12-Jul D 1.1 1285.4 12-Jul N 1285.4 12.1 1284.3 13-Jul D 1284.3 10.5 1272.2 13-Jul N 1272.2 16.7 1261.7 14-Jul D 1261.7 12.8 1245 14-Jul N 1245 12.9 1232.2 15-Jul D 1232.2 9.6 1219.3 15-Jul N 1219.3 13.4 1209.7 16-Jul D 1209.7 1.7 1196.3 16-Jul N 1196.3 0 1196.3 17-Jul D 1196.3 6 1194.6 17-Jul N 1194.6 0 1194.6 18-Jul D 1194.6 0 1194.6 18-Jul N 1194.6 0 1194.6 19-Jul D 1194.6 0 1194.6 19-Jul N 1194.6 0 1194.6 20-Jul D 1194.6 26.5 1168.1 20-Jul N 1168.1 21.7 1146.4 21-Jul D 1146.4 37 1109.4 21-Jul N 1109.4 20.5 1088.9 22-Jul D 1088.9 14.3 1074.6 22-Jul N 1074.6 0 1074.6 23-Jul D 1074.6 7.3 1067.3 23-Jul N 1067.3 20.4 1046.9 24-Jul D 1046.9 33.3 1013.6 24-Jul N 1013.6 16.9 996.7 25-Jul D 996.7 18.1 978.6 25-Jul N 978.6 20.4 958.2 26-Jul D 958.2 13.6 944.6 26-Jul N 944.6 0 944.6 27-Jul D 944.6 0 944.6 27-Jul N 944.6 0 944.6 28-Jul D 944.6 0 944.6 28-Jul N 944.6 0 944.6 29-Jul D 944.6 14.2 930.4 29-Jul N 930.4 19.6 910.8 30-Jul D 910.8 19.4 891.4 30-Jul N 891.4 24.5 866.9 31-Jul D 866.9 23.00 843.9 31-Jul N 843.9 22.3 821.6 1-Aug D 821.6 15 806.6 1-Aug N 806.6 15 791.6 2-Aug D 791.6 10.25 781.35 2-Aug N 781.35 19.25 762.1 3-Aug D 762.1 15.5 746.6 3-Aug N 746.6 11.2 735.4 4-Aug D 735.4 10 725.4 4-Aug N 725.4 0 725.4 5-Aug D 725.4 0 725.4 5-Aug N 725.4 0 725.4 6-Aug D 725.4 16.6 708.8 6-Aug N 708.8 5.1 703.7 7-Aug D 703.7 0 703.7 7-Aug N 703.7 0 703.7 8-Aug D 703.7 1.5 702.2 8-Aug N 702.2 8.5 693.7 9-Aug D 693.7 11.4 682.3 9-Aug N 682.3 15.2 667.1 10-Aug D 667.1 12.3 654.8 10-Aug N 654.8 15 639.8 11-Aug D 639.8 20.2 619.6 11-Aug N 619.6 7.6 612 12-Aug D 612 13.1 598.9 12-Aug N 598.9 13.1 585.8 13-Aug D 585.8 5.2 580.6 13-Aug N 580.6 14.7 565.9 14-Aug D 565.9 10.1 555.8 14-Aug N 555.8 15.9 539.9 15-Aug D 539.9 10.1 529.8 15-Aug N 529.8 23.8 506 16-Aug D 506 16.3 489.7 16-Aug N 489.7 12.5 477.2 17-Aug D 477.2 0 477.2 17-Aug N 477.2 0 477.2 18-Aug D 477.2 0 477.2 18-Aug N 477.2 0 477.2 19-Aug D 477.2 23.8 453.4 19-Aug N 453.4 16.5 436.9 20-Aug D 436.9 21.5 415.4 20-Aug N 415.4 14.3 401.1 21-Aug D 401.1 16.3 384.8 21-Aug N 384.8 15.4 369.4 22-Aug D 369.4 14 355.4 22-Aug N 355.4 1.7 353.7 23-Aug D 353.7 7.5 346.2 23-Aug N 346.2 9.4 336.8 24-Aug D 336.8 16 320.8 24-Aug N 320.8 4.4 316.4 25-Aug D 316.4 4.7 311.7 25-Aug N 311.7 5.3 306.4 26-Aug D 306.4 0 306.4 26-Aug N 306.4 0 306.4 27-Aug D 306.4 0 306.4 27-Aug N 306.4 0 306.4 28-Aug D 306.4 44 262.4 28-Aug N 262.4 0 262.4 29-Aug D 262.4 25.2 237.2 