Cronograma de Avance Valorizado Ne 318-20212 15 Al 25
Cronograma de Avance Valorizado Ne 318-20212 15 Al 25
UBICACIÓN
Departamento : CUSCO
Provincia : ESPINAR
0 MOVIMIENTO DE TIERRAS
15 CONCRETO SIMPLE
20 CONCRETO ARMADO
35 CIELO RASOS
45 REVOQUES
55 PISOS
75 VENTANAS
340 FLETES
OCORURO -
CUSCO ESPINAR
PALLPATA
LADRILLO 63 63 1,765,423.64 1,686,690.46
OCORURO -
CUSCO ESPINAR
PALLPATA
LADRILLO 63 63 1,765,423.64 1,686,690.46
OCORURO -
CUSCO ESPINAR
PALLPATA
LADRILLO 63 63 1,765,423.64 1,686,690.46
OCORURO -
CUSCO ESPINAR
PALLPATA
LADRILLO 63 63 1,765,423.64 1,686,690.46
OCORURO -
CUSCO ESPINAR
PALLPATA
LADRILLO 63 63 1,765,423.64 1,686,690.46
9/7/2021
OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES,
MONTO APROBADO SEGÚN EXPEDIENTE TÉCNICO MOVIMIENTO DE
SEGURIDAD Y SALUD
0.00 0.00
MOVIMIENTO DE TIERRAS CONCRETO SIMPLE CONCRETO ARMADO
15.00 20.00
COBERTURA DE PLANCHA CORRUGADA
TIJERALES Y RETICULADOS CIELO RASOS
GALVANIZADA
45.00
DE YESO PISOS VEREDAS ZOCALOS Y CONTRAZOCALOS
55.00 60.00
NTRAZOCALOS PUERTAS VENTANAS INSTALACIONES ELECTRICAS
VALOR. VALOR.
% N° BEN. PRESUP. % N° BEN. PRESUP. % N° BEN. PRESUP.
ACUM. ACUM.
VALOR. VALOR.
VALOR. Devolución 4ta.
% N° BEN. PRESUP. % ACUMULADA ACUMULADA % 4ta. Semana 8va. Semana
ACUM. Semana
ANTERIOR ACTUAL
340.00
RETIROS AUTORIZADOS Y DEVOLUCIONES EJECUCIÓN FINANCIERO (APORTE PNVR)
VALOR. VALOR.
Devolución 8va. Devolución Devolución Devolcuión
13va. Semana 14va. Semana 18va. Semana ACUMULADA ACUMULADA
Semana 13va. Semana 14va. Semana 18va. Semana
ANTERIOR ACTUAL
- -
RO (APORTE PNVR)
CON DOCUMENTO
OBSERVACIONES DEL COORDINADOR REGIONAL OBSERVACIONES DEL COORDINADOR GENERAL SUSTENTATORIO DEL
% TÉCNICO
DEDUCTIVO
0.00%
0.00%
0.00%
0.00%
0.00%
FORMATO N° 23
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
CONVENIO N° 318-2020-CUS/VMVU/PNVR
PROYECTO “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE PRESUPUESTO TOTAL : S/. 1,111,315.21
FECHA DE INICIO DE OBRA 4/5/2021 COSTO DIRECTO : S/. 936,932.91
P. DE EJECUCION DE OBRA
Mes 1° MES - ABRIL 2° MES - MAYO 3° MES - JUNIO 4° MES - JULIO 5° MES - AGOSTO 6° MES - SETIEMBRE
ÍTEM PARTIDA PPTO
Semana 1 2 3 4 4B 5 6 7 8 9A 9B 10 11 12 13A 13B 14 15 16 17-A 17-B 18 19 20 21 22-A 22-B
Dia 05-.11 12-18 19-25 26-30 1-2 3-9 10-16 17-23 24-30 31 1-6 7-13 14-20 21-27 28-30 1-4 5-11 12-18 19-25 26-31 1 2-8 9-15 16-22 23-29 30-31 1
OBRAS PROVISIONALES Y TRABAJOS Programado 2,583.53 2,583.53 1,158.26 1,438.54 1,143.22 1,158.26 1,158.26 1,158.26 1,158.26 193.04 965.22 1,158.26 1,158.26 1,158.26 579.13 579.13 1,158.26 1,158.26 1,158.26 1,158.26 - 1,158.26 1,158.26 1,158.26 1,158.26 386.09 193.04
1.00 PRELIMINARES, SEGURIDAD Y SALUD 29,176.65
Ejecutado 2,583.53 2,590.39 1,165.12
Programado 24,078.99 4,166.76 - - 9,956.12 1,388.92 - - - - - - - - - - - - - - - - - - -
2.00 MOVIMIENTO DE TIERRAS 39,590.79
Ejecutado 24,078.99 4,166.76 - - - - - - - - - - - - - - - - - - - - - -
Programado 2,772.90 11,462.29 9,613.69 3,301.25 16,796.30 14,420.53 7,182.61 1,063.37 531.69 8,591.35 11,837.29 1,063.37 531.69 - - - - - - - - - - - - -
3.00 CONCRETO SIMPLE 89,168.33
Ejecutado 2,772.90 7,316.71 - - - - - - - - - - - - - - - - - - - - - -
Programado 9,338.82 10,310.20 3,362.08 15,839.01 22,851.10 22,851.10 31,315.25 7,518.65 27,275.76 40,469.31 6,987.33 4,658.22 2,329.11 - - - - - - - - - - - -
4.00 CONCRETO ARMADO 205,105.94
Ejecutado - 18,011.13 - - - - - - - - - - - - - - - - - - - - - -
Programado - - - - - - - - - - 9,423.86 12,565.15 9,423.86 12,565.15 9,423.86 - 18,847.73 15,706.44 - - - -
5.00 TIJERALES Y RETICULADOS 87,956.06
Ejecutado -
COBERTURA DE PLANCHA CORRUGADA Programado - - - - - - - - - - - 12,509.54 16,679.38 12,509.54 16,679.38 12,509.54 - 25,019.07 20,849.23 - - - -
6.00 GALVANIZADA 116,755.68
Ejecutado - - - - - - - - - - - - - - - - - - - - - - - -
Programado - - - - - - - - - - - - - - 8,919.90 6,689.93 - 13,379.85 11,149.88 11,149.88 11,149.88 - -
7.00 CIELO RASOS 62,439.30
Ejecutado -
Programado 26,970.61 8,990.20 35,960.81 35,960.81 35,960.81 44,951.01 8,990.20 26,970.61 53,941.22 26,970.61 8,990.20 - - - - - - - - - - - - -
8.00 MUROS 314,657.09
Ejecutado -
Programado - - - 85.49 28.50 113.98 113.98 113.98 113.98 56.99 28.50 113.98 113.98 113.98 85.49 - 56.99 -
9.00 REVOQUES 1,139.81
Ejecutado -
Programado - - - - - 7,279.24 12,132.06 14,558.47 14,558.47 7,279.24 7,279.24 9,705.65 12,132.06 - - - - - - - - -
10.00 ENLUCIDO DE YESO 84,924.43
Ejecutado - - - - - - - - - - - - - - - - - - - - - - -
Programado - - - - - - - 593.00 2,490.68 2,095.35 1,528.68 6,960.30 6,960.30 7,369.37 7,211.76 - 4,298.28 4,100.61 4,878.68 2,927.21 - -
11.00 PISOS 51,414.24
Ejecutado - - - - - - - - - - - - - - - - - - - - - - -
Programado - - - - - - 1,321.70 1,321.70 991.28 991.28 660.85 991.28 330.43 - - - - - - - - -
12.00 VEREDAS 6,608.51
Ejecutado -
Programado - - - - - - - - 3,625.49 3,625.49 3,625.49 3,625.49 3,625.49 1,792.94 1,792.94 - 1,792.94 1,792.94 1,792.94 - - -
13.00 ZOCALOS Y CONTRAZOCALOS 27,092.15
Ejecutado -
Programado - - - - - - - - - - - - - 40,753.35 26,569.79 14,610.03 17,256.24 7,516.22 -
14.00 PUERTAS 106,705.62
Ejecutado -
Programado - - - - - - - - - - - - - - 8,013.06 38,915.01 37,641.24 - -
15.00 VENTANAS 84,569.31
Ejecutado -
Programado - - - - - - - - - - - - - - - 11,315.12 11,315.12 - -
16.00 INSTALACIONES ELECTRICAS 22,630.23
Ejecutado -
Programado - - - - - - - - - - 14,132.30 14,132.30 - 9,662.78 - - - - -
17.00 EVACUACION AGUAS PLUVIALES 37,927.37
Ejecutado -
Programado - - - - - - - - - - - - - - - - 4,308.57 2,872.38 1,436.19
18.00 MITIGACION Y LIMPIEZA 8,617.14
Ejecutado -
Programado - - - - - - - - - - - - - 4,308.73 4,308.73 4,308.73 4,308.73 - -
19.00 ACARREOS 17,234.91
Ejecutado -
Programado 58,595.38 - 58,595.38 - - - - - 58,595.38 - - - - 117,190.76 - - - - - - - - - - -
20.00 FLETES 292,976.90
Ejecutado - - 28,015.88 - - - - - - - - - - - - - - - - - - - - -
Programado 26,662.52 9,523.19 80,554.75 48,333.04 85,348.25 71,143.30 74,390.70 67,152.78 78,573.38 17,262.08 129,791.53 120,973.82 52,766.73 37,118.27 16,956.58 152,826.04 51,799.49 46,253.92 62,731.29 53,004.07 - 119,277.98 93,648.94 88,128.64 90,065.24 10,774.69 1,629.23
COSTO DIRECTO 1,686,690.46
Ejecutado 26,662.52 9,530.05 54,508.84 - - - - - - - - - - - - - - - - - - - - - - - -
P = PROGRAMADO 1.58% 0.56% 4.78% 2.87% 5.06% 4.22% 4.41% 3.98% 4.66% 1.02% 7.70% 7.17% 3.13% 2.20% 1.01% 9.06% 3.07% 2.74% 3.72% 3.14% 0.00% 7.07% 5.55% 5.22% 5.34% 0.64% 0.10% 0.00%
AVANCE SEMANAL (%)
E = EJECUTADO 1.58% 0.57% 3.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
P = PROGRAMADO 1.58% 2.15% 6.92% 9.79% 14.85% 19.06% 23.48% 27.46% 32.12% 33.14% 40.83% 48.01% 51.13% 53.33% 54.34% 63.40% 66.47% 69.21% 72.93% 76.08% 76.08% 83.15% 88.70% 93.92% 99.26% 99.90% 100.00% 100.00%
AVANCE ACUMULADO (%)
E = EJECUTADO 1.58% 2.15% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38% 5.38%
P = PROGRAMADO 165,073.50 9.79% 393,870.49 23.35% 357,606.94 21.20% 366,614.81 21.74% 401,895.49 23.83% 1,629.23 0.10%
AVANCE MENSUAL (%)
E = EJECUTADO 90,701.41 5.38% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00
P = PROGRAMADO 165,073.50 9.79% 558,943.99 33.14% 916,550.93 54.34% 1,283,165.74 76.08% 1,685,061.23 99.90% 1,686,690.46 100%
AVANCE ACUMULADO (%)
E = EJECUTADO 90,701.41 5.38% 90,701.41 5.38% 90,701.41 5.38% 90,701.41 5.38% 90,701.41 5.38% 90,701.41 0.00
CONVENIO N° 318-2020-CUS/VMVU/PNVR
PROYECTO “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO” PRESUPUESTO TOTAL : S/. 2,250,437.04
N° PARTIDA PERIODO
01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 29,176.65 2,583.53 2,583.53 1,158.26 1,438.54 1,143.22 1,158.26 1,158.26 1,158.26 1,158.26 193.04 965.22 1,158.26 1,158.26 1,158.26 579.13 579.13 1,158.26 1,158.26 1,158.26 1,158.26 - 1,158.26 1,158.26 1,158.26 1,158.26 386.09 193.04
1.01 PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DE COVID-19 5,395.00 250.93 250.93 250.93 209.11 41.82 250.93 250.93 250.93 250.93 41.82 209.11 250.93 250.93 250.93 125.47 125.47 250.93 250.93 250.93 250.93 - 250.93 250.93 250.93 250.93 83.64 41.82
1.01.01 LIMPIEZA Y DESINFECCION DEL CENTRO DE TRABAJO 465.00 129.00 3.60 Programado 21.63 21.63 21.63 18.02 3.60 21.63 21.63 21.63 21.63 3.60 18.02 21.63 21.63 21.63 10.81 10.81 21.63 21.63 21.63 21.63 - 21.63 21.63 21.63 21.63 7.21 3.60
Ejecutado -
1.04 TRAZO NIVELES Y REPLANTEO PRELIMINAR 3,800.71 1,425.27 1,425.27 - - 950.18 - - - - - - - - - - - - - - - - - - - -
1.04.01 TRAZOS, NIVELES (REPLANTEO PRELIMINAR) 3,800.71 8.00 475.09 Programado 1,425.27 1,425.27 - - 950.18 - - - - - - - - - - - - - - - - - - -
Ejecutado 19912.23 - - - - -
2.01.02 EXCAVACION DE ZANJA HASTA H=1.00m (APORTE) 9,722.44 14.00 694.46 Programado 4166.76 4166.76 1,388.92
Ejecutado - 1114.91
3.01.02 SUMINISTRO DE OIEDRA MEDIANA (APORTE) 4,621.50 5.00 924.30 Programado 2,772.90 1,848.60
Ejecutado 2772.9 2781.51
3.01.03 NIVELACION RELLENO Y APISANADO DE CAMA DE PIEDRA (APORTE) 5,316.86 10.00 531.69 Programado 1,063.37 531.69 1,063.37 1,063.37 1,063.37 531.69
Ejecutado -
3.02 SOBRECIMIENTOS 43,095.68 - - 3,591.31 3,591.31 1,795.65 10,773.92 5,386.96 7,182.61 - - - 10,773.92 - - - - - - - - - - - - - -
3.02.01 SOBRECIMIENTOS MEZCLA CEMENTO-HORMIGON 1:8 + 30% PM 17,613.80 24.00 733.91 Programado 1,467.82 1,467.82 733.91 4,403.45 2,201.73 2,935.63 4,403.45
Ejecutado - 1,397.92 - - - - - -
3.02.02 ENCOFRADO Y DESENCIOFRADO DE SOBRECIMIENTO h=0.35m 25,481.88 24.00 1,061.75 Programado 2,123.49 2,123.49 1,061.75 6,370.47 3,185.24 4,246.98 6,370.47
Ejecutado - 2,022.37
04 CONCRETO ARMADO 205,105.94 - - 9,338.82 10,310.20 3,362.08 15,839.01 22,851.10 22,851.10 31,315.25 7,518.65 27,275.76 40,469.31 6,987.33 4,658.22 2,329.11 - - - - - - - - - - - -
4.01 COLUMNAS 111,544.97 - - 9,338.82 10,310.20 3,362.08 15,839.01 15,839.01 15,839.01 15,839.01 1,195.35 5,976.75 18,005.74 - - - - - - - - - - - - - - -
4.01.01 CONCRETO COLUMNAS Fc=175 kg/cm2 25,698.19 25.00 1,027.93 Programado 1,027.93 2,055.86 1,027.93 4,111.71 4,111.71 4,111.71 4,111.71 5,139.64
Ejecutado - 1,631.63 - - - - - - -
4.01.02 ENCOFRADO Y DESENCIOFRADO DE COLUMNAS 28,470.01 25.00 1,138.80 Programado 1,138.80 2,277.60 1,138.80 4,555.20 4,555.20 4,555.20 4,555.20 5,694.00
Ejecutado - 1,807.62
4.01.03 ACERO CORRUGADO FY=4000 kg/cm2 57,376.77 48.00 1,195.35 Programado 7,172.10 5,976.75 1,195.35 7,172.10 7,172.10 7,172.10 7,172.10 1,195.35 5,976.75 7,172.10
Ejecutado - 14,571.88
4.02 VIGAS 93,560.97 - - - - 7,012.09 7,012.09 15,476.24 6,323.30 21,299.02 22,463.57 6,987.33 4,658.22 2,329.11 - - - - - - - - - - -
4.02.01 CONCRETO VIGAS Fc=175 kg/cm2 27,949.33 24.00 1,164.56 Programado 1,164.56 5,822.78 6,987.33 6,987.33 4,658.22 2,329.11
Ejecutado -
4.02.02 ENCOFRADO Y DESENCIOFRADO EN VIGAS 37,563.28 10.00 3,756.33 Programado 11,268.98 3,756.33 11,268.98 11,268.98
FORMATO N° 23
CONVENIO N° 318-2020-CUS/VMVU/PNVR
PROYECTO “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO” PRESUPUESTO TOTAL : S/. 2,250,437.04
N° PARTIDA PERIODO
Ejecutado -
4.02.03 ACERO CORRUGADO FY=4000 kg/cm2 GRADO 60 PARA VIGAS 28,048.36 20.00 1,402.42 Programado 7,012.09 7,012.09 4,207.25 1,402.42 4,207.25 4,207.25
Ejecutado -
5.00 TIJERALES Y RETICULADOS 87,956.06 - - - - - - - - - - - 9,423.86 12,565.15 9,423.86 12,565.15 9,423.86 - 18,847.73 15,706.44 - - - -
5.01 TIJERAL DE MADERA DE 2"X4" 56,420.28 28.00 2,015.01 Programado 6,045.03 8,060.04 6,045.03 8,060.04 6,045.03 12,090.06 10,075.05
Ejecutado - - - - - - - -
5.02 CORREAS DE MADERA 2"X2" 27,812.58 28.00 993.31 Programado 2,979.92 3,973.23 2,979.92 3,973.23 2,979.92 5,959.84 4,966.53
Ejecutado - - - - - - - -
5.03 FRISO DE MADERA DE 1 1/2" X 2 1/2" 3,723.20 28.00 132.97 Programado - - - - - - - - - - - 398.91 531.89 398.91 531.89 398.91 797.83 664.86 - - - -
Ejecutado - - - - - - - -
6.00 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA 116,755.68 12,509.54 16,679.38 12,509.54 16,679.38 12,509.54 - 25,019.07 20,849.23
6.01 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA 108,312.88 28.00 3,868.32 Programado - - - - - - - - - - - 11,604.95 15,473.27 11,604.95 15,473.27 11,604.95 23,209.90 19,341.59 - - - -
Ejecutado - - - - - - - -
6.02 CUMBRERA CALAMINA 0.30 mm, 11 CANALES INCL PINTADO 8,442.80 28.00 301.53 Programado 904.59 1,206.11 904.59 1,206.11 904.59 1,809.17 1,507.64
Ejecutado -
7.00 CIELO RASOS 62,439.30 8,919.90 6,689.93 - 13,379.85 11,149.88 11,149.88 11,149.88 -
CIELORASO CON PLACA DE YESO LAMINADO CON VINYL Y FOIL DE ALUMINIO
07.01.
