Está en la página 1de 10

GESTIÓN DE PROYECTOS INVERSIONES EL PINO SAC

JULIO_2018
Prorateo Complementarias Lurin COSTOS Y PRESUPUESTO

PROYECTO LIMA SUR _ LURIN

1,014,559.97
PRADERAS DE LURIN LUCUMOS SANTA GENOVEVA
276,242.10 AV 550,935.25 AV 187,382.62 AV
100.00% 100.00% 100.00%
ETAPA I ETAPA II ETAPA III ETAPA I ETAPA II ETAPA III ETAPA IV y V UNICA
75,595.41 131,872.35 68,774.34 260,653.59 146,063.76 70,796.31 73,421.59 187,382.62
27.37% 47.74% 24.90% 47.31% 26.51% 12.85% 13.33% 100.00%

DESCRIPCION UND DN METRADO RATIO PARCIAL


Linea de Impulsión (PTAP-->Cisterna CRB-1) ml 200 574.10 350.00 S/. 200,935.00 463,624.72 AV
K-9 59.58% 40.42%
S/. 119,723.35 S/. 0.00 S/. 81,211.65

Osmosis_PTAP(Pz1, Pz2, LI Pz1->Cisterna, LI, Pz2-->Cisterna ml 250.00 367.47 4,500.00 S/. 1,653,615.00 463,624.72 AV
HDPE 59.58% 40.42%
S/. 985,275.51 S/. 0.00 S/. 668,339.49

PTARD glb 1.00 1,800,000.00 S/. 1,800,000.00 1,014,559.97 AV


27.23% 54.30% 18.47%
S/. 490,099.94 S/. 977,451.78 S/. 332,448.28

Linea de Impulsion Desague(CB-1-->PTARD) ml 2,739.55 200.00 S/. 547,909.40 187,382.62 AV


100.00%
S/. 0.00 S/. 0.00 S/. 547,909.40

Colector (HU-->CB-1) ml 306.67 200.00 S/. 61,333.80 187,382.62 AV


100.00%
S/. 0.00 S/. 0.00 S/. 61,333.80

CB-1 und 1.00 1,525,424.00 S/. 1,525,424.00 187,382.62 AV


100.00%
S/. 0.00 S/. 0.00 S/. 1,525,424.00

Linea de Impulsión (Cisterna CRB-1-->REP-1) ml 200 574.10 110.00 S/. 63,151.00 276,242.10 AV
K-9 100.00%
S/. 63,151.00 S/. 0.00 S/. 0.00

REP-1 und 1.00 950,000.00 S/. 950,000.00 276,242.10 AV


100.00%
S/. 950,000.00 S/. 0.00 S/. 0.00

Linea de Conduccion (REP-1-->REP-2 provisional) ml 150.00 284.11 350.00 S/. 99,438.50 276,242.10 AV
K-9 100.00%
S/. 99,438.50 S/. 0.00 S/. 0.00

REP-2 und 1.00 980,000.00 S/. 980,000.00 550,935.25 AV


100.00%
S/. 0.00 S/. 980,000.00 S/. 0.00

Linea de Impulsion (OSMOSIS-->REP-2) ml 150 1,235.40 350.00 S/. 432,390.35 550,935.25 AV


K-9 100.00%
S/. 0.00 S/. 432,390.35 S/. 0.00

Linea de Conduccion (REP-2-->HU) ml 250 114.72 110.00 S/. 12,618.87 550,935.25 AV


Pozo-2 100.00%
S/. 0.00 S/. 12,618.87 S/. 0.00

und 1.00 S/. 0.00 550,935.25 AV


100.00%
S/. 0.00 S/. 0.00 S/. 0.00

Linea de Impulsion (Pozo2-->OSMOSIS) ml 200 221.55 110.00 S/. 24,370.72 550,935.25 AV


HDPE 100.00%
S/. 0.00 S/. 24,370.72 S/. 0.00

PTAP (RAP-1/OSMOSIS_INVERSA/CB-2/BIODIGESTOR) glb 1.00 1,485,000.00 S/. 1,485,000.00 550,935.25 AV


100.00%
S/. 0.00 S/. 1,485,000.00 S/. 0.00
Nota:
Para el proyecto sta genoveva se esta considerando el parque zonal en area del hueco
GESTION DE PROYECTOS INVERSIONES EL PINO SAC
MARZO_2020
PRORRATEO_OBRAS GENERALES_LURIN
COSTOS Y PRESUPUESTO

LOTES AREA VENDIBLE PARTICIPACIÓN / PROYECTO


ESQUEMA PROYECTO ETAPAS
PARCIAL TOTAL PARCIAL TOTAL PARCIAL TOTAL
I 617 und 75595.41 m2 27.37% 17.98%
PRADERAS PRADERAS
II 1044 und 2173 und 131872.35 m2 276242.10 m2 47.74% 100%
DE LURIN DE LURIN
III 512 und 68774.34 m2 24.90%
LUCUMO 1 I 20 und 260653.59 m2 30.39% 55.83%
LUCUMO 2 I 33 und 146063.76 m2 17.03% EJECUTADO
LUCUMO 3 I 18 und 70796.31 m2 8.25% PROYECTADO
I 83 und 83304.09 m2 9.71%
LUCUMO 261 und 857660.99 m2 100%
LUCUMO 4 y 5 II 61 und 74752.32 m2 8.72%
III 6 und 4269.19 m2 0.50%
LUCUMO VI I2 - I 4 und 180014.91 m2 20.99%
LUCUMO 5C I 36 und 37806.82 m2 4.41%
I 227 und 25086.16 m2 6.23% 26.19%
II 146 und 14784.34 m2 3.67%
SANTA III 200 und 19913.29 m2 4.95%
SANTA GENOVEVA
IV 121 und 2607 und 20079.47 m2 402359.70 m2 4.99% 100%
GENOVEVA SALDO 1202 und 138210.59 m2 34.35%
RDM 679 und 76222.55 m2 18.94%
LUCUMO VI
I2 - II 32 und 108063.30 m2 26.86%
1536262.79 m2 1536262.79 m2

