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 1.00 1.00 4.50 perimetro= 1.60 7.20
1.00 2.00 0.79 perimetro= 1.00 1.58
1.00 1.00 3.00 perimetro= 1.00 3.00
06.01.04.03.02 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 1.00 1.00 4.50 0.25 0.55 0.62
1.00 1.00 0.79 0.25 0.25 0.05
1.00 1.00 3.00 0.25 0.25 0.19
06.02 ARQUITECTURA
06.02.01 MUROS Y TABIQUES DE ALBAÑILERIA
06.02.01.01 MURO DE CABEZA LADR. SIL-CALC KK STANDARD 09X12X24 CON CEM-ARE m2 1.00 1.00 3.42 2.12 7.25
1.00 1.00 1.34 3.00 4.02
1.00 1.00 1.35 2.65 3.58
06.02.01.02 REBOQUES ENLUCIDOS Y MOLDURAS
06.02.01.02.01 TARRAJEO EN MUROS EXTERIORES CEMENTO ARENA MEZCLA 1:4 m2 1.00 1.00 3.42 2.12 7.25
1.00 1.00 1.34 3.00 4.02
1.00 1.00 1.35 2.65 3.58
06.02.01.02.02 TARRAJEO EN MUROS INTERIORES CEMENTO ARENA MEZCLA 1:4 m2 1.00 1.00 3.42 2.12 7.25
1.00 1.00 1.34 3.00 4.02
1.00 1.00 1.35 2.65 3.58
06.02.01.02.03 TARRAJEO EN PLACAS Y COLUMNAS SUPERFICIE MEZCLA 1:4 m2 1.00 2.00 perimetro= 1.60 6.32 20.22
2.00 2.00 perimetro= 0.63 5.02 12.61
2.00 2.00 perimetro= 1.20 0.85 4.08
06.02.01.02.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA MEZCLA 1: m2 1.00 1.00 4.50 perimetro= 1.60 7.20
1.00 2.00 0.79 perimetro= 1.00 1.58
1.00 1.00 3.00 perimetro= 1.00 3.00
06.02.01.03 PINTURAS
06.02.01.03.01 PINTURA LATEX VINILICO EN MUROS EXTERIORES m2 1.00 14.85 14.85
06.02.01.03.02 PINTURA LATEX VINILICO EN MUROS INTERIORES m2 1.00 14.85 14.85
06.02.01.03.03 PINTURA LATEX VINILICO EN SUPERFICIE PLACAS Y COLUMNAS m2 1.00 36.92 36.92
06.02.01.03.04 PINTURA LATEX VINILICO EN SUPERFICIE VIGAS INTERIOR - EXTERIOR m2 1.00 14.26 14.26
07 CERCO PERIMETRICO
07.01 ESTRUCTURAS
07.01.01 COLUMNAS
07.01.01.01 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 16.00 perimetro= 0.60 2.55 24.48
2.00 perimetro= 0.75 2.55 3.83
07.01.01.02 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 1.00 18.00 0.30 0.15 2.55 2.07
07.01.02 VIGAS
07.01.02.01 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 1.00 2.00 43.11 0.15 12.93
07.01.02.02 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 1.00 1.00 43.11 0.15 0.15 0.97
07.02 ALBAÑILERIA
07.02.01 MUROS Y TABIQUES DE ALBAÑILERIA
07.02.01.01 MURO DE SOGA LADR. SIL-CALC KK STANDARD 09X12X24 CON CEM-AREN m2 1.00 9.00 3.00 2.55 68.85
1.00 1.00 2.29 2.55 5.84
1.00 1.00 2.85 2.55 7.27
1.00 1.00 2.98 2.55 7.60
1.00 1.00 2.40 2.55 6.12
07.02.03 ARQUITECTURA
07.02.03.01 REVOQUES ENLUCIDOS Y MOLDURAS
07.02.03.01.01 TARRAJEO EN MUROS EXTERIORES CEMENTO ARENA MEZCLA 1:4 m2 1.00 95.68 95.68
07.02.03.01.02 TARRAJEO EN MUROS INTERIORES CEMENTO ARENA MEZCLA 1:4 m2 1.00 95.68 95.68
07.02.03.01.03 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA MEZCLA 1:4 m2 1.00 12.93 12.93
07.02.03.01.04 TARRAJEO EN PLACAS Y COLUMNAS SUPERFICIE MEZCLA 1:4 m2 1.00 28.31 28.31
07.02.03.02 PINTURA
07.02.03.02.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 1.00 191.35 191.35
07.03.01.01.02 CONCRETO PARA MURO DE CONTENCIÓN F'C=210 KG/CM2 m3 1.00 1.00 43.11 0.40 4.40 75.87
07.04 ARQUITECTURA
07.04.01 REVOQUES ENLUCIDOS Y MOLDURAS
07.04.01.01 TARRAJEO EN MUROS DE CONTENCION m2 1.00 189.68 189.68
07.04.02 PINTURAS
07.04.02.01 PINTURA CON ESMALTE EN MUROS DE CONTENCION m2 1.00 189.68 189.68
08 CONSTRUCCION DE SS.HH
08.01 ESTRUCTURAS
08.01.01 COLUMNAS
08.01.01.01 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2
1.00 3.00 perimetro= 0.15 4.07 1.83
