Está en la página 1de 1

22.

20

DD EE

A B C D E F G
6.90 6.90 6.90 7.50 7.50 3.60

T3.1 A 15 T3.1 A 1 P2 03 T1.1 A 05 T1.1 A 0 T1.1 A 02


Suite Master I.S. Suite Master Escada Suite 01 I.S. Suite 01 Sala
A 33.5 m A 12.1 m A 21.12 m A 1 .4 m A 4. m A 31.5 m

0.25
1 1

0.45
BOMBA DE
CALOR

SER.06 1.05 1.10


SER.04

2.25

2.25
SER.06
SER.04

4.29

0.25

0.25
5.80

1.20
i 2

2.45
SER.05 EQS.02.07
2

1.00
SER.07

3.75 3.07 2.74 1.54 3.75 14.85 1.50 5.35 5.00 0.90 1.50

4.23
SER.10 SER.10 VE.04.15b VE.04.15b SER.10 VE.04.8a
SER.10
VE.04.12c VE.04.9j

1.19
1.00
2 2

ARM.06.3
5.15 0.60 2.15 2.31 0.60 2.93 0.45 1.89 3.89 1.19 VE.04.5e

3.53
CC CC

1.97
ARM.05.5

10.28
VI.02.1a
i 2 i 2

3.53
ARM.04.3
1.21 3.94 0.60 1.29 0.85 1.26 0.17 1.49 4.95 0.60 5.08

1.60
9.01

9.01

1.20
VE.04.9g ARM.07.1 .

7.83
.

1.00
VI.02.1a VI.02.1a
7.90

T3.1 A 14
I.S. Suite 02
1 2 3 4 5 6 7 8 9 10 11 12 SER.02

1.23
A 3. m 1.80
BB BB
3.26 2.00 1.31 7.04 1.95 3.66 1.44

0.90
3.54

T3.1 A 13 VI.02.1a T1.1 A 03

3.00
PLACA MLL MLR/MSR
Suite 02 Cozinha
A 15. m SER.01 A . 3m
1.15

T3.1 A 10 . 0 T1.1 A 01

1.21
Circulação 02
VI.02.1a Hall

5.82
VE.04.9h
A . m ARM.05.2 ARM.05.2 A 10. 4 m

0.25
VI.04.3a 23 22 21 20 19 18 17 16 15 14 13
0.60

P2 05 SER.10

0.60
0.23 0.23

FRIGO CONG. FO+MICRO AQS


A.T. Hidráulica SER.10 SER.16
3 A 2.53 m 3
T1.1 A 04
P2 04 I.S. Social
1.71

A.T. Eléctrica VI.02.1a

2.68
ARM.05.2 ARM.05.2 A 1.55 m

2.36
A 3.3 m

1.50
VE.04.15a VI.02.1a P2 0
P2 02

1.63
ARM.09.1 Balneário Masc.
Ante Câmara 1.40 1.80 1.40 1.07 1.80 1.03 1.63 A 3.0 m
A 3.3 m VE.04.6a P2 0
VI.04.1c VI.04.1a VI.04.1a
3.54

T3.1 A 11 VI.02.1a Balneário Fem.

0.25
VI.04.1a
Suite 03 A 2. m
A 14. m VE.04.7a VE.04.7a
P2 01
T3.1 A 12
1.80

Hall Piscina

1.40
1.36
ARM.01.1

20.10
I.S. Suite 03 . 0 . .20 A 14.3 m
A 3. m 3.07 1.32
VE.04.7b
VI.02.1a

0.25
7.90

8.02

T3.1 A 0
I.S. Serviço VI.04.1a VI.04.1a
A 2. 2 m SER.08
MSR MLR
T3.1 A 0
1.65

2.02

1.65
Lavandaria
A 3.3 m 2.46 1.16 2.04 1.65 1.32 3.00 3.84 T2.1 A 0
VE.04.7a VI.02.1a I.S. Suite 02
T3.1 A 0
VI.02.1a A 4. 5 m

3.19
3.58
Estendal
A 3. m T2.1 A 0
VE.04.7a

4.31
. 0 . 0 Suite 02
P2 0 VI.02.1a
ARM.02.1 A 1 .45 m
Hall Privado 02 VI.04.5b
1.56

A . 5m VI.04.5a VE.04.9c
3.30 3.32 1.80 VI.02.1a
P2 0 ARM.04.4 ARM.05.3
Hall Privado 01
SER.10

0.62
A . 3m SER.10
4 4
4.22

FO+MICRO VI.04.5b
T3.1 A 05

0.25
Cozinha
ARM.02.2

MLR
T2.1 A 05
0.60

A 1 .44 m CONG.