PARTICIPACIÓN / ESQUEMA
ITEM DESCRIPCION UND METRADO RATIO TOTAL
% S/

1 POZO N°1 LUCUMO Qb=9.5 lps P-01 LUC und 1.00 100.00% S/ -
2 POZO N°2 LUCUMO Qb=20 lps P-02 LUC und 1.00 100.00% S/ -
3 EQUIPAMIENTO DE POZO N°2 LUCUMO Qe=20lps P-02 LUC und 1.00 100.00% S/ -
4 LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN110mm LIAC-01 ml 230.00 100.00% S/ -
5 LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN200mm LIAC-02 ml 225.00 100.00% S/ -
6 RESERVORIO APOYADO DE AGUA CRUDA V=120 m3 RAAC-01 und 1.00 100.00% S/ -
7 PLANTA DE TRATAMIENTO DE AGUA POTABLE OI Qi=16.67 lps PTAP-01 und 1.00 100.00% S/ -
8 CISTERNA DE AGUA POTABLE V=100 m3 CAP-01 und 1.00 100.00% S/ -
9 LINEA DE IMPULSIÓN DE AGUA POTABLE HD K-9 DN150mm LIAP-01 ml 1,560.00 100.00% S/ -
10 RESERVORIO ELEVADO DE AGUA POTABLE V=600 m3 REAP-01 und 1.00 100.00% S/ -
24.36% S/ -
11 LINEA DE CONDUCCIÓN DE AGUA DE RECHAZO HDPE DN110mm LCAR-01 ml 2,150.00
75.64% S/ -
17.98% S/ -
12 LAGUNA DE EVAPORACIÓN DE AGUA DE RECHAZO A=2500 m2 LEAR-01 und 1.00 55.83% S/ -
26.19% S/ -
17.98% S/ -
13 LAGUNA DE EVAPORACIÓN DE AGUA DE RECHAZO A=2500 m2 LEAR-02 und 1.00 55.83% S/ -
26.19% S/ -
14 CAMARA DE BOMBEO DE DESAGUE Qb=6 lps CBD-01 und 1.00 100.00% S/ -
15 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES Qi=6 lps PTAR-01 und 1.00 100.00% S/ -
16 CISTERNA DE AGUA TRATADA V=100 m3 CAT-01 und 1.00 100.00% S/ -
17 LINEA DE IMPULSIÓN DE AGUA TRATADA PVC DN160mm LIAT-01 ml 1,680.00 100.00% S/ -
18 RESERVORIO APOYADO DE AGUA TRATADA V=60 m3 RAAT-01 und 1.00 100.00% S/ -
17.98% S/ -
19 LINEA DE CONDUCCIÓN DE AGUA TRATADA HDPE DN110mm LCAT-01 ml 1,980.00 55.83% S/ -
26.19% S/ -
17.98% S/ -
20 RESERVORIO APOYADO DE AGUA TRATADA V=100 m3 RAAT-02 und 1.00 55.83% S/ -
26.19% S/ -

21 POZO N°1 SANTA GENOVEVA Qb=14.50 lps P-01 SG und 1.00 100.00% S/ -
22 EQUIPAMIENTO DE POZO N°1 SANTA GENOVEVA Qe=80lps P-01 SG und 1.00 100.00% S/ -
23 LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN110mm LIAC-03 ml 22.00 100.00% S/ -
68.07% S/ -
24 RESERVORIO APOYADO DE AGUA CRUDA V=125 m3 RAAC-02 und 1.00
31.93% S/ -
68.07% S/ -
25 RESERVORIO APOYADO DE AGUA CRUDA V=720 m3 RAAC-02 und 1.00
31.93% S/ -
26 PLANTA DE TRATAMIENTO DE AGUA POTABLE OI Qi=16.67 lps PTAP-02 und 1.00 100.00% S/ -
27 CISTERNA DE AGUA POTABLE V=328 m3 CAP-02 und 1.00 100.00% S/ -
28 LINEA DE IMPULSIÓN DE AGUA POTABLE HDPE DN200mm LIAP-02 ml 2,650.00 100.00% S/ -
29 RESERVORIO ELEVADO DE AGUA POTABLE V=1100 m3 REAP-02 und 1.00 100.00% S/ -
68.07% S/ -
30 LINEA DE CONDUCCIÓN DE AGUA DE RECHAZO HDPE DN160mm LCAR-02 ml 410.00
31.93% S/ -
31 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES Qi=6 lps PTAR-02 und 1.00 100.00% S/ -

32 POZO N°2 SANTA GENOVEVA Qb=14.50 lps P-02 SG und 1.00 100.00% S/ -
33 EQUIPAMIENTO DE POZO N°2 SANTA GENOVEVA Qe=80 lps P-02 SG und 1.00 100.00% S/ -
34 LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN110mm LIAC-04 ml 325.00 100.00% S/ -
35 PLANTA DE TRATAMIENTO DE AGUA POTABLE OI Qi=16.67 lps PTAP-03 und 1.00 100.00% S/ -
36 CISTERNA DE AGUA POTABLE V=520 m3 CAP-03 und 1.00 100.00% S/ -
37 LINEA DE IMPULSIÓN DE AGUA POTABLE HD K-9 DN300mm LIAP-03 ml 2,220.00 100.00% S/ -
38 RESERVORIO ELEVADO DE AGUA POTABLE V=1460m3 REAP-03 und 1.00 100.00% S/ -
39 LINEA DE IMPULSIÓN DE AGUA POTABLE HDPE DN200mm LIAP-04 ml 250.00 100.00% S/ -
40 RESERVORIO APOYADO DE AGUA POTABLE V=100m3 RAAP-01 und 1.00 100.00% S/ -
41 LINEA DE ADUCCIÓN DE AGUA POTABLE HDPE DN160mm LAAP-01 ml 710.00 100.00% S/ -
42 CAMARA DE BOMBEO DE DESAGÜE Q=6 lps CBD-02 und 1.00 100.00% S/ -
43 LINEA DE IMPULSIÓN DE DESAGÜE HDPE DN160mm LID-01 ml 850.00 100.00% S/ -
44 CAMARA DE BOMBEO DE DESAGÜE Q=6 lps CBD-03 und 1.00 100.00% S/ -
45 LINEA DE IMPULSIÓN DE DESAGÜE HDPE DN110mm LID-02 ml 250.00 100.00% S/ -
46 CAMARA DE BOMBEO DE DESAGÜE Q=6 lps CBD-04 und 1.00 100.00% S/ -
47 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES Qi=6 lps PTAR-03 und 1.00 100.00% S/ -
48 CISTERNA DE AGUA TRATADA V=100 m3 CAT-02 und 1.00 100.00% S/ -
49 LINEA DE IMPULSIÓN DE AGUA TRATADA HDPE DN160mm LIAT-02 ml 360.00 100.00% S/ -
50 RESERVORIO APOYADO DE AGUA TRATADA V=100 m3 RAAT-03 und 1.00 100.00% S/ -
CABIDA DE COSTO
4/6/2021
OBRAS GENERALES DE AGUA POTABLE_LURIN

