CALENDARIO DE ADQUISICION DE MATERIALES E INSUMOS

OBRA : "REHABILITACIÓN Y MEJORAMIENTO DE CAMINO VECINAL - 20.40 KM EN TROCHA CARROZABLE TRAMO CRUZ CHIQUITA - NUEVO SAN MARTIN"
LUGAR : DISTRITO DE HUARMACA - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE PIURA
ENTIDAD : MUNICIPALIDAD DISTRITAL DE HUARMACA

JUN. 21 JUL. 21 AGOS. 21 SEP. 21 OCT. 21 NOV. 21 DIC. 21


Recursos Und. IU Cantidad Precio (S/.) Parcial (S/.)
01 AL 30 01 AL 31 01 AL 31 01 AL 30 01 AL 31 01 AL 30 01 AL 27

CAPACITADOR mes 47 3.00 2,500.00 7,500.00 2,500.00 2,500.00 2,500.00

OPERARIO hh 47 5,701.74 23.80 135,701.39 19,385.91 19,385.91 19,385.91 19,385.91 19,385.91 19,385.91 19,385.91

OFICIAL hh 47 5,970.47 18.84 112,483.74 16,069.11 16,069.11 16,069.11 16,069.11 16,069.11 16,069.11 16,069.11

PEON hh 47 37,529.55 17.01 638,377.68 91,196.81 91,196.81 91,196.81 91,196.81 91,196.81 91,196.81 91,196.81
ALQUILER DE LOCAL mes 39 8.00 1,200.00 9,600.00 1,371.43 1,371.43 1,371.43 1,371.43 1,371.43 1,371.43 1,371.42
FLETE TERRESTRE Glb 32 1.00 78,117.71 78,117.71 10,415.69 20,831.39 10,415.69 10,415.69 10,415.69 10,415.69 5,207.87
ALAMBRE NEGRO N° 8 kg 02 718.67 2.97 2,134.46 711.49 711.49 711.48
ALAMBRE NEGRO N° 16 kg 02 25.00 2.97 74.25 24.75 24.75 24.75
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 03 1,103.00 2.22 2,448.66 816.22 816.22 816.22
CLAVOS PARA MADERA CON CABEZA DE 3" kg 02 763.38 3.14 2,397.00 799.00 799.00 799.00
CALAMINA GALVANIZADA DE 0.83X12´ pln 56 90.00 22.00 1,980.00 1,980.00
ALCANTARILLA METALICA CIRCULAR TMC Ø=36" m 09 10.00 268.00 2,680.00 2,680.00
TUBERIA PVC SAP UF S-20 Ø10" m 72 300.30 45.00 13,513.50 6,756.75 6,756.75
TUBERIA PVC SAP C-10 D=4" m 72 337.47 21.19 7,150.99 3,575.50 3,575.49
DERECHO DE CANTERA m3 39 32,510.29 10.00 325,102.95 21,673.53 86,694.12 43,347.06 43,347.06 43,347.06 43,347.06 43,347.06
GEOTEXTIL NO TEJIDO DE 200 GR/M2 m2 30 715.30 9.90 7,081.42 1,011.63 2,023.26 2,023.26 2,023.27
CEMENTO PORTLAND TIPO I (42.5 kg) bol 21 11,389.41 22.03 250,908.64 55,757.48 55,757.48 55,757.48 55,757.48 27,878.72
YESO BOLSA 28 kg bol 30 105.00 7.37 773.85 110.55 110.55 110.55 110.55 110.55 110.55 110.55
TUBERIA PVC SAP C-10 D=2" m 72 322.77 14.41 4,651.12 1,550.37 1,550.37 1,550.38
ADITIVO CURADOR DE CONCRETO Gal 30 98.01 12.71 1,245.75 155.72 311.44 311.44 311.44 155.71
MADERA TORNILLO p2 43 7,696.81 4.97 38,253.18 9,563.29 9,563.29 9,563.29 9,563.31
ESTACAS DE MADERA DE LA ZONA L=30CM und 43 8,400.00 1.00 8,400.00 700.00 1,400.00 1,400.00 1,400.00 1,400.00 1,400.00 700.00
TRIPLAY 4' x 8' x 18 mm pln 45 449.18 91.53 41,113.06 6,852.18 13,704.35 13,704.35 6,852.18
TRIPLAY DE 4'x8'x 4 mm pln 42 210.00 25.90 5,439.00 906.50 1,813.00 1,813.00 906.50