0.61x0.61 e=6MM / INC. ACCESORIOS E INSTALACION
62,439.30 28.00 2,229.98 Programado - - 8,919.90 6,689.93 13,379.85 11,149.88 11,149.88 11,149.88
Ejecutado - -
8.00 MUROS 314,657.09 26,970.61 8,990.20 35,960.81 35,960.81 35,960.81 44,951.01 8,990.20 26,970.61 53,941.22 26,970.61 8,990.20
8.01 MURO DE LADRILLO TIPO PANDERETA MEDIDAS SEGUN PLANO 239,929.83 35.00 6,855.14 Programado 20,565.41 6,855.14 27,420.55 27,420.55 27,420.55 34,275.69 6,855.14 20,565.41 41,130.83 20,565.41 6,855.14
Ejecutado - - - - - - - - - - - -
FORMATO N° 23
CONVENIO N° 318-2020-CUS/VMVU/PNVR
PROYECTO “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO” PRESUPUESTO TOTAL : S/. 2,250,437.04
N° PARTIDA PERIODO
8.02 SUMINISTRO E INSTALACION DE POLIESTIRENO DE 1" DENSIDAD 10 46,721.17 35.00 1,334.89 Programado 4,004.67 1,334.89 5,339.56 5,339.56 5,339.56 6,674.45 1,334.89 4,004.67 8,009.34 4,004.67 1,334.89
Ejecutado - - - - - - - - - - - -
8.03 BRUÑAS DE MUROS DE LADRILLO 28,006.09 35.00 800.17 Programado 2,400.52 800.17 3,200.70 3,200.70 3,200.70 4,000.87 800.17 2,400.52 4,801.04 2,400.52 800.17
Ejecutado -
9.00 REVOQUES 1,139.81 - - - - 85.49 28.50 113.98 113.98 113.98 113.98 56.99 28.50 113.98 113.98 113.98 85.49 - 56.99 - - - - -
9.01 BOTA AGUA EN VANO DE VENTANA CON CORTA GOTERA. CON MORTERO 1:4 E= 1.5 1,139.81 40.00 28.50 Programado 85.49 28.50 113.98 113.98 113.98 113.98 56.99 28.50 113.98 113.98 113.98 85.49 56.99
Ejecutado -
10.00 ENLUCIDO DE YESO 84,924.43 7,279.24 12,132.06 14,558.47 14,558.47 7,279.24 7,279.24 9,705.65 12,132.06 -
10.01 ENLUCIDO DE YESO EN MURO DE LADRILLO 66,277.92 35.00 1,893.65 Programado 5,680.96 9,468.27 11,361.93 11,361.93 5,680.96 5,680.96 7,574.62 9,468.27
Ejecutado - - - - - - - - -
10.02 DERRAMES DE VANOS CON YESO E=1.5CM 18,646.51 35.00 532.76 Programado 1,598.27 2,663.79 3,196.54 3,196.54 1,598.27 1,598.27 2,131.03 2,663.79
Ejecutado -
11.00 PISOS 51,414.24 593.00 2,490.68 2,095.35 1,528.68 6,960.30 6,960.30 7,369.37 7,211.76 - 4,298.28 4,100.61 4,878.68 2,927.21 -
197.67 Programado 593.00 790.67 395.33 395.33 790.67 790.67 790.67 790.67 395.33 197.67
11.01 BASE DE TIERRA MATERIAL PROPIO COMPACTADO/NIVELADO E= 10 CM 5,930.00 30.00
Ejecutado -
11.02 ACERO DE TEMPERATURA 11,333.45 20.00 566.67 Programado 1,700.02 1,700.02 1,133.35 2,266.69 2,266.69 1,700.02 566.67
Ejecutado -
11.03 PISO DE CEMENTO PULIDO E:4" ACAB. CON OCRE INC. BRUÑADO 34,150.79 35.00 975.74 Programado 3,902.95 3,902.95 4,878.68 5,854.42 3,902.95 3,902.95 4,878.68 2,927.21
Ejecutado -
12.00 VEREDAS 6,608.51 - - - - - - - 1,321.70 1,321.70 991.28 991.28 660.85 991.28 330.43 - - - - - - - - -
12.01 NIVELACION, RELLENO Y APISONADO INTERIOR C/MAT PROPIO (APORTE) 715.18 20.00 35.76 Programado 143.04 143.04 107.28 107.28 71.52 107.28 35.76
Ejecutado - - - - - - - -
VEREDA DE CONCRETO SIMPLE F'C=140 KG/CM2 E= 10 CM ACABADO
12.02
FROTACHADO INCLUYE BRUÑADO
4,879.22 20.00 243.96 Programado 975.84 975.84 731.88 731.88 487.92 731.88 243.96
Ejecutado - - - - - - - -
12.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS 1,014.11 20.00 50.71 Programado - - - - - - - 202.82 202.82 152.12 152.12 101.41 152.12 50.71
Ejecutado -
13.00 ZOCALOS Y CONTRAZOCALOS 27,092.15 3,625.49 3,625.49 3,625.49 3,625.49 3,625.49 1,792.94 1,792.94 - 1,792.94 1,792.94 1,792.94 - -
ZOCALO DE CEMENTO SOBRE MURO EXTERIOR H=58 CM E= 2 CM INCLUYE
13.01
BRUÑAS 18,127.43 20.00 906.37 Programado 3,625.49 3,625.49 3,625.49 3,625.49 3,625.49
Ejecutado -
13.02 CONTRAZOCALO DE MADERA CON RODON, DE 5.80 CM X 1.90 CM X 2.40 M 8,964.72 5.00 1,792.94 Programado 1,792.94 1,792.94 1,792.94 1,792.94 1,792.94
Ejecutado -
14.00 PUERTAS 106,705.62 40,753.35 26,569.79 14,610.03 17,256.24 7,516.22
14.01 PUERTA MACHIHEMBRADA DE 0.90X2.10 M. INCLUYE. INSTALACION 39,693.15 15.00 2,646.21 Programado - - - - - - - - - - - - - - 7,938.63 7,938.63 7,938.63 10,584.84 5,292.42 -
Ejecutado - - - - - -
14.02 PUERTA CONTRAPLACADA DE 0.90X2.10 M. INCLUYE. INSTALACION 27,797.49 25.00 1,111.90 Programado 6,671.40 5,559.50 6,671.40 6,671.40 2,223.80
Ejecutado - - - - - -
14.03 PUERTA CONTRAPLACADA DE 0.80X2.10 M. INCLUYE. INSTALACION 39,214.98 3.00 13,071.66 Programado 26,143.32 13,071.66
Ejecutado - - - - - -
15.00 VENTANAS 84,569.31 - - - - - - - - - - - - - - - - - - 8,013.06 38,915.01 37,641.24 - -
VENTANA DE ALUMINIO DE 0.78 X 1.08 M INC/VIDRIO, CON CONTRAVENTANA DE
15.01
MADERA
65,872.17 7.00 9,410.31 Programado 28,230.93 37,641.24
Ejecutado -
15.02 VENTANA CENITAL 18,697.14 7.00 2,671.02 Programado 8,013.06 10,684.08
Ejecutado -
16.00 INSTALACIONES ELECTRICAS 22,630.23 11,315.12 11,315.12
16.01 INSTALACION ELECTRICA EN MÓDULO 22,630.23 6.00 3,771.71 Programado 11,315.12 11,315.12
Ejecutado -
17.00 EVACUACION AGUAS PLUVIALES 37,927.37 14,132.30 14,132.30 - 9,662.78
17.01 SISTEMA DE EVACUACION DE AGUAS PLUVIALES 36,237.60 8.00 4,529.70 Programado 13,589.10 13,589.10 9,059.40
Ejecutado -
17.02 ENCOFRADO Y DESENCOFRADO DE DADOS DE CONCRETO. 1,087.95 9.00 120.88 Programado - - - - - - - - - - - - - - 362.65 362.65 362.65
Ejecutado - - - -
17.03 CONCRETO SIMPLE f'c=100 kg/cm2 PARA DADOS DE PROTECCION 601.82 10.00 60.18 Programado 180.55 180.55 240.73
Ejecutado -
18.00 MITIGACION Y LIMPIEZA 8,617.14 4,308.57 2,872.38 1,436.19
18.01 MITIGACION DEL IMPACTO AMBIENTAL (APORTE) 8,617.14 6.00 1,436.19 Programado 4,308.57 2,872.38 1,436.19
Ejecutado -
19.00 ACARREOS 17,234.91 4,308.73 4,308.73 4,308.73 4,308.73
19.01 ACARREO DE MATERIAL EXCEDENTE Y LIMPIEZA DE OBRA FINAL (APORTE) 17,234.91 8.00 2,154.36 Programado 4,308.73 4,308.73 4,308.73 4,308.73
Ejecutado -
FORMATO N° 23
CONVENIO N° 318-2020-CUS/VMVU/PNVR
PROYECTO “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO” PRESUPUESTO TOTAL : S/. 2,250,437.04
N° PARTIDA PERIODO
Ejecutado - 16,776.32 - - -
FLETE TERRESTRE TRANSP. MATERIALES DE ALMACEN A PUNTA DE
20.01.02
CARRETERA (INCL. CARGA-DESCARGA)
17,192.30 5.00 3,438.46 Programado 3,438.46 3,438.46 3,438.46 6,876.92
Ejecutado - 859.61 - - -
20.01.03 FLETE RURAL DE MATERIALES PUNTA DE CARRETERA A VIVIENDA (APORTE) 23,291.26 5.00 4,658.25 Programado 4,658.25 - 4,658.25 - - - 4,658.25 - - - - 9,316.50 - - - - - - - - - -
Ejecutado - - - - -
ACOMPAÑAMIENTO, CARGA Y DESCARGA TRANSP. DE MATERIALES PUNTA DE
20.01.04
CARRETERA A VIVIENDA (APORTE)
14,728.95 5.00 2,945.79 Programado 2,945.79 2,945.79 2,945.79 5,891.58
Ejecutado - -
20.02 FLETE Y TRANSPORTE DE PIEDRA Y AGREGADOS 153,882.77 30,776.55 - 30,776.55 - - - 30,776.55 - - - - 61,553.11 - - - - - - - - - -
FLETE TERRESTRE TRANSP. AGREGADOS DEL PROVEDOR A PUNTA DE
20.02.01
CARRETERA (INCL. CARGA-DESCARGA)
41,540.62 5.00 8,308.12 Programado 8,308.12 8,308.12 8,308.12 16,616.25
Ejecutado - 8,308.12 - - -
FLETE TERRESTRE TRANSP. PIEDRA DE CANTERA A PUNTA DE CARRETERA
20.02.02
(INCL. CARGA-DESCARGA)
10,359.14 5.00 2,071.83 Programado 2,071.83 2,071.83 2,071.83 4,143.66
Ejecutado - 2,071.83 - - -
FLETE TERRESTRE TRANSP. DE AGREGADO Y PIEDRA DE PUNTA DE
20.02.03
CARRETERA A VIVIENDA (APORTE) 62,974.69 5.00 12,594.94 Programado 12,594.94 12,594.94 12,594.94 25,189.88
Ejecutado - - - -
ACOMPAÑAMIENTO, CARGA Y DESCARGA TRANSP. DE AGREGADO Y PIEDRA DE
20.02.04
PUNTA DE CARRETERA A VIVIENDA (APORTE)
39,008.32 5.00 7,801.66 Programado 7,801.66 7,801.66 7,801.66 15,603.33
Ejecutado -
TOTAL 1,686,690.46 Programado 26,662.52 9,523.19 80,554.75 48,333.04 85,348.25 71,143.30 74,390.70 67,152.78 78,573.38 17,262.08 129,791.53 120,973.82 52,766.73 37,118.27 16,956.58 152,826.04 51,799.49 46,253.92 62,731.29 53,004.07 - 119,277.98 93,648.94 88,128.64 90,065.24 10,774.69 1,629.23
Ejecutado 26,662.36 9,530.05 54,508.84 - - - - - - - - - - - - - - - - - - - - - - - - -
P = PROGRAMADO 1.58% 0.56% 4.78% 2.87% 5.06% 4.22% 4.41% 3.98% 4.66% 1.02% 7.70% 7.17% 3.13% 2.20% 1.01% 9.06% 3.07% 2.74% 3.72% 3.14% 0.00% 7.07% 5.55% 5.22% 5.34% 0.64% 0.10%
AVANCE SEMANAL (%)
E = EJECUTADO 1.58% 0.57% 3.23% 0.00%
P = PROGRAMADO 1.58% 2.15% 6.92% 9.79% 14.85% 19.06% 23.48% 27.46% 32.12% 33.14% 40.83% 48.01% 51.13% 53.33% 54.34% 63.40% 66.47% 69.21% 72.93% 76.08% 76.08% 83.15% 88.70% 93.92% 99.26% 99.90% 100.00%
AVANCE ACUMULADO (%)
E = EJECUTADO 1.58% 2.15% 5.38% 5.38%
P = PROGRAMADO 165,073.50 9.79% 393,870.49 23.35% 357,606.94 21.20% 366,614.81 21.74% 401,895.49 23.83% 1,629.23 0.10%
AVANCE MENSUAL (%)
E = EJECUTADO 90,701.25 5.38% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00
P = PROGRAMADO 165,073.50 9.79% 558,943.99 33.14% 916,550.93 54.34% 1,283,165.74 76.08% 1,685,061.23 99.90% 1,686,690.46 100.00%
AVANCE ACUMULADO (%)
E = EJECUTADO 90,701.25 5.38% 90,701.25 0.00% 90,701.25 0.00% 90,701.25 0.00% 90,701.25 9070125.00% 90,701.25
AMPLIACION DE PLAZO
TRANSFERE FECHA PLAZO OBSERVACI
FECHA RECEPCIÓN MONTO FECHA N° DÍAS FIN DE OBRA
NCIAS TRAMITE VIGENCIA ONES
Proyecto: “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS ACCOPARA, COCHAPATA Y OTROS - DISTRITO DE LIVITACA; CENTRO POBLADO CRUZ SAYHUA - DISTRITO DE CHAMACA - PROVINCIA DE CHUMBIVILCAS - DEPARTAMENTO DE CUSCO”
AVANCES
PRESUPUESTO BASE SALDO
ITEMS DESCRIPCION PARTIDA (01) DEL 05 AL 11 ABRIL (02) DEL 12 AL 18 ABRIL (03) DEL 19 AL 25 ABRIL (04) DEL 26 AL 30 ABRIL (05) DEL 15 AL 21 FEBRERO ACUMULADO
U.M. METRADO P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES, SEGURIDAD Y
01 29,176.65 2,583.370 2,590.390 1,165.12 #REF! #REF! 6,338.84 #REF!