DEMANDA (l/s) RESUMEN


ESQUEMA PROYECTOS PARTICIPACIÓN
Qb AP 2024 PARTICIPACIÓN

PRADERAS DE LURIN 5.27 2.30% IEP S/ 26,522,138.33


PRADERAS DE LURIN
MACROPOLIS 3.68 1.61% MACROPOLIS S/ 432,658.23
LUCUMO 1
LUCUMO 2 80.58 35.15% OFERTA (l/s)
LUCUMO LUCUMO 3 P-01 LUC 9.50
LUCUMO 4 y 5 91.84 40.06% P-02 LUC 20.00
LUCUMO VI (I2) 10.93 4.77% P-01 SG 80.00
SANTA GENOVEVA 23.05 10.06% P-02 SG 14.50
SANTA GENOVEVA
LUCUMO VI (RDM + I2) 13.91 6.07% QbAC 2024 124.00
TOTAL 229.27 100% Qb AP 2024 93.00

ITEM DESCRIPCION UND. CANT. P.U. TOTAL S/.

OBRAS GENERALES DE AGUA POTABLE S/ 26,954,796.56


01 POZO S/ 6,639,482.40
01.01 EJECUTADO S/ 5,124,504.00
01.01.01 P-01 LUC POZO N°1 LUCUMO Qb=9.5 lps (INC. PERFORACIÓN) * UND 1.00 S/ 867,300.00 S/ 867,300.00
01.01.02 P-02 LUC POZO N°2 LUCUMO Qb=20 lps (INC. PERFORACIÓN) * UND 1.00 S/ 1,774,248.00 S/ 1,774,248.00
01.01.03 P-01 SG POZO N°1 SANTA GENOVEVA Qb=14.50 lps (INC. PERFORACIÓN) * UND 1.00 S/ 1,276,170.00 S/ 1,276,170.00
01.01.04 P-02 SG POZO N°2 SANTA GENOVEVA Qb=14.50 lps (INC. PERFORACIÓN) * UND 1.00 S/ 1,206,786.00 S/ 1,206,786.00
01.02 PROYECTADO S/ 1,514,978.40
01.02.01 P-02 LUC EQUIPAMIENTO DE POZO N°2 LUCUMO Qe=20lps UND 1.00 S/ 692,424.00 S/ 692,424.00
01.02.02 P-01 SG EQUIPAMIENTO DE POZO N°1 SANTA GENOVEVA Qe=80lps UND 1.00 S/ 822,554.40 S/ 822,554.40
02 OSMOSIS S/ 12,736,836.94
02.01 EJECUTADO S/ 6,026,887.86
02.01.01 RAAC-01 RESERVORIO APOYADO DE AGUA CRUDA V=120 m3 UND 1.00 S/ 735,966.00 S/ 735,966.00
02.01.02 PTAP-01 PLANTA DE TRATAMIENTO DE AGUA POTABLE OI Qi=18.06 lps UND 1.00 S/ 1,245,195.00 S/ 1,245,195.00
02.01.03 CAP-01 CISTERNA DE AGUA POTABLE V=100 m3 UND 1.00 S/ 498,078.00 S/ 498,078.00
02.01.04 LCAR-01 LINEA DE CONDUCCIÓN DE AGUA DE RECHAZO HDPE DN110mm ML 2,150.00 S/ 216.83 S/ 466,173.75
02.01.05 RAAC-02 RESERVORIO APOYADO DE AGUA CRUDA V=125 m3 UND 1.00 S/ 718,620.00 S/ 718,620.00
02.01.06 PTAP-02 PLANTA DE TRATAMIENTO DE AGUA POTABLE OI Qi=18.06 lps UND 1.00 S/ 1,469,330.10 S/ 1,469,330.10
02.01.07 CAP-02 CISTERNA DE AGUA POTABLE V=328 m3 UND 1.00 S/ 893,525.01 S/ 893,525.01
02.02 PROYECTADO S/ 6,709,949.08
02.02.01 CAP-01 AMPLIACIÓN CISTERNA DE AGUA POTABLE V=200 m3 UND 1.00 S/ 811,006.53 S/ 811,006.53
02.02.02 LEAR-01 LAGUNA DE EVAPORACIÓN DE AGUA DE RECHAZO A=2500 m2 UND 1.00 S/ 177,000.00 S/ 177,000.00
02.02.03 RAAC-02 RESERVORIO APOYADO DE AGUA CRUDA V=720 m3 UND 1.00 S/ 2,083,200.00 S/ 2,083,200.00
02.02.04 LCAR-02 LINEA DE CONDUCCIÓN DE AGUA DE RECHAZO HDPE DN110mm ML 433.00 S/ 238.51 S/ 103,273.75
02.02.05 LEAR-02 LAGUNA DE EVAPORACIÓN DE AGUA DE RECHAZO A=2500 m2 UND 1.00 S/ 177,000.00 S/ 177,000.00
02.02.06 PTAP-03 PLANTA DE TRATAMIENTO DE AGUA POTABLE OI Qi=18.06 lps UND 2.00 S/ 1,679,234.40 S/ 3,358,468.80
03 LINEA DE IMPULSIÓN S/ 1,986,702.04
03.01 EJECUTADO S/ 946,045.88
03.01.01 LIAC-01 LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN110mm ML 230.00 S/ 158.59 S/ 36,476.16
03.01.02 LIAC-02 LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN200mm ML 225.00 S/ 189.98 S/ 42,745.50
03.01.03 LIAC-03 LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN110mm ML 22.00 S/ 158.59 S/ 3,489.02
03.01.04 LIAC-04 LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN110mm ML 325.00 S/ 158.59 S/ 51,542.40
03.01.05 LIAP-01 LINEA DE IMPULSIÓN DE AGUA POTABLE HD K-9 DN150mm ML 1,560.00 S/ 520.38 S/ 811,792.80
03.02 PROYECTADO S/ 1,040,656.16
03.02.01 LIAC-03 LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN200mm ML 22.00 S/ 231.28 S/ 5,088.16
03.02.02 LIAP-02 LINEA DE IMPULSIÓN DE AGUA POTABLE HDPE DN250mm/200mm ML 2,630.00 S/ 259.60 S/ 682,748.00
03.02.03 LIAP-03 LINEA DE IMPULSIÓN DE AGUA POTABLE HDPE DN250 ML 1,300.00 S/ 271.40 S/ 352,820.00
04 RESERVORIO ELEVADO S/ 4,984,320.00
04.01 EJECUTADO S/ 1,444,320.00
04.01.01 REAP-01 RESERVORIO ELEVADO DE AGUA POTABLE V=600 m3 * UND 1.00 S/ 1,444,320.00 S/ 1,444,320.00
04.02 PROYECTADO S/ 3,540,000.00
04.02.01 REAP-02 RESERVORIO ELEVADO DE AGUA POTABLE V=1100 m3 UND 1.00 S/ 3,540,000.00 S/ 3,540,000.00
05 MANTENIMIENTO S/ 607,455.18
05.01 EJECUTADO S/ 138,174.54
05.01.01 P-02 LUC POZO N°2 LUCUMO Qb=20 lps UND 1.00 S/ 13,577.58 S/ 13,577.58
05.01.02 PTAP-01 PLANTA DE TRATAMIENTO DE AGUA POTABLE OI Qi=18.06 lps UND 1.00 S/ 38,793.24 S/ 38,793.24
05.01.03 CAP-01 CISTERNA DE AGUA POTABLE V=100 m3 UND 1.00 S/ 35,819.49 S/ 35,819.49
05.01.04 REAP-01 RESERVORIO ELEVADO DE AGUA POTABLE V=600 m3 UND 1.00 S/ 49,984.23 S/ 49,984.23
05.02 PROYECTADO S/ 469,280.64
05.02.01 POZO Qb=124 lps UND 4.00 S/ 15,517.24 S/ 62,068.94
05.02.02 OSMOSIS Qi=72.22 lps UND 4.00 S/ 44,335.13 S/ 177,340.52
05.02.03 CISTERNA DE AGUA POTABLE V=428 m3 UND 4.00 S/ 40,936.56 S/ 163,746.24
05.02.04 RESERVORIO ELEVADO DE AGUA POTABLE V=1700 m3 UND 4.00 S/ 16,531.23 S/ 66,124.93
COSTO TOTAL S/ 26,954,796.56

