CUADRO DE COLUMNAS

(ESC. 1:25)
NIVEL TIPO C - 01 C - 02 C - 03 CL
18Ø5/8"

4Ø5/8"+
6Ø1/2"
4Ø5/8"+

PRIMER Y SEGUNDO NIVEL


6Ø1/2" 4Ø3/8"
Ø 3 8"

.40
.75

.25

.15
Ø 3 8" Ø 1/2 "
Ø 3 8" 2Ø5/8"+ 2Ø5/8"+
DIMENSION
2Ø1/2" 2Ø1/2"
.80 .20

.20
.25 .25 .25

.25
.25 .25

Confinar Ambos Extremos Confinar Ambos Extremos Confinar Ambos Extremos Confinar Ambos Extremos
(Alternar trave) (Alternar trave) (Alternar trave) (Alternar trave)

bxd A = 0.312 m2 A = 0.25m2 A = 0.25m2 0.15m x 0.20m

ACERO 18Ø5/8" 8Ø5/8" + 10Ø1/2" 8Ø5/8" + 10Ø1/2" 4Ø3/8"

2 @ 0.05, 5 @ 0.10, 5 @ 0.15, 2 @ 0.05, 5 @ 0.10, 5 @ 0.15, 2 @ 0.05, 5 @ 0.10, 5 @ 0.15,


ESTRIBOS @ 0.15
Resto @ 0.25 Resto @ 0.25 Resto @ 0.25

CONCRETO f'c = 210 Kg/cm² f'c = 210 Kg/cm² f'c = 210 Kg/cm² f'c = 175 Kg/cm²

CANTIDAD 04 Und. 06 Und. 06 Und. 36 Und.