Documentos de Académico
Documentos de Profesional
Documentos de Cultura
CONTINGENCIA
OBRAS CIVILES
PLATAFORMA 03 FIDEL 11-Set 04-Oct 23
PINTURA EXTERIOR E INTERIOR FIDEL 11-Set 22-Set 11 2 M2 901 82.0 82.0 82.0 82.0 82.0 82.0 82.0 82.0 82.0 82.0
PINTURA CIELO RASO FIDEL 23-Set 04-Oct 10 1 M2 531 53.1 53.1 53.1 53.1 53.1 53.1 53.1 53.1 63.1 53.1
PINTURA DE CONTRAZOCALO FIDEL 23-Set 27-Set 4 1 M2 366 91.5 91.5 91.5 91.5
PLATAFORMA 02 FIDEL 12-Set 28-Set 16
COLOCACION DE CIELO RASO FIDEL 12-Set 22-Set 10 2 m2 474 47.4 47.4 47.4 47.4 47.4 47.4 47.4 47.4 47.4 47.4
COLOCACION DE CUBIERTA TR4 FIDEL 23-Set 28-Set 5 2 m2 507 101.4 101.4 101.4 101.4 101.4
PLATAFORMA 01 FIDEL 12-Set 03-Oct 21
TABIQUERIA DE DRYWALL FIDEL 12-Set 22-Set 10 2 m2 522 52.2 52.2 52.2 52.2 52.2 52.2 52.2 52.2 52.2 52.2 MATERIALES
COLOCACION DE CIELO RASO FIDEL 23-Set 03-Oct 10 2 m2 474 47.4 47.4 47.4 47.4 47.4 47.4 47.4 47.4 47.4
CERCO PERIMETRICO FIDEL 13-Set 02-Oct 19
CIMIENTOS CORRIDOS FIDEL 13-Set 16-Set 4 1 m3 19 4.8 4.8 4.8 4.8 EQUIPOS (CARMIX, MINICARGADOR)
ENCOFRADO DE MUROS DE GRAVEDAD FIDEL 15-Set 22-Set 7 2 m2 170 24.3 24.3 24.3 24.3 24.3 24.3 24.3
CONCRETO CICLOPEO P/MUROS FIDEL 19-Set 28-Set 9 1 m3 189 18.8 18.8 18.8 18.8 18.8 18.8 18.8 18.8 18.8
HABILITACION DE ACERO P/ SOBRECIMIENTO FIDEL 19-Set 29-Set 10 1 kg 829 82.9 82.9 82.9 82.9 82.9 82.9 82.9 82.9 82.0 82.9
ENCOFRADO DE VIGAS Y SOBRECIMIENTOS FIDEL 26-Set 02-Oct 6 2 M2 161 26.8 26.8 26.8 26.8 26.8 26.8 26.8
VARIOS 12-Set 03-Oct 21
CANALETA PARA TECHO (P3,P2) FIDEL 20-Set 23-Set 3 1 ML 308 77.0 77.0 77.0 77.0
REJILLA DE FIERRO FUNDIDO FIDEL 12-Set 19-Set 7 1 ML 122 17.4 17.4 17.4 17.4 17.4 17.4 17.4 (MATERIALES)
JUNTAS DE DILATACION FIDEL 19-Set 03-Oct 14 3 ML 2,067 147.0 147.0 147.0 147.0 147.0 147.0 147.0 147.0 147.0 147.0 147.0 147.0 147.0 147.0 (PERSONAL FEMENINO)
ESTRUCTURAS METALICAS
PLATAFORMA 03 FIDEL 12-Set 03-Oct 21
APOYO PARA COLUMNAS METALICA FIDEL 12-Set 14-Set 3 1 UND 24 8.0 8.0 8.0 (INGRESO DE MATERIAL Y PERSONAL)
0 ARMADO DE COLUNNAS FIDEL 15-Set 19-Set 4 1 UND 12 3.0 3.0 3.0 3.0
MONTAJE DE COLUMNAS FIDEL 20-Set 22-Set 3 1 UND 12 4.0 4.0 4.0
ARMADO DE VIGAS FIDEL 23-Set 27-Set 4 1 UND 4 1.0 1.0 1.0 1.0
MONTAJE DE VIGAS FIDEL 28-Set 29-Set 2 1 UND 4 2.0 2.0
COLOCACION DE CABLES Y TENSORS FIDEL 30-Set 01-Oct 2 1 M. 173 86.5 86.5
COLOCACION DE TEMPLADORES FIDEL 02-Oct 03-Oct 2 1 UND 40 20.0 20.0
Proyeccción de Avance Semanal Contingencia Plan Semanal Plan Semanal Plan Semanal Avance Plan Semana
Plan Linea Base 01 Rev 01 Plan Linea Base 01 Rev 01 Plan Linea Base 01 Rev 01 Avance Plan SemanaL (LB)
Plan Actualizado Plan Actualizado Plan Actualizado