MEMORIA DE CALCULO

PROYECTO: UNISUR 4 FASE 1, ESTIMACION 5


DESCRIPCIÓN: INSTALACIONES ELECTRICAS
OFERTANTE: CONESA S.A.
FECHA: 29/07/2022

ELECTRICAS HG, MEDIA TENSION


ANCHO DE
LONGITUD (ML) PROFUNDIDAD (M) VOLUMEN TOTAL EXCAVADO (M3) VOLUMEN TOTAL LODOCRETO(M3) VOLUMEN TOTAL RELLENO (M3)
CORTE (M)
18 1.8 0.7 22.68 5.67 17.01
18 1.8 0.7 22.68 11.34 11.34
18 1.8 0.7 22.68 11.34 11.34
14.1 1.6 0.75 16.92 8.46 8.46
33 0.8 0.75 19.80 9.90 9.90
25.3 0.8 0.75 15.18 15.18 0.00
22.5 0.8 0.75 13.50 3.38 10.13
4.5 1.4 0.75 4.73 1.18 3.54
21.7 0.75 0.75 12.21 3.05 9.15
29.9 0.7 0.75 15.70 3.92 11.77
24.1 0.7 0.75 12.65 3.16 9.49
21 0.7 0.75 11.03 2.76 8.27
23.85 0.7 0.7 11.69 2.92 8.76
22.5 0.7 0.75 11.81 2.95 8.86
30.2 0.7 0.7 14.80 3.70 11.10
26.3 0.7 0.75 13.81 3.45 10.36
22.5 0.75 0.75 12.66 3.16 9.49
22.7 0.8 0.75 13.62 3.41 10.22
29.76 0.8 0.8 19.05 4.76 14.28
23.6 0.7 0.8 13.22 3.30 9.91
50 0.75 0.85 31.88 7.97 23.91
50 0.75 0.85 31.88 7.97 23.91
56.63 0.75 0.85 36.10 9.03 27.08
55.33 0.75 0.85 35.27 8.82 26.45
23.31 1.2 1 27.97 6.99 20.98
31.72 0.85 1.1 29.66 7.41 22.24
26.8 0.8 0.8 17.15 8.58 8.58
31 0.8 0.8 19.84 9.92 9.92
26.5 0.8 0.8 16.96 8.48 8.48
30 0.8 0.8 19.20 9.60 9.60
25 0.8 0.8 16.00 8.00 8.00
25 0.8 0.8 16.00 8.00 8.00
0 0.00 0.00 0.00
TOTALES 598.30 207.77 390.53