SALUD
1.01 PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DE COVID-19 5,395.00 2,583.370 2,590.390 253.57 - - 758.00 4,637.01
1.01.01 LIMPIEZA Y DESINFECCION DEL CENTRO DE TRABAJO glb 1.00 465.00 465.00 0.047 21.62 4.65% 0.047 21.860 4.70% 0.047 21.86 4.70% - 0.00% - 0.00% 0.14 65.33 14.05% 0.86 399.67 85.95%
EVALUACION DE LAS CONDICIONES DE SALUD DEL TRABAJOR PREVIO
1.01.02
AL INICIO A OBRA
glb 1.00 250.00 250.00 0.047 11.63 4.65% 0.047 11.750 4.70% 0.047 11.75 4.70% - 0.00% - 0.00% 0.14 35.13 14.05% 0.86 214.88 85.95%
1.01.03 LAVADO Y DESINFECCION DE MANOS glb 1.00 1,740.00 1,740.00 0.047 80.91 4.65% 0.047 81.780 4.70% 0.047 81.78 4.70% - 0.00% - 0.00% 0.14 244.47 14.05% 0.86 1,495.53 85.95%
SENSIBILIZACION DE LA PREVENCION DEL CONTAGIO EN EL CENTRO DE
1.01.04
TRABAJO
glb 1.00 2,940.00 2,940.00 0.047 136.71 4.65% 0.047 138.180 4.70% 0.047 138.18 4.70% - 0.00% - 0.00% 0.14 413.07 14.05% 0.86 2,526.93 85.95%
1.02 PROCEDIMIENTO OBLIGATORIO PARA INICIO DE LOS TRABAJOS 8,625.00 405.38 - - 1,211.81 7,413.19
1.02.01 PROCESO PARA INICIO DEL TRABAJO glb 1.00 8,625.00 8,625.00 0.047 401.06 4.65% 0.047 405.380 4.70% 0.047 405.38 4.70% - 0.00% - 0.00% 0.14 1,211.81 14.05% 0.86 7,413.19 85.95%
1.03 TRABAJOS PRELIMINARES 473.32 - - - - 473.32
1.03.01 CARTEL DE OBRA DE 4.00 X 2.50 und 1.00 473.32 473.32 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 1.00 473.32 100.00%
1.04 TRAZO NIVELES Y REPLANTEO PRELIMINAR 3,800.71 - - - 2,850.53 950.18
1.04.01 TRAZOS, NIVELES (REPLANTEO PRELIMINAR) m2 2,621.18 1.45 3,800.71 982.94 1,425.27 37.50% 982.943 1,425.270 37.50% - - 0.00% - 0.00% - 0.00% 1,965.89 2,850.53 75.00% 655.30 950.18 25.00%
1.05 SEGURIDAD Y SALUD 10,882.62 506.17 - - 1,518.50 9,364.12
1.05.01 EQUIPO DE SEGURIDAD INDIVIDUAL glb 63.00 93.90 5,915.70 2.93 275.15 4.65% 2.930 275.150 4.65% 2.93 275.15 4.65% - 0.00% - 0.00% 8.79 825.44 13.95% 54.21 5,090.26 86.05%
1.05.02 EQUIPO DE SEGURIDAD COLECTIVA glb 63.00 26.62 1,677.06 2.93 78.00 4.65% 2.930 78.000 4.65% 2.93 78.00 4.65% - 0.00% - 0.00% 8.79 234.01 13.95% 54.21 1,443.05 86.05%
1.05.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 63.00 7.22 454.86 2.93 21.16 4.65% 2.930 21.160 4.65% 2.93 21.16 4.65% - 0.00% - 0.00% 8.79 63.47 13.95% 54.21 391.39 86.05%
1.05.04 CAPACITACION EN SALUD Y SEGURIDAD glb 63.00 45.00 2,835.00 2.93 131.86 4.65% 2.930 131.860 4.65% 2.93 131.86 4.65% - 0.00% - 0.00% 8.79 395.58 13.95% 54.21 2,439.42 86.05%
02 MOVIMIENTO DE TIERRAS 39,590.79 24,078.990 4,166.760 - - - 28,245.75 11,345.04
2.01 EXCAVACIONES 39,590.79 24,078.99 4,166.76 - - - 28,245.75 11,345.04
2.01.01 CORTE Y EXPLANACIÒN DE TERRENO NORMAL MANUAL (APORTE) m3 1,310.59 22.79 29,868.35 873.73 19,912.23 66.67% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% 873.73 19,912.23 66.67% 436.86 9,956.12 33.33%
2.01.02 EXCAVACION DE ZANJA HASTA H=1.00m (APORTE) m3 426.61 22.79 9,722.44 182.83 4,166.76 42.86% 182.833 4,166.760 42.86% - 0.00% - 0.00% - 0.00% 365.67 8,333.52 85.71% 60.94 1,388.92 14.29%
03 CONCRETO SIMPLE 89,168.33 0.000 2,772.900 7,316.71 - - 10,089.61 79,078.72
3.01 CIMIENTOS 46,072.65 3,896.42 - - 6,669.32 39,403.33
3.01.01 CIMIENTO CORRIDO MAMPOSTERIA DE PIEDRA, MEZCLA 1:10 + 50% P.G. m3 284.41 127.05 36,134.29 - 0.00% 0.000 0.000 0.00% 8.78 1,114.91 3.09% - 0.00% - 0.00% 8.78 1,114.91 3.09% 275.63 35,019.38 96.91%
3.01.02 SUMINISTRO DE OIEDRA MEDIANA (APORTE) m3 142.20 32.50 4,621.50 - 0.00% 85.320 2,772.900 60.00% 85.58 2,781.51 60.19% - 0.00% - 0.00% 170.90 5,554.41 120.19% -28.70 -932.91 -20.19%
3.01.03 NIVELACION RELLENO Y APISANADO DE CAMA DE PIEDRA (APORTE) m3 142.20 37.39 5,316.86 - 0.00% 0.000 0.000 0.00% - - 0.00% - 0.00% - 0.00% - - 0.00% 142.20 5,316.86 100.00%
3.02 SOBRECIMIENTOS 43,095.68 3,420.29 - - 3,420.29 39,675.39 92.06%
3.02.01 SOBRECIMIENTOS MEZCLA CEMENTO-HORMIGON 1:8 + 30% PM m3 110.57 159.30 17,613.80 - 0.00% 0.000 0.000 0.00% 8.78 1,397.92 7.94% - 0.00% - 0.00% 8.78 1,397.92 7.94% 101.79 16,215.88 92.06%
3.02.02 ENCOFRADO Y DESENCIOFRADO DE SOBRECIMIENTO h=0.35m m2 1,078.37 23.63 25,481.88 - 0.00% 0.000 0.000 0.00% 85.58 2,022.37 7.94% - 0.00% - 0.00% 85.58 2,022.37 7.94% 992.79 23,459.51 92.06%
04 CONCRETO ARMADO 205,105.94 0.000 0.000 18,011.13 - - 18,011.13 271,327.67
4.01 COLUMNAS 111,544.97 18,011.13 - - 18,011.13 93,533.84
4.01.01 CONCRETO COLUMNAS Fc=175 kg/cm2 m3 80.68 318.52 25,698.19 - 0.00% 0.000 0.000 0.00% 5.12 1,631.63 6.35% - 0.00% - 0.00% 5.12 1,631.63 6.35% 75.56 24,066.56 93.65%
4.01.02 ENCOFRADO Y DESENCIOFRADO DE COLUMNAS m2 902.95 31.53 28,470.01 - 0.00% 0.000 0.000 0.00% 57.33 1,807.62 6.35% - 0.00% - 0.00% 57.33 1,807.62 6.35% 845.62 26,662.39 93.65%
4.01.03 ACERO CORRUGADO FY=4000 kg/cm2 kg 11,521.44 4.98 57,376.77 - 0.00% 0.000 0.000 0.00% 2,926.08 14,571.88 25.40% - 0.00% - 0.00% 2,926.08 14,571.88 25.40% 8,595.36 42,804.89 74.60%
4.02 VIGAS 93,560.97 - - - - 93,560.97
4.02.01 CONCRETO VIGAS Fc=175 kg/cm2 m3 99.09 282.06 27,949.33 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 99.09 27,949.33 100.00%
4.02.02 ENCOFRADO Y DESENCIOFRADO EN VIGAS m2 1,030.26 36.46 37,563.28 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 1,030.26 37,563.28 100.00%
4.02.03 ACERO CORRUGADO FY=4000 kg/cm2 GRADO 60 PARA VIGAS kg 5,632.20 4.98 28,048.36 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 5,632.20 28,048.36 100.00%
5.00 TIJERALES Y RETICULADOS 87,956.06 0.000 0.000 - - - - 84,232.86
5.01 TIJERAL DE MADERA DE 2"X4" und 252.00 223.89 56,420.28 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 252.00 56,420.28 100.00%
5.02 CORREAS DE MADERA 2"X2" p2 3,996.06 6.96 27,812.58 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 3,996.06 27,812.58 100.00%
5.03 FRISO DE MADERA DE 1 1/2" X 2 1/2" p2 482.28 7.72 3,723.20 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 482.28 3,723.20 100.00%
6.00 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA 116,755.68 0.000 0.000 0.00%
6.01 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA m2 2,585.65 41.89 108,312.88 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 2,585.65 108,312.88 100.00%
6.02 CUMBRERA CALAMINA 0.30 mm, 11 CANALES INCL PINTADO m 387.64 21.78 8,442.80 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 387.64 8,442.80 100.00%
7.00 CIELO RASOS 62,439.30 0.000 0.000 - - - - 377,096.39
CIELORASO CON PLACA DE YESO LAMINADO CON VINYL Y FOIL DE
7.01 1,135.26 55.00 62,439.30 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 1,135.26 62,439.30 100.00%
ALUMINIO 0.61x0.61 e=6MM / INC. ACCESORIOS E INSTALACION m
8.00 MUROS 314,657.09 0.000 0.000 - 0.00% - 0.00% - 0.00% - - 0.00% - 0.00%
8.01 MURO DE LADRILLO TIPO PANDERETA MEDIDAS SEGUN PLANO m2 4,599.00 52.17 239,929.83 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 4,599.00 239,929.83 100.00%
8.02 SUMINISTRO E INSTALACION DE POLIESTIRENO DE 1" DENSIDAD 10 m2 3,435.38 13.60 46,721.17 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 3,435.38 46,721.17 100.00%
8.03 BRUÑAS DE MUROS DE LADRILLO m 17,952.62 1.56 28,006.09 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 17,952.62 28,006.09 100.00%
9.00 REVOQUES 1,139.81 0.000 0.000 - - - - 86,064.24
BOTA AGUA EN VANO DE VENTANA CON CORTA GOTERA. CON
9.01
MORTERO 1:4 E= 1.5 CM
m2 44.23 25.77 1,139.81 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 44.23 1,139.81 100.00%
Proyecto: “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS ACCOPARA, COCHAPATA Y OTROS - DISTRITO DE LIVITACA; CENTRO POBLADO CRUZ SAYHUA - DISTRITO DE CHAMACA - PROVINCIA DE CHUMBIVILCAS - DEPARTAMENTO DE CUSCO”
AVANCES
PRESUPUESTO BASE SALDO
ITEMS DESCRIPCION PARTIDA (01) DEL 05 AL 11 ABRIL (02) DEL 12 AL 18 ABRIL (03) DEL 19 AL 25 ABRIL (04) DEL 26 AL 30 ABRIL (05) DEL 15 AL 21 FEBRERO ACUMULADO
U.M. METRADO P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
11.02 ACERO DE TEMPERATURA m2 1,253.70 9.04 11,333.45 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 1,253.70 11,333.45 100.00%
11.03 PISO DE CEMENTO PULIDO E:4" ACAB. CON OCRE INC. BRUÑADO m3 1,253.70 27.24 34,150.79 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 1,253.70 34,150.79 100.00%
FORMATO Nº 11
Proyecto: “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS ACCOPARA, COCHAPATA Y OTROS - DISTRITO DE LIVITACA; CENTRO POBLADO CRUZ SAYHUA - DISTRITO DE CHAMACA - PROVINCIA DE CHUMBIVILCAS - DEPARTAMENTO DE CUSCO”
AVANCES
PRESUPUESTO BASE SALDO
ITEMS DESCRIPCION PARTIDA (01) DEL 05 AL 11 ABRIL (02) DEL 12 AL 18 ABRIL (03) DEL 19 AL 25 ABRIL (04) DEL 26 AL 30 ABRIL (05) DEL 15 AL 21 FEBRERO ACUMULADO
U.M. METRADO P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
12.00 VEREDAS 6,608.51 0.000 0.000 - - - - - - 5,594.40 84.65%
NIVELACION, RELLENO Y APISONADO INTERIOR C/MAT PROPIO
12.01
(APORTE)
m2 151.20 4.73 715.18 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 151.20 715.18 100.00%
VEREDA DE CONCRETO SIMPLE F'C=140 KG/CM2 E= 10 CM ACABADO
12.02 m2 151.20 32.27 4,879.22 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 151.20 4,879.22 100.00%
FROTACHADO INCLUYE BRUÑADO
12.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 44.13 22.98 1,014.11 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 44.13 1,014.11 100.00%
13.00 ZOCALOS Y CONTRAZOCALOS 27,092.15 0.000 0.000
ZOCALO DE CEMENTO SOBRE MURO EXTERIOR H=58 CM E= 2 CM
13.01
INCLUYE BRUÑAS
m2 720.20 25.17 18,127.43 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 720.20 18,127.43 100.00%
14.02 PUERTA CONTRAPLACADA DE 0.90X2.10 M. INCLUYE. INSTALACION und 63.00 441.23 27,797.49 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 63.00 27,797.49 100.00%
14.03 PUERTA CONTRAPLACADA DE 0.80X2.10 M. INCLUYE. INSTALACION und 126.00 311.23 39,214.98 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 126.00 39,214.98 100.00%
15.02 VENTANA CENITAL und 63.00 296.78 18,697.14 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 63.00 18,697.14 100.00%
16.00 INSTALACIONES ELECTRICAS 22,630.23 0.000 0.000
16.01 INSTALACION ELECTRICA EN MÓDULO glb 63.00 359.21 22,630.23 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 63.00 22,630.23 100.00%
17.00 EVACUACION AGUAS PLUVIALES 37,927.37 0.000 0.000
17.01 SISTEMA DE EVACUACION DE AGUAS PLUVIALES und 126.00 287.60 36,237.60 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 126.00 36,237.60 100.00%
17.02 ENCOFRADO Y DESENCOFRADO DE DADOS DE CONCRETO. m2 44.10 24.67 1,087.95 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 44.10 1,087.95 100.00%
17.03 CONCRETO SIMPLE f'c=100 kg/cm2 PARA DADOS DE PROTECCION m3 2.76 218.05 601.82 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 2.76 601.82 100.00%
18.00 MITIGACION Y LIMPIEZA 8,617.14 0.000 0.000
18.01 MITIGACION DEL IMPACTO AMBIENTAL (APORTE) glb 63.00 136.78 8,617.14 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 63.00 8,617.14 100.00%
19.00 ACARREOS 17,234.91 0.000 0.000
ACARREO DE MATERIAL EXCEDENTE Y LIMPIEZA DE OBRA FINAL
19.01
(APORTE)
glb 63.00 273.57 17,234.91 - 0.00% 0.000 0.000 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 63.00 17,234.91 100.00%
COSTO DIRECTO 0.00 1,686,690.46 26,662.36 1.58% 9,530.050 0.57% 54,508.840 3.23% 0.00 0.00% 0.00 0.00% 90,701.21 5.38% 1,383,936.95 82.05%
FORMATO N° 23
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
CONVENIO N° 222-2020-CUS/VMVU/PNVR.
PROYECTO “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS ACCOPARA, COCHAPATA Y OTROS - DISTRITO DE LIVITACA; CENTRO POBLADO CRUZ SAYHUA - DISTRITO DE CHAMACA - PROVINCIA DE CHUMBIVILCAS - DEPARTAMENTO DE CUSCO” MONTO TOTAL DEL PRESUPUESTO: S/. 2,250,437.04
PERIODO
MES ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO
N° PARTIDA DIAS DE PRESUPUESTO Semana 1 2 3 4 5 6 7 8 9 10 11-A 11-B 12 13 14 15-A 15-B 16 17 18 19 20-A 20-B 21 22 23 24-A 24-B 25 26
PRESUPUESTO
EJECUCION POR DIA
Dia 18-24 25-31 1-7 8-14 15-21 22-28 1-7 8-14 15-21 22-28 29-31 1-4 5-11 12-18 19-25 26-30 1-2 3-9 10-16 17-23 24-30 31 1-6 7-13 14-20 21-27 28-30 1-4 5-11 12-16
Programado 28.15 28.15 28.15 28.15 28.15 28.15 28.15 28.15 28.15 28.15 14.08 14.08 28.15 28.15 28.15 14.08 14.08 28.15 28.15 28.15 28.15 14.08 14.08 28.15 28.15 28.15 14.08 14.08 28.15 28.15
1.01.01 LIMPIEZA Y DESINFECCION DEL CENTRO DE TRABAJO S/ 732.00
Ejecutado -
EVALUACION DE LAS CONDICIONES DE SALUD DEL TRABAJOR PREVIO AL Programado 480.00
1.01.02 S/ 480.00
INICIO A OBRA Ejecutado
Programado 73.15 73.15 73.15 73.15 73.15 73.15 73.15 73.15 73.15 73.15 36.58 36.58 73.15 73.15 73.15 36.58 36.58 73.15 73.15 73.15 73.15 36.58 36.58 73.15 73.15 73.15 36.58 36.58 73.15 73.15
1.01.03 LAVADO Y DESINFECCION DE MANOS S/ 1,902.00
Ejecutado -
SENSIBILIZACION DE LA PREVENCION DEL CONTAGIO EN EL CENTRO DE Programado 4,240.00
1.01.04 S/ 4,240.00
TRABAJO Ejecutado
Programado 12,750.00
1.02.01 PROCESO PARA INICIO DEL TRABAJO S/ 12,750.00
Ejecutado
1.03 TRABAJOS PRELIMINARES S/ 614.33
Programado 614.33
1.04 CARTEL DE OBRA DE 4.00 X 2.50 S/ 614.33
Ejecutado
1.04 TRAZO NIVELES Y REPLANTEO PRELIMINAR S/ 4,329.80
Programado 2,164.90 2,164.90
1.04.01 TRAZOS, NIVELES (REPLANTEO PRELIMINAR)
S/ 4,329.80 Ejecutado 1,425.27 - 56.97
1.05 SEGURIDAD Y SALUD S/ 15,244.84
Programado 8,359.24
1.05.01 EQUIPO DE SEGURIDAD INDIVIDUAL S/ 8,359.24
Ejecutado 219.98
Programado 2,630.36
1.05.02 EQUIPO DE SEGURIDAD COLECTIVA S/ 2,630.36
Ejecutado 69.22
Programado 455.24
1.05.03 SEÑALIZACION TEMPORAL DE SEGURIDAD S/ 455.24
Ejecutado 11.98
Programado 316.67 633.33 633.33 633.33 633.33 633.33 316.67
1.05.04 CAPACITACION EN SALUD Y SEGURIDAD S/ 3,800.00
Ejecutado
1.06 CONTROL DE CALIDAD S/ 1,045.00
Programado 380.00
1.06.01 CONTROL DE HUMEDAD DE MADERA S/ 380.00
Ejecutado
Programado 665.00
1.06.02 CONTROL DE CALIDAD DE FABRICACION DE ADIOBE S/ 665.00
Ejecutado
2 MOVIMIENTO DE TIERRAS S/ 53,613.18
2.01 EXCAVACIONES S/ 53,613.18
Programado 18,142.68 18,142.68
2.01.01 CORTE Y EXPLANACIÒN DE TERRENO NORMAL MANUAL (APORTE) S/ 36,285.35
Ejecutado - 9,548.57 477.44
Programado 8,663.92 8,663.92
2.01.02 EXCAVACION DE ZANJA HASTA H=1.00m (APORTE) S/ 17,327.83
Ejecutado
3 CONCRETO SIMPLE S/ 164,760.15
3.01 CIMIENTOS S/ 93,966.41
Programado 45,877.64 45,877.64
3.01.01 CIMIENTO CORRIDO MAMPOSTERIA DE PIEDRA, MEZCLA 1:10 + 70% P.G. S/ 91,755.28
Ejecutado
Programado 1,105.57 1,105.57
3.01.02 CIMIENTO COLUMNAS, MEZCLA 1:10 + 50% P.G.(MANUAL) S/ 2,211.13
Ejecutado
3.02 SOBRECIMIENTOS S/ 70,793.74
Programado 14,037.60 14,037.60 14,037.60
3.02.01 SOBRECIMIENTOS MEZCLA CEMENTO-HORMIGON 1:8 + 30% PM S/ 42,112.80
Ejecutado
Programado 8,053.37 8,053.37 8,053.37
3.02.02 ENCOFRADO Y DESENCIOFRADO DE SOBRECIMIENTO h=0.35m S/ 24,160.11
Ejecutado
Programado 1,526.90 1,526.90
3.02.03 CONCRETO f'c=140 kg/cm2 PARA BASE DE COLUMNA ( MANUAL) S/ 3,053.79
Ejecutado
Programado 733.52 733.52
3.02.04 ENCOFRADO Y DESENCOFRADO DE BASE DE COLUMNA S/ 1,467.04
Ejecutado
4 ESTRUCTURAS DE MADERA S/ 191,965.93
4.01 VIGAS COLLAR DE MADERA S/ 78,976.80
Programado 16,459.64 16,459.64 16,459.64
04.01.01 VIGA COLLAR DE MADERA DE 3" X 2" S/ 49,378.91
Ejecutado
Programado 8,396.06 8,396.06
04.01.02 DINTEL DE MADERA 3"X8" S/ 16,792.12
Ejecutado
Programado 1,629.30 1,629.30
04.01.03 DINTEL DE MADERA 1 1/2"X8" S/ 3,258.60
Ejecutado
Programado 3,182.39 3,182.39 3,182.39
04.01.04 FRISO DE MADERA DE 1 1/2" X 3" S/ 9,547.17
Ejecutado
4.02 TIJERALES Y RETICULADOS S/ 98,932.93
Programado 9,255.09 4,627.55 4,627.55 9,255.09 9,255.09
4.02.01 TIJERAL DE MADERA DE 2"X4" ( TECHO L= 6.80) S/ 37,020.36
Ejecutado
TIJERAL DE MADERA DE 2" X 4" SIN TRAVESAÑO ( EN TIMPANO - TECHO L= Programado 4,631.44 2,315.72 2,315.72 4,631.44 4,631.44
4.02.02 6.80)
S/ 18,525.76
Ejecutado
Programado 10,846.70 5,423.35 5,423.35 10,846.70 10,846.70
4.02.03 CORREAS DE MADERA 2"X2" S/ 43,386.81
Ejecutado
4.03 COLUMNAS Y VIGAS DE MADERA S/ 14,056.20
Programado 2,224.52 1,112.26 1,112.26 2,224.52 2,224.52
04.03.01 COLUMNA DE MADERA DE 2.8 M X 5" X 5" S/ 8,898.08
Ejecutado
Programado 1,289.53 644.77 644.77 1,289.53 1,289.53
04.03.02 VIGAS DE MADERA DE 2" X 4" S/ 5,158.12
Ejecutado
5 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA S/ 159,557.76
Programado 39,889.44 39,889.44 19,944.72 19,944.72 39,889.44
5.01 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA S/ 159,557.76
Ejecutado
6 CIELO RASOS DE FIBROCEMENTO S/ 61,256.00
CIELORASO CON PLACA DE YESO LAMINADO CON VINYL Y FOIL DE ALUMINIO S/ Programado 15,314.00 15,314.00 15,314.00 15,314.00
6.01 61,256.00
0.61x0.61 e=6MM / INC. ACCESORIOS E INSTALACION Ejecutado
7 MUROS S/ 277,229.36
Programado 75,905.76
7.01 ELABORACION DE ADOBES 0.40 x 0.40 x 0.10 m S/ 75,905.76
Ejecutado -
Programado 34,727.44
7.02 ELABORACION DE MEDIO ADOBE 0.40 x 0.19 x 0.10 m S/ 34,727.44
Ejecutado #NAME?