1.00 1.00 perimetro= 0.30 4.07 1.22
1.00 2.00 perimetro= 0.30 2.85 1.71
1.00 2.00 perimetro= 0.30 2.85 1.71
08.01.01.02 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 1.00 4.00 0.15 0.15 4.85 0.44
1.00 4.00 0.15 0.15 3.85 0.35
08.01.02 VIGAS
08.01.02.01 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 1.00 2.00 Perimetro= 0.30 10.40 6.24
08.01.02.02 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 1.00 2.00 10.40 0.15 0.15 0.47
08.01.03.02 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 1.00 2.00 area= 6.54 0.17 2.22
08.02 ARQUITECTURA
08.02.01 REBOQUES ENLUCIDOS Y MOLDURAS
08.02.01.01 TARRAJEO EN MUROS EXTERIORES CEMENTO ARENA MEZCLA 1:4 m2
1.00 1.00 9.80 2.52 24.70
1.00 1.00 1.20 2.85 3.42
1.00 2.00 2.42 1.80 8.71
1.00 1.00 1.30 1.80 2.34
1.00 3.00 3.70 3.64 40.40
1.00 1.00 2.68 3.64 9.76
08.02.01.04 TARRAJEO EN VIGAS MEZCLA 1:4 m2 1.00 2.00 Perimetro= 0.30 10.40 6.24
08.02.04.02 CORREAS DE TUBO RECTANGULAR LAC DE 2" X 2" X 1.5mm m 1.00 5.00 10.60 53.00
08.02.04.05 CERRAJERIA
08.02.04.05.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 3.00 4.00 12.00
08.02.04.05.02 CERRADURA DE DOS GOLPES FORTE pza 3.00 1.00 3.00
08.02.04.06 VIDRIOS, CRISTALES Y SIMILARES
08.02.04.06.01 VENTANA DE VIDRIO TIPO NOVA DE 6 MM VIDRIO INCOLORO p2
1.00 2.00 2.42 1.05 5.08
1.00 1.00 1.30 1.05 1.37
08.02.04.06.02 VIDRIO SEMIDOBLE INCOLORO CRUDO p2 3.00 1.00 0.92 0.45 1.24
08.02.05 PINTURAS
08.02.05.01 PINTURA LATEX VINILICO EN MUROS EXTERIORES m2 1.00 104.52 104.52
08.02.05.02 PINTURA LATEX VINILICO EN MUROS INTERIORES m2 1.00 89.33 89.33
08.02.05.03 PINTURA LATEX VINILICO EN SUPERFICIE PLACAS Y COLUMNAS m2 1.00 6.47 6.47
08.02.05.04 PINTURA LATEX VINILICO EN SUPERFICIE VIGAS INTERIOR - EXTERIOR m2 1.00 6.24 6.24
08.02.05.05 PINTURA EN VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANO m 1.00 23.55 23.55
08.02.05.06 PINTURA AL BARNIZ EN PUERTAS m2 1.00 7.87 7.87
08.03 INSTALACIONES SANITARIAS
08.03.01 INSTALACIONES SANITARIAS DE DESAGUE
08.03.01.01 APARATOS Y ACCESORIOS SANITARIOS
08.03.01.01.01 INODORO TANQUE BAJO BLANCO + ACCESORIOS pza 1.00 6.00 6.00
08.03.01.01.02 LAVATORIO DE PARED BLANCO + ACCESORIOS pza 1.00 4.00 4.00
08.03.01.01.03 PAPELERA DE LOZA BLANCA DE 13 X 15 pza 1.00 6.00 6.00
08.03.01.01.04 GRIFOS DE BRONCE DE 1/2" und 1.00 4.00 4.00
08.03.01.02 SISTEMA DE DESAGUE Y VENTILACION
08.03.01.02.01 SALIDA DE DESAGUE PVC SAL PARA DESAGUE DE 2" pto 1.00 6.00 6.00
08.03.01.02.02 SALIDA DE DESAGUE PVC SAL PARA DESAGUE DE 4" pto 1.00 12.00 12.00
08.03.01.02.03 RED DE DESAGUE TUBERIA PVC SAL DE 2" m 1.00 12.00 12.00
08.03.01.02.04 RED DE DESAGUE TUBERIA PVC SAL DE 4" m 1.00 73.60 73.60
08.03.01.02.05 REGISTROS DE BRONCE DE 4" pza 1.00 6.00 6.00
08.03.01.02.06 SUMIDERO CROMADO DE 2" pza 1.00 2.00 2.00
08.03.01.02.07 SALIDA DE VENTILACION PVC SAL Ø 2" pto 1.00 2.00 2.00
08.03.01.02.08 SOMBRERO VENTILACION PVC SAL DE 2" pza 1.00 2.00 2.00
08.03.01.02.09 CAJA DE REGISTRO DE DESAGUE 12" X 24" - CONSTRUCCION und 1.00 1.00 1.00
08.03.01.02.10 EXCAV. ZANJAS P/CIMIENTOS m3 1.00 1.00 85.60 0.40 0.50 17.12
08.03.01.02.11 RELLENO CON MATERIAL SELECCIONADO m3 1.00 21.40 21.40
08.03.01.03 VALVULAS Y ACCESORIOS DE DESAGUE
08.03.01.03.01 CODO PVC SAL 4"X45° und 1.00 10.00 10.00
08.03.01.03.02 CODO PVC SAL 4"X90° und 1.00 12.00 12.00
08.03.01.03.03 CODO PVC SAL 2"X45° und 1.00 2.00 2.00
08.03.01.03.04 CODO PVC SAL 2"X90° und 1.00 8.00 8.00