ROLLO DE 50 M DE MALLA PROTECTORA NARANJA und 37 16.00 50.00 800.00 200.00 100.00 200.00 200.00 100.00
ROLLO DE 200 M DE CINTA DE BALIZAMIENTO ROJA und 37 16.00 50.00 800.00 200.00 100.00 200.00 200.00 100.00
POSTE DE SEÑALIZACIÓN DE MADERA Y CONCRETO und 62 100.00 20.00 2,000.00 500.00 250.00 500.00 500.00 250.00
PANEL GENÉRICO INDICATIVO DE PROTECCIONES OBLIGATORIAS DE DIMENSIONES 1.50 X 1.00 M und 30 5.00 150.00 750.00 187.50 93.75 187.50 187.50 93.75
SEÑAL DE PROHIBIDO EL PASO DE 30 X 20 CM und 30 10.00 40.00 400.00 100.00 50.00 100.00 100.00 50.00
SEÑAL DE PELIGRO DE 30 X 20 CM und 30 10.00 40.00 400.00 100.00 50.00 100.00 100.00 50.00
POSTES KILOMETRICOS und 62 21.00 170.00 3,570.00 1,190.00 1,190.00 1,190.00
CASCOS CON CINTAS REFLECTIVAS und 37 15.00 10.00 150.00 37.50 50.00 50.00 12.50
GAFAS DE SEGURIDAD CONTRA EL POLVO E IMPACTOS EN LOS OJOS CON CERTIFICACIÓN ANZI Z8.1 und 37 100.00 10.00 1,000.00 250.00 333.33 333.33 83.34
PAR DE GUANTES DE CUERO PARA MANIPULACIÓN DE TODO TIPO DE OBJETOS Y HERRAMIENTAS par 37 101.00 10.00 1,010.00 252.50 336.67 336.67 84.16
OVEROL DRILL NARANJA O AZUL C/ REFLECTOR und 37 100.00 24.00 2,400.00 600.00 800.00 800.00 200.00
POLO AZUL CON LOGOTIPO DE LA EMPRESA und 37 120.00 20.00 2,400.00 600.00 800.00 800.00 200.00
CHALECO NARANJA C/ CINTA REFLECTIVA COLOR PLATA 1" 1/2 und 37 100.00 10.00 1,000.00 250.00 333.33 333.33 83.34
TAPONES REUTILIZABLES CON CORDÓN 3M und 37 100.00 20.90 2,090.00 522.50 696.67 696.67 174.16
ZAPATOS DE SEGURIDAD PUNTA DE ACERO Y SUELA DE GOMA ANTIDESLIZANTE par 37 100.00 45.00 4,500.00 1,125.00 1,500.00 1,500.00 375.00
CASCO DE SEGURIDAD CONTRA GOLPES EN LA CABEZA CON ARNÉS DE ADAPTACIÓN Y BARBIQUEJO und 37 100.00 15.00 1,500.00 375.00 500.00 500.00 125.00
MASCARILLA ANTI POLVO DESECHABLE X 50 UND und 37 300.00 6.00 1,800.00 450.00 600.00 600.00 150.00
ARNÉS DE SEGURIDAD CUERPO COMPLETO CON CORREAS AJUSTABLES Y 3 ANILLOS DE ACERO und 30 20.00 150.00 3,000.00 750.00 1,000.00 1,000.00 250.00
LÍNEA DE VIDA DOBLE 1 PUNTO C/ AMORTIGUADOR und 30 20.00 170.00 3,400.00 850.00 1,133.33 1,133.33 283.34
CINTURÓN ANTI VIBRATORIO O FAJA LUMBAR C/SUSPENSIÓN und 30 30.00 30.00 900.00 225.00 300.00 300.00 75.00
CHALECO REFLECTIVO und 30 10.00 10.00 100.00 25.00 33.33 33.33 8.34
BOTIQUIN, INCLUYE MEDICINA und 30 2.00 400.00 800.00 150.00 200.00 200.00 200.00 50.00
CALENDARIO DE ADQUISICION DE MATERIALES E INSUMOS
OBRA : "REHABILITACIÓN Y MEJORAMIENTO DE CAMINO VECINAL - 20.40 KM EN TROCHA CARROZABLE TRAMO CRUZ CHIQUITA - NUEVO SAN MARTIN"
LUGAR : DISTRITO DE HUARMACA - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE PIURA
ENTIDAD : MUNICIPALIDAD DISTRITAL DE HUARMACA

