Está en la página 1de 38

PRECIOS UNITARIOS BAJA TENSION

DESCRIPCION: ESTRUCTURA Unidad : PZA Partida :


RD20
CLAVE:
INSUMO/CLAVE CANTIDAD UNIDAD COSTO TOTAL
DESCRIPCION

Obra de Mano
OBRAM-05 AYUDANTE 0.50 JOR $348.25
LINIERO $174.13
OBRAM-10 LINIERO 0.50 JOR $645.75 $322.88
0.00 JOR $0.00
0.00 JOR $0.00
0.00 JOR $0.00

Subtotal Obra de
Mano

Materiales
MAT-01 CRUCETA PR 200 2.00 PZA $510.97 $1,021.94
MAT-02 PERNO DOBLE 4.00 PZA $70.90 $283.60
ROSCA 16*457
MAT-03 OJO RE 2.00 PZA $27.56 $55.12
MAT-04 AISLADOR ASSUS 2.00 PZA $187.58 $375.16
25 KV
MAT-05 GRAPA RAL 8 2.00 PZA $81.11 $162.22
PZA $0.00 $0.00
PZA $0.00 $0.00
PZA $0.00 $0.00
Flete $ 0.03 56.9412

Subtotal
Materiales

Maquinaria
EQUI_01 GRUA HIAB 0.00 Hora $800.00 $0.00
EQUI_02 HERREMIENTA 0.05 $24.85
MENOR
Subtotal
Maquinaria

** Costo Directo :

Obra de $497.00
Mano:
Materiales: $1,954.98
Maquinaria: $24.85
Basicos:
Costo $2,476.83
Directo:
Costo $743.05
Indirecto:
Precio $3,219.88
Unitario:

Cliente:
Obra:
Ubicacion:
DESCRIPCION: ESTRUCTURA Unidad : PZA Partida :
CCF20
CLAVE:
INSUMO/CLAVE CANTIDAD UNIDAD COSTO TOTAL
DESCRIPCION

Obra de Mano
OBRAM-05 AYUDANTE 0.55 JOR $645.75
LINIERO $355.16
OBRAM-10 LINIERO 0.55 JOR $348.25 $191.54
0.00 JOR $0.00
0.00 JOR $0.00
0.00 JOR $0.00

Subtotal Obra de
Mano

Materiales
MAT-01 CORTA CIRCUITO 2.00 PZA $1,005.25 $2,010.50
FUSIBLE 25 KV
MAT-02 LISTON FUSIBLE 5 2.00 PZA $25.46 $50.92
AMP
MAT-03 CONECTOR 2.00 PZA $84.50 $169.00
ESTRIBO CAL 1/0
MAT-04 CONETOR 2.00 PZA $120.00 $240.00
PERICO CAL 1/0
MAT-05 CONECTOR PURO 2.00 PZA $12.41 $24.82
BIMETALICO CAL
1/0

MAT-06 ALAMBRE DE CU 2.00 KG $187.53 $375.06


CAL 4
$0.00 $0.00
$0.00 $0.00
Flete $ 0.03 86.109

Subtotal
Materiales

Maquinaria
EQUI_01 GRUA HIAB 0.00 Hora $800.00 $0.00
EQUI_02 HERREMIENTA 0.05 $27.34
MENOR
Subtotal
Maquinaria
** Costo Directo :

Obra de $546.70
Mano:
Materiales: $2,956.41
Maquinaria: $27.34
Basicos:
Costo $3,530.44
Directo:
Costo $1,059.13
Indirecto:
Precio $4,589.58
Unitario:

Cliente:
Obra:
Ubicacion:

DESCRIPCION: ESTRUCTURA Unidad : PZA Partida :


ITR2B
CLAVE:
INSUMO/CLAVE CANTIDAD UNIDAD COSTO TOTAL
DESCRIPCION

Obra de Mano
OBRAM-05 AYUDANTE 1.00 JOR $348.25
LINIERO $348.25
OBRAM-10 LINIERO 1.00 JOR $645.75 $645.75
0.00 JOR $0.00
0.00 JOR $0.00
0.00 JOR $0.00