ELECTRICAS PVC, ESPECIALES


ANCHO DE
LONGITUD (ML) PROFUNDIDAD (M) VOLUMEN TOTAL EXCAVADO (M3) VOLUMEN TOTAL LODOCRETO(M3) VOLUMEN TOTAL RELLENO (M3)
CORTE (M)
18 1.8 0.75 24.30 12.15 12.15
18 1.8 0.75 24.30 12.15 12.15
18 1.8 0.75 24.30 12.15 12.15
14.1 1.6 0.7 15.79 7.90 7.90
33 0.8 0.6 15.84 7.92 7.92
25.3 0.8 0.6 12.14 6.07 6.07
22.5 0.8 0.6 10.80 5.40 5.40
4.5 1.4 0.7 4.41 2.21 2.21
21.7 0.65 0.7 9.87 4.94 4.94
29.9 0.6 0.6 10.76 5.38 5.38
24.1 0.6 0.6 8.68 4.34 4.34
21 0.6 0.6 7.56 3.78 3.78
23.85 0.6 0.6 8.59 4.29 4.29
30.2 0.6 0.7 12.68 6.34 6.34
26.3 0.6 0.6 9.47 4.73 4.73
22.5 0.6 0.6 8.10 4.05 4.05
22.7 0.8 0.6 10.90 5.45 5.45
29.76 0.8 0.8 19.05 9.52 9.52
23.6 0.7 0.8 13.22 6.61 6.61
22.5 0.8 0.8 14.40 7.20 7.20
50 0.75 0.85 31.88 15.94 15.94
50 0.75 0.85 31.88 15.94 15.94
56.63 0.75 0.85 36.10 18.05 18.05
55.33 0.75 0.85 35.27 17.64 17.64
23.31 1.2 1 27.97 13.99 13.99
31.72 0.85 1.1 29.66 14.83 14.83
13.63 0.85 1.1 12.74 6.37 6.37
51.99 0.85 0.75 33.14 16.57 16.57
31.72 0.85 1.1 29.66 14.83 14.83
20 0.85 0.8 13.60 6.80 6.80
20 0.85 0.8 13.60 6.80 6.80
20 0.85 0.8 13.60 6.80 6.80
0 0.00 0.00 0.00
TOTALES 574.26 287.13 287.13
TUBERIA DE ILUMINACION Y TV
ANCHO DE
LONGITUD (ML) PROFUNDIDAD (M) VOLUMEN TOTAL EXCAVADO (M3) VOLUMEN TOTAL LODOCRETO(M3) VOLUMEN TOTAL RELLENO (M3)
CORTE (M)
50 0.6 0.75 22.50 0.00 22.50
75 0.6 0.7 31.50 0.00 31.50
75 0.6 0.75 33.75 0.00 33.75
50 0.7 0.75 26.25 0.00 26.25
50 0.7 0.75 26.25 0.00 26.25
75 0.7 0.75 39.38 0.00 39.38
75 0.6 0.7 31.50 0.00 31.50
25.46 0.6 0.7 10.69 0.00 10.69
69.85 0.7 0.8 39.12 0.00 39.12
150 0.6 0.75 67.50 0.00 67.50
92 0.65 0.7 41.86 0.00 41.86
909.65 0.15 0.75 102.34 0.00 102.34
TOTALES 472.63 0.00 472.63

RELLENO DE LODOCRETO, EN AGUA PLUVIAL


ANCHO DE
LONGITUD (ML) PROFUNDIDAD (M) VOLUMEN TOTAL EXCAVADO (M3) VOLUMEN TOTAL LODOCRETO(M3) VOLUMEN TOTAL RELLENO (M3)
CORTE (M)
113.54 1.8 0.75 0.00 153.28 0.00
72.69 1.2 0.75 0.00 65.42 0.00
13.49 0.765 0.16 0.00 1.65 0.00
27.65 1.40 0.4 0.00 15.48 0.00
26.48 1.40 0.4 0.00 14.83 0.00
8.37 1.10 0.25 0.00 2.30 0.00
19.52 1.10 0.35 0.00 7.52 0.00
11.05 1.10 0.35 0.00 4.25 0.00
43.68 1.10 0.35 0.00 16.82 0.00
43.95 1.10 0.35 0.00 16.92 0.00
TOTALES 0.00 298.47 0.00