08.03.01.03.05 TEE PVC SAL 4"X 2" und 1.00 4.00 4.00
08.03.01.03.06 YEE PVC SAL 4"X4" und 1.00 10.00 10.00
08.03.01.03.07 YEE PVC SAL 4"X2" und 1.00 4.00 4.00
08.03.01.03.08 TRAMPA HIDRAULICA DE 2" und 1.00 2.00 2.00
08.03.01.04 PRUEBAS HIDRAULICA
08.03.01.04.01 PRUEBA HIDRAULICA TUBERIA DE DESAGUE und 1.00 1.00 1.00
08.03.02 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
08.03.02.01 REDES DE AGUA FRIA Y ALIMENTADORES
08.03.02.01.01 SALIDA DE AGUA FRIA Ø 1/2" pto 1.00 10.00 10.00
08.03.02.01.02 RED DE DISTRIBUCION TUBERIA PVC SAP C-10 Ø DE 3/4" m 1.00 45.00 45.00
08.03.02.01.03 RED DE DISTRIBUCION TUBERIA PVC SAP C-10 Ø DE 1/2" m 1.00 28.50 28.50
08.03.02.01.04 EXCAV. ZANJAS P/CIMIENTOS m3 1.00 1.00 73.50 0.40 0.40 11.76
08.03.02.01.05 RELLENO CON MATERIAL SELECCIONADO m3 1.00 14.70 14.70
08.03.02.02 VALVULAS Y ACCESORIOS DE AGUA FRIA
08.03.02.02.01 VALVULA DE COMPUERTA DE BRONCE DE 1/2" und 1.00 4.00 4.00
08.03.02.02.02 CODO PVC SAP 3/4"X90° und 1.00 35.00 35.00
08.03.02.02.03 CODO PVC SAP 1/2"X90° und 1.00 15.00 15.00
08.03.02.02.04 CODO DE F°G° 1/2"X90° und 1.00 12.00 12.00
08.03.02.02.05 TEE PVC SAP 3/4" und 1.00 13.00 13.00
08.03.02.02.06 TEE PVC SAP DE 1/2" und 1.00 18.00 18.00
08.03.02.02.07 TRANSICION DE PVC SAP 1/2" und 1.00 8.00 8.00
08.03.02.02.08 NIPLE DE F°G° DE 1/2" und 1.00 19.00 19.00
08.03.02.02.09 ADAPTADOR DE PVC SAP CON UNION ROSCADA DE 1/2" und 1.00 25.00 25.00
08.03.02.02.10 UNIONES UNIVERSALES DE PVC SAP 1/2" und 1.00 8.00 8.00
08.03.02.03 TANQUE ROTOPLAS (1100 LTS)
08.03.02.03.01 TANQUE POLIETILENO COLOR AZUL DE 1100 LTS pza 1.00 1.00 1.00
08.03.02.03.02 TANQUE ELEVADO DE ETERNIT ACCESORIOS pza 1.00 1.00 1.00
08.03.02.04 PRUEBAS HIDRAULICA
08.03.02.04.01 PRUEBA HIDRAULICA TUBERIA DE AGUA FRIA und 1.00 1.00 1.00
09.01.01.02 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 1.00 8.00 area= 0.08 4.20 2.69
1.00 4.00 area= 0.04 4.20 0.59
09.01.02 VIGAS
09.01.02.01 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 1.00 2.00 12.00 perimetro= 0.45 10.80
1.00 2.00 7.73 perimetro= 0.45 6.96
09.01.02.02 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 1.00 2.00 12.00 0.15 0.15 0.54
1.00 2.00 7.73 0.15 0.15 0.35
09.02.01.01.02 TRAZO Y REPLANTEO DE EJES Y NIVELES DURANTE EL PROCESO m2 1.00 1.00 12.00 0.40 4.80
09.02.01.04.02 CONCRETO PARA MURO DE CONTENCIÓN F'C=210 KG/CM2 m3 1.00 1.00 12.00 0.40 0.85 4.08
09.04 ALBAÑILERIA
09.04.01 MUROS Y TABIQUES DE ALBAÑILERIA
09.04.01.01 MURO DE CABEZA LADR. SIL-CALC KK STANDARD 09X12X24 CON CEM-ARE m2 1.00 1.00 9.30 2.33 21.67
1.00 1.00 9.30 1.60 14.88
1.00 2.00 2.43 1.60 7.78
1.00 1.00 1.00 0.45 0.45
1.00 2.00 3.37 3.80 25.61
09.04.02.02 TARRAJEO EN MUROS INTERIORES CEMENTO ARENA MEZCLA 1:4 m2 1.00 1.00 9.30 2.33 21.67
1.00 1.00 9.30 1.60 14.88
1.00 2.00 2.43 1.60 7.78
1.00 1.00 3.18 2.33 7.41
1.00 2.00 3.37 3.80 25.61
09.04.02.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA MEZCLA 1:4 m2 1.00 8.00 perimetro= 1.00 4.20 33.60
1.00 4.00 perimetro= 0.67 4.20 11.26
08.04.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 m2 1.00 2.00 12.00 perimetro= 0.45 10.80
1.00 2.00 7.73 perimetro= 0.45 6.96
09.04.02.05 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS Y VANOS MEZCLA 1: m 1.00 1.00 perimetro= 7.40 7.40
1.00 1.00 perimetro= 5.30 5.30
09.04.03.02 FALSO PISO DE CONCRETO E=4" m2 1.00 1.00 12.00 7.73 92.76
09.04.03.03 PISO DE CONCRETO ACABADO FROTACHADO COLOREADO E= 2MM m2 1.00 1.00 12.00 7.73 92.76
09.04.05.03 CORREAS DE TUBO RECTANGULAR LAC DE 2" X 2" X 1.5mm m 1.00 11.00 13.00 143.00
09.04.05.04 VIGAS DE TUBO RECTANGULAR LAC DE 2" X 4" m 1.00 4.00 17.50 70.00
09.04.05.05 TUBO RECTANGULAR LAC DE 2" X 3" (DIAGONALES) m 1.00 4.00 12.90 51.60
09.04.06 CERRAJERIA
09.04.06.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 2.00 4.00 8.00
09.04.06.02 CERRADURA DE DOS GOLPES FORTE pza 2.00 1.00 2.00
09.04.08 PINTURAS
09.04.08.01 PINTURA LATEX VINILICO EN MUROS EXTERIORES m2 1.00 70.39 70.39
09.04.08.02 PINTURA LATEX VINILICO EN MUROS INTERIORES m2 1.00 77.35 77.35
09.04.08.03 PINTURA LATEX VINILICO EN SUPERFICIE PLACAS Y COLUMNAS m2 1.00 44.86 44.86
09.04.08.04 PINTURA LATEX VINILICO EN SUPERFICIE VIGAS INTERIOR - EXTERIOR m2 1.00 17.76 17.76
09.04.08.05 PINTURA EN VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VAN m 1.00 12.70 12.70
09.04.08.06 PINTURA AL BARNIZ EN PUERTAS m1 1.00 6.20 6.20
09.04.08.07 PINTURA CON ESMALTE EN MUROS DE CONTENCION m2 1.00 28.49 28.49
09.04.08.08 PINTURA CON ESMALTE EN BANCAS m2 1.00 64.76 64.76
09.05.01.02 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE pto 1.00 3.00 3.00
08.04.09.01.03 SALIDA DE LUMINARIA DE EMERGENCIA MONTAJE EN PARED pto 1.00 1.00 1.00
09.05.01.04 SALIDA DE TOMACORRIENTE BIPOLAR SIMPLE C/ TOMA A TIERRA pto 1.00 5.00 5.00
09.05.02 CANALIZACIONES, CONDUCTOS O TUBERIAS
09.05.02.01 TUBERIAS PVC SEL DE 20mm (ELÉCTRICAS) Ø=3/4" P EN CENTROS DE LU m 1.00 56.20 56.20
09.05.04 INTERRUPTORES
09.05.04.01 INTERRUPTOR TERMO MAGNETICO MONOFASICO 2x80AMP pza 1.00 2.00 2.00
09.05.05 ALIMENTADORES
09.05.05.01 TABLERO DE DISTRIBUCION
09.05.05.01.01 TABLERO DE DISTRIBUCION DE TIPO ENGRAMPE DE 18 POLOS und 1.00 1.00 1.00
10 CONSTRUCCION DE NICHOS
10.01 ESTRUCTURAS
10.01.01 TRABAJOS PRELIMINARES
10.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 1.00 1.00 23.20 7.50 174.00
10.01.02.02 EXCAVACION EN CIMIENTOS CORRIDOS m3 1.00 1.00 23.20 7.50 0.50 87.00
10.01.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.00 1.00 23.20 7.50 0.10 17.40
10.01.04.02 COLUMNAS
10.01.04.02.01 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 1.00 12.00 Perimetro= 0.60 4.81 34.63
10.01.04.02.02 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 1.00 12.00 0.15 0.15 4.81 1.30
10.01.04.03 VIGAS
10.01.04.03.01 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 1.00 2.00 26.20 perimetro= 0.45 23.58
2.00 4.00 4.15 perimetro= 0.45 14.94
2.00 1.00 5.18 perimetro= 0.45 4.66
10.01.04.03.02 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 1.00 2.00 26.20 0.15 0.15 1.18
2.00 4.00 4.15 0.15 0.15 0.75
2.00 1.00 5.18 0.15 0.15 0.23
10.01.04.04.02 CONCRETO PARA MURO DE CONTENCIÓN F'C=210 KG/CM2 m3 2.00 22.00 4.50 0.96 0.05 9.50
2.00 42.00 4.50 0.70 0.08 21.17
2.00 37.00 4.50 0.70 0.05 11.66
2.00 18.00 0.96 0.08 6.30 17.42
2.00 11.00 4.50 0.08 6.30 49.90
2.00 1.00 10.10 7.50 0.08 12.12
10.02 ARQUITECTURA
10.02.01 REVOQUES ENLUCIDOS Y MOLDURAS
10.02.01.01 TARRAJEO EN MUROS EXTERIORES CEMENTO ARENA MEZCLA 1:4 m2 2.00 60.00 perimetro= 2.70 0.05 16.20
1.00 16.00 perimetro= 2.70 0.05 2.16
10.02.01.02 TARRAJEO EN MUROS INTERIORES CEMENTO ARENA MEZCLA 1:4 m2 2.00 57.00 4.50 perimetro= 2.70 1,385.10
1.00 16.00 0.96 perimetro= 2.70 41.47
10.02.01.03 TARRAJEO EN PLACAS Y COLUMNAS SUPERFICIE MEZCLA 1:4 m2 1.00 12.00 Perimetro= 0.60 4.81 34.63