Subtotal Obra de
Mano

Materiales
MAT-01 CRUZETA PT 200 1.00 PZA $351.86 $351.86
MAT-02 ABRAZDERA UL 1.00 PZA $52.44 $52.44
MAT-03 CORTA CIRCUITO 2.00 PZA $1,005.25 $2,010.50
FUSIBLE 25 KV
MAT-04 APARTARRAYO 2.00 PZA $1,063.42 $2,126.84
SITETICO 18 KV
MAT-05 LISTON FUSIBLE 2.00 PZA $25.46 $50.92
5AMP
MAT-06 CONECTRO PURO 2.00 PZA $12.41 $24.82
BIMETALICO CAL
1/0

MAT-07 ALAMBRE CU 2.00 KG $187.53 $375.06


DENUDO CAL 4
MAT-08 SOPORTE CV1 2.00 PZA $98.64 $197.28
MAT-09 ABRAZADERA 2.00 PZA $99.57 $199.14
3UH
MAT-10 TORNILLO 2.00 PZA $18.36 $36.72
MAQUINA 16*76
MAT-11 PLACA 1PC 10.00 PZA $3.68 $36.80

Flete $ 0.03 163.8714

Subtotal
Materiales

Maquinaria
EQUI_01 GRUA HIAB 0.00 Hora $800.00 $0.00
EQUI_02 HERREMIENTA 0.05 $49.70
MENOR
Subtotal
Maquinaria

** Costo Directo :

Obra de $994.00
Mano:
Materiales: $5,626.25
Maquinaria: $49.70
Basicos:
Costo $6,669.95
Directo:
Costo $2,000.99
Indirecto:
Precio $8,670.94
Unitario:

Cliente:
Obra:
Ubicacion:

DESCRIPCION: SISTEMA DE Unidad : PZA Partida :


TIERRA DE 2
VARILLAS
CLAVE:
INSUMO/CLAVE CANTIDAD UNIDAD COSTO TOTAL
DESCRIPCION

Obra de Mano
OBRAM-05 AYUDANTE 0.30 JOR $348.25
LINIERO $104.48
OBRAM-10 LINIERO 0.30 JOR $645.75 $193.73
0.00 JOR $0.00
0.00 JOR $0.00
0.00 JOR $0.00

Subtotal Obra de
Mano

Materiales
MAT-01 CABLE CU 7.00 KG $192.00 $1,344.00
DESNUDO CAL 2
MAT-02 VARILLA DE 3.00 PZA $187.60 $562.80
5/8*3MTS
MAT-03 CARGA 3.00 PZA $59.76 $179.28
SOLDABLE N 90
MAT-04 CONETOR 3.00 PZA $12.41 $37.23
BIMETALICO CAL
1/0
MAT-05 0.00 PZA $0.00 $0.00
MAT-06 0.00 PZA $0.00 $0.00
MAT-07 0.00 PZA $0.00 $0.00
MAT-08 0.00 PZA $0.00 $0.00
Flete $ 0.03 63.6993

Subtotal
Materiales

Maquinaria
EQUI_01 GRUA HIAB 0.22 Hora $800.00 $176.00
EQUI_02 HERREMIENTA 0.05 $14.91
MENOR
Subtotal
Maquinaria
** Costo Directo :

Obra de $298.20
Mano:
Materiales: $2,187.01
Maquinaria: $190.91
Basicos:
Costo $2,676.12
Directo:
Costo $535.22
Indirecto:
Precio $3,211.34
Unitario:

Cliente:
Obra:
Ubicacion:

DESCRIPCION: K DE UNA Unidad : PZA Partida :