29-Aug N 237.2 11.1 226.1 30-Aug D 226.1 7.2 218.9 30-Aug N 218.9 18.7 200.2 31-Aug D 200.2 4.00 196.2 31-Aug N 196.2 0 196.2 1-Sep D 196.2 0 196.2 1-Sep N 196.2 0 196.2 2-Sep D 196.2 24.5 171.7 2-Sep N 171.7 29.5 142.2 3-Sep D 142.2 24.5 117.7 3-Sep N 117.7 19.3 98.4 4-Sep D 98.4 0 98.4 4-Sep N 98.4 0 98.4 5-Sep D 98.4 6.3 92.1 5-Sep N 92.1 17.5 74.6 6-Sep D 74.6 11.9 62.7 6-Sep N 62.7 13.6 49.1 7-Sep D 49.1 3.4 45.7 OBSERVACIONES CON-009 CON-009 CON-009 CON-009 CON-009 CON-009 CON-009 CON-009 Vacunacion Enfermo por vacunacion Fin del pozo Trasladando Trasladando Trasladando Trasladando Trasladando Inicio CON-002 CON-002 CON-002 CON-002 CON-002 Parados por falta de brocas CON-002 (Se reinici0 operación a las 1:30 pm CON-002 CON-002 CON-002 CON-002 CON-002 CON-002 - FINAL DE POZO Parada por finalizacion de pozo Traslado a pozo CON-006 Traslado a pozo CON-006 Traslado a pozo CON-006 Traslado a pozo CON-006 CON-006 (Inicia a perforar 12:30 pm CON-006 CON-006 CON-006 CON-006 CON-006 CON-006 CON-006 CON-006 CON-006 CON-006 CON-006 CON-006 FINALIZA POZO Parada por finalizacion de pozo Traslado a pozo CON-004 Traslado a pozo CON-004 Inicio CON-004 10:30 am CON-004 CON-004 - Parados por falta de broca CON-004 - Parados Por falta de Broca CON-004 - Reinicia Perforacion 14:00 CON-004 CON-004 CON-004 CON-004 CON-004 CON-004 CON-004 CON-004 CON-004 CON-004 CON-004 CON-004 CON-004 CON-004 CON-004 CON-004 CON-004_FIN DEL POZO Traslado CON-010 Traslado CON-010 Traslado CON-010 Traslado CON-010 Inico Pozo CON-010 CON-010 CON-010 CON-010 CON-010 CON-010 CON-010 CON-010 CON-010 CON-010 CON-010 CON-010 CON-010 CON-010 - FIN DEL POZO Traslado CON-003 Traslado CON-003 Traslado CON-003 Traslado CON-003 CON-003 _ INICIO POZO CON-003 _ PARADA POR ORDEN PUBLICO CON-003 CON-003 CON-003 CON-003 CON-003 FIN DEL POZO Traslado CON-001 Traslado CON-001 Traslado CON-001 CON-001 - INICIO POZO CON-001 CON-001 CON-001 CON-001 - Parados por falta de cajas CON-001 - Parados por falta de cajas CON-001 - Reinicio Operación CON-001 CON-001 CON-001 CON-001 - FIN DEL POZO TOTAL METROS 2045.7 TOTAL PERFORADOS 1495.1
Fecha Turno Inicia Perforados Faltan