JUN. 21 JUL. 21 AGOS. 21 SEP. 21 OCT. 21 NOV. 21 DIC. 21


Recursos Und. IU Cantidad Precio (S/.) Parcial (S/.)
01 AL 30 01 AL 31 01 AL 31 01 AL 30 01 AL 31 01 AL 30 01 AL 27
SIMULACROS, INCLUYE LOGISTICA mes 39 8.00 500.00 4,000.00 333.33 666.67 666.67 666.67 666.67 666.67 333.32
EXTINTOR MANUAL DE POLVO QUIMICO SECO DE 12 KG und 30 1.00 200.00 200.00 50.00 50.00 50.00 50.00
CONO DE SEÑALIZACION NARANJA DE 28" DE ALTURA und 30 17.00 50.00 850.00 121.43 242.86 242.86 242.85
SEÑAL INFORMATIVA und 30 3.00 1,200.00 3,600.00 514.29 1,028.57 1,028.57 1,028.57
SEÑAL PREVENTIVA 0.60 X 0.60 M und 30 35.00 750.00 26,250.00 3,750.00 7,500.00 7,500.00 7,500.00
CONOS DE SEGURIDAD und 30 25.00 50.00 1,250.00 312.50 312.50 312.50 312.50
TRANQUERA DE MADERA DE 2.40 X 1.20 m und 30 12.00 100.00 1,200.00 57.14 114.29 228.57 228.57 228.57 228.57 114.29
SEÑALIZACION PREVENTIVAS und 30 20.00 40.00 800.00 66.67 133.33 133.33 133.33 133.33 133.33 66.68
CAPACITACIÓN A LAS CUADRILLAS DE PRIMEROS AUXILIOS Y EMERGENCIAS mes 39 1.00 8,500.00 8,500.00 2,125.00 2,125.00 2,125.00 2,125.00
LOGISTICA mes 39 1.00 9,000.00 9,000.00 1,285.71 1,285.71 1,285.71 1,285.71 1,285.71 1,285.71 1,285.74
CAPACITACIONES DE RIESGOS LABORALES und 39 1.00 500.00 500.00 71.43 71.43 71.43 71.43 71.43 71.43 71.42
CAPACITACION DE FORMACION DE GRUPOS und 39 2.00 3,750.00 7,500.00 1,071.43 1,071.43 1,071.43 1,071.43 1,071.43 1,071.43 1,071.42
CARTEL DE OBRA, INCLUYE PARANTES E INSTALACION 2.40 X 3.60 und 39 1.00 1,480.00 1,480.00 1,480.00
ACCESORIOS Y PEGAMENTO %mt 37 1.00 1,180.22 1,180.22 168.60 168.60 168.60 168.60 168.60 168.60 168.62
ESTACION TOTAL CON ACCESORIOS he 49 28.00 12.00 336.00 48.00 48.00 48.00 48.00 48.00 48.00 48.00
NIVEL TOPOGRAFICO he 49 56.00 5.00 280.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00
HERRAMIENTAS MANUALES %mo 37 15,923.65 2,839.14 2,839.14 2,839.14 2,839.14 2,839.14 1,727.95
MOTOBOMBA 7-10 HP 3-4" hm 48 3,955.49 25.00 98,887.24 14,126.75 14,126.75 14,126.75 14,126.75 14,126.75 14,126.75 14,126.74
COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP hm 49 598.55 12.00 7,182.56 2,394.19 2,394.19 2,394.18