RESUMEN COSTO OBRA


EJECUTADO S/ 13,679,932.29
PROYECTADO S/ 13,274,864.28

(*) ESTIMACIÓN
NO INCLUYE GASTOS DE INGENIERIA
CABIDA DE COSTO _ OBRAS COMPLEMENTARIAS SANITARIAS
8/3/2020
ESQUEMA PRADERAS DE LURIN

HU HU
Participacion Participacion Total RATIO TOTAL
Esquema Proyectos Area Vendible ( m2)
Parcial OOGG OOGG ESQUEMA PRADERAS DE LURIN #NAME?
PRAD.DE LURIN PRADERAS DE LURIN 100.00% 100.00% Area Vendible Total ( m2) 0.00
LUCUMO 1 #DIV/0! OC AV ( US$ ) #NAME?
LUCUMO 2 #DIV/0! GG OC AV ( US$ ) #NAME?
LUCUMO 3 #DIV/0!
LUCUMO #DIV/0!
LUCUMO 4 y 5 #DIV/0!
LUCUMO VI #DIV/0! T.C. 3.40
LUCUMO 5C #DIV/0!
SANTA GENOVEVA #DIV/0!
SANTA GENOVEVA #DIV/0!
LUCUMO VI #DIV/0!
Area Vendible Total ( AVT) 0.00 EJECUTADO
PROYECTADO

Item DESCRIPCION UND. CANT. P.U. COSTO PARCIAL S/. IGV TOTAL S/. RATIO AV (US$)

OBRAS COMPLEMENTARIAS ( OC ) GLB 1.00 #REF! #REF! #NAME? #NAME? #NAME?