20-Sep D 0 0.00 2045.7 20-Sep N 0 0.00 2045.7 21-Sep D 2045.7 26.80 2018.9 21-Sep N 2018.9 24.20 1994.7 22-Sep D 1994.7 20.80 1973.9 22-Sep N 1973.9 19.40 1954.5 23-Sep D 1954.5 10.00 1944.5 23-Sep N 1944.5 0.00 1944.5 24-Sep D 1944.5 0.00 1944.5 24-Sep N 1944.5 0.00 1944.5 25-Sep D 1944.5 29.00 1915.5 25-Sep N 1915.5 27.80 1887.7 26-Sep D 1887.7 21.20 1866.5 26-Sep N 1866.5 15.50 1851.00 27-Sep D 1851 18.90 1832.10 27-Sep N 1832.1 34.30 1797.80 28-Sep D 1797.8 3.70 1794.10 28-Sep N 1794.1 0.00 1794.10 29-Sep D 1794.1 10.80 1783.30 29-Sep N 1783.3 12.50 1770.80 30-Sep D 1770.8 10.60 1760.20 30-Sep N 1760.2 16.40 1743.80 1-Oct D 1743.8 13.50 1730.30 1-Oct N 1730.3 1.80 1728.50 2-Oct D 1728.5 8.00 1720.50 2-Oct N 1720.5 13.00 1707.50 3-Oct D 1707.5 13.20 1694.30 3-Oct N 1694.3 0.00 1694.30 4-Oct D 1694.3 0.00 1694.30 4-Oct N 1694.3 0.00 1694.30 5-Oct D 1694.3 0.00 1694.30 5-Oct N 1694.3 0.00 1694.30 6-Oct D 1694.3 11.20 1683.10 6-Oct N 1683.1 17.00 1666.10 7-Oct D 1666.1 6.80 1659.30 7-Oct N 1659.3 5.80 1653.50 8-Oct D 1653.5 0.00 1653.50 8-Oct N 1653.5 0.80 1652.70 9-Oct D 1652.7 5.10 1647.60 9-Oct N 1647.6 8.90 1638.70 10-Oct D 1638.7 0.00 1638.70 10-Oct N 1638.7 9.40 1629.30 11-Oct D 1629.3 9.60 1619.70 11-Oct N 1619.7 15.10 1604.60 12-Oct D 1604.6 10.30 1594.30 12-Oct N 1594.3 0.00 1594.30 13-Oct D 1594.3 0.00 1594.30 13-Oct N 1594.3 0.00 1594.30 14-Oct D 1594.3 0.00 1594.30 14-Oct N 1594.3 0.00 1594.30 15-Oct D 1594.3 0.00 1594.30 15-Oct N 1594.3 0.00 1594.30 16-Oct D 1594.3 0.00 1594.30 16-Oct N 1594.3 22.50 1571.80 17-Oct D 1571.8 15.60 1556.20 17-Oct N 1556.2 18.50 1537.70 18-Oct D 1537.7 8.50 1529.20 18-Oct N 1529.2 12.10 1517.10 19-Oct D 1517.1 8.80 1508.30 19-Oct N 1508.30 14.40 1493.90 20-Oct D 1493.90 0.00 1493.90 20-Oct N 1493.90 0.00 1493.90 21-Oct D 1493.90 7.00 1486.90 21-Oct N 1486.90 19.00 1467.90 22-Oct D 1467.90 15.30 1452.60 22-Oct N 1452.60 21.70 1430.90 23-Oct D 1430.90 2.70 1428.20 23-Oct N 1428.20 9.90 1418.30 24-Oct D 1418.30 20.10 1398.20 24-Oct N 1398.20 16.90 1381.30 25-Oct D 1381.30 11.00 1370.30 25-Oct N 1370.30 16.80 1353.50 26-Oct D 1353.50 15.50 1338.00 26-Oct N 1338.00 14.30 1323.70 27-Oct D 1323.7 0.00 1323.7 27-Oct N 1323.7 0.00 1323.7 28-Oct D 1323.7 20.00 1303.7 28-Oct N 1303.7 20.20 1283.5 29-Oct D 1283.5 16.90 1266.6 29-Oct N 1266.6 18.60 1248.0 30-Oct D 1248 16.80 1231.2 30-Oct N 1231.2 0.00 1231.2 31-Oct D 1231.2 0.00 1231.2 31-Oct N 1231.2 30.00 1201.2 1-Nov D 1201.2 19.10 1182.1 1-Nov N 1182.1 14.40 1167.7 2-Nov D 1167.7 0.00 1167.7 2-Nov N 1167.7 0.00 1167.7 3-Nov D 1167.7 8.30 1159.4 3-Nov N 1159.4 18.50 1140.9 4-Nov D 1140.9 2.30 1138.6 4-Nov N 1138.6 0.00 1138.6 5-Nov D 1138.6 14.80 1123.8 5-Nov N 1123.8 11.90 1111.9 