VARILLA
CLAVE:
INSUMO/CLAVE CANTIDAD UNIDAD COSTO TOTAL
DESCRIPCION

Obra de Mano
OBRAM-05 AYUDANTE 0.30 JOR $348.25
LINIERO $104.48
OBRAM-10 LINIERO 0.30 JOR $645.75 $193.73
0.00 JOR $0.00
0.00 JOR $0.00
0.00 JOR $0.00

Subtotal Obra de
Mano

Materiales
MAT-01 CABLE DE CU 2.70 KG $192.00 $518.40
DES. CAL 2
MAT-02 VARRILA COOPER 1.00 PZA $187.60 $187.60
3* 5/8 MTS
MAT-03 CARDA 1.00 PZA $59.76 $59.76
SOLDABLE NUM.
90
MAT-04 CONECTOR YP 1.00 PZA $49.75 $49.75
CAT. YP27AU26
MAT-05 0.00 PZA $0.00 $0.00
MAT-06 0.00 PZA $0.00 $0.00
MAT-07 0.00 PZA $0.00 $0.00
MAT-08 0.00 PZA $0.00 $0.00
Flete $ 0.03 24.4653

Subtotal
Materiales

Maquinaria
EQUI_01 GRUA HIAB 0.00 Hora $800.00 $0.00
EQUI_02 HERREMIENTA 0.05 $14.91
MENOR
Subtotal
Maquinaria

** Costo Directo :

Obra de $298.20
Mano:
Materiales: $839.98
Maquinaria: $14.91
Basicos:
Costo $1,153.09
Directo:
Costo $230.62
Indirecto:
Precio $1,383.70
Unitario:

Cliente:
Obra:
Ubicacion:

DESCRIPCION: ESTRUCTURA Unidad : PZA Partida :


RBA
CLAVE:
INSUMO/CLAVE CANTIDAD UNIDAD COSTO TOTAL
DESCRIPCION

Obra de Mano
OBRAM-05 AYUDANTE 0.70 JOR $348.25
LINIERO $243.78
OBRAM-10 LINIERO 0.70 JOR $645.75 $452.03
0.00 JOR $0.00
0.00 JOR $0.00
0.00 JOR $0.00

Subtotal Obra de
Mano

Materiales
MAT-01 CABLE PARA 16.00 MTS $20.21 $323.36
RETENIDA DE 3/8
MAT-02 AISLADOR PIÑA 1.00 PZA $54.50 $54.50
3R
MAT-03 PERNO ANCLA 1.00 PZA $137.08 $137.08
1PA
MAT-04 ANCLA CONICA 1.00 PZA $202.00 $202.00
C3
MAT-05 REAMATE 4.00 PZA $33.45 $133.80
PREFORMADOM
DE 3/8
MAT-06 GUARDA CABO 1.00 PZA $11.46 $11.46
3/8
MAT-07 PLACA 2PC 1.00 PZA $12.61 $12.61
MAT-08 GRAPA Y BASE 1.00 JGO $141.45
RB
MAT-09 CEPA 1.00 PZA $500.00 $500.00
MAT-10 TUBO CONDUIR 0.50 TMO $367.80 $183.90
PGG 51MM
MAT-11 PROTECTOR 1.00 PZA $226.86 $226.86
RETENIDA
MAT-12 ABRAZADERA 3BS 2.00 PZA $120.00 $240.00

MAT-13 Flete $ 0.03 41.2443

Subtotal
Materiales

Maquinaria
EQUI_01 GRUA HIAB 0.00 Hora $800.00 $0.00
EQUI_02 HERREMIENTA 0.05 $34.79
MENOR
Subtotal
Maquinaria

** Costo Directo :

Obra de $695.80
Mano:
Materiales: $2,066.81
Maquinaria: $34.79
Basicos:
Costo $2,797.40
Directo:
Costo $559.48
Indirecto:
Precio $3,356.89
Unitario:

Cliente:
Obra:
Ubicacion:

DESCRIPCION: POSTE PC-11 700 Unidad : PZA Partida :


