CONCENTRADO DE AVANCE OBRA 1856, INSTITUTO TEPEYAC
DESCRICION
MARCA PLANO PIEZAS PESO UNITARIO PESO TOTAL AREA UNT AREA TOTAL EMBARQUE 1 EMBARQUE 2
PIEZAS PESOS PIEZAS PESOS
COLUMNA CM3-3 1856-PRE-3 1 382.47 382.47 8.08 8.08 1 382.47 0.00
COLUMNA CM3-4 1856-PRE-4 2 387.55 775.10 8.11 16.22 2 775.10 0.00
COLUMNA CM3-5 1856-PRE-5 1 382.47 382.47 8.08 8.08 1 382.47 0.00
COLUMNA CM3-6 1856-PRE-6 1 389.38 389.38 8.14 8.14 1 389.38 0.00
COLUMNA CM3-7 1856-PRE-7 2 399.82 799.64 8.19 16.38 2 799.64 0.00
COLUMNA CM3-8 1856-PRE-8 1 389.38 389.38 8.14 8.14 1 389.38 0.00
COLUMNA CM3-9 1856-PRE-9 1 374.55 374.55 8.06 8.06 1 374.55 0.00
COLUMNA CM3-10 1856-PRE-10 2 376.10 752.20 8.09 16.18 2 752.20 0.00
COLUMNA CM3-11 1856-PRE-11 1 374.55 374.55 8.06 8.06 1 374.55 0.00
COLUMNA CM3-12 1856-PRE-12 1 619.02 619.02 14.60 14.60 1 619.02 0.00
COLUMNA CM3-13 1856-PRE-13 2 584.29 1,168.58 15.96 31.92 2 1,168.58 0.00
COLUMNA CM3-14 1856-PRE-14 1 615.45 615.45 14.50 14.50 1 615.45 0.00
COLUMNA CM3-15 1856-PRE-15 2 640.56 1,281.12 14.68 29.36 1 640.56 1 640.56
COLUMNA CM3-16 1856-PRE-16 2 600.47 1,200.94 16.01 32.02 1 600.47 1 600.47
COLUMNA CM3-17 1856-PRE-17 2 600.47 1,200.94 16.01 32.02 1 600.47 1 600.47
COLUMNA CM3-18 1856-PRE-18 2 636.99 1,273.98 14.57 29.14 1 636.99 1 636.99
COLUMNA CM3-19 1856-PRE-19 1 619.02 619.02 14.57 14.57 0.00 1 619.02
COLUMNA CM3-20 1856-PRE-20 2 591.20 1,182.40 16.02 32.04 0.00 2 1,182.40
COLUMNA CM3-21 1856-PRE-21 1 615.45 615.45 14.50 14.50 0.00 1 615.45
TRABE V3-22 1856-PRE-22 1 454.96 454.96 16.52 16.52 1 454.96 0.00
TRABE V4-23 1856-PRE-23 2 715.19 1,430.38 16.65 33.30 2 1,430.38 0.00
TRABE V3-24 1856-PRE-24 1 454.96 454.96 16.52 16.52 1 454.96 0.00
TRABE V2-25A 1856-PRE-25 3 260.84 782.52 14.28 42.83 3 782.52 0.00
TRABE V2-25B 1856-PRE-25 8 269.78 2,158.24 14.77 118.12 8 2,158.24 0.00
TRABE V2-25C 1856-PRE-25 4 269.74 1,078.96 14.76 59.05 4 1,078.96 0.00
TRABE V3-26 1856-PRE-26 3 385.70 1,157.10 14.31 42.93 3 1,157.10 0.00
TRABE V1-27 1856-PRE-27 1 96.91 96.91 5.87 5.87 1 96.91 0.00
TRABE V1-28 1856-PRE-28 2 96.07 192.14 5.93 11.86 2 192.14 0.00
TRABE V1-29 1856-PRE-29 1 96.91 96.91 5.87 5.87 1 96.91 0.00
