Documentos de Académico
Documentos de Profesional
Documentos de Cultura
CalculodeEstructurasall
CalculodeEstructurasall
4.31
A
1 2.94
2 0.00
3
Determinación del peralte
# 3 @ 30 cm.
9 cm.
11
MEMORIA DE CALCULO
11
2 cm.
4.31
A
1 2.94
2 0.00
3
f'c = 200 kg/cm²
fy = 4200 kg/cm²
b= 20.00 cm
h= 28.73 cm = 30.00 cm
r= 2.00 cm
d= 26.00 cm
Para A₁ :
(B + b) x h 9.50
= = = 4.751775
2 2.00
Para A₂ :
(B + b) x h 0.00
= = = 0
2 2.00
P= 522.70 kg
= 0.52 ton
Peso de la losa
P 0.52
WL = = = 0.12 ton/m²
L 4.31
MEMORIA DE CALCULO
0.26
WT = = 0.06 ton/m Peso de la trabe
4.31
CW = WL + W T = 0.18 ton
P= Cv x A = 807.80 kg
= 0.81 ton
0.81
= = 0.19 ton/m
4.31
W= Cw + Cv = 0.41 ton/m
W= 1.75 ton
4.31
Wl
2
Wl
2
MEMORIA DE CALCULO
Wl²
8
Wl 1.75065735
V= = = 0.88 ton
2 2
Wl² 7.545333179
M= = = 0.94 ton
8 8
Vu = V x Fc = 1.05 ton
Mu = M x Fc = 1.13 ton
Ȼ fy As
q= Ȼ=
F"c bd
Fr = 0.9
MR = Fr b d² F"c q(1-0.5q)
= 2631.01501326009 kg
MEMORIA DE CALCULO
= 2.631 ton
Av = 2 As = 1.42 cm²
FR Av fy d 124051.2
S= = = -8
(Vu - VCR) -1580.621
10
d 26.00
Smax = = = 13 cm
2 2
= 10 cm
4 # 4
E # 3 @ 10
4 # 4
30.00
20.00
MEMORIA DE CALCULO
As = 4 # 3 = 2.84 cm²
= 65.478 ton
Av = 2 As = 1.42 cm²
Wc = 72 kg
= 0.072 ton
MEMORIA DE CALCULO
= 6.5133876 ton
Lado = 0.81 m