RODILLO LISO VIBRATORIO AUTOPROP. 101-135 HP 10-12 Ton. hm 49 1,007.57 160.00 161,210.94 26,868.49 26,868.49 26,868.49 53,736.98 26,868.49
RADIO TRANSMISOR día 49 12.00 5.00 60.00 10.00 10.00 10.00 10.00 10.00 10.00
CARGADOR SOBRE LLANTAS DE 180-240 HP hm 49 2,110.71 200.00 422,141.62 32,472.43 64,944.86 64,944.86 64,944.86 129,889.73 64,944.88
EXCAVADORA SOBRE ORUGAS 170-250 HP hm 49 2,464.17 350.00 862,460.59 123,208.66 123,208.66 123,208.66 123,208.66 246,471.31 123,154.64
RETROEXCAVADORA S/LLANTA 80-95 HP 0.5-1.3Y hm 49 67.64 120.00 8,117.16 624.40 1,248.79 1,248.79 1,248.79 2,497.59 1,248.80
TRACTOR DE ORUGAS DE 190-240 HP hm 49 394.27 350.00 137,993.49 22,998.91 22,998.91 22,998.91 22,998.91 45,997.85
MOTONIVELADORA 135 - 185 HP hm 49 1,342.13 220.00 295,268.24 53,685.13 53,685.13 53,685.13 53,685.13 53,685.13 26,842.59
CAMION VOLQUETE DE 15 m3 hm 49 9,162.90 130.00 1,191,176.57 210,774.01 250,774.01 290,774.01 250,774.02 125,387.01 62,693.51
CAMION CISTERNA 5000 GALONES (AGUA) hm 49 3,577.49 150.00 536,623.44 51,106.99 102,213.99 102,213.99 102,213.99 102,213.99 51,106.99 25,553.50
VIBRADOR DE CONCRETO 4 HP 2.40" hm 49 384.39 7.00 2,690.71 768.78 768.78 768.78 384.37
MEZCLADORA DE CONCRETO 18HP 11-12 P3 hm 48 706.35 10.20 7,204.82 2,058.52 2,058.52 2,058.52 1,029.26
MOTOSIERRA GASOLINERA DE 225 A hm 48 489.60 10.00 4,896.00 1,958.40 1,958.40 979.20
MOVILIZACION Y DESMOVILIZACION Glb 32 1.00 192,360.00 192,360.00 27,480.00 27,480.00 27,480.00 27,480.00 27,480.00 27,480.00 27,480.00
ZARANDA C/MALLA (TMAX 2 1/2") hm 48 471.90 5.90 2,784.21 278.42 556.84 556.84 556.84 556.84 278.43
COSTO DIRECTO = 5,745,805.78 466,672.20 922,529.41 975,053.83 1,025,774.52 1,216,494.83 764,657.51 374,623.48
GASTOS GENERALES 10.00% 574,580.58 46,667.22 92,252.94 97,505.38 102,577.45 121,649.48 76,465.75 37,462.36
UTILIDAD 4.998% 287,175.37 23,324.28 46,108.02 48,733.19 51,268.21 60,800.41 38,217.58 18,723.68
SUB TOTAL = 6,607,561.73 536,663.70 1,060,890.37 1,121,292.40 1,179,620.18 1,398,944.72 879,340.84 430,809.52
IGV 18%= 1,189,361.11 96,599.47 190,960.27 201,832.63 212,331.63 251,810.05 158,281.35 77,545.71