DATOS GENERALES CAJAS TIPO H TRIPLE + TRINCHERA ELECTRICA


NO. CAJAS AREA CIMIENTO ALTURA DE CAJA VOLUMEN EXCAVACION %

1 4.77 0.20 3.20 15.26 100%


1 4.77 0.20 3.20 15.26 100%
EXCAVACION 30.53
SUMA DE AREAS 9.54
CAJAS TIPO H A
TRIPLE
CONSTRUIR 2

DATOS GENERALES CAJAS TIPO H 1.00 X 1.00


NO. CAJAS AREA CIMIENTO ALTURA DE CAJA VOLUMEN EXCAVACION %

1 1.44 0.20 1.50 2.16 100%


2 1.44 0.20 1.50 2.16 100%
3 1.44 0.20 1.50 2.16 100%
4 1.44 0.20 1.02 1.47 100%
5 1.44 0.20 1.02 1.47 100%
6 1.44 0.20 1.02 1.47 100%
7 1.44 0.20 1.02 1.47 100%
8 1.44 0.20 1.02 1.47 100%
9 1.44 0.20 1.02 1.47 100%
10 1.44 0.20 1.02 1.47 100%
11 1.44 0.20 1.02 1.47 100%
12 1.44 0.20 1.02 1.47 100%
13 1.44 0.20 1.50 2.16 100%
14 1.44 0.20 1.25 1.80 100%
15 1.44 0.20 1.02 1.47 100%
16 1.44 0.20 1.02 1.47 100%
17 1.44 0.20 1.02 1.47 100%
18 1.44 0.20 1.02 1.47 100%
19 1.44 0.20 1.02 1.47 100%
20 1.44 0.20 1.02 1.47 100%
21 1.44 0.20 1.02 1.47 100%
22 1.44 0.20 1.02 1.47 100%
23 1.44 0.20 1.02 1.47 100%
24 1.44 0.20 1.02 1.47 100%
25 1.44 0.20 1.02 1.47 100%
26 1.44 0.20 1.02 1.47 100%
27 1.44 0.20 1.02 1.47 100%
28 1.44 0.20 1.02 1.47 100%
29 1.44 0.20 1.02 1.47 100%
30 1.44 0.20 1.02 1.47 100%
31 1.44 0.20 1.02 1.47 100%
32 1.44 0.20 1.02 1.47 100%
33 1.44 0.20 1.02 1.47 100%
34 1.44 0.20 1.02 1.47 100%
35 1.44 0.20 1.02 1.47 100%
36 1.44 0.20 1.02 1.47 100%
37 1.44 0.20 1.02 1.47 100%
38 1.44 0.20 1.02 1.47 100%
39 1.44 0.20 1.02 1.47 100%
40 1.44 0.20 1.02 1.47 100%
41 1.44 0.20 1.02 1.47 100%
42 1.44 0.20 1.02 1.47 100%
43 1.44 0.20 1.02 1.47 100%
44 1.44 0.20 1.02 1.47 100%
45 1.44 0.20 1.02 1.47 100%
46 1.44 0.20 1.02 1.47 100%
47 1.44 0.20 1.02 1.47 100%
48 1.44 0.20 1.02 1.47 100%
49 1.44 0.20 1.02 1.47 100%
50 1.44 0.20 1.02 1.47 100%
51 1.44 0.20 1.02 1.47 100%
52 1.44 0.20 1.02 1.47 100%
53 1.44 0.20 1.02 1.47 100%
54 1.44 0.20 1.02 1.47 90%
55 1.44 0.20 1.50 2.16 90%
56 1.44 0.20 1.50 2.16 90%
57 1.44 0.20 1.50 2.16 90%
58 1.44 0.20 1.50 2.16 90%
59 1.44 0.20 1.50 2.16 90%
60 1.44 0.20 1.50 2.16 90%
61 1.44 0.20 1.50 2.16 90%
62 1.44 0.20 1.50 2.16 90%
63 1.44 0.20 1.50 2.16 90%
64 1.44 0.20 1.50 2.16 90%
65 1.44 0.20 1.50 2.16 90%
66 1.44 0.20 1.50 2.16 90%
67 1.44 0.20 1.50 2.16 90%
68 1.44 0.20 1.50 2.16 90%
69 1.44 0.20 1.50 2.16 90%
70 1.44 0.20 1.50 2.16 90%
71 1.44 0.20 1.50 2.16 90%
72 1.44 0.20 1.50 2.16 90%
EXCAVACION 121.29
SUMA DE AREAS 103.68

1.00 X 1.00
CAJAS TIPO H REALIZADAS 70

DATOS GENERALES CAJAS TIPO H 0.60 X 0.60


NO. CAJAS AREA CIMIENTO ALTURA DE CAJA VOLUMEN EXCAVACION %

1 0.64 0.20 1.20 0.77 90%


2 0.64 0.20 1.20 0.77 90%
3 0.64 0.20 1.20 0.77 90%
4 0.64 0.20 1.20 0.77 90%
5 0.64 0.20 1.20 0.77 90%
6 0.64 0.20 1.20 0.77 90%
7 0.64 0.20 1.20 0.77 90%
EXCAVACION 5.38
SUMA DE AREAS 4.48
CAJAS TIPO H 0.60X0.60 A
0.60 X 0.60
CONSTRUIR 6

EXCAVACION A MAQUINA EXCAVACION A MANO RELLENO LODOCRETO


TOTALES 1542.85 259.53 793.37