6-Nov D 1111.9 15.50 1096.4 6-Nov N 1096.4 18.90 1077.5 7-Nov D 1077.5 11.40 1066.1 7-Nov N 1066.1 7.50 1058.6 8-Nov D 1058.6 14.70 1043.9 8-Nov N 1043.9 12.40 1031.5 9-Nov D 1031.5 13.50 1018 9-Nov N 1018 13.70 1004.3 10-Nov D 1004.3 10.10 994.2 10-Nov N 994.2 16.00 978.2 11-Nov D 978.2 16.40 961.8 11-Nov N 961.8 0.00 961.8 12-Nov D 961.8 0.00 961.8 12-Nov N 961.8 0.00 961.8 13-Nov D 961.8 16.70 945.1 13-Nov N 945.1 16.60 928.5 14-Nov D 928.5 4.30 924.2 14-Nov N 924.2 0.00 924.2 15-Nov D 924.2 0.00 924.2 15-Nov N 924.2 0.00 924.2 16-Nov D 924.2 12.10 912.1 16-Nov N 912.1 13.60 898.5 17-Nov D 898.5 0.00 898.5 17-Nov N 898.5 0.00 898.5 18-Nov D 898.5 3.40 895.1 18-Nov N 895.1 14.70 880.4 19-Nov D 880.4 11.00 869.4 19-Nov N 869.4 13.30 856.1 20-Nov D 856.1 15.60 840.5 20-Nov N 840.5 12.00 828.5 21-Nov D 828.5 6.70 821.8 21-Nov N 821.8 0.00 821.8 22-Nov D 821.8 0.00 821.8 22-Nov N 821.8 0.00 821.8 23-Nov D 821.8 5.30 816.5 23-Nov N 816.5 19.00 797.5 24-Nov D 797.5 6.40 791.1 24-Nov N 791.1 15.60 775.5 25-Nov D 775.5 9.40 766.1 25-Nov N 766.1 6.60 759.5 26-Nov D 759.5 17.20 742.3 26-Nov N 742.3 0.00 742.3 27-Nov D 742.3 0.00 742.3 27-Nov N 742.3 0.00 742.3 28-Nov D 742.3 11.20 731.1 28-Nov N 731.1 7.60 723.5 29-Nov D 723.5 8.50 715 29-Nov N 715 14.00 701 30-Nov D 701 1.80 699.2 30-Nov N 699.2 13.50 685.7 1-Dec D 685.7 4.20 681.5 1-Dec N 681.5 6.80 674.7 2-Dec D 674.7 1.50 673.2 2-Dec N 673.2 0.00 673.2 3-Dec D 673.2 0.00 673.2 3-Dec N 673.2 0.00 673.2 4-Dec D 673.2 0.00 673.2 4-Dec N 673.2 0.00 673.2 5-Dec D 673.2 10.30 662.9 5-Dec N 662.9 10.30 652.6 6-Dec D 652.6 11.40 641.2 6-Dec N 641.2 0.00 641.2 7-Dec D 641.2 1.40 639.8 7-Dec N 639.8 13.30 626.5 8-Dec D 626.5 3.40 623.1 8-Dec N 623.1 0.00 623.1 9-Dec D 623.1 0.00 623.1 9-Dec N 623.1 0.00 623.1 10-Dec D 623.1 5.10 618 10-Dec N 618 0.00 618 11-Dec D 618 9.50 608.5 11-Dec N 608.5 14.30 594.2 12-Dec D 594.2 13.50 580.7 12-Dec N 580.7 6.80 573.9 13-Dec D 573.9 9.20 564.7 13-Dec N 564.7 14.10 550.6 Total Perforados OBSERVACIONES 1954.3 CON-011 TRASLADO 1954.3 CON-011 TRASLADO 1981.1 CON-011 INICIO PERFORACION 2005.3 CON-011 2026.1 CON-011 2045.5 CON-011 2055.5 CON-011 - FINAL POZO 2055.5 CON-012 - TRASLADO 2055.5 CON-012 - TRASLADO 2055.5 CON-012 - TRASLADO 2084.5 CON-012 - INICIO POZO 2112.3 CON-012 2133.5 CON-012 2149 CON-012 2167.9 CON-012 2202.2 CON-012 2205.9 CON-012 - Se para por falta de cajas 2205.9 CON-012_parados por falta de