PRESUPUESTO OBRA = 7,796,922.84 633,263.17 1,251,850.64 1,323,125.03 1,391,951.81 1,650,754.77 1,037,622.19 508,355.23
CALCULO DEL MONTO MAXIMO DE ADELANTO PARA MATERIALES

OBRA: “REHABILITACIÓN Y MEJORAMIENTO DE CAMINO VECINAL – 20.40 KM EN TROCHA CARROZABLE TRAMO CRUZ CHIQUITA -NUEVO SAN MARTIN”

Monto Maximo = CI X % Incidencia x Saldo Bruto por Valorizar x Ima / Imo


Donde:
CI : Coeficiente de Incidencia de elemento representativo
% Incidencia Porcentaje de incidencia
Ima : Indice del elemento representativo a la fecha del adelanto Jun-21
Imo : Indice del elemento representativo a la fecha base May-20

MONTO CONTRATADO 7,796,922.84 CON IGV


ADELANTO DE MATERIALES 1,559,384.56 1,321,512.34
Con IGV Sin IGV

K= 0.025*(HIAr / HIAo) + 0.031*(MFr / MFo) + 0.107*(DCr / DCo) + 0.155*(Mr / Mo) + 0.682*(Mr / Mo)

COEFICIENTE DE % DE SALDO POR Imo Ima


IU DESCRIPCION MONTO MAXIMO MONTO SOLICITADO
INCIDENCIA INCIDENCIA VALORIZAR May-2020 May-2021
37 HERRAMIENTA MANUAL 0.025 72.000% 6,607,561.73 310.37 353.54 135,479.18 -
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.025 20.000% 6,607,561.73 465.91 477.31 33,846.19 -
03 ACERO DE CONSTRUCCION CORRUGADO 0.025 8.000% 6,607,561.73 546.55 760.27 18,382.69 -
32 FLETE TERRESTRE 0.031 45.161% 6,607,561.73 497.49 495.98 92,224.49 -
43 MADERA NACIONAL PARA ENCOF. Y CARPINT. 0.031 54.839% 6,607,561.73 744.04 840.21 126,848.11 -
21 CEMENTO PORTLAND TIPO I 0.107 42.056% 6,607,561.73 471.42 471.50 297,390.21 250,908.64
30 DÓLAR (GENERAL PONDERADO) 0.107 57.944% 6,607,561.73 511.43 587.46 470,571.46 325,102.95
47 MANO DE OBRA INC. LEYES SOCIALES 0.155 100.000% 6,607,561.73 619.99 633.53 1,046,539.03 -
49 MAQUINARIA Y EQUIPO IMPORTADO 0.682 100.000% 6,607,561.73 324.14 363.39 5,052,030.32 745,500.75
SUBTOTAL 7,273,311.68 1,321,512.34
IGV 237,872.22
TOTAL 1,559,384.56
INCIDENCIA DE ADELANTO PARA MATERIALES 20.00%

MONTO SOLICITADO

CEMENTO PORTLAND TIPO I Und. IU Cantidad Precio (S/.) Parcial (S/.)

CEMENTO PORTLAND TIPO I (42.5 kg) bol 21 11,389.41 22.03 250,908.64


250,908.64

DÓLAR (GENERAL PONDERADO) Und. IU Cantidad Precio (S/.) Parcial (S/.)

DERECHO DE CANTERA m3 39 32,510.29 10.00 325,102.95


325,102.95

MAQUINARIA Y EQUIPO IMPORTADO Und. IU Cantidad Precio (S/.) Parcial (S/.)

EXCAVADORA SOBRE ORUGAS 170-250 HP hm 49 1,130.00 350.00 395,500.75


MOTONIVELADORA 135 - 185 HP hm 49 1,000.00 220.00 220,000.00
CAMION VOLQUETE DE 15 m3 hm 49 1,000.00 130.00 130,000.00
745,500.75
ADELANTO DE MATERIALES - CALENDARIO DE ADQUISICIÓN DE MATERIALES E INSUMOS
OBRA : "REHABILITACIÓN Y MEJORAMIENTO DE CAMINO VECINAL - 20.40 KM EN TROCHA CARROZABLE TRAMO CRUZ CHIQUITA - NUEVO SAN MARTIN"
LUGAR : DISTRITO DE HUARMACA - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE PIURA
ENTIDAD : MUNICIPALIDAD DISTRITAL DE HUARMACA

JUL. 21 AGOS. 21 SEP. 21 OCT. 21 NOV. 21 DIC. 21


IU Recursos Und. Cantidad Precio (S/.) Parcial (S/.) TOTAL
01 AL 31 01 AL 31 01 AL 30 01 AL 31 01 AL 30 01 AL 27

39 DERECHO DE CANTERA m3 32,510.29 10.00 325,102.95 43,347.06 43,347.06 65,020.59 65,020.59 65,020.59 43,347.06 325,102.95

21 CEMENTO PORTLAND TIPO I (42.5 kg) bol 11,389.41 22.03 250,908.64 55,757.48 55,757.48 55,757.48 55,757.48 27,878.72 250,908.64

49 EXCAVADORA SOBRE ORUGAS 170-250 HP hm 1,130.00 350.00 395,500.75 79,100.15 79,100.15 79,100.15 79,100.15 79,100.15 395,500.75

49 MOTONIVELADORA 135 - 185 HP hm 1,000.00 220.00 220,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 220,000.00

49 CAMION VOLQUETE DE 15 m3 hm 1,000.00 130.00 130,000.00 21,666.67 21,666.67 21,666.67 21,666.67 21,666.67 21,666.67 130,000.00