Programado 12,798.40
7.03 MOLDES Y CUBIERTAS PARA ADOBES S/ 12,798.40
Ejecutado -
Programado 33,179.59 33,179.59 33,179.59
7.04 MUROS DE ADOBE e=0.40M REFORZADO S/ 99,538.77
Ejecutado
Programado 6,837.21 6,837.21 6,837.21
7.05 REFUERZO CON CAÑA CHANCADA EN MUROS DE ADOBE S/ 20,511.64
Ejecutado
Programado 8,436.84 8,436.84 8,436.84 8,436.84
7.06 TABIQUE CON PLACA DE YESO DE 1/2" INC/INSTALACION S/ 33,747.35
Ejecutado
8 REVOQUES Y REVESTIMIENTOS S/ 188,638.80
Programado 18,290.23 9,145.11 9,145.11 18,290.23 18,290.23
8.01 ENLUCIDO DE YESO SOBRE MURO DE ADOBE EXTERIOR S/ 73,160.91
Ejecutado
Programado 25,123.64 12,561.82 12,561.82 25,123.64 25,123.64
8.02 ENLUCIDO DE YESO SOBRE MURO DE ADOBE INTERIOR S/ 100,494.55
Ejecutado
Programado 2,720.01 1,360.01 1,360.01 2,720.01 2,720.01
8.03 DERRAMES DE VANOS C:A 1:5 E=1.5CM S/ 10,880.04
Ejecutado
Programado 1,025.83 512.91 512.91 1,025.83 1,025.83
8.04 BOTA AGUA EN VANO DE VENTANA CON CORTA GOTERA S/ 4,103.30
8.04 BOTA AGUA EN VANO DE VENTANA CON CORTA GOTERA S/ 4,103.30
Ejecutado
9 PISOS S/ 180,662.57
9.01 PISO DE CONCRETO S/ 63,276.99
Programado 1,233.69 1,233.69 1,233.69
9.01.01 BASE DE TIERRA MATERIAL PROPIO COMPACTADO/NIVELADO E= 10 CM S/ 3,701.06
Ejecutado
Programado 2,255.73 2,255.73 2,255.73
9.01.02 SUMINISTRO DE PIEDRA MEDIANA S/ 6,767.20
Ejecutado
NIVELACION RELLENO Y APISONADO DE CAMA DE PIEDRA MEDIANA E= 0.10 M Programado 1,207.71 1,207.71 1,207.71
9.01.03 S/ 3,623.14
( APORTE) Ejecutado
Programado 2,394.65 2,394.65 2,394.65
9.01.04 ACERO DE TEMPERATURA S/ 7,183.95
Ejecutado
Programado 13,747.16 13,747.16 13,747.16
9.01.05 PISO DE CEMENTO FROTACHADO DE E= 3" S/ 41,241.47
Ejecutado
Programado 253.39 253.39 253.39
9.01.06 JUNTA ASFALTICA DE 1/2" X 3" S/ 760.17
Ejecutado
9.02 PISO DE MADERA S/ 117,385.58
BASE DE MATERIAL PROPIO COMPACTADO/NIVELADO DE 9% A 12% DE Programado 736.01 1,472.02 1,472.02 1,472.02
9.02.01 HUMEDAD E= 10 CM
S/ 5,152.08
Ejecutado
Programado 16,033.36 32,066.71 32,066.71 32,066.71
9.02.02 PISO DE MADERA MACHIHEMBRADA DE 3/4"x4" + DURMIENTES DE 2"X4" S/ 112,233.50
Ejecutado
10 VEREDAS S/ 11,079.88
10.01 Programado 360.00 180.00 180.00 360.00
NIVELACION, RELLENO Y APISONADO INTERIOR C/MAT PROPIO (APORTE) S/ 1,079.99
Ejecutado
VEREDA DE CONCRETO SIMPLE F'C=140 KG/CM2 E= 10 CM ACABADO Programado 2,522.24 1,261.12 1,261.12 2,522.24
10.02 FROTACHADO INCLUYE BRUÑADO
S/ 7,566.73
Ejecutado
Programado 254.93 127.46 127.46 254.93
10.03 CONCRETO F'C=140 KG/CM2 PARA UÑAS DE VEREDA S/ 764.78
Ejecutado
Programado 556.13 278.06 278.06 556.13
10.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS S/ 1,668.38
Ejecutado
11 ZOCALOS Y CONTRAZOCALOS S/ 51,757.86
Programado 11,681.34 11,681.34 11,681.34
11.01 ZOCALO DE CEMENTO SOBRE MURO DE ADOBE H=70CM INC/BRUÑAS S/ 35,044.02
Ejecutado
Programado 8,356.92 4,178.46 4,178.46
11.02 CONTRAZOCALO DE MADERA CON RODON, DE 5.80 CM X 1.90 CM X 2.40 M S/ 16,713.84
Ejecutado
12 PUERTAS S/ 118,580.52
SUMINISTRO PUERTA DE MADERA MACHIHEMBRADO INC. MARCO 0.86 x 2.15 Programado 12,160.00 12,160.00 6,080.00 6,080.00
12.01 M (P1)
S/ 36,480.00
Ejecutado
SUMINISTRO PUERTA DE MADERA CONTRAPLACADO INC. MARCO 0.86 x 2.07 Programado 5,573.33 5,573.33 2,786.67 2,786.67
12.02 M (P2)
S/ 16,720.00
Ejecutado
SUMINISTRO PUERTA DE MADERA CONTRAPLACADO INC. MARCO 0.76 x 2.07 Programado 11,146.67 11,146.67 5,573.33 5,573.33
12.03 S/ 33,440.00
M (P3) Ejecutado
Programado 3,654.84 3,654.84 3,654.84
12.04 INSTALACION DE PUERTA MACHIHEMBRADO (P1) INC. ACCESORIOS S/ 10,964.52
Ejecutado
Programado 2,330.67 2,330.67 2,330.67
12.05 INSTALACION DE PUERTA CONTRAPLACADO (P2) INC. ACCESORIOS S/ 6,992.00
Ejecutado
Programado 4,661.33 4,661.33 4,661.33
12.06 INSTALACION DE PUERTA CONTRAPLACADO (P3) INC. ACCESORIOS S/ 13,984.00
Ejecutado
13 VENTANAS S/ 91,200.00
CONTRAVENTANA (V-1) DE MADERA CONTRAPLACADO CON TRIPLAY DD Programado 3,515.00 3,515.00 7,030.00 7,030.00 7,030.00
13.01 E=4MM Y POLIESTIRENO D=10, INC. ACCESORIOS E INSTALACION
S/ 28,120.00
Ejecutado
CONTRAVENTANA (V-2) DE MADERA CONTRAPLACADO CON TRIPLAY DD Programado 1,615.00 1,615.00 3,230.00 3,230.00 3,230.00
13.02 E=4MM Y POLIESTIRENO D=10, INC. ACCESORIOS E INSTALACION
S/ 12,920.00
Ejecutado
VENTANA (V-1) DE ALUMINIO CON SISTEMA CORREDIZO Y VIDRIO SIMPLE DE Programado 2,280.00 2,280.00 4,560.00 4,560.00 4,560.00
13.03 S/ 18,240.00
6MM, INC. ACCESORIOS E INSTALACION Ejecutado
VENTANA (V-2) DE ALUMINIO CON SISTEMA CORREDIZO Y VIDRIO SIMPLE DE Programado 1,330.00 1,330.00 2,660.00 2,660.00 2,660.00
13.04
6MM, INC. ACCESORIOS E INSTALACION Ejecutado
S/ 10,640.00
VENTANA CENITAL DE ALUMINIO CON POLICARBONATO ALVEOLAR E=6MM Programado 2,660.00 2,660.00 5,320.00 5,320.00 5,320.00
13.05 INC. INSTALACION
S/ 21,280.00
Ejecutado
14 PINTURA S/ 23,782.77
Programado 6,776.72 3,388.36 3,388.36 6,776.72
14.01 PINTURA SATINADO EN MURO EXTERIOR S/ 20,330.16
Ejecutado
Programado - - - -
1402 PINTURA SATINADO EN MURO INTERIOR S/ -
Ejecutado
Programado 1,150.87 575.44 575.44 1,150.87
14.03 PINTURA SATINADO EN ZOCALO DE CEMENTO S/ 3,452.61
Ejecutado
15 INSTALACIONES ELECTRICAS S/ 29,015.28
Programado 3,626.91 3,626.91 7,253.82 7,253.82 7,253.82
15.01 INSTALACION ELECTRICA EN MÓDULO S/ 29,015.28
Ejecutado
16 EVACUACION AGUAS PLUVIALES S/ 54,388.21
CANALETAS DE PLANCHA F°G° E=6MM D=5", INC. ACCESORIOS E Programado 10,133.33 5,066.67 5,066.67 10,133.33
16.01 INSTALACION
S/ 30,400.00
Ejecutado
Programado 9,965.12 9,965.12
16.02 MONTANTE Y/O VENTILACION CON TUBERIA PVC - SAP Ø 3" S/ 19,930.24
Ejecutado
Programado 791.53 791.53
16.03 ENCOFRADO Y DESENCOFRADO DE DADOS DE CONCRETO. S/ 1,583.05
Ejecutado
Programado 1,237.46 1,237.46
16.04 CONCRETO SIMPLE f'c=100 kg/cm2 PARA DADOS DE PROTECCION S/ 2,474.92
Ejecutado
17 MITIGACION Y LIMPIEZA S/ 10,332.96
Programado 5,166.48 5,166.48
17.01 MITIGACION DEL IMPACTO AMBIENTAL (APORTE) S/ 10,332.96
Ejecutado 135.96
18 ACARREOS S/ 20,665.92
Programado 10,332.96 10,332.96
18.01 ACARREO DE MATERIAL EXCEDENTE Y LIMPIEZA DE OBRA FINAL (APORTE) S/ 20,665.92
Ejecutado
19 FLETES S/ 194,902.39
19.01 FLETES DE TRANSPORTE DE MATERIALES S/ 84,235.60
FLETE TERRESTRE TRANSP. MATERIALES DEL PROVEEDOR AL ALMACEN Programado 7,440.76 13,021.33 7,440.76 3,720.38 5,580.58
19.01.01 S/ 37,203.81
(INCL. CARGA-DESCARGA) Ejecutado 7,440.76
FLETE TERRESTRE TRANSP. MATERIALES DE ALMACEN A PUNTA DE Programado 4,054.05 7,094.59 4,054.05 2,027.03 3,040.55
19.01.02 CARRETERA (INCL. CARGA-DESCARGA)
S/ 20,270.27
Ejecutado
FLETE RURAL DE ACEMILA PARA TRANSPORTE DE MATERIALES PUNTA DE Programado 1,926.21 5,136.57 5,778.64
19.01.03 S/ 12,841.42
CARRETERA A VIVIENDA (APORTE) Ejecutado
ACOMPAÑAMIENTO, CARGA Y DESCARGA TRANSP. DE MATERIALES EN Programado 2,784.02 4,872.04 2,784.02 1,392.01 2,088.01
19.01.04 S/ 13,920.10
ACEMILA (APORTE) Ejecutado
19.02 FLETE DE TRANSPORTE DE AGREGADOS Y PIEDRA S/ 110,666.79
FLETE TERRESTRE TRANSP. AGREGADOS DEL PROVEDOR A PUNTA DE Programado 41,998.98
19.02.01 S/ 41,998.98
CARRETERA (INCL. CARGA-DESCARGA) Ejecutado
FLETE RURAL DE ACEMILA TRANSP. DE AGREGADO Y PIEDRA PUNTA DE Programado 17,420.61 4,355.15
19.02.03 S/ 21,775.76
CARRETERA O CANTERA A VIVIENDA (APORTE) Ejecutado #NAME? 1,088.79 1,088.79
P = PROGRAMADO 9.51% 9.13% 2.39% 1.47% 1.73% 3.87% 5.77% 2.97% 0.86% 3.92% 2.15% 3.19% 5.43% 7.09% 3.70% 1.47% 2.71% 5.78% 2.98% 3.86% 2.13% 2.21% 3.48% 3.55% 3.35% 2.84% 0.21% 0.23% 1.22% 0.81%
AVANCE SEMANAL (%)
E = EJECUTADO #NAME? #NAME? 0.62% 0.56% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
P = PROGRAMADO 9.51% 18.64% 21.03% 22.50% 24.23% 28.10% 33.87% 36.84% 37.70% 41.63% 43.78% 46.97% 52.40% 59.49% 63.19% 64.66% 67.37% 73.14% 76.12% 79.97% 82.11% 84.32% 87.80% 91.34% 94.70% 97.53% 97.74% 97.97% 99.19% 100.00%
AVANCE ACUMULADO (%)
E = EJECUTADO #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
P = PROGRAMADO 358,792.89 18.64% 293,115.47 15.23% 252,099.89 13.10% 392,591.89 20.40% 393,274.05 20.43% 195,724.20 10.17% 39,129.09 2.03%
AVANCE MENSUAL (%)
E = EJECUTADO #NAME? #NAME? 22,880.66 1.19% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
P = PROGRAMADO 358,792.89 18.64% 651,908.37 33.87% 904,008.23 46.97% 1,296,600.13 67.37% 1,689,874.18 87.80% 1,885,598.38 97.97% 1,924,727.51 100.00%
AVANCE ACUMULADO (%)
E = EJECUTADO #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? 0.00 0.00% 0.00 0.00%
AMPLIACION DE PLAZO
JUNIO
MAYO
PRESUPUESTO ( S/. ) HOJA DE METRADOS MES: MAYO 2019 HOJA DE METRADOS MES: JUNIO 2019 HOJA DE METRADOS MES: JULIO 2019
METRADO X
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
PRECIO PARCIAL
SÁBADO
DOMINGO
SÁBADO
DOMINGO
SÁBADO
DOMINGO
SÁBADO
DOMINGO
SABADO
DOMINGO
SÁBADO
DOMINGO
SÁBADO
DOMINGO
SÁBADO
DOMINGO
SABADO
DOMINGO
SÁBADO
DOMINGO
VIERNES
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
JUEVES
JUEVES
JUEVES
JUEVES
JUEVES
JUEVES
JUEVES
JUEVES
JUEVES
JUEVES
LUNES
LUNES
LUNES
LUNES
LUNES
LUNES
LUNES
LUNES
LUNES
METRADO
E N E L MES
ITEM PARTIDAS
UNIDAD
23-May
24-May
25-May
26-May
27-May
28-May
29-May
30-May
31-May
10-Aug
11-Aug
12-Aug
13-Aug
14-Aug
15-Aug
16-Aug
17-Aug
18-Aug
19-Aug
20-Aug
21-Aug
22-Aug
10-Jun
11-Jun
12-Jun
13-Jun
14-Jun
15-Jun
16-Jun
17-Jun
18-Jun
19-Jun
20-Jun
21-Jun
22-Jun
23-Jun
24-Jun
25-Jun
26-Jun
27-Jun
28-Jun
29-Jun
30-Jun
1-Aug
2-Aug
3-Aug
4-Aug
5-Aug
6-Aug
7-Aug
8-Aug
9-Aug
1-Jun
3-Jun
4-Jun
5-Jun
6-Jun
7-Jun
8-Jun
9-Jun
2-Jul
1-Jul
2-Jul
3-Jul
4-Jul
5-Jul
6-Jul
7-Jul
1.0 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 2,491.69
1.02.01 LIMPIEZA, TRAZOS, NIVELES (REPLANTEO PRELIMINAR) 1.27 686.92 41.61 540.88 13.00
m2 540.88
1.03 SEGURIDAD Y SALUD 1,661.14
1.03.01 EQUIPO DE SEGURIDAD INDIVIDUAL 65.92 856.96 1.00 5.00 5.00 3.00 13.00
glb 13.00
1.03.02 EQUIPO DE SEGURIDAD COLECTIVA 19.27 250.51 1.00 - 2.00 2.00 2.00 2.00 2.00 1.00 1.00 1.00
glb 13.00
1.03.03 SEÑALIZACION TEMPORAL DE SEGURIDAD 6.23 80.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3.00 1.00 1.00
glb 13.00
1.03.04 CAPACITACION EN SALUD Y SEGURIDAD 36.36 472.68 1.00 0.50 0.50 0.38 0.38 0.38 0.38 0.48 3.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
glb 13.00
2.0 MOVIMIENTO DE TIERRAS 8,169.53
2.01.01 CORTE Y EXPLANACIÒN DE TERRENO NORMAL MANUAL (APORTE) 270.44 22.79 6,163.33 20.80 270.44 13.00
m3
2.01.02 EXCAVACION DE ZANJA HASTA H=1.00m (APORTE) 22.79 2,006.20 6.77 54.16 16.26 13.54 12.40 4.07
m3 88.03
3.0 CONCRETO SIMPLE 18,216.27
3.02.01 SOBRECIMIENTOS MEZCLA CEMENTO-HORMIGON 1:8 + 30% PM m3 22.82 171.20 3,906.78 1.76 1.76 1.76 2.00 3.52 1.76 1.76 1.76 3.52 1.76 1.76
3.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.35 m 19.20 4,272.38 17.12 17.12 17.12 2.00 34.24 17.12 17.12 17.12 34.24 17.12 17.12
m2 222.52
4.0 CONCRETO ARMADO 36,368.14
4.01.01 CONCRETO COLUMNAS f'c=175 kg/cm2 319.75 4,601.20 1.11 - 1.11 0.50 0.50 0.11 1.11 1.11
m3 14.39
4.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS 27.35 4,439.45 12.49 - 12.49 6.00 6.49 12.09 12.49
m2 162.32
4.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 PARA COLUMNAS 2,377.38 4.27 10,151.41 182.88 914.30 91.40 91.40 183.02 7.00 1,097.26
kg
4.02 VIGAS 17,176.08
7.01 ESTRUCTURA DE SOPORTE DE PERFILES METALICOS DE CIELO RASO 44.18 10,349.61 18.02 -
m 234.26
7.02 CIELORASO CON FIBROCEMENTO DE 4MM 1.20MX2.40M 41.60 9,745.22 18.02 -
m2 234.26