1.20
PLACA
Lavandaria
T3.1 A 03
ARM.04.2 VI.02.1a MSR A 3. 5 m
1.35

Circulação 01 0.66 1.39 FRIGO 3.92 1.32 1.65 0.42 1.30 1.80 1.57 1.80 1.78 1.73 VE.04.19a
A . 1m VI.02.1a VI.02.1a
VI.02.1a
2.40

T3.1 A 0 MLL CUBA


VI.02.1a

0.60
AQS
VI.02.1b VI.02.2a AQS FO+MICRO CONG. FRIGO
Churrasqueira
A 2.4 m
2.76

VE.04.5c T2.1 A 03
AA AA Cozinha

1.21
VE.04.11a A . m
0.60

MLL CUBA PLACA


0.90
7.90

ARM.04.5
i 2
8.35

7.98
10.82 2.93 0.45 2.15 3.66 1.44
4.96

5.96

.
3.50

2.99
4.50

3.98
SER.06
1.00

5 5
1.19

1.19

VE.04.15b VE.04.15b
0.75

VE.04.5d VE.04.12a SER.10

0.66 SER.10 SER.10 SER.10


0.66

7.35 7.02 7.35 3.75 0.25 1.00 5.60 0.20 4.60 0.20 2.15

0.24
SER.07
SER.05
2.46

.
i 2
3.76

0.24
1.06

8.01 1.76
0.24

SER.05
A B C D E F G
DD T3.1 A 02 T3.1 A 04 T3.1
EE A 01 T2.1 A 0 T2.1 A 0 T2.1 A 01 T2.1 A 04 T2.1 A 02
Sala I.S. Social Hall I.S. Suite 01 Suite 01 Hall I.S. Social Sala
P A A P2 A 3. m A 2.23 m A 3. m A 4.32 m A 20.4 m A .3 m A 2.14 m A 3 . 1m

P2 T1.1-A T3.1-A
01 Hall Piscina 14.38 m² - TEC.01+PIN.03 PAV.05 PAR.10 01 Hall 10.84 m² ROD.01 TEC.01+PIN.03 PAV.03 PIN.03 01 Hall 3.87 m² ROD.01 TEC.01+PIN.03 PAV.03 PIN.03
02 Ante Câmara 3.3 m² ROD.02 TEC.01+PIN.03 PAV.06 PIN.05 02 Sala 31.59 m² ROD.01 TEC.01+03+PIN.03 PAV.03 PIN.03 02 Sala 63.99 m² ROD.01 TEC.01+03+PIN.03 PAV.03 PIN.03
03 Escada 21.12 m² ROD.02 TEC.05+PIN.05 PAV.06 PIN.05 03 Cozinha 9.83 m² ROD.01 TEC.01+PIN.03 PAV.03 PIN.04 03 Circulação 01 7.81 m² ROD.01 TEC.01+PIN.03 PAV.03 PIN.03
04 A.T. Eléctrica 3.3 m² ROD.03 TEC.05+PIN.05 PAV.07 PIN.05 04 I.S. Social 1.55 m² - TEC.02+PIN.04 PAV.03 PAR.08+PIN.04 04 I.S. Social 2.23 m² - TEC.02+PIN.04 PAV.03 PAR.08+PIN.04
05 A.T. Hidráulica 2.53 m² ROD.03 TEC.05+PIN.05 PAV.07 PIN.05 05 Suite 01 17.48 m² ROD.01 TEC.01+03+PIN.03 PAV.03 PIN.03 05 Cozinha 16.44 m² ROD.01 TEC.02+04+PIN.04 PAV.03 PIN.04 V1.R02 Projecto de Execução 2022/07/08
06 Hall Privado 01 7.83 m² ROD.01 TEC.01+PIN.03 PAV.03 PAR.01+PIN.03 06 I.S. Suite 01 4.76 m² - TEC.02+04+PIN.04 PAV.03+04 PAR.07a+PIN.04 06 Estendal 3.9 m² ROD.02 TEC.08 PAV.03 PIN.02
V1.R01 Projecto de Execução 2022/06/17
07 Hall Privado 02 7.85 m² ROD.01 TEC.01+PIN.03 PAV.03 PAR.01+PIN.03 T2.1-A 07 Lavandaria 3.37 m² - TEC.02+PIN.04 PAV.03 PAR.06+PIN.04
V1.R00 Projecto de Execução 2022/06/08
08 Balneário Fem. 2.66 m² - TEC.02+PIN.04 PAV.05 PAR.08+PIN.04 01 Hall 7.3 m² ROD.01 TEC.01+PIN.03 PAV.03 PIN.03 08 I.S. Serviço 2.72 m² - TEC.02+PIN.04 PAV.03 PAR.06+PIN.04
Revisão Descrição Data
09 Balneário Masc. 3.06 m² - TEC.02+PIN.04 PAV.05 PAR.08+PIN.04 02 Sala 36.81 m² ROD.01 TEC.01+03+PIN.03 PAV.03 PIN.03 09 Churrasqueira 2.49 m² ROD.02 TEC.08+PIN.01 PAV.02 PIN.02
03 Cozinha 9.97 m² ROD.01 TEC.01+PIN.03 PAV.03 PIN.04 10 Circulação 02 9.89 m² ROD.01 TEC.01+PIN.03 PAV.03 PIN.03
04 I.S. Social 2.14 m² - TEC.02+PIN.04 PAV.03 PAR.08+PIN.04 11 Suite 03 14.98 m² ROD.01 TEC.01+03+PIN.03 PAV.03 PIN.03
05 Lavandaria 3.95 m² - TEC.02+PIN.04 PAV.03 PAR.06+PIN.04 12 I.S. Suite 03 3.6 m² - TEC.02+PIN.04 PAV.03+04 PAR.07a+PIN.04
06 Suite 01 20.49 m² ROD.01 TEC.01+03+PIN.03 PAV.03 PIN.03 13 Suite 02 15.98 m² ROD.01 TEC.01+03+PIN.03 PAV.03 PIN.03 Arquitectura e Coordenação Geral
07 I.S. Suite 01 4.32 m² - TEC.02+PIN.04 PAV.03+04 PAR.07a+PIN.04 14 I.S. Suite 02 3.6 m² - TEC.02+PIN.04 PAV.03+04 PAR.07a+PIN.04 COSTA LOPES. ARQ_Rua Kwamme N'krumah, nº 10 - Piso 8, Luanda - Angola · T: 00244 222 331 666 · F: 00244 222 331 658 · arquitectos@costalopes.com · www.costalopes.com