COSTO DIRECTO = 1,321,512.34 144,113.88 243,871.36 265,544.89 265,544.89 265,544.89 136,892.45 1,321,512.34

IGV 18%= 237,872.22 25,940.50 43,896.84 47,798.08 47,798.08 47,798.08 24,640.64 237,872.22

TOTAL = 1,559,384.56 170,054.38 287,768.20 313,342.97 313,342.97 313,342.97 161,533.09 1,559,384.56


CALENDARIO DE UTILIZACION DE EQUIPOS
OBRA : "REHABILITACIÓN Y MEJORAMIENTO DE CAMINO VECINAL - 20.40 KM EN TROCHA CARROZABLE TRAMO CRUZ CHIQUITA - NUEVO SAN MARTIN"
LUGAR : DISTRITO DE HUARMACA - PROVINCIA DE HUANCABAMBA - DEPARTAMENTO DE PIURA
ENTIDAD : MUNICIPALIDAD DISTRITAL DE HUARMACA

JUN. 21 JUL. 21 AGOS. 21 9.00 OCT. 21 NOV. 21 DIC. 21


Recursos Und. IU Cantidad Precio (S/.) Parcial (S/.)
01 AL 30 01 AL 31 01 AL 31 01 AL 30 01 AL 31 01 AL 30 01 AL 27
ESTACION TOTAL CON ACCESORIOS he 49 28.00 12.00 336.00 48.00 48.00 48.00 48.00 48.00 48.00 48.00
NIVEL TOPOGRAFICO he 49 56.00 5.00 280.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00
HERRAMIENTAS MANUALES %mo 19,887.24 2,839.14 2,839.14 2,839.14 2,839.14 2,839.14 2,839.14 2,839.14
MOTOBOMBA 7-10 HP 3-4" hm 48 3,955.49 25.00 98,887.24 14,126.75 14,126.75 14,126.75 14,126.75 14,126.75 14,126.75 14,126.75
COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP hm 49 598.55 12.00 7,182.56 2,394.19 2,394.19 2,394.19
RODILLO LISO VIBRATORIO AUTOPROP. 101-135 HP 10-12 Ton. hm 49 1,007.57 160.00 161,210.93 26,868.49 26,868.49 26,868.49 53,736.98 26,868.49
RADIO TRANSMISOR día 49 12.00 5.00 60.00 10.00 10.00 10.00 10.00 10.00 10.00
CARGADOR SOBRE LLANTAS DE 180-240 HP hm 49 2,110.71 200.00 422,141.62 32,472.43 64,944.86 64,944.86 64,944.86 129,889.73 64,944.86
EXCAVADORA SOBRE ORUGAS 170-250 HP hm 49 2,464.17 350.00 862,460.59 123,208.66 123,208.66 123,208.66 123,208.66 246,471.31 123,208.66
RETROEXCAVADORA S/LLANTA 80-95 HP 0.5-1.3Y hm 49 67.64 120.00 8,117.16 624.40 1,248.79 1,248.79 1,248.79 2,497.59 1,248.79
TRACTOR DE ORUGAS DE 190-240 HP hm 49 394.27 350.00 137,993.49 22,998.91 22,998.91 22,998.91 22,998.91 45,997.83
MOTONIVELADORA 135 - 185 HP hm 49 1,342.13 220.00 295,268.23 53,685.13 53,685.13 53,685.13 53,685.13 53,685.13 26,842.57
CAMION VOLQUETE DE 15 m3 hm 49 9,162.90 130.00 1,191,176.57 210,774.01 250,774.01 290,774.01 250,774.02 125,387.01 62,693.50
CAMION CISTERNA 5000 GALONES (AGUA) hm 49 3,577.49 150.00 536,623.44 51,106.99 102,213.99 102,213.99 102,213.99 102,213.99 51,106.99 25,553.50
VIBRADOR DE CONCRETO 4 HP 2.40" hm 49 384.39 7.00 2,690.71 768.78 768.78 768.78 384.39
MEZCLADORA DE CONCRETO 18HP 11-12 P3 hm 48 706.35 10.20 7,204.82 2,058.52 2,058.52 2,058.52 1,029.26
MOTOSIERRA GASOLINERA DE 225 A hm 48 489.60 10.00 4,896.00 1,958.40 1,958.40 979.20
MOVILIZACION Y DESMOVILIZACION Glb 32 1.00 192,360.00 192,360.00 27,480.00 27,480.00 27,480.00 27,480.00 27,480.00 27,480.00 27,480.00
ZARANDA C/MALLA (TMAX 2 1/2") hm 48 471.90 5.90 2,784.21 278.42 556.84 556.84 556.84 556.84 278.42