10.02.01.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA MEZCLA 1:4 m2 1.00 2.00 26.20 perimetro= 0.45 23.58
2.00 4.00 4.15 perimetro= 0.45 14.94
2.00 1.00 5.18 perimetro= 0.45 4.66
10.02.02 PINTURAS
10.02.02.01 PINTURA LATEX VINILICO EN MUROS EXTERIORES m2 1.00 18.36 18.36
10.02.02.02 PINTURA LATEX VINILICO EN MUROS INTERIORES m2 1.00 1,426.57 1,426.57
10.02.02.03 PINTURA LATEX VINILICO EN SUPERFICIE PLACAS Y COLUMNAS m2 1.00 34.63 34.63
10.02.02.04 PINTURA LATEX VINILICO EN SUPERFICIE VIGAS INTERIOR - EXTERIOR m2 1.00 43.18 43.18
10.03.01.02 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE pto 1.00 7.00 7.00
10.03.01.03 SALIDA DE LUMINARIA DE EMERGENCIA MONTAJE EN PARED pto 1.00 2.00 2.00
10.03.04 INTERRUPTORES
10.03.04.01 INTERRUPTOR TERMO MAGNETICO MONOFASICO 2x80AMP pza 1.00 2.00 2.00
10.03.05 ALIMENTADORES
10.03.05.01 TABLERO DE DISTRIBUCION
10.03.05.01.01 TABLERO DE DISTRIBUCION DE TIPO ENGRAMPE DE 18 POLOS und 1.00 1.00 1.00
11 CONSTRUCCION DE DEPOSITO
11.01 ESTRUCTURAS
11.01.01 TRABAJOS PRELIMINARES
11.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 1.00 1.00 3.80 3.00 11.40
11.01.01.02 TRAZO Y REPLANTEO DE EJES Y NIVELES DURANTE EL PROCESO m2 1.00 1.00 3.80 3.00 11.40
11.01.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.00 4.00 0.60 0.60 0.20 0.29
11.01.03.02 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORRIDOS m2 2.00 2.00 3.50 0.40 5.60
2.00 1.00 3.00 0.40 2.40
2.00 1.00 1.78 0.40 1.42
11.01.03.03 CIMIENTOS CORRIDOS MEZCLA C:H 1:10 +30% P.G m3 2.00 2.00 3.50 0.40 0.40 2.24
2.00 1.00 3.00 0.40 0.40 0.96
2.00 1.00 1.78 0.40 0.40 0.57
11.01.03.05 SOBRECIMIENTOS MEZCLA C:H 1:8+25% P.M. m3 2.00 2.00 3.50 0.15 0.30 0.63
2.00 1.00 3.00 0.15 0.30 0.27
2.00 1.00 1.78 0.15 0.30 0.16
11.01.04 OBRAS DE CONCRETO ARMADO
11.01.04.01 ZAPATAS
11.01.04.01.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 1.00 4.00 0.60 0.60 0.90 1.30
11.01.04.02 COLUMNAS
11.01.04.02.01 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 1.00 2.00 perimetro= 0.30 4.08 2.45
1.00 2.00 perimetro= 0.45 2.83 2.55
11.01.04.02.02 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 1.00 2.00 0.15 0.15 4.08 0.18
1.00 2.00 0.15 0.15 2.83 0.13
11.01.04.03 VIGAS
11.01.04.03.01 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 2.00 2.00 3.80 perimetro= 0.45 6.84
2.00 2.00 3.00 perimetro= 0.45 5.40
11.01.04.03.02 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 2.00 2.00 3.80 0.15 0.15 0.34
2.00 2.00 3.00 0.15 0.15 0.27
11.01.05.01.02 CONCRETO PARA MURO DE CONTENCIÓN F'C=210 KG/CM2 m3 1.00 1.00 3.00 0.40 2.40 2.88
11.02 ALBAÑILERIA
11.02.01 MUROS Y TABIQUES DE ALBAÑILERIA
11.02.01.01 MURO DE SOGA LADR. SIL-CALC KK STANDARD 09X12X24 CON CEM-AREN m2 1.00 2.00 3.50 3.50 24.50
1.00 2.00 2.70 4.08 22.03
1.00 1.00 1.28 1.00 1.28
1.00 1.00 0.50 2.83 1.42
11.02.02.02 TARRAJEO EN MUROS INTERIORES CEMENTO ARENA MEZCLA 1:4 m2 1.00 2.00 3.50 3.50 24.50
1.00 1.00 2.70 4.08 11.02
1.00 1.00 1.28 1.00 1.28
1.00 1.00 0.50 2.83 1.42
11.02.02.03 TARRAJEO EN PLACAS Y COLUMNAS SUPERFICIE MEZCLA 1:4 m2 1.00 2.00 perimetro= 0.30 4.08 2.45
1.00 2.00 perimetro= 0.45 2.83 2.55
11.02.02.04 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA MEZCLA 1:4 m2 2.00 2.00 3.80 perimetro= 0.30 4.56
2.00 2.00 3.00 perimetro= 0.30 3.60
11.02.02.05 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS Y VANOS MEZCLA m 1.00 1.00 4.94 4.94
1.00 1.00 5.66 5.66
11.02.03.02 FALSO PISO DE CONCRETO E=4" m2 1.00 1.00 3.50 2.70 9.45
11.02.03.03 PISO DE CONCRETO ACABADO FROTACHADO COLOREADO E= 2MM m2 1.00 1.00 3.50 2.70 9.45
11.02.05.02 CORREAS DE TUBO RECTANGULAR LAC DE 2" X 2" X 1.5mm m 1.00 6.00 3.20 19.20
11.02.05.03 VIGAS DE TUBO RECTANGULAR LAC DE 2" X 4" m 1.00 3.00 7.95 23.85
11.02.05.04 TUBO RECTANGULAR LAC DE 2" X 3" (DIAGONALES) m 1.00 3.00 5.80 17.40
11.02.06 CERRAJERIA
11.02.06.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 1.00 4.00 4.00
11.02.07.02 VIDRIO SEMIDOBLE INCOLORO CRUDO p2 1.00 1.00 0.96 0.74 0.71
11.02.08 PINTURAS
11.02.08.01 PINTURA LATEX VINILICO EN MUROS EXTERIORES m2 1.00 38.21 38.21
11.02.08.02 PINTURA LATEX VINILICO EN MUROS INTERIORES m2 1.00 38.21 38.21
11.02.08.03 PINTURA LATEX VINILICO EN SUPERFICIE PLACAS Y COLUMNAS m2 1.00 5.00 5.00
11.02.08.04 PINTURA LATEX VINILICO EN SUPERFICIE VIGAS INTERIOR - EXTERIOR m2 1.00 8.16 8.16
11.02.08.05 PINTURA EN VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VAN m 1.00 10.60 10.60
11.02.08.06 PINTURA AL BARNIZ EN PUERTAS m2 1.00 2.60 2.60
11.03 INSTALACIONES ELECTRICAS
11.03.01 SALIDAS PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEÑALES DÉBILES.
11.03.01.01 SALIDA DE TECHO CENTROS DE LUZ pto 1.00 1.00 1.00
11.03.01.02 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE pto 1.00 1.00 1.00
11.03.01.03 SALIDA DE LUMINARIA DE EMERGENCIA MONTAJE EN PARED pto 1.00 1.00 1.00
11.03.01.04 SALIDA DE TOMACORRIENTE BIPOLAR SIMPLE C/ TOMA A TIERRA pto 1.00 1.00 1.00
11.03.02 CANALIZACIONES, CONDUCTOS O TUBERIAS
11.03.02.01 TUBERIAS PVC SEL DE 20mm (ELÉCTRICAS) Ø=3/4" P EN CENTROS DE LUZ m 1.00 1.00 18.90 18.90
11.03.03 CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS.
11.03.03.01 CABLE ELECTRICO TW Nº 14 AWG (ALUMBRADO) m 1.00 1.00 37.80 37.80
11.03.04 INTERRUPTORES
11.03.04.01 INTERRUPTOR TERMO MAGNETICO MONOFASICO 2x80AMP pza 1.00 1.00 1.00
11.03.05 ALIMENTADORES
11.03.05.01 ARTEFACTOS DE ILUMINACION
11.03.05.01.01 FLUORESCENTE LINEAL 2x36 w CON REJILLA Y SISTEMA OPTICO SEMI und 1.00 1.00 1.00
11.03.05.02 MEDIDOR DE ENERGIA
11.03.05.02.01 MEDIDOR DE ENERGIA und 1.00 1.00 1.00
11.03.05.03 CAJAS DE CONCRETO Y METALICAS
11.03.05.03.01 CAJA DE PASO METALICA CON TAPA DE 0.15x0.15x0.10 pza 1.00 2.00 2.00
12 CONSTRUCCION DE PARQUE 01
12.01 SARDINELES DE JARDINERIA
12.01.01 TRABAJOS PRELIMINARES
12.01.01.01 TRAZO Y REPLANTEO m2 1.00 1.00 area= 1,001.91 1,001.91
12.01.04 PINTURAS
12.01.04.01 PINTURA ESMALTE EN SARDINELES m2
2.00 perimetro= 77.05 0.30 46.23
2.00 perimetro= 56.30 0.30 33.78
2.00 perimetro= 25.34 0.30 15.20
2.00 perimetro= 100.00 0.30 60.00
2.00 perimetro= 29.30 0.30 17.58
8.00 perimetro= 6.09 0.30 14.62
12.02 VEREDA INTERIOR Y PERIMETRAL
12.02.01 TRABAJOS PRELIMINARES
12.02.01.01 TRAZO Y REPLANTEO m2 1.00 1.00 area= 123.59 123.59
1.00 1.00 area= 43.59 43.59
vereda 1.00 1.00 77.20 1.20 92.64
1.00 1.00 area= 99.12 99.12
1.00 1.00 area= 9.85 9.85
1.00 1.00 area= 72.63 72.63
12.02.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.00 1.00 area= 123.59 0.10 12.36
1.00 1.00 area= 72.63 0.10 7.26
vereda 1.00 1.00 77.20 1.20 0.10 9.26
1.00 1.00 area= 99.12 0.10 9.91
1.00 1.00 area= 5.90 0.10 0.59
1.00 1.00 area= 72.63 0.10 7.26
12.02.03.05 PISO DE CONCRETO ACABADO FROTACHADO COLOREADO E= 4MM m2 1.00 20.00 6.00 0.10 12.00
1.00 15.00 3.78 0.10 5.67
1.00 64.00 1.20 0.10 7.68
1.00 12.00 5.61 0.10 6.73
1.00 4.00 1.77 0.10 0.71
12.03 GRADAS
12.03.01 ENCOFRADO Y DESENCOFRADO m2 4.00 3.00 1.74 0.15 3.13
12.03.02 CONCRETO EN GRADAS F'C=175kg/cm2+30% PM m3 4.00 3.00 1.74 0.35 0.15 1.10
12.03.03 TARRAJEO EN GRADAS CEMENTO-ARENA 1:5 m2 4.00 3.00 1.74 0.15 3.13
12.04.02 CONCRETO F'C=175 KG/CM2 EN BASE DE POSTES m3 1.00 18.00 0.40 0.40 0.60 1.73
12.04.04 POSTE ORNAMENTAL DE 4" C/BRAZOS DE DOBLE LUMINARIA und 1.00 18.00 18.00
12.04.05 TABLERO DE DISTRIBUCION CAJA METALICA CON 36 POLOS und 1.00 1.00 1.00
12.05.03 SUM. E INSTAL. TUBERIA PVC SAP C-10 Ø 1/2" m 1.00 1.00 55.48 55.48
12.07 EQUIPAMIENTO
12.07.01 BASURERO DE FIBRA DE VIDRIO und 1.00 6.00 6.00
13 CONSTRUCCION DE PARQUE 02
13.01 SARDINELES DE JARDINERIA
13.01.01 TRABAJOS PRELIMINARES
13.01.01.01 TRAZO Y REPLANTEO m2 1.00 1.00 area= 310.21 310.21
13.01.04 PINTURAS
13.01.04.01 PINTURA ESMALTE EN SARDINELES m2
4.00 perimetro= 19.44 1.70 132.19
1.00 perimetro= 21.76 1.70 36.99
2.00 perimetro= 21.76 1.70 73.98
13.02 VEREDA INTERIOR Y PERIMETRAL
13.02.01 TRABAJOS PRELIMINARES
13.02.01.01 TRAZO Y REPLANTEO m2 1.00 1.00 area= 49.65 49.65
1.00 1.00 area= 113.09 113.09
13.02.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.00 1.00 area= 49.65 0.10 4.97
1.00 1.00 area= 113.09 0.10 11.31
13.02.02.03 EXTENDIDO, RIEGO Y COMPACTADO m2 1.00 1.00 area= 49.65 49.65
1.00 1.00 area= 113.09 113.09
13.02.03.02 CONCRETO F'C=175 KG/CM2 EN SARDINELES m2 1.00 1.00 area= 49.65 0.10 4.97
1.00 1.00 area= 113.09 0.10 11.31
1.00 1.00 area= 7.00 0.10 0.70
13.02.03.05 PISO DE CONCRETO ACABADO FROTACHADO COLOREADO E= 4MM m2 1.00 1.00 area= 49.65 49.65
1.00 1.00 area= 113.09 113.09
1.00 1.00 area= 7.00 7.00
13.03 GRADAS
13.03.01 ENCOFRADO Y DESENCOFRADO m2 4.00 6.00 3.21 0.17 13.10
13.03.02 CONCRETO EN GRADAS F'C=175kg/cm2+30% PM m3 4.00 6.00 3.21 0.30 0.17 3.93
13.03.03 TARRAJEO EN GRADAS CEMENTO-ARENA 1:5 m2 4.00 6.00 3.21 0.17 13.10
13.04.03 SUM. E INSTAL. TUBERIA PVC SAP C-10 Ø 1/2" m 1.00 1.00 62.00 62.00
11.08 EQUIPAMIENTO
11.08.01 BASURERO DE FIBRA DE VIDRIO und 1.00 3.00 3.00
14.04 GRADAS
14.04.01 ENCOFRADO Y DESENCOFRADO m2
1.00 5.00 3.72 0.17 3.16
1.00 8.00 2.78 0.17 3.78
1.00 7.00 2.78 0.17 3.31
1.00 7.00 3.41 0.17 4.06
1.00 4.00 2.03 0.17 1.38
1.00 5.00 3.94 0.17 3.35
1.00 5.00 2.70 0.17 2.30
1.00 8.00 3.35 0.17 4.56
2.00 9.00 3.35 0.17 10.25
1.00 8.00 2.10 0.17 2.86
2.00 9.00 2.40 0.17 7.34
14.06.02 MONTANTE PARA AGUAS PLUVIALES TUB. PVC SAL Ø DE 4" m 1.00 1.00 7.30 7.30
15.01.05.03 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 1.00 2.00 2.00
15.02 POZO PERCOLADOR
15.02.01 TRABAJOS PRELIMINARES
15.02.01.01 LIMPIEZA DE TERRENO MANUAL m2
1.00 1.00 1.60 1.40 2.24
1.00 1.00 1.25 1.30 1.63
15.02.05.03 TAPA PRE FABRICADO PARA INSPECCION und 1.00 3.00 3.00
16 FLETE TERRESTRE
16.01 FLETE TERRESTRE GLB 1.00 1.00
TOTAL
1.00
1.00
1.00
1,807.62
276.68
373.51
1.00
1.00
1.00
5.98
5.98
7.49
0.42
11.05
4.16
7.49
73.28
43.24
3.46
1,672.32
11.78
0.86
115.05
14.85
14.85
14.85
36.92
11.78
2.48
14.85
14.85
36.92
14.26
28.31
2.07
237.90
12.93
0.97
152.51
95.68
10.20
11.34
95.68
95.68
12.93
28.31
191.35
12.93
