ESTATUS AL 11.03.

2022
PROYECTO : ESTATUS DE CIMENTACION EN HANGAR FECHA:
UBICACIÓN: CONDORCOCHA - JUNIN

EJE H1
Ítem Descripción de la Actividad Und EJE 1Ha EJE 2Ha EJE 3Ha EJE 4Ha EJE 5Ha/6Ha EJE 7Ha EJE 8Ha EJE 9Ha EJE 10Ha EJE 11Ha EJE 12Ha EJE 13Ha

Ítem ESTATUS 1.00 30-Dec 30-Dec


1 EXCAVACION m3 X X X X X X X X
2 SUBZAPATA kg X X X X X X
3 ZAPATA m2 X X X
4 PEDESTALES m3

EJE H2
Ítem Descripción de la Actividad Und EJE 1Hb EJE 2Hb EJE 3Hb EJE 4Hb EJE 5Ha/6Ha EJE 7Hb EJE 8Hb EJE 9Hb EJE 10Hb EJE 11Hb EJE 12Hb EJE 13Hb

Ítem ESTATUS
1 EXCAVACION m3 X X X X X X X X X
2 SUBZAPATA kg X X X X
3 ZAPATA m2 X X X
4 PEDESTALES m3

FALSA ZAPATA VACIADAS


VOLUMEN DE CONCRETO VACIADO ZAPATA: 30 M3
ESTATUS AL 11.03.2022
PROYECTO : ESTATUS DE CIMENTACION EN HANGAR FECHA:
UBICACIÓN: CONDORCOCHA - JUNIN

EJE H1
Ítem Descripción de la Actividad Und EJE 1Ha EJE 2Ha EJE 3Ha EJE 4Ha EJE 5Ha/6Ha EJE 7Ha EJE 8Ha EJE 9Ha EJE 10Ha EJE 11Ha EJE 12Ha EJE 13Ha

Ítem ESTATUS 1.00 30-Dec 30-Dec


1 EXCAVACION m3 X X X X X X X X
2 SUBZAPATA kg X X X X X X
3 ZAPATA m2 X X X X X
4 PEDESTALES m3

EJE H2
Ítem Descripción de la Actividad Und EJE 1Hb EJE 2Hb EJE 3Hb EJE 4Hb EJE 5Ha/6Ha EJE 7Hb EJE 8Hb EJE 9Hb EJE 10Hb EJE 11Hb EJE 12Hb EJE 13Hb

Ítem ESTATUS
1 EXCAVACION m3 X X X X X X X X X
2 SUBZAPATA kg X X X X
3 ZAPATA m2 X X X
4 PEDESTALES m3

ZAPATAS VACIADAS
VOLUMEN DE CONCRETO VACIADO EN ZAPATA: 34 M3
PROYECTO : ESTATUS DE CIMENTACION EN HANGAR FECHA:
UBICACIÓN: CONDORCOCHA - JUNIN

SECTOR N°3
Ítem Descripción de la Actividad Und EJE 1Ha EJE 2Ha EJE 3Ha
METRADO METRADO
Ítem ESTATUS 1.00 30-Dec 30-Dec
1 EXCAVACION m3 X X X
2 SUBZAPATA m3 x x x
3 ZAPATA- ACERO kg
4 ZAPATA - ENCOFRADO m2
5 ZAPATA - CONCRETO m3
6 CALIZ- ACERO kg
7 CALIZ - ENCOFRADO m2
8 CALIZ - CONCRETO m3

SECTOR N°6
Ítem Descripción de la Actividad Und EJE 1Hb EJE 2Hb EJE 3Hb
METRADO METRADO
Ítem ESTATUS
1 EXCAVACION m3 X X X
2 SUBZAPATA m3 X 25 X 29 X
3 ZAPATA- ACERO kg X 509.43 X 509.43 X
4 ZAPATA - ENCOFRADO m2 X X X
5 ZAPATA - CONCRETO m3 X X X
6 CALIZ- ACERO kg X 430.68 X X
7 CALIZ - ENCOFRADO m2
8 CALIZ - CONCRETO m3

INTERFERENCIA
CALIZ
VOLUMEN DE PEDESTAL: 3 M3
ESTATUS AL07/04/2022

N°3 SECTOR N°2


EJE 3Ha EJE 4Ha EJE 5Ha/6Ha EJE 7Ha EJE 8Ha EJE 9Ha
METRADO METRADO METRADO METRADO METRADO

X X X 42.57 X 42.57 X
X X X 19 X 15 X
x X 692.63 X 692.63 X
x X 3.18 X
x X 18 X
X 430.68 X 430.68 X
X
X

N°6 SECTOR N°5


EJE 3Hb EJE 4Hb EJE 5Ha/6Ha EJE 7Hb EJE 8Hb EJE 9Hb
METRADO METRADO METRADO METRADO METRADO

X X X X X
33 X 25 X 35 X 26 X
509.43 X 509.43 X 509.43 X 509.43 X
X 5.64 X 7.62 X x
x X 19 X 17
430.68 X 430.68 X 430.68 X 430.68 X
X X X
X X 3

RESUMEN CONCRETO

ELEMENTO RESISTENCIA f'c TOTAL (m3)


FALSA ZAPATA 100 339
ZAPATA 210 144
CADIZ 210 18

RESUMEN DE ACERO
ELEMENTO TOTAL (kg)
FALSA ZAPATA
ZAPATA 8740.65
CADIZ 5598.84

RESUMEN DE ENCOFRADO
ELEMENTO
FALSA ZAPATA
ZAPATA
CADIZ
SECTOR N°1
EJE 9Ha EJE 10Ha EJE 11Ha EJE 12Ha EJE 13Ha
METRADO METRADO METRADO METRADO METRADO

42.57 X 42.57 X 42.57 X 42.57 x 42.57 12 100%


15 X 14 X 15 X 15 X 12 12 100%
692.63 X 692.63 X 692.63 X 692.63 x 8 67%
X 3.18 X 2.88 X 2.88 x 7 58%
18 X 19 X 17 X 17 6 50%
430.68 X 430.68 X 430.68 X 430.68 x 7 58%
X X X x 5 42%
3 X 3 X 3 X 3 4 33%

SECTOR N°4
EJE 9Hb EJE 10Hb EJE 11Hb EJE 12Hb EJE 13H
METRADO METRADO METRADO METRADO METRADO

X X X X 12 100%
X X 24 X 20 X 17 11 92%
X X 509.43 X 509.43 X 509.43 11 92%
x X x X 11 92%
X x X 19 9 75%
X X 430.68 x X 430.68 11 92%
X X X 6 50%
X X X 3 5 42%
TOTAL % AVANCE
24 100.0%
23 95.8%
19 79.2%
18 75.0%
15 62.5%
18 75.0%
11 45.8%
9 37.5%