Fierro de 3/8"@250 mm N
C/sentido Tanque Industrial
Tanque Industrial
25,000 lts.
25,000 lts.

1.28
W E
+3774.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

0.10
S

0.25

C
4

A
---
A

D-01

---

D
3

4
D-01
---

F
D-01
B

---
ESTE PLANO

D-03
2

3
D-01
---

C
D-02

2
E

D-03
---

1
P-003-1

C
0.10 MODULO DE 2 PISOS

1
A
0.41

S
Material compactado

P-002-1
Junta 1

P-001-1
al 95% del PM
MODUL
OS
POR
TAC
AMP

E E

N
P-2 P-2 P-2 P-2 P-2 P-2 P-2 P-2 P-2 P-2 C-2 CORTE 2-2 1:20

P-003-1-2
D-03

P-001-2
+3773.60 +3773.70 +3773.80 +3773.90 +3774.00
D-03 D-03 D-03
D-03

Eje
1 1 1 1 1
1
P-2 P-2 Junta 1 P-2 P-2 P-2 P-2 P-2 P-2 P-2 P-2 0.80
0.40 0.40
E E
P-1 P-1' P-1' P-1 P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1 P-1 P-1' P-1' P-1

0.40
D-01 +3773.60 +3773.70 +3773.80 +3773.90 +3774.00
D-01 D-01

D-05
D-01 D-01

D-05

0.80
Eje

0.40
ESQUEMA DE UBICACIÓN 1:2000
MODULO 10 MODULO 09 MODULO 08 MODULO 07 MODULO 06 Concreto 210 Kg/cm2 0.70
(nota1) 0.35 0.35

0.10
+3774.40
Pasillo

0.35
Junta 1

0.70
0.48
D Junta 1 Junta 1 Junta 1 Junta 1 Eje D
D D 3Ø1/2"

0.35
P-1' P-1 P-1' P-1 4Ø1/2"
P-1 P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1 P-1'
D-04 D-04 Mat. Compactado
al 95% PM

Eje
Concreto 210 Kg/cm2
PEDESTAL P-1' (nota1)

0.10
+3776.40
D-01 DETALLE 01 1:20
C-2 C-2
C-2 C-2 C-2 C-2 C-2 C-2
AS BUILT

0.05
3Ø1/2

0.48
0.25
0.20 4Ø1/2

Mat. Compactado

0.25
0.20

0.15
al 95% PM
Junta 1 Junta 1 Junta 1 Junta 1 Junta 1
0.13 0.13
PEDESTAL P-1
C C

0.05
P-1 P-1' P-1' P-1 P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1 P-1 Tub 4" x 3 mm D-02 DETALLE 02 1:20
P-1' P-1' P-1' P-1'
D-04 D-04 2-Ø5/8"-250-100-C/2-G36
D-04
(nota1) 0.30
+3774.40 Pl de 1/4" 200x200mm

0.30

0.30
0.10
Concreto 210 Kg/cm2

C 0.30 C

0.48
Tub 4" x 3 mm
2-Ø5/8"-250-100-C/2-G36
2Ø1/2
Pl de 1/4" 200x200mm

2 3Ø1/4

0.10
Concreto 210 Kg/cm2

Mat. Compactado
Junta 1 Junta 1 Junta 1 Junta 1 Junta 1

0.30
al 95% PM

B B PEDESTAL P-2 2Ø1/2

P-1 P-1' P-1' P-1 P-1' P-1' P-1' P-1' P-1' P-1 P-1
P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1' P-1'
D-01 D-03 DETALLE 03 1:15 D-06 DETALLE 06 1:20
D-01 D-01 D-02
D-02
Tecnoport de 3/8" Acero Ø 3/8" @ 0.25 m
+ Sello elástico Ambos sentidos
C-2 C-2

Material compactado al 95% del PM


C-3 C-3
JUNTA TIPO1 EXPANSION

C-3 CORTE 3-3 1:20 VER DETALLE 07

2.25

P-1 P-1' P-1' P-1' P-1 Fierro de 3/8"@250 mm


B B
C/sentido
A A

0.10
Junta 1 P-1' P-1 P-2 Junta 1 P-1' P-1' Junta 1 P-1' P-1' Junta 1 P-1' P-1' Junta 1 P-1' P-1

0.25
P-2 P-2 P-1' P-2 P-1' P-2 P-2 P-1' P-1' P-2 P-2 P-1' P-2 P-2

0.10
D-03 +3773.60 D-03 +3773.70 D-03 +3773.80 +3773.90 D-03 +3774.00
D-03
Material compactado al 95% del PM D-05 DETALLE 05 1:50

P-2 P-2 P-2 P-2 P-2 P-2 P-2 P-2 P-2


P-2 D-07 DETALLE 07 1:20

D-06
D-06
D-06

0.100 0.200 0.100


0.100 0.250 0.100 NOTAS:
1 LA MODIFICACIÓN DE LOS PEDESTALES P-1 A P-1'

0.100
0.125
SE REALIZÓ SEGÚN EL INSTRUCTIVO DE CAMPO N° 09.
D-05

D-05
2 EL VACIADO DE LOS PEDESTALES P-1, P-1' Y P-2 SE

0.150
0.400
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

0.150
REALIZÓ DE MANERA MONOLÍTICA SEGÚN EL

0.100
INSTRUCTIVO DE CAMPO N° 09.
3. LA CONSTRUCCIÓN DE LAS LOSAS DE APOYO DE

0.100
ESCALERAS METÁLICAS SE REALIZÓ DE ACUERDO AL
DETALLE 05 SEGÚN LA INDICACIÓN DEL RFI N° 09.
1 CIMENTACIONES MODULOS PORTACAMP PABELLON 2 1:75
D-07 DETALLE 07 1:10

A A
DIBUJADO: CLIENTE: ESCALA:
REVISADO:
CÍA. MINERA COIMOLACHE S.A. FORMATO:

DISEÑADO:
PROYECTO: A1
VERIFICADO: DESARROLLO DE LA INGENIERIA DE DETALLES DEL TODAS LAS DIMENSIONES EN METROS (m)
CIA MINERA COIMOLACHE S.A. CAMPAMENTO CIENEGA
APROBADO:
REV. A
U.P. TANTAHUATAY CIMENTACIONES
N° 0

TÍTULO: PLANO N°:


PROYECCIÓN:
CIMENTACION MODULOS PORTACAMP PABELLON 2 J&R-12010009300-P-02-02-ASB_0
DATUM:
PLANO N° REFERENCIA DE PLANOS REV. POR FECHA DESCRIPCIÓN REVISADO APROBADO REV. POR FECHA DESCRIPCIÓN REVISADO APROBADO
FUENTE: