CANTIDAD DE AGREGADO LLEGADO A OBRA

SERGENSAF SAC
N° MATERIAL PARIACANCHA SAN MIGUEL CHACRACOCHA PICHUYCOCHA
1 HORMIGON 153.00
2 ARENA GRUESA SHOTCRETE 60.00

LUIS HURTADO
N° MATERIAL PARIACANCHA SAN MIGUEL CHACRACOCHA PICHUYCOCHA
1 HORMIGON 30.00 30.00 66.00 33.00
3 ARENA FINA 65.00 25.00

CANTERA SHELBY
N° MATERIAL PARIACANCHA SAN MIGUEL CHACRACOCHA PICHUYCOCHA
1 ARENA FINA 10.00

CANTIDAD A NECESITAR EN OBRA (FRENTE YANAHUANCA)


LUIS HURTADO
N° MATERIAL PARIACANCHA SAN MIGUEL CHACRACOCHA PICHUYCOCHA
1 HORMIGON 11.67 5.83
2 ARENA GRUESA 12.00 10.00
3 ARENA FINA AMARILLA 10.00
4 ARENA FINA 15.00

tratar sobre quien va a firmar como almacener


SHAHUANA SUB TOTAL METRADO COSTO UNIT SUB TOTAL 153
153.00 87.00 13,311.00
60.00 100.00 6,000.00 243.00
19,311.00

SHAHUANA SUB TOTAL METRADO COSTO UNIT SUB TOTAL 111.50


12.50 171.50 120.00 20,580.00
90.00 180.00 16,200.00 12000
36,780.00

SHAHUANA SUB TOTAL METRADO COSTO UNIT SUB TOTAL


10.00 170.00 1,700.00 COMPRA SIN BOLETA, SOLO ENTREGÓ GUIA
1,700.00

SHAHUANA SUB TOTAL METRADO COSTO UNIT SUB TOTAL


26.33 43.83 90.00 3,944.70 SHELBY SIN BOLETA
10.00 32.00 120.00 3,840.00 SHELBY SIN BOLETA
10.00 20.00 150.00 3,000.00 PAGAR CON SALDO SOBRANTE
15.00 200.00 3,000.00 PAGAR CON SALDO SOBRANTE
TOTAL 13,784.70
SALDO 6,280.00
FALTA CUBRIR - 7,504.70

uien va a firmar como almacenero


DEPOSITOS REALIZADOS
AUT 02 19,311.00
AUT 03 25,500.00
AUT 04 19,260.00
64,071.00

DEPOSITADO A PROVEEDOR 64,071.00


COSTO MAT ENTREGADO 57,791.00
SALDO 6,280.00

95.00
5.28
31.6666667

7,784.70 3,068.10
3,360.00
6,428.10

no muy grueso

falta entregar 15.00 San Miguel arena fina


falta entregar 20.00 Pariacancha hormigon

50.00 san miguel cemento


200.00
600.00
480.00
200.00
200.00
15.00
94.17 1,695.00
1,130.00
730.00
510.00
10,710.00
CANTIDAD DE ALAMBRES Y CLAVOS LLEGADO A OBRA
CANTIDAD DE MATERIAL ENTREGADO
N° MATERIAL SOLICITADO COSTO UNIT SUB TOTAL
1 ALAMBRE NEGRO 16 351.00 4.50 1,579.50
2 ALAMBRE NEGRO 08 521.00 4.50 2,344.50
3 CLAVOS 2" 24.00 4.50 108.00
4 CLAVOS 2.5" 70.00 4.50 315.00
5 CLAVOS 3" 163.00 4.50 733.50
2 CLAVOS 4" 57.00 4.50 256.50
3 CLAVOS DE CALAMINA 90.00 4.50 405.00
5,742.00

CANTIDAD DE MATERIAL ENTREGADO (ADICIONAL)


N° MATERIAL CANTIDAD COSTO UNIT SUB TOTAL
1 ALAMBRE NEGRO 16 124.00 6.00 744.00
2 ALAMBRE NEGRO 08 204.00 6.00 1,224.00
3 CLAVOS 2" 46.00 6.00 276.00
4 CLAVOS 2.5" -
5 CLAVOS CALAMINA 10.00 12.00 120.00
6 CLAVOS 4" 3.00 6.00 18.00
2,382.00

CANTIDAD A NECESITAR EN OBRA (FRENTE YANAHUANCA)

N° MATERIAL PARIACANCHA SOLICITADO COSTO UNIT


1 ALAMBRE NEGRO 16 290.00 6.20 1,798.00
2 ALAMBRE NEGRO 08 400.00 6.20 2,480.00
3 CLAVOS 2" 46.00 6.20 285.20
4 CLAVOS 2.5" 46.00 6.20 285.20
5 CLAVOS 3" 100.00 6.20 620.00
6 CLAVOS 4" 40.00 6.20 248.00
7 CLAVOS DE CEMENTO 1.5" 2,500.00 0.20 500.00
8 CLAVOS S/C DE 2.5" 62.00 12.00 744.00
TOTAL - 6,960.40
SALDO - 900.50
FALTA CUBRIR - 7,860.90
CANTIDAD DEPOSITADO SEGÚN CONTRATO

N° MATERIAL CANTIDAD PRECIO UNIT SUB TOTAL


1.00 ALAMBRE NEGRO 16 351.00 4.50 1,579.50
2.00 ALAMBRE NEGRO 08 521.00 4.50 2,344.50
3.00 CLAVOS 2" 24.00 4.50 108.00
4.00 CLAVOS 3" 288.00 4.50 1,296.00
5.00 CLAVOS 4" 57.00 4.50 256.50
6.00 CLAVOS DE CALAMINA 1.00 405.00 405.00
7.00 CLAVOS S/C DE 1" 1.00 4.50 4.50
8.00 CLAVOS S/C DE 2.5" 62.00 6.90 427.80
9.00 CLAVOS DE CEMENTO 1.5" 2,538.00 0.20 507.60
10.00 ALAMBRE GALVANIZADO 12 17.00 7.00 119.00
11.00 HOJA DE SIERRA 34.00 5.15 175.10
TOTAL 7,223.50

DEPOSITADO A PROVEEDOR 7,223.50


COSTO MAT ENTREGADO 8,124.00
SALDO - 900.50
475.00 26.39 316.67
725.00 40.28 483.33
70.00 3.89 46.67
70.00 3.89 46.67
163.00 9.06 108.67
60.00 3.33 40.00
60.00 3.33 40.00
CANTIDAD DE MATERIALES

COSTO SEGÚN COTIZACION


N° MATERIAL SOLICITADO COSTO UNIT SUB TOTAL
1 PUERTAS EXTERIORES COMPLETO 30.00 550.00 16,500.00 lima
COSTO SEGÚN COTIZACION 16,500.00

N° MATERIAL SOLICITADO COSTO UNIT SUB TOTAL


1 PUERTAS EXTERIORES COMPLETO 30.00 600.00 18,000.00 HYO
COSTO SEGÚN COTIZACION 18,000.00

N° MATERIAL SOLICITADO COSTO UNIT SUB TOTAL


1 PUERTAS EXTERIORES COMPLETO 30.00 770.00 23,100.00 DIMFER LIMA
COSTO SEGÚN COTIZACION 23,100.00
COSTO PRESUPUESTADO
N° MATERIAL CANTIDAD PRECIO UNIT SUB TOTAL
1.00 PUERTA DE MADERA MACHIEMBRADA DE 2.10X0 30.00 580.00 17,400.00
COSTO PRESUPUESTADO 17,400.00

COSTO PRESUPUESTADO 17,400.00


COSTO SEGÚN COTIZACION 16,500.00
SALDO 900.00

225.00 13,500.00
14,040.00 14,040.00

7.00 3.50
11.00 13.00
1/2

700.00 14,200.00
600.00 14,640.00

297.70 8.33
306.03 18,362.00

4.662

24.50
143.00 3,360.50 143.00
167.50 200.00
480.00
600.00
200.00
150.00 1,623.00 90.17
420.00 1,000.00
270.00 730.00
14235
670.00
330.00 6765
200.00
600.00
480.00
200.00
1,480.00 400.00
1,880.00
2,300.00
420.00 154.00
266.00
CANTIDAD DE MATERIALES

COSTO SEGÚN COTIZACION


N° MATERIAL SOLICITADO COSTO UNIT SUB TOTAL
1.00 PUERTA CONTRAPLACADA 0.80X 2.10 M. 60.00 225.00 13,500.00
2.00 PUERTA CONTRAPLACADA 0.90X 2.10 M. 30.00 245.00 7,350.00
COSTO SEGÚN COTIZACION 20,850.00

N° MATERIAL SOLICITADO COSTO UNIT SUB TOTAL


1.00 PUERTA CONTRAPLACADA 0.80X 2.10 M. 60.00 255.10 15,306.00
2.00 PUERTA CONTRAPLACADA 0.90X 2.10 M. 30.00 276.10 8,283.00
COSTO SEGÚN COTIZACION 23,589.00

N° MATERIAL SOLICITADO COSTO UNIT SUB TOTAL


1.00 PUERTA CONTRAPLACADA 0.80X 2.10 M. 60.00 299.00 17,940.00
2.00 PUERTA CONTRAPLACADA 0.90X 2.10 M. 30.00 302.00 9,060.00
COSTO SEGÚN COTIZACION 27,000.00
COSTO PRESUPUESTADO
N° MATERIAL CANTIDAD PRECIO UNIT SUB TOTAL
1.00 PUERTA CONTRAPLACADA 0.80X 2.10 M. 60.00 230.00 13,800.00
2.00 PUERTA CONTRAPLACADA 0.90X 2.10 M. 30.00 272.00 8,160.00
COSTO PRESUPUESTADO 21,960.00

COSTO SEGÚN COTIZACION 20,850.00


COSTO PRESUPUESTADO 21,960.00
SALDO 1,110.00
CANTIDAD DE MATERIALES

COSTO SEGÚN COTIZACION COSTO PRESUPUESTADO


N° MATERIAL SOLICITADO COSTO UNIT SUB TOTAL N°
1 VENTANA DE ALUMINO 90.00 160.00 14,400.00 LIMA 1.00
2 CONTRAVENTANA 90.00 130.00 11,700.00 PASCO 2.00
COSTO SEGÚN COTIZACION 26,100.00 3.00
4.00
N° MATERIAL SOLICITADO COSTO UNIT SUB TOTAL
1 VENTANA DE ALUMINO 90.00 165.00 14,850.00 HYO
2 CONTRAVENTANA 90.00 195.00 17,550.00 DIMFER
COSTO SEGÚN COTIZACION 32,400.00
COSTO PRESUPUESTADO 15,621.41
COSTO SEGÚN COTIZACION 26,100.00
SALDO - 10,478.59
COSTO PRESUPUESTADO
MATERIAL CANTIDAD PRECIO UNIT SUB TOTAL
MATERIALES : ALUMINIO PARA VENTANA 90.00 4.08 367.20
MADERA, TRIPLAY Y OTROS MATERIALES PARA FABRICACION DE CONTRAVE 90.00 95.00 8,550.00
JUNQUILLO DE MADERA DE 1 CM X 1 CM 517.10 2.00 1,034.21
VIDRIO TRANSPARENTE 6MM 75.60 75.00 5,670.00
COSTO PRESUPUESTADO 15,621.41
CANTIDAD DE MATERIALES

N° MATERIAL SOLICITADO COSTO UNIT SUB TOTAL


1 PARANTE DE ACERO GALVANIZADO DE 64 X 38 mm X 0.45 mm X 3 M 700.00 10.50 7,350.00
2 RIEL DE ACERO GALVANIZADO DE 25 X 65 mm X 45 mm X 3 m 330.00 8.20 2,706.00
3 CLAVOS FULMINANTE 3.7 x 38 mm CAJA 100 PZAS 13.00 12.00 156.00
4 CINTA DE PAPEL PARA JUNTA DE 50mm 17.00 12.00 204.00
5 FULMINANTE CALIBRE 22 CAJA DE 100 PZAS 13.00 18.00 234.00
6 MASILLA PARA JUNTAS 18.00 32.00 576.00
7 TORNILLO TORNILLO SPACK 4.5X60 2.00 77.00 154.00
8 TORNILLO AUTOPERFORANTE PUNTA BROCA 1 X1/2" C/ARANDELA 1.00 90.00 90.00
9 TORNILLO PUNTA FINA DE F°G° 6 X 1" 8.00 21.00 168.00
10 TORNILLO WAFER PUNTA FINA 8 X 12 MM CAJA DE 500 7.00 28.50 199.50
11 PLANCHA DE POLICARBONATO ALVEOLAR TRANSLUCIDO 5.80m x 2.10m e= 6mm 6.00 290.00 1,740.00
12 PLACA DE YESO 1.22 X 2.44 M E=3/8" 210.00 26.50 5,565.00
13 CODO PVC-SAP S/P 3" X 90° 180.00 8.50 1,530.00
14 TUBERIA PVC-SAP DESAGUE DE 3" X 3 m 60.00 27.00 1,620.00
15 TIRAFON DE 1/4" X 3" 7.00 110.00 770.00
16 TARUGOS DE 1/4" 2.00 19.00 38.00
COSTO SEGÚN COTIZACION 23,100.50

COSTO PRESUPUESTADO 23,162.30


COSTO SEGÚN COTIZACION 23,100.50
SALDO 61.80
N° MATERIAL SOLICITADO COSTO UNIT SUB TOTAL
1 PARANTE DE ACERO GALVANIZADO DE 64 X 38 mm X 0.45 mm X 3 M 819.87 7.30 5,985.02
2 RIEL DE ACERO GALVANIZADO DE 25 X 65 mm X 45 mm X 3 m 239.57 7.60 1,820.74
3 CLAVOS FULMINANTE 3.7 x 38 mm CAJA 100 PZAS 159.71 10.50 1,677.00
4 CINTA DE PAPEL PARA JUNTA DE 50mm 29.81 13.00 387.57
5 FULMINANTE CALIBRE 22 CAJA DE 100 PZAS 15.97 17.70 282.69
6 MASILLA PARA JUNTAS 29.97 32.00 959.14
7 TORNILLO AUTORROSCANTE DE F°G° 1 1/2" X 3/16" 480.00 2.00 960.00
8 TORNILLO WAFER PUNTA FINA 8 X 12 MM CAJA DE 500 9.58 17.00 162.91
9 PLANCHA DE POLICARBONATO ALVEOLAR TRANSLUCIDO 5.80m x 2.10m e= 6mm 5.47 248.00 1,357.06
10 PLACA DE YESO 1.22 X 2.44 M E=3/8" 209.76 24.00 5,034.18
11 TIRAFON DE 1/4" X 3" 1,440.00 0.90 1,296.00
12 TARUGO DE PLÁSTICO 2"X1/2" 360.00 1.00 360.00
13 CODO PVC-SAP S/P 3" X 90° 180.00 8.00 1,440.00
14 TUBERIA PVC-SAP DESAGUE DE 3" X 3 M 60.00 24.00 1,440.00
-
-
COSTO PRESUPUESTADO 23,162.30
90.00 20.00 1,800.00 20.00 1,800.00
90.00 20.00 1,800.00 20.00

120.00 24.00 2,880.00 45.00 5,400.00


6,480.00 7,200.00 720.00
CANTIDAD DE MATERIALES

COSTO SEGÚN COTIZACION


N° MATERIAL SOLICITADO COSTO UNIT
1 CAJA PARA 1 LLAVE TERMOMAGNÉTICA ADOSABLE PARA RIEL DIN 30.00 10.50
2 CAJA TOMA PARA INTERRUPTOR Y/O TOMACORRIENTE 240.00 1.00
3 CAJA GALV. OCTOGONAL LIVIANA DE 4" 150.00 1.00
4 CABLE TW # 14 AWG - LS0H EQUIVALENTE A 14 30.00 155.00
5 SOCKET SALIDA DE FOCO 150.00 3.60
6 INTERRUPTOR TERMOMAGNETICO RIEL DIN 10kA 230/400V 2P 32A 30.00 21.00
7 INTERRUPTOR TERMOMAGNETICO RIEL DIN 10kA 230/400V 2P 20A 30.00 21.00
8 INTERRUPTOR SIMPLE 90.00 4.00
9 INTERRUPTOR DOBLE 30.00 5.00
10 TOMACORRIENTE DOBLE 120.00 5.00
11 FOCOS AHORRADORES 150.00 5.00
12 CINTA AISLANTE 30.00 5.00
COSTO SEGÚN COTIZACION

COSTO PRESUPUESTADO
COSTO SEGÚN COTIZACION
SALDO
COSTO PRESUPUESTADO
SUB TOTAL N° MATERIAL SOLICITADO
315.00 1 CAJA PARA 1 LLAVE TERMOMAGNÉTICA ADOSABLE PARA RIEL DIN 30.00
240.00 2 CAJA TOMA PARA INTERRUPTOR Y/O TOMACORRIENTE 240.00
150.00 3 CAJA GALV. OCTOGONAL LIVIANA DE 4" 150.00
4,650.00 4 CABLE TW # 14 AWG 30.00
540.00 5 SOCKET SALIDA DE FOCO 150.00
630.00 6 INTERRUPTOR TERMOMAGNETICO RIEL DIN 10kA 230/400V 2P 32A 30.00
630.00 7 INTERRUPTOR TERMOMAGNETICO RIEL DIN 10kA 230/400V 2P 20A 30.00
360.00 8 INTERRUPTOR SIMPLE 90.00
150.00 9 INTERRUPTOR DOBLE 30.00
600.00 10 TOMACORRIENTE DOBLE 120.00
750.00 11 FOCOS AHORRADORES 150.00
150.00 12 CINTA AISLANTE 30.00
9,165.00 COSTO PRESUPUESTADO

8,679.00
9,165.00
- 486.00
COSTO UNIT SUB TOTAL
10.00 300.00
1.00 240.00
2.50 375.00
140.00 4,200.00
2.50 375.00
20.00 600.00
18.00 540.00
3.50 315.00
3.80 114.00
4.50 540.00
6.00 900.00
6.00 180.00
COSTO PRESUPUESTADO 8,679.00
CANTIDAD DE MATERIALES
COSTO SEGÚN COTIZACION
N° MATERIAL SOLICITADO COSTO UNIT
1 PINTURA ESMALTE 15.00 41.00
2 PINTURA LATEX 30.00 20.50
3 THINNER 30.00 15.50
4 IMPRIMANTE 90.00 20.50
5 BARNIZ MARINO 15.00 44.00
COSTO SEGÚN COTIZACION

COSTO PRESUPUESTADO
COSTO SEGÚN COTIZACION
SALDO
COSTO PRESUPUESTADO
SUB TOTAL N° MATERIAL
615.00 MAESTRO 1 PINTURA LATEX
615.00 FAST
465.00 2 THINNER
1,845.00 KILOS 3 IMPRIMANTE
660.00 PARACAS 4 BARNIZ MARINO
4,200.00

2,751.57 1,125.00
4,200.00
- 1,448.43

2.20
1.90
2.20
3.10
0.70
2.20
SOLICITADO COSTO UNIT SUB TOTAL
37.27 21.00 782.60

8.10 16.00 129.60


35.51 13.90 493.58
38.45 35.00 1,345.79
COSTO PRESUPUESTADO 2,751.57

8.80 2.50 22.00


7.60 2.50 19.00
4.40 2.50 11.00
6.20 2.50 15.50 98.72
1.40 2.50 3.50
4.40 2.50 11.00
82.00 100.00
2,460.00 24.60
61.50

4.18 8.36
6.82
1.54 25.00
16.72 501.60 12.54
74.04

100.00 2,961.60
29.62

20.00
CANTIDAD DE MATERIALES
COSTO SEGÚN COTIZACION
N° MATERIAL
1 GANCHO CON TORCEDURA EN CALIENTE ATORNILLADO A PLATINA DE FIERRO NEGRO DE 3/16 X 1.5"X 6M
2 SOPORTE PARA TUBO PVC 3" DE PLATINA DE FIERRO DE 1" X 3/16"
3 ABRAZADERA TIPICA PLATINA DE 1 X 3/16" DE DOS OREJAS DE 3"
4 CANALETA DE PLANCHA F° G° 1/40" D= 5"
SOLICITADO COSTO UNIT SUB TOTAL N°
60.00 7.00 420.00 1
240.00 7.00 1,680.00 2
180.00 5.00 900.00 3
351.00 15.00 5,265.00 4
COSTO SEGÚN COTIZACION 8,265.00

COSTO PRESUPUESTADO 5,572.80


COSTO SEGÚN COTIZACION 8,265.00
SALDO - 2,692.20

13.68
COSTO PRESUPUESTADO
MATERIAL SOLICITADO COSTO UNIT
GANCHO CON TORCEDURA EN CALIENTE ATORNILLADO A PLATINA DE FIERRO N 60.00 3.00
SOPORTE PARA TUBO PVC 3" DE PLATINA DE FIERRO DE 1" X 3/16" 240.00 7.00
ABRAZADERA TIPICA PLATINA DE 1! X 3/16" DE DOS OREJAS DE 3" 180.00 5.00
CANALETA DE PLANCHA Fª Gª 1/40" D= 5" 351.60 8.00
COSTO PRESUPUESTADO
SUB TOTAL
180.00 - 240.00
1,680.00 -
900.00 -
2,812.80 - 2,452.20
5,572.80 - 2,692.20
RESUMEN TOTAL SALDOS PAR

ITEM DESCRIPCION SUB TOTAL ITEM


1 AGREGADOS EN GENERAL - 7,504.70 1
2 ALAMBRES Y CLAVOS - 7,860.90 2
3 PUERTAS EXTERIORES 900.00 3
4 PUERTAS INTERIORES 1,110.00 4
5 VENTANAS - 10,478.59 5
6 MAT. DRYWALL 61.80 6
7 MAT. INST. ELECT. - 486.00 7
8 PINTURA - 1,448.43 8
9 MAT. EVAC. PLUVIAL - 2,692.20 9
TOTAL - 28,399.02 10
11

GASTOS A REALIZAR - 28,399.02


SALDOS A CUBRIR 19,833.99
SALDOS - 8,565.03
SALDOS PARA CUBRIR

DESCRIPCION SUB TOTAL


2.5 MILLAR DE LADRILLO 3,450.00
YESO 3,165.00
PERNO 3/8" X 5" CON TUERCA Y ARANDELA 672.00
BISAGRA CAPUCHINA ALUMINIZADA DE 3"x3" 1,656.00
CERRADURA DE POMO PUERTA INTERIOR 3,150.00
CERROJO PARA CANDADO DE ACERO NIQUELADO 4" X 3/8" 240.00
CANDADO DE BRONCE DE 50 MM 960.00
PRESERVANTE PARA MADERA 2,800.89
PLATINA 12" X 2" X 1/8" HABILITADO E INCLUYE DOS AGUJEROS 2,520.00
PEGAMENTO PARA PVC 752.10
PERNO EXPANSOR 468.00

TOTAL 19,833.99
CANTIDAD DE MATERIALES

COSTO SEGÚN PLANILLAS


N° MONC SOLICITADO COSTO UNIT SUB TOTAL N°
1 AUT. 02 1.00 10,557.60 10,557.60 1
2 AUT. 03 1.00 3,585.60 3,585.60
3 AUT. 04 1.00 13,280.00 13,280.00
COSTO SEGÚN PLANILLAS 27,423.20

COSTO SEGÚN PLANILLAS (A PAGAR Y PROGRAMADO)


N° MONC SOLICITADO COSTO UNIT SUB TOTAL
1 MES ABRIL SAN MIGUEL (pendiente Julio) 1.00 1,394.40 840.00 A PAGAR EN JULIO
2 MES MAYO SAN MIGUEL 1.00 A PAGAR
14,320.00 14,320.00
3 MES MAYO PARIACANCHA 1.00 A PAGAR
4 MES JUNIO SAN MIGUEL 1.00 3,880.00 3,880.00 A PAGAR EN JULIO
5 MES JUNIO PARIACANCHA 1.00 3,680.00 3,680.00 A PAGAR EN JULIO
6 MES JULIO PARIACANCHA - SAN MIGUEL 1.00 3,600.00 3,600.00 PROGRAMADO
7 MES AGOSTO 1.00 8,000.00 8,000.00 PROGRAMADO
COSTO A PAGAR PLANILLAS 34,320.00

26,320.00

1,394.40

23,771.20

6,440.80
6,108.80
3,600.00
8,000.00
COSTO PRESUPUESTADO
MATERIAL SOLICITADO COSTO UNIT SUB TOTAL
PRESUPUESTO DE OBRA - PEON 1.00 50,438.55 50,438.55

COSTO PRESUPUESTADO 50,438.55

A PAGAR EN JULIO COSTO PRESUPUESTADO 50,438.55


COSTO SEGÚN PLANILLAS 27,423.20
COSTO A PAGAR PLANILLAS 34,320.00
A PAGAR EN JULIO SALDO - 11,304.65
A PAGAR EN JULIO
PROGRAMADO
PROGRAMADO

22,720.00 7,171.20 PARA TERMINAR EN PARIACANCHA


5,976.00 SE DEBE
13,147.20 PARA NO DEBER A NADIE
15,160.00 14,699.85
27,847.05 ACABAR Y NO DEBER
12,000.00

8,400.00 30,000.00 YANAHUANCA DOS MESES

2,548.80
23,015.35

MINAR EN PARIACANCHA 8,366.40


30,000.00
DEBER A NADIE 45,000.00
83,366.40 74,000.00 9,366.40

NCA DOS MESES


CANTIDAD DE MATERIALES

COSTO SEGÚN PLANILLAS


N° MONC SOLICITADO
1 AUT. 02 1.00
2 AUT. 03 1.00
3 AUT. 04 1.00
4 APORTE PARA CUBRIR DESFASE - ARENA FINA 1.00
5 APORTE PARA CUBRIR DESFASE - MADERA PARA ENCOFRADO 1.00
6 APORTE PARA CUBRIR DESFASE - FLETE TERRESTRE LADRILLO 1.00
7 APORTE PARA CUBRIR DESFASE - FLETE AGREGADOS ARENA FINA Y HORMIGON 1.00
8 DESTAJO 01 1.00
9 DESTAJO 02 1.00
10 DESTAJO PAGADO CON MAESTRO DE OBRA 1.00
COSTO SEGÚN PLANILLAS

COSTO POR PAGAR DESTAJOS


N° MONC SOLICITADO
1 FALTA PAGAR 1.00
COSTO POR PAGAR DESTAJOS

57,960.00
36,944.20
21,015.80
20,985.00
30.80
COSTO PRESUPUESTADO
COSTO UNIT SUB TOTAL N° MATERIAL SOLICITADO
3,795.92 3,795.92 1 PRESUPUESTO DE OBRA - CALIFICADA (Op-Of) 1.00
17,434.64 17,434.64 2 PRESUPUESTO DE OBRA - MAESTRO DE OBRA 1.00
3,841.52 3,841.52 COSTO PRESUPUESTADO
9,772.72 9,772.72 ###
525.00 525.00
7,945.12 7,945.12 37,817.46 3,781.75
2,743.00 2,743.00 12,120.00
15,374.85 15,374.85 49,937.46
22,442.61 22,442.61 COSTO PRESUPUESTADO
1,788.36 1,788.36 1,788.36 COSTO SEGÚN PLANILLAS
OSTO SEGÚN PLANILLAS 85,663.74 36,093.74 COSTO POR PAGAR DESTAJOS

39,605.82 23,973.74
83,000.00 81,211.64
COSTO UNIT SUB TOTAL
43,394.18 43,394.18
OSTO POR PAGAR DESTAJOS 43,394.18 83,000.00
94.00 9,088.80
13,203.56 32.00 73,911.20 74,398.40
12,190.62 30,190.62 101.00 83,487.20
227.00
7,905.90

36,960.00 6,326.04 MAESTRO DE OBRA


15.80

0
0

0
2300 2300

-
COSTO UNIT SUB TOTAL
122,066.75 122,066.75
9,088.80 9,088.80
OSTO PRESUPUESTADO 131,155.55

51,725.82 46,409.48 5,316.34


41,599.21 18,000.00
69,725.82 3,873.66

OSTO PRESUPUESTADO 131,155.55


OSTO SEGÚN PLANILLAS 85,663.74
OSTO POR PAGAR DESTAJOS 43,394.18 CIELO RASO NO
SALDO 2,097.63 PINTURA NO
18,000.00

5,973.74 SOBRANTE
45,000.00 YANAHUANCA 45,000.00
3,750.00
45,000.00
12,120.00 75,000.00
18,000.00 30,000.00
30,120.00
67,937.46

MAESTRO DE OBRA

4600
CANTIDAD DE MATERIALES

COSTO SEGÚN PLANILLAS


N° MONC SOLICITADO
1 NOVIEMBRE 1.00
2 DICIEMBRE 1.00
3 ENERO 1.00
COSTO SEGÚN PLANILLAS

COSTO POR PAGAR DESTAJOS


N° MONC SOLICITADO
1 MARZO 1.00
2 ABRIL 1.00
3 MAYO 1.00
4 JUNIO 1.00
5 JULIO - PARIACANCHA 1.00
6 JULIO - YANAHUANCA 1.00
7 AGOSTO YANAHUANCA 1.00
COSTO POR PAGAR DESTAJOS
COSTO PRESUPUESTADO
COSTO UNIT SUB TOTAL N° MATERIAL SOLICITADO
1,850.00 1,850.00 1 PRESUPUESTO DE OBRA - ALIMENTACION 1.00
1,450.00 1,450.00
1,945.00 1,945.00 COSTO PRESUPUESTADO
OSTO SEGÚN PLANILLAS 5,245.00

COSTO PRESUPUESTADO
COSTO UNIT SUB TOTAL COSTO SEGÚN PLANILLAS
578.00 578.00 A PAGAR COSTO POR PAGAR DESTAJOS
2,383.00 2,383.00 A PAGAR
2,118.00 2,118.00 A PAGAR
1,919.00 1,919.00 PAGAR EN JULIO
1,710.00 1,710.00 PROGRAMADO 3,629.00
1,710.00 PROGRAMADO
1,710.00 PROGRAMADO
OSTO POR PAGAR DESTAJOS 8,708.00
1,710.00
2,688.00
4,398.00

PENDIENTE YANAHUANCA
COSTO UNIT SUB TOTAL
5,400.00 5,400.00
-
OSTO PRESUPUESTADO 5,400.00

OSTO PRESUPUESTADO 5,400.00


OSTO SEGÚN PLANILLAS 5,245.00
OSTO POR PAGAR DESTAJOS 8,708.00
SALDO - 8,553.00

ALIMENTO LO QUE SE DEB


ALIMENTACION PARIACANCHA

ENDIENTE YANAHUANCA
RESUMEN TOTAL SALDOS PARA CUBRIR

ITEM DESCRIPCION SUB TOTAL ITEM


1 MANO DE OBRA NO CALIFICADA - 11,304.65 1
2 MANO DE OBRA CALIFICADA 2,097.63 2
3 ALIMENTACION - 8,553.00 3
4
5
6
7
8
TOTAL - 17,760.03 9

GASTOS A REALIZAR - 17,760.03


SALDOS A CUBRIR 41,775.05
SALDOS 24,015.02
SALDOS PARA CUBRIR

DESCRIPCION SUB TOTAL


PRESUPUESTO DE OBRA - ALMACENERO 4,588.85
PRESUPUESTO DE OBRA - ALQUILER DE CAMION 10,710.00
PRESUPUESTO DE OBRA - ASISTENTE DE RESIDENTE 10,637.78
PRESUPUESTO DE OBRA - EQUIPO Y HERRAMIENTAS 5,466.65
PRESUPUESTO DE OBRA - PLAN COVID 6,360.00
PRESUPUESTO DE OBRA - OPERADOR Y CAPACITADOR 1,011.77
PRESUPUESTO DE OBRA - SCTR 2,000.00
OTROS 1,000.00

TOTAL 41,775.05