CLAVE:
INSUMO/CLAVE CANTIDAD UNIDAD COSTO TOTAL
DESCRIPCION

Obra de Mano
OBRAM-05 AYUDANTE 0.73 JOR $348.25
LINIERO $254.22
OBRAM-10 LINIERO 0.73 JOR $645.75 $471.40
0.00 JOR $0.00
0.00 JOR $0.00
0.00 JOR $0.00

Subtotal Obra de
Mano

Materiales
MAT-01 POSTE PC 11-700 1.00 PZA $3,735.00 $3,735.00
MAT-02 CEPA 1.00 PZA $500.00 $500.00
Mat-03 INCADO 1.00 PZA $250.00 $250.00
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $0.00 $0.00
Flete $ 0.03 134.55

Subtotal
Materiales

Maquinaria
EQUI_01 GRUA HIAB 3.20 Hora $800.00 $2,560.00
EQUI_02 HERREMIENTA 0.05 $36.28
MENOR
Subtotal
Maquinaria

** Costo Directo :

Obra de $725.62
Mano:
Materiales: $4,619.55
Maquinaria: $2,596.28
Basicos:
Costo $7,941.45
Directo:
Costo $1,588.29
Indirecto:
Precio $9,529.74
Unitario:

Cliente:
Obra:
Ubicacion:

DESCRIPCION: CABLE Unidad : PZA Partida :


NEUTRANEL 1+1
CAL. 6
CLAVE:
INSUMO/CLAVE CANTIDAD UNIDAD COSTO TOTAL
DESCRIPCION

Obra de Mano
OBRAM-05 AYUDANTE 0.01 JOR $348.25
LINIERO $2.09
OBRAM-10 LINIERO 0.01 JOR $645.75 $3.87
0.00 JOR $0.00
0.00 JOR $0.00
0.00 JOR $0.00

Subtotal Obra de
Mano

Materiales
MAT-01 CABLE 1.05 MTS $11.36 $11.93
NEUTRANEL 1+1
CAL. 6
MAT-02 CONECTOR CAL 6 1.00 PZA $13.68 $13.68

0.00 PZA $1.00 $0.00


0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $0.00 $0.00
Flete $ 0.03 0.76824

Subtotal
Materiales

Maquinaria
EQUI_01 GRUA HIAB 0.00 Hora $800.00 $0.00
EQUI_02 HERREMIENTA 0.05 $0.30
MENOR
Subtotal
Maquinaria

** Costo Directo :

Obra de $5.96
Mano:
Materiales: $26.38
Maquinaria: $0.30
Basicos:
Costo $32.64
Directo:
Costo $6.53
Indirecto:
Precio $39.17
Unitario:

Cliente:
Obra:
Ubicacion:

DESCRIPCION: TRO Unidad : PZA Partida :


MONOFASICO DE
15 KVA 23 KV /
240-120
CLAVE:
INSUMO/CLAVE CANTIDAD UNIDAD COSTO TOTAL
DESCRIPCION

Obra de Mano
OBRAM-05 AYUDANTE 1.00 JOR $348.25
LINIERO $348.25
OBRAM-10 LINIERO 1.00 JOR $645.75 $645.75
0.00 JOR $0.00
0.00 JOR $0.00
0.00 JOR $0.00

Subtotal Obra de
Mano

Materiales
MAT-01 TRO 15 KVA 1.00 PZA $16,065.00 $16,065.00
0.00 PZA $0.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $0.00 $0.00
Flete $ 0.03 481.95
Subtotal
Materiales

Maquinaria
EQUI_01 GRUA HIAB 3.00 Hora $800.00 $2,400.00
EQUI_02 HERREMIENTA 0.05 $49.70
MENOR
Subtotal
Maquinaria

** Costo Directo :

Obra de $994.00
Mano:
Materiales: $16,546.95
Maquinaria: $2,449.70
Basicos:
Costo $19,990.65
Directo:
Costo $3,998.13
Indirecto:
Precio $23,988.78
Unitario:

Cliente:
Obra:
Ubicacion:

DESCRIPCION: AISLADOR 22 PD Unidad : PZA Partida :


CLAVE:
INSUMO/CLAVE CANTIDAD UNIDAD COSTO TOTAL
DESCRIPCION

Obra de Mano
OBRAM-05 AYUDANTE 0.21 JOR $348.25
LINIERO $73.13
OBRAM-10 LINIERO 0.21 JOR $645.75 $135.61
0.00 JOR $0.00
0.00 JOR $0.00
0.00 JOR $0.00
Subtotal Obra de
Mano

Materiales
MAT-01 22 PD 2.00 PZA $364.68 $729.36
MAT-02 ALMBRE DE AL 1.00 KG $68.00 $68.00
SUABE CAL 4
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $0.00 $0.00
Flete $ 2.00 1594.72

Subtotal
Materiales

Maquinaria
EQUI_01 GRUA HIAB 0.00 Hora $0.00 $0.00
EQUI_02 HERREMIENTA 0.05 $10.44
MENOR
Subtotal
Maquinaria

** Costo Directo :

Obra de $208.74
Mano:
Materiales: $2,392.08
Maquinaria: $10.44
Basicos:
Costo $2,611.26
Directo:
Costo $522.25
Indirecto:
Precio $3,133.51
Unitario:

Cliente:
Obra:
Ubicacion:

DESCRIPCION: ACSR CAL 1/0 Unidad : PZA Partida :


CLAVE:
INSUMO/CLAVE CANTIDAD UNIDAD COSTO TOTAL
DESCRIPCION

Obra de Mano
OBRAM-05 AYUDANTE 0.01 JOR $348.25
LINIERO $3.48
OBRAM-10 LINIERO 0.01 JOR $645.75 $6.46
0.00 JOR $0.00
0.00 JOR $0.00
0.00 JOR $0.00

Subtotal Obra de
Mano

Materiales
MAT-01 ACSR CAL 1/0 1.05 MTS $32.52 $34.15
MAT-02 0.00 KG $0.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $1.00 $0.00
0.00 PZA $0.00 $0.00
Flete $ 2.00 68.292

Subtotal
Materiales

Maquinaria
EQUI_01 GRUA HIAB 0.00 Hora $0.00 $0.00
EQUI_02 HERREMIENTA 0.05 $0.50
MENOR
Subtotal
Maquinaria

** Costo Directo :
Obra de $9.94
Mano:
Materiales: $102.44
Maquinaria: $0.50
Basicos:
Costo $112.88
Directo:
Costo $22.58
Indirecto:
Precio $135.45
Unitario:

Cliente:
Obra:
Ubicacion:

DESCRIPCION: MEDICION Unidad : PZA Partida :


CLAVE:
INSUMO/CLAVE CANTIDAD UNIDAD COSTO TOTAL
DESCRIPCION

Obra de Mano
OBRAM-05 AYUDANTE 1.10 JOR $348.25
LINIERO $383.08
OBRAM-10 LINIERO 1.10 JOR $645.75 $710.33
0.00 JOR $0.00
0.00 JOR $0.00
0.00 JOR $0.00

Subtotal Obra de
Mano

Materiales
MAT-01 JUEGO 1.00 JGO $1,151.00 $1,151.00
ACOMETIDA
MAT-02 VARILLA 5/8* 1.00 PZA $113.00 $113.00
3MTS
MAT-03 CARGO 1.00 PZA $59.76 $59.76
SOLDABLE
MAT-04 CONECTOR PURO 1.00 PZA $12.41 $12.41
1/0
MAT-05 0.00 PZA $0.00 $0.00
MAT-06 0.00 PZA $0.00 $0.00
MAT-07 PZA $0.00 $0.00
MAT-08 0.00 PZA $0.00 $0.00
MAT-09 $0.00
MAT-10 $0.00
MAT-11 0.00 PZA $0.00 $0.00
Flete $ - 0

