FECHA CONCEPTO CANTIDAD COSTO UNIT COSTO UNI COSTO TOTAL 01-abr MP y MT POR SILLA MADERA 50 300.00 15,000.00 PEGAMENTO 25 60.00 1,500.00 TORNILLOS 10 30.00 300.00 PINTURA 25 100.00 2,500.00 Total MPD 193.00 19,300.00 MOD Mano de obra directa 250.00 25,000.00 CIF MOD 64% - Aplicados 160.00 16,000.00 TOTAL COSTOS 603.00 60,300.00
ASIENTOS DE COMPRAS - CONTABILIDAD FINANCIERA
Fecha Detalle Debe Haber 01-ene Bancos 20,000.00 Anticipo Compra mesas OT 100 20,000.00 Anticipo por compra 100 sillas Inventario de MP y MT 39,500.00 Madera lam 100.00 300.00 30,000.00 Pegamento b 50.00 60.00 3,000.00 Tornillos cajas 50.00 30.00 1,500.00 Pintura bidon 50.00 100.00 5,000.00 Credito IVA 13% 14.94 5,902.30 5,902.30 Bancos 45,402 Compra de MP y MT