OBRAS GENERALES SANITARIAS GLB 1.00 #REF! #REF! #NAME? #NAME? #DIV/0!
P-01 LUC POZO N°1 LUCUMO Qb=9.5 lps (INC. PERFORACIÓN) * UND 1.00 735,000.00 735,000.00 132,300.00 867,300.00 #DIV/0!
P-02 LUC POZO N°2 LUCUMO Qb=20 lps (INC. PERFORACIÓN) * UND 1.00 1,503,600.00 1,503,600.00 270,648.00 1,774,248.00 #DIV/0!
#NAME? UND #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
LIAC-01 LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN110mm ML 230.00 134.40 30,912.00 5,564.16 36,476.16 #DIV/0!
LIAC-02 LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN200mm ML 225.00 161.00 34,500.00 6,210.00 40,710.00 #DIV/0!
RAAC-01 RESERVORIO APOYADO DE AGUA CRUDA V=120 m3 UND 1.00 623,700.00 623,700.00 112,266.00 735,966.00 #DIV/0!
PTAP-01 PLANTA DE TRATAMIENTO DE AGUA POTABLE OI Qi=18.06 lps UND 1.00 1,055,250.00 1,055,250.00 189,945.00 1,245,195.00 #DIV/0!
CAP-01 CISTERNA DE AGUA POTABLE V=100 m3 UND 1.00 422,100.00 422,100.00 75,978.00 498,078.00 #DIV/0!
LIAP-01 LINEA DE IMPULSIÓN DE AGUA POTABLE HD K-9 DN150mm ML 1,560.00 441.00 687,960.00 123,832.80 811,792.80 #DIV/0!
REAP-01 RESERVORIO ELEVADO DE AGUA POTABLE V=600 m3 * UND 1.00 1,224,000.00 1,224,000.00 220,320.00 1,444,320.00 #DIV/0!
LCAR-01 LINEA DE CONDUCCIÓN DE AGUA DE RECHAZO HDPE DN110m ML 523.78 183.75 96,245.35 17,324.16 113,569.51 #DIV/0!
LEAR-01 LAGUNA DE EVAPORACIÓN DE AGUA DE RECHAZO A=2500 m2 UND #REF! 150,000.00 #REF! #REF! #REF! #REF!
LEAR-02 LAGUNA DE EVAPORACIÓN DE AGUA DE RECHAZO A=2500 m2 UND #REF! 150,000.00 #REF! #REF! #REF! #REF!
415 GASTOS GENERALES ( GG OC) GLB 15.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Gastos Generales _ Obras Complementarias GLB 15.00 #NAME? #NAME? #NAME? #NAME? #NAME?
P-01 LUC POZO N°1 LUCUMO Qb=9.5 lps (INC. PERFORACIÓN) * UND 1.00 73,500.00 73,500.00 13,230.00 86,730.00 #DIV/0!
P-02 LUC POZO N°2 LUCUMO Qb=20 lps (INC. PERFORACIÓN) * UND 1.00 150,360.00 150,360.00 27,064.80 177,424.80 #DIV/0!
#NAME? UND #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
LIAC-01 LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN110mm ML 230.00 13.44 3,091.20 556.42 3,647.62 #DIV/0!
LIAC-02 LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN200mm ML 225.00 16.10 3,622.50 652.05 4,274.55 #DIV/0!
RAAC-01 RESERVORIO APOYADO DE AGUA CRUDA V=120 m3 UND 1.00 62,370.00 62,370.00 11,226.60 73,596.60 #DIV/0!
PTAP-01 PLANTA DE TRATAMIENTO DE AGUA POTABLE OI Qi=18.06 lps UND 1.00 622,320.81 622,320.81 112,017.74 734,338.55 #DIV/0!
CAP-01 CISTERNA DE AGUA POTABLE V=100 m3 UND 1.00 42,210.00 42,210.00 7,597.80 49,807.80 #DIV/0!
LIAP-01 LINEA DE IMPULSIÓN DE AGUA POTABLE HD K-9 DN150mm ML 1560.00 44.10 68,796.00 12,383.28 81,179.28 #DIV/0!
REAP-01 RESERVORIO ELEVADO DE AGUA POTABLE V=600 m3 * UND 1.00 122,400.00 122,400.00 22,032.00 144,432.00 #DIV/0!
LCAR-01 LINEA DE CONDUCCIÓN DE AGUA DE RECHAZO HDPE DN110m ML 523.78 18.38 9,624.53 1,732.42 11,356.95 #DIV/0!
LEAR-01 LAGUNA DE EVAPORACIÓN DE AGUA DE RECHAZO A=2500 m2 UND #REF! 15,000.00 #REF! #REF! #REF! #REF!
LEAR-02 LAGUNA DE EVAPORACIÓN DE AGUA DE RECHAZO A=2500 m2 UND #REF! 15,000.00 #REF! #REF! #REF! #REF!
COSTO TOTAL #NAME? #NAME?
CABIDA DE COSTO _ OBRAS COMPLEMENTARIAS SANITARIAS
8/1/2020
ESQUEMA LUCUMO

HU HU

Esquema Proyectos Area Vendible ( m2) Participacion Participacion RATIO TOTAL


Parcial OOGG Total OOGG #NAME?
ESQUEMA LUCUMO
PRAD.DE LURIN PRADERAS DE LURIN 100.00% 100.00% Area Vendible Total ( m2) 0.00
LUCUMO 1 #DIV/0! OC AV ( US$ ) #NAME?
LUCUMO 2 #DIV/0! GG OC AV ( US$ ) #NAME?
LUCUMO 3 #DIV/0!
LUCUMO #DIV/0!
LUCUMO 4 y 5 #DIV/0!
LUCUMO VI #DIV/0! T.C. 3.40
LUCUMO 5C #DIV/0!
SANTA GENOVEVA #DIV/0!
SANTA GENOVEVA #DIV/0!
LUCUMO VI #DIV/0!
Area Vendible Total ( AVT) 0.00 EJECUTADO
PROYECTADO