8.0 MUROS 47,375.29
8.01 MURO TIPO CANTO LADRILLO BLOQUER 10X20X30 cm 44.47 42,202.03 73.00 - 73.00 73.00 73.00 35.00 38.00 35.00 38.00 35.00 38.00 35.00 38.00 35.00 38.00 46.00 50.00 50.00
m2 949.00
8.02 SUMINISTRO E INSTALACION DE POLIESTIRENO DE 2" DENSIDAD 20 13.06 4,628.99 27.26 - 27.17 27.26 27.26 54.52 27.26 27.26 27.26 54.52
m2 354.44
8.03 BRUÑAS EN MUROS DE LADRILLO 1.91 544.27 21.92 - 21.92 21.92 21.92 11.96 10.00 11.96 10.00 11.96 10.00 11.96 10.00 11.96 10.00 43.92
m 284.96
9.0 REVOQUES 219.21
BOTA AGUA EN VAN O DE VENTANA C ON CORTA GOTER A. CON MORTERO 0.70
9.01 m2 9.13 24.01 219.21 -
1:4 E0 1 .5 CM
10.0 ENLUCIDO DE YESO 16,802.34
11.01 BASE DE TIERRA MATERIAL PROPIO COMPACTADO/NIVELADO E= 10 CM m2 123.63 4.70 581.06 9.51 -
11.03 INSTALACION DE POLIESTIRENO DE E= 2" DENSIDAD 20 (APORTE) m2 123.63 1.92 237.37 9.51 -
11.09 BASE DE MATERIAL PROPIO COMPACTADO CON 9% A 12% DE HUMEDAD m2 135.07 6.26 845.54 10.39 -
11.10 PISO DE MADERA MACHIHEMBRADA DE 3/4"X4" + DURMIENTES DE 2"X4" m2 135.07 108.78 14,692.91 10.39 -
12.01 NIVELACIÓN, RELLENO Y APISONADO INTERIOR C/MAT PROPIO m2 107.77 4.70 506.52 8.29 - 8.29 8.29 8.29 8.29 8.29 14.87 10
VER EDA DE C ONC RETO F' C=1 40 KG/CM2 E=0 .1 0m AC ABADO 8.29
12.02 m2 107.77 32.15 3,464.81 -
FROTACHADO INC LUYE BRUÑ AD O
12.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 46.43 19.85 921.64 3.57 -
14.01 PUERTA MACHIHEMBRADA DE 0.90X2.10 M. INCLUYE INSTALACION P-01 und 13.00 522.86 6,797.18 1.00 -
14.02 PUERTA CONTRAPLACADA DE 0.90 X 2.10 M. INCLUYE INSTALACION P-02 und 13.00 494.96 6,434.48 1.00 -
14.03 PUERTA CONTRAPLACADA DE 0.80 X 2.10 M. INCLUYE INSTALACION P-03 und 26.00 489.96 12,738.96 2.00 -
17.01 SISTEMA DE EVACUACION DE AGUAS PLUVIALES und 26.00 348.25 9,054.50 2.00 -
17.03 CONCRETO SIMPLE F'C=100 KG/CM2 PARA DADOS DE PROTECCIÓN m3 0.57 230.37 131.31 0.04 -
18.01 CONSTRUCCION DE ESTUFA SALUDABLE DE LADRILLO glb 13.00 456.30 5,931.90 1.00 -
18.02 APOYO DE PEON EN CONSTRUCCION DE ESTUFA ( APORTE) glb 13.00 102.59 1,333.67 1.00 -
19.01 MITIGACION DEL IMPACTO AMBIENTAL (APORTE) 136.78 1,778.14 1.00 0.06 0.06 0.06 0.06 0.06 0.30 0.15 2.00 2.00 2.00 2.00 2.55 2.00
glb 13.00
20.0 ACARREOS 3,556.41
AC ARREO D E MATERIAL EXC EDENTE Y LIMPIEZA D E OBRA FINAL 1.00
20.01 glb 13.00 273.57 3,556.41 -
(APORTE)
21.0 FLETES 74,023.35
21.02.01 COSTO FLETE TERRESTRE DEL ALMACEN A LAS VIVIENDAS (APORTE) glb 1.00 53,943.43 53,943.43 0.08 0.03 0.03 0.03 0.02 0.01 1.50 0.12 0.04 0.02 0.02 0.02 0.02 0.02 0.04 0.04 0.04 0.04 0.04 0.03 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
MIÉRCOLES
SÁBADO
DOMINGO
SÁBADO
DOMINGO
SÁBADO
DOMINGO
SÁBADO
DOMINGO
SÁBADO
DOMINGO
SÁBADO
DOMINGO
SÁBADO
DOMINGO
DOMINGO
SÁBADO
DOMINGO
SÁBADO
DOMINGO
SÁBADO
DOMINGO
SÁBADO
DOMINGO
DOMINGO
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
MART ES
VIERNES
JUEVES
JUEVES
JUEVES
JUEVES
JUEVES
JUEVES
JUEVES
JUEVES
JUEVES
JUEVES
JUEVES
JUEVES
LUNES
LUNES
LUNES
LUNES
LUNES
LUNES
LUNES
LUNES
LUNES
LUNES
LUNES
LUNES
SEMANA 01
SEMANA 0
SEMANA 0
0
15-Nov
16-Nov
17-Nov
18-Nov
19-Nov
20-Nov
21-Nov
22-Nov
23-Nov
24-Nov
25-Nov
26-Nov
27-Nov
28-Nov
29-Nov
30-Nov
30-Dec
10-Aug
11-Aug
12-Aug
13-Aug
14-Aug
10-Sep
11-Sep
12-Sep
13-Sep
14-Sep
15-Sep
16-Sep
17-Sep
18-Sep
19-Sep
20-Sep
21-Sep
22-Sep
23-Sep
24-Sep
25-Sep
26-Sep
27-Sep
28-Sep
29-Sep
10-Jul
11-Jul
12-Jul
13-Jul
14-Jul
15-Jul
16-Jul
17-Jul
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
1-Aug
2-Aug
3-Aug
4-Aug
5-Aug
6-Aug
7-Aug
8-Aug
9-Aug
1-Sep
2-Sep
3-Sep
4-Sep
5-Sep
6-Sep
7-Sep
8-Sep
9-Sep
8-Jul
9-Jul
- - - -
- - - -
- - - 540.88
- - - -
- - - 13.00
- - - -
- - - -
- - - 1.00
- - - -
- - - -
- - - 270.44
- - - 70.42
- - - -
- - - -
4.57 - - - -
- - - -
- - - -
- - - -
1.70 1.76 - - - -
17.05 17.15 - - - -
- - - -
- - - -
- - - -
- - - -
3.14 1.50 1.28 3.00 0.50 1.50 1.50 1.71 0.03 1.57 1.57 - - - -
12.70 20.00 16.35 16.35 16.35 16.35 16.35 16.35 16.35 0.04 16.35 16.35 - - - -
- - - -
63.4 63.4 63.4 63.5 33.43 15 15 63.43 190.27 31.71 31.72 31.71 31.72 - - - -
- - - -
30.75 30.75 - - - -
- - - -
- - - -
- - - -
- - - -
- - - -
2.10 0.71 - - - -
- - - -
30.00 31.27 62.52 60.00 61.20 15.00 15.30 10.40 40.90 20.40 70.39 31.27 30.30 40.90 20.40 11.09 40.88 20.39 - - - -
15.00 16.42 62.84 31.40 15.71 25.71 5.71 15.71 31.42 15.41 25.70 6.02 31.42 - - - -
- - - -
114.15 - - - -
124.71 - - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
3 2 - - - -
- - - -
- - - -
4.50 1.80 1 - - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
0.07 - - - -
VAL SEM. AGOS.
M. SEM AGOST
MET ACUM
M. SEM JUL
METRADO SEMANAL: MAYO METRADO SEMANAL: JUNIO METRADO SEMANAL: JULIO METRADO SEMANAL: AGOSTO METRADO SEMANAL: SETIEMBRE RESUMEN DE METRADO MENSUAL VALORIZACION SEMANAL MES: MAYO VALORIZACION SEMANAL MES: JUNIO VALORIZACION SEMANAL MES: JULIO VALORIZACION SEMANAL MES: AGOSTO VALORIZACION SEMANAL MES: SETIEMBRE
METRADO TOTAL
SEMANA 02
SEMANA 03
SEMANA 04
SEMANA 05
SEMANA 06
SEMANA 07
SEMANA 07
SEMANA 08
SEMANA 09
SEMANA 10
SEMANA 11
SEMANA 11
SEMANA 12
SEMANA 13
SEMANA 14
SEMANA 15
SEMANA 15
SEMANA 16
SEMANA 17
SEMANA 01
SEMANA 05
SEMANA 01
SEMANA 02
SEMANA 03
SEMANA 04
SEMANA 05
SEMANA 01
SEMANA 02
SEMANA 03
SEMANA 05
SEMANA 01
SEMANA 02
SEMANA 03
SEMANA 05
SEMANA 01
SEMANA 18
SEMANA 19
SEMANA 02
SEMANA 03
SEMANA 04
SEMANA 04
SEMANA 04
- - - - - 0.26 - - - - - - - - - - - - - - - - 0.26 - - - 0.26 13.00 INCOMPLETO - - - - - - - - - 143.63 - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - #REF! #REF! - - - - - - - - - - - - - - - -
1.00 - 1.00 3.00 3.00 5.00 - - - - - - - - - - - - - - - 1.00 12.00 - - - 13.00 13.00 - - - - 6.23 - 6.23 18.69 18.69 31.15 - - - - - - - - - - - -
2.00 1.00 1.00 2.00 3.00 3.00 - - - - - - - - - - - - - - - 3.00 10.00 - - - 13.00 13.00 - - - 36.36 72.72 36.36 36.36 72.72 109.08 109.08 - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - #REF! #REF! - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
13.54 - - 4.07 - - - - - - - - - - - - - - - 83.96 4.07 - - - 88.03 13.00 #REF! #REF! - - - 1,604.87 308.58 - - 92.76 - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - #REF! #REF! - - - - - - - - - - - - - - - - - - - - - -
22.57 9.02 22.53 - - - - - - - - - - - - - - - - 4.57 - 22.57 31.55 - - 4.57 58.69 13.01 #REF! #REF! - - - - 3,086.00 1,233.30 3,080.53 - - - - - - - - - - - - - - -
20.30 9.04 - - - - - - - - - - - - - - - - - 20.30 9.04 - - - 29.34 12.98 #REF! #REF! - - - - 633.36 282.05 - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3.52 3.52 3.52 5.28 3.52 - - - - 1.70 - - - - - - - - - 1.76 - 3.52 15.84 1.70 - 1.76 22.82 12.97 - - - - 602.62 602.62 602.62 903.94 602.62 - - - - 291.04 - - - - - - - -
34.24 34.24 34.24 51.36 34.24 - - - - 17.05 - - - - - - - 17.15 - 34.24 154.08 17.05 - 17.15 222.52 13.00 #REF! #REF! - - - - 657.41 657.41 657.41 986.11 657.41 - - - - 327.36 - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - #REF! #REF! - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - #REF! #REF! - - - - - - -
VAL SEM SET
VALORIZACION SEMANAL MES: SETIEMBRE
SEMANA 02
SEMANA 03
SEMANA 05
SEMANA 04
- - - -
- - -
- - - -
- - -
- - - -
- - - -
- - - -
- - - -
- - -
- - - -
- - - -
- - -
- - -
- - - -
- - 624.86 -
- - -
- - -
- - - -
- - 301.31 -
- 329.28 -
- - - -
- - - -
- - 709.85 -
- - 683.20 -
- - -
- - -
- - 434.32 434.32
- - 504.23 504.23
- - - -
- - -
- - 951.52 951.52
- - 509.34 509.34
- - 64.75 65.18
- - -
- - 1,271.32 1,271.32
- - 609.77 609.77
- - - -
- - -
- - -
- - - -
- - 6,492.62 667.05
- - 709.68 1.70
- - 83.75 0.17
- - - -
- - -
- - -
- - - -
- - - -
- - - -
- - -
- - -
- - - -
- - -
- - -
- - - -
- - - -
- - 2,614.30 1,568.58
- - 2,474.80 1,484.88
- 4,899.60 2,939.76
- - - -
- - - 1,087.85
- - - -
- - - -
- 1,804.13 286.37
- - -
- - - -
- - -
- - - -
- - -
- - -
- - - -
- - - -
- - - -
- - -
- - - -
- - - -
- - - -
- - 406.19
- - 597.80
- - - -
- - 3,776.04
120.00%
100.00%
80.00%
60.00%
40.00%
20.00%
PROGRAMADO ACUMULADO
EJECUTADO ACUMULADO
DIA 05-.11 12-.18 19-25 26-30 1-2 3-9 10-16 17-23 24-30 31 1-6 7-13 14-20 21-27 28-30 1-4 5-11 12-18 19-25 26-31 1 2-8 9-15 16-22 23-29 30-31 1
PROGRAMADO 1.58% 2.15% 6.92% 9.79% 14.85% 19.06% 23.48% 27.46% 32.12% 33.14% 40.83% 48.01% 51.13% 53.33% 54.34% 63.40% 66.47% 69.21% 72.93% 76.08% 76.08% 83.15% 88.70% 93.92% 99.26% 99.90% 100.00%
ACUMULADO 0
EJECUTADO
ACUMULADO 1.58% 2.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Err:509 Err:509
0
EJECUTADO 0 1.58% 0.57% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Err:509 Err:509
DATOS DEL NE CONVENIO Nº 318-2020-CUS/VMVU/PNVR
“MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE
NUCLEO EJECUTOR OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y OTROS - DISTRITO DE PALLPATA - PROVINCIA
DE ESPINAR - DEPARTAMENTO DE CUSCO”
CONVENIO NE CONVENIO Nº 318-2020-CUS/VMVU/PNVR RESUMEN DEL ESTADO FINANCIERO
CUENTA BANCARIA 533-01633963-0-84 BANCO BCP COSTO DIRECTO 1,686,690.46
COORDINADOR REGIONAL ARQ. LEONEL PALACIOS RAYMONDI CAP MANO DE OBRA CALIFICADA 267,515.35
MONITOR TECNICO ARQ.DENNIS FERNANDEZ CAP MANO DE OBRA NO CALIFICADA 181,764.52
MONITOR FINANCIERO LIC. HECTOR LAZARTE MATERIALES 921,776.35
MONITOR SOCIAL LIC. ROXANA GUTIERREZ EQUIPO 9,475.68
HERRAMIENTAS 13,181.66
AGENTES DEL CONVENIO FLETE 292,976.90
GESTOR SOCIAL DNI COSTO INDIRECTO 294,832.78
ESPECIALIDAD CPP FONO GASTOS GENERALES 232,084.78
DIRECCION / EMAIL TOTAL GASTOS GENERALES VARIABLES Y FIJOS DEL 109,725.45
RESIDENTE EFRAIN CARLOS COAQUIRA CHURA DNI 44392243 COSTO TOTAL RESIDENTE DE OBRA 53,250.00
ESPECIALIDAD INGENIERO CIP 174309 FONO 961637685 COSTO TOTAL ASISTENTE DE RESIDENTE 22,500.00
DIRECCION / EMAIL carlosingcivmet@gmail.com COSTO TOTAL ASISTENTE ADMINISTRATIVO 21,750.00
SUPERVISOR HUBERT VALENCIA GONGORA DNI 41405880 COSTO TOTAL ADMINISTRADOR NEC 0.00
ESPECIALIDAD INGENIERO CAP FONO 96480720 COSTO TOTAL GESTOR SOCIAL 24,500.00
DIRECCION / EMAIL TOTAL DE GASTOS FINANCIEROS 359.33
PRESIDENTE FLORES COATA, ELOY DNI 24873885 GASTOS DE GESTION 9,498.00
SECRETARIO CRUZ MAMANI, BARTOLOME DNI 24887073 TOTAL DE GASTOS DE GESTIÓN DEL NÚCLEO EJECUTO 9,498.00
NUCLEO EJECUTOR
TESORERO CCAMAQQUE TAIPE, JUAN DNI 40675526 TOTAL DE GASTOS DE GESTION DEL NUCLEO EJECUTO 0.00
FISCAL KANA CHUCTAYA, HECTOR LEONIDAS DNI 80356568 GASTOS DE SUPERVISIÓN 53,250.00
COSTO TOTAL DE SUPERVISION 53,250.00
DATOS GENERALES DEL PROYECTO FECHAS IMPORTANTES TOTAL 1,981,523.24
REGION CUSCO FECHA FIRMA CONVENIO 20-10-20 APORTES BENEFICIARIOS 216,099.60
DEPARTAMENTO CUSCO FECHA 1º VISITA EVALUACION 11-01-21 MONTO A TRANSFERIR AL N.E. 1,765,423.64
PROVINCIA ESPINAR FECHA DE INICIO DE OBRA 05-04-21 COMPONENTES
DISTRITO OCORURO - PALLPATA FECHA TERMINO PROGRAMADA. 01-09-21 COSTO DIRECTO 1,686,690.46
LOCALIDAD CC.PP. HUALCA Y KANAKATA, AJOYANI CENTRA, CHAQUEYLLA Y OTROS
TIEMPO DE EJECUCION 150 COSTO INDIRECTO 294,832.78
REGION GEOGRAFICA SIERRA DESEMBOLSOS TOTAL 1,981,523.24
BENEFICIARIOS DIRECTOS 63 FECHA APERTURA DE CUENTA RESUMEN
CATEGORIA AMBIENTAL 3 FECHA COMP. DE PAGO C.D. SIN APORTE DE BENEF. 1,470,590.86
COMPROBANTE DE PAGO COSTO INDIRECTO 294,832.78
FECHA 1ª DESEMBOLSO MONTO FINANCIADO PNVR 1,765,423.64
MONTO 1º DESEMBOLSO
FECHA COMP. DE PAGO
COMPROBANTE DE PAGO
FECHA 2º DESEMBOLSO
MONTO 2º DESEMBOLSO
PRESUP
PARTIDA DESCRIPCIÓN
Unid.
glb
01.01.01 LIMPIEZA Y DESINFECCION DEL CENTRO DE TRABAJO
01.01.02 EVALUACION DE LAS CONDICIONES DE SALUD DEL TRABAJOR PREVIO AL INICIO glb
A OBRA
01.01.03 glb
LAVADO Y DESINFECCION DE MANOS
glb
01.02.01 PROCESO PARA INICIO DEL TRABAJO
und
01.03.01 CARTEL DE OBRA DE 4.00 X 2.50
glb
01.05.01 EQUIPO DE SEGURIDAD INDIVIDUAL
glb
01.05.02 EQUIPO DE SEGURIDAD COLECTIVA
glb
01.05.03 SEÑALIZACION TEMPORAL DE SEGURIDAD
glb
01.05.04 CAPACITACION EN SALUD Y SEGURIDAD
02 MOVIMIENTO DE TIERRAS
02.01 EXCAVACIONES
m3
02.01.02 EXCAVACION DE ZANJA HASTA H=1.00m (APORTE)
03.01 CIMIENTOS
m3
03.01.02 SUMINISTRO DE PIEDRA MEDIANA (APORTE)
m3
03.01.03 NIVELACION RELLENO Y APISONADO DE CAMA DE PIEDRA MEDIANA ( APORTE)
03.02 SOBRECIMIENTOS
m3
03.02.01 SOBRECIMIENTOS MEZCLA CEMENTO-HORMIGON 1:8 + 30% PM
m2
03.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.35m
04 CONCRETO ARMADO
04.01 COLUMNAS
m3
04.01.01 CONCRETO COLUMNAS f'c=175 kg/cm2
m2
04.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS
kg
04.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 COLUMNAS
04.02 VIGAS
m3
04.02.01 CONCRETO VIGAS f'c=175 kg/cm2
m2
04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS
kg
04.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 PARA VIGAS
05 TIJERALES Y RETICULADOS
und
05.01 TIJERAL DE MADERA DE 2"X4"
p2
05.01 CORREAS DE MADERA 2"X2"
p2
05.01 FRISO DE MADERA DE 1 1/2" X 2 1/2"
m2
06.01 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA
m
06.01 CUMBRERA CALAMINA 0.30 mm, 11 CANALES INCL PINTADO
07 CIELO RASOS
CIELORASO CON PLACA DE YESO LAMINADO CON VINYL Y FOIL DE ALUMINIO
07.01 m
0.61x0.61 e=6MM / INC. ACCESORIOS E INSTALACION
08 MUROS
m2
08.01 MURO DE LADRILLO TIPO PANDERETA MEDIDAS SEGUN PLANO
m2
08.02 SUMINISTRO E INSTALACION DE POLIESTIRENO DE 1" DENSIDAD 10
m
08.03 BRUÑAS DE MUROS DE LADRILLO
09 REVOQUES
BOTA AGUA EN VANO DE VENTANA CON CORTA GOTERA. CON MORTERO 1:4 E= 1.5
09.01 m2
CM
10 ENLUCIDO DE YESO
m2
10.01 ENLUCIDO DE YESO EN MURO DE LADRILLO
m
10.02 DERRAMES DE VANOS CON YESO E=1.5CM
11 PISOS
m2
11.01 BASE DE TIERRA MATERIAL PROPIO COMPACTADO/NIVELADO E= 10 CM
m2
11.02 ACERO DE TEMPERATURA
m2
11.03 PISO DE CEMENTO PULIDO E:4" ACAB. CON OCRE INC. BRUÑADO
12 VEREDAS
m2
12.01 NIVELACION, RELLENO Y APISONADO INTERIOR C/MAT PROPIO (APORTE)
VEREDA DE CONCRETO SIMPLE F'C=140 KG/CM2 E= 10 CM ACABADO FROTACHADO
12.02 m2
INCLUYE BRUÑADO
m2
12.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS
13 ZOCALOS Y CONTRAZOCALOS
ZOCALO DE CEMENTO SOBRE MURO EXTERIOR H=58 CM E= 2 CM INCLUYE
13.01 m2
BRUÑAS
m
13.02 CONTRAZOCALO DE MADERA CON RODON, DE 5.80 CM X 1.90 CM X 2.40 M
14 PUERTAS
und
14.01 PUERTA MACHIHEMBRADA DE 0.90X2.10 M. INCLUYE. INSTALACION
und
14.02 PUERTA CONTRAPLACADA DE 0.90X2.10 M. INCLUYE. INSTALACION
und
14.03 PUERTA CONTRAPLACADA DE 0.80X2.10 M. INCLUYE. INSTALACION
15 VENTANAS
VENTANA DE ALUMINIO DE 0.78 X 1.08 M INC/VIDRIO, CON CONTRAVENTANA DE
15.01 und
MADERA
und
15.02 VENTANA CENITAL
16 INSTALACIONES ELECTRICAS
glb
16.01 INSTALACION ELECTRICA EN MÓDULO
und
17.01 SISTEMA DE EVACUACION DE AGUAS PLUVIALES
m2
17.02 ENCOFRADO Y DESENCOFRADO DE DADOS DE CONCRETO.
m3
17.03 CONCRETO SIMPLE f'c=100 kg/cm2 PARA DADOS DE PROTECCION
18 MITIGACION Y LIMPIEZA
glb
18.01 MITIGACION DEL IMPACTO AMBIENTAL (APORTE)
19 ACARREOS
glb
19.01 ACARREO DE MATERIAL EXCEDENTE Y LIMPIEZA DE OBRA FINAL (APORTE)
20 FLETES
1.00 473.32
473.32
284.41 127.05
36,134.29
142.20 37.39
5,316.86
110.57 159.30
17,613.80
1078.37 23.63
25,481.88
80.68 318.52
25,698.19
902.95 31.53
28,470.01
11521.44 4.98
57,376.77
99.09 282.06
27,949.33
1030.26 36.46
37,563.28
5632.20 4.98
28,048.36
252.00 223.89
56,420.28
3996.06 6.96
27,812.58
482.28 7.72
3,723.20
2585.65 41.89
108,312.88
387.64 21.78
8,442.80
4599.00 52.17
239,929.83
3435.38 13.60
46,721.17
17952.62 1.56
28,006.09
3860.10 17.17
66,277.92
1979.46 9.42
18,646.51
1253.70 4.73
5,930.00
1253.70 9.04
11,333.45
1253.70 27.24
34,150.79
151.20 4.73
715.18
44.13 22.98
1,014.11
1065.96 8.41
8,964.72
63.00 630.05
39,693.15
63.00 441.23
27,797.49
126.00 311.23
39,214.98
63.00 296.78
18,697.14
63.00 359.21
22,630.23
126.00 287.60
36,237.60
44.10 24.67
1,087.95
2.76 218.05
601.82
63.00 136.78
8,617.14
63.00 273.57
17,234.91
1,686,690.45
V S D METRADO L M M J V S
ANTERIOR
ACUM
ACUMULADO
16 17 18 SEMANAL 19 20 21 22 23 24
0.00783333 0.00783333 0.047 0.094 0.008 0.008 0.008 0.008 0.008 0.008
0.00783333 0.00783333 0.047 0.094 0.008 0.008 0.008 0.008 0.008 0.008
0.00783333 0.00783333 0.047 0.094 0.008 0.008 0.008 0.008 0.008 0.008
0.00783333 0.00783333 0.047 0.094 0.008 0.008 0.008 0.008 0.008 0.008
0.000 0.000
0.008 0.008 0.047 0.094 0.008 0.008 0.008 0.008 0.008 0.008
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.488 0.488 2.930 5.860 0.488 0.488 0.488 0.488 0.488 0.488
0.488 0.488 2.930 5.860 0.488 0.488 0.488 0.488 0.488 0.488
0.488 0.488 2.930 5.860 0.488 0.488 0.488 0.488 0.488 0.488
0.488 0.488 2.930 5.860 0.488 0.488 0.488 0.488 0.488 0.488
0.000 0.000
0.000 0.000
0.000 873.727
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
D METRADO
ANTERIOR ACUM. METRADO
ACUM SALDO
ACUMULADO SEMANAL ACUM ACUMULADO VALORIZADO
25 SEMANAL MENSUAL ACUM
ACTUAL MENSUAL
0.000 0.000
0.000 0.000
0.000 0.000
0.00 0.00
2,145.71
ACUMULAD
SALDO
O TOTAL %
1.00
0.01% 0.007833333
0.02%
0.00%
0.00%
0.00%
0.00%
25.86%
0.05%
0.35%
1.29%
0.21%
2.93%
1.88%
0.00%
0.00%
1.60%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
#DIV/0!
FORMATO Nº 11
Proyecto: “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS ACCOPARA, COCHAPATA Y OTROS - DISTRITO DE LIVITACA; CENTRO POBLADO CRUZ SAYHUA - DISTRITO
DE CHAMACA - PROVINCIA DE CHUMBIVILCAS - DEPARTAMENTO DE CUSCO”
VALORIZACION DE OBRA MENSUAL
FECHA: 28/02/2020
ABRIL
PRESUPUESTO BASE ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
5-11 12-18 19-25 26-30
U.M. METRADO P.U. PARCIAL VALORIZ VALORIZ VALORIZ VALORIZ METRADO VALORIZ % METRADO VALORIZ %
OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES, SEGURIDAD Y
01 29,176.65 2,583.370 2,590.390 1,165.12 - 29,176.65
SALUD
1.01 PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DE COVID-19 5,395.00 253.57 - 5,395.00
1.01.01 LIMPIEZA Y DESINFECCION DEL CENTRO DE TRABAJO glb 1.00 465.00 465.00 21.620 21.860 21.86 - 0.00% 1.00 465.00 100.00%
EVALUACION DE LAS CONDICIONES DE SALUD DEL TRABAJOR PREVIO
1.01.02
AL INICIO A OBRA
glb 1.00 250.00 250.00 11.630 11.750 11.75 - - 0.00% 1.00 250.00 100.00%
1.01.03 LAVADO Y DESINFECCION DE MANOS glb 1.00 1,740.00 1,740.00 80.910 81.780 81.78 - - 0.00% 1.00 1,740.00 100.00%
SENSIBILIZACION DE LA PREVENCION DEL CONTAGIO EN EL CENTRO DE
1.01.04
TRABAJO
glb 1.00 2,940.00 2,940.00 136.710 138.180 138.18 - - 0.00% 1.00 2,940.00 100.00%
1.02 PROCEDIMIENTO OBLIGATORIO PARA INICIO DE LOS TRABAJOS 8,625.00 405.38 - 8,625.00
1.02.01 PROCESO PARA INICIO DEL TRABAJO glb 1.00 8,625.00 8,625.00 401.060 405.380 405.38 - - 0.00% 1.00 8,625.00 100.00%
1.03 TRABAJOS PRELIMINARES 473.32 0.000 0.000 - - - 473.32
1.03.01 CARTEL DE OBRA DE 4.00 X 2.50 und 1.00 473.32 473.32 0.000 0.000 - - - 0.00% 1.00 473.32 100.00%
1.04 TRAZO NIVELES Y REPLANTEO PRELIMINAR 3,800.71 0.000 0.000 - - 3,800.71
1.04.01 TRAZOS, NIVELES (REPLANTEO PRELIMINAR) m2 2,621.18 1.45 3,800.71 1,425.270 1,425.270 - - - 0.00% 2,621.18 3,800.71 100.00%
1.05 SEGURIDAD Y SALUD 10,882.62 506.17 - 10,882.62
1.05.01 EQUIPO DE SEGURIDAD INDIVIDUAL glb 63.00 93.90 5,915.70 275.150 275.150 275.15 - - 0.00% 63.00 5,915.70 100.00%
1.05.02 EQUIPO DE SEGURIDAD COLECTIVA glb 63.00 26.62 1,677.06 78.000 78.000 78.00 - - 0.00% 63.00 1,677.06 100.00%
1.05.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 63.00 7.22 454.86 21.160 21.160 21.16 - - 0.00% 63.00 454.86 100.00%
1.05.04 CAPACITACION EN SALUD Y SEGURIDAD glb 63.00 45.00 2,835.00 131.860 131.860 131.86 - - 0.00% 63.00 2,835.00 100.00%
02 MOVIMIENTO DE TIERRAS 39,590.79 24,078.990 4,166.760 - - 39,590.79
2.01 EXCAVACIONES 39,590.79 - - 39,590.79
2.01.01 CORTE Y EXPLANACIÒN DE TERRENO NORMAL MANUAL (APORTE) m3 1,310.59 22.79 29,868.35 19,912.230 0.000 - - 0.00% 1,310.59 29,868.35 100.00%
2.01.02 EXCAVACION DE ZANJA HASTA H=1.00m (APORTE) m3 426.61 22.79 9,722.44 4,166.760 4,166.760 - - 0.00% 426.61 9,722.44 100.00%
03 CONCRETO SIMPLE 89,168.33 0.000 2,772.900 7,316.71 - 89,168.33
3.01 CIMIENTOS 46,072.65 3,896.42 - 46,072.65
3.01.01 CIMIENTO CORRIDO MAMPOSTERIA DE PIEDRA, MEZCLA 1:10 + 50% P.G. m3 284.41 127.05 36,134.29 0.000 0.000 1,114.91 - 0.00% 284.41 36,134.29 100.00%
3.01.02 SUMINISTRO DE OIEDRA MEDIANA (APORTE) m3 142.20 32.50 4,621.50 0.000 2,772.900 2,781.51 0.00% 142.20 4,621.50 100.00%
3.01.03 NIVELACION RELLENO Y APISANADO DE CAMA DE PIEDRA (APORTE) m3 142.20 37.39 5,316.86 0.000 0.000 - - 0.00% 142.20 5,316.86 100.00%
3.02 SOBRECIMIENTOS 43,095.68 3,420.29 43,095.68
3.02.01 SOBRECIMIENTOS MEZCLA CEMENTO-HORMIGON 1:8 + 30% PM m3 110.57 159.30 17,613.80 0.000 0.000 1,397.92 - 0.00% 110.57 17,613.80 100.00%
3.02.02 ENCOFRADO Y DESENCIOFRADO DE SOBRECIMIENTO h=0.35m m2 1,078.37 23.63 25,481.88 0.000 0.000 2,022.37 - 0.00% 1,078.37 25,481.88 100.00%
04 CONCRETO ARMADO 205,105.94 18,011.13 - 205,105.94
4.01 COLUMNAS 111,544.97 18,011.13 - 111,544.97
4.01.01 CONCRETO COLUMNAS Fc=175 kg/cm2 m3 80.68 318.52 25,698.19 0.000 0.000 1,631.63 - 0.00% 80.68 25,698.19 100.00%
4.01.02 ENCOFRADO Y DESENCIOFRADO DE COLUMNAS m2 902.95 31.53 28,470.01 0.000 0.000 1,807.62 - 0.00% 902.95 28,470.01 100.00%
4.01.03 ACERO CORRUGADO FY=4000 kg/cm2 kg 11,521.44 4.98 57,376.77 0.000 0.000 14,571.88 - 0.00% 11,521.44 57,376.77 100.00%
FORMATO Nº 11
Proyecto: “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS ACCOPARA, COCHAPATA Y OTROS - DISTRITO DE LIVITACA; CENTRO POBLADO CRUZ SAYHUA - DISTRITO
DE CHAMACA - PROVINCIA DE CHUMBIVILCAS - DEPARTAMENTO DE CUSCO”
VALORIZACION DE OBRA MENSUAL
FECHA: 28/02/2020
ABRIL
PRESUPUESTO BASE ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
5-11 12-18 19-25 26-30
U.M. METRADO P.U. PARCIAL VALORIZ VALORIZ VALORIZ VALORIZ METRADO VALORIZ % METRADO VALORIZ %
4.02 VIGAS 93,560.97 - - 93,560.97
4.02.01 CONCRETO VIGAS Fc=175 kg/cm2 m3 99.09 282.06 27,949.33 0.000 0.000 - - 0.00% 99.09 27,949.33 100.00%
4.02.02 ENCOFRADO Y DESENCIOFRADO EN VIGAS m2 1,030.26 36.46 37,563.28 0.000 0.000 - - 0.00% 1,030.26 37,563.28 100.00%
4.02.03 ACERO CORRUGADO FY=4000 kg/cm2 GRADO 60 PARA VIGAS kg 5,632.20 4.98 28,048.36 0.000 0.000 - - 0.00% 5,632.20 28,048.36 100.00%
5.00 TIJERALES Y RETICULADOS 87,956.06 - - 87,956.06
5.01 TIJERAL DE MADERA DE 2"X4" und 252.00 223.89 56,420.28 0.000 0.000 - - 0.00% 252.00 56,420.28 100.00%
5.02 CORREAS DE MADERA 2"X2" p2 3,996.06 6.96 27,812.58 0.000 0.000 - - 0.00% 3,996.06 27,812.58 100.00%
5.03 FRISO DE MADERA DE 1 1/2" X 2 1/2" p2 482.28 7.72 3,723.20 0.000 0.000 - - - 0.00% 482.28 3,723.20 100.00%
6.00 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA 116,755.68 - 116,755.68
6.01 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA m2 2,585.65 41.89 108,312.88 0.000 0.000 - - - 0.00% 2,585.65 108,312.88 100.00%
6.02 CUMBRERA CALAMINA 0.30 mm, 11 CANALES INCL PINTADO m 387.64 21.78 8,442.80 0.000 0.000 - - 0.00% 387.64 8,442.80 100.00%
7.00 CIELO RASOS 62,439.30 - - 62,439.30
CIELORASO CON PLACA DE YESO LAMINADO CON VINYL Y FOIL DE
7.01 1,135.26 55.00 62,439.30 0.000 0.000 - - 0.00% 1,135.26 62,439.30 100.00%
ALUMINIO 0.61x0.61 e=6MM / INC. ACCESORIOS E INSTALACION m
8.00 MUROS 314,657.09 - - 314,657.09
8.01 MURO DE LADRILLO TIPO PANDERETA MEDIDAS SEGUN PLANO m2 4,599.00 52.17 239,929.83 0.000 0.000 - - 0.00% 4,599.00 239,929.83 100.00%
8.02 SUMINISTRO E INSTALACION DE POLIESTIRENO DE 1" DENSIDAD 10 m2 3,435.38 13.60 46,721.17 0.000 0.000 - - 0.00% 3,435.38 46,721.17 100.00%
8.03 BRUÑAS DE MUROS DE LADRILLO m 17,952.62 1.56 28,006.09 0.000 0.000 - - 0.00% 17,952.62 28,006.09 100.00%
9.00 REVOQUES 1,139.81 - - 1,139.81
BOTA AGUA EN VANO DE VENTANA CON CORTA GOTERA. CON
9.01
MORTERO 1:4 E= 1.5 CM
m2 44.23 25.77 1,139.81 0.000 0.000 - - 0.00% 44.23 1,139.81 100.00%
11.02 ACERO DE TEMPERATURA m2 1,253.70 9.04 11,333.45 0.000 0.000 - - 0.00% 1,253.70 11,333.45 100.00%
11.03 PISO DE CEMENTO PULIDO E:4" ACAB. CON OCRE INC. BRUÑADO m3 1,253.70 27.24 34,150.79 0.000 0.000 - - 0.00% 1,253.70 34,150.79 100.00%
FORMATO Nº 11
Proyecto: “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS ACCOPARA, COCHAPATA Y OTROS - DISTRITO DE LIVITACA; CENTRO POBLADO CRUZ SAYHUA - DISTRITO
DE CHAMACA - PROVINCIA DE CHUMBIVILCAS - DEPARTAMENTO DE CUSCO”
VALORIZACION DE OBRA MENSUAL
FECHA: 28/02/2020
ABRIL
PRESUPUESTO BASE ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
5-11 12-18 19-25 26-30
U.M. METRADO P.U. PARCIAL VALORIZ VALORIZ VALORIZ VALORIZ METRADO VALORIZ % METRADO VALORIZ %
12.00 VEREDAS 6,608.51 - - 6,608.51
NIVELACION, RELLENO Y APISONADO INTERIOR C/MAT PROPIO
12.01 m2 151.20 4.73 715.18 0.000 0.000 - - 0.00% 151.20 715.18 100.00%
(APORTE)
VEREDA DE CONCRETO SIMPLE F'C=140 KG/CM2 E= 10 CM ACABADO
12.02
FROTACHADO INCLUYE BRUÑADO
m2 151.20 32.27 4,879.22 0.000 0.000 - - 0.00% 151.20 4,879.22 100.00%
12.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 44.13 22.98 1,014.11 0.000 0.000 - - 0.00% 44.13 1,014.11 100.00%
13.00 ZOCALOS Y CONTRAZOCALOS 27,092.15 - 27,092.15
ZOCALO DE CEMENTO SOBRE MURO EXTERIOR H=58 CM E= 2 CM
13.01
INCLUYE BRUÑAS