08 Suite 02 16.45 m² ROD.01 TEC.01+03+PIN.03 PAV.03 PIN.03 15 Suite Master 33.5 m² ROD.01 TEC.01+03+PIN.03 PAV.03 PIN.03 Arq.º Alexandre Falcão Costa Lopes, Arq.º António Falcão Costa Lopes

09 I.S. Suite 02 4.95 m² - TEC.02+PIN.04 PAV.03+04 PAR.07a+PIN.04 16 I.S. Suite Master 12.16 m² - TEC.02+04+PIN.04 PAV.03+04 PAR.07a+07b+PIN.
04 João Tavares & Associados

Estrutura e Fundações
JTA · Largo de Santos, nº 9 - 3º Andar, 1200-808 Lisboa, Portugal · T: 00351 213 932 890 · www.2ta-eng.com · 2ta@2ta-eng.com

Eng.º João Tavares

Instalações Eléctricas, Telecomunicações, Segurança, Elevadores, Gestão Técnica, Climatização e Ventilação e Hidráulicas
PROJEST Estudos e Projectos · Avenida Murtala Mohamed, Parcela 3, Baía de Luanda, Rua 7, Edifício Dyeji, 1º Andar, Sala D, Ingombota · T: 943 252 366, 943 252 430, 943 252 431

Eng.º Luis Nunes

Promotor
Promotor COOPERATIVA MFINDA
Projecto Escala Revisão
EDIFÍCIO MFINDA 1 : 100 V1.R02
Project Scale Revision

Especialidade Data Aprovação


Discipline
ARQUITECTURA Date 2022/07/08 Aproved -
Fase Nº Ordem
Phase PROJECTO DE EXECUÇÃO Drawing No AR02.03
Designação C. Custo
PLANTA PISO 02 A19-011_PE
Content Code
ESTE DESENHO É PROPRIEDADE DOS SEUS AUTORES E NÃO PODE SER REPRODUZIDO SEM AUTORIZAÇÃO EXPRESSA RESERVADOS TODOS OS DIREITOS PELA LEGISLAÇÃO EM VIGOR - DECRETO LEI 63 / 85 DE 14 DE MARÇO

También podría gustarte