RATIO AV
Item DESCRIPCION UND. CANT. P.U. COSTO PARCIAL S/. IGV TOTAL S/.
(US$)
OBRAS COMPLEMENTARIAS ( OC ) GLB 1.00 #NAME? #NAME? #NAME? #NAME? #DIV/0!
OBRAS GENERALES SANITARIAS GLB 1.00 #NAME? #NAME? #NAME? #NAME? #DIV/0!
P-01 SG POZO N°1 SANTA GENOVEVA Qb=14.50 lps (INC. PERFORACIÓN) UND 1.00 1,081,500.00 1,081,500.00 194,670.00 1,276,170.00 #DIV/0!
LIAC-03 LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN110mm ML 22.00 134.40 2,956.80 532.22 3,489.02 #DIV/0!
PTAP-02 PLANTA DE TRATAMIENTO DE AGUA POTABLE OI Qi=18.06 lps UND 1.00 1,245,195.00 686,543.71 123,577.87 810,121.58 #DIV/0!
#NAME? ML #REF! #NAME? #NAME? #NAME? #NAME? #NAME?
LCAR-01 LINEA DE CONDUCCIÓN DE AGUA DE RECHAZO HDPE DN110m ML 1,626.22 183.75 298,817.15 53,787.09 352,604.24 #DIV/0!
LEAR-01 LAGUNA DE EVAPORACIÓN DE AGUA DE RECHAZO A=2500 m2 UND #REF! 150,000.00 #REF! #REF! #REF! #REF!
LEAR-02 LAGUNA DE EVAPORACIÓN DE AGUA DE RECHAZO A=2500 m2 UND #REF! 150,000.00 #REF! #REF! #REF! #REF!
P-01 SG EQUIPAMIENTO DE POZO N°1 SANTA GENOVEVA Qe=80lps UND 1.00 697,080.00 697,080.00 125,474.40 822,554.40 #DIV/0!
RAAC-02 RESERVORIO APOYADO DE AGUA CRUDA V=125 m3 UND #REF! 609,000.00 #REF! #REF! #REF! #REF!
RAAC-02 RESERVORIO APOYADO DE AGUA CRUDA V=720 m3 UND #REF! 1,765,423.73 #REF! #REF! #REF! #REF!
CAP-02 CISTERNA DE AGUA POTABLE V=328 m3 UND 1.00 757,224.58 757,224.58 136,300.43 893,525.01 #DIV/0!
#NAME? UND 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
LCAR-02 LINEA DE CONDUCCIÓN DE AGUA DE RECHAZO HDPE DN110 ML #REF! 202.13 #REF! #REF! #REF! #REF!
415 GASTOS GENERALES ( GG OC) GLB 15.00 #NAME? #NAME? #NAME? #NAME? #NAME?
Gastos Generales _ Obras Complementarias GLB 15.00 #NAME? #NAME? #NAME? #NAME? #NAME?
P-01 SG POZO N°1 SANTA GENOVEVA Qb=14.50 lps (INC. PERFORACIÓN) UND 1.00 108,150.00 108,150.00 19,467.00 127,617.00 #DIV/0!
LIAC-03 LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN110mm ML 22.00 13.44 295.68 53.22 348.90 #DIV/0!
PTAP-02 PLANTA DE TRATAMIENTO DE AGUA POTABLE OI Qi=18.06 lps UND 1.00 76,124.49 76,124.49 13,702.41 89,826.90 #DIV/0!
#NAME? ML #REF! #NAME? #NAME? #NAME? #NAME? #NAME?
LCAR-01 LINEA DE CONDUCCIÓN DE AGUA DE RECHAZO HDPE DN110m ML 1,626.22 18.38 29,881.72 5,378.71 35,260.42 #DIV/0!
LEAR-01 LAGUNA DE EVAPORACIÓN DE AGUA DE RECHAZO A=2500 m2 UND #REF! 15,000.00 #REF! #REF! #REF! #REF!
LEAR-02 LAGUNA DE EVAPORACIÓN DE AGUA DE RECHAZO A=2500 m2 UND #REF! 15,000.00 #REF! #REF! #REF! #REF!
P-01 SG EQUIPAMIENTO DE POZO N°1 SANTA GENOVEVA Qe=80lps UND 1.00 69,708.00 69,708.00 12,547.44 82,255.44 #DIV/0!
RAAC-02 RESERVORIO APOYADO DE AGUA CRUDA V=125 m3 UND #REF! 60,900.00 #REF! #REF! #REF! #REF!
RAAC-02 RESERVORIO APOYADO DE AGUA CRUDA V=720 m3 UND #REF! 176,542.37 #REF! #REF! #REF! #REF!
CAP-02 CISTERNA DE AGUA POTABLE V=328 m3 UND 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? UND 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
LCAR-02 LINEA DE CONDUCCIÓN DE AGUA DE RECHAZO HDPE DN110 ML #REF! 20.21 #REF! #REF! #REF! #REF!
COSTO TOTAL #NAME? #NAME?
CABIDA DE COSTO _ OBRAS COMPLEMENTARIAS SANITARIAS
8/3/2020
ESQUEMA SANTA GENOVEVA

HU HU
Participacion Participacion Total RATIO TOTAL
Esquema Proyectos Area Vendible ( m2)
Parcial OOGG OOGG ESQUEMA SANTA GENOVEVA #NAME?
PRAD.DE LURIN PRADERAS DE LURIN 100.00% 100.00% Area Vendible Total ( m2) 0.00
LUCUMO 1 #DIV/0! OC AV ( US$ ) #NAME?
LUCUMO 2 #DIV/0! GG OC AV ( US$ ) #REF!
LUCUMO 3 #DIV/0!
LUCUMO #DIV/0!
LUCUMO 4 y 5 #DIV/0!
LUCUMO VI #DIV/0! T.C. 3.40
LUCUMO 5C #DIV/0!
SANTA GENOVEVA #DIV/0!
SANTA GENOVEVA #DIV/0!
LUCUMO VI #DIV/0!
Area Vendible Total ( AVT) 0.00 EJECUTADO
PROYECTADO

Item DESCRIPCION UND. CANT. P.U. COSTO PARCIAL S/. IGV TOTAL S/. RATIO AV (US$)

OBRAS COMPLEMENTARIAS ( OC ) GLB 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?