m2 720.20 25.17 18,127.43 0.000 0.000 - - 0.00% 720.20 18,127.43 100.00%
14.01 PUERTA MACHIHEMBRADA DE 0.90X2.10 M. INCLUYE. INSTALACION und 63.00 630.05 39,693.15 0.000 0.000 - - 0.00% 63.00 39,693.15 100.00%
14.02 PUERTA CONTRAPLACADA DE 0.90X2.10 M. INCLUYE. INSTALACION und 63.00 441.23 27,797.49 0.000 0.000 - - 0.00% 63.00 27,797.49 100.00%
14.03 PUERTA CONTRAPLACADA DE 0.80X2.10 M. INCLUYE. INSTALACION und 126.00 311.23 39,214.98 0.000 0.000 - - 0.00% 126.00 39,214.98 100.00%
ABRIL
PRESUPUESTO BASE ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
5-11 12-18 19-25 26-30
U.M. METRADO P.U. PARCIAL VALORIZ VALORIZ VALORIZ VALORIZ METRADO VALORIZ % METRADO VALORIZ %
FLETE RURAL DE MATERIALES PUNTA DE CARRETERA A VIVIENDA
20.01.03 glb 1.00 23,291.26 23,291.26 0.000 0.000 - - 0.00% 1.00 23,291.26 100.00%
(APORTE)
ACOMPAÑAMIENTO, CARGA Y DESCARGA TRANSP. DE MATERIALES
20.01.04 1.00 14,728.95 14,728.95 0.000 0.000 - - 0.00% 1.00 14,728.95 100.00%
PUNTA DE CARRETERA A VIVIENDA (APORTE) glb
20.02 FLETE Y TRANSPORTE DE PIEDRA Y AGREGADOS 153,882.77 0.000 0.000 10,379.95 - - 153,882.77
FLETE TERRESTRE TRANSP. AGREGADOS DEL PROVEDOR A PUNTA
20.02.01 glb 1.00 41,540.62 41,540.62 0.000 0.000 8,308.12 - 0.00% 1.00 41,540.62 100.00%
DE CARRETERA (INCL. CARGA-DESCARGA)
FLETE TERRESTRE TRANSP. PIEDRA DE CANTERA A PUNTA DE
20.02.02 glb 1.00 10,359.14 10,359.14 0.000 0.000 2,071.83 - 0.00% 1.00 10,359.14 100.00%
CARRETERA (INCL. CARGA-DESCARGA)
FLETE TERRESTRE TRANSP. DE AGREGADO Y PIEDRA DE PUNTA DE
20.02.03 glb 1.00 62,974.69 62,974.69 0.000 0.000 - - 0.00% 1.00 62,974.69 100.00%
CARRETERA A VIVIENDA (APORTE)
COSTO DIRECTO 0.00 1,686,690.46 26,662.36 9,530.05 54,508.84 0.00 0.00 0.00% 1,686,690.46 100.00%
CRONOGRAMA DE ADQUISICIONES TOTAL
PROYECTO: “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y OTROS - DISTRITO DE PALLPATA -
PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO”
UBICACIÓN:
Localidad: AJOYANI CENTRAL, CHAQUEYLLA, JARUMA CHAQUELLA, JARUMA SALLANI, JARUMA SORA, PRADO ESPERANZA, HUALCA, KANAKATA
Distrito: PALLPATA, OCORURO
Provincia: ESPINAR
Depart.: CUSCO
ENTIDAD: MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO
PROGRAMA NACIONAL DE VIVIENDA RURAL
RESIDENTE ING. EFRAIN CARLOS COAQUIRA CHURA
03012600010003 FLETE DE MATERIALES DE PUNTA DE CARRETERA A VIVIENDA glb 1.00 23,291.26 23,291.26 1.00 S/. 23,291.26 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
ACOMPAÑAMIENTO, CARGA Y DESCARGA TRANSP DE
03012900010003 glb 1.00 14,728.95 14,728.95 1.00 S/. 14,728.95 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
MATERIALES PUNTA DE CARRETERA A VIVIENDA
FLETE DE AGREGADOS DE PROVEEDOR A PUNTA DE
0301290003 glb 1.00 41,540.62 41,540.62 1.00 S/. 41,540.62 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
CARRETERA
0301340001 FLETE DE PIEDRA DE CANTERA A PUNTA DE CARRETERA glb 1.00 10,359.14 10,359.14 1.00 S/. 10,359.14 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
FLETE DE PIEDRA Y AGREGADOS DE PUNTA DE CARRETERA A
03013700010001 glb 1.00 62,974.69 62,974.69 1.00 S/. 62,974.69 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
VIVIENDA
AVANCES
PRESUPUESTO BASE SALDO
ITEMS DESCRIPCION PARTIDA (01) DEL 02 AL 06 OCTUBRE (02) DEL 07 AL 13 OCTUBRE (03) DEL 14 AL 20 OCTUBRE (04) DEL 21 AL 27 OCTUBRE (05-A) DEL 28 AL 31 OCTUBRE (05-B) DEL 01 AL 03 NOVIEMBRE (06) DEL 04 AL 10 NOVIEMBRE (07) DEL 11 AL 17 NOVIEMBRE (08) DEL 18 AL 24 NOVIEMBRE (09) DEL 25 AL 30 NOVIEMBRE (10) DEL 02 AL 08 DICIEMBRE (11) DEL 09 AL 15 DICIEMBRE (12) DEL 16 AL 22 DICIEMBRE (13) DEL 23 AL 29 DICIEMBRE (14) DEL 30 DICIEMBRE ACUMULADO
U.M. METRADO P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
2.01.01 CORTE Y EXPLANACIÒN DE TERRENO NORMAL MANUAL (APORTE) 748.91 22.79 17,067.66 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 748.91 17,067.66 100.00% 0.00
m3
2.01.02 EXCAVACION DE ZANJA HASTA H=1.00m (APORTE) m3 243.78 22.79 5,555.75 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 243.78 5,555.75 100.00% 0.00
3.0 CONCRETO SIMPLE 40,754.22 0.00
3.01 CIMIENTOS 19,773.81 0.00
CIMIENTO CORRIDO DE CONCRETO CICLOPEO MEZCLA
3.01.01
CEMENTO HORMIGON 1:10 + 50% P.G.
m3 162.52 99.54 16,177.24 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 9.03 898.74 5.56% - 0.00% - 0.00% - 0.00% - 0.00% 9.03 898.74 5.56% 153.49 15,278.51 94.44% 2.00
3.01.02 SUMINISTRO DE PIEDRA MEDIANA (APORTE) m3 81.26 6.50 528.19 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 81.26 528.19 100.00% 0.00
NIVELACION RELLENO Y APISONADO DE CAMA DE PIEDRA
3.01.03
MEDIANA ( APORTE)
m3 81.26 37.76 3,068.38 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 81.26 3,068.38 100.00% 0.00
3.02.01 SOBRECIMIENTOS MEZCLA CEMENTO-HORMIGON 1:8 + 30% PM m3 63.18 133.79 8,452.85 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 3.51 469.60 5.56% - 0.00% - 0.00% - 0.00% - 0.00% 3.51 469.60 5.56% 59.67 7,983.25 94.44% 2.00
3.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.35m m2 616.21 20.33 12,527.55 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 34.23 695.97 5.56% - 0.00% - 0.00% - 0.00% - 0.00% 34.23 695.97 5.56% 581.98 11,831.57 94.44% 2.00
4.0 CONCRETO ARMADO 109,719.80 0.00
4.01 COLUMNAS 58,825.45 0.00
4.01.01 CONCRETO COLUMNAS f'c=175 kg/cm2 m3 46.10 358.88 16,544.37 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 10.24 3,676.53 22.22% 15.37 5,514.79 33.33% - 0.00% - 0.00% - 0.00% 25.61 9,191.32 55.56% 20.49 7,353.05 44.44% 20.00
4.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 515.97 30.14 15,551.34 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 114.66 3,455.85 22.22% 171.99 5,183.78 33.33% - 0.00% - 0.00% - 0.00% 286.65 8,639.63 55.56% 229.32 6,911.70 44.44% 20.00
4.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 COLUMNAS kg 6,583.68 4.06 26,729.74 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 365.76 1,484.99 5.56% - 0.00% - 0.00% - 0.00% - 0.00% 365.76 1,484.99 5.56% 6,217.92 25,244.76 94.44% 2.00
4.02 VIGAS 50,894.35 0.00
4.02.01 CONCRETO VIGAS f'c=175 kg/cm2 m3 56.62 313.43 17,746.41 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 15.73 4,929.56 27.78% 1.57 492.96 2.78% - 0.00% - 0.00% - 0.00% 17.30 5,422.51 30.56% 39.32 12,323.89 69.44% 11.00
4.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 588.72 34.11 20,081.24 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 163.53 5,578.12 27.78% 16.35 557.81 2.78% - 0.00% - 0.00% - 0.00% 179.89 6,135.93 30.56% 408.83 13,945.31 69.44% 11.00
4.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 PARA VIGAS kg 3,218.40 4.06 13,066.70 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 894.00 3,629.64 27.78% 89.40 362.96 2.78% - 0.00% - 0.00% - 0.00% 983.40 3,992.60 30.56% 2,235.00 9,074.10 69.44% 11.00
5.0 TIJERALES Y RETICULADOS 51,617.11 0.00
5.01 TIJERAL DE MADERA DE 2"X4" und 144.00 243.15 35,013.60 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 144.00 35,013.60 100.00% 0.00
5.02 CORREAS DE MADERA 2"X2" p2 2,283.46 6.43 14,682.65 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 2,283.46 14,682.65 100.00% 0.00
5.03 FRISO DE MADERA DE 1 1/2" X 2 1/2" p2 275.59 6.97 1,920.87 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 275.59 1,920.87 100.00% 0.00
6.0 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA 60,247.70 0.00
6.01 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA m2 1,477.51 37.85 55,923.83 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 1,477.51 55,923.83 100.00% 0.00
6.02 CUMBRERA CALAMINA 0.30 mm, 11 CANALES INCL PINTADO m 221.51 19.52 4,323.88 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 221.51 4,323.88 100.00% 0.00
7.0 CIELO RASOS 57,126.28 0.00
7.01 ESTRUCTURA DE SOPORTE DE PERFILES METALICOS DE CIELO m 648.72 53.67 34,816.80 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 648.72 34,816.80 100.00% 0.00
7.02 CIELORASO CON PLACA DE YESO 1.22 X 2.44 E= 3/8" m2 648.72 34.39 22,309.48 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 648.72 22,309.48 100.00% 0.00
8.0 MUROS 160,703.88 0.00
8.01 MURO DE LADRILLO TIPO PANDERETA MEDIDAS SEGUN PLANO m2 2,628.00 46.81 123,016.68 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 292.00 13,668.52 11.11% 584.00 27,337.04 22.22% - 0.00% - 0.00% - 0.00% 876.00 41,005.56 33.33% 1,752.00 82,011.12 66.67% 12.00
SUMINISTRO E INSTALACION DE POLIESTIRENO DE 1" DENSIDAD
8.02 1,963.07 9.06 17,785.44 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 218.12 1,976.16 11.11% 436.24 3,952.32 22.22% - 0.00% - 0.00% - 0.00% 654.36 5,928.48 33.33% 1,308.72 11,856.96 66.67% 12.00
10 m2
8.03 BRUÑAS DE MUROS DE LADRILLO m 10,258.64 1.94 19,901.77 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 1,139.85 2,211.31 11.11% 2,279.70 4,422.61 22.22% - 0.00% - 0.00% - 0.00% 3,419.55 6,633.92 33.33% 6,839.10 13,267.84 66.67% 12.00
9.0 REVOQUES 591.11 0.00
BOTA AGUA EN VANO DE VENTANA CON CORTA GOTERA. CON
9.01
MORTERO 1:4 E= 1.5 CM
m2 25.27 23.39 591.11 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 25.27 591.11 100.00% 0.00
11.06 BASE DE MATERIAL PROPIO COMPACTADO/NIVELADO DE 9% A 12% m2 374.04 6.43 2,405.08 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 374.04 2,405.08 100.00% 0.00
PISO DE MADERA MACHIHEMBRADA DE 3/4"X4" + DURMIENTES DE
11.07 m2 374.04 90.93 34,011.46 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 374.04 34,011.46 100.00% 0.00
2"X3"
FORMATO Nº 11
Proyecto: "MEJORAMIENTO DE VIVIENDA RURAL EN EL C.P. HUAYTIRE – DISTRITO DE CANDARAVE – PROVINCIA DE CANDARAVE – DEPARTAMENTO DE TACNA"
VALORIZACION DE OBRA MENSUAL - OCTUBRE - 2019
FECHA: 31/10/2019
AVANCES
PRESUPUESTO BASE SALDO
ITEMS DESCRIPCION PARTIDA (01) DEL 02 AL 06 OCTUBRE (02) DEL 07 AL 13 OCTUBRE (03) DEL 14 AL 20 OCTUBRE (04) DEL 21 AL 27 OCTUBRE (05-A) DEL 28 AL 31 OCTUBRE (05-B) DEL 01 AL 03 NOVIEMBRE (06) DEL 04 AL 10 NOVIEMBRE (07) DEL 11 AL 17 NOVIEMBRE (08) DEL 18 AL 24 NOVIEMBRE (09) DEL 25 AL 30 NOVIEMBRE (10) DEL 02 AL 08 DICIEMBRE (11) DEL 09 AL 15 DICIEMBRE (12) DEL 16 AL 22 DICIEMBRE (13) DEL 23 AL 29 DICIEMBRE (14) DEL 30 DICIEMBRE ACUMULADO
U.M. METRADO P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
12.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 25.22 20.59 519.24 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 25.22 519.24 100.00% 0.00
AVANCES
PRESUPUESTO BASE SALDO
ITEMS DESCRIPCION PARTIDA (01) DEL 02 AL 06 OCTUBRE (02) DEL 07 AL 13 OCTUBRE (03) DEL 14 AL 20 OCTUBRE (04) DEL 21 AL 27 OCTUBRE (05-A) DEL 28 AL 31 OCTUBRE (05-B) DEL 01 AL 03 NOVIEMBRE (06) DEL 04 AL 10 NOVIEMBRE (07) DEL 11 AL 17 NOVIEMBRE (08) DEL 18 AL 24 NOVIEMBRE (09) DEL 25 AL 30 NOVIEMBRE ACUMULADO
U.M. METRADO P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
3.01.02 SUMINISTRO DE PIEDRA MEDIANA (APORTE) m3 81.26 6.50 528.19 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 81.26 528.19 100.00%
NIVELACION RELLENO Y APISONADO DE CAMA DE PIEDRA
3.01.03
MEDIANA ( APORTE)
m3 81.26 37.76 3,068.38 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 81.26 3,068.38 100.00%
3.02 SOBRECIMIENTOS 20,980.41 0.00%
3.02.01 SOBRECIMIENTOS MEZCLA CEMENTO-HORMIGON 1:8 + 30% PM m3 63.18 133.79 8,452.85 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 12.29 1,643.61 19.44% 28.08 3,756.82 44.44% 14.04 1,878.41 22.22% 3.51 469.60 5.56% 57.92 7,748.45 91.67% 5.27 704.40 8.33%
3.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.35m m2 616.21 20.33 12,527.55 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 8.56 174.02 1.39% 94.16 1,914.27 15.28% 273.87 5,567.80 44.44% 136.94 2,783.90 22.22% 34.23 695.97 5.56% 547.76 11,135.97 88.89% 68.45 1,391.58 11.11%
4.0 CONCRETO ARMADO 109,719.80
4.01 COLUMNAS 58,825.45
4.01.01 CONCRETO COLUMNAS f'c=175 kg/cm2 m3 46.10 358.88 16,544.37 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 5.12 1,838.26 11.11% 6.40 2,297.83 13.89% 6.40 2,297.83 13.89% 17.93 6,433.92 38.89% 28.17 10,110.45 61.11%
4.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 515.97 30.14 15,551.34 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 14.33 431.98 2.78% 43.00 1,295.94 8.33% 71.66 2,159.91 13.89% 71.66 2,159.91 13.89% 200.66 6,047.74 38.89% 315.32 9,503.59 61.11%
4.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 COLUMNAS kg 6,583.68 4.06 26,729.74 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 506.00 2,054.36 7.69% 2,042.00 8,290.52 31.02% 548.64 2,227.48 8.33% 914.40 3,712.46 13.89% - 0.00% 4,011.04 16,284.82 60.92% 2,572.64 10,444.92 39.08%
4.02 VIGAS 50,894.35
4.02.01 CONCRETO VIGAS f'c=175 kg/cm2 m3 56.62 313.43 17,746.41 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 4.72 1,478.87 8.33% 4.72 1,478.87 8.33% 9.44 2,957.73 16.67% 47.18 14,788.67 83.33%
4.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 588.72 34.11 20,081.24 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 49.06 1,673.44 8.33% 49.06 1,673.44 8.33% 98.12 3,346.87 16.67% 490.60 16,734.37 83.33%
4.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 PARA VIGAS kg 3,218.40 4.06 13,066.70 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 268.20 1,088.89 8.33% 268.20 1,088.89 8.33% 536.40 2,177.78 16.67% 2,682.00 10,888.92 83.33%
5.0 TIJERALES Y RETICULADOS 51,617.11
5.01 TIJERAL DE MADERA DE 2"X4" und 144.00 243.15 35,013.60 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 144.00 35,013.60 100.00%