TRABE V1-30 1856-PRE-30 2 224.59 449.18 14.31 28.62 2 449.18 0.00
TRABE V1-31 1856-PRE-31 1 230.79 230.79 14.44 14.44 1 230.79 0.00
TRABE V1-32 1856-PRE-32 4 231.85 927.40 14.84 59.36 4 927.40 0.00
TRABE V1-33 1856-PRE-33 1 235.37 235.37 14.87 14.87 1 235.37 0.00
TRABE V1-34 1856-PRE-34 1 238.47 238.47 14.87 14.87 1 238.47 0.00
TRABE V1-35A 1856-PRE-35 3 33.88 101.64 2.19 6.56 3 101.64 0.00
TRABE V1-35B 1856-PRE-35 9 30.96 278.64 2.00 17.99 9 278.64 0.00
TRABE V1-35C 1856-PRE-35 2 26.41 52.82 2.35 4.70 2 52.82 0.00
TRABE V3-36 1856-PRE-36 1 422.14 422.14 15.30 15.30 1 422.14 0.00
TRABE V3-37 1856-PRE-37 1 145.15 145.15 5.31 5.31 1 145.15 0.00
TRABE V3-38 1856-PRE-38 1 454.96 454.96 16.52 16.52 1 454.96 0.00
TRABE V4-39 1856-PRE-39 2 662.53 1,325.06 15.43 30.86 1 662.53 1 662.53
TRABE V3-40 1856-PRE-40 3 144.03 432.09 5.34 16.02 1 144.03 2 288.06
TRABE V4-41 1856-PRE-41 2 715.19 1,430.38 16.64 33.28 1 715.19 1 715.19
TRABE V3-42 1856-PRE-42 1 442.14 442.14 15.30 15.30 0.00 1 442.14
TRABE V3-43 1856-PRE-43 1 454.96 454.96 16.52 16.52 0.00 1 454.96
TRABE V3-44 1856-PRE-44 6 381.48 2,288.88 14.28 85.68 2 762.96 4 1,525.92
TRABE V2-45 1856-PRE-45 4 263.94 1,055.76 14.34 57.36 2 527.88 2 527.88
TRABE V2-46 1856-PRE-46 1 273.31 273.31 14.80 14.80 1 273.31 0.00
TRABE V2-47 1856-PRE-47 1 273.31 273.31 14.80 14.80 1 273.31 0.00
TRABE V2-48 1856-PRE-48 1 273.27 273.27 14.80 14.80 0.00 1 273.27
TRABE V2-49 1856-PRE-49 1 273.27 273.27 14.80 14.80 0.00 1 273.27
TRABE V2-50 1856-PRE-50 2 263.94 527.88 14.34 28.68 0.00 2 527.88
TRABE V2-51A 1856-PRE-51 12 269.78 3,237.36 14.77 177.18 6 1,618.68 6 1,618.68
TRABE V2-51B 1856-PRE-51 6 269.74 1,618.44 14.76 88.58 0.00 6 1,618.44
TRABE V2-52 1856-PRE-52 1 273.31 273.31 14.80 14.80 0.00 1 273.31
TRABE V2-53 1856-PRE-53 1 273.31 273.31 14.80 14.80 0.00 1 273.31
TRABE V1-54 1856-PRE-54 3 92.41 277.23 5.83 17.49 1 92.41 2 184.82
TRABE V1-55A 1856-PRE-55 3 163.11 489.33 10.53 31.60 1 163.11 2 326.22
TRABE V1-55B 1856-PRE-55 3 64.71 194.13 4.18 12.54 1 64.71 2 129.42
TRABE V1-55C 1856-PRE-55 3 33.88 101.64 2.19 6.56 1 33.88 2 67.76
TRABE V1-55D 1856-PRE-55 3 47.99 143.97 3.10 9.30 1 47.99 2 95.98
TRABE V1-55E 1856-PRE-55 1 52.45 52.45 3.39 3.39 0.00 1 52.45