OBRAS GENERALES SANITARIAS GLB 1.00 #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
LAGUNA DE EVAPORACIÓN DE AGUA DE RECHAZO A=2500 m2 LEAR-01 UND #REF! 150,000.00 #REF! #REF! #REF! #REF!
LAGUNA DE EVAPORACIÓN DE AGUA DE RECHAZO A=2500 m2 LEAR-02 UND #REF! 150,000.00 #REF! #REF! #REF! #REF!
LINEA DE CONDUCCIÓN DE AGUA TRATADA HDPE DN110mm LCAT-01 ML #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
RESERVORIO APOYADO DE AGUA TRATADA V=100 m3 RAAT-02 UND #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
RESERVORIO APOYADO DE AGUA CRUDA V=125 m3 RAAC-02 UND #REF! 609,000.00 #REF! #REF! #REF! #REF!
RESERVORIO APOYADO DE AGUA CRUDA V=720 m3 RAAC-02 UND #REF! 1,765,423.73 #REF! #REF! #REF! #REF!
LINEA DE CONDUCCIÓN DE AGUA DE RECHAZO HDPE DN160mm LCAR- ML #REF! 202.13 #REF! #REF! #REF! #REF!
POZO N°2 SANTA GENOVEVA Qb=14.50 lps P-02 SG UND 1.00 1,022,700.00 1,022,700.00 184,086.00 1,206,786.00 #DIV/0!
LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN110mm LIAC-04 ML 325.00 134.40 43,680.00 7,862.40 51,542.40 #DIV/0!
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
415 GASTOS GENERALES ( GG OC) GLB 15.00 #NAME? #NAME? #REF! #REF! #REF!
Gastos Generales _ Obras Complementarias GLB 15.00 #NAME? #NAME? #REF! #REF! #REF!
LAGUNA DE EVAPORACIÓN DE AGUA DE RECHAZO A=2500 m2 LEAR-01 UND #REF! 15,000.00 #REF! #REF! #REF! #REF!
LAGUNA DE EVAPORACIÓN DE AGUA DE RECHAZO A=2500 m2 LEAR-02 UND #REF! 15,000.00 #REF! #REF! #REF! #REF!
LINEA DE CONDUCCIÓN DE AGUA TRATADA HDPE DN110mm LCAT-01 ML #NAME? #NAME? 28,049.53 5,048.91 33,098.44 #DIV/0!
RESERVORIO APOYADO DE AGUA TRATADA V=100 m3 RAAT-02 UND #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
RESERVORIO APOYADO DE AGUA CRUDA V=125 m3 RAAC-02 UND #REF! 60,900.00 #REF! #REF! #REF! #REF!
RESERVORIO APOYADO DE AGUA CRUDA V=720 m3 RAAC-02 UND #REF! 176,542.37 #REF! #REF! #REF! #REF!
LINEA DE CONDUCCIÓN DE AGUA DE RECHAZO HDPE DN160mm LCAR- ML #REF! 20.21 #REF! #REF! #REF! #REF!
POZO N°2 SANTA GENOVEVA Qb=14.50 lps P-02 SG UND 1.00 102,270.00 102,270.00 18,408.60 120,678.60 #DIV/0!
LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN110mm LIAC-04 ML 325.00 13.44 4,368.00 786.24 5,154.24 #DIV/0!
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
COSTO TOTAL #REF! #REF!
BALANCE OBRAS GENERALES DE AGUA POTABLE - LURIN

DEMANDA AGUA CRUDA POR PROYECTO BALANCE OFERTA - DEMANDA AGUA CRUDA
PRADERAS LUCUMO STA GENOVEVA MACROPOLIS TOTAL URB. STA ELENA, LUCUMO, STA GENOVEVA Y MACROPOLIS
AÑO
Qb AC (l/s) Qb AC (l/s) Qb AC (l/s) Qb AC (l/s) Qb AC (l/s) AÑO Oferta (l/s) Demanda (l/s) Balance (l/s)
2020 4.49 21.72 0.00 2.74 28.94 2020 58.50 28.94 29.56
FUENTE 2021 5.37 28.23 0.41 3.29 37.30 2021 58.50 37.30 21.20
2022 6.29 34.75 1.10 3.94 46.08 2022 58.50 46.08 12.42
2023 7.21 42.89 2.48 4.73 57.31 2023 58.50 57.31 1.19
2024 8.12 51.03 6.85 5.68 71.69 2024 124.00 71.69 52.31
2025 9.04 59.18 11.63 6.81 86.67 2025 124.00 86.67 37.33

DEMANDA MODULO OSMOSIS INVERSA BALANCE OFERTA - DEMANDA MODULO OSMOSIS INVERSA

URB. STA ELENA, LUCUMO, STA GENOVEVA Y MACROPOLIS URB. STA ELENA, LUCUMO, STA GENOVEVA Y MACROPOLIS
AÑO Qb AC (l/s) Vrap AC (m3) Módulos (und) Vcist AP (m3) AÑO Oferta (l/s) Demanda (l/s) Balance (l/s)
2020 28.94 160.00 2.00 137.00 2020 30.00 28.94 1.06
OSMOSIS
2021 37.30 240.00 3.00 176.00 2021 45.00 37.30 7.70
2022 46.08 320.00 4.00 218.00 2022 60.00 46.08 13.92
2023 57.31 320.00 4.00 270.00 2023 60.00 57.31 2.69
2024 71.69 400.00 5.00 337.00 2024 75.00 71.69 3.31
2025 86.67 480.00 6.00 408.00 2025 90.00 86.67 3.33

BALANCE OFERTA - DEMANDA ALMACENAMIENTO AGUA


DEMANDA ALMACENAMIENTO AGUA POTABLE POR PROYECTO
POTABLE
SANTA ELENA LUCUMO STA GENOVEVA MACROPOLIS TOTAL URB. STA ELENA, LUCUMO, STA GENOVEVA Y MACROPOLIS
AÑO
Vrep AP (m3) Vrep AP (m3) Vrep AP (m3) Vrep AP (m3) Vrep (m3) AÑO Oferta (m3) Demanda (m3) Balance (m3)
2020 61 292 0 38 391 2020 600.00 391.00 209.00
REP
2021 73 380 6 45 504 2021 600.00 504.00 96.00
2022 85 467 15 54 621 2022 1700.00 621.00 1079.00
2023 97 577 34 65 773 2023 1700.00 773.00 927.00
2024 110 686 93 78 967 2024 1700.00 967.00 733.00
2025 122 796 157 93 1168 2025 1700.00 1168.00 532.00
DATOS POR PROYECTO