5.02 CORREAS DE MADERA 2"X2" p2 2,283.46 6.43 14,682.65 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 2,283.46 14,682.65 100.00%
5.03 FRISO DE MADERA DE 1 1/2" X 2 1/2" p2 275.59 6.97 1,920.87 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 275.59 1,920.87 100.00%
6.0 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA 60,247.70
6.01 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA m2 1,477.51 37.85 55,923.83 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 1,477.51 55,923.83 100.00%
6.02 CUMBRERA CALAMINA 0.30 mm, 11 CANALES INCL PINTADO m 221.51 19.52 4,323.88 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 221.51 4,323.88 100.00%
7.0 CIELO RASOS 57,126.28
7.01 ESTRUCTURA DE SOPORTE DE PERFILES METALICOS DE CIELO R m 648.72 53.67 34,816.80 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 648.72 34,816.80 100.00%
7.02 CIELORASO CON PLACA DE YESO 1.22 X 2.44 E= 3/8" m2 648.72 34.39 22,309.48 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 648.72 22,309.48 100.00%
8.0 MUROS 160,703.88
8.01 MURO DE LADRILLO TIPO PANDERETA MEDIDAS SEGUN PLANO m2 2,628.00 46.81 123,016.68 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 438.00 20,502.78 16.67% 876.00 41,005.56 33.33% 292.00 13,668.52 11.11% 1,606.00 75,176.86 61.11% 1,022.00 47,839.82 38.89%
SUMINISTRO E INSTALACION DE POLIESTIRENO DE 1" DENSIDAD
8.02 1,963.07 9.06 17,785.44 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 327.18 2,964.24 16.67% 654.36 5,928.48 33.33% 218.12 1,976.16 11.11% 1,199.66 10,868.88 61.11% 763.42 6,916.56 38.89%
10 m2
8.03 BRUÑAS DE MUROS DE LADRILLO m 10,258.64 1.94 19,901.77 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 1,709.77 3,316.96 16.67% 3,419.55 6,633.92 33.33% 1,139.85 2,211.31 11.11% 6,269.17 12,162.19 61.11% 3,989.47 7,739.58 38.89%
9.0 REVOQUES 591.11
BOTA AGUA EN VANO DE VENTANA CON CORTA GOTERA. CON
9.01 m2 25.27 23.39 591.11 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 25.27 591.11 100.00%
MORTERO 1:4 E= 1.5 CM
10.0 ENLUCIDO DE YESO 52,529.67
10.01 ENLUCIDO DE YESO EN MURO DE LADRILLO m2 2,205.77 18.42 40,630.29 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 2,205.77 40,630.29 100.00%
10.02 DERRAMES DE VANOS CON YESO E=1.5CM m 1,131.12 10.52 11,899.38 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 1,131.12 11,899.38 100.00%
11.0 PISOS 50,807.98
BASE DE TIERRA MATERIAL PROPIO COMPACTADO/NIVELADO E=
11.01 m2 342.36 4.86 1,663.87 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 342.36 1,663.87 100.00%
10 CM
11.02 ACERO DE TEMPERATURA m2 342.36 7.43 2,543.73 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 342.36 2,543.73 100.00%
11.03 PISO DE CEMENTO FROTACHADO DE E= 3" m2 342.36 23.89 8,178.98 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 342.36 8,178.98 100.00%
11.04 SUMINISTRO DE PIEDRA MEDIANA (APORTE) m2 374.04 0.65 243.13 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 374.04 243.13 100.00%
NIVELACION RELLENO Y APISONADO DE CAMA DE PIEDRA
11.05
MEDIANA E= 0.10 M ( APORTE)
m2 374.04 4.71 1,761.73 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 374.04 1,761.73 100.00%
11.06 BASE DE MATERIAL PROPIO COMPACTADO/NIVELADO DE 9% A 12% m2 374.04 6.43 2,405.08 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 374.04 2,405.08 100.00%
PISO DE MADERA MACHIHEMBRADA DE 3/4"X4" + DURMIENTES DE
11.07
2"X3"
m2 374.04 90.93 34,011.46 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 374.04 34,011.46 100.00%
FORMATO Nº 11
Proyecto: "MEJORAMIENTO DE VIVIENDA RURAL EN EL C.P. HUAYTIRE – DISTRITO DE CANDARAVE – PROVINCIA DE CANDARAVE – DEPARTAMENTO DE TACNA"
VALORIZACION DE OBRA MENSUAL - OCTUBRE - 2019
FECHA: 31/10/2019
AVANCES
PRESUPUESTO BASE SALDO
ITEMS DESCRIPCION PARTIDA (01) DEL 02 AL 06 OCTUBRE (02) DEL 07 AL 13 OCTUBRE (03) DEL 14 AL 20 OCTUBRE (04) DEL 21 AL 27 OCTUBRE (05-A) DEL 28 AL 31 OCTUBRE (05-B) DEL 01 AL 03 NOVIEMBRE (06) DEL 04 AL 10 NOVIEMBRE (07) DEL 11 AL 17 NOVIEMBRE (08) DEL 18 AL 24 NOVIEMBRE (09) DEL 25 AL 30 NOVIEMBRE ACUMULADO
U.M. METRADO P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
12.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 25.22 20.59 519.24 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 25.22 519.24 100.00%
15.02 VENTANA CENITAL und 36.00 342.68 12,336.48 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 36.00 12,336.48 100.00%
16.0 INSTALACIONES ELECTRICAS 17,952.84
16.01 INSTALACION ELECTRICA EN MÓDULO glb 36.00 498.69 17,952.84 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 36.00 17,952.84 100.00%
17.0 EVACUACION AGUAS PLUVIALES 35,693.45
17.01 SISTEMA DE EVACUACION DE AGUAS PLUVIALES und 72.00 484.21 34,863.12 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 72.00 34,863.12 100.00%
17.02 ENCOFRADO Y DESENCOFRADO DE DADOS DE CONCRETO. m2 25.20 21.47 541.04 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 25.20 541.04 100.00%
17.03 CONCRETO SIMPLE f'c=100 kg/cm2 PARA DADOS DE PROTECCION m3 1.58 183.09 289.28 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 1.58 289.28 100.00%
18.0 MITIGACION Y LIMPIEZA 4,924.08
18.01 MITIGACION DEL IMPACTO AMBIENTAL (APORTE) glb 36.00 136.78 4,924.08 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 2.00 273.56 5.56% - 0.00% 2.00 273.56 5.56% 34.00 4,650.52 94.44%
19.0 ACARREOS 9,848.52
ACARREO DE MATERIAL EXCEDENTE Y LIMPIEZA DE OBRA FINAL
19.01
(APORTE) glb 36.00 273.57 9848.52 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 36.00 9,848.52 100.00%
AVANCES
PRESUPUESTO BASE SALDO
ITEMS DESCRIPCION PARTIDA (01) DEL 02 AL 06 OCTUBRE (02) DEL 07 AL 13 OCTUBRE (03) DEL 14 AL 20 OCTUBRE (04) DEL 21 AL 27 OCTUBRE (05-A) DEL 28 AL 31 OCTUBRE (05-B) DEL 01 AL 03 NOVIEMBRE (06) DEL 04 AL 10 NOVIEMBRE (07) DEL 11 AL 17 NOVIEMBRE (08) DEL 18 AL 24 NOVIEMBRE (09) DEL 25 AL 30 NOVIEMBRE (10) DEL 02 AL 08 DICIEMBRE (11) DEL 09 AL 15 DICIEMBRE (12) DEL 16 AL 22 DICIEMBRE (13) DEL 23 AL 29 DICIEMBRE (14) DEL 30 DICIEMBRE ACUMULADO
U.M. METRADO P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
2.01.01 CORTE Y EXPLANACIÒN DE TERRENO NORMAL MANUAL (APORTE) 748.91 22.79 17,067.66 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 748.91 17,067.66 100.00% 0.00
m3
2.01.02 EXCAVACION DE ZANJA HASTA H=1.00m (APORTE) m3 243.78 22.79 5,555.75 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 243.78 5,555.75 100.00% 0.00
3.0 CONCRETO SIMPLE 40,754.22 0.00
3.01 CIMIENTOS 19,773.81 0.00
CIMIENTO CORRIDO DE CONCRETO CICLOPEO MEZCLA
3.01.01
CEMENTO HORMIGON 1:10 + 50% P.G.
m3 162.52 99.54 16,177.24 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 4.51 448.93 2.78% 49.66 4,943.16 30.56% 45.14 4,493.68 27.78% 22.57 2,246.84 13.89% 9.03 898.74 5.56% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 130.92 13,031.33 80.55% 31.60 3,145.91 19.45% 29.00
3.01.02 SUMINISTRO DE PIEDRA MEDIANA (APORTE) m3 81.26 6.50 528.19 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 81.26 528.19 100.00% 0.00
NIVELACION RELLENO Y APISONADO DE CAMA DE PIEDRA
3.01.03
MEDIANA ( APORTE)
m3 81.26 37.76 3,068.38 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 81.26 3,068.38 100.00% 0.00
3.02.01 SOBRECIMIENTOS MEZCLA CEMENTO-HORMIGON 1:8 + 30% PM m3 63.18 133.79 8,452.85 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 12.29 1,643.61 19.44% 28.08 3,756.82 44.44% 14.04 1,878.41 22.22% 3.51 469.60 5.56% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 57.92 7,748.45 91.67% 5.27 704.40 8.33% 33.00
3.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.35m m2 616.21 20.33 12,527.55 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 8.56 174.02 1.39% 94.16 1,914.27 15.28% 273.87 5,567.80 44.44% 136.94 2,783.90 22.22% 34.23 695.97 5.56% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 547.76 11,135.97 88.89% 68.45 1,391.58 11.11% 32.00
4.0 CONCRETO ARMADO 109,719.80 0.00
4.01 COLUMNAS 58,825.45 0.00
4.01.01 CONCRETO COLUMNAS f'c=175 kg/cm2 m3 46.10 358.88 16,544.37 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 5.12 1,838.26 11.11% 6.40 2,297.83 13.89% 6.40 2,297.83 13.89% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 17.93 6,433.92 38.89% 28.17 10,110.45 61.11% 14.00
4.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 515.97 30.14 15,551.34 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 14.33 431.98 2.78% 43.00 1,295.94 8.33% 71.66 2,159.91 13.89% 71.66 2,159.91 13.89% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 200.66 6,047.74 38.89% 315.32 9,503.59 61.11% 14.00
4.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 COLUMNAS kg 6,583.68 4.06 26,729.74 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 506.00 2,054.36 7.69% 2,042.00 8,290.52 31.02% 548.64 2,227.48 8.33% 914.40 3,712.46 13.89% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 4,011.04 16,284.82 60.92% 2,572.64 10,444.92 39.08% 21.93
4.02 VIGAS 50,894.35 0.00
4.02.01 CONCRETO VIGAS f'c=175 kg/cm2 m3 56.62 313.43 17,746.41 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 4.72 1,478.87 8.33% 4.72 1,478.87 8.33% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 9.44 2,957.73 16.67% 47.18 14,788.67 83.33% 6.00
4.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 588.72 34.11 20,081.24 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 49.06 1,673.44 8.33% 49.06 1,673.44 8.33% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 98.12 3,346.87 16.67% 490.60 16,734.37 83.33% 6.00
4.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 PARA VIGAS kg 3,218.40 4.06 13,066.70 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 268.20 1,088.89 8.33% 268.20 1,088.89 8.33% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 536.40 2,177.78 16.67% 2,682.00 10,888.92 83.33% 6.00
5.0 TIJERALES Y RETICULADOS 51,617.11 0.00
5.01 TIJERAL DE MADERA DE 2"X4" und 144.00 243.15 35,013.60 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 144.00 35,013.60 100.00% 0.00
5.02 CORREAS DE MADERA 2"X2" p2 2,283.46 6.43 14,682.65 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 2,283.46 14,682.65 100.00% 0.00
5.03 FRISO DE MADERA DE 1 1/2" X 2 1/2" p2 275.59 6.97 1,920.87 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 275.59 1,920.87 100.00% 0.00
6.0 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA 60,247.70 0.00
6.01 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA m2 1,477.51 37.85 55,923.83 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 1,477.51 55,923.83 100.00% 0.00
6.02 CUMBRERA CALAMINA 0.30 mm, 11 CANALES INCL PINTADO m 221.51 19.52 4,323.88 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 221.51 4,323.88 100.00% 0.00
7.0 CIELO RASOS 57,126.28 0.00
7.01 ESTRUCTURA DE SOPORTE DE PERFILES METALICOS DE CIELO m 648.72 53.67 34,816.80 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 648.72 34,816.80 100.00% 0.00
7.02 CIELORASO CON PLACA DE YESO 1.22 X 2.44 E= 3/8" m2 648.72 34.39 22,309.48 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 648.72 22,309.48 100.00% 0.00
8.0 MUROS 160,703.88 0.00
8.01 MURO DE LADRILLO TIPO PANDERETA MEDIDAS SEGUN PLANO m2 2,628.00 46.81 123,016.68 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 438.00 20,502.78 16.67% 876.00 41,005.56 33.33% 292.00 13,668.52 11.11% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 1,606.00 75,176.86 61.11% 1,022.00 47,839.82 38.89% 22.00
SUMINISTRO E INSTALACION DE POLIESTIRENO DE 1" DENSIDAD
8.02 1,963.07 9.06 17,785.44 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 327.18 2,964.24 16.67% 654.36 5,928.48 33.33% 218.12 1,976.16 11.11% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 1,199.66 10,868.88 61.11% 763.42 6,916.56 38.89% 22.00
10 m2
8.03 BRUÑAS DE MUROS DE LADRILLO m 10,258.64 1.94 19,901.77 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 1,709.77 3,316.96 16.67% 3,419.55 6,633.92 33.33% 1,139.85 2,211.31 11.11% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% 6,269.17 12,162.19 61.11% 3,989.47 7,739.58 38.89% 22.00
9.0 REVOQUES 591.11 0.00
BOTA AGUA EN VANO DE VENTANA CON CORTA GOTERA. CON
9.01
MORTERO 1:4 E= 1.5 CM
m2 25.27 23.39 591.11 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 25.27 591.11 100.00% 0.00
11.06 BASE DE MATERIAL PROPIO COMPACTADO/NIVELADO DE 9% A 12% m2 374.04 6.43 2,405.08 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 374.04 2,405.08 100.00% 0.00
PISO DE MADERA MACHIHEMBRADA DE 3/4"X4" + DURMIENTES DE
11.07 m2 374.04 90.93 34,011.46 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 374.04 34,011.46 100.00% 0.00
2"X3"
FORMATO Nº 11
Proyecto: "MEJORAMIENTO DE VIVIENDA RURAL EN EL C.P. HUAYTIRE – DISTRITO DE CANDARAVE – PROVINCIA DE CANDARAVE – DEPARTAMENTO DE TACNA"
VALORIZACION DE OBRA MENSUAL - OCTUBRE - 2019
FECHA: 31/10/2019
AVANCES
PRESUPUESTO BASE SALDO
ITEMS DESCRIPCION PARTIDA (01) DEL 02 AL 06 OCTUBRE (02) DEL 07 AL 13 OCTUBRE (03) DEL 14 AL 20 OCTUBRE (04) DEL 21 AL 27 OCTUBRE (05-A) DEL 28 AL 31 OCTUBRE (05-B) DEL 01 AL 03 NOVIEMBRE (06) DEL 04 AL 10 NOVIEMBRE (07) DEL 11 AL 17 NOVIEMBRE (08) DEL 18 AL 24 NOVIEMBRE (09) DEL 25 AL 30 NOVIEMBRE (10) DEL 02 AL 08 DICIEMBRE (11) DEL 09 AL 15 DICIEMBRE (12) DEL 16 AL 22 DICIEMBRE (13) DEL 23 AL 29 DICIEMBRE (14) DEL 30 DICIEMBRE ACUMULADO
U.M. METRADO P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
12.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 25.22 20.59 519.24 - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - 0.00% 25.22 519.24 100.00% 0.00