28.31
189.68
75.87
739.50
189.68
189.68
6.47
0.78
44.15
6.24
0.47
72.16
6.54
2.22
67.20
89.33
104.52
6.47
6.24
23.55
33.18
33.18
33.18
7.87
49.40
53.00
43.30
26.10
12.00
3.00
6.45
1.24
104.52
89.33
6.47
6.24
23.55
7.87
6.00
4.00
6.00
4.00
6.00
12.00
12.00
73.60
6.00
2.00
2.00
2.00
1.00
17.12
21.40
10.00
12.00
2.00
8.00
4.00
10.00
4.00
2.00
1.00
10.00
45.00
28.50
11.76
14.70
4.00
35.00
15.00
12.00
13.00
18.00
8.00
19.00
25.00
8.00
1.00
1.00
1.00
7.00
4.00
2.00
5.00
45.30
90.60
5.00
1.00
7.00
1.00
1.00
8.00
44.86
3.28
220.42
17.76
0.89
140.24
4.80
4.80
4.08
5.10
4.80
20.40
4.08
341.78
64.76
3.96
219.30
70.39
70.39
77.35
44.86
17.76
12.70
28.49
64.76
92.76
92.76
92.76
6.20
122.72
13.00
143.00
70.00
51.60
8.00
2.00
39.40
70.39
77.35
44.86
17.76
12.70
6.20
28.49
64.76
11.00
3.00
1.00
5.00
56.20
112.40
2.00
1.00
11.00
1.00
1.00
19.00
174.00
174.00
3.89
87.00
17.40
73.49
18.66
3.89
39.66
34.63
1.30
228.35
43.18
2.16
348.19
2,223.25
121.76
2,326.46
18.36
1,426.57
34.63
43.18
18.36
1,426.57
34.63
43.18
16.00
7.00
2.00
66.50
133.00
2.00
1.00
16.00
1.00
1.00
16.00
11.40
11.40
4.02
0.29
4.67
1.44
9.42
3.77
7.07
1.06
1.30
13.22
5.00
0.31
92.71
12.24
0.61
52.32
7.20
2.88
31.58
49.23
38.21
38.21
5.00
8.16
10.60
9.45
9.45
9.45
2.60
15.17
19.20
23.85
17.40
4.00
1.00
1.28
0.71
38.21
38.21
5.00
8.16
10.60
2.60
1.00
1.00
1.00
1.00
18.90
37.80
1.00
1.00
1.00
2.00
1,001.91
28.11
35.14
28.11
187.40
9.37
187.40
187.40
441.42
139.95
46.65
470.46
111.96
32.79
32.79
15.00
327.90
32.79
3.13
1.10
3.13
21.77
1.73
52.20
18.00
1.00
1.00
18.00
250.58
501.16
36.00
1.00
7.20
10.48
55.48
12.00
25.00
10.00
120.41
401.38
38.00
6.00
310.21
12.87
16.09
12.87
243.17
24.32
243.17
243.17
162.74
48.82
16.27
162.74
40.69
12.97
16.97
9.00
101.30
169.74
13.10
3.93
13.10
9.60
2.00
62.00
23.00
28.00
4.00
7.82
86.92
20.00
3.00
309.33
61.87
30.93
309.33
38.67
188.39
188.39
167.97
188.39
46.34
13.90
128.12
60.07
12.01
6.01
60.07
7.51
23.47
61.23
688.80
117.36
2.98
7.30
1.00
2.98
0.96
5.56
5.56
8.15
10.18
10.77
1.65
13.22
37.80
13.22
1.00
31.20
130.00
2.00
3.87
3.87
6.03
7.54
7.52
1.71
4.42
29.40
7.70
0.44
1.00
3.00
1.00
HOJAS DE METRADOS ACEROS
PROYECTO :
“MEJORAMIENTO DEL CEMENTERIO MUNICIPAL, EN EL CENTRO POBLADO DE HUANIPACA, DISTRITO DE HUANIPACA, PROVINCIA DE ABANCAY –
APURÍMAC”.
METRADO: METRADOS DE ACEROS
METRADOS
ITEN DESCRIPCION N° DE LONGITUD DE ACERO PESO DE LONGITUD PESO TOTAL DE
UND DIAMETRO N° VECES PARCIAL KG
PIESAS 1/4" 3/8" 1/2" 5/8" 3/4" ACERO KG/M. TOTAL ML. ACERO KG.
06 ARCO DE ENTRADA
06.01.04.01.02 ACERO PARA ZAPATAS GRADO 60 KG 73.28
Tipo 01 5/8" 2.00 9.00 1.30 1.60 23.40 37.44
5/8" 2.00 7.00 1.60 1.60 22.40 35.84
07 CERCO PERIMETRICO
07.01.01.03 ACERO GRADO 60 EN COLUMNAS KG 237.90
3/8" 18.00 4.00 3.57 0.56 257.04 143.94
estribos 1/4" 18.00 24.00 0.87 0.25 375.84 93.96
07 MURO DE CONTENCION
#REF! ACERO GRADO 60 EN MURO DE CONTENCION KG 1/2" 2.00 6.00 43.50 1.02 522.00 532.44 739.50
1/2" 2.00 145.00 0.70 1.02 203.00 207.06
08 CONSTRUCCION DE SS.HH
#REF! ACERO GRADO 60 EN COLUMNAS KG 1/2" 4.00 4.00 1.50 1.02 24.00 24.48 44.15
3/8" 4.00 10.00 0.58 0.56 23.20 12.99
08.01.03 LOSA MACIZA EN VESTUARIO DE SACERDOTE KG 3/8" 1.00 15.00 4.00 0.56 60.00 33.60 67.20
3/8" 1.00 20.00 3.00 0.56 60.00 33.60
10 CONSTRUCCION DE NICHOS