DEMANDA AGUA CRUDA FUENTE Y OSMOSIS


PRADERAS LUCUMO STA GENOVEVA MACROPOLIS Descripción Qequipado2020 Qequipado2024 Descripción Qingreso
AÑO
Qb AC (l/s) Qb AC (l/s) Qb AC (l/s) Qb AC (l/s) Pozo N°1 Lucumo 9.50 l/s 9.50 l/s Modulo Ósmosis 1 15.00 l/s
2020 4.49 21.72 0.00 2.74 Pozo N°2 Lucumo 20.00 l/s 20.00 l/s Modulo Ósmosis 2 15.00 l/s
FUENTE 2021 5.37 28.23 0.41 3.29 Pozo N°1 Sta Genoveva 14.50 l/s 80.00 l/s Modulo Ósmosis 3 15.00 l/s
2022 6.29 34.75 1.10 3.94 Pozo N°2 Sta Genoveva 14.50 l/s 14.50 l/s Modulo Ósmosis 4 15.00 l/s
2023 7.21 42.89 2.48 4.73 Qb AC (l/s) 58.50 l/s 124.00 l/s 60.00 l/s
2024 8.12 51.03 6.85 5.68 Qb AP (l/s) 43.88 l/s 93.00 l/s
2025 9.04 59.18 11.63 6.81

DEMANDA MODULO OSMOSIS INVERSA

PRADERAS LUCUMO STA GENOVEVA MACROPOLIS TOTAL


AÑO
Módulos (und) Módulos (und) Módulos (und) Módulos (und) Módulos (und)
2020 0.30 1.45 0.00 0.18 1.93
OSMOSIS
2021 0.36 1.88 0.03 0.22 2.49
2022 0.42 2.32 0.07 0.26 3.07
2023 0.48 2.86 0.17 0.32 3.82
2024 0.54 3.40 0.46 0.38 4.78
2025 0.60 3.95 0.78 0.45 5.78

DEMANDA AGUA POTABLE

PRADERAS LUCUMO SANTA GENOVEVA MACROPOLIS TOTAL


AÑO
Qb AP (l/s) Vrep AP (m3) Qb AP (l/s) Vrep AP (m3) Qb AP (l/s) Vrep AP (m3) Qb AP (l/s) Vrep AP (m3) Qb AP (l/s)
2020 2.91 61 14.08 292 0.00 0.00 1.77 38.00 18.76
REP
2021 3.48 73 18.30 380 0.27 6.00 2.13 45 24.17
2022 4.07 85 22.52 467 0.71 15.00 2.56 54 29.87
2023 4.67 97 27.80 577 1.61 34.00 3.07 65 37.14
2024 5.27 110 33.08 686 4.44 93.00 3.68 78 46.46
2025 5.86 122 38.36 796 7.54 157.00 4.42 93 56.17
GESTION DE PROYECTOS INVERSIONES EL PINO SAC
NOVIEMBRE_2019
PRORRATEO_OBRAS GENERALES_PUCUSANA
COSTOS Y PRESUPUESTO

LOTES AREA VENDIBLE PORCENTAJE FUERA DE SERVICIO


PROYECTO ETAPAS
PARCIAL TOTAL PARCIAL TOTAL PARCIAL TOTAL EJECUTADO
LAS LOMAS I Y II 666 und 666 und 81593.69 m2 81593.69 m2 100% 100% PROYECTADO
POSEIDON 25 ha 919 und 919 und 147664.88 m2 147664.88 m2 100% 100%
229258.57 m2 229258.57 m2

ITEM DESCRIPCION UND METRADO RATIO PARCIAL PORCENTAJE PARCIAL


1 LINEA DE CONDUCCIÓN DE AGUA POTABLE PVC DN 250mm ml 6,990.00 100.00% S/ -
2 LINEA DE CONDUCCIÓN DE AGUA POTABLE PVC DN 160mm ml 75.00 100.00% S/ -
3 CISTERNA DE AGUA POTABLE CP-01 250m3 und 1.00 100.00% S/ -
4 AMPLIACIÓN Y EQUIPAMIENTO CISTERNA DE AGUA POTABLE CP-01 450m3 und 1.00 100.00% S/ -
5 LINEA DE IMPULSIÓN DE AGUA POTABLE HD DN 250mm ml 1,180.00 100.00% S/ -
35.59% S/ -
6 RESERVORIO APOYADO DE AGUA POTABLE RAP-01 600m3 und 1.00
64.41% S/ -
35.59% S/ -
6 LINEA DE CONDUCCIÓN DE AGUA POTABLE PEAD DN 160mm ml 650.00
64.41% S/ -
7 CAMARA DE BOMBEO DE DESAGUE CBD-01 Qb = 2.2 lps und 1.00 100.00% S/ -
8 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES PTAR-01 Qi = 2.2 lps und 1.00 100.00% S/ -
9 CISTERNA DE AGUA TRATADA DE DESAGÜE CP-02 50m3 und 1.00 100.00% S/ -
10 LINEA DE IMPULSIÓN DE AGUA TRATADA PEAD DN 63mm ml 390.00 100.00% S/ -
11 TANQUE APOYADO DE AGUA TRATADA TAP-01 25m3 und 1.00 100.00% S/ -
12 PERFORACIÓN Y EQUIPAMIENTO DE POZO TUBULAR Qb = 80lps und 1.00 100.00% S/ -
13 LINEA DE IMPULSIÓN DE AGUA CRUDA HDPE DN 200mm ml 805.00 100.00% S/ -
14 RESERVORIO APOYADO DE AGUA CRUDA RAP-02 480m3 und 1.00 100.00% S/ -
15 PLANTA DE TRATAMIENTO DE AGUAS POTABLE PTAP-01 Qi = 16.67 lps und 6.00 100.00% S/ -
16 CASETA DE REBOMBEO DE AGUA POTABLE und 1.00 100.00% S/ -
17 LINEA DE IMPULSIÓN DE AGUA POTABLE HD DN 250mm ml 460.00 100.00% S/ -
18 RESERVORIO APOYADO DE AGUA POTABLE RAP-03 700m3 und 1.00 100.00% S/ -
19 CAMARA DE BOMBEO DE DESAGUE CBD-01 Qb = 56 lps und 1.00 100.00% S/ -
20 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES PTAR-01 Qi = 56 lps und 1.00 100.00% S/ -
21 CISTERNA DE AGUA TRATADA DE DESAGÜE CP-03 100m3 und 1.00 100.00% S/ -
22 LINEA DE IMPULSIÓN DE AGUA TRATADA PEAD DN 63mm ml 950.00 100.00% S/ -
23 TANQUE APOYADO DE AGUA TRATADA TAP-02 200m3 und 1.00 100.00% S/ -