cajas 2216.7 CON-012 - Reinicia a las 3:30 pm 2229.2 CON-012 2239.8 CON-012 2256.2 CON-012 2269.7 CON-012 2271.5 CON-012 2279.5 CON-012 2292.5 CON-012 2305.7 CON-012 FINAL DE POZO 2305.7 CON-013 TRASLADO 2305.7 CON-013 TRASLADO 2305.7 CON-013 TRASLADO 2305.7 CON-013 TRASLADO 2305.7 CON-013 TRASLADO 2316.9 CON-013 INICIO DE POZO 2333.9 CON-013 2340.7 CON-013 2346.5 CON-013 2346.5 CON-013 Parada por daño del Shut 2347.3 CON-013 Nuevamente falla el Shut 2352.4 CON-013 2361.3 CON-013 _Se detiene por Daño en el arranque 2361.3 CON-013_ Se detiene por salida de Jimmy Incapacidad 2370.7 CON-013 2380.3 CON-013 2395.4 CON-013 2405.7 CON-013-FIN DE POZO 2405.7 CON-014-TRASLADO 2405.7 CON-014-TRASLADO 2405.7 CON-014-TRASLADO 2405.7 CON-014-TRASLADO 2405.7 CON-014-TRASLADO 2405.7 CON-014-TRASLADO 2405.7 CON-014-TRASLADO 2405.7 CON-014-TRASLADO 2428.2 CON-014-INICIO DE POZO 2443.8 CON-014 2462.3 CON-014 2470.8 CON-014 2482.9 CON-014 2491.7 CON-014 2506.1 CON-014 - FIN DEL POZO 2506.1 CON-015 TRASLADO 2506.1 CON-015 TRASLADO 2513.1 CON-015 - INICIO DE POZO 2532.1 CON-015 2547.4 CON-015 2569.1 CON-015 2571.8 CON-015 - Parada por falta de brocas. 10 am finaliza turno 2581.7 CON-015 Se reinicia perforacion 2601.8 CON-015 Se reciben 3 brocas 2618.7 CON-015 2629.7 CON-015 2646.5 CON-015 2662 CON-015 2676.3 CON-015 FIN DEL POZO 2676.3 CON-016 TRASLADO 2676.3 CON-016 TRASLADO 2696.3 CON-016 INICIO DEL POZO 2716.5 CON-016 2733.4 CON-016 2752 CON-016 2768.8 CON-016 FIN DEL POZO 2768.8 CON-017 TRASLADO 2768.8 CON-017 TRASLADO 2798.8 CON-017 INICIO DEL POZO 2817.9 CON-017 2832.3 CON-017 DAÑO TRIPLE BOMBA Y ARRANQUE 2832.3 CON-017 DAÑO TRIPLE BOMBA Y ARRANQUE 2832.3 CON-017 2840.6 CON-017 2859.1 CON-017 2861.4 CON-017 FIN DEL POZO 2861.4 CON-018 TRASLADO 2876.2 CON-018 INICIO DEL POZO 2888.1 CON-018 2903.6 CON-018 2922.5 CON-018 2933.9 CON-018 2941.4 CON-018 FIN DEL POZO 2956.1 CON-019 INICIO DEL POZO 2968.5 CON-019 2982 CON-019 2995.7 CON-019 3005.8 CON-019 3021.8 CON-019 3038.2 CON-019 FIN DEL POZO 3038.2 CON-019 3038.2 CON-020 TRASLADO 3038.2 CON-020 TRASLADO 3054.9 CON-020 INICIO DE POZO 3071.5 CON-020 3075.8 CON-020 3075.8 CON-020 NO SE PERFORÓ POR DAÑO CHUCK 3075.8 CON-020 NO SE PERFORÓ POR DAÑO CHUCK 3075.8 CON-020 NO SE PERFORÓ POR DAÑO CHUCK 3087.9 CON-020 3101.5 CON-020 3101.5 CON-020 3101.5 CON-020 3104.9 CON-020 3119.6 CON-020 3130.6 CON-020 3143.9 CON-020 3159.5 CON-020 3171.5 CON-020 3178.2 CON-020 FIN