Subtotal
Materiales

Maquinaria
EQUI_01 GRUA HIAB 0.00 Hora $0.00 $0.00
EQUI_02 HERREMIENTA 0.05 $54.67
MENOR
Subtotal
Maquinaria

** Costo Directo :

Obra de $1,093.40
Mano:
Materiales: $1,336.17
Maquinaria: $54.67
Basicos:
Costo $2,484.24
Directo:
Costo $496.85
Indirecto:
Precio $2,981.09
Unitario:
PREL-10
COSTO TOTAL

$497.00
$1,954.98

$24.85

$2,476.83

20.00
PREL-10
COSTO TOTAL

$546.70

$2,956.41

$27.34
$3,530.44

20.00

PREL-10
COSTO TOTAL

$994.00
$5,626.25

$49.70

$6,669.95

20.00
PREL-10
COSTO TOTAL

$298.20

$2,187.01

$190.91
$2,676.12

20.00

PREL-10
COSTO TOTAL

$298.20
$839.98

$14.91

$1,153.09

20.00

PREL-10
COSTO TOTAL

$695.80

$2,066.81
$34.79

$2,797.40

20.00

PREL-10
COSTO TOTAL

$725.62
$4,619.55

$2,596.28

$7,941.45

20.00

PREL-10
COSTO TOTAL
$5.96

$26.38

$0.30

$32.64
20.00

PREL-10
COSTO TOTAL

$994.00
$16,546.95

$2,449.70

$19,990.65

20.00

PREL-10
COSTO TOTAL
$208.74

$2,392.08

$10.44

$2,611.26

20.00
PREL-10
COSTO TOTAL

$9.94

$102.44

$0.50

$112.88
20.00

PREL-10
COSTO TOTAL

$1,093.40
$1,336.17

$54.67

$2,484.24

20.00
MATERIALES PRECIO
LINIERO $ 645.75
AYUDANTE DE LINIERO $ 348.25
GRUA $ 800.00
FLETE $ 0.03
CEPA $ 500.00
varilla tierra 5/8*3 con pro $ 187.60
varilla tierra 5/8*3 $ 113.00
cable desnudo cu cal 2 $ 192.00
carga soldable n 90 $ 59.76
abrazadera 3uh $ 99.57
soporte cv1 $ 98.64
tor maquina 16*76 $ 18.36
placa 1pc $ 3.68
alambre cu des cal 4 $ 187.53
conector estribo cal 1/0 $ 84.50
conector perico cal 1/0 $ 120.00
conector puro cal 1/0 $ 12.41
abrazadera ul $ 52.44
cruzeta pt 200 $ 351.86
cruzeta pr 200 $ 510.97
aislador assus 23 kv $ 187.58
grapa ral 8 $ 81.11
ojo re $ 27.56
aparta rayo 21 kv $ 1,063.42
ccf 27 kv $ 1,005.25
liston fusibel $ 25.46
tubo c/cople $ 367.80
grapa y base rb $ 141.45
remate preformado 3/8 $ 33.45
cable retenida 3/8 $ 20.21
perno ancla 1pa $ 137.08
placa 2 pc $ 12.61
POSTE 11-700 $ 3,735.00
CABLE CAL 6 1+1 $ 11.36
CONECTOR CAL 6 $ 13.68
TRO 15 KVA $ 16,065.00
ANCLA C3 $ 202.00
aislador 22 PD $ 364.68
alambre al suabe cal 4 $ 68.00
conector yp $ 49.75
per DR 16*457 $ 70.90
piña 3R $ 54.50
guarda cabo 3/8 $ 11.46
ACSR CAL 1/0 $ 32.52
perno dr 16*508 $ 90.00
abrazadera 3BS $ 78.77
HINCADO DE POSTE $ 250.00
PROTECTOR DE RETENIDA $ 226.86
JUEGO ACOMETIDA $ 1,151.00

También podría gustarte