TRABE V3-56 1856-PRE-56 2 89.60 179.20 3.35 6.70 0.00 2 179.20
TRABE V3-57 1856-PRE-57 1 169.61 169.61 6.22 6.22 0.00 1 169.61
TRABE V1-58 1856-PRE-58 1 245.42 245.42 15.41 15.41 0.00 1 245.42
TRABE V1-59 1856-PRE-59 1 85.19 85.19 5.31 5.31 0.00 1 85.19
TRABE V1-60 1856-PRE-60 1 264.51 264.51 16.64 16.64 0.00 1 264.51
TRABE V1-61 1856-PRE-61 2 244.37 488.74 15.54 31.08 0.00 2 488.74
TRABE V1-62 1856-PRE-62 2 84.77 169.54 5.34 10.68 0.00 2 169.54
TRABE V1-63 1856-PRE-63 2 263.46 526.92 16.77 33.54 0.00 2 526.92
TRABE V1-64 1856-PRE-64 1 245.42 245.42 15.41 15.41 0.00 1 245.42
TRABE V1-65 1856-PRE-65 1 85.19 85.19 5.31 5.31 0.00 1 85.19
TRABE V1-66 1856-PRE-66 1 264.51 264.51 16.64 16.64 0.00 1 264.51
TRABE V1-67 1856-PRE-67 6 222.63 1,335.78 14.34 86.04 0.00 6 1,335.78
TRABE V1-68 1856-PRE-68 4 224.17 896.68 14.34 57.36 0.00 4 896.68
TRABE V1-69 1856-PRE-69 2 224.17 448.34 14.34 28.68 0.00 2 448.34
TRABE V1-69A 1856-PRE-69A 2 233.83 467.66 14.87 29.74 0.00 2 467.66
TRABE V1-70 1856-PRE-70 2 233.83 467.66 14.87 29.74 0.00 2 467.66
TRABE V1-71 1856-PRE-71 1 233.83 233.83 14.87 14.87 0.00 1 233.83
TRABE V1-72 1856-PRE-72 1 233.83 233.83 14.87 14.87 0.00 1 233.83
TRABE V1-73 1856-PRE-73 3 92.45 277.35 5.83 17.49 0.00 3 277.35
TRABE V1-74A 1856-PRE-74 3 163.15 489.45 10.54 31.61 0.00 3 489.45
TRABE V1-74B 1856-PRE-74 3 64.75 194.25 4.18 12.54 0.00 3 194.25
TRABE V1-74C 1856-PRE-74 3 33.92 101.76 2.19 6.57 0.00 3 101.76
TRABE V1-74D 1856-PRE-74 3 48.02 144.06 3.10 9.30 0.00 3 144.06
LARGUEROS L1-75 1856-PRE-75 18 55.87 1,005.66 14.79 266.22 0.00 18 1,005.66
CONTRAFLAMBEOS 1856-PRE-76 72 116.55 116.55 4.69 4.69 0.00 72 116.55
50,684.87
101,369.74 2,385.22 26,320.91 24,363.96
EMBARQUE 1 EMBARQUE 2
GENERADOR
ESTRUCTURA METALICA
O.- 1856 INSTITUTO TEPEYAC, QRO 2.0
44,604.85
89,209.70 1,312.89 35,122.16
ESTIMACION 2
INDUSTRIA METALICA INTEGRADA, S.A. DE C.V. GRUPO CONSTRUCTOR PEASA S.A. DE CV.
Elaboró Revisó APROBO AUTORIZO LIDER DE PROYECTOI
ING. JONATHAN GOMEZ MARTINEZ ARQ. MARIO CONRADO GARCIA ARQ. SALVADOR MARQUEZ ARQ. MARCO AURELIO RODRIGUEZ VARGAS
RESIDENTE DE OBRA SUPERVISION ESTRUCTURA SUPERINTENDENTE LIDER DE PROYECTO.