DE POZO 3178.2 CON-021 TRASLADO 3178.2 CON-021 TRASLADO 3178.2 CON-021 TRASLADO 3183.5 CON-021 INICIO DE POZO 3202.5 CON-021 3208.9 CON-021 3224.5 CON-021 3233.9 CON-021 3240.5 CON-021 3257.7 CON-021 - FIN DEL POZO 3257.7 CON-022 TRASLADO 3257.7 CON-022 TRASLADO 3257.7 CON-022 TRASLADO 3268.9 CON-022 INICIO POZO 3276.5 CON-022 3285 CON-022 3299 CON-022 3300.8 CON-022 3314.3 CON-022 3318.5 CON-022 3325.3 CON-022 3326.8 CON-022 3326.8 CON-022 NO SE PERFORÓ POR DAÑO MOTOR ROTARIA 3326.8 CON-022 NO SE PERFORÓ POR DAÑO MOTOR ROTARIA 3326.8 CON-022 NO SE PERFORÓ POR FALTA DE PERFORISTA 3326.8 CON-022 3326.8 CON-022 NO SE PERFORÓ POR FALTA DE PERFORISTA 3337.1 CON-022 3347.4 CON-022 NO SE PERFORÓ POR FALTA DE PERFORISTA 3358.8 CON-022 3358.8 CON-022 NO SE PERFORÓ POR DAÑO TRIPLE BOMBA 3360.2 CON-022 3373.5 CON-022 3376.9 CON-022 3376.9 CON-023 TRASLADO 3376.9 CON-023 TRASLADO 3376.9 CON-023 TRASLADO 3382 CON-023 3382 CON-023 NO SE PERFORA PORQUE LOS 2 TURNOS TRABAJARON DE DIA 3391.5 CON-023 3405.8 CON-023 3419.3 CON-023 3426.1 CON-023 3435.3 CON-023 3449.4 CON-023 REPORTE DE AVANCE EN METROS PERFORADOS - PROYECTO LA CONCEPCIÓN
POZO Inició Finalizó Prof Final
CON 007 5/24/2021 6/4/2021 209.0
CON 005 6/6/2021 6/14/2021 250.0 CON 008 6/17/2021 6/19/2021 92.0 CON 009 6/20/2021 7/17/2021 254.4 CON 002 7/20/2021 7/26/2021 250 CON 006 7/29/2021 8/4/2021 219.2 CON 004 8/6/2021 8/16/2021 248.2 CON 010 8/19/2021 8/25/2021 170.8 CON 003 8/28/2021 8/31/2021 110.2 CON 001 9/2/2021 9/7/2021 150.5 CON 011 9/21/2021 9/23/2021 101.2 CON 012 9/25/2021 10/3/2021 250.2 CON 013 10/6/2021 10/12/2021 100.0 CON 014 10/16/2021 10/20/2021 100.4 CON 015 10/21/2021 10/26/2021 170.2 CON 016 10/28/2021 10/30/2021 92.5 CON 017 10/31/2021 11/4/2021 92.6 CON 018 11/5/2021 11/7/2021 80.0 CON 019 11/8/2021 11/11/2021 96.8 CON 020 11/13/2021 11/21/2021 140.0 CON 021 11/23/2021 11/26/2021 79.5 CON 022 11/28/2021 12/7/2021 119.2 CON 023 12/10/2021 12/14/2021 72.5
CAMPAÑA DE PERFORACION FASE I
Total metros Contratados 2000.0 Total metros perforados 1954.3 Metros no perforados 45.7
CAMPAÑA DE PERFORACION FASE II
Total metros Contratados 2000.0 Total a perforar 2045.7 Metros perforados 1495.1 Restan por perforar 550.6
TOTAL PERFORADOS FASE I Y FASE II AL 25 DE NOVI 3449.4
SE DEBEN ADICIONAR 133 METROS MAS QUE DEBIERON PERFORARSE EN SURAMER, SEGÚN INFORMO WILLIAN EL DIA 06 DE OCTUBRE DE 2021 ECTO LA CONCEPCIÓN RARSE EN SURAMER, SEGÚN