Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Lotes Camino Real
Lotes Camino Real
0
0
.23
12
S-
386
.48 S-
LO m2
5
TE 408
20.8
34 .12
LO
TE
m2
21.0 35 S-
0 420
.39
8
.53
.09
21.4
42 m2 S-
LO 432
34
TE
S- 19.0 36 .06
1
391 0 m2
22.1
LO
S-
TE .36 S-
355
33 m 2 LO 442
S- TE
4
20.7 m2 1.3 0 m2
6m
6
0
24.4
LO
TE 2 S-
32 LO
TE 44 8.2
38
23.2
S-4 19.0 1m
6
02.7 0 2
24.4
LO
16.0 TE LO S-4
MANZANA
8
0 31 2m TE
50.8
2 S-4 39
23.5
LO 02.7 19.0 7m
TE 2m 0 2
7
16.0 30
9
B
25.1
0 2 LO S-4
16.0 LO
TE
40 53.5
19.0
23.7
0 TE S-4 3m
7
29 09.2 0 2
25.1
S-4
8m 56.0
3
S-3 16.0 LO
16.0 0 2 S-4
23.8
92.0 0 19.0
TE 0m
0m LO 09.2 0
41
2
TE 8m
25.5
2
7
16.0 28
2
S-3 0 LO
TE
92.0
24.0
8
7 19.0 42
16.0
55,3 0m 0 LO S-4 0
25.5
2 TE 16.0
0
0
27
2
24.5
LO 183. 16.0 0m
46,7
TE S=
8
13
400 16.0 63 0 2 19
.32 0 S-4
S-6 m2 LO 32.0
26.0
65.3 16.0 TE
0
LO 26 0m
24.5
1m 14
TE S-4 0 2
00.3
0
LO
TE 2
2m 16.0
27.0
12 S-4 LO
2 0 TE
28,9 5 6.7 16.0 25
0m
0
7 S-4 0 S-4
2
LO
2 S-4
27.0
TE 32
25.0
2 2 0 TE
22.0
S-4 24
25.0
LO
TE 08.6
20.7 S-4 16
5 28.4 4m 16.0
5
LO 2 16.0
0
22.1
TE 5m
10
2 MANZANA 6 0
25.5
LO
TE S-
19.0 S-4 17 416 16.0
4
38.1 .96 0
0
A m2
25.5
4m
5
LO
22.5
TE 2 LO S-
9 TE
416
4
18
19.0 S-4 .96 16.0
0 40.0 m2 0
23.0
26.0
7.50
LO 4m
TE LO
8 2
6
TE
S-4 16.0
6
19
19.0 S-4 32.0 0
26.0
23.1
0 LO 46.8 0m
TE 8m LO 2
6
7 TE
S-4
6
2 20
0
32.0
15.0
27.0
0 LO .1 2
TE 4m LO
2
2
6 TE
0
21 S-
433
S-4
SECCION CALLE PRIMARIA
27.0
60.5 .7
7.50
19.0 6m
24.0
0 LO 6m 2
0
TE LO
5 2 TE
22
6
S-
19.0 463
24.2
27.1
0 LO
TE .03
4 m2 LO
TE
4
23
1
S-
46
24.3
19.0 LO 6.4
0 TE
3 5m
2
7
19.0 S-
458
24.5
LO
0 TE
2 .0 9m
2
5
LO
24.1
19.0 TE
0 1
1
19.0
0
6.00
FRACCIONAMIENTO
LOTES TIPO
16.00
A 23 SUPERFICIE Camino
S- 458.09m2
B 19 LOTES
Real RANCHOS.
S- 433.76m2 PARQUE LINEAL 2,754.45 m2 San Vicente, Nay.
TOTAL 42
24.11
